DOE-STD-3024-98, Content of System Design Descriptions
Functional areas: System Design Descriptions, Safety Functions, System Classification
This Standard provides criteria and guidance for the technical content and organizational structure of system design descriptions (SDDs) at Department of Energy (DOE) facilities. This Standard should be used to develop an SDD for all active safety class (SC) and safety significant (SS) systems for nuclear facilities. Superseded by DOE-STD-3024-2011.
Superseded By:
DOE-STD-3024-2011, Content of System Design Descriptions on Aug 22, 2011
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE-STD-3024-2011Content of System Design Descriptions (Aug 22, 2011)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
TS
NOT MEASUREMENT
SENSITIVE
DOE-STD-3024-98
October 1998
DOE STANDARD
CONTENT OF SYSTEM DESIGN
DESCRIPTIONS
U.S. Department of Energy AREA EDCO
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
WELCOME
This Portable Document Format (PDF) file contains bookmarks, thumbnails, and hyperlinks to help you navigate through the document. All items listed in the Contents are linked to the corresponding sections. In addition, if you click on a section heading while you are reading the text, you will return to the Contents. Click on the DOE seal below to move to the Contents page.
This document has been reproduced directly from the best available copy.
Available to DOE and DOE contractors from ES&H Technical Information Services, U.S.
Department of Energy, (800) 473-4375, fax: (301) 903-9823.
Available to the public from the U.S. Department of Commerce, Technology Administration,
National Technical Information Service, Springfield, VA 22161; (703) 605-6000.
DOE-STD-3024-98
Page iii
FOREWORD
This Department of Energy (DOE) standard is approved for use by all Departmental organizational units and
contractors of the Department.
A System Design Description (SDD) describes the requirements and features of a system. This standard
envisions “systems” and “subsystems” within the context of the way these terms are defined within this
standard.
This standard provides guidance on the expected technical content of SDDs. The need for such a standard
was recognized during efforts to develop SDDs for safety systems at DOE Hazard Category 2 nonreactor
nuclear facilities. Existing guidance related to the corresponding documents in other industries is generally
not suitable to meet the needs of DOE nuclear facilities. Across the DOE complex, different contractors have
guidance documents, but they vary widely from site to site. While such guidance documents are valuable, no
single guidance document has all the attributes that DOE considers important, including a reasonable degree
of consistency or standardization. This standard is a consolidation of the best of the existing guidance.
This standard has been developed with a technical content and level of detail intended to be most applicable
to safety systems at DOE Hazard Category 2 nonreactor nuclear facilities. Notwithstanding that primary
intent, this standard is recommended for other systems at such facilities, especially those that are important to
achieving the programmatic mission of the facility. In addition, application of this standard should be
considered for systems at other facilities, including non-nuclear facilities, on the basis that SDDs may be
beneficial and cost-effective.
This standard should be applied in a logical and systematic manner that fits the local situation in a way that
leads to SDDs that are user friendly, promote safety, and increase operating efficiency. This standard is
intended to be applied either to new facilities and systems or to existing systems. Attachments to this
standard provide guidance on tailoring SDDs that should be considered when preparing SDDs for existing
systems.
Section 2
Like National consensus standards, the DOE Technical Standards program expects its standards to be
applied generally voluntarily. The existence of a standard does not mandate its use. Sometimes standards
are applied voluntarily by the local design engineering organization or by the sponsoring organization.
Sometimes, a standard is mandated by a higher authority or a regulatory agency, and hence the standard
becomes mandatory. Whether a standard is applied on a voluntary or mandatory basis, distinguishing the
requirements contained in a standard from its recommendations becomes highly desirable. This distinction is
accomplished by the careful use of the terms “shall” to designate requirements and “should” to designate
recommendations within the standard. Compliance with a standard is then achieved by adherence to its
requirements and consideration of its recommendations. This standard does not create a requirement for the
development of SDDs for particular systems at particular facilities, nor that such SDDs must adhere to this
standard. Consideration of the Introduction or Attachments to this standard is not mandatory for adherence
to this standard.
Beneficial comments for improvements of this standard (additions, deletions, or other changes) and any
pertinent information should be addressed to either Mr. John Fredlund or Mr. Rick Kendall at DP-45/GTN,
U. S. Department of Energy, 19901 Germantown Rd., Germantown, MD 20874-1290. Commenters are
encouraged to use the form DOE F 1300.3, “Document Improvement Proposal.”
DOE-STD-3024-98
Page iv
INTENTIONALLY BLANK
DOE-STD-3024-98
Page v
Table of Contents
PARAGRAPH PAGE
Foreword . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii
Introduction to DOE-STD-3024-98
Purpose of a System Design Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii
Purpose of DOE-STD-3024-98 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii
Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii
Tailoring Requirements (Graded Approach) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii
Format and Content of DOE-STD-3024-98 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix
Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi
Abbreviations and Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiii
References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xiii
DOE-STD-3024-98
Outline of an SDD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Technical Content Guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
CHAPTER 1
Introduction of an SDD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Section 3
1.1 System Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2 Limitations of this SDD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.3 Ownership of this SDD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.4 Definitions/Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.5 Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
CHAPTER 2
General Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.1 System Functions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 System Classification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.3 Basic Operational Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
CHAPTER 3
Requirements and Bases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Bases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
DOE-STD-3024-98
Page vi
TABLE OF CONTENTS (continued)
PARAGRAPH PAGE
3.1 General Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3.2 Specific Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3.3 Engineering Disciplinary Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3.4 Testing and Maintenance Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
3.5 Other Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
CHAPTER 4
System Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
4.1 Configuration Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
4.2 Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
4.3 Testing and Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
4.4 Supplemental Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Section 4
Appendices to the SDD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Appendix A Source Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Appendix B System Drawings and Lists . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Appendix C System Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Appendix D System History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Attachments to DOE-STD-3024-98
Attachment 1 Application of the Graded Approach to the Development of SDDs
Attachment 2 Compiling Technical Information for the Development of SDDs
Attachment 3 Developmental References
DOE-STD-3024-98
Page vii
Introduction to DOE-STD-3024-98
This section provides background information concerning the purpose and functions of System Design
Descriptions (SDDs) and the use of this standard in preparing SDDs. This section has been formatted
differently from the main body of this standard, which starts on page 1 with the outline for an SDD.
Purpose of a System Design Description
An SDD identifies the requirements associated with structures, systems, and components (SSCs),
explains why those requirements exist (that is, provides the bases for the requirements), and describes
the features of the system design provided to meet those requirements. As part of a configuration
management change control process, the SDD helps ensure consistency among the engineering
requirements for systems, the actual installed physical configuration, and the associated documentation.
The SDD is a central coordinating link among the engineering design documents, the facility
authorization basis, and implementing procedures. An SDD does not originate requirements or basis
information, but rather collects that information into a convenient usable form. The SDD consolidates
information about a particular system into one document. This provides the advantage that a reader
does not have to wade through many different documents and pull out the pertinent parts or have to
decipher the details in vendor technical manuals and engineering documents.
During the design and construction of a new facility or new system, the SDD might serve as the vehicle
for collecting and conveying the system requirements and their bases (i.e. the technical baseline). The
SDD should contain requirements that are derived from programmatic needs as well as from the
associated safety analyses. Accordingly, the development of the SDD must be coordinated with the
engineering design process and with the safety analysis development. The SDD may be used for
controlling changes as the design evolves from a concept through the preliminary design to the final
design. Sometimes this is accomplished in conjunction with Facility Design Descriptions (FDDs). In
an FDD, all the systems in a facility can be addressed with their top-level functions and requirements,
and the FDD refers to SDDs for more detailed information. An FDD provides a mechanism for
addressing simple, less important systems such as a potable water system, without having to develop
separate SDDs. The SDD is updated periodically and hence becomes more complete and detailed as the
design and safety analysis processes mature. Toward the end of the design phase, the SDD may be
used as a source document for the development of the facility authorization basis. Safety information in
the SDDs is extracted and placed into the SAR. In this case, the authorization basis mirrors the safety
information in the SDD. Even though the SDD may precede the development of the SAR, and hence
may become a source document for the authorization basis, an SDD is not a part of the authorization
basis. DOE does not rely upon information found uniquely in the SDD to make decisions regarding the
safety of the facility.
Section 5
For an existing facility or system, when the development and approval of the authorization basis have
preceded the development of SDDs, the safety portions of the SDDs must mirror the authorization basis
documents. Accordingly, the SDD is not an authorization basis document. Controlling equipment
changes depends on recognizing changes, knowing what the existing requirements are, and
understanding why those requirements exist. The modification might involve a change in how the
requirement will be met, or might involve modifying a requirement or establishing a new requirement.
Evaluating the acceptability of a change in requirements is difficult if the reasons behind the
requirements are not understood. The SDD can help meet this change control need. When a change to
the system is proposed, the SDD can be consulted to identify the pertinent requirements and the
referenced engineering source documents. The results of the change would be reflected back into the
DOE-STD-3024-98
Page viii
SDD. Changes to the SDD itself are entirely within the purview of the DOE contractor within an
appropriate change control process.
An SDD supports the authorization basis and helps ensure that operations of the system will be
consistent with the authorization basis. While the authorization basis is focused on safety, the SDD is
broader because it also addresses other important features provided to accomplish the programmatic
mission, to maintain system reliability, and to promote effectiveness, efficiency, and flexibility in
operations and maintenance. To treat the SDD as a part of the facility authorization basis would be
counter-productive to these broader purposes.
The SDD promotes safe and efficient operation by providing the information necessary for a solid
technical understanding of the system. The SDD collects and provides significantly more detail than is
appropriate for authorization basis documents but less detail than the engineering design documents.
This level of detail is particularly appropriate for the intended audience of facility operations personnel,
maintenance personnel, and technical support personnel. The SDD identifies procedures for facility
operations, testing, and maintenance related to the system being described, and points the reader to
those specific documents in their proper context. This information leads to fewer operational errors and
incidents. SDDs also identify which performance characteristics of the system are the most important.
This information promotes a better understanding of where to exercise greatest care and attention to
detail. In both operations and maintenance, an understanding of why requirements exist promotes better
employee performance and adherence to safety management programs, implementing procedures, and
administrative controls.
The SDD is a convenient reference for evaluating the performance of the system. System performance
evaluations are important for several reasons. These include assessing overall facility operational
effectiveness and efficiency, compliance with regulatory requirements, the possible need for
improvements to increase system reliability, and the possible need for system design modifications to
meet changing programmatic mission needs and demands.
The SDD should be a controlled document and maintained as an authoritative up-to-date source of
technical information on the system. The SDD records technical information that might tend to get lost
as personnel changes occur over the years. SDDs can be used also as technical source documents for
the development of personnel training programs.
Section 6
Purpose of DOE-STD-3024-98
This standard defines the expected technical content and organizational structure of SDDs.
Applicability
This standard may be used to develop an SDD for any new or existing system at any DOE facility.
Tailoring Requirements (Graded Approach)
Provisions and flexibilities have been incorporated into this standard so that it can be applied directly in
many situations and accommodate systems of varying importance and systems of different physical
types (such as ventilation, fluids, and electrical power systems).
DOE-STD-3024-98
Page ix
Since the requirements in this standard have been selected to be most applicable at DOE Hazard
Category 2 nonreactor nuclear facilities, and more specifically to safety systems at those facilities,
further tailoring of the requirements for those systems would generally be inappropriate.
When applying this standard to non-safety systems at nuclear facilities and to systems at nonnuclear
facilities, the graded approach should be employed. Attachment 1 to this standard provides guidance on
these applications. The graded approach considers many factors that must be considered on a case-by-
case basis. These include importance of the facility, remaining facility lifetime, the magnitude of the
hazards involved, the importance of the system, and the complexity of the system. The types and
amount of information contained in an SDD will vary depending on the specific system being described.
Engineering judgement must be used to ensure that appropriate, useful, and necessary information is
provided in the SDD, while avoiding the expenditure of resources to include information that does not
add value to the SDD. The level of effort involved in the development of an SDD will be determined in
part by the availability of current and dependable design information. Attachment 2 to this standard
provides guidance on compiling technical information for preparation of SDDs and may be useful for
existing systems where a well documented design information is not readily available.
Format and Content of DOE-STD-3024-98
Following this introduction, this standard presents the outline for an SDD, followed by guidance on the
technical content of an SDD. Because this standard provides guidance on developing a document, the
technical content guidance sections have been numbered to correspond with the outline of that
document. This formatting is intended to make this standard easier to understand and easier to refer to
later.
This standard and the outline of the SDD have been developed in a style intended to be as user friendly
as possible. The standard and the corresponding SDDs may be read the first time on a straight-through,
cover-to-cover basis, or various sections may be referred to as the need arises. To facilitate this first
reading, certain information is presented early to promote a solid understanding of the information that
follows. Section 1 and Section 2 of the SDD provide preliminary information that is will be
advantageous to understanding the requirements that follow in Section 3. The requirements are
presented first in order to lay the ground work for why the system is designed with certain capabilities
and characteristics. Section 4 then describes how the system meets its requirements.
Section 7
As used in this standard, the term “requirement” refers to those characteristics that have been
developed, specified, and approved as an output of the design engineering process, and have been issued
by the design engineering authority for the system. These requirements may be contained in documents
such as drawings, procurement specifications, components lists, bills of materials, installation
specifications, and testing specifications. All the engineering considerations behind these issued
requirements are considered the bases of the requirements. Basis information includes specific design
inputs and constraints (for example, functional and performance needs, mandated regulations, codes,
and standards and design procedures), and intermediate products of the design process (such as studies,
analyses, and calculations). The basis for a requirement might address several different considerations.
For example, the bases might include information that indicates that a portion of certain capability was
specified in order to meet the functional requirements that were design inputs, another portion because
of particular regulatory requirements, an additional part of the total capability was to meet certain
general engineering design constraints that might include site-specific engineering policies, standards,
and procedures, and that another part of the total capability was specified as safety margin.
DOE-STD-3024-98
Page x
It is important that an SDD clearly distinguish between the items that are true requirements that the
system must meet and those additional characteristics that are optional. In an SDD, it is intended that
Section 3 would contain only the requirements on the system (and their bases), but not the extra, non-
mandatory performance capabilities that might exist in the actual system design configuration. Section
4 of the SDD, on the other hand, presents a description of the actual system that, not only describes
how the system meets its requirements, but also describes the full capacity and capabilities of the
system. The principle of stating requirements only in Section 3 and describing the full capability in
Section 4 is illustrated in the example below:
Requirement
The output power from the UPS system shall be provided (1) when incoming normal building
electrical power is available, (2) through incoming electrical transients and momentary
disturbances, and (3) for 2 hours following the loss of incoming building power.
Description
The UPS battery is rated at a nominal 125 Vdc and has been sized at 1800 Ampere-hours (Ah).
This sizing has been shown to be capable of driving the full-rated inverter output for 3 hours. This
ensures that the UPS will be able to provide clean electrical power not only when normal building
power is available and through incoming switching transients, but also for a period significantly
greater than the 2 hours required after the loss of building power. The capacity beyond the 2-hour
requirement is an additional and optional design feature, not margin.
Section 8
Performance capabilities that might exist in the actual installed system that exceed the “requirements”
are not considered to be “requirements” but rather would be extra capabilities. Changes to
characteristics presented in the Description (Section 4) that do not have a corresponding requirement
(Section 3) or exceed the requirements can normally be approved by the contractor facility operating
organization. Changes to a requirement stated in Section 3 would necessitate the review and approval
by the design engineering authority. In considering a particular change request, the design engineering
authority would be expected to review the design basis and in some cases might need to request
approval from the authority that issued the design inputs (for example, a regulatory agency), before
such a change could be approved. For codes and standards identified in an SDD that have been applied
voluntarily at the option of the DOE contractor, the authority to modify that application remains at the
discretion of the contractor. It should be noted that the DOE program for Unreviewed Safety Questions
is aimed at determining if contractor final approval of a change is sufficient or DOE approval is
required.
A major purpose of the SDD is to collect information so that the reader does not have to wade through
numerous complex documents in an effort to locate the pertinent information. The information to be
provided in the SDD is to be a combination of comprehensive (or narrative) and index (or road map)
approaches. This middle-ground approach is based on including that information that the system
engineer, facility operator, or other user may need but not including excessive details such as
specifications of reinforcement bars for the structural members of the building or specific steps in an
alarm response procedure. Engineering judgement must be applied to determine when information
might be more detailed than is worthwhile for the intended audience of the SDDs and hence that
information should only be referenced. The status of the source document for information (that is,
current document or archived historical record) should not be a deciding factor in determining if the
information may be needed by the SDD user. The best approach may often be to provide a brief
summary and a reference to the details. To omit information from an SDD on the basis that the
information might need to be revised sometime in the future if a change were to be made is not a valid
basis. If the information is important to the overall purposes of an SDD and to the intended audience,
it should be included in the SDD.
DOE-STD-3024-98
Page xi
In some cases, there are sections that may appear to be repetitious. Repetition of the same information
is not intended. It is appropriate to address the same topic in different ways and for different purposes
in different parts of the standard or SDD. For example, “boundaries and interfaces” is the topic in four
different places. In Section 1, the Introduction, it is necessary to address boundaries only so that the
reader can easily determine if this SDD covers a specific component of interest or if a different SDD
should be consulted. In Section 2, the Overview, it is necessary to depict the system boundaries and
interfacing systems on the system diagram. In Section 3, the Requirements, it is necessary to address
boundaries and interfacing systems only to the extent that there are system requirements in these areas.
In Section 4, the Description, it is necessary to describe the precise physical boundaries of the system in
order that components at or near the boundaries are properly classified and hence receive the
appropriate care and attention in activities such as procurement and maintenance. Thus, while the same
topic is addressed in multiple locations, the information presented in these sections is not repetitious.
Different types of requirements in Section 3, especially the various engineering disciplinary
requirements, are potentially repetitious. As stated in the standard, the information should be presented
once and referred to if the same information is needed elsewhere. As this standard is applied to develop
SDDs, care should be exercised to avoid presenting the same information repeatedly.
Section 9
Glossary
This glossary explains important terms in this standard. To the extent practical, standard definitions
have been used, and the source of that definition is referenced within square brackets at the end of the
entry. The full bibliographical information on these references is given in Attachment 3 to this
standard. In some cases, the general definitions have been supplemented in order to explain more fully
how the term is used in this standard.
Authorization Basis. Those aspects of the facility design basis and operational requirements relied upon by
DOE to authorize operation. These aspects are considered to be important to the safety of the facility
operations. The authorization basis includes the safety basis for the facility, which focuses on the
protection of personnel, both offsite and onsite. DOE-STD-3009-94 defines "safety basis" as
information relating to the control of hazards at a facility (including design, engineering analyses, and
administrative controls) upon which DOE depends for its conclusion that activities at the facility can be
conducted safely. The terms "authorization basis" and "safety basis" are sometimes used
interchangeably. The authorization basis may also include information related to environmental
protection. [See References 4 and 10.]
Authorization Basis Documents. Documents providing authorization basis information. These typically
include, but are not necessarily limited to, the SAR, TSRs, EISs, DOE-issued Safety Evaluation
Reports, and documents containing facility-specific commitments to comply with DOE Orders or
policies. [See Reference 10.]
Basis. The basis explains why a requirement exists, and why it has been specified in a particular manner or
at a particular value during the engineering design process. Basis information is delineated in design
input information, design constraints, and intermediate outputs, such as design studies, analyses, and
calculations. The basis encompasses consideration of such factors as facility mission, facility
availability, facility efficiency, costs, schedule, maintainability, and safety. [See Reference 7.]
Controlled Documents. Documents whose content is maintained uniform among the copies by an
administrative control system. The goal of controlling documents is to ensure that work is performed
using approved current information, not obsolete information. Important documents to be controlled
are uniquely identified (including revision number, date, and specific copy number), and distribution is
http://www.doe.gov/html/techstds/standard/std3009/std3009.pdf
DOE-STD-3024-98
Page xii
formally controlled. Revisions to controlled documents are uniquely tracked and implemented,
including mandatory page replacements and receipt acknowledgment. Controlled documents typically
include procedures for operations, surveillance, and maintenance, and safety basis documents such as
the SAR, TSRs, and hazard and accident analyses. [See Reference 5.]
Design Information. Design information is the combination of the requirements and the corresponding
basis information associated with the engineering design process. [See Reference 7.]
Section 10
Engineering Design Process. The technical and management process that begins with the identification of
design inputs and constraints (e.g., mission objectives, commitments, applicable codes, standards,
regulations, procedures, and methodologies), processes this information, and results in the issuance of
requirements. This process defines and documents the inputs; adheres to the constraints; performs and
documents the necessary analyses, calculations, technical studies and evaluations; and ensures the
outputs of the process (i.e., the requirements that dictate a design that satisfies the inputs and
constraints) are documented and complete. [See Reference 7.]
Requirements. The results of the engineering design process that define what has been required.
Requirements are typically defined on design output documents (such as drawings and specifications)
that specify the functions, capabilities, capacities, physical dimensions, limits, setpoints, etc. for a
structure, system, or component. [See Reference 7.]
Safety Structures, Systems, and Components (Safety SSCs). The set of safety-class SSCs and safety-
significant SSCs for a given facility. The definitions for safety-class SSCs and safety-significant SSCs
and associated relevant information are provided in DOE-STD-3009-94. [See Reference 8.]
Subsystem. A combination of components, modules, devices, or software within a system which can
perform a function or an identifiable part of a function. A subsystem may be deemed to exist when
specific flow paths or equipment or functional capabilities can be correlated with different parts of the
system functions or system requirements. For example, if the system function statement were to say to
maintain negative differential pressures in various zones, there might be one flow path that could be
correlated with maintaining the negative differential pressure in one of these zones. In another example,
a general fire protection system might have one subsystem that detects fire conditions, another
subsystem that holds the fire water, and a third subsystem that delivers the fire water to the proper
location to suppress the fire. In some systems, programmable software is treated as a subsystem
associated with the system.
Support System. A system that provides a supporting service to another system that is necessary for the
supported system to be capable of meeting its system requirements. For example, an instrument air
system may be necessary for a ventilation system to meet its system requirements with regard to certain
dampers opening, modulating to maintain a specified negative pressure differential, or closing under
specified conditions. In another example, an HVAC system may be necessary to maintain the
temperature of the environment to within the limits for which some components are rated. In some
designs, components or the system may go to a so-called “Fail-Safe” condition upon loss of electric
power or some other supporting service, but that is a preferred failure mode. Preferred failure modes
do not negate the support system being necessary.
System. An interrelated set of structures, equipment, subsystems, modules, components, devices, parts,
and/or interconnecting items that is capable of performing a specified function or set of functions that
fulfill a purpose. Systems usually have defined physical boundaries, and systems often depend upon
human interactions. Some aspects of a system might be important to safety or programmatic mission,
Section 11
http://www.doe.gov/html/techstds/standard/std3009/std3009.pdf
DOE-STD-3024-98
Page xiii
while others might not. Sometimes a distributed set of individual structural elements may be considered
collectively to be a system. Accordingly, the term “system” is used in this standard to fully encompass
structures, systems, and components (SSCs). A system design description may be appropriate even if
a particular set of items does not meet this definition.
System Engineer. An engineer assigned technical responsibility for a particular system(s) and who
coordinates technical activities related to the assigned system(s). The system engineer has technical
understanding of the system requirements, design, operation, testing, and maintenance. The system
engineer ensures that relevant documents such as system design descriptions, technical drawings,
diagrams, lists, and procedures for surveillance, testing, and maintenance are complete, accurate, and
up to date. The system engineer may also keep vendor technical information and appropriate files
concerning system history of repairs, modifications, operational problems and other unique conditions
or circumstances. Equivalent terms include: cognizant engineer, system specialist, and subject matter
expert.
Abbreviations and Acronyms
CM Configuration Management
CRT Cathode Ray Tube type of display unit or monitor
EIS Environmental Impact Statement
FMEA Failure Modes and Effects Analysis
FSAR, or SAR Final (or Facility) Safety Analysis Report, or Safety Analysis Report
HVAC Heating, Ventilation, Air Conditioning system
MEL Master Equipment List
OSR Operational Safety Requirements
P&ID Piping and Instrumentation Diagram
QA Quality Assurance
SDD System Design Description
SNM Special Nuclear Material
SSC(s) Structure, System, or Component(s)
TSR(s) Technical Safety Requirement(s)
References
This standard does not mandate or otherwise depend on other documents. Reference documents that
were considered during the development of this standard are identified in Attachment 3 to this standard.
DOE-STD-3024-98
Page xiv
INTENTIONALLY BLANK
DOE-STD-3024-98
Page 1
CONTENT OF SYSTEM DESIGN DESCRIPTIONS
Outline of an SDD
SDDs shall adhere to the following outline to the
extent that it is relevant to the system being
described. When a section of the outline below is
not applicable to the system, the section should be
retained in the SDD with a simple statement that the
section is not applicable. It is preferred that a brief
explanation of its non-applicability also be provided,
especially if the reason for the non-applicability
might not be immediately obvious to some readers.
Conversely, the outline might need to be expanded
to address aspects of some systems not covered by
the outline.
Note: The outline below is not
intended to define some minimum
content requirement, but rather to
provide general guidance. This outline
is intentionally exhaustive to
encompass important aspects of
virtually any system. The content of
specific SDDs is expected to vary with
the type of physical system being
d e s c r i b e d ( f o r e x a m p l e ,
ventilation/confinement systems,
electrical power systems, chemical
processes).
CHAPTER 1
Introduction
1.1 System Identification
1.2 Limitations of this SDD
1.3 Ownership of this SDD
1.4 Definitions/Glossary
1.5 Acronyms
CHAPTER 2
General Overview
2.1 System Functions
2.2 System Classification
2.3 Basic Operational Overview
CHAPTER 3
Section 12
Requirements and Bases
3.1 General Requirements
3.1.1 System Functional
Requirements
3.1.2 Subsystem and Major
Components
3.1.3 Boundaries and Interfaces
3.1.4 Codes, Standards, and
Regulations
3.1.5 Operability
3.2 Special Requirements
3.2.1 Radiation and Other Hazards
3.2.2 ALARA
3.2.3 Nuclear Criticality Safety
3.2.4 Industrial Hazards
3.2.5 Operating Environment and
Natural Phenomena
3.2.6 Human Interface Requirements
3.2.7 Specific Commitments
3.3 Engineering Disciplinary
Requirements
3.3.1 Civil and Structural
3.3.2 Mechanical and Materials
3.3.3 Chemical and Process
3.3.4 Electrical Power
3.3.5 Instrumentation and Control
3.3.6 Computer Hardware and
Software
3.3.7 Fire Protection
3.4 Testing and Maintenance
Requirements
3.4.1 Testability
3.4.2 TSR-Required Surveillances
3.4.3 Non-TSR Inspections and
Testing
3.4.4 Maintenance
3.5 Other Requirements
3.5.1 Security and SNM Protection
3.5.2 Special Installation
Requirements
3.5.3 Reliability, Availability, and
Preferred Failure Modes
3.5.4 Quality Assurance
3.5.5 Miscellaneous
(Continued on next page)
DOE-STD-3024-98
Page 2
CHAPTER 4
System Description
4.1 Configuration Information
4.1.1 Description of System,
Subsystems, and Major
Components
4.1.2 Boundaries and Interfaces
4.1.3 Physical Location and Layout
4.1.4 Principles of Operation
4.1.5 System Reliability Features
4.1.6 System Control Features
4.2 Operations
4.2.1 Initial Configuration (Pre-
startup)
4.2.2 System Startup
4.2.3 Normal Operations
4.2.4 Off-Normal Operations
4.2.5 System Shutdown
4.2.6 Safety Management Programs
and Administrative Controls
4.3 Testing and Maintenance
4.3.1 Temporary Configurations
4.3.2 TSR-Required Surveillances
4.3.3 Non-TSR Inspections, and
Testing
4.3.4 Maintenance
Appendices
Appendix A Source Documents
Appendix B System Drawings
Appendix C System Procedures
DOE-STD-3024-98
Page 3
Technical Content Guidance
Chapter 1
Introduction of an SDD
The purpose of this section of the SDD is to provide
limited preliminary information related to the
specific SDD such that the SDD can be understood,
and can be used effectively and efficiently.
1.1 System Identification
This section shall identify the scope of the system
being described in the particular SDD. This section
shall identify the boundaries of the system concisely
and only to the extent necessary to explain the
physical scope of the system that is covered by this
SDD and shall identify the interfacing systems that
are not covered by this SDD. This subsection is
anticipated to be only about one paragraph or so
long.
1.2 Limitations of this SDD
This section shall explain any limitations that may
exist on the SDD (i.e., on this latest version). If the
scope of the SDD is limited in some way, the reader
needs to be made aware of that limitation. For
example, the current version may be preliminary and
provide basis information for only the safety
requirements. Similarly, if certain sections of the
SDD have not been fully addressed or developed
completely at this time, the reader should be
informed of this limitation.
1.3 Ownership of this SDD
This section shall identify the owner of the SDD and
state that the owner is responsible for the technical
content of, and for reviewing changes to, the SDD.
The owner is expected in most cases to be the
system engineer, but this could vary in different
organizational structures. The owner should not be
identified by name, because assignments could
change. Rather, the SDD should point the reader to
a place or document that would identify the specific
individual assigned as SDD owner.
Section 13
1.4 Definitions/Glossary
This section shall define or explain key terms and
phrases necessary for the reader to understand the
SDD.
1.5 Acronyms
This section shall define the acronyms used in the
SDD.
Chapter 2
General Overview
The SDD shall include an overview of the system
that includes: (1) statements of the safety functions
and other functions assigned to the system; (2) the
overall classification of the system; and (3) a basic
operational overview of the system, including a
simplified system diagram. This general overview
section should be limited to that information
necessary to establish a foundation for
understanding the requirements and bases
information that follows in the SDD. This is a
preliminary section; details on the system will be
provided later.
2.1 System Functions
The SDD shall state the functions that the system
needs to be capable of performing in order to
accomplish its intended purpose in the facility. To
the extent applicable to the system being described,
the system’s function statements shall address the
areas of safety (protection of onsite and offsite
personnel from radiological and other type hazards),
environmental protection, programmatic mission,
and general functions. Statements of the functions
of the system shall be sufficiently specific to the
system as to be distinctively different from the
functions of other systems. When taken collectively,
the functions of all the systems should describe
comprehensively how those systems contribute to
the overall operation of the facility.
Statements of safety function serve as the key link
between the authorization basis documents and
supporting documents. As discussed in Reference
DOE-STD-3024-98
Page 4
12, the essential constituents of statements of safety
function are:
a. The situations, and any specific accidents,
during which the system may be called upon
to perform its safety function(s).
b. The specific objective of the system in its role
of preventing, detecting, or mitigating
undesirable occurrences.
c. Those performance characteristics that have
been specifically relied upon in the
authorization basis, including the hazard
analysis and accident analysis, (this may
include initial conditions or assumptions
concerning the system or its operation).
Statements of safety functions in the SDD shall be
consistent with the corresponding information in the
facility authorization basis and specific references to
the authorization basis documents shall be provided.
Note: A fundamental understanding of
the functions to be provided by Safety
SSCs is integral to maintaining the
analyzed and approved engineering
basis, as well as to operations, testing,
surveillance, maintenance, and
modification activities. It is important
that safety function statements contain
sufficient information and clarity to
provide the fundamental understanding
that supports the development of
functional requirements, identification
of appropriate criteria, safety
assessments, evaluation of system
performance capabilities, and
evaluation of changes.
If all the system functions have been defined, then
the overall function or purpose of the system has
been defined indirectly also. To avoid potential
misunderstandings due to this definition being only
implicit, the SDD shall explicitly state the overall
function or purpose of the system.
2.2 System Classification
Section 14
The SDD shall state the overall classification that
has been assigned to the system. This classification
should have been based on the highest ranking (most
important) requirements identified for the system,
using the hierarchy presented in Section 3 of this
standard. For example, if a system were to have
Safety-Significant, Mission-Critical, and General
requirements, but no Safety-Class requirements, it
would be classified as a “Safety-Significant”
system. If a system were to have Mission-Critical
and General requirements, but no Safety or
Environmental Requirements, it would be classified
as a “Mission-Critical” system. This part of the
section should be limited to a simple one-sentence
statement such as, “This system is classified as
‘Mission-Critical.’”
This section shall include a simple positive or
negative statement indicating whether or not the
system being described is the subject of the facility
OSRs/TSRs.
2.3 Basic Operational Overview
This section shall include a simplified system
diagram, including boundaries and interfaces.
Where subsystems exist, they shall be illustrated on
the simplified system diagram.
This section shall include a brief discussion of how
the system operates. This discussion should be
limited to those operational aspects necessary to
understand the requirements in Section 3.
Chapter 3
Requirements and Bases
This section of the SDD identifies both the
requirements on the system and the bases for those
requirements. This section shall also present the
classification of those requirements with regard to
importance, and shall refer to the source documents
from which the requirements and bases were
obtained.
DOE-STD-3024-98
Page 5
Requirements and Bases statements should be
appropriate, concise, and meaningful. System
requirements statements should be clear and specific
and should not include basis information. For
example, a requirement statement such as,
“Redundancy is required to mitigate component
failures” would be better stated as, “Full-capacity
redundancy is required for the following
components: ....” and providing the explanation for
this requirement as part of the basis information. In
addition, the bases statements should be informative
and provide value-added instead of merely re-stating
the requirement in different words.
Requirements
System requirements build on and logically support
the system functions. For example, a system
function statement might say that the system has to
function “on a highly reliable basis.” The system
requirement statements would then specify those
features, such as component quality requirements
plus redundancy and diversity requirements, that
provide the high reliability for the system.
The requirements and bases to be included are those
related to the system as a whole and those that are
specific to individual subsystems and components
within the system.
Requirements come from various sources. For
example, some requirements might originate from
regulatory agencies such as DOE or EPA, from
state and local governments (such as release limits
or building codes), or from DOE contractor
organizations such as site management, design
engineering, construction, ES&H, or facility
management. Also, requirements can have different
levels of importance. For example, some
requirements are part of the DOE authorization
basis for a facility, and operation of that facility is
allowed only if those requirements are complied with
(such a requirement can be changed only if prior
approval is obtained from DOE). Other
requirements may be designer options considered
desirable for various reasons and have no bearing on
the facility authorization basis. Such requirements
may or may not affect operations directly, and may
be changed as deemed appropriate by the design
authority (which may be the facility management)
Section 15
without approval from others such as site-level
contractor management or a regulatory authority. It
is important to include all requirements and their
bases in the SDD regardless of their source or
importance, because the SDD is intended to identify
all requirements and bases for a system so that
operations and maintenance personnel will have the
complete understanding necessary for safe, reliable,
and efficient operation of the system.
Categorizing requirements by type, as shown in the
outline on page 1, has been found to be useful for
identifying information that may be sought quickly
for making decisions concerning system Operability
and compliance with the authorization basis. This
categorization is also helpful for routine searches,
for example, it might be necessary to find all seismic
requirements for a given system or for the facility
overall.
Repetition of requirements should be avoided.
However, some requirements could fit into more
than one section of the SDD, as shown in the outline
on page 1 of this standard. For example, a
requirement might say that certain components must
go to specified positions (open, or closed) upon loss
of electrical power. From one perspective, this
might be considered to be an electrical power
engineering requirement (Section 3.3.4). From
another perspective, this same requirement could be
viewed as a reliability requirement (Section 3.5.3).
In such cases, the information should be presented in
only one section of the SDD and then that section
referenced in other sections where the same
information becomes pertinent. One approach is
simply to place the requirement in the first section in
the SDD in which it becomes relevant. Another
approach is use engineering judgement to select the
most fitting section for the requirement.
Requirements shall be classified with regard to their
importance to ensure appropriate consideration in
system operation, maintenance, performance
evaluations, and evaluation of system changes. The
following hierarchy, or equivalent, shall be used.
DOE-STD-3024-98
Page 6
1. Safety Requirements
a. Safety Class
b. Safety Significant
c. Other Safety Requirements
2. Environmental Requirements
3. Mission-Critical Requirements
4. General Requirements
Requirements classified as Safety-Class or Safety-
Significant are those identified as necessary for
Safety-Class and Safety-Significant SSCs to
accomplish their safety functions, as established as
established by the hazards analysis and safety
analysis processes. The "Other Safety
Requirements” classification applies to those
requirements that, although not classified as Safety-
Class or Safety-Significant, still perform functions
considered important to overall facility safety and
are part of worker safety or the defense-in-depth
safety basis for the facility.
The safety requirements statements shall be
consistent with, and be explicitly correlated back to,
the corresponding statements of functional
requirements and performance criteria in the facility
FSAR, TSRs/OSRs, and other authorization basis
documents, if the authorization basis has already
been established for the facility. One convenient
way to correlate these requirements is to use
footnotes. For example, a footnote to a particular
requirement statement might say, “This requirement
corresponds to Requirement 4.4.3.8 on Page 4.4-12
in the FSAR (Reference 3 in Appendix A).” An
alternate way to correlate these requirements is with
a table (for example, a requirements matrix) in a
separate Appendix or Attachment to the SDD.
Section 16
Often the Environmental Protection category is
omitted from requirement classification lists.
Sometimes environmental protection is taken to be a
subset of safety in general. The environmental
protection category should be considered separately
and explicitly in the SDD in order to make sure that
this important set of requirements is not overlooked
and to address requirements related to environmental
permits.
Mission-critical functions are those that are
necessary to prevent or mitigate substantial
interruptions of facility operations or severe cost or
other adverse impacts, or are necessary to satisfy
other DOE programmatic mission considerations.
The General category is used for requirements that
do not fit into the other categories.
This set of classifications is based on DOE-STD-
3009 for nuclear facilities. This set of
classifications, a modified set, or a completely new
set of classifications may be used for nonnuclear
facilities.
Bases
A major function of the SDD is not only to state the
engineering requirements on the system, but also to
explain the basis for those requirements. Basis
information explains why the requirement exists,
why it is specified in a particular manner, and why it
has a particular value. While it is highly desirable
that the bases for all requirements be documented in
the SDD, it is imperative that the basis information
for safety requirements be stated in the SDD.
Technical basis information shall be included
directly in the body of the SDD immediately after
the requirement, rather than relegate such
information to an appendix or refer to another
document. However, the basis may be provided in
one place for a group of related requirements. The
bases for the requirements should be presented in a
manner that minimizes the disruption of the reader’s
flow of thought. The recommended manner for
presenting the basis information is to provide it in
separate paragraphs that are set off in a special
format or font that is clearly discernable. The
following example illustrates this approach:
http://www.doe.gov/html/techstds/standard/std3009/std3009.pdf
http://www.doe.gov/html/techstds/standard/std3009/std3009.pdf
DOE-STD-3024-98
Page 7
Requirement: The exhaust air high
temperature trip setpoint on the
ventilation exhaust fan shall be 175-
185EF.
Basis: The setpoint was chosen high
enough above normal operating
exhaust air temperature of 140EF to
avoid spurious trips of the ventilation
exhaust fan, but low enough to
provide early detection of hot gases.
The safety analysis shows that in the
event of a fire, the consequences to
workers from the spread of toxic
products of combustion are acceptable
if the fan is tripped before exhaust air
temperature reaches 200EF.
Basis information can take different forms. Specific
engineering documents (such as studies, analyses,
calculations, and reports) are important basis
references. In addition, appropriate and specific
references to national codes and standards should be
included in the basis references, when appropriate.
Operational experience and standard engineering
practices are valid reasons that could justify a
requirement.
References
Specific references are essential to understanding
and using the SDD. References to source
documents from which requirements and basis
information has been extracted adds traceability to
the SDD and improves its credibility. To the extent
that such reference documents are available, the
source documents that contain the cited
requirements or the bases information shall be
referenced in the SDD. Even if the supporting
reference document contains only the requirement
but not the basis information, such as may be the
case for a procurement specification, that document
should be included as a reference.
Section 17
In some cases, the requirement or basis information
is not recorded in a separate document, the
documentation no longer exists, or it is not feasible
to retrieve such a document. In those cases, the
reference should state that a documented reference is
not available, so as to avoid potential confusion and
wasted effort.
One method of referencing the source documents
that has been found to be user friendly is to provide
the bibliographical information on the source
documents in an Appendix to the SDD. Then
footnotes can refer to particular source documents
and provide specific page references where they are
appropriate in the body of the SDD. For example,
the footnote for a particular requirement might say:
“See Appendix A, Reference 5, pages 12-16.” This
technique has the advantage that complete
bibliographical details do not need to be repeated
each time a document is referenced. In addition, this
technique can also make SDD revisions easier.
Such footnotes need not be limited to a single source
document. If more than one source
document/reference contains pertinent information,
they should be included in the footnote.
The following sections of this standard have been
numbered purposely to correspond to the sections of
an SDD, as shown in the outline on page 1, to make
this standard easier to use.
3.1 General Requirements
3.1.1 System Functional Requirements
This subsection shall state those functional
requirements and their bases, for both safety
requirements and non-safety requirements, that are
necessary to fulfill the system function statements.
If the requirements and bases have already been
presented earlier in the SDD (see for example, item
c. in Section 2.1), refer to that section rather than
repeat the information.
Note: Functional requirements in
general relate to how the system
functions, performs, behaves, or
responds to particular conditions.
Non-functional requirements should be
addressed in other subsections that
correspond to the most fitting
engineering or topical category, such
as those that address reliability
features, electrical power needs,
testability, or quality assurance
provisions.
DOE-STD-3024-98
Page 8
Functional requirements shall address the system or
facility situations to which the system is designed to
respond, the expected ambient operating conditions
related to those situations under which it must
perform its assigned function(s), and the sequence in
which certain actions are to be accomplished.
These requirement statements should include
sufficient detail to establish the acceptance criteria
or limits against which the actual performance
capability of the as-built system can be evaluated.
(In some situations, such acceptance criteria may be
called “Performance Criteria.”)
3.1.2 Subsystems and Major Components
General requirements and their bases that are unique
to subsystems and major components shall be
identified in this section.
3.1.3 Boundaries and Interfaces
This section shall identify any requirements (and
their bases) that might exist concerning the
boundaries of the system being described, with
emphasis on the components at the boundaries (for
example, isolation valves). For example, the
boundary with an associated instrument air system
may be required to be at the upstream side of a
particular check valve. Referring to the simplified
system diagram in Chapter 2 of the SDD may be
useful for this purpose.
Section 18
The SDD shall identify any requirements (and their
bases) that might exist regarding interfacing
systems, especially “support systems” (see
Glossary, page xi). For example, it might be
required that the system be operated on the smooth
and reliable electric power available only from an
uninterruptible power system. The SDD shall also
identify those interface requirements (and their
bases) that might exist regarding the need for the
system being described to provide support to
another system, especially if that support is
necessary to the other system.
3.1.4 Codes, Standards, and Regulations
This subsection shall identify those codes,
standards, or portions thereof that have been applied
to the system. This section shall identify those
codes and standards that have been required either
by regulatory organizations or by the DOE
contractor.
Note: Where codes, standards, or
portions thereof have been applied at
the option of the DOE contractor and
compliance is expected by the
contractor, they become requirements
on the system and hence they need to
be included in this section. In contrast,
if codes and standards (or similar
documents such as Handbooks or
Guides) are intended to be used only as
general guidance and compliance is not
required, they are not requirements on
the system and hence should be
addressed in other sections of the
SDD.
To the extent practical, the bases associated with
codes and standards shall identify the authority that
determined that it was appropriate to apply each of
the codes and standards, so that future proposed
changes or exceptions in the application of those
codes and standards can be referred to the
appropriate authority.
The specific codes and standards shall be identified,
rather than simply the general name of the standards
organization. Consideration should also be given to
the desirability of identifying the edition (or year of
publication) for each identified code or standard.
Note: In the future, the subsequent
editions of some codes or standards
might contain requirements that this
particular system does not meet and
should not have to meet. If the
editions of the standards are not
specified, it implies an intent to
maintain compliance with all
subsequent editions.
A system may need to meet a particular section of,
but not the entire, code or standard. Identify only
those sections that will be or have been complied
with and for which such compliance will be
maintained.
DOE-STD-3024-98
Page 9
Note: If the whole standard is
identified without any qualifications, it
implies an intent to comply with the
entire standard.
This subsection shall similarly identify government
regulations that are applicable to the system being
described. These include: the Code of Federal
Regulations (CFRs), DOE nuclear safety
management rules and orders, regulations from
other Federal agencies such as the EPA, court
orders (if applicable), state laws and regulations,
and state permit requirements.
3.1.5 Operability
When the system being described is the subject of
TSRs (or OSRs) that require the system to be
Operable, this subsection shall state the specific
definition of system Operability (i.e., what aspects
of this system are required to be capable of
performing as intended in order for this system to be
formally considered Operable). To the extent that
the facility authorization basis, including the
OSRs/TSRs, defines Operability specifically for the
system, that definition shall be the one stated in the
SDD. This subsection shall also identify the facility
operating modes or conditions for which the system
is required to be Operable.
Section 19
Note: System compliance with its
“Operability” requirements will ensure
accomplishment of those safety
functions specified by the applicable
authorization basis documents such as
the FSAR or TSRs. The general
definition of Operability is that a
system, subsystem, component, or
device shal l be considered
OPERABLE or have OPERABILITY
when it is capable of performing its
specified function(s), and when all
necessary attendant instrumentation
and controls, electrical power, cooling
water, or other auxiliary equipment
that are required for the system,
subsystem, train, component, or device
to perform its function(s) are also
capable of performing their related
support function(s).
The purpose of this section is to state the specific
Operability conditions that result from applying the
general definition of Operability to the system being
described. In some cases, a certain portion or
feature of a system may be disabled or unavailable,
but the system is still capable of successfully
completing its required safety function(s) despite the
failed portion or feature. Statements of Operability
should not be restrictive to the point of requiring the
system to be declared inoperable in such a case.
If the system has additional Operability
requirements that may have been established by
facility management that go beyond those
requirements included in the OSRs/TSRs, these
shall also be included in this section, but in a
manner distinctive from the TSR Operability
requirements.
3.2 Specific Requirements
3.2.1 Radiation and Other Hazards
This section shall address those safety requirements
(and their bases) that have been established for the
design of the system in consideration of radiation or
other hazards (such as lasers and hazardous
chemicals) that are beyond those typically accepted
in an industrial workplace covered by OSHA.
These requirements pertain to the necessary level of
protection for facility workers, other employees
located at the site, and the public. This is the
jurisdiction of the facility authorization basis. All
system functional requirements assumed in facility
authorization basis documents shall be identified if
they have not already been presented in the SDD.
This section includes those radiological safety
requirements that must be met to comply with
specific numerical exposure limits regardless of
cost. Those additional safety features that may be
provided on a cost-beneficial basis are generally
referred to as As Low As Reasonably Achievable
(ALARA), which is addressed in the next section.
3.2.2 ALARA
This subsection shall identify those requirements
that might exist to include in the design safety
features (such as special shielding) to reduce the
DOE-STD-3024-98
Page 10
radiation exposures to personnel to ALARA. In
general, ALARA goals are achieved (or
implemented) on a cost-beneficial basis, as
contrasted with numerical radiation exposure limits
that must be met regardless of cost.
This section should also address those requirements
(and bases) that might exist to protect sensitive
components from radiation exposure or to minimize
radiological contamination. Monitoring equipment
and alarms should also be addressed.
This section should include only information that is
specifically related to the system being described;
general information about the facility radiation
control program or ALARA program should not be
repeated here.
3.2.3 Nuclear Criticality Safety
Section 20
This subsection shall identify those requirements
(and bases) that might exist related to design
features to prevent an inadvertent nuclear criticality.
An example would be critical dimensions on the size
and shape of pipes, tanks, or other containers. This
subsection should also reflect things that
intentionally are not present, such as sources of
water that have been routed so as not to be overhead
or in the immediate vicinity.
Non-design, operational (or administrative) aspects
of the nuclear criticality safety program that apply
to this system, such as the use of materials/contents
placards, should be addressed under Safety
Management Programs in Section 4.
3.2.4 Industrial Hazards
This subsection shall identify requirements for
safety features for hazards that are typically
accepted at commercial industrial workplaces. This
subsection shall identify Environmental, Safety, and
Health (ES&H) requirements pertaining to the
system being described related to personnel safety
and OSHA considerations.
This subsection is not intended to generate a
research project to identify all the features of a piece
of equipment that may be related to the safety of
personnel operating the equipment. However,
prominent aspects (such as guards surrounding
rotating machinery) or those that were part of the
basis for selecting the particular equipment from a
vendor should be identified. This subsection
provides the information that would help preclude
potential future modifications that might
compromise features important to protecting
employees.
3.2.5 Operating Environment and Natural
Phenomena
This subsection shall identify requirements (and
their bases) related to the normal environment that
the system must be capable of operating under, for
example, ambient temperature, humidity, altitude,
noise, radiation, electromagnetic or radio frequency
interference (EMI/RFI) and vibration.
This section shall also address abnormal and
accident environments, consistent with the hazards
analysis and accident analysis. This section should
be limited to environmental conditions that go
beyond typical design requirements such as those
found in the Uniform Building Code. This section
should address extraordinary design requirements
for protection from natural phenomena such as
tornadoes, floods, or seismic events. For example,
if the system must operate during or following an
earthquake, the associated acceleration spectra
should be identified.
3.2.6 Human Interface Requirements
This subsection shall identify the requirements (and
bases) that may exist related to the design of the
system to enhance the interface between the system
and the human operator.
This section shall identify any design requirements
for alarms intended to trigger manual safety actions.
The basis for such a requirement should include a
summary of the conditions that are intended to
generate the alarm (the meaning or significance of
the condition) and a brief summary of the actions
that need to be taken manually in response to the
alarm.
Requirements for alarms that are related to non-
safety actions should be similarly described.
DOE-STD-3024-98
Page 11
This section should identify those requirements that
may exist for the design to distinguish indications
and alarms that promote the prompt and effective
performance of necessary operator safety actions
from other indications and alarms. Similarly, this
section should identify requirements that may have
arisen related to factors such as shapes, colors, or
locations of particular indicators, controls, or
displays because such features had been identified
as important to success by a human interface task
analysis or similar types of evaluations.
Section 21
3.2.7 Specific Commitments
This subsection shall identify commitments that
have been made to the DOE or another regulatory
agency such as the EPA, and in some cases, court
orders. For example, in the investigation of an
operational event at a facility, it might have been
determined that a major contributor to the incident
was the absence of positive position indication for
some critical dampers or valves. As part of the
corrective actions to prevent recurrences of that or
similar events, the contractor may have made a
commitment to DOE that all dampers and valves
will have positive position indicators provided. In
that case, this commitment would be identified as a
requirement for the system, and a reference made to
the appropriate document(s) that provide the
commitment. Such commitments may be contained
in occurrence reports, correspondence, or other
documents.
3.3 Engineering Disciplinary
Requirements
This section should identify those requirements and
bases that are typically related to particular
disciplines of engineering.
3.3.1 Civil and Structural
This subsection shall identify those civil and
structural engineering requirements (and their bases)
related to the system being described. This section
should include only the civil or structural
requirements for a typical facility such as may be
found in the Uniform Building Code. Examples of
requirements to be included are anchorage, bracing,
or support requirements for equipment (for example,
to prevent damage to equipment or injury to
personnel).
3.3.2 Mechanical and Materials
This subsection shall identify those mechanical or
materials engineering requirements (and their bases)
related to the system being described. Such
requirements may relate to pumps (for example,
type, net positive suction head, flow capacity,
discharge pressure), valves (for example, type, size,
stroke time, location), HVAC system components
and flow rates or differential pressures, equipment
heat generation limits or cooling system parameters,
and parameters relating to compressors, filters, fans,
boilers, and other equipment.
3.3.3 Chemical and Process
This subsection shall identify those chemical or
process requirements (and their bases) related to the
system being described. Such requirements might
include process or engineering limits on physical
parameters such as temperature, pressure,
concentrations, feed rate, ph, heat transfer rates,
chemical compositions (for example, amount or
concentration of impurities allowable). Other
requirements might relate to the type of process (that
is, continuous or batch, reactive or non-reactive),
waste generation considerations, or necessary
process evolutions (for example, hold times,
agitation rates).
3.3.4 Electrical Power
This subsection shall identify those electrical power
engineering requirements (and their bases) related to
the system being described. In most cases, these
will involve the need for electrical power at a
particular voltage level, current, frequency, or
quality. In some cases, however, these requirements
might involve providing electrical power for other
systems. Examples of these later cases would be
systems that include diesel generators, motor-
generator sets, uninterruptible power supplies, or
battery banks. Such systems would typically
include the associated electrical distribution system
plus automatic and manual transfer features and the
associated alternate power paths or circuits.
DOE-STD-3024-98
Page 12
Section 22
Examples of requirements are the length of time the
system must be capable of performing its function(s)
following the loss of normal utility power, and fail-
safe states that equipment must assume upon loss of
power. Another example is power quality
requirements. For example, a component that is
critical to the proper functioning of a safety system
may be sensitive to voltage or frequency
perturbations and thus have a power quality
requirement that the component receive regulated
power from an uninterruptible power supply with
specific output parameters, such as between 118.5
and 121.5 Vac and between 59 and 61 Hz at the
input terminal of the device.
3.3.5 Instrumentation and Control
This subsection shall identify those instrumentation
and control engineering requirements (and their
bases) related to the system being described. This
subsection is focused primarily on hardware
controls; computer hardware and software controls
are addressed separately in a later section.
This section of the SDD shall include requirements
for manual and automatic actions for system
initiation and control, indicators, alarms, and
manual controls that are used to operate the system.
This section shall identify required ranges and
accuracies.
This section shall distinctively identify
instrumentation that either is (or will be) directly
subject to TSR requirements or provides
information to verify compliance with TSRs. This
section of the SDD shall identify the required
nominal values of the setpoints associated with the
system and ranges of acceptable setpoint values.
The basis information shall explain any limitations,
either administrative, design, and limits important to
safety, that may exist on the system or its
components.
3.3.6 Computer Hardware and Software
This subsection shall identify those computer
hardware and software engineering requirements
(and their bases) related to the system being
described. Many of the instrumentation and control
topics discussed in section 3.3.5 are also relevant to
computer hardware and software. The topics
addressed in section 3.3.6 should be those unique to
computer hardware and software. Examples of such
types of requirements include: sample rates, real-
time performance, data communications, and
provisions for backing up programs and data.
If there are requirements on the design and
development process for computer hardware and
software aspects of the system being described (for
example, verification and validation, or qualitative
reliability goals), they should be described in this
section of the SDD. Key design documentation
(such as the Software Requirements Specification)
should be referenced.
Note: The performance of digital
systems over the entire range of input
conditions cannot be inferred from
testing a limited sample of input
conditions. Therefore, the design
qualification for digital systems is
often based on requirements for
employing a high-quality development
process that incorporates disciplined
specification and implementation of
design requirements.
If diverse or defense-in-depth features are provided
as backup to protect against hardware or software
features, these features should be identified in this
section of the SDD.
Section 23
Note: Software and hardware are
often shared to provide multiple
functions to a greater degree than is
typical for analog systems. Although
this sharing is the basis for many of
the advantages of digital systems, it
also presents the potential for common
mode failures (or common cause
failures) that might defeat the
redundancy provided within the
hardware and software. Sometimes
diverse or defense-in-depth features
that are not susceptible to the effects of
such failures are provided to ensure
that their consequences are tolerable.
For example, the automatic computer
monitoring and alarming for certain
DOE-STD-3024-98
Page 13
facility variables may be backed
up by separate hardware
i n d i c a t o r s o r m a n u a l
surveillances.
If there are requirements related to reliability of
commercial off-the-shelf (COTS) hardware or
software, they should be described. Such
requirements may, for example, include vendor
documentation demonstrating high reliability based
on a formal program for recording and tracking
failures.
Note: Computer based systems often
employ COTS, for example, source
code embedded in a programmable
logic controller (PLC). Another
example would be local application
programming of commercial software
such as database management system
software.
Administrative programs that support computer and
software activities (such as software configuration
management and quality assurance) should be
described in the appropriate section of the SDD,
which might be in Section 4.
3.3.7 Fire Protection
This subsection shall identify requirements (and
their bases) that might exist for fire protection
features within the system, including detection,
suppression, and other mitigation features. An
example of the information provided in this section
would be requirements on ventilation system fire
dampers to close at or before a critical temperature
is reached, and for the dampers to be rated for
preventing the spread of fire for a specific time.
This subsection should also identify special types of
fire suppression materials, such as the need to use
halon in a particular area rather than a water
sprinkler system.
3.4 Testing and Maintenance
Requirements
This section shall address those aspects of testing
and maintenance of the system being described that
are related to the design of the system.
3.4.1 Testability
This section shall identify those design requirements
(and their bases) that might exist for features that
make the system testable, especially those design
features that preclude the need to install temporary
configurations manually on a frequent basis (for
example, every 12 months or more often). For
example, a requirement might exist to provide a test
panel, with spring-loaded switches and bypass
indicating lights, that eliminates the use of manually
installed temporary configurations. Another
example might be a requirement to bring certain
electrical connections to external test points to avoid
internal electrical hazards and to avoid potential
errors in manually installing temporary
configurations. Operational (non-design) limitations
on the use of temporary configurations is addressed
in Section 4.3.1.
3.4.2 TSR-Required Surveillances
When the system being described is the subject of
TSR/OSR Surveillance Requirements, this
subsection shall identify the type(s) of surveillance
required (that is, checks, inspections, functional
tests, or calibrations); identify how often the
surveillance is required to be performed (including
any grace period that may be allowed); state the
acceptance criteria for each surveillance; and
describe those features provided in the design to
facilitate those surveillance actions.
Section 24
3.4.3 Non-TSR Inspections and Testing
If the system being described is the subject of
required inspection, testing, or surveillance
requirements (including setpoint verifications or
adjustments) that are beyond those specified in the
TSRs/OSRs, this subsection shall identify them,
state how often they are required to be performed,
state the acceptance criteria for these activities, and
describe any design features necessary to perform
those surveillance actions. These items shall be
clearly distinguished from TSR-required items.
Note: Where surveil lances,
inspections, or testing beyond the
TSRs have been applied at the option
of the DOE contractor and compliance
DOE-STD-3024-98
Page 14
is expected by the contractor,
they become requirements on
the system and hence they need
to be included in this section.
Note: In some cases, an industry code
or standard may mandate certain
inservice inspection (ISI) or testing
(IST) activities. In many cases, the
manufacturer recommends certain
checks, tests, and calibrations that
need to be adhered to (unless a local
engineering analysis establishes a basis
for alternate activities or a modified
schedule for those activities).
3.4.4 Maintenance
This subsection shall identify maintenance activities
required to comply with the manufacturer’s
recommendations or otherwise required to ensure
continued reliability. An example is a requirement
to periodically replace specified components such as
seals or replace lubricants that degrade over time or
to replace certain parts that wear out-of-tolerances
after a number of cycles or operations, in order to
prevent a failure.
3.5 Other Requirements
3.5.1 Security and SNM Protection
This subsection shall identify those requirements
(and their bases) that might exist related to general
security of the facility or to the need to protect
special nuclear materials (SNM). These
requirements may impact the design of certain
systems. For example, the design of a vault to store
special materials may be required to include features
such as combination locks, weight, size, and seismic
capability in order to protect the contents of the
vault from certain postulated situations.
When security or SNM protection requirements
apply to a system, their existence shall be identified
in the SDD and appropriate references provided for
the documents that explain those requirements,
subject to the restrictions of classified documents.
3.5.2 Special Installation Requirements
This subsection shall identify any requirements (and
their bases) that may exist related to special
arrangements, locations, or installation of
components of the system being described. These
might include alignments, shock mounting, lengths
of electrical signal cable, special routing
requirements for pump Net Positive Suction Head
considerations, physical separation between
redundant equipment, location requirements to
minimize equipment interferences, and “free space”
requirements for maintenance access.
Note: Some installation requirements
may be specified in the vendor’s or
manufacturer’s technical information
that comes with the equipment. For
example, some equipment may be
required to be wall mounted, instead of
floor mounted, or to be oriented in a
particular direction, or to maintain a
min imum bend r ad ius fo r
interconnecting equipment, or locating
certain types of components in a fluid
system (liquid or air) a minimum
distance from a bend or other flow-
perturbing component.
Section 25
3.5.3 Reliability, Availability, and Preferred
Failure Modes
This subsection shall identify requirements (and
their bases) for design provisions that will ensure the
system will perform its function(s) by improving
system availability, improving reliability by
minimizing ways in which it can fail, or minimizing
the impact of failures. Such provisions might
include equipment redundancy, diversity, physical
separation, electrical isolation, features that provide
mechanisms for on-line testing, features that avoid
frequent use of temporary configurations (such as
lifted leads or jumpers) for testing and maintenance,
automatic fault detection capability, and preferred
failure modes ("fail-safe" states).
3.5.4 Quality Assurance
This section of the SDD shall identify the general
category of Quality Assurance (QA) to be applied to
DOE-STD-3024-98
Page 15
the system as a whole and to the components of the
system, and should identify any specific QA actions
deemed to be necessary. When the general QA
category provides for options related to specific QA
activities, the SDD shall identify which options
apply to this system. When specific QA
requirements, such as witnessing vendor testing, are
applicable only to certain components, those
requirements should be identified (perhaps, in a
table) in the SDD.
3.5.5 Miscellaneous Requirements
This part of the system requirements section of the
SDD is for requirements and their bases that do not
fit conveniently into the other defined subsections.
Chapter 4
System Description
The SDD shall include a comprehensive description
of the system, including both its safety features and
non-safety features. The SDD description shall
emphasize those features provided to meet the
requirements on the system.
This section of the SDD shall identify the
components of the system; describe how those
components are laid out physically and
interconnected; explain the system flow paths;
identify the indicators, controls, and alarms
provided; define the acceptable ranges for system
performance and setpoints; and explain how the
system operates.
The manufacturer and model number for
components in the current system configuration
must be recorded in a controlled document for
several reasons including to facilitate identifying the
applicable information in vendor-supplied
documents. In some cases, the SDD may be the
most appropriate place to record this information. In
other cases, the SDD may reference a separate
controlled document such as the MEL or Bill of
Materials that contains this configuration
information.
Describe the system with specific values, rather than
simply repeating the requirements. For example,
suppose a requirement on the system is that the
centerline of a pump suction line be located more
than 8 inches and less than 14 inches above the
bottom of a tank. This requirement might have been
based on a combination of net positive suction head
considerations for the pump and avoiding debris that
may be on the bottom of the tank. In describing the
system, do not simply repeat the 8 to 14inches
requirement, but rather describe the actual
installation more specifically, such as the centerline
of the suction pipe is 11.25 inches above the bottom
of the tank. For a requirement that a valve be
provided with position indication that is displayed in
the control room, do not simply say that valve
indication is provided in the control room. State
more specifically that, for example, valve position
limit switches are provided on the valve that indicate
on the auxiliary systems panel in the control room
when the valve is greater than 90% open (green
light) or greater than 90% closed (red light).
Section 26
In addition, features of the system description that
are related to the system requirements shall be
correlated. One method for this correlation which
has been found effective and convenient is to use
footnotes. For example, a footnote to a particular
feature, characteristic, or performance capability
might say “This feature is related to System
Requirement 3.3.4.15.”
4.1 Configuration Information
4.1.1 Description of System, Subsystems, and
Major Components
The detailed system diagram shall identify the
components in the system and their interconnections.
This diagram should extend sufficiently to identify
the interfacing equipment and systems. The
boundary between the system being described and
the interfacing systems shall be shown on the
diagram in a distinctive manner. Similarly, the
subsystems that have already been shown in the
simplified system diagram in Chapter 2 of the SDD
should be identified in a distinctive manner that can
be correlated with the earlier diagram. For a very
simple system, a single diagram may be used.
A purpose of the system diagram is to illustrate
which components are needed to fulfill the system
DOE-STD-3024-98
Page 16
functions. To the extent practical, piping and
instrumentation diagrams (P&IDs) should be
provided as the system diagram. For a fluid system
or a ventilation system, the system diagram might be
some form of a flow diagram. A P&ID is a system
flow diagram that also shows the location of
installed instrumentation and controls. For an
electrical system, the system diagram might take the
form of a one-line diagram. For electronic systems
that involve components such as transducers,
bistable voltage comparators, and power supplies, a
system functional block diagram might be the most
informative. For a computer system, the system
diagram might take the form of a combination of a
hardware diagram and a summary logic diagram.
The system diagram shall encompass at least all the
major components provided to meet the
requirements of the system. The components shown
on the diagram should be identified in the same
manner as the equipment is labeled in the field.
Pertinent sizing values should be shown on the
diagram. For example, a fan may be identified as
10,000 cfm, a pump may be labeled as 250 gpm, an
electrical transformer may be identified as
480V/120V.
This section should also describe any operational or
maintenance features that are beyond the design
requirements. For example, a ventilation damper
position indicator may have been installed in the
operations center (in addition to the local position
indicator) as an enhancement due to operational
problems with that particular damper.
4.1.2 Boundaries and Interfaces
It is important to define the boundaries of the system
so that components at or near the boundaries are
classified properly and hence receive appropriate
attention in activities such as the procurement of
replacement parts and maintenance actions.
The precise boundaries of the system should
encompass all components necessary for the system
to meet all of its requirements. This includes
mechanical boundaries, electrical boundaries, other
support systems boundaries, and instrumentation
and controls boundaries.
Mechanical boundaries should be based on
components, and not based on a room location.
Such components may be capable of isolating one
system from another system. For example, these
components might be isolation valves or dampers,
fill and drain valves, vent valves, or safety relief
valves. The system boundaries should extend out to
and include such interface isolation devices.
Section 27
Heat exchangers are typically assigned to the system
from which the heat is being removed, when the
primary function is remove heat; or to the system
that is being heated, when the primary function is to
provide heat. Mechanical support components for
piping and duct work should be included in the
primary system, unless a separate facility system
has been defined to address such supports
generically.
Electrical boundaries are usually located at circuit
breakers. For electrical power distribution system,
those breakers that route power to other distribution
points are usually considered to be part of the
electrical power system. However, those breakers
that provide power uniquely to a particular system
are often considered to be part of that system,
instead of the electrical power system. For example,
if a particular pump motor gets its electrical power
from a specific circuit breaker in a panel, the
breaker is assigned with the pump motor to the
pump system. The system boundary for the pump
system would be at the input/line/supply side of the
circuit breaker, not at the load side of the circuit
breaker.
When instrument air is provided to support the
functioning of a system, the instrument air
components that are necessary for the system being
described to accomplish its functions are usually
considered to be part of that system. Where
applicable, the boundary of the system should
extend out to and include the first upstream isolation
valve in the air supply if the system can still
function when the isolation valve is closed.
Sometimes this may be at a check valve associated
with an air accumulator.
The Instrumentation and Controls (I&C) systems
are usually not designated as separate systems but
rather are most often considered integral portions of
DOE-STD-3024-98
Page 17
the system being controlled. The system boundaries
are then usually determined by the interfaces with
the supporting electrical power or instrument air
necessary to make the I&C portions perform
properly.
A separate I&C system may include sensors,
controls, signals to actuated equipment, and alarms.
For example, an I&C system might include a flow
sensor, a signal comparator, and a control signal
that would open a valve more if the flow were to be
below the desired value, or close the valve if the
flow were to be above the desired value. If the I&C
system has been designated as a separate system, the
boundaries might be selected at the mechanical
output connections to the flow sensor and at the
input signal connections to the valve actuator.
Interfacing systems need to be defined with the level
of detail necessary to ensure proper functioning and
necessary support. The most critical of these
interfacing systems are “support systems” because
they provide services that are necessary to the
system being described. Electric power (both
motive power and control power), steam power, and
instrument air are examples. For the current actual
configuration of the system, the important
characteristics of the support systems shall be
defined.
The system being described may also provide
support that is essential to the performance of
another system. For example, a particular control
system may be essential for the proper operation of
a ventilation system.
4.1.3 Physical Layout and Location
Section 28
The system diagram, being schematic in nature,
does not identify the location of the equipment or
physical configuration. This section (or another
figure) should explain where the equipment is
installed (building, room numbers) and its physical
arrangement within each room. Any special features
regarding the installation, location or arrangement of
the equipment should be explained.
4.1.4 Principles of Operation
This section shall describe generally how the system
operates with emphasis on how the system
accomplishes its required functions. This discussion
should also describe other operational features about
the system. For ease of understanding, the
discussion should use a walk-down approach,
referring to and following the system and subsystem
flow paths in the diagram.
The description should not be limited to the required
performance, but rather it should reflect the full
capabilities and capacities of the installed system.
Extra optional capabilities of the system design,
beyond that required, such as extra capabilities
beyond the safety margins that were added by the
designer or were obtained as part of the procurement
process should be identified to prevent these from
being considered as part of the “safety margin” at
some time in the future. For example, a particular
set of components might have been required to be
designed for a 0.20 g earthquake, but the actual
equipment was designed and qualified for a 0.35 g
earthquake.
The discussion should be appropriate to the intended
audience of the SDD. This discussion should not be
so detailed as to approach an engineering analysis or
so simplistic as to not add value to the SDD. This
discussion should be developed in coordination with
the discussion of the system operational
considerations to be provided in Section 4.2
“Operations” in a manner that avoids unnecessary
overlap or repetition.
When components of the system are unusual or
complicated, the principles of their operation should
be explained. For example, if the system contains a
proportional-integral-derivative (PID) controller, its
operation should be summarized because many
readers may need to be educated on this type of
controller or at least reminded.
4.1.5 System Reliability Features
This section shall describe any attributes, features,
design or operating characteristics, and other
information important to the reliability of the
system.
DOE-STD-3024-98
Page 18
System design characteristics such as preferred
failure modes or "fail-safe" positions or states shall
be discussed. This section should discuss other
known failure modes of the system and their affects
on the system and the facility. (The associated
compensatory measures and recovery action are
addressed in Section 4.2.4.) References should be
provided to applicable engineering studies or failure
modes and effects analyses (FMEAs), if such
reports are known to exist. Features in the system
design that make the system testable shall be
described.
Where the system includes redundant subsystems or
components, the SDD description shall identify
these redundant features. The SDD shall describe
the capacity and degree of redundancy provided.
For example, a particular design might require the
operation of two exhaust fans at all times, but four
fans are provided in the design. If two fans are
necessary, each might be a 50% capacity fan, with
two additional 50% fans in standby ready for
operation. Also, discuss independence of the
redundant features. Any technical limitations on the
use of the redundant features shall also be described.
For example, while four fans are available for
operation, a maximum of only three fans is allowed
to be operated at one time to avoid excessive flow
rates.
Section 29
4.1.6 System Control Features
This section shall describe the indication, alarm, and
control features of the system that are used to
operate the system and monitor its performance.
Control logic diagrams should be provided.
4.1.6.1 System Monitoring
The instrumentation, indicators, alarms, and other
information provided to operations personnel,
remote and local, to allow assessment of system
status and performance shall be described, including
types, ranges, and accuracies. This may include
indicators, recorders, status lights, CRT displayed
information, computer printouts, and information
automatically stored on disks or tapes. The
locations of these items should be identified clearly,
such as being mounted directly on the equipment,
installed remotely on a nearby control panel, or
installed remotely in a central location.
Instrumentation either directly subject to TSRs or
that provide information to verify compliance with
TSRs shall be identified as such.
4.1.6.2 Control Capability and Locations
System, equipment, and component manual
operational controls shall be described. The
locations of these controls and the actions caused by
actuating these controls shall be identified clearly.
4.1.6.3 Automatic and Manual Actions
The SDD shall describe the conditions under which
important features are to be activated and whether
these features are activated automatically or
manually. Where automatic or manual controls are
specifically associated with specific instrumentation,
the instrumentation and control actions should be
correlated in the SDD. For example, the control
action might be taken only upon reaching a
particular value as detected by a specific
instrumentation channel or displayed by a specific
indicating device, or an indicator might provide
feedback of system response that must be closely
monitored
Where alarms are provided that are intended to
trigger manual safety actions, the SDD shall provide
an overview of the operator actions that are to be
taken and refer to the corresponding operating
procedures that govern the operator responses to the
alarms. Alarms for non-safety actions (such as
those that identify the need for operational
adjustments or fine tuning) should be described
similarly. Here again, footnotes should be used to
point to the particular procedure in the appropriate
appendix to the SDD. This discussion should be
coordinated with the discussion in Section 4.2
“Operations” related to off-normal operations in a
manner that avoids unnecessary overlap and
repetition.
4.1.6.4 Setpoints and Ranges
This section of the SDD shall identify setpoints
associated with the system (including pre-trip
DOE-STD-3024-98
Page 19
alarms) and the purpose of the setpoints. The
values of setpoints and other system limitations shall
be correlated with the system requirements,
especially TSR-required setpoints.
Note: It is common practice to include
setpoints and limitations information in
a set of tables in a stand-alone
document that contains such
information for numerous systems.
When a setpoint entry is made into the
table, the entry needs to identify the
adjustment by name, where the
adjustment is located physically, where
and how the adjusted value is
determined, the nominal value of the
adjustment, the range of acceptable
values for the setpoint, and the bases
for the values. The acceptable ranges
need to be specified in actual values,
not as tolerances, percentages, or other
approaches tha t necess i ta te
calculations.
Section 30
It may be advantageous not to repeat setpoint data
in the SDD in order to avoid the need to revise the
SDD each time a setpoint specification is changed.
When complete setpoint data is not provided as part
of the SDD, a reference shall be provided to the
separate document that contains the governing
setpoint information.
Internal controls and adjustments that are beyond
the domain of operators but within the domain of
maintenance personnel should be identified. It is not
necessary to identify all adjustments in the SDD;
however, some setpoints will affect the limits of
performance of the equipment and should be made
known to the operators. For example, a backup
diesel generator may have an automatic trip on
overspeed or overcurrent. The preferred approach
to these setpoints is to identify in the SDD those
setpoints that have a direct bearing on the limits of
system performance and to present the nominal
values of those setpoints. The SDD should also
provide a footnote reference to the maintenance
procedures or other information that identifies all the
internal setpoints and adjustments and provides the
range of acceptable values.
4.1.6.5 Interlocks, Bypasses, and Permissives
This section shall identify interlocks, automatic and
manual operating bypasses, permissives, and other
design constraints or conditions associated with the
system being described. For example, the function
of a particular safety system may become available
automatically after system pressure exceeds a
specified value, but be deactivated below this
pressure to prevent inadvertent actuation when the
system is operating within a pressure range for
which the safety function is not needed. Interlocks
provided to prevent or permit certain system actions
or responses only when specific conditions are met
shall be listed. Provisions for manually disabling,
bypassing or otherwise altering system performance,
and the conditions and limitations under which they
are to be used shall be identified and explained.
4.2 Operations
In this section, where operations personnel have
voluntarily adopted good practices related to the
operation of the system, those practices should be
identified. For example, operations personnel may
have assigned equipment nomenclatures and
equipment labeling in accordance with a particular
good practices guide.
4.2.1 Initial Configuration (Pre-startup)
Some systems must be verified (for example, by
system walkdown or status checks) to be in the
proper configuration for system operation prior to
those systems being started. When this is the case,
the SDD should describe the pre-startup
configuration in general terms and provide a
reference to the applicable procedure(s).
Note: Previously, the use of footnotes
and bibliographical information in an
Appendix has been discussed with
regard to referring to system
requirements and source documents.
In a similar manner, footnotes should
be used to refer to procedures for
system operations.
DOE-STD-3024-98
Page 20
4.2.2 System Startup
This section shall summarize the key steps in the
startup procedure and refer to the corresponding
procedure.
Particular attention should be drawn to the startup
sequence, any timing that is involved, and how it is
determined that the system is ready for the next step.
Finally, this section should describe how to
determine if the system was started up successfully
or unsuccessfully.
4.2.3 Normal Operations
Section 31
This section shall identify all the normal operating
modes of the system, describe when each mode is
appropriate, and generally how mode changes are
accomplished. A reference shall be provided to the
procedures that cover system operations, including
operational mode changes, to the extent that such
procedures exist. A footnote that refers to a
particular referenced item in the appropriate
appendix to the SDD may be convenient. This
section should then focus on and describe the most
frequently used mode of operations, including
routine checks on system performance and
performance data logging that are performed by the
operations staff to verify that the system is operating
normally, including the key parameters and their
nominal values. Those surveillance actions
preformed by maintenance staff should be identified
in Section 4.3.
This section should also identify the types of
automatic records or logs that are maintained by or
for the system in the central control area, including
any equipment status changes that are “alarmed”
during normal operations.
This section should also briefly address Conduct of
Operations as it applies to this particular system.
For example, at shift turnover, certain types of
information about how this system is functioning
might be appropriate or required. Then a reference
should be provided to the specific procedure that
provides the details for these aspects of the
operation of the system.
4.2.4 Off-Normal Operations
This subsection shall identify off-normal conditions
for which the system is intended to operate. Off-
normal events range from simple, ordinary events
such as the failure of a particular component, to
anticipated system upsets (such as loss of cooling or
lubrication, excessive leakage, or high radiation
levels), to unlikely events such as a fire, explosion,
or earthquake. For each off-normal event, this
section should identify how the upset would be
detected, describe the impact of the event on
functional capability of the system (and to the extent
appropriate, the impact on the facility).
This section should briefly summarize the recovery
actions for each type of off-normal condition. Some
facilities use what are called “Alarm Response
Procedures” that define pre-planned, reviewed, and
approved actions that operators are to take when
particular alarms are activated. Typically, such
procedures will identify each important alarm that
requires action, describe what conditions will cause
that alarm to activate, define those few immediate
operator actions, and then define those less urgent
follow-up actions that are appropriate to that alarm.
This section should provide a reference to the
appropriate documents for recovery actions.
4.2.5 System Shutdown
If it is necessary to shut down the system in a
particular sequence or with special timing, those
system shutdown actions shall be summarized and a
reference to the corresponding procedure provided.
4.2.6 Safety Management Programs and
Administrative Controls
This subsection shall identify the aspects of safety
management programs that apply to the system
being described. This discussion should focus on
the unique aspects of the application of those
programs (such as radiation control and
configuration management) and simply reference the
general programs that apply to many systems at the
facility.
This section should identify administrative controls
placed on the System and/or its operation, and
DOE-STD-3024-98
Page 21
Section 32
reference the associated procedures. If general
access to the equipment of the system is restricted in
any way, those restrictions shall be identified in
general terms.
4.3 Testing and Maintenance
In this section, where maintenance personnel have
voluntarily adopted good practices related to the
system, those practices should be identified. For
example, maintenance personnel may have decided
that all battery testing will be performed in
accordance with a particular national standard.
4.3.1 Temporary Configurations
Situations under which temporary configurations are
used during surveillance or maintenance shall be
identified and described in the SDD. The SDD shall
state the operational limitations on the use of those
configurations and shall refer to the applicable
governing procedures.
In some cases, it is necessary to use temporary
configurations in order to conduct surveillance,
testing, inspection, and maintenance activities
properly. For example, it might be necessary to lift
leads temporarily so that the fire deluge system will
not be activated during the test of the fire detection
system. In most cases, there are operational
limitations on the use of such temporary
configurations that may impact system availability.
For example, redundant sets of equipment might not
be allowed to be jumpered out, bypassed, or
otherwise rendered out of service at the same time.
Another type of limitation might be time constraints
on how long lifted leads, jumpers, bypasses, etc. are
permitted to be in use, especially where operability
is a factor. It might be necessary to provide
compensatory measures during the time some
equipment is not operable or out of service. Another
limitation might be special provisions in procedures
to control the use of such temporary configurations
adequately, including removal verifications,
especially if the use or misuse of such
configurations could affect safety or availability.
4.3.2 TSR-Required Surveillances
When the system being described is the subject of
TSR/OSR Surveillance Requirements, the SDD
shall summarize the methods used to meet the
requirements in this area (including confirmation
that the acceptance criteria have been met), and
refer to the procedures used to implement these
requirements.
4.3.3 Non-TSR Inspections and Testing
When the system being described is the subject of
non-TSR/OSR inspection, testing, or surveillance
requirements, the SDD shall summarize the methods
used to meet the requirements in this area (including
confirmation that the acceptance criteria have been
met), and shall provide references to the
implementing procedures.
4.3.4 Maintenance
This subsection of the SDD is aimed primarily at
meeting the needs of maintenance personnel,
although it contains some information that is
important to operating personnel. This information
is also important to the system engineer in the role
of being responsible for all aspects of the system,
which includes testing and maintenance actions.
The SDD shall summarize the routine actions
required by preventive maintenance procedures and
post-maintenance testing procedures. This section
may also provide references to appropriate
maintenance procedures.
4.3.4.1 Post-Maintenance Testing
This section shall explain the extent to which a post-
maintenance testing program is applied to the
system being described. Key performance or
acceptance criteria that must be satisfied or verified
during post-maintenance testing (for the system to
fulfill its functions such as those identified in the
hazards and accident analyses) shall be identified.
The SDD should also provide appropriate references
to post-maintenance testing procedures.
Section 33
DOE-STD-3024-98
Page 22
4.3.4.2 Post-Modification Testing
In some cases, the maintenance organization also
serves as the construction or installation
organization for system modifications. In such
cases, extreme care is necessary to ensure that
change activities are recognized as different from
maintenance. The SDD shall explain the extent to
which a post-modification testing program applies to
the system being described.
4.4 Supplemental Information
Some contractors have found it beneficial to address
supplemental topics in the SDD in order to facilitate
other considerations, including the Unreviewed
Safety Question process. This section of the SDD
may include the following topics:
a. Summary of potential system and component
failures (and reference to a Failure Modes
and Effects Analysis (FMEA) or similar
analysis if one exists)
Failure Modes
Probability/Likelihood
Consequences (effects of failures)
Mitigative Features
b. Margins of Safety in the design
c. Optional extra performance capabilities
d. Summary of critical engineering studies and
calculations
e. System limitations and precautions
f. Other
Appendices to the SDD
Appendix A: Source Documents
This appendix shall contain the bibliographical
information for documents that are referenced in the
body of the SDD. It may be decided to provide
separate appendices for documents of various types,
such as: design documents, procurement documents,
vendor documents, etc. or it may be decided to
subdivide a single appendix into subsections that
address different document types.
Appendix B: System Drawings and Lists
This appendix shall identify the diagrams and
drawings and other relevant information provided in
separate documents, tables or lists associated with
or affecting the system being described. These
might include physical arrangement diagrams,
isometric drawings, installation drawings, P&IDs,
functional control diagrams, process flow diagrams,
schematic and one-line diagrams, wiring diagrams,
sketches of particular portions or features of the
system, load lists, setpoint tables, and instrument
calibration lists.
Additionally, Master Equipment Lists, Parts Lists,
Bill of Materials, and lists showing the hierarchy of
drawings that are pertinent to the system being
described should be identified.
To avoid unnecessary revisions of the SDD, this
tabulation of the system drawings should not include
specific revision numbers/letters nor revision dates.
Instead, this appendix should state that the most
recently approved version is to be used.
Appendix C: System Procedures
This appendix should contain a listing of the
procedures associated with or affecting the system
being described. In a manner similar to the System
Drawings appendix, this appendix should avoid
specific revision information. Procedures should be
listed in groups according to their general type, for
example, operating procedures, TSR surveillance
procedures, and maintenance procedures.
Appendix D: System History
This appendix is optional. This appendix should list
those system modifications or changes considered to
be of significance, such as those that result in
changes to requirements, bases, TSRs, and
setpoints. The maintenance and repair actions
considered to be of major significance should also
be identified. Each such modification or change,
and maintenance or repair action should be briefly
summarized and the appropriate documentation
(such as, design change packages or work packages)
referenced. System history information may be kept
Section 34
DOE-STD-3024-98
Page 23
in separate referenced files or in the SDD, but it
should be kept.
DOE-STD-3024-98
Page 24
INTENTIONALLY BLANK
DOE-STD-3024-98
Att 1-1
Attachment 1
Application of the Graded Approach
to the Development of SDDs
The graded approach provides substantial flexibility for the development of SDDs that can be meshed with
the priorities and resources available to the facility. This appendix addresses the systems for which SDDs
may be appropriate, and the application of the graded approach to SDDs including the phased approach to
such developments.
FACILITY CATEGORIZATION
The graded approach should be applied based on a number of considerations, including the hazard
categorization of the facility (in accordance with DOE-STD-1027) and the categorization of the system.
Appropriately graded levels of effort could then be established, each of which would provide system
requirements and system description information. At a Hazard Category 1 nuclear facility, it might be
decided, for example, that a Facility Design Description (FDD) will be developed and SDDs will be
developed for all safety and mission critical systems. At a Hazard Category 2 nuclear facility, it might be
decided, for example, that SDDs will be developed only for safety SSCs. At a Hazard Category 3 nuclear
facility, it might be decided, for example, that separate SDDs would not be developed, but instead an FDD
would be developed which describes the facility from an overall perspective and summarizes all the SSCs.
Such an FDD would most likely emphasize the system requirements and system descriptions for each System.
FACILITY REMAINING LIFETIME
The useful life of the completed SDD should be long enough to make it worth the resources expended to
develop the SDD. If the remaining operational lifetime of the facility is only a couple years, it might be
concluded that the development of SDDs is not worthwhile.
SSC CLASSIFICATION
The systems within the facility should be classified in accordance with DOE-STD-3009. The system
importance classification should be used to determine which systems need to have SDDs developed. All
safety SSCs should have SDDs developed (Safety SSCs include both Safety-Class SSCs and Safety-
Significant SSCs). Serious consideration should also be given to developing SDDs for environmental-
protection and mission-critical Systems.
GRADING WITHIN AN SDD
When the decision has been made to develop an SDD for a particular system, the graded approach determines
the level of effort to be applied during development.
The factor that will have the greatest effect on the level of effort involved in developing an SDD is the
complexity of the system involved. Simple systems might yield an SDD of only a few pages. Complex
systems might necessitate many pages to describe its requirements, bases, and operational aspects.
http://www.doe.gov/html/techstds/standard/std1027/s1027cn1.pdf
http://www.doe.gov/html/techstds/standard/std3009/std3009.pdf
DOE-STD-3024-98
Att 1-2
Another way in which the graded approach can be applied to the development of SDDs is the level of effort
that would be expended in retrieving, compiling, and assembling existing design information (that is,
requirements and bases information). See Attachment 2 to this standard.
Section 35
The topics that need to be addressed in an SDD may be adjusted using the graded approach. The most
important systems would have SDDs that are the most comprehensive. Less important systems might not
warrant the cost of developing such comprehensive SDDs. For example, sections of the outline such as
“Operations” (Section 4.2) and “Testing and Maintenance” (Section 4.3) might be considered for omission.
Having determined which topics of the outline need to be addressed in an SDD for a particular system, the
next consideration is the level of detail to which a topic should addressed. For important systems, a
particular topic in the outline may warrant a page or more of discussion. For a less important system, that
same topic may warrant only one short paragraph or simply a reference to appropriate procedures. This is
particularly pertinent with regard to Section 4 of the SDD.
The graded approach must not be used to justify inaccuracies in SDDs. Bad information is worse than no
information. Care must be exercised to ensure that all statements, tables, drawings, and other information in
an SDD is accurate, regardless of the system classification and the graded approach.
PHASED APPROACH
In addition to the decisions regarding which systems warrant SDDs and the extent of the content of particular
SDDs, another important consideration is whether to schedule or divide the development of those SDDs into
time phases. For example, SDDs for safety-class systems might be developed during the first year, followed
by SDDs for safety-significant systems the second year. The remaining SDDs would be scheduled for
subsequent years.
The content of the SDDs might be scheduled for development in stages. For example, the most important
sections of the SDD (such as the System Requirements and Bases) would be developed for all SDDs during
the first phase and issued as Revision 0 of those SDDs. Then during the subsequent phase, those SDDs
would be revised (completed) by developing the remaining sections (such as the System Description) and
issuing them as Revision 1 of the SDDs.
DOE-STD-3024-98
Att 2-1
Attachment 2
Compiling Technical Information
for the Development of SDDs
A key variable in determining the level of effort that the development of an SDD will involve is the amount of
effort that goes toward locating, screening, reviewing source documents, and extracting the desired
information from them. This effort could range from almost nothing to a project that requires substantial
effort. Obviously, the more technical information that is used, the better the quality and usefulness of the
resulting SDD. However, because the costs and schedule will tend to grow, facility management will need to
make a decision regarding the level of effort. This attachment provides information that can help with that
decision.
AVAILABILITY OF DESIGN INFORMATION
There may be a perception that existing DOE nuclear facilities have little or no design information available
(that is, requirements and basis), that it would be prohibitively expensive to retrieve, and would probably not
be relevant to the current facility configuration. There may also be the perception that only new facilities
have any design information available.
Section 36
These perceptions are not completely accurate. Field experience in both the commercial nuclear industry and
the DOE nuclear complex indicates that some virtually new facilities have already “lost” important design
information that once existed, and that many “existing” facilities have a fair amount of design information
still on-hand or reasonably retrievable. In some cases, the need to capture the design information when it was
produced was not recognized, and as a result it may have been simply discarded at the end of the design
effort. The same is true for modifications to existing facilities. The situation varies widely, however. At a
few facilities, there is almost no information available. At some, a moderate amount of information is on-
hand but some essential information is no longer available. At others, a moderate amount of information is
on-hand, but the reliability or trustworthiness of the information is questionable. At a few, a vast amount of
information is available that is highly trustworthy.
Whether a facility is a new facility or an “existing” facility is not a significant factor, but rather more directly
the amount of design information necessary, and whether that information is on-hand or can be retrieved
within reasonable efforts.
THE DOE-STD-3009 APPROACH
DOE-STD-3009-94 provides a sound approach to establishing the important technical requirements for
safety SSCs that are used in the development of upgraded FSARs to meet DOE 5480.23. That approach
involves a combination of two points: (1) Using design information that is immediately available or can be
retrieved through reasonable efforts; and (2) Developing new information regarding the necessary functional
requirements as part of the process hazards analysis effort in sufficient detail to support the safety analysis.
Documented engineering judgements (including their bases) can be used to extrapolate existing information
and thereby establish the performance capabilities of the existing systems. The assumed performance
capabilities can often be verified against records of operating experience or by testing, at relatively small
costs. These capabilities, once verified to be adequate by analysis and validated in the field, then become
requirements. This approach has technical merit and is suggested by OSHA in its rulemaking regarding the
process hazards analysis program. When sufficient technical information is not on-hand or reasonably
retrievable, this second method is strongly recommended.
http://www.doe.gov/html/techstds/standard/std3009/std3009.pdf
DOE-STD-3024-98
Att 2-2
DOCUMENT RETRIEVAL
Efforts to retrieve design information have sometimes been limited to search only for specific types of
information under the perception that such a limitation will lead to cost-effective results. Although general
decisions regarding how far to look for information can be made and are valid, experience has shown that a
priori limiting the search to certain types of information may not be effective nor efficient.
Reasonable general limitations can be placed on the search for design information. A recommended approach
is to try to identify the most promising locations and search only those places. This is the concept of a “smart
search.” With a very small effort, it is usually possible to identify those locations that are most likely to have
the desired information. A few telephone calls could be made to long-term employees to find out where the
most fruitful places to look are. For example, someone may remember a packrat engineer who never throws
away anything and his file cabinets are rich; someone in program management who has the files on old
projects; or someone in document control center. When these few most productive locations have been
searched, the “smart search” is complete.
Section 37
An important management consideration is to know when to stop. How will we know when we have searched
long enough? To facilitate answering this question, it is necessary to understand the information that is
needed and the types of documents that are likely to contain the information. The information required is
indicated by "shall" statements in the body of this standard. Engineers who have had design experience with
large engineering firms can usually tell us what types of documents are typically produced for different types
of systems and components. The search can be stopped upon completion of reasonable efforts to retrieve the
types of documents that would be expected to contain the information.
REVIEWING RETRIEVED DOCUMENTS
The system engineer (cognizant facility engineer) can easily and quickly ascertain which of the retrieved
documents contain information that is applicable to the current configuration of the facility. This can
sometimes be accomplished on the basis of the date of the document and a knowledge of previous system
modifications.
A question arises about what would we do with the documents that are not related to the current SDD task.
Some suggest merely casting those documents aside or sending them to Records Management for storage. A
better approach might be to make a list of the documents found, to avoid having to re-scan this location
during future tasks. For example, when the next SDD is being developed, we might need some more
information from that location. An even better approach is to conduct the search/retrieval process for all the
SDD systems as one consolidated task and to keep an inventory of other documents found for broader future
uses.
Having retrieved some documents related to the system at hand, how might we sort that information? One
approach is to sort the documents by system, then by type of document (reports and studies, analysis,
calculations, drawings, specifications, procurement documents), and finally by document date (with the most
recent documents on top).
The next step would be to review the documents and extract the design information. Experience indicates
that when important relevant design information is found, it will likely contain both requirement information
and basis information.
The information is not likely segregated as safety design information and non-safety design information. So
what do we do with the non-safety information? Having completed the search and located the information in
DOE-STD-3024-98
Att 2-3
specific documents, it would seem senseless not to use it just because it is not-safety-related. The majority of
the cost of retrieving the information has already been spent, so it would be very cost-effective to include this
non-safety information in the SDD, also. Besides, SDDs are not limited in scope to safety-related
information.
RESOLVING CONFLICTING INFORMATION
Invariably it seems, we will find that some information in one source document does not agree with
information in another source document. Fortunately, most of the time, these conflicts can be quickly
resolved. For example, the cognizant system engineer may be able to identify information that is outdated
and no longer applicable. However, sometimes, the conflicts cannot be easily resolved. In these cases the
conflict should be formally documented and tracked until it is resolved. It is recommended that a log of Open
Items for the SDD be kept for this purpose.
Section 38
The Open Items need to be reviewed to determine if any are safety-significant. Safety-significant Open Items
should be treated as discrepancies within the facility non-conformance program. The discrepancies need to
be reviewed also to determine if any impact “Operability” of any systems, or might be “reportable
occurrences.” Open Items that are not safety-significant, but involve critical information that could have an
adverse impact on facility operations should also be formally tracked to closure.
MISSING INFORMATION
With the retrieval of design information completed, a determination should be made regarding what
information may still be missing and if any of that information is truly critical to safety or to effective and
efficient operations. If the missing information is not critical, do not invest any more time and money into
perfecting the data bank. If the missing information is truly critical, a plan must be developed to recover that
information. Here again, the DOE-STD-3009 approach to the problem may be valuable. In a few cases,
calculations or analyses might have to be regenerated.
http://www.doe.gov/html/techstds/standard/std3009/std3009.pdf
DOE-STD-3024-98
INTENTIONALLY BLANK
DOE-STD-3024-98
Att 3-1
Attachment 3
Developmental References
This Attachment identifies documents that are considered during the development of this standard, either
directly or indirectly, and provides the bibliographical information that might be needed to retrieve these
documents for background information purposes.
1. DOE 5480.19 “Conduct of Operations Requirements For DOE Facilities,” 7-9-90, Change 1:
5-18-92.
2. DOE 5480.21 “Unreviewed Safety Questions,” 12-24-91.
3. DOE 5480.22 “Technical Safety Requirements,” 2-25-92, Change 1: 9-15-92, Change 2: 1-23-96.
4. DOE 5480.23 “Nuclear Safety Analysis Reports,” 4-10-92, Effective Date: 4-30-92, Chg 1: 3/10/94.
5. DOE 5700.6C “Quality Assurance,” 8-21-91.
6. DOE-STD-1027-92 “Hazard Categorization and Accident Analysis Techniques for Compliance with
DOE Order 5480.23, Nuclear Safety Analysis Reports,” December 1992, Change 1: September 1997.
7. DOE-STD-1073-93 “Guide for Operational Configuration Management Program,” Part 1 and Part 2,
November 1993.
8. DOE-STD-3009-94 “Preparation Guide for U. S. Department of Energy Nonreactor Nuclear Facility
Safety Analysis Reports,” July 1994
9. DOE Office of Field Management Good Practice Guide GPG-FM-012 “Configuration and Data
Management,” April 1996.
10. DOE Office of Defense Programs “Interim Guidance on Authorization Basis,” Revision 1, August 21,
1995.
11. DOE Office of Defense Programs Safety Information Letter (SIL) No. 95-04 “Management of Safety
Analysis Report Information Using Standard Configuration Management Practices,” June 1995.
12. DOE Office of Defense Programs Safety Information Letter (SIL) No. 96-04 “Improved Safety
Function Definition in Safety Documentation For Nuclear Facilities,” September 1996
13. Electronic Industries Association (EIA) document EIA/IS-632 “EIA Interim Standard: System
Engineering,” December 1994
14. Electronic Industries Association (EIA) document EIA/IS-649 “EIA Interim Standard: National
Consensus Standard for Configuration Management,” August 1995.
15. International Organization for Standardization (ISO) document ISO 10007:1995 “Quality
Management — Guidelines for Configuration Management,” First Edition, April 15, 1995.
Section 39
http://www.doe.gov/html/techstds/standard/std1027/s1027cn1.pdf
http://www.doe.gov/html/techstds/standard/std3009/std3009.pdf
http://www.doe.gov/html/techstds/standard/std1073/s1073toc.pdf
DOE-STD-3024-98
INTENTIONALLY BLANK
DOE-STD-3024-98
CONCLUDING MATERIAL
Project Number: Preparing Activity: Preparing Agent:
EDCO-0001 DOE-DP-45 J. T. BEARD, INC.
Mr. John Fredlund ENGINEERING CONSULTANT
Mr. Rick Kendall
Review Activity:
DOE-HQ DOE Field Offices DOE Area Offices DOE Other
EE ALO Amarillo Bonneville Power Administration
EH CHO Fermi Fernald Environmental Management
EM GFO Kansas City Grand Junction Project Office
ER IDO Kirtland Morgantown Energy Technology Center
FE OAK Los Alamos Pittsburgh Energy Technology Center
GC OHO Miamisburg Western Area Power Administration
IG ORO Sandia
NE RFO West Valley
NN RLO
PO SRO
RW NVO
National Laboratories DOE M&O Contractors
Ames Laboratory Lockheed Martin Energy Services
Argonne National Laboratory Mason & Hangar Company
Brookhaven National Laboratory Oak Ridge Associated Universities
Energy Technology Engineering Center Westinghouse Savannah River Company
Fermi National Accelerator Laboratory
Idaho National Energy & Environmental Laboratory
Lawrence Berkeley National Laboratory
Lawrence Livermore National Laboratory
Oak Ridge National Laboratory
Pacific Northwest National Laboratory
Princeton Plasma Physics Laboratory
Stanford Linear Accelerator Laboratory
DOE-STD-3024-98
FOREWORD
Table of Contents
INTRO TO STANDARD
Purpose of SDD
Purpose of Standard
Applicability
Tailoring (Graded App)
Format & Content of Std
Glossary
Abbreviations and Acronyms
References
OUTLINE OF SDD
Technical Content Guidance
Chapter 1 Introduction of an SDD
1.1 System Identification
1.2 Limitations of this SDD
1.3 Ownership of this SDD
1.4 Definitions/Glossary
1.5 Acronyms
Chapter 2 General Overview
2.1 System Functions
2.2 System Classification
2.3 Basic Operational Overview
Chapter 3 Requirements and Bases
Requirements
Bases
References
3.1 General Requirements
3.2 Specific Requirements
3.3 Engineering Disciplinary Requirements
3.4 Testing and Maintenance Requirements
3.5 Other Requirements
Chapter 4 System Description
4.1 Configuration Information
4.2 Operations
4.3 Testing and Maintenance
4.4 Supplemental Information
Appendices to the SDD
Appendix A: Source Documents
Appendix B: System Drawings and Lists
Appendix C: System Procedures
Appendix D: System History
Attachment 1
Attachment 2
Attachment 3
CONCLUDING MATERIAL