DOE-STD-3025-2022, Quality Assurance Inspection and Performance Testing of High Efficiency Particulate Air (HEPA) and Ultra Low Penetrating Air (ULPA) Filters
Functional areas: Quality Assurance, HEPA Filter, ULPA Filter, Performance Testing
This standard establishes essential elements of a DOE program for quality assurance inspection and performance testing of High Efficiency Particulate Air (HEPA) filters to be installed in DOE Nuclear facilities that fall within the scope of DOE-STD-3020, Specification for HEPA Filters Used by DOE Contractors. Supersedes DOE-STD-3025-2007.
Version history and related documents
Supersedes
Earlier documents this one replaced.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.
DOE-STD-3025-2022
Supersedes
DOE-STD-3025-2007
DOE TECHNICAL STANDARD
QUALITY ASSURANCE INSPECTION AND
PERFORMANCE TESTING OF HIGH
EFFICIENCY PARTICULATE AIR AND ULTRA
LOW PENETRATING AIR FILTERS
U.S. Department of Energy
Washington, D.C. 20585
DOE-STD-3025-2022
Available to the public on the Department of Energy
Technical Standards Program Web site at:
https://www.standards.doe.gov
https://www.standards.doe.gov/
https://www.standards.doe.gov/
https://www.standards.doe.gov/
DOE-STD-3025-2022
i
FOREWORD
The United States Department of Energy (DOE) performs quality assurance inspections and performance
testing of High Efficiency Particulate Air (HEPA) filters and Ultra Low Penetrating Air (ULPA) filters.
This DOE Standard is approved for use by DOE and its contractors for inspection and performance
testing of HEPA and ULPA filters.
This Standard was developed for application in DOE and National Nuclear Security Administration
(NNSA) programs. This Standard was developed in the format required by the DOE Technical Standard
Program May 2015 Style Guidance. This Standard incorporates the filter independent testing
requirements described in the Secretary of Energy’s June 4, 2001, letter to the Chairman of the Defense
Nuclear Facilities Safety Board (DNFSB).
A working group comprised of subject matter experts drawn from DOE, contractors, and industry was
used to prepare the Standard. This revision incorporates appropriate recommendations from affected
DOE and NNSA programs, including manufacturers, purchasers, users, and technical experts.
This 2022 version of the Standard includes information for the testing of ULPA filters. In addition, filters
that have passed performance testing, but have incorrect manufacturer labeling may be forwarded to the
Sites to be dispositioned in coordination with the manufacturer unless stated otherwise in the purchase
order.
Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve
this document should be emailed to nuclearsafety@hq.doe.gov or sent to:
Office of Nuclear Safety (AU-30)
Office of Environment, Health Safety and Security
U.S. Department of Energy
1000 Independence Avenue, SW
Washington, D.C. 20585
DOE technical standards, such as this Standard, typically do not establish requirements but can provide
guidance or direction. However, all or part of the provisions in a DOE standard can become requirements
under the following circumstances:
(1) The standard is explicitly required in a regulation, invoked in a DOE directive, or included in a
contract; or
DOE-STD-3025-2022
ii
(2) The organization makes a commitment to meet this standard by contract or in an implementation
plan or program plan
Where this Standard is required to be met for one of the reasons above, the “shall” statements in this
Standard are considered as requirements for the facilities and activities. The “should” statements in this
Standard are considered recommendations and are not required.
DOE-STD-3025-2022
iii
Table of Contents
ACRONYNMS ............................................................................................................................................ v
1.0 SCOPE ............................................................................................................................................ 1
Section 2
2.0 PURPOSE ....................................................................................................................................... 1
3.0 APPLICABILITY .......................................................................................................................... 1
4.0 GENERAL REQUIREMENTS .................................................................................................... 1
4.1. Qualification of Filters to be Installed in Nuclear Facilities ......................................... 2
4.2. Quality Assurance Inspection and Performance Testing of Filters at a DOE-
approved FTF .................................................................................................................... 2
HEPA Filter General Performance Testing Requirements .................................... 3
ULPA Filter General Performance Testing Requirements .................................... 3
5.0 FILTER TEST FACILITY PROCEDURES .............................................................................. 4
5.1. Receipt of Filters Processes .............................................................................................. 4
FTF Receipt Inspection .......................................................................................... 4
Initial Handling and Storage .................................................................................. 5
Pre-Test Filter Inspection ....................................................................................... 5
5.2. Penetration and Resistance Testing Considerations ...................................................... 6
Testing Requirements and Test Methods ............................................................... 6
Approved Test Aerosols ........................................................................................ 7
5.3. Inspection and Test Reports and Labeling Requirements ............................................ 7
FTF Inspection and Test Reports for HEPA and ULPA Filters ............................ 7
FTF Labeling ......................................................................................................... 9
5.4. FTF Personnel Expectations .......................................................................................... 10
Personnel Qualification ........................................................................................ 10
Training ................................................................................................................ 12
Documentation ..................................................................................................... 13
5.5. Reporting Requirements ................................................................................................ 13
Test Data Summary ............................................................................................. 13
Report Format ...................................................................................................... 14
Status Report ........................................................................................................ 14
5.6. Contacts with Filter Manufacturers .............................................................................. 14
5.7. Waiver and Filter Media Repair ................................................................................... 14
5.8. Equipment Maintenance and Calibration .................................................................... 15
Section 3
5.9. Document Control and Records Management ............................................................. 15
DOE-STD-3025-2022
iv
6.0 REFERENCES ............................................................................................................................. 15
6.1. Federal Regulations, Department of Energy Standards and Publications ................ 15
6.2. Other Standards .............................................................................................................. 16
6.3. Other References ............................................................................................................. 16
APPENDIX A. HEPA AND ULPA FILTER TEST REPORT ..................................................... A-1
APPENDIX B. LABEL EXAMPLES ............................................................................................. B-1
APPENDIX C. SEMIANNUAL REPORT FORMAT .................................................................. C-1
APPENDIX D. MONTHLY STATUS REPORT FORMAT ........................................................ D-3
DOE-STD-3025-2022
v
ACRONYNMS
ACFM Actual Cubic Feet per Minute
ASHRAE American Society of Heating, Refrigeration and Air Conditioning Engineers
ASME American Society of Mechanical Engineers
AU-30 Office of Nuclear Safety
DNFSB Defense Nuclear Facilities Safety Board
DOE Department of Energy
DOP Di-octyl Phthalate
DOS Di-octyl Sebacate
FTF Filter Test Facility
HEPA High Efficiency Particulate Air
IEST Institute of Environmental Sciences and Technology
In wg Inches water gauge
MPPS Most Penetrating Particle Size
NIST National Institute of Standards and Technology
NNSA National Nuclear Security Administration
Pa Pascal
PAO Poly-alpha Olefin
PSL Polystyrene Latex
SCFM Standard Cubic Feet per Minute
ULPA Ultra Low Penetrating Air
DOE-STD-3025-2022
vi
Intentionally Blank
DOE-STD-3025-2022
1
1.0 SCOPE
This Standard establishes essential elements or characteristics of a U.S. Department of Energy (DOE)
program for independent inspection and performance testing of High Efficiency Particulate Air (HEPA)
and Ultra Low Penetrating Air (ULPA) filters to be installed in radiological or nuclear facilities as
required by the Secretary of Energy’s June 4, 2001, letter to the Chairman of the Defense Nuclear
Facilities Safety Board (DNFSB), 100 Percent Quality Assurance (QA) Testing of HEPA Filters at the
Filter Test Facility (FTF).
2.0 PURPOSE
The purpose of this Standard is to establish the requirements for performing independent quality
assurance inspection and performance testing for HEPA and ULPA filters at a DOE approved filter test
facility (FTF) prior to HEPA and ULPA filter acceptance or installation by the site.
3.0 APPLICABILITY
This Standard applies to the DOE FTF, which performs the quality assurance inspection and testing
described in this Standard. The typical filter received at the FTF consists of a glass fiber medium.
However, there are many classes of HEPA filters using other medium, such as high-strength, metal, and
ceramic, which are currently under various stages of testing, development and review by the American
Society of Mechanical Engineers (ASME) Committee on Nuclear Air and Gas Treatment or the American
Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE). These classes of filters
will be considered for testing at the FTF if the qualification requirements of ASME AG-1, Code on
Section 4
Nuclear Air and Gas Treatment have been met or the filters have been successfully analyzed for use in an
approved site safety analysis.
4.0 GENERAL REQUIREMENTS
The FTF shall maintain and implement a DOE-approved Quality Assurance Program, which is qualified
by the DOE in accordance with the contract.
The FTF shall independently inspect and test HEPA and ULPA filters in accordance with Section 5.0 of
this Standard, the purchaser’s written specifications, procurement documents, and any special written
instructions from the purchaser.
DOE-STD-3025-2022
2
4.1. Qualification of Filters to be Installed in Nuclear Facilities
The FTF shall not test any HEPA filter model unless the filter is qualified prior to purchase in
accordance with DOE Standard, DOE-STD-3020, Specification for HEPA Filters Used by DOE
Contractors.
Legacy filters, such as certain encapsulated filters, that are described in DOE-STD-3020 are
required to be tested at the FTF but are exempt from qualification requirements. Prototype filters
are required to be tested at the FTF, but can be exempt from qualification by an approved site
safety analysis.
ULPA filters shall be able to meet the requirements of Institute of Environmental Sciences and
Technology, IEST-RP-CC007, Testing of Ultralow Penetration (ULPA) Filters, and IEST-RP-
CC001, HEPA and ULPA Filters.
Qualification requirements for ULPA filter models prior to purchase will be specified in the next
revision of DOE-STD-3020.
4.2. Quality Assurance Inspection and Performance Testing of Filters at a DOE-
approved FTF
Prior to installation in a DOE nuclear facility, HEPA filters are independently inspected and
tested at the FTF in accordance with DOE-STD-3020. Filters rated below 20 actual cubic feet per
minute (ACFM) airflow that are ULPA filters will be tested at the FTF in accordance with
Institute of Environmental Sciences and Technology publications IEST-RP-CC001 and IEST-RP-
CC007.
Unless otherwise instructed by site purchase order, FTF inspections and tests shall include:
• Visual inspection for compliance with purchase order (e.g., type, size, quantity received, and
shipping damage).
• Visual inspection for manufacturing defects and compliance with construction and materials
requirements as shown in DOE-STD-3020 for HEPA filters or purchaser specifications.
• Penetration testing at 100% rated airflow for all filters.
• Penetration testing at 20% for filters with rated airflow of 125 ACFM (212 m3/hr) and
higher.
DOE-STD-3025-2022
3
• Airflow resistance testing at 100% of rated airflow.
The FTF will notify the site, the Office of Nuclear Safety (AU-30), and the manufacturer within
five working days of any filter that fails testing. The test report of the filter that failed testing will
be provided with the notification.
HEPA Filter General Performance Testing Requirements
HEPA filter maximum penetration allowed is 0.03% at an aerosol particle diameter of 0.3
micrometers. If a penetration greater than 0.03% is measured, the filter shall be rejected, and
purchaser notified in writing with the test results that indicate the filter does not meet the
penetration requirements.
The resistance shall be reported to the nearest 0.1 inches water gauge (in wg) or 25 Pascal (Pa).
Maximum airflow resistance for HEPA filters is shown in DOE-STD-3020 or as otherwise noted
in ASME AG-1 at rated airflow. DOE-STD-3020 contains the following tables related to
maximum airflow resistance at rated airflow:
Section 5
• Table 5-1. Nominal Sizes and Ratings for FC HEPA Filters;
• Table 5-3. FK Type 1 Radial Flow HEPA Filters - Nominal Rating; and
• Table 5-4. FK Type 2 Axial Flow Circular HEPA Filters - Nominal Rating.
ULPA Filter General Performance Testing Requirements
ULPA filters rated below 20 ACFM that are to be used as a safety component in DOE nuclear
facilities shall be inspected and tested per the purchase order or the latest versions of IEST
Standards. If no testing requirements are identified in the purchase order for filters rated below
20 ACFM, the FTF will request that the purchaser provide the test procedures, or the filter will
not be tested until a test procedure is specified. The purchaser should ensure that the factory
conducts testing with the most penetrating particle size (MPPS). The purchaser should provide
the allowable penetration to the FTF as it can vary depending on the ULPA filter model
purchased. Allowable penetration specified should be no more than 0.0010% at the rated flow.
Particle size for test aerosols for ULPA filters should be specified in the purchase order. The
default MPPS for ULPA filters is a 0.1 micrometer diameter.
DOE-STD-3025-2022
4
5.0 FILTER TEST FACILITY PROCEDURES
All FTF operations shall be conducted in accordance with written procedures that conform to this
Standard and its DOE-approved quality assurance program. All FTF procedures shall contain
specific acceptance criteria. The FTF procedures shall also cover the following functions:
• Receipt inspection.
• Un-boxing, handling, re-boxing, and storage of filters.
• Inspection for defects, damage, and compliance with purchase order specifications.
• Performance of physical measurements as necessary to determine if dimensional
requirements, squareness requirements, and pleat curvature requirements are met.
• Verifying that the arrow label is attached in the correct air flow direction.
• Documentation and records keeping as specified in the FTF contract.
• Operations and calibration procedures for each penetration and resistance test device.
• Test and inspection reports, including disposition, retention to be available as records to DOE
upon request.
• Labeling of accepted and rejected filters.
• Segregation and disposition of rejected filters.
• Shipping of accepted or rejected filters.
• Preparation of status reports.
• Preparation of monthly and semiannual reports to DOE.
• Training and qualification of personnel.
5.1. Receipt of Filters Processes
FTF Receipt Inspection
Any filter shipment received without a previously transmitted purchase order shall not be
processed for testing until the appropriate purchase order is received. All filter packages, crates,
and pallets accepted shall be inspected upon receipt at the FTF. Any damage must be noted on
the Bill of Lading before signing. The FTF has the option of declining receipt of any packages
with excessive damage. Upon acceptance, damaged cartons, and cartons improperly oriented
DOE-STD-3025-2022
5
shall be opened immediately and the filters inspected. A description of any observed damage
shall be recorded on the filter inspection and test report. The state of the shipping container needs
to be verified that it is in compliance with the applicable sections of DOE-STD-3020, followed by
further verification that there are no fasteners (e.g., nails, screws, etc.) protruding into the
container that could potentially damage filters or place workers at risk of injury while handling
Section 6
filter packages.
Initial Handling and Storage
Filter handlers shall be properly trained to handle filter cartons correctly. Cartons shall be
oriented with arrows on the filter cartons pointed "up". Filter cartons shall be stacked not more
than three (3) high, and pallets shall not be stacked on top of one another, or other material
stacked on top of filter pallets. Filters shall be stored in a clean, dry location. Storage facilities
for filters shall be equipped with temperature controls to meet storage requirements specified in
DOE-STD-3020.
Pre-Test Filter Inspection
Prior to testing, each filter shall be visually examined for possible damage, compliance with
applicable sections of DOE-STD-3020 or purchaser’s specifications, and workmanship. Damage
to filters noted during the pre-test inspection shall be recorded on the filter inspection and test
report shown in Appendix A, Part 1, HEPA and ULPA Filter Test Report, and Part 2, Visual
Inspection Checklist. Damaged filters shall not be tested but shall be immediately reported to the
purchaser for disposition. An exception to this requirement is when the only defect is related to
labeling on the filter or packaging.
The inspection shall include verification of general workmanship, filter type, size, gasket
installation and material, separators, frame dimension and material, squareness of rectangular
filters, parallelism of media face, face guards (or galvanized mesh), and required labels or
markings. Filters inspected with only labeling or marking deficiencies shall be tested and
forwarded to the purchaser with an added label identifying the deficiency.
Squareness of filters is determined by using the requirements of Section FC in ASME AG-1.
Filters shall be inspected for looseness of filter packs, excessive slump or distortion, loose
gaskets, breaks or tears, or patching of the filter media.
DOE-STD-3025-2022
6
Manufacturer’s labels shall be legible and contain information as specified in ASME AG-1 as
well as test data, manufacturer’s test date, and medium area. In addition, the FTF shall verify that
any existing air flow label is pointing in the correct direction.
5.2. Penetration and Resistance Testing Considerations
Testing Requirements and Test Methods
Following visual inspection, each filter, completely encased in the test apparatus, shall be tested
for penetration at 100% of the rated airflow, and filters rated at 125 ACFM (212 m3/hr) or greater
shall also be tested at 20% of rated airflow. For encapsulated filters, a special housing may be
required to ensure the filter is encased within the test apparatus. Each filter, except encapsulated
filters, shall be tested for resistance to airflow at 100% of the rated airflow. Test air flow rates
shall be measured in ACFM. If approved in writing by the DOE, conversion to standard cubic
feet per minute (SCFM) is not required. Test conditions are required to be shown on all test
reports. The filter test apparatus shall be equipped with "chucks", which encase the HEPA filter
in the test position. Encapsulated filters shall not be routinely tested for resistance to airflow.
Operating, calibration, and test procedures shall be prepared for each test device and shall
include, as a minimum, the following elements:
• Filling of the generator reservoir and verification of fluid level.
• Daily verification of airflow rates using National Institute of Standards and Technology
Section 7
(NIST) traceable orifice plates. Flow rates shall be adjusted such that the inclined manometer
reading is within +/- 0.02 in. wg of the orifice plate calibration value.
• Adjustment and verification of critical airflows (and temperatures for thermal test method
only).
• Calibration of filter test equipment, which determine particle size, penetration, and resistance.
• Calibration of instruments, which are used to calibrate the filter test equipment.
• Equipment maintenance and calibration schedules.
• Design and use of adapters to permit tests of non-standard filters or special test procedures.
• Operation, service, and maintenance of test equipment, including the system exhaust air
cleaning device.
DOE-STD-3025-2022
7
For penetration and resistance testing, the following types of Penetrometer Systems are
authorized that use approved test aerosols.
• As to be determined by the most recent contract use the Q-107 or preferred laser method for
testing filters with rated airflows greater than or equal to 250 ACFM (425 m3/hr).
• As to be determined by the most recent contract use the Q-76 or preferred laser method for
testing filters with rated airflows less than 250 ACFM (425 m3/hr).
DOE shall be notified in writing of any proposed modification to the FTF equipment or testing
protocols. Modifications shall be approved in advance by DOE.
Approved Test Aerosols
Test aerosol materials currently approved by DOE for HEPA and ULPA filter penetration testing
are di-octyl phthalate (DOP), also known as DEHP, di-octyl sebacate (DOS), also known as
DEHS, and poly-alpha olefin (PAO). Polystyrene latex (PSL) spheres with 0.3 micrometer
diameter may also be used but only when testing filters made with glass fiber media in
accordance with IEST-RP-CC007. Other aerosol materials may be approved for use by DOE
after evaluation by the Office of Nuclear Safety. The DOP and DOS aerosols may be generated
by a thermal aerosol generator to produce 0.3 micrometer aerosols. Alternatively, a Laskin
nozzle can be used to generate and heterodisperse DOP and DOS aerosols and a laser particle
counter can be used to measure the amount of maximum penetrating particle sized aerosols for
testing filters. Particle size for testing HEPA filters is specified at 0.3 micrometers. Particle size
for test aerosols for ULPA filters should be specified in the purchase order as the required particle
size can vary based on the ULPA filter purchased. The default MPPS for ULPA filters is a 0.1
micrometer diameter.
5.3. Inspection and Test Reports and Labeling Requirements
FTF Inspection and Test Reports for HEPA and ULPA Filters
Upon completion of quality assurance inspections and performance tests, the FTF shall provide a
written report of test data to the purchaser in accordance with Appendix A.
Additional information regarding the serial number and calibration due date of all measuring and
test equipment should also be provided upon request. Reasons for rejection of any filters shall be
included in the report and the rejected filters shall be specifically identified. The FTF shall
DOE-STD-3025-2022
8
provide the purchaser with a written test report, however, the site is responsible for tracking any
rejected nonconforming items in accordance with its Quality Assurance program.
The test report form shall include, as a minimum:
• Identification of the FTF;
• Name of customer;
• Purchaser order number;
• Date shipped;
Section 8
• Date of shipment received;
• Date of inspection and test;
• Purchaser’s specification or standard (if applicable);
• Filter manufacturer;
• Filter description (model or designation number);
• Rated flow (SCFM);
• Test conditions:
o Test air temperature;
o Test air humidity;
o Barometric pressure; and
o Test flow (ACFM).
• Signature and printed name of testing technician or electronic signature;
• Signature and printed name of qualified individual approving the report or electronic
signature;
• Serial number of each filter tested;
• Resistance (in. wg or Pa) across filter pack at rated airflow;
• Penetration test at 100% rated airflow for all filters;
• Penetration test at 20% for filters with rated airflow of 125 ACFM (212 m3/hr) and higher;
• Number ordered;
• Number received;
DOE-STD-3025-2022
9
• Number accepted;
• Initials of individual(s) reviewing the purchase order for the required testing information for
the filter shipment received;
• Initials of testing technician for each individual filter;
• If applicable, indicate the cause for rejection:
o P = Penetration;
o R = Resistance;
o D = Damage; and
o O = Other: as described in Part 2 of Appendix A.
FTF Labeling
5.3.2.1. Accepted Filters
Each accepted filter shall be identified with a properly secured FTF "Accepted" label (green). An
"Accepted" label design is shown in Appendix B. The “Accepted” label shall include the
following:
• Identification of the FTF;
• Filter serial number;
• Resistance at rated airflow;
• Penetration test at 100% rated airflow for all filters;
• Penetration test at 20% for filters with rated airflow of 125 ACFM (212 m3/hr) and higher;
and
• Date tested.
5.3.2.2. Rejected Filters
Each rejected filter shall be identified with a properly secured FTF "Rejected" label (red/orange).
This label can be a single-or double-sided label and shall be attached to the filter. The "Rejected"
label design is shown in Appendix B. Rejected filters are then segregated and reported to the
purchaser prior to disposition. The following information is included on the rejection label:
• Indication of rejection;
DOE-STD-3025-2022
10
• Identification of the inspector and date;
• Purchase order number and purchaser;
• Filter serial number;
• Findings (including rejection codes);
• Where applicable (i.e., when tested):
o percent penetration;
o resistance in in. wg; and
o flow at 100% and 20%.
5.3.2.3. Accepted Filters with Incorrect Manufacturer Labeling
Each accepted filter that passed performance testing but has incorrect labeling attached by the
manufacturer that does not meet the requirements of DOE-STD-3020 shall be identified with a
properly secured FTF "Accepted Caution" label (yellow). See the "Accepted Caution" label
design in Appendix B.
5.4. FTF Personnel Expectations
All personnel who inspect, test, directly supervise, or interpret the results of inspections and tests
of HEPA and ULPA filters at the FTF shall be qualified in accordance with Section 5.4.1 of this
Standard. All personnel who handle filters, including shipping, receiving, and materials-handling
personnel, shall be trained in the requirements for proper handling, stacking, and storage of
filters.
Personnel Qualification
The FTF shall ensure that personnel selected to conduct, supervise, or interpret the results of FTF
inspections and tests are qualified by experience, formal training, or instruction, and are
Section 9
physically capable of carrying out the functions for which they are responsible. Personnel
qualification shall be documented, retained, and stored at FTF for inspection by DOE.
Personnel assigned to handle the filters shall be instructed in the proper procedures and shown to
be qualified for conducting the following activities:
• Handling, stacking, storing, un-boxing, re-boxing, crating, and placing filters on pallets.
DOE-STD-3025-2022
11
• Operation of appropriate materials handling equipment, such as fork-lift industrial trucks,
hoists, or conveyers.
• Verifying compliance with inspection and testing requirements as determined by supervisor
review
• Inspection for shipping damage, correct orientation, and proper stacking at time of receipt.
• Preparation of filters for shipping, including the proper orientation, packaging, and proper
loading in transport vehicles.
Personnel responsible for the inspection and testing of filters, shall have formal training and
demonstrated performance verified by direct supervision. Those in supervision of inspection and
testing personnel shall have formal training and demonstrated comprehension. The personnel
responsible for the interpretation of inspection and test results shall have formal training and
demonstrated comprehension as verified by direct supervision in the following:
• All applicable provisions of this Standard.
• Differences in applicable specifications provided by the DOE sites for filters to be tested at
FTF.
• Materials, construction, and performance specifications of filters.
• Use and interpretation of filter specifications and purchase criteria, with particular attention to
ASME AG-1 Sections FC and FK and the Institute of Environmental Sciences and
Technology publication IEST-RP-CC007.
• Performance specifications and the calibration of test devices and other instruments used at
the FTF.
• Procedures for handling, inspection, testing, data recording, labeling, and disposition of
accepted and rejected filters.
• Proficiency in the operation, adjustment, and maintenance of the FTF instruments and
equipment.
• All applicable Quality Assurance requirements (e.g., DOE Order 414.1D, Quality Assurance,
and ASME NQA-1, Quality Assurance Requirements for Nuclear Facility Applications).
In addition to the items above, prior to being granted the authority to sign data forms and reports
attesting to the accuracy and completeness of the reported data or result, personnel shall have
demonstrated proficiency in the following:
DOE-STD-3025-2022
12
• Data evaluation and analysis, including validation of test results.
• Interpretation of applicable standards, specifications, and purchase-order requirements
relative to the acceptability of filters.
• Determination of the appropriate rejection status when compliance with all specified
requirements cannot be demonstrated.
• Preparation and issuance of appropriate documentation of inspection and test results.
• Identification of materials of construction and certifications, and compliance of filters to such
certifications.
5.4.1.1. Physical Qualifications
Personnel responsible for supervision of inspection and testing activities or for interpretation of
inspection and test results shall demonstrate appropriate physical qualifications necessary to
conduct those operations. They shall include the following:
• Visual acuity, including near vision, and depth perception.
• Physical capability for performing job related tasks.
Section 10
• Hearing acuity.
Training
Personnel responsible for HEPA filter inspection and testing supervision of inspection and testing
activities, or the interpretation of inspection and test results, shall satisfactorily complete a formal
training course. This course shall address the principles of HEPA filter testing. The course shall
be equivalent to the Harvard University School of Public Health In-Place Filter Testing
Workshop. New hires shall receive on-the-job training and instruction by qualified personnel.
Training should also be provided to verify an individual’s knowledge of IEST-RP-CC007 and
IEST-RP-C001. Personnel shall have familiarity with the development of MIL-STD-282, Filter
Units, Protective Clothing, Gas-Mask Components and Related Products: Performance Test
Methods and ASME AG-1. FTF management is responsible for establishing ongoing personnel
training maintenance programs and re-certification programs that assure personnel remain
qualified as described in Section 5.4.1 to carry-out required FTF activities.
DOE-STD-3025-2022
13
Documentation
Physical and technical qualifications of personnel responsible for inspection and testing,
supervision of inspection and testing activities, and interpretation of inspection and test results,
shall be documented. Documentation shall include written evidence of the dates and extent of
instruction along with any formal training, and documentation shall show approval by an assigned
supervisor. The supervisor’s signature will certify satisfactory demonstration of the individual's
ability to perform relevant job functions.
All FTF personnel training and health records, certifications, and qualifications shall be retained
and stored in water-and fire-resistant locked containers in accordance with its DOE-approved
quality assurance program. These records will be made available to DOE for inspection and
review to assure they meet DOE requirements.
Personnel training records shall be retained for the duration of the FTF contract and as specified
in Section 5.9. Recertification of skills is to be required at intervals defined in facility operating
procedures.
5.5. Reporting Requirements
The FTF shall prepare accurate monthly and semi-annual reports describing test activities for
those periods, including a tabulation of test data as described below. Copies shall be sent to DOE
as specified by the FTF contract. Further distribution of filter test data reports shall be at the
discretion of DOE.
Test Data Summary
For each monthly and semiannual report, a summary of filter test data during the report period
shall be presented in tabular format separated by rows of filter purchasers and so recorded. The
report shall provide the following data:
• Name of purchaser;
• Name of filter supplier;
• Purchase order number;
• Rated airflow ACFM;
• Number of filters received/inspected;
DOE-STD-3025-2022
14
• Number of filters tested;
• Number of filters accepted;
• Number of filters rejected; and
• Reason for rejected filters [as specified in Appendix C].
Report Format
The format of the monthly and semiannual reports shall be as specified in Appendix C. Narrative
information, including explanations of trends or problems observed during the report period, shall
also be provided. The monthly report can be modified based on the approval of DOE.
Status Report
A Status Report shall be prepared at a minimum on a monthly basis. The Status Report shall
Section 11
provide accurate information on the status of orders received and filters tested. The format of the
Status Report is shown in Appendix D.
5.6. Contacts with Filter Manufacturers
FTF contact with HEPA and ULPA filter manufacturers shall preclude the potential for conflicts
of interest. When questions arise regarding HEPA and ULPA filters being tested by the FTF,
contact between the FTF and filter manufacturers will normally be limited to the following unless
preapproved by the purchaser:
• Notices of shipping damage.
• Responses to manufacturer’s requests for information about filter receipt and test schedules.
• Queries by the FTF concerning manufacturer's instructions for disposition of rejected filters.
5.7. Waiver and Filter Media Repair
Filter testing shall be performed as specified in DOE-STD-3020 or as specified in the purchase
order. When authorized and agreed to in writing by the purchaser and the FTF manager, the FTF
may accept minor deviations from certain specification provisions, provided that the minor
deviations do not affect the basic performance of the filter. The purchaser shall maintain this
documented disposition in accordance with its Quality Assurance program. However, filters that
fail penetration or resistance tests shall not be accepted with any waiver, nor shall the FTF
attempt to repair damage to the filter media. It shall be the responsibility of the purchaser and
DOE-STD-3025-2022
15
manufacturer to determine disposition of those filters that do not pass either penetration or
resistance tests.
5.8. Equipment Maintenance and Calibration
In accordance with the DOE approved FTF quality assurance program, FTF equipment (e.g.,
pressure and temperature measurement instruments, orifice plates, mass-flow meters, and other
instruments critical to the performance of tests) shall be properly maintained and calibrated using
qualified personnel and NIST traceable standards in accordance with specified frequencies.
Calibration reports and certifications shall be maintained by the FTF and shall be available to
DOE upon request.
5.9. Document Control and Records Management
The FTF shall maintain controlled access to all stored records, data, and other technical
information generated in the performance of quality assurance inspection and performance testing
of filters. Documents shall be maintained in a safe and secure manner to prevent tampering and
water or fire damage. The FTF shall transfer to DOE all data and records at the conclusion of the
contract period in accordance with the contract provisions. These shall include, but are not
limited to, personnel qualification records, logs of filter tests, and instrument calibration records.
6.0 REFERENCES
The following References either form a part of this Standard to the extent specified herein, or
specify requirements for filter quality assurance inspection, or testing. Unless otherwise stated in
contract requirements, the current issue date and revision number of a referenced document at the
time of inspection or testing shall apply, including addenda and amendments. In the event of a
conflict between provisions of this Standard and provisions of the Reference Standards, the text
of this Standard shall take precedence.
6.1. Federal Regulations, Department of Energy Standards and Publications
DOE Order 414.1D, Quality Assurance
DOE-STD-3020, Specifications for HEPA Filters used by DOE Contractors
DOE-STD-3025-2022
16
Section 12
6.2. Other Standards
ASME AG-1- Version agreed to in contract, Code on Nuclear Air and Gas Treatment
ASME NQA-1- Version agreed to in contract, Quality Assurance Requirements for Nuclear
Facility Applications
IEST-RP-CC007, Testing of Ultralow Penetration (ULPA) Filters
IEST-RP-CC001, HEPA and ULPA Filters
MIL-STD-282, Filter Units, Protective Clothing, Gas-Mask Components and Related Products:
Performance Test Methods
6.3. Other References
The Secretary of Energy’s June 4, 2001, letter to the Chairman of the Defense Nuclear Facilities
Safety Board, 100 Percent Quality Assurance (QA) Testing of HEPA Filters at the Filter Test
Facility (FTF)
DOE-STD-3025-2022
A-1
APPENDIX A. HEPA AND ULPA FILTER TEST REPORT
PENETRATION AND RESISTANCE TEST RESULTS (Part 1)
Page of
CUSTOMER TEST CRITERIA NUMBER ORDERED DATE RECEIVED:
PENETRATION FOR HEPA
PURCHASE ORDER NUMBER NUMBER RECEIVED DATE TESTED
RESISTANCE
IN. WG. @ 100% RATED FLOW
FILTER MODEL NUMBER NUMBER ACCEPTED DATE SHIPPED
SPECIFICATION
MANUFACTURER
REJECTS TEST CONDITIONS
FILTER DESCRIPTION Test Air Temperature
°F
Test Flow (ACFM) PENETRATION RESISTANCE
P.O. Reviewed By: Rated Flow (SCFM) BAROMETRIC PRESS
mm Hg.
Test Air Humidity in %
RH
DAMAGE OTHER
ITEM
No.
FILER SERIAL
NUMBER
INSPECTION RESULTS TEST RESULTS FILTER
TESTED
BY:
RESISTANCE % PENETRATION
100% 20%
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
DISTRIBUTION TESTED BY:
APPROVED BY:
DOE-STD-3025-2022
A-2
VISUAL INSPECTION CHECK LIST (Part 2)
Customer: P.O. #: Date:
Specific Reference for Acceptance Criteria:
RECEIPT INSPECTION
Satisfactory Unsatisfactory N/A
Number of Filters Per Shipping Papers ☐ ☐ ☐
Filters Received Upright (pleats vertical) ☐ ☐ ☐
Cartons/Filters Undamaged ☐ ☐ ☐
Crates/Pallets Undamaged ☐ ☐ ☐
Characteristics As Specified In Purchase Order or Specifications:
Comments: Add information such as the serial numbers of filters not passing
inspection and those accepted with waiver. Satisfactory Unsatisfactory N/A
Number of Filters ☐ ☐ ☐
Frame Material ☐ ☐ ☐
Frame Construction ☐ ☐ ☐
Gaskets Type ☐ ☐ ☐
Location/Size ☐ ☐ ☐
Construction ☐ ☐ ☐
Capacity:
☐ ☐ ☐
UL-586 Label ☐ ☐ ☐
Faceguards ☐ ☐ ☐
Separators:
☐ ☐ ☐
Required Labels/Marking/Identification ☐ ☐ ☐
Exposed Edges of Metal Frame Sealed ☐ ☐ ☐
Frame Edges/Faces Free of Splinters/ Rough Edges ☐ ☐ ☐
Gaskets Secure and Undamaged ☐ ☐ ☐
Fluid Seal Gasket Undamaged ☐ ☐ ☐
No Damage to Filter Media ☐ ☐ ☐
Filter Dimensions ☐ ☐ ☐
Squareness of Frame ☐ ☐ ☐
Hidden Shipping Damage ☐ ☐ ☐
Filter Pack Tightness ☐ ☐ ☐
Filter Workmanship ☐ ☐ ☐
Other: ☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Inspected by: Approved by:
DOE-STD-3025-2022
B-1
APPENDIX B. LABEL EXAMPLES
Accepted Label (Green)
FILTER TEST FACILITY
Address
DOE Contract: _______________________
Filter Serial Number: __________________
FILTER TEST RESULTS
Resistance
(in wg)
% Penetration
at 100% Flow
% Penetration
at 20% Flow Date of Test
ACCEPTED
Accepted Caution Label (Yellow)
FILTER TEST FACILITY
Address
DOE Contract: _______________________
Filter Serial Number: __________________
FILTER TEST RESULTS
Resistance
(in wg)
% Penetration
at 100% Flow
% Penetration
at 20% Flow Date of Test
CAUTION: Incorrect Manufacturer’s
Labeling
DOE-STD-3025-2022
B-2
REJECTED
FILTER TEST FACILITY
Address
Inspector: Date:
FILTER TEST RESULTS
Resistance
(in wg)
% Penetration
at 100% Flow
% Penetration
at 20% Flow Date of Test
Section 13
∗ Rejection Codes
D – Damage P – Penetration
O – Other R – Resistance
DOE-STD-3025-2022
C-1
APPENDIX C. SEMIANNUAL REPORT FORMAT
This Appendix shows the report format and includes the required tabular data that will simplify extracting data for analysis. Other aspects of the
semiannual reports, including any narrative, shall also be provided.
Purchaser Supplier P O
Number
Rated
Flow
(cfm)
Number
Received/
Inspected
Number
Tested
Number
Accepted
Number
Rejected
Reasons for Rejection
Resistance Penetration Manufacturing
Defects
Does Not
Meet
PO and/or
Spec
Shipping
Damage
Reason for Rejects
Subtotal
Total
MONTHLY REPORT FORMAT
This Appendix shows the report format and includes the required tabular data that will simplify extracting data for analysis. Other aspects of the
monthly reports, including any narrative, shall also be provided.
DOE FILTER TEST FACILITY
MONTHLY REPORT
Month 20XX
Purchaser Supplier P O
Number
Rated
Flow
(cfm)
Number
Received/
Inspected
Number
Tested
Number
Accepted
Number
Rejected
Reasons for Rejection
Resistance Penetration Manufacturing
Defects
Does Not
Meet
PO and/or
Spec
Shipping
Damage
Reason for Rejects
Subtotal
Total
DOE-STD-3025-2022
C-2
Intentionally Blank
DOE-STD-3025-2022
APPENDIX D. MONTHLY STATUS REPORT FORMAT
Month Year
Orders on Hold
Date Rec’d Hold Reason Purchaser Purchase Order
Number
Item
# Mfg. Size (cfm) Qty. Notes
Total
Orders Ready
Date Rec’d Hold Reason Purchaser Purchase Order
Number
Item
# Mfg. Size (cfm) Qty. Notes
Total
Filters Rejected, Waiting Manufacturer Shipping Info
Date Rec’d Hold Reason Purchaser Purchase Order
Number
Item
# Mfg. Size (cfm) Qty. Notes
Total
DOE-STD-3025-2022
Intentionally Blank
1.0 SCOPE
2.0 PURPOSE
3.0 APPLICABILITY
4.0 GENERAL REQUIREMENTS
4.1. Qualification of Filters to be Installed in Nuclear Facilities
4.2. Quality Assurance Inspection and Performance Testing of Filters at a DOE-approved FTF
4.2.1 HEPA Filter General Performance Testing Requirements
4.2.2 ULPA Filter General Performance Testing Requirements
5.0 FILTER TEST FACILITY PROCEDURES
5.1. Receipt of Filters Processes
5.1.1 FTF Receipt Inspection
5.1.2 Initial Handling and Storage
5.1.3 Pre-Test Filter Inspection
5.2. Penetration and Resistance Testing Considerations
5.2.1 Testing Requirements and Test Methods
5.2.2 Approved Test Aerosols
5.3. Inspection and Test Reports and Labeling Requirements
5.3.1 FTF Inspection and Test Reports for HEPA and ULPA Filters
5.3.2 FTF Labeling
5.3.2.1. Accepted Filters
5.3.2.2. Rejected Filters
5.3.2.3. Accepted Filters with Incorrect Manufacturer Labeling
5.4. FTF Personnel Expectations
5.4.1 Personnel Qualification
5.4.1.1. Physical Qualifications
5.4.2 Training
5.4.3 Documentation
5.5. Reporting Requirements
5.5.1 Test Data Summary
5.5.2 Report Format
5.5.3 Status Report
5.6. Contacts with Filter Manufacturers
5.7. Waiver and Filter Media Repair
5.8. Equipment Maintenance and Calibration
5.9. Document Control and Records Management
6.0 REFERENCES
6.1. Federal Regulations, Department of Energy Standards and Publications
6.2. Other Standards
6.3. Other References
APPENDIX A. HEPA AND ULPA FILTER TEST REPORT
APPENDIX B. LABEL EXAMPLES
APPENDIX C. SEMIANNUAL REPORT FORMAT
APPENDIX D. MONTHLY STATUS REPORT FORMAT