DOE-STD-3026-99, Filter Test Facility Quality Program Plan
Functional areas: HEPA, Filter Testing, Facility Quality Program
This standard was developed primarily for application in U.S. Department of Energy programs. It contains specific direction for HEPA filter testing performed at a DOE-accepted HEPA Filter Test Facility (FTF). Canceled by DOE-STD-3025-2007.
Unknown Block text
Canceled By:
Version history and related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
TS
NOT MEASUREMENT
SENSITIVE
DOE-STD-3026-99
February 1999
Superseding
DOE NE F 3-44
July 1986
DOE STANDARD
FILTER TEST FACILITY QUALITY
PROGRAM PLAN
U.S. Department of Energy FSC 4460
Washington, D.C. 20585
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
This document has been reproduced from the best available copy.
Available to DOE and DOE contractors from ES&H Technical Information
Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823.
Available to the public from the U.S. Department of Commerce, Technology
Administration, National Technical Information Service, Springfield, VA 22161;
(703) 605-6000.
DOE-STD-3026-99
iii
FOREWORD
This Department of Energy standard supercedes DOE NE F 3-44 and is approved for use by all DOE
components and their contractors.
This standard was developed primarily for application in U.S. Department of Energy programs. It contains
specific direction for HEPA filter testing performed at a DOE-accepted HEPA Filter Test Facility (FTF).
Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this
document should be sent to the Office of Nuclear Safety Policy and Standards (EH-31), U.S. Department
of Energy, Washington, D.C. 20585, by letter or by using the self-addressed Document Improvement
Proposal form (DOE F 1300.3) appearing at the end of this document.
DOE technical standards, such as this standard, do not establish requirements. However, all or part of the
provisions in a DOE standard can become requirements under the following circumstances:
(1) they are explicitly stated to be requirements in a DOE requirements document; or,
(2) the organization makes a commitment to meet a standard in a contract or in an implementation plan
or program plan required by a DOE requirements document.
Throughout this standard, the word "shall" is used to denote actions that must be performed if the
objectives of this standard are to be met. If the provisions in this standard are made requirements through
one of the two ways discussed above, then the "shall" statements would become requirements. It is not
appropriate to consider that "should" statements would automatically be converted to "shall" statements as
this action would violate the consensus process used to approve this standard.
NOTICE
The "Preparing Activity" wishes to establish continuity between this standard (DOE-STD-3026-99) and its
direct predecessor, entitled "DOE Filter Test Facilities Quality Program Plan (NE F 3-44)." The original
standard was first issued by DOE as a Nuclear Energy (NE) standard on June 1984.
DOE-STD-3026-99
iv
INTENTIONALLY BLANK
DOE-STD-3026-99
v
TABLE OF CONTENTS
TITLE PAGE
1. SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.2. Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2. APPLICABLE DOCUMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.1 Department of Energy (DOE) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.2 American National Standards Institute (ANSI) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Section 2
3. QUALITY PROGRAM PLAN PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.3 Implementation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4. REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4.1 General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
4.2 Control Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
4.3 Records Management and Document Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
5. CORRECTIVE ACTIONS AND CONTROL OF NON-CONFORMING ITEMS . . . . . . . . . . . 6
6. ASSESSMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
7. TRAINING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
DOE-STD-3026-99
vi
INTENTIONALLY BLANK
DOE-STD-3026-99
1
1. SCOPE
1.1 Introduction
DOE Order 5700.6C requires that all DOE contractor programs be conducted under
established quality assurance programs. Basic requirements for DOE quality assurance
activities appear in "Quality Assurance Program Requirements for Nuclear Facilities"
ANSI/ASME NQA-1 as specifically applied to DOE Filter Test Facilities (FTF) and their
operation.
1.2. Definitions
1.2.1 Acceptance Test. Inspection and testing of a nuclear grade filter to verify
certain characteristics or properties which determine acceptance or rejection of
that filter.
1.2.2 Airflow Resistance. An index of the energy required to maintain airflow
through a filter. Airflow resistance is measured in terms of the air pressure
difference (pressure drop) across a filter at a specified flow rate (e.g. see section
5.2.2, Table-1, Standard DOE-STD-3020-97).
Note: The initial airflow resistance of a new filter serves as an index of the
filter’s potential loading capacity.
1.2.3. Filter Test Facility (FTF). A facility accepted by the DOE specifically to
conduct quality assurance inspections and tests of HEPA filters.
1.2.4 High Efficiency Particulate Air (HEPA) Filter. A throwaway, extended-media,
dry type filter with a rigid casing enclosing the full depth of the pleats. Aerosol
collection efficiency of the filter shall be at least 99.97% for 0.3 micrometer
diameter particles. The maximum airflow resistance shall be as specified in
Section 5.2.2, Table 1 of DOE Standard 3020-97.
1.2.5 Penetration. The downstream test aerosol concentration, expressed as a
percentage of the upstream test aerosol concentration.
DOE-STD-3026-99
2
1.2.6 Preparing Activity. The DOE organization responsible for issue and
interpretation of this standard.
1.2.7 Quality Program Plan (QPP). The basic document which identifies actions
necessary to ensure that High Efficiency Particulate Air (HEPA) filter test and
inspection data are reliable, accurate, and reproducible.
1.2.8 Quality Control. Those checks and balances imposed on FTF procedures and
Section 3
operations which implement the QPP.
2. APPLICABLE DOCUMENTS
The following documents are a part of this standard to the extent specified herein. Unless
otherwise stated, the current issue date and revision number of a referenced document shall apply,
including addenda and/or amendments. In the event of a conflict between provisions of this
standard and provisions of the referenced documents, the text of this standard shall take
precedence. Appeals in this matter may be addressed to the DOE "Preparing Activity," which is
designated as the DOE entity responsible for issue and interpretation of this standard.
2.1 Department of Energy (DOE)
DOE Order 5700.6C - Quality Assurance
DOE-STD-3020-97 - Specification for HEPA Filters used by DOE Contractors
DOE-STD-3022-98 - DOE HEPA Filter Test Program
DOE-STD-3025-99 - Quality Assurance Inspection and Testing of HEPA Filters . . . .
(formerly DOE NE F 3-43)
2.2 American National Standards Institute (ANSI)
ANSI/ASME NQA-1 - Quality Assurance Program Requirements for Nuclear
Facilities
DOE-STD-3026-99
3
3. QUALITY PROGRAM PLAN PREPARATION
3.1 General
Each FTF shall be operated under a site-specific and documented Quality Program Plan
(QPP) that provides for assessing of all FTF operations. The QPP shall be written and
implemented in concert with applicable site quality programs, insofar as practicable,
including on-site assessment activities. Independent inspections or surveillance of FTF
activities, including provisions of this document, shall be conducted at appropriate
intervals by the FTF managers or designees. Independent assessments shall be conducted
periodically using on-site QA programs as deemed necessary. Findings and
recommendations resulting from these activities shall be documented and satisfactorily
resolved as determined by the assessor. Records of findings, recommendations, and
corrective action shall be prepared and maintained.
3.2 Preparation
Each FTF shall prepare a written QPP that provides for assessing of all FTF operations.
The QPP shall identify and apply to activities affecting inspection and testing of HEPA
filters at each FTF. Measures presented in the following sections of this document shall be
applied as necessary.
3.3 Implementation
Preparation, implementation, and maintenance of the QPP is the responsibility of the FTF
manager, including provisions for purchase of suitable equipment and training of person-
nel.
4. REQUIREMENTS
4.1 General
This Quality Program Plan was prepared by reviewing the 18 elements of ANSI/ASME
NQA-1 and selecting those elements which were directly applicable to a Quality Plan for
Filter Test Facilities; therefore, this Plan is traceable to
DOE-STD-3026-99
4
NQA-1. The following items shall be addressed in the QPP. If certain items are
determined to be not applicable, the QPP shall contain a short statement explaining and
justifying each determination.
4.2 Control Measures
4.2.1 Design Control. Design activities associated with FTF operations shall be
defined, verified, controlled, and documented. Design activities include design
or modification of facilities, facility systems, test equipment, and support
equipment. The use of appropriate engineering methods is required and shall be
documented. The technical rationale or “basis for design” that supports planned
design activities shall also be documented. (Examples of applicable systems or
Section 4
equipment include the High Flow Alternative Test System [HFATS], exhaust air
handling systems with air cleaning capabilities, penetrometers, and associated
hardware, such as chucks or calibration devices.)
4.2.2 Control of Purchased Items and Services. Procurement of those items and
services important to testing activities shall be controlled to the extent necessary
to assure quality of items or services purchased. The following are considered
important procurement activities and services: source evaluation, vendor
inspection, tests or certifications, and receipt inspection. Examples of
applicable items that require procurement services are: test equipment, laser
spectrometers, diluter boards, and calibration services. Post-receipt activities
such as monitoring performance as an indicator of procured equipment/service
quality.
4.2.3 Identification of Items. Items requiring identification and control shall be
specified in the QPP. Identification requirements can be met either by marking
items or maintaining documents traceable to these items. (Examples of
applicable items are rejected filters and "as built" or "as modified" drawings.)
4.2.4 Control of Measuring and Test Equipment. Measuring and test equipment,
including manometers, gages, meters, and other measuring devices, shall be
controlled and calibrated within specified time periods to maintain the required
DOE-STD-3026-99
5
accuracy of HEPA filter test systems. Calibration of measuring devices critical
for completion of HEPA filter performance tests shall be performed prior to
initial use, following repairs/alterations, and periodically, as specified in the
QPP.
Sources of calibration devices or services shall be specified in the QPP.
Depending on the importance to the testing system, calibration sources or
standards must be traceable to the National Institutes of Standards Technology
(NIST) or other recognized industrial standards, including on-site standards.
Records of calibration shall be prepared and maintained as required in
accordance with site procedures.
4.2.5 Inspection and Testing Activities. Inspections and tests of HEPA filters shall be
conducted only in accordance with approved FTF procedures. Monitoring and
documentation of FTF inspection and testing activities shall be accomplished in
accordance with Sections 10 and 11 of DOE-STD-3020-97. The results of
inspection and test activities shall be identified, either on the tested items
themselves (filters), or in documents directly traceable to the items. The QPP
shall provide assurance that HEPA filters that have failed to pass inspections are
segregated and cannot be installed in operating air handling systems. The QPP
shall provide assurance that critical test components that have failed calibration,
or are out of calibration, shall not be used for testing, pending completion of
corrective action. Disposition instructions for non-complying items shall be
provided in the QPP.
4.3 Records Management and Document Control
4.3.1 Records Management. Specifications for records transmittal, distribution, and
retention shall be established in the QPP. Records shall be legible, readily
identifiable and retrievable. They shall be protected against damage,
deterioration or loss and shall be available for assessment at any time. Retention
periods for stored records shall be compatible with on-site records storage
DOE-STD-3026-99
6
Section 5
retention periods, but in no case shall records of HEPA filter test activities and
results be stored for less than three years from time of test.
4.3.2 Document Control. Preparation, issuance, and change of documents relating to
HEPA filter test activities shall be controlled to ensure the documents are
correct, current, properly reviewed, and approved. Documents and changes
thereto shall be reviewed for adequacy and approved at appropriate management
levels.
4.3.3 Procurement Documents. Documents related to the purchase of critical items,
including records of inspection visits to vendors, item acceptance, and
assessment of vendor quality programs (if applicable) shall be maintained by the
FTF and shall be made available to authorized persons on request.
4.3.4 Instructions, Procedures, and Drawings. Activities performed at the FTF shall
be as specified by approved written procedures covering, as a minimum, topics
addressed in this standard. Operating procedures and records to show compli-
ance with their requirements shall be retained at the FTF. Reports and/or
records to customers, as specified by DOE, shall be prepared and retained at the
FTF. "As built" drawings of facilities, equipment, etc., shall be kept current and
retained at the FTF.
4.3.5 Certification Records. Records that furnish documentary evidence of FTF
certification shall be specified, prepared, and maintained.
5. CORRECTIVE ACTIONS AND CONTROL OF NON-CONFORMING ITEMS
Test equipment, items, or activities identified as in non-compliance with specifications of the
overall HEPA Filter Test Program, as defined in this document and related procedures, shall be
corrected in a timely manner. Provisions for corrective actions, including written procedures and
documentation of corrective actions, shall be included in the QPP. Documentation of non-
conformance shall include a discussion of cause, identification of corrective action techniques, and
a conclusion that corrective actions have been adequately completed.
DOE-STD-3026-99
7
HEPA filters which have failed applicable tests shall be clearly identified as non-conforming items
and stored separately from filters which have been tested and found acceptable, or from filters
which are awaiting testing. Disposition of non-conforming filters shall be completed according to
provisions of the QPP.
6. ASSESSMENTS
FTF management staff shall conduct periodic self-assessments of filter testing activities. QA
specialists not normally associated with day-to-day filter test activities shall perform periodic
assessments of the FTF test program and provide results to FTF management and to the DOE.
DOE, or a DOE-appointed representative, may perform assessments of FTF activities at DOE's
discretion. Assessors shall be qualified by training and experience to perform the assessments.
Records of all assessment or inspection activities, including identification and correction of non-
conformance issues, shall be retained on site according to local records retention requirements.
7. TRAINING
Personnel qualifications shall be established and all FTF personnel shall be adequately trained to
perform assigned tasks. A formal training program for various levels of FTF personnel shall be
established. The training program(s) shall be described in site procedures, and records shall be
maintained to indicate satisfactory trainee performance. FTF personnel shall not be allowed to test
Section 6
filters for penetration and resistance without supervision until they have completed their
designated training. Records of training participation and performance shall be prepared and
properly maintained. Levels and intensity of training shall be equivalent to that received by Non-
Destructive Test (NDT) personnel.
DOE-STD-3026-99
8
INTENTIONALLY BLANK
DOE-STD-3026-99
CONCLUDING MATERIAL
Review Activity: Preparing Activity:
DOE Field Offices DOE-DP-45
DP-21/23/25/31/33 AL
EH-11/30/63 CH Project Number:
EM-23 ID
NE-44 NV 4460-0006
ER-8.1 OR
SR
RF
National Laboratories
INEL
Area Offices
Amarillo Area Office
Kirtland Area Office
COVER
FOREWORD
NOTICE
TABLE OF CONTENTS
1. SCOPE
1.1 Introduction
1.2. Definitions
2. APPLICABLE DOCUMENTS
2.1 Department of Energy (DOE)
2.2 American National Standards Institute (ANSI)
3. QUALITY PROGRAM PLAN PREPARATION
3.1 General
3.2 Preparation
3.3 Implementation
4. REQUIREMENTS
4.1 General
4.2 Control Measures
4.3 Records Management and Document Control
5. CORRECTIVE ACTIONS AND CONTROL OF NON-CONFORMING ITEMS
6. ASSESSMENTS
7. TRAINING