DOE-STD-1213-2014 Chg Notice 2, Protective Force Contingency Planning Technical Standard
In light of the events of September 11, 2001, and subsequent international terrorism events, it is even more vital than before to ensure national security interests and departmental personnel are well protected. Emergency situations stemming from natural or man-made disasters, including terrorist activities, may require the establishment and deployment of a contingency protective force (CPF) and the sustained conduct of operations. This Technical Standard has been developed to support the continued safe and secure operation of Department of Energy (DOE) sites and facilities, including National Nuclear Security Administration (NNSA) sites and facilities, and the protection of Departmental employees, including NNSA employees, contractor employees, and the public under such adverse conditions.
Version history and related documents
Supersedes
Earlier documents this one replaced.
Related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DOE-STD-1213-2014
July 2014
Change Notice NO 1
September 2015
Change Notice NO 2
August 2019
DOE STANDARD
PROTECTIVE FORCE CONTINGENCY PLANNING
TECHNICAL STANDARD
U.S. Department of Energy Washington, D.C.
20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
NOT MEASUREMENT
SENSITIVE
DOE-STD-1213-2014
Available to the public on the DOE Technical Standard Program website at
www.standards.doe.gov.
DOE-STD-1213-2014
iii
ATTACHMENT 1
Change Notice No. 2 DOE-STD-1213-2014
June 2019
Protective Force Contingency Planning Technical Standard
Table of Changes
Page/Section Change
Page ix, TABLE OF CONTENTS Added: “APPENDIX M Sample Lessons Learned”
Page 3, 2.2 INITIAL PLANNING Deleted: “non routine”
Added: “When time permits”
Changed: capital “A” to small “a”
Page 4, 2.4 CONTINGENCY
OPERATIONS PLAN
Added: “contingency”
Added: “Because the contingency operations plan
deviates from the approved security plan, the
contingency plan should delineate the change in
security risk to be accepted by the appropriate federal
security risk acceptance official.”
Page 4, 5, 2.6 SELF - ASSESSMENTS Added: “ a. OBJECTIVE.
(1) Provide assurance to the Secretary,
Departmental Elements, and other
government agencies that S&S interests and
activities are protected at the required levels.
(2) Provide DOE line management with the
information necessary to make informed
decisions regarding the allocation of
resources, acceptance of risk, and mitigation
of S&S vulnerabilities.
b. PURPOSE.
(1) Surveys, self-assessments, and review
programs are conducted to ensure that
S&S systems and processes at
facilities/sites are operating in compliance
with Departmental and national-level
policies, requirements, and standards for
the protection of security assets and
interests.
(2) These programs provide the means for
timely identification and correction of
deficiencies and noncompliant conditions
to prevent adverse events and validate the
effectiveness of corrective actions
DOE-STD-1213-2014
iv
implemented to address identified
deficiencies.”
Page 5, 2.7 PLANNING
CONSIDERATIONS, a. Operations , (3).
Added: “Representatives”
Page 9, 2.9 SITE OPERATIONS
REVIEW, e., (2).
Deleted: “is unacceptable”
Added: “or change in security risk must be
communicated to the appropriate federal security risk
acceptance official”
Page 11, 2.11 REQUESTS FOR
ASSISTANCE, a., (d)
Deleted: “(d) operations security and counter intelligence
issues and procedures; and”
Page 13, 3.2 COMMUNICATION Deleted: “HQ”
Added: “Program Office or Headquarters Departmental
Element as well as DOE Office of Security and General
Counsel which…”
Page 14, 3.4 DEPARTMENT OF
ENERGY FIELD ELEMENTS
Deleted: “f. NNSA/Program Offices” and “g. Office of
Security”
Page 17, 3.9 MEETINGS Deleted: “DOE”
Added: “Local Field/Site Officials and PF
Management…”
Page 24, 5.3 REQUIRED
QUALIFICATION
Added: “A, Chg. 1.”
Page 27, 5.7 LOGISTICS, c., Rotation Deleted: “If practical, some Augmentees may be
permitted to remain for an additional rotation if a
spousal visit can be arranged; the transportation and
training costs would be less than if a replacement had
to be sent and trained.”
Page 37, 8.2 RUMOR CONTROL Added: “the Local Field/Site Officials and…”
Page 38, 8.5 DAMAGE CLAIMS Added: “Confirmed acts of vandalism and violence
should be referred to federal oversight and local law
enforcement for disposition.”
Section 2
Page A-1, 4. Updated to Read: “DOE O 151.1D, Comprehensive
Emergency Management System dated 08-11-16.”
Page A-1, 5. Updated to Read: “DOE O 470.4B, Chg 2,
Safeguards and Security Program dated 7-21-
11.”
Page A-1, 6. Updated to Read: “DOE O 470.3C, Design Basis Threat
Order (DBT), dated 11-23-16.”
Page A-1, 7. Updated to Read: “DOE O 471.6, Chg 2, Information
Security Program, dated 6-29-11.”
Page A-1, 8. Updated to Read: “DOE O 472.2, Chg 1, Personnel
Security, dated 7-21-11.”
Page A-1, 9. Updated to Read: “DOE O 473.3A, Chg 1, Protection
Program Operations, dated 6-29-11.”
Page C-1, 3. APPROVAL Added: “APPROVAL
The CPF Operations Plan is a deviation from the
site’s approved security plan: the appropriate
DOE-STD-1213-2014
v
federal risk-acceptance official must approve the
CPF Operations Plan.”
Page M-1, APPENDIX M. Lessons
Learned Template
Added: “ APPENDIX M. Lessons Learned Template
Based on input
from___________________Management, as well as the
off-site POC, the overall management of the Strike Plan
went__________________. Every effort was made to
keep personnel informed as to the status prior to, during,
and after the strike. The communications and pre-
planning meetings proved __________as
___________worked through this event.
EXECUTIVE SUMMARY
SITE/FACILITY OVERVIEW
PRE-STRIKE PLANNING
Observations:
Lesson Learned:
STRIKE
Observations:
Lesson Learned:
RECOVERY
Observations:
Lesson Learned:
TIMELINE
SELF-ASSESSMENT
LESSONS LEARNED
CONCLUSION
SUMMARY OF FINDINGS
DOE-STD-1213-2014
vi
TABLE OF CONTENTS
FOREWORD ............................................................................................................................. xi
1. INTRODUCTION .........................................................................................................1
1.1 Purpose .................................................................................................................1
1.2 Scope ......................................................................................................................... 1
1.3 General .................................................................................................................1
2. PLANNING ...................................................................................................................3
2.1 General .................................................................................................................3
2.2 Initial Planning .....................................................................................................3
2.3 Action Plan...........................................................................................................3
2.4 Contingency Operations Plan ............................................................................. 4
2.5 Task List...............................................................................................................4
2.6 Self-Assessments .................................................................................................. 4
2.7 Planning Considerations .......................................................................................4
2.8 Policy Decisions...................................................................................................6
2.9 Site Operations Review........................................................................................7
2.10 Contingency Protective Force Scheduling ...........................................................8
2.11 Requests for Assistance ........................................................................................9
2.12 Special Planning Considerations ..........................................................................10
Section 3
3. COORDINATION .........................................................................................................11
3.1 General .................................................................................................................11
3.2 Communication ....................................................................................................11
3.3 Department of Energy ..........................................................................................12
3.4 Department of Energy Field Elements .................................................................12
3.5 Site Facility Management Contractor ................................................................. 13
3.6 Protective Force Contractor .................................................................................13
3.7 Contingency Operations Center .......................................................................... 14
3.8 Teamwork Concept ............................................................................................. 15
3.9 Meetings .................................................................................................................... 15
4. LIAISON WITH OTHER AGENCIES .........................................................................17
4.1 General .................................................................................................................17
4.2 Local Law Enforcement Agency Offices .............................................................17
4.3 State Agencies ......................................................................................................17
4.4 Federal Agencies ..................................................................................................18
4.5 Coordination Meetings.........................................................................................18
4.6 Site Access Monitoring ........................................................................................18
5. AUGMENTEE SELECTION AND REQUIREMENT STANDARDS ..........................21
5.1 General .................................................................................................................21
5.2 Requests for Assistance ....................................................................................... 21
DOE-STD-1213-2014
vii
5.3 Required Qualifications ....................................................................................... 21
5.4 Augmentee Identification .................................................................................... 22
5.5 Home Site Support ............................................................................................... 22
5.6 Reporting Date Coordination ............................................................................... 23
5.7 Logistics............................................................................................................... 23
5.8 Augmentee Welcome Package ............................................................................ 24
5.9 Augmentee In-Processing .................................................................................... 25
5.10 Badging ................................................................................................................ 25
Section 4
6. CONTINGENCY PROTECTIVE FORCE TRAINING ................................................. 27
6.1 General Training Requirements ........................................................................... 27
6.2 Training Plan ....................................................................................................... 27
6.3 Auxiliary Force Training ..................................................................................... 27
6.4 Augmentation Force Training .............................................................................. 27
6.5 Site-Specific Training Requirements ................................................................... 27
6.6 National Training Center Support ....................................................................... 28
6.7 Retraining and Remediation Policy ..................................................................... 29
6.8 Follow-On Training ............................................................................................. 29
6.9 Contingency Protective Force Validation Test Plan ............................................ 29
6.10 Replacement Training .......................................................................................... 30
6.11 Training Records ................................................................................................. 30
7. CONTINGENCY PROTECTIVE FORCE DEPLOYMENT ......................................... 31
7.1 General ................................................................................................................. 31
7.2 Contingency Operations Center Operations ........................................................ 31
7.3 Work Stoppage Deployment and Relief Planning ............................................... 32
7.4 Contingency Protective Force Deployment Preparations .................................... 33
7.5 Protective Force Equipment and Weapons Turn-In Procedures .......................... 34
8. MANAGEMENT RESPONSE TO WORK STOPPAGE ACTIVITIES ........................ 35
8.1 General ................................................................................................................. 35
8.2 Rumor Control ..................................................................................................... 35
8.3 Crossing Picket Lines .......................................................................................... 35
8.4 Guidelines for Crossing Picket Lines .................................................................. 36
8.5 Damage Claims .................................................................................................... 36
8.6 Operations Security ............................................................................................. 36
8.7 Bomb Threat Procedures ..................................................................................... 37
9. REDEPLOYMENT OF THE SITE PROTECTIVE FORCE .......................................... 39
9.1 General ................................................................................................................. 39
9.2 Protective Force Records Review ........................................................................ 39
9.3 Contingency Protective Force Change-Out ......................................................... 39
9.4 Contingency Protective Force Out-Processing .................................................... 40
DOE-STD-1213-2014
viii
Section 5
10. AFTER-ACTION REPORT AND LESSONS LEARNED ............................................. 43
10.1 General ................................................................................................................. 43
10.2 Daily Journals ......................................................................................................43
10.3 Management Briefing Book .................................................................................43
10.4 Meeting Minutes and Notes ................................................................................ 43
10.5 Security Self-Evaluation From Contingency Protective Force Members ............43
10.6 After-Action Report and Lessons Learned ..........................................................43
APPENDIX A REFERENCES A-1
APPENDIX B DEFINITIONS B-1
APPENDIX C SAMPLE CONTINGENCY PROTECTIVE FORCE OPERATIONS PLAN
C-1
APPENDIX D SAMPLE TASK LIST D-1
APPENDIX E SAMPLE POST/SHIFT ASSIGNMENT MATRIX E-1
APPENDIX F SAMPLE WORK STOPPAGE QUESTIONS AND ANSWERS
INFORMATION SHEET F-1
APPENDIX G SAMPLE BRIEFING TOPICS G-1
APPENDIX H SAMPLE LETTERS H-1
APPENDIX I SAMPLE CHECKLISTS I-1
APPENDIX J SAMPLE REFRESHER TRAINING REQUIREMENTS AND
VERIFICATION FOR AUXILIARY (SITE) FORCE PERSONNEL J-1
APPENDIX K SAMPLE TRAINING SCHEDULE FOR AUGMENTATION
FORCE PERSONNEL K-1
APPENDIX L SAMPLE WORK EXPERIENCE FORM L-1
APPENDIX M SAMPLE LESSONS LEARNED TEMPLATE M-1
DOE-STD-1213-2014
ix
This page intentionally left blank.
DOE-STD-1213-2014
x
FOREWORD
This Department of Energy Technical Standard is for use by all Departmental elements.
Beneficial comments (recommendations, additions, and deletions) and any pertinent data
that may improve this document should be emailed to richard.faiver@hq.doe.gov or mailed
to:
U.S. Department of Energy
Office of Environment, Health, Safety, and Security
Office of Security Policy, GTN/AU-51
1000 Independence Ave., SW
Washington, D.C. 20585-1290
Department of Energy Technical Standards do not establish requirements. However, all or
part of the provisions in this Technical Standard can become requirements under the
following circumstances:
• They are explicitly stated to be requirements in a Department of Energy
requirements document (e.g., a purchase requisition).
• The organization makes a commitment to meet a standard in a contract,
implementation plan, or program plan.
• This Technical Standard is incorporated into a contract.
This Technical Standard was prepared following requirements for due process, consensus, and
approval as required by the U.S. Department of Energy Standards Program. Consensus is
established when substantial agreement has been reached by all members of the writing team
and the Technical Standard has been approved through the Department of Energy directives
approval process (REVCOM). Substantial agreement means much more than a simple
majority, but not necessarily unanimity. Consensus requires that all views and objections be
considered, and that a concerted effort be made toward their resolution.
mailto:richard.faiver@hq.doe.gov
DOE-STD-1213-2014
xi
This page intentionally left blank.
DOE-STD-1213-2014
1
1. INTRODUCTION
1.1 PURPOSE
Section 6
In light of the events of September 11, 2001, and subsequent international terrorism events, it
is even more vital than before to ensure national security interests and departmental personnel
are well protected. Emergency situations stemming from natural or man-made disasters,
including terrorist activities, may require the establishment and deployment of a contingency
protective force (CPF) and the sustained conduct of operations. This Technical Standard has
been developed to support the continued safe and secure operation of Department of Energy
(DOE) sites and facilities, including National Nuclear Security Administration (NNSA) sites
and facilities, and the protection of Departmental employees, including NNSA employees,
contractor employees, and the public under such adverse conditions.
1.2 SCOPE
This Technical Standard outlines the responsibilities, planning considerations, training,
management oversight, and other activities related to establishment of a CPF. Appendixes
A and B contain applicable references and definitions of terms. Appendixes C through L
contain various sample forms, letters, and schedules to help administrative staff plan for a
CPF. While the Department is neutral in labor disputes between its security contractors and
their work forces, a protective force (PF) work stoppage would raise serious issues for the
security of facilities and assets. Therefore, this is one of the potential events that should be
taken into account when planning for the security of facilities and assets under adverse
conditions (see below).
1.3 GENERAL
The following emergency situations could require the establishment and deployment of a CPF:
• Demonstrations or Civil Disturbance. These situations are normally announced,
and consequently, the PF could be augmented by local law enforcement agency
(LLEA) and PF personnel from other sites, as required.
• Natural or Man-Made Disasters. The primary concerns in these situations are
environmental, safety, and health issues and the protection of classified
information and special nuclear material (SNM). Because these situations may
offer little or no warning, initial augmentation could consist of recalling off-duty
PF personnel, relying on supervisors, and extending work hours.
• PF Work Stoppages or Strikes. Site security during a work stoppage can be
provided by PF supervisors, managers, and qualified administrative personnel
augmented by qualified non-bargaining-unit personnel from other DOE PF
contractors and sites.
• Short-Term Vulnerability Operations. To mitigate a pronounced safeguards or
DOE-STD-1213-2014
2
security vulnerability, additional PF personnel would usually be deployed until the
vulnerability was corrected. Because the short-term nature of such events does not
justify permanent physical security upgrades, additional PF personnel would be used
on an extended hourly basis and in accordance with their approved collective
bargaining agreements.
DOE-STD-1213-2014
3
2. PLANNING
2.1 GENERAL
The successful deployment of a CPF is ultimately based on detailed and careful planning.
Therefore, the planning phase for contingency operations is considered the most critical
part in order to provide maximum support to contingency needs
2.2 INITIAL PLANNING
Section 7
Ideally, planning for emergency situations or potential work stoppages involving the site PF
should be ongoing. This may include consolidating leadership teams on site working longer
hours to ensure adequate support. When time permits a 1-year planning window is considered
the minimum required to adequately plan for, train, and assemble a CPF to assume complete
site security operations. The initial planning objective is to clearly define responsibilities and
timelines for planning activities so the most cost- and process-efficient development,
coordination, preparation, and implementation can occur within the time available. Suggested
action items include agreement upon a basic charter, development of an action plan,
establishment of a contingency operations center (COC), breakdown of work requirements,
and scheduling of milestones.
All potential agencies, organizations, departments, and individuals, regardless of eventual
participation or level of support, should be involved in the initial planning. It should be
assumed that either work stoppages or demonstrations will occur to ensure adequate and
realistic planning and preparation.
Ideally, CPF planning should be focused and continuous. Regardless of work stoppages,
PF contract negotiations, or the actual threat or likelihood of a civil disturbance, nothing
should interrupt or stop the planning process.
2.3 ACTION PLAN
Successful planning requires recognition of the need for an action plan and agreement by
management to develop one. The action plan should include a commitment to prepare task
lists and draft a CPF operations plan. CPF planning/implementation can be broken down into
five distinct phases, with numerous activities taking place simultaneously:
• planning,
• training,
• activation,
• operations, and
• closeout.
2.4 CONTINGENCY OPERATIONS PLAN
DOE-STD-1213-2014
4
A site-specific CPF contingency operations plan should be developed to ensure tasks are
assigned and responsibilities clearly defined. The plan should include a prioritization of
security requirements to ensure no degradation of safeguards and security protection. The
number of posts should be reduced to the minimum necessary, thereby reducing staffing
requirements as much as possible. Because the contingency operations plan deviates from the
approved security plan, the contingency plan should delineate the change in security risk to be
accepted by the appropriate federal security risk acceptance official. An initial draft of the
operations plan, outlining proposed staffing, should be prepared immediately for field element
comment. The plan will undergo numerous revisions and changes as situations develop and
additional facts and information become available. Working drafts will provide a vehicle for
coordination and planning by all interested parties. (See Appendix C, “Sample Contingency
Protective Force Operations Plan.”)
2.5 TASK LIST
A list of all necessary CPF tasks, activities, and actions should be developed. For each task,
the list should detail the functional area, responsible individual/agency, and estimated
completion date. The task list should be updated as appropriate and disseminated to all
affected organizations. (See Appendix D, “Sample Task List.”)
2.6 SELF-ASSESSMENTS
Section 8
Administration of a self-assessment by PF management before deployment of the CPF can
be a valuable tool for determining whether all required tasks have been completed and helps
ensure the changeover in security forces is as smooth as possible. During actual
contingency operations, an abbreviated self-assessment should be conducted to review all
aspects of the ongoing operation. Likewise, a self-assessment should be conducted after
return to normal operations; this will greatly aid in assessing effectiveness of planning and
provide a format for an after action/lessons-learned report.
a. OBJECTIVE.
(1) Provide assurance to the Secretary, Departmental Elements, and other government
agencies that S&S interests and activities are protected at the required levels.
(2) Provide DOE line management with the information necessary to make informed
decisions regarding the allocation of resources, acceptance of risk, and mitigation of
S&S vulnerabilities.
b. PURPOSE.
(3) Surveys, self-assessments, and review programs are conducted to ensure that S&S
systems and processes at facilities/sites are operating in compliance with
Departmental and national-level policies, requirements, and standards for the
protection of security assets and interests.
DOE-STD-1213-2014
5
(4) These programs provide the means for timely identification and correction of
deficiencies and noncompliant conditions to prevent adverse events, and validate the
effectiveness of corrective actions implemented to address identified deficiencies.
2.7 PLANNING CONSIDERATIONS
The following, while not all-inclusive, should be considered during contingency
planning:
a. Operations.
(1) Will site operations be conducted at pre-emergency work levels?
(2) Which site operations, duties, and tasks will continue unaffected and
which will be curtailed or temporarily discontinued? How will they be
staffed?
(3) Who will be the Transition Manager to ensure integrity of post equipment,
smooth incident free transition and serve as a liaison with the Union
Representatives (due to the potential sensitivities of the work stoppage)?
(4) Who will ensure that all supporting sites have a designated liaison that will
coordinate activities such as payroll, timekeeping, scheduling and
implementation?
(5) What will be the probable size of the site workforce on the first day of the
work stoppage or emergency situation?
(6) What will be the chain of command for contingency operations?
(7) Who will be the site and PF management points of contact (POCs)? For
DOE Headquarters (HQ)? For the news media?
(8) For planning purposes, what will be the estimated length of the
emergency situation or work stoppage?
(9) If the emergency situation is a work stoppage, what will be the response of
other bargaining units and individual members?
b. Law Enforcement.
(1) Which organization or agency has LLEA liaison authority for coordination
and requests for assistance?
(2) Who is specifically designated/authorized to execute formal arrest and
criminal complaints with the responding LLEA?
(3) Will formal criminal complaints be followed up in cases where arrests are
DOE-STD-1213-2014
6
made?
(4) Will there be documentary coverage of the work stoppage or civil disturbance,
including still photography and video with sound?
(5) What is the site law enforcement jurisdiction and what level of support will
LLEAs provide based on that jurisdictional status?
c. Access Control.
Section 9
(1) If the emergency situation is a work stoppage, will individual members of
the bargaining unit who want to report to work be permitted to do so?
(2) During a work stoppage, how will site access be handled? Will at least one
access control point be reserved for neutral personnel?
(3) Will there be designated strike locations identified for the union to use?
d. Logistics and Administration.
(1) Will an offsite transshipment off-load point be established in the event truck
drivers will not cross picket or demonstration lines? If so, when and how will
it be staffed?
(2) Will non-SNM shipments be sent and received?
(3) Will special equipment such as street sweepers, portable lighting, and tow
trucks be available?
(4) At what level (and from which office(s), department(s), or division(s)) will
the COC be supported and staffed?
(5) What are the potential impacts of work stoppages/non-routine operations on
the Human Reliability Program (HRP) and on the security clearances of PF
personnel?
(6) When will offsite vendors, subcontractors, and suppliers be notified of
the pending work stoppage or non-routine operation?
(7) Will members of the Protective Force engaging in a work stoppage or
locked out by management be allowed to keep their security badges?
(8) Who will coordinate physical fitness maintenance, maintain weapons
qualifications, drug testing, etc.?
2.8 POLICY DECISIONS
Policy decisions may result from issues raised during initial planning; therefore, policy
issues such as those listed below should be identified and their resolution coordinated among
DOE-STD-1213-2014
7
HQ, NNSA, program offices, field elements, the site facility management contractor (FMC),
and the PF contractor.
a. Will consolidation and/or lockdown of SNM, classified matter, and DOE special
security interests be implemented to assist in the reduction of security posts, response
elements, and patrols? Would consolidation and lockdown also reduce the risk of
multiple response scenarios and ease the burden on the entire CPF?
b. Will normal plant operations be maintained versus reducing or curtailing some
operations?
c. What will be the FMC’s approach in responding to work-stoppage-related complaints,
issues, and allegations made by the bargaining unit?
d. Will selected critical operational supplies and spare parts be stockpiled by the FMC in
the event of a protracted work stoppage or disruption of delivery?
e. If a work stoppage occurs, what will be the PF management strategy to de-escalate
and/or avoid confrontations with bargaining unit management and picketers?
f. Will official requests be submitted to LLEAs for strict enforcement of laws such as
trespassing and endangerment?
g. What is the defined role of Federal law enforcement agencies, and what will be the
timetable for their assistance, if necessary?
h. What is the anticipated need for LLEA physical presence and support at site access
control points to prevent disruptions and violence?
i. Who will be the official site POC for the control and release of all information
concerning the emergency situation or work stoppage?
j. Who will determine the type of coordination, cooperation, and relationship to be
established with the news media?
k. Has the number and management of site access points been reviewed to ensure the
proper locations and operations and that the fewest gates and entrances are in use?
Will each access point require law enforcement protection that would create an
unnecessary staffing burden on the LLEA?
Section 10
l. How will site emergencies be handled, i.e. fire, medical, evacuations, etc?
m. Will a LLEA POC be established to ensure jurisdiction and support of all activities
involving the LLEA are clearly communicated and understood?
2.9 SITE OPERATIONS REVIEW
a. Planning decisions concerning consolidation or lockdown of SNM targets should be
DOE-STD-1213-2014
8
prioritized. Changes in location and security of SNM may impact the perceived
attractiveness of the target and thus reduce the risk. This, in turn, will affect the
number and disposition of CPF personnel.
b. SNM targets should be assessed, if possible, with the goal of eliminating or reducing
the threat of theft or sabotage. Consolidation of SNM targets will decrease CPF
strength and alarm response requirements.
c. A work stoppage impact assessment study should be conducted by the FMC and plant
operations to determine activities that are required for operation versus those that can
be postponed.
d. PF requirements may be evaluated by comparing normal staffing and operations
versus what is feasible with a CPF. Reductions can be effected by changing
administrative requirements [e.g., the convenience of expedited entry-exit to the plant
site or Protected Area (PA)]. Short delays at portals and entry control points may be
acceptable at peak times during picketing or demonstrations as a tradeoff for reducing
commitments and staffing. In some cases where posts cannot be closed, staff
reductions may be possible.
e. Consideration should be given to consolidating CPF assets within the PA and Material
Access Area (MAA) and to changing the requirements for armed and unarmed posts in
other locations.
(1) Evaluation of the site security plan (SSP) and vulnerability assessment (VA)
reports will assist in determining possible post reductions and changes.
(a) Each post and patrol should be analyzed and prioritized for level of
staffing and necessity.
(b) The number and location of supervisory personnel also should be
reviewed based on changes in posts/patrols and the use of CPF
personnel not as familiar with site operations and procedures as the site
PF.
(c) Any emergency situation where staffing levels are reduced provides an
opportunity to assess and possibly reduce certain posts and
requirements after the emergency ends.
(2) Whatever the emergency situation, any degradation to the protective envelope
provided for SNM or change in security risk must be communicated to the
appropriate federal security risk acceptance official. (See Appendix E,
“Sample Post/Shift Assignment Matrix.”)
2.10 CONTINGENCY PROTECTIVE FORCE SCHEDULING
a. Shift hours should not exceed 12 working hours in a 24-hour period or 60 hours in a 7-
day work period. Safety and health considerations of the CPF individuals and
DOE-STD-1213-2014
9
continued high levels of security are paramount.
b. A rotation policy concerning the relief of Augmentees should be established and
published before their arrival. A 30-day rotation policy with the option to volunteer
for an additional mutually agreed upon period of time is a viable option.
Consideration for replacement arrival, training, and cost should also be factored into
the rotation policy time frame.
c. An established, written, and equitable overtime policy for the CPF is required to
ensure fair treatment regarding granting overtime and the potential to earn additional
income. Augmentees need to understand whether home site or work site overtime
policies will be used.
Section 11
2.11 REQUESTS FOR ASSISTANCE
PF subject matter experts should be available to provide assistance during all phases of PF
contingency operations.
a. DOE HQ.
(1) Office of Security provides support on the following:
(a) PF policies in the areas of qualifications, training, tactics, and
employment and policy concerning special response teams (SRTs);
(b) requirements for PF equipment, communications, weapons, and
uniforms;
(c) qualifications for PF employment;
(d) PF operations policy, SSPs, and VA reports.
(2) DOE/NNSA program offices are responsible for the following:
(a) representing program office interests,
(b) providing program and project direction and planning,
(c) providing funding assistance, and
(d) approving SSPs.
(3) Office of the General Counsel assists in planning, as necessary.
b. DOE/NNSA field elements provide the following:
(1) oversight of DOE policy implementation,
(2) safeguards and security guidance, and
DOE-STD-1213-2014
10
(3) funding review.
c. National Training Center (NTC) can provide the following:
(1) training instructors,
(2) training evaluators,
(3) training records and qualification reviews, and
(4) assistance in developing CPF training plan schedules.
d. Office of Secure Transportation (OST) may assist by providing Augmentees
and assisting with replacement personnel transportation issues and other
transportation security issues.
e. Site Facility Management Contractors (FMC) provides general site support and
logistics and maintenance assistance.
2.12 SPECIAL PLANNING CONSIDERATIONS.
Special considerations should be made to ensure:
a. Availability of road-cleaning equipment to sweep up nails and other objects that could
damage tires.
b. Use of temporary PF posts inside the perimeter of the site and away from picket or
demonstration line locations.
c. Emergency or portable lighting for temporary gate or access point operations.
d. Portable toilets to ensure temporary gate and access control points have adequate
sanitation facilities.
e. Tow trucks and fuel to remove, refill, or jump-start disabled PF vehicles.
f. Establishment of temporary onsite detention/arrest centers to deal with trespassers,
vandals, or perpetrators of acts of violence.
g. Establishment of formal record keeping and segregation of files pertaining to the CPF
and operations associated with the emergency.
h. Procurement and issuance of cellular telephones to CPF managers and supervisory
personnel.
i. Approved onsite and LLEA parking locations for the safe parking of bargaining unit
or demonstrator privately owned vehicles.
DOE-STD-1213-2014
11
3. COORDINATION
3.1 GENERAL
Coordination and control of the numerous onsite and offsite offices, agencies, and
organizations involves continuous communication, meetings, and teamwork.
3.2 COMMUNICATION
A number of methods are available to help ensure organizations and individuals are kept
informed and updated. Official press releases, site internal public address systems,
telephone voice mail broadcasts, electronic mail distribution lists, fax machine distribution
systems, personal pager broadcasts, and employee bulletin boards are all available and
should be used as appropriate. Official company and DOE letterheads should be used to
preclude unauthorized and counterfeit correspondence.
Section 12
a. DOE/NNSA field elements should be designated as the POCs for responding to HQ
(DOE, NNSA, or program office) inquiries. Within each field element, one
individual or position should be appointed to release media information, work
stoppage negotiation information, damage information in the event of a disaster, and
any other written correspondence related to the CPF operation. Field element public
affairs offices (PAOs) should develop review and approval processes for releasing
information.
b. Daily written status reports transmitted to Program Office or Headquarters
Departmental Element, as well as DOE Office of Security and General Counsel
which will alleviate communications and coordination concerns between the field
element and the various interested offices at HQ. Reports should be limited to one
page and contain short, concise paragraphs summarizing the issues or facts as they
occur. In certain situations, the use of telephonic communications may be
necessary to report critical or time-sensitive information.
c. At the site, daily telephonic updates to upper and lower management will
keep superiors and subordinates informed and help dispel rumors.
d. Keeping the CPF current on all aspects of the situation will alleviate rumors as well as
uncertainty (see also paragraph 8.2, “Rumor Control”). Briefings to the CPF should
include a comprehensive initial briefing as part of the site-specific training program
and a daily briefing at the shift rotation. (See Appendix F, “Sample Work Stoppage
Questions and Answers Information Sheet.”)
e. Briefings to subordinate organizations and subcontractors also should be included
in all communication or information distribution plans.
3.3 DEPARTMENT OF ENERGY
Within DOE, the following key organizations should be kept up-to-date on the status of the
planning and operation of the CPF to enable them to provide support as indicated. (See
DOE-STD-1213-2014
12
Appendix G, “Sample Briefing Topics.”)
a. NNSA/program offices—Departmental oversight and site support.
b. Office of Security—policy and assistance.
c. NTC—training support.
d. OST—Augmentee support.
e. Field elements—operation updates and status of Augmentee work performance.
f. Office of the General Counsel—labor relations; jurisdictional and arrest and detention
authority issues.
g. Finance and Accounting—Augmentee salary, overtime, lodging, and transportation
costs.
h. Office of Worker and Community Transition—guidance and assistance in labor
relations.
3.4 DEPARTMENT OF ENERGY FIELD ELEMENTS
At each field element, the following key divisions or departments should be kept up-to-date
on the status of the planning and operation of the CPF so they can provide support and
assistance.
a. Office of the Manager.
b. Public Affairs.
c. Chief Counsel.
d. Individual site facility or operations managers.
e. Emergency preparedness staff (emergency operations center).
DOE-STD-1213-2014
13
3.5 SITE FACILITY MANAGEMENT CONTRACTOR
The site FMC has certain support operations and activities that should be coordinated on a
continuous basis, including the following:
a. safeguards and security and public affairs support to the site;
b. personnel support to the COC, and;
c. logistical support to the CPF.
3.6 PROTECTIVE FORCE CONTRACTOR
Each PF contractor should assign key departments to develop the CPF operations plan task
list, participate in the self-assessment, and support ongoing CPF operations. While PF
contractor organizations may not be organized exactly as described below, the
functions/activities described should be handled somewhere in their organizational structures.
Section 13
a. The PF manager acts as the single POC for information concerning the CPF.
b. The PAO prepares and controls all press releases and inquiries and acts as official
spokesperson for the PF manager.
(1) Any contingency type event at a DOE facility will draw interest and concern
for the health and safety of the public; therefore, the initial press release
concerning a work stoppage or ongoing demonstration should be prepared,
approved, and ready for dissemination immediately upon commencement of the
activity.
(2) PF contractors should consider additional staffing for the PAO until the
emergency situation is no longer considered newsworthy.
c. The appropriate legal advisors consult with DOE on preparing restraining orders, as
necessary; assisting in damage claims; and providing legal advice as required.
d. The Finance and Accounting Department arranges transportation (air and
ground), lodging, pay, per diem, overtime rates, and budgeting and accounting for
CPF operations.
e. The Personnel Security Section ensures security clearances for all CPF staff
members are current and valid and verifies the enrollment status of each CPF
member in the HRP as required. The Personnel Security Section is also responsible
for conducting security in-briefings and debriefings of CPF personnel. In some
circumstances, the section is also responsible for developing and implementing the
operations security plan.
f. The Logistics and Equipment Department ensures sufficient quantities of seasonal
uniforms, weapons, PF equipment, and communication equipment are available for
DOE-STD-1213-2014
14
the CPF. The Logistics and Equipment Department plays a key role in the changeover
of PF personnel and the CPF at the beginning and end of the work stoppage or
contingency operation.
g. The Environmental Safety and Health Department reviews all plans, training, and
COC activities for health and safety issues. Additionally, the department monitors
CPF activities, posts, and patrols to ensure compliance with environmental safety
and health procedures and requirements.
h. The Operations Section implements the contingency plan, operates the COC, controls
and manages the CPF, and provides input to the self-assessment and after-action
report.
i. The Planning Section maintains and eventually archives all formal records and
documentation pertaining to the CPF operation. The Planning Section, supported by
the other departments as necessary, develops the contingency plan, completes the
self- assessment and after-action report, and establishes the COC.
j. The Training Department develops and implements all training plans, lesson plans,
training schedules, individual and unit training, limited-scope performance tests
(LSPTs), and testing. The Training Department requests, compiles, and maintains
all CPF training records and evaluates the qualifications and certifications of all CPF
members to ascertain security police officer (SPO) status and additional training
requirements.
k. The Command, Control, and Communications Section supports COC activities
and daily operations of the CPF and provides staffing support as necessary.
3.7 CONTINGENCY OPERATIONS CENTER
Section 14
When activated, the COC becomes the focal point for CPF operations management; it does
not augment or replace the site emergency operations center. The COC manages all CPF
information and data, shift scheduling, and rotation of the CPF. The main functions of the
COC are to control all planning and scheduling for the CPF and routine communications
relative to the work stoppage or emergency, to maintain liaison through communications with
LLEAs and the site, and to provide some of the administrative functions normally handled by
PF shift commanders. If activated in advance of a work stoppage or other security
emergency, the COC can also serve as the single POC by receiving and disseminating
information concerning Augmentee requirements and act as the hub of pre-work-stoppage
activities. Coordination among all support activities and individuals is vital to the success of
the COC and the CPF operation.
3.8 TEAMWORK CONCEPT
The extensive support and coordination between and among different organizations on and off
the site will be heavily dependent upon teamwork. The safety of all personnel and the
security of SNM will be paramount. Cooperation and teamwork among all DOE, contractor,
subcontractor, and LLEA personnel are critical to success.
DOE-STD-1213-2014
15
3.9 MEETINGS
Each organization should strive to conduct coordination and staff meetings in accordance with
specific needs and requirements. Normally, Local Field/Site Officials and PF Management will
conduct morning staff meetings and evening management updates. The COC can operate
through twice-daily shift briefings and meetings between PF management and the CPF.
DOE-STD-1213-2014
16
4. LIAISON WITH OTHER AGENCIES
4.1 GENERAL
A single Federal POC should be established and maintained for communication and
coordination between the site and each LLEA. Coordination, support, and requests for
assistance should be firmly controlled to ensure credibility and continuity of effort with all
LLEAs.
Typically, law enforcement agencies do not seek to make arrests in civil disturbance or work
stoppage situations; however, when used with restraint and sound police judgment, arrests are
a key to preventing strike violence and returning order to civil disturbance situations.
Planning with LLEAs for the detention, arrest, and processing of protesters and/or
environmental activists during civil disturbance situations should include memorandums of
understanding to define responsibilities. Detainee holding areas, processing points, and
transportation requirements should be coordinated well in advance. In situations involving
natural or man-made disasters, the operation of a joint command center to effect coordination
should be included in any planning.
4.2 LOCAL LAW ENFORCEMENT AGENCY OFFICES
In some instances, coordination and support will take place between the local jurisdictional
office of an LLEA (e.g., highway patrol) and the State or Federal headquarters of the same
agency. Regardless of the size or type of jurisdiction, any LLEA involved in any aspect of
legal jurisdiction over possible CPF operations should be fully aware of the current situation
and actions and possible requests for assistance. The following are examples of LLEAs with
which the site and/or CPF might interact:
a. Local police (including military police if located on a military reservation).
b. Sheriff.
c. Local offices of State law enforcement organizations.
d. Local court system.
4.3 STATE AGENCIES
Section 15
State law enforcement agencies have the ability to draw upon additional assets and resources
to respond to requests for assistance and to support CPF operations. State agencies include
the following:
a. Office of the Governor.
b. State National Guard.
c. State police headquarters.
DOE-STD-1213-2014
17
d. State highway patrol headquarters.
e. State court system.
4.4 FEDERAL AGENCIES
Depending on the type of occurrence, Federal agencies such as the following may be needed
to support CPF operations:
a. U.S. Nuclear Regulatory Commission.
b. Federal Bureau of Investigation.
c. U.S. Marshal.
d. U.S. Attorney’s Office.
e. U.S. Magistrate.
4.5 COORDINATION MEETINGS
Well planned and coordinated meetings are critical to ensuring effective use of time and
resources. The POC should inform LLEAs immediately when a work stoppage settlement
has been reached, including when it is to be effective, and when an emergency situation has
been declared over. This allows for reassignment of LLEA assets assigned to site support
and entry control point monitoring.
4.6 SITE ACCESS MONITORING
Access points are critical locations at the site during work stoppages, demonstrations, or civil
disturbances. Not only are picket line confrontations and acts of violence possible at access
points, but the safety of employees and visitors may also be threatened. It is quite important to
refrain from documenting legal activities, but illegal activities should be documented as fully
as possible. The documentation may be required as proof of criminal charges and/or as
evidence in other legal proceedings.
a. If possible, video and still photography should be available for use at access control
points during peak hours to record disturbances as appropriate. However, PF and field
element legal counsel should be consulted before video or photographic surveillance is
initiated because documentary surveillance of workers engaged in legal and legitimate
collective bargaining activities, such as legal picketing during a work stoppage, can
itself amount to an unfair labor practice in that it interferes with or inhibits the workers
in the exercise of their rights.
b. In the absence of photographic surveillance, gate observers can be used to produce a
written, chronological listing of date, time, and event information. A special log
specifically designed for recording access control point and picket line activities
should be developed and implemented.
DOE-STD-1213-2014
18
c. The most beneficial access control point monitoring involves the use of LLEA patrols
at the site entrances. LLEA patrols can monitor traffic flow and act as a deterrent to
confrontations and incidents. The patrols should maintain a neutral position and
interact only on an official basis. Additionally, LLEA patrols should be in position to
closely observe all activities at gates and to respond appropriately to unsafe and
unlawful acts. Specifically, patrols should be alert to the following violations of laws
while still allowing picketers their legal right to picket:
(1) Impedance of traffic by the picketers or other persons associated with the
picket line.
(2) Destruction of private or public property.
(3) Assault.
(4) Child endangerment.
DOE-STD-1213-2014
19
This page intentionally left blank.
DOE-STD-1213-2014
20
5. AUGMENTEE SELECTION AND REQUIREMENT STANDARDS
5.1 GENERAL
Section 16
A site anticipating a non-routine situation or emergency that might require Augmentees should,
if possible, send a formal request for Augmentees (non-bargaining-unit members if the
anticipated situation is a work stoppage) to other DOE sites 6 to 9 months before the
anticipated date for the situation. Early notification allows the host site to identify potential
problems associated with qualification, certification, and required generic training of
Augmentees. It further allows the host site to ensure all training records, security clearance
information, and HRP documentation are complete and correct. (See Appendix H, “Sample
Letters.”)
5.2 REQUESTS FOR ASSISTANCE
The following information should be provided to those sites potentially providing Augmentees
to aid the planning process:
a. Projected emergency start date.
b. Projected duration of the emergency.
c. Site-specific training requirements.
d. Defensive and offensive position requirements.
e. List of intermediate force and specialty weapons used at the host site.
f. Site weapons restrictions.
g. Approved procedures for weapon manipulation and first-round carry.
h. Use of force requirements/rules of engagement.
i. Additional PF equipment requirements.
5.3 REQUIRED QUALIFICATIONS
Employees eligible for consideration as Augmentees should have the following
qualifications/certifications:
a. Primary, specialty and secondary weapons qualifications.
b. Medical and physical readiness qualifications.
c. Security clearance.
d. HRP status.
DOE-STD-1213-2014
21
e. Valid driver’s license.
f. Intermediate force weapon training.
Additional guidance can be found in DOE O 473.3A, Chg.1, Attachment 2, Section B. 2. Page
2-9, or its successor.
5.4 AUGMENTEE IDENTIFICATION
The total number of fully qualified Augmentees should be identified to the host site at least 45
days before their departure from their home sites. Within 2 weeks, a “by-name list” should be
provided to the host site. The following is the minimum information that should be provided
for each Augmentee:
a. Name.
b. Social security number.
c. Weapons qualifications.
d. Current medical/physical readiness test (to include level).
e. Security clearance.
f. HRP status.
g. Training status.
5.5 HOME SITE SUPPORT
Each home or support site is required to provide the following items to the Augmentee:
a. Appropriate and sufficient quantities of uniforms, if required.
b. Leather gear or load-bearing equipment.
c. Intermediate force weapon.
d. Duty weapon.
e. Basic load of ammunition.
f. DOE weapons card (note: consult DOE/NNSA counsel when Strategic Petroleum
Reserve personnel augment at other sites or vice versa).
g. Respirator equipment to include special inserts if required (if not available at the
home site, requirements should be identified to the host site).
h. Protective vest.
DOE-STD-1213-2014
22
i. Prescription safety glasses, if necessary.
j. Two pairs of prescription glasses, per DOE requirements.
5.6 REPORTING DATE COORDINATION
Reporting requirements for Augmentees should be clearly delineated, and alternate
Augmentees should be identified along with the primary Augmentees. Because of potential
unanticipated delays, the host site should allow a 12-hour reporting window for Augmentees.
Transportation and shipping delays of weapons and equipment should also be anticipated.
5.7 LOGISTICS
Section 17
Reservations for rooms, cars, and airplane tickets should be made well in advance and
coordinated with all parties. (Block reservations with options for cancellation should be
applied when possible.) In planning for Augmentee staff, the following things should be
considered:
a. Funding/Compensation Issues.
(1) Finance and administration can be consolidated at the host site or work hours
and overtime can be sent to the Augmentee’s home site for inclusion in
individual finance records and eventual payment.
(2) Salary issues can become a primary concern to Augmentees and should be
aggressively solved as they arise. Shift schedules, rotation policy, and overtime
criteria provisions for the CPF should be sent to all sites and to individual
Augmentees to ensure a complete understanding of pay options and potential
problem areas.
(3) Per diem tables should be coordinated with home sites and Augmentees to
ensure an understanding of the current authorization rate.
(4) Overtime criteria and rates often vary for each site and PF. An explanation of
when overtime starts and the equitable distribution of overtime should be
established and disseminated to all home site finance departments and
Augmentees.
b. Lodging/Transportation Issues.
(1) Lodging sites in the same general location should be used and Augmentees
from the same home site should be lodged together and scheduled on the
same shift. Hotel management should be advised of possible union activities
which could result in transportation disruptions to and from the site due to the
situation.
(2) Transportation to and from the work site should be coordinated to ensure all
CPF members are accommodated and adequate transportation is provided if
DOE-STD-1213-2014
23
more than one lodging site is used.
(3) Rental cars should be allocated on a basis of no fewer than three persons per
vehicle. Full-size, four-door vehicles or vans should be reserved to ensure all
gear can be adequately transported. If available, government vehicles should be
used to lower costs.
c. Rotation. A policy on rotation to home sites should be communicated to all
Augmentees ahead of time. If practical, some Augmentees may be permitted to
remain for an additional rotation if a spousal visit can be arranged; the transportation
and training costs would be less than if a replacement had to be sent and trained.
d. Communications. Telephone and/or e-mail capabilities should be considered
so that Augmentees can communicate regularly with their families.
5.8 AUGMENTEE WELCOME PACKAGE
The host site should prepare and send “welcome packages” to help Augmentees assimilate
into the CPF and encourage esprit de corps. To ensure all pertinent information has been
disseminated and received by Augmentees, the packages should be sent to prospective staff
before they leave their home sites. Welcome packages may include but are not limited to
the following:
a. A letter of acknowledgment from the manager of the PF and/or DOE
site manager containing:
• standards of conduct and professionalism;
• work requirements, including rotation, shift length, overtime, and pay;
• coordination concerning lodging and transportation;
• final reporting date, time, and location information; and
• suggested methods of shipping weapons and intermediate force chemicals.
b. Site information, history, and general knowledge.
c. Local community information.
d. Site and local area maps.
e. Places of local interest, recreation, and leisure.
Section 18
f. Emergency medical facility accommodations to take care of sickness occurring
while deployed.
5.9 AUGMENTEE IN-PROCESSING
DOE-STD-1213-2014
24
a. Augmentees should report within a specified time frame (12 hours is suggested)
and be greeted by host personnel assigned, trained, and available to quickly and
efficiently complete all in-processing procedures and support. Advance
information concerning incoming flights could aid in airport pickups and alleviate
transportation and orientation problems. (See Appendix I, “Sample Checklists.”)
b. The armory should be set up with a qualified armorer Augmentee if required, to
receive, document, and store Augmentee weapons immediately. Firearms storage,
documentation, and sign-out procedures should be disseminated to all Augmentees.
c. All equipment, uniforms, and weapons should be inspected and inventoried to ensure
adequacy and acceptability by CPF management. The issuance, documentation, and
control of host site equipment should be scheduled immediately to ensure proper fit,
wear, and operability.
d. A written disciplinary policy should be established and explained to all individuals
who make up the CPF. Misconduct and negligence will not be tolerated during
contingency operations. Violators will be sent back to home sites.
5.10 BADGING
a. The HSPD-12 badge is the standard DOE badge, it may be used by Augmentees.
If required, a site only badge (e.g., for access control) may need to be issued.
b. A contingency picture identification badge should be developed and issued to members
of the CPF. This badge will be used in addition to normal security badges to designate
those personnel with approved access to the site.
c. Augmentee badging should be arranged to preclude overloading the badge operation.
DOE-STD-1213-2014
25
This page intentionally left blank.
DOE-STD-1213-2014
26
6. CONTINGENCY PROTECTIVE FORCE TRAINING
6.1 GENERAL TRAINING REQUIREMENTS
The training of auxiliary force and Augmentee members who will eventually make up the CPF
and assume site security responsibilities is of paramount importance. Training requirements for
the auxiliary force and Augmentee members will vary according to previous levels of training,
the amount of refresher training needed, and the degree of site familiarization required.
Requests for training support and assistance should be considered early in the planning phase
and training plan development.
6.2 TRAINING PLAN
A comprehensive training plan and training schedule are critical to the effective constitution
of a CPF. The rotation policy of Augmentees and the rotation schedule are also tied to a
comprehensive training plan to ensure replacement of fully trained CPF members.
6.3 AUXILIARY FORCE TRAINING
Former SPOs who are in nonunion supervisory, administrative, staff, and management
positions, and who remain site-qualified or are capable of being requalified, may be used to
make up the auxiliary force component of the CPF. A training and qualifications records check
should be performed as soon as possible to determine suitability and acceptability of potential
CPF members. Refresher training should be initiated in sufficient time to not only ensure
training completion and pertinent qualifications, but to rule out personnel who are no longer
suited for CPF duties. Firearms will not be issued unless all approved DOE training, medical,
and physical readiness standards are met. The number of auxiliary staff members available
directs the number of Augmentees required. [See Appendix J, “Sample Refresher Training
Requirements and Verification for Auxiliary (Site) Force Personnel.”]
Section 19
6.4 AUGMENTATION FORCE TRAINING
Only fully qualified and certified SPO nominees should be accepted. Training records, HRP
status, and security clearance information should be requested from the home sites in an
expeditious manner to allow for sufficient time for full review of all potential candidates and
to allow for rejection and new requests for support, as necessary. (See Appendix K, “Sample
Training Schedule for Augmentation Force Personnel.”)
6.5 SITE-SPECIFIC TRAINING REQUIREMENTS
a. Determine the amount of training needed for a variety of site-specific
posts and patrols such as the following:
• Unarmed posts (security officers).
• Fixed posts.
• Mobile posts.
DOE-STD-1213-2014
27
• SRTs.
b. Train CPF members to perform duties at a single post or patrol initially. Cross train
on additional posts or patrols as time permits.
(1) Cross training CPF members on multiple posts and patrols increases the
flexibility of assigning personnel and creates additional opportunity for
overtime and adjusting work hours.
(2) Cross training should be addressed in the training and rotation plans.
c. Look for opportunities to optimize training and foster teamwork such as pairing up
auxiliary force members and Augmentees for training. Whenever possible, pair-up
training should be used to take advantage of auxiliary force experience and
familiarity with the site.
d. Include a map orientation, terrain walk, “windshield tour,” and actual physical
orientation to the post or patrol area where the CPF member is to work.
e. Train CPF members to the required level in radiological contamination,
alarm annunciation, monitoring, assessment training, and emergency
procedures.
f. Coordinate environmental safety and health training with other departments well in
advance to ensure adequate instructors, equipment, and classroom space.
g. Ensure site-specific requirements for the loading configuration of all firearms
are thoroughly understood by all CPF members.
h. Brief CPF members on the operations security plan to ensure they understand
the operational and sensitive information that should be protected.
i. Training on local rules of engagement should be emphasized.
6.6 NATIONAL TRAINING CENTER SUPPORT
The NTC, upon request, can provide valuable training assistance and support. Requests and
coordination should be accomplished ahead of time because of the nature of training
requirements and commitments of the NTC.
6.7 RETRAINING AND REMEDIATION POLICY
A written policy concerning the retraining of auxiliary force members of the CPF should be
established to ensure only qualified and trainable individuals are selected. Time and cost
should be factored into selection decisions. Examination and LSPT failures also should be
addressed and policy guidance disseminated to all CPF members to ensure they understand the
consequences of failure. If a one-time failure is acceptable, then such a policy should be
adhered to and enforced. Accurate and full documentation should be completed and annotated
DOE-STD-1213-2014
28
on individual training records. Augmentees who fail to meet acceptable testing standards
should be sent back to home sites immediately.
6.8 FOLLOW-ON TRAINING
CPF training should be a continuous process until the force is relieved of duty and
contingency operations have ended. Additional follow-on training includes the following:
a. supervisory personnel conducting individual training on all posts during all shifts;
Section 20
b. field training officers, if available, conducting daily evaluations and retraining at
posts and during patrol breaks, as necessary and practical;
c. NTC instructors conducting post and patrol evaluations and retraining, as necessary;
d. maintaining standard operating procedures and general and post orders on each post
and patrol for reference, review, and self-training; and
e. qualified personnel conducting job knowledge and performance evaluations.
6.9 CONTINGENCY PROTECTIVE FORCE VALIDATION TEST PLAN
The CPF should be validated to ensure it is capable of performing and sustaining contingency
operations. The same standards, timelines, and requirements outlined in the SSP VA report
for the site PF should be strictly adhered to by the CPF. Any test result deviation in which
SNM or other DOE security interests are put at risk is unacceptable and should be corrected
before the CPF assumes contingency operations.
Ideally, a force-on-force (FOF) exercise to validate training and assess the CPF should be
conducted. An FOF exercise would provide a vehicle to collect data for analysis, provide
timeline testing, and allow vulnerability comparison and analysis with VA results in the SSP.
However, such an exercise places a significant demand on current staffing and costs and could
impact site safety or jeopardize labor relations and ongoing negotiations with the bargaining
unit. The potential for confrontations between the CPF, site PF, and aggressors also exists and
presents control problems. Time to conduct such a detailed exercise may not be available
either.
In lieu of conducting an FOF exercise, LSPTs of individual CPF members, patrols, and units
can be initiated. LSPTs, together with establishing specific response timelines and post/patrol
inspections, can provide sufficient data to validate the CPF’s ability to perform contingency
operations.
6.10 REPLACEMENT TRAINING
Plans and training schedules should be developed and in place to conduct replacement
training, depending upon the anticipated work stoppage and length of tour for the
Augmentees.
DOE-STD-1213-2014
29
6.11 TRAINING RECORDS
Training records of site auxiliary force personnel and Augmentees should be consolidated as
soon as possible. Augmentee records should be requested in sufficient time for evaluation of
certification and qualification requirements. Special records jackets can be prepared on each
individual assigned to the CPF during the contingency period. The records can be broken
down into two sections: (1) records documenting training received by the Augmentee at the
home site, including current physical, medical, and firearms qualifications, in accordance with
pertinent DOE policy, and (2) records of all training, examinations, LSPTs, retesting
qualifications, and certifications conducted after arrival at the site. Augmentees should be
queried as to work experience and knowledge to take advantage of previous training and
experience. (See Appendix M, “Sample Work Experience Form.”)
DOE-STD-1213-2014
30
7. CONTINGENCY PROTECTIVE FORCE
DEPLOYMENT
7.1 GENERAL
The COC provides a single POC and clearinghouse for the dissemination of information
and a focal point for offsite support.
7.2 CONTINGENCY OPERATIONS CENTER OPERATIONS
a. Pre-emergency activation of the COC should be considered as soon as possible. The
COC should be operated for 12-hour periods during workdays before Augmentees
arrive and go to 24-hour continuous operation as soon as Augmentees start arriving
onsite.
Section 21
b. The ability to communicate is vital to the effectiveness of any law enforcement
agency or PF. The COC serves as the communication base for the CPF.
(1) Because of varied backgrounds, CPF members should be trained in standard
communication procedures and common codes.
(2) Contingency operations should require the encryption of radio communications
by certain elements.
c. The COC should monitor contingency force response to central alarm station
(CAS) and secondary alarm station (SAS) intrusion detection system alarms.
d. The COC should maintain an accurate chronological log of events and activities from
activation to close out of operations.
e. The COC should test the work continuation notification plan and alert roster.
f. Staffing the COC and the CPF should begin with site auxiliary force personnel filling
the most critical PF assignments. These include COC staffing and shift supervisor
positions, CAS/SAS operations, alarm stations within the PA, and SRT positions.
Augmentees should be assigned to posts commensurate with their ranks and training
and the needs of the site. The training concept of pairing auxiliary force personnel
and Augmentees also should carry over to post staffing, when possible. Post/patrol
pairing will further enhance training and response.
g. The COC should have complete and current listings of the onsite and offsite POCs
and should serve as the communication point for all POC’s and onsite PF
management.
h. Access to the COC should be strictly controlled to protect sensitive contingency
operations and ensure only CPF personnel or federal oversight personnel with valid
requirements and a need to know are allowed admittance. Special badging or the use of
access rosters is recommended to help restrict access into the COC.
DOE-STD-1213-2014
31
i. A physical security survey of the COC, including access control, internal operating
procedures, physical security equipment, and hardware, should be conducted before
activation. Any deficiencies noted should be corrected or compensated to ensure a
secure environment to direct contingency operations.
j. An operations security assessment should be conducted to identify critical and sensitive
information to be protected and to determine potential pathways in which the
information could be obtained in an unauthorized manner.
7.3 WORK STOPPAGE DEPLOYMENT AND RELIEF PLANNING
a. Gasoline should be readily available to replenish PF vehicles in case they are
intentionally depleted before changeover and work stoppage situations.
b. New radio codes should be prepared and made ready for dissemination and use.
c. Additional charged radios and fresh batteries should be available for issue as
required.
d. New lock combinations should be placed on containers, with qualified personnel
available to make the changes.
e. The relief of the PF and change-out by the CPF should be directed by PF
management and not by circumstances such as a planned walkout or set deadline.
Planning the change-out in advance of the anticipated time will alleviate potential
confrontations between forces and the opportunity for vandalism.
f. If possible, relief should be done in specific order by individual patrols and posts. A
one-by-one patrol and post relief lessens the chance for confrontations and maintains
maximum security. A suggested generic relief order, starting with the most critical
posts/patrols and ending with the least important, is as follows:
(1) CAS/SAS posts.
(2) SRTs.
Section 22
(3) MAA posts.
(4) PA mobile response units.
(5) Towers (as applicable).
(6) Access control posts and portals.
(7) Property Protection Area (PPA) posts.
g. Extra keys for vehicles, doors, and other PF-controlled areas should be available in
the event they are lost or misplaced. If practical, locksmiths should be placed on
standby to ensure immediate access to required PF areas. Key accountability needs
DOE-STD-1213-2014
32
to be verified prior to the release of site PF.
h. Vehicle maintenance schedules should be strictly enforced and vehicles maintained in
top condition before any anticipated work stoppage to ensure dependability of the PF
vehicles.
i. A supply of patrol and post forms should be available to replenish stocks that are
missing or depleted.
j. A pre-inventory and operability plan should be developed and accomplished to ensure
system and equipment integrity.
7.4 CONTINGENCY PROTECTIVE FORCE DEPLOYMENT PREPARATIONS
a. Relief of the PF and posting of CPF should be accomplished with minimum disruption
of security operations.
b. Before the CPF assumes duties at posts and patrols, all PF posts and mobile units
should be inspected and photographed to document their physical condition.
(1) Additionally, checklists can be developed so site PF personnel can complete a
post/patrol inventory as a normal procedure during shift change and,
subsequently, changeover to the CPF.
(2) The incoming CPF will verify the same post/patrol inventory checklist with a
CPF supervisor present.
c. Post inspections should be conducted twice per shift on changeover day.
Thereafter, inspections should be made once per shift.
d. PF management and HQ and field element representatives should be present at the
initial CPF roll call and periodically thereafter to demonstrate the importance of the
operation and to show support for the CPF. Periodically, these same representatives
should conduct post visits.
e. Discipline and professional standards of the CPF are vital to a smooth relief of the PF
and transition to CPF operations.
f. PF supervisors should monitor all aspects of the changeover and relief to ensure
incidents or confrontations between forces are avoided.
g. If possible, disinterested parties should monitor the changeover. HQ and site Federal
employees can be used to monitor CPF operations, including the shift briefing and PF
post and patrol relief.
h. The use of an independent assessment to determine the effectiveness of management
and oversight of CPF operations during the emergency situation is an effective method
of quickly evaluating operations and correcting management problems, which may not
DOE-STD-1213-2014
33
be readily apparent because of concerns and involvement with day-to-day activities.
(1) The assessment should be conducted as soon as possible after the CPF is in
place to take advantage of lessons learned and to make operational
adjustments. This will improve and correct management operations during the
early stages of the non-routine operation, civil disturbance, or work stoppage.
(2) The review should include applicable records, documents, procedures,
correspondence, and plans and observations and discussions with FMC and PF
company management and DOE field element safeguards and security
managers.
(3) Interviews should be conducted with PF management personnel and auxiliary
force and Augmentee force SPOs.
i. All logs, post and patrol reports, incident reports, alarm assessments, and
documentation generated by the CPF should be specially annotated as such and
archived separately.
Section 23
7.5 PROTECTIVE FORCE EQUIPMENT AND WEAPONS TURN-IN
PROCEDURES
a. All PF equipment (e.g., radios, keys, intermediate force weapons, handcuffs, and
respirators) should be inspected and a receipt provided when turned in by the PF at
the onset of a work stoppage.
b. Firearms will be turned in to the armory immediately, inspected (broken down), and
the weapons cards retained with the firearms in the armory.
DOE-STD-1213-2014
34
8. MANAGEMENT RESPONSE TO WORK STOPPAGE ACTIVITIES
8.1 GENERAL
PF management should take a proactive role during a work stoppage to ensure site employees,
property, and vital interests are protected. While the CPF assumes many of these
responsibilities, PF management also should take an active role.
8.2 RUMOR CONTROL
During any unusual situation rumors and half-truths spread through the work environment;
therefore, timely and accurate dissemination of information is of utmost importance.
a. During work stoppages, allegations should be investigated and responded to
immediately.
b. Managers and supervisors should be attuned to rumors and gossip within the CPF ranks
and ensure accurate information is passed on to CPF members.
c. The use of a newsletter to control rumors and disseminate information to CPF
members is a valuable tool in managing a diverse organization. Information in the
newsletter should be timely and accurate to ensure it is read, and it should be published
at least weekly.
d. DOE and the public should be fully satisfied with the adequacy of site security and
the safeguarding and security of SNM and other critical national assets. This allows
the Local Field/Site Officials and PF management to negotiate without security
becoming an issue in the work stoppage.
e. Workers not involved with the work stoppage also should be kept fully informed
of all work stoppage activities.
8.3 CROSSING PICKET LINES
Employees should be made aware of the mixed feelings that could affect them during
the crossing of a hostile picket line, including the following:
a. the strong desire to get to work and not be injured,
b. the equally strong desire not to appear afraid or intimidated in the face of threatening
pickets,
c. the wish to avoid direct or close contact with pickets or other strikers, and
d. the need to be cordial or at least display a lack of animosity toward striking fellow
employees.
DOE-STD-1213-2014
35
8.4 GUIDELINES FOR CROSSING PICKET LINES
Information such as the following should be communicated to individuals who might have
to cross a picket line, including regular employees and CPF members.
a. Stay inside your vehicle and do not linger when traveling through a picketed
gate.
b. Drive with added caution.
c. Do not use language or gestures that might provoke negative responses.
d. Do not respond in any way if you are confronted in a negative manner or with
abusive language.
e. Car pool with other employees whenever possible; this reduces the total number
of vehicles entering the site and ensures witnesses to any unlawful acts committed
or attempted against personnel.
f. Do not exit your vehicle, even if you encounter acts of violence (e.g., property damage
to vehicles); continue to the first security post, call security, and prepare a report.
8.5 DAMAGE CLAIMS
In the event of vandalism or violence, a system for submitting, processing, and
investigating damage claims as a result of work-stoppage-related incidents should be
established. Confirmed acts of vandalism and violence should be referred to federal
oversight and local law enforcement for disposition.
Section 24
8.6 OPERATIONS SECURITY
a. Contingency-operation-related information should be considered “Official Use Only”
and handled accordingly.
b. Physical security measures and practices should be reviewed to ensure adequacy and
adaptability to the COC and other physical locations used by the CPF, such as
classrooms and shift briefing areas.
c. Information security procedures such as document control, accountability,
destruction, and transfer should be considered when CPF operations or work-
stoppage-related information is involved.
d. Operations security assessments of activities, programs, or facilities should be
conducted to identify critical information to be protected and the potential pathways in
which the information could be obtained in an unauthorized manner.
8.7 BOMB THREAT PROCEDURES
Bomb threats from varied sources are a real possibility during work stoppages, demonstrations,
DOE-STD-1213-2014
36
civil unrest, and other security emergencies. Current procedures should be reviewed and
amended as necessary. Refresher training should be conducted on how to respond to telephone
bomb threats, who makes decisions on evacuations or conducting searches, and when and how
to initiate search procedures.
DOE-STD-1213-2014
37
This page intentionally left blank.
DOE-STD-1213-2014
38
9. REDEPLOYMENT OF THE SITE PROTECTIVE FORCE
9.1 GENERAL
Redeployment of the site PF should be planned, coordinated, and executed as carefully and
thoroughly as initial deployment of the CPF.
9.2 PROTECTIVE FORCE RECORDS REVIEW
A review of each individual PF member’s training, qualification, and personnel security
records should be conducted to ascertain his/her fitness for return to duty.
a. A review of PF training and firearms qualification records should be conducted to
identify any individuals whose qualifications have expired or will expire by the end of
the re-deployment month.
b. A firearms range schedule for requalification should be developed immediately.
c. A review of PF medical and physical readiness qualification records should be
conducted to identify any individuals whose qualifications have expired or will expire
by the end of the redeployment month.
d. A physical readiness test schedule should be developed for necessary requalification.
e. A review of individual PF physical profiles and limited work requirements should
be conducted to determine work status.
f. A letter for HRP reinstatement should be prepared for those PF members eligible for
HRP.
9.3 CONTINGENCY PROTECTIVE FORCE CHANGE-OUT
a. Senior management should be present at the shift briefing to welcome back PF
members and explain any changes or management decisions that affect PF operations.
b. The shift briefing should consist of post/patrol assignments, expected standards of
performance, post/patrol inventory requirements, a reminder of HRP reporting
responsibilities, and specific posting instructions.
c. Each post and patrol will be changed out from CPF personnel to PF personnel with a
PF supervisor present to monitor the relief. If possible, disinterested party monitoring
also may be required to minimize potential conflicts.
d. Before the PF returns to posts and patrols, all posts and mobile units should be
inspected and photographed to document physical condition.
(1) CPF personnel should complete a post/patrol inventory checklist prior to
changeover to the site PF.
DOE-STD-1213-2014
39
(2) The incoming PF can verify the same post/patrol inventory checklist with a PF
supervisor present.
Section 25
e. To maintain maximum security, personnel change-out should progress from the
most critical posts/patrols to the least important, as follows:
(1) CAS/SAS.
(2) SRTs.
(3) MAA posts.
(4) PA mobile response units.
(5) Towers (as applicable).
(6) Access control posts and portals.
(7) PPA posts.
f. When the supervisor and site PF personnel arrive at the post/patrol, the supervisor
should ask CPF personnel for completed post/patrol inventory checklists or vehicle
sheets and any normally transferred equipment (keys, radios, etc.). CPF personnel
may then be released to leave the post and report for final checkout and release.
g. Site PF personnel may then assume the post/patrol and complete a post/patrol
inventory while the PF supervisor is present. The supervisor should immediately
resolve any discrepancies.
9.4 CONTINGENCY PROTECTIVE FORCE OUT-PROCESSING
All CPF personnel should report immediately to a predetermined location for out-processing at
the end of their final shifts. At a minimum, the following areas should be addressed in a
checklist (see Appendix J, “Sample Checklists”):
a. Security (debriefing statement and security operations nondisclosure form).
b. Property supply.
c. Arms room.
d. Badging.
e. Administration.
f. Letters of appreciation and verbal recognition, if appropriate, should be presented to
CPF personnel by DOE/NNSA senior management before the CPF personnel return to
their home sites.
DOE-STD-1213-2014
40
g. CPF training records should be annotated to reflect approved training, certification,
and qualifications.
h. Each Augmentee should be debriefed concerning possible site security improvements
noted during the contingency tour. Such recommendations and suggestions could
involve operations, procedures, equipment, physical security systems, or PF activities.
i. The receipt and return of the firearms from other sites should be controlled by written
receipt form. A three-part receipt or similar method would provide adequate controls
and documentation.
DOE-STD-1213-2014
41
This page intentionally left blank.
DOE-STD-1213-2014
42
10. AFTER-ACTION REPORT AND LESSONS LEARNED
10.1 GENERAL
Accurate and complete documentation on all contingency operations activities is vital for
reviews following the phase-out of the CPF and for preparing reports, answering inquiries, and
preparing for audits. Each office and organization that supported the CPF should have
generated documentation concerning the support provided. Upon resumption of normal
operations, all documentation not already maintained in the COC should be centralized,
reviewed, and archived.
10.2 DAILY JOURNALS
Managers and supervisors who participate in any of the phases of a CPF operation should
maintain daily journals recording any support provided to and/or actions taken as a result
of contingency operations. Likewise, organizations should maintain daily journals of
support provided and record any significant activities.
10.3 MANAGEMENT BRIEFING BOOK
A chronological record of daily (24-hour) occurrences should be compiled in a briefing book
and provided to senior management on and off the site to keep them apprised of all significant
activities. Such briefing books are an excellent source of information for preparing a formal
after-action report.
10.4 MEETING MINUTES AND NOTES
Each coordination and planning meeting should be summarized in notes and informal
minutes disseminated to all participants to ensure decisions and tasks are properly
understood and followed.
Section 26
10.5 SECURITY SELF-EVALUATION FROM CONTINGENCY PROTECTIVE
FORCE MEMBERS
CPF members should be debriefed before returning to their home sites. Debriefings
should include discussions of safeguards or security procedures, physical security
measures, and/or equipment changes or upgrades that would enhance security onsite.
Likewise, changes that would improve support for, training of, or planning for the CPF
should also be discussed.
10.6 AFTER-ACTION REPORT AND LESSONS LEARNED
A formal after-action report outlining lessons learned should be initiated immediately
after the return to normal operations. A realistic completion date and recommended
format should be included in the call for input. The report should be broken down into
issues, background, and recommendations.
DOE-STD-1213-2014
43
This page intentionally left blank.
DOE-STD-1213-2014
A-1
APPENDIX A. REFERENCES
1. 10 CFR 1046, “Medical, Physical Readiness, Training, and Access Authorization
Standards for Protective Force Personnel.”
2. 10 CFR 1047, “Limited Arrest Authority and Use of Force by Protective Force Officers.”
3. 10 CFR 1049, “Limited Arrest Authority and Use of Force by Protective Force
Officers of the Strategic Petroleum Reserve.”
4. DOE O 151.1D, Comprehensive Emergency Management System, dated 08-11-16.
5. DOE O 470.4B, Chg 2, Safeguards and Security Program, dated 7-21-11.
6. DOE O 470.3C, Design Basis Threat Order (DBT), dated 11-23-16.
7. DOE O 471.6, Chg 2, Information Security Program, dated 6-29-11.
8. DOE O 472.2, Chg 1, Personnel Security, dated 7-21-11.
9. DOE O 473.3A, Chg 1, Protection Program Operations, dated 6-29-11.
DOE-STD-1213-2014
2
This page intentionally left blank.
DOE-STD-1213-2014
B-1
APPENDIX B. DEFINITIONS
Alarm Assessment—The process of determining an alarm condition stimulus.
Augmentation Force—The offsite protective force (PF) supervisors and managers (non-
bargaining-unit members) who have been tasked to participate as members of a contingency
protective force. Security police officers and security officers from PF organizations not
represented by a bargaining unit.
Augmentee—One who participates as a member of the augmentation force.
Auxiliary Force—The onsite protective force (PF) supervisors and managers (non-bargaining-
unit members) who have been tasked to participate as members of a contingency PF.
Bargaining Unit—The legally recognized unit of employees represented for collective
bargaining purposes by a labor organization which negotiates on behalf of protective force
members.
Contingency Protective Force (CPF)—A combination of onsite protective force (PF)
supervisors and managers (auxiliary force); offsite PF supervisors and managers
(augmentation force); Federal employees who are members of the Office of Secure
Transportation; and other Federal employees. The CPF is staffed and organized for the
duration of the emergency or non-routine situation.
Economic Strike—Work stoppage over economic issues (i.e., disputes over wages, hours,
or working conditions).
Force-on-Force Testing—Validation testing to ensure the contingency force can
adequately defend site targets.
Illegal Picket—A picket line formed at an access gate that all parties had formally agreed
would be excluded from work stoppage activities.
Injunction—A court order enjoining a bargaining unit or management from a given course
of action.
Lockout—A management decision that prohibits members of the bargaining unit from
entering the site and returning to work.
Section 27
Picket—A person stationed outside a DOE site access gate during a strike to express protest
or grievance and discourage entry by other non-striking employees or vendors.
Picket Line—A line or procession of people picketing a DOE site access gate.
Protective Force—Security officers, security police officers, Office of Secure
Transportation Federal agents, and other personnel assigned to protective duties
involving the safeguards and security interests of the Department.
DOE-STD-1213-2014
B-2
Restraining Order—A legal action forbidding a party from doing a threatened act until a
hearing on the application can be heard.
Strike—A concerted refusal by employees to go on working in an attempt to force an
employer to meet certain demands.
Unfair Labor Practice Strike—A strike in protest of unfair labor practices. The strike can
happen any time the bargaining unit believes management has conducted unfair practices.
Union—A recognized organization legally formed to represent its individual members
in collective bargaining, contract negotiations, and labor matters.
Work Stoppage—An authorized or unauthorized refusal to work by a group of employees.
DOE-STD-1213-2014
C-1
APPENDIX C. SAMPLE CONTINGENCY PROTECTIVE FORCE
OPERATIONS PLAN
This sample plan outline is intended to be generic in nature and to act as a guide in the
development of a site-specific contingency protective force (CPF) operations plan. It
provides a wide range of CPF topical areas and procedural requirements that may or may not
be applicable in all circumstances.
1. PURPOSE.
The (name of site/facility) Contingency Protective Force (CPF) Operations Plan
has been developed to ensure the continued safe operation of Department of Energy
(DOE) sites and individual facilities. The primary focus of the plan is to provide for the
safeguarding and security of DOE special nuclear material and other security interests
and to provide for the safety, health, and protection of all personnel, the public, and the
environment.
2. SCOPE.
The plan outlines the responsibilities, requirements, qualifications, and functions to be
implemented in the event of emergency and/or nonroutine situations involving
protective force (PF) operations. Distribution of this plan is controlled to ensure all
revisions are incorporated into existing plans.
3. APPROVAL.
The CPF Operations Plan is a deviation from the site’s approved security plan; the
appropriate federal risk-acceptance official must approve the CPF Operations Plan.
4. REFERENCES. (List appropriate DOE, local, and other documents that apply to
the plan.)
5. DEFINITIONS/ACRONYMS. (Include definitions and acronyms relevant to
operation of a contingency force.
6. RESPONSIBILITIES. (Define the responsibilities collateral to each of the
following positions, as appropriate.)
a. Department of Energy.
(1) Site Manager.
(2) Public Affairs Officer.
(3) Facility Representatives.
(4) Manager, Safeguards and Security (DOE/National Nuclear Security
Administration).
DOE-STD-1213-2014
C-2
(5) General Counsel.
(6) Manager, Site Emergency Operations Center.
(7) Office of Labor Relations.
b. Site Protective Force Contractor.
(1) General Manager.
(2) Contingency Operations Center (COC) Shift Leader.
(3) Public Affairs Officer.
(4) Chief Counsel.
(5) Finance and Accounting Department.
(6) Manager, Personnel Security Department.
(7) Logistics and Equipment Issue/Control Officer.
(8) Environmental Safety and Health Officer.
Section 28
(9) Operations Department.
(10) Planning Department.
(11) Training Department.
(12) Performance Testing Department.
(13) Command, Control, and Communications Department.
c. Site Facility Management Contractor (FMC) Manager.
(1) Facility Managers.
(2) FMC Safeguards and Security Director.
7. ASSUMPTIONS. The following are examples of the types of questions that can
guide the development of site-specific assumptions for this section.
a. Will DOE/National Nuclear Security Administration and the FMC attempt to
conduct operations at pre–work-stoppage levels?
b. Which site operations will continue and which will be curtailed?
c. Will members of the bargaining unit who want to report to work be permitted
DOE-STD-1213-2014
C-3
to do so, or will they be locked out?
d. Will an offsite transshipment point be established?
e. If a work stoppage occurs, what will be the chain of command for work
stoppage operations?
f. If a work stoppage occurs, what will be its estimated length?
8. CONTINGENCY PROTECTIVE FORCE.
a. Current Protective Force Deployment.
b. Protective Force Available (auxiliary and augmentation forces).
(1) Security Officer.
(2) Security Police Officer (working only fixed posts).
(3) Security Police Officer (mobile posts).
(4) Security Police Officer (SRT).
(5) Specialized Personnel (pilot, crew chief, dog handler, boat crew).
(6) Clerical.
(7) Supervisors and Managers.
(8) Administration.
c. Assignments (Posts/Patrols).
(1) Modifications to Existing Staff.
(2) Armed Posts.
(3) Unarmed Posts.
d. Post/Patrol Closure Selection and Criteria.
e. Scheduling
(1) Shift Hours.
(2) Overtime Policy.
(3) Rotation Policy.
f. Overtime Required to Meet Staffing Requirements.
DOE-STD-1213-2014
C-4
g. Auxiliary Force Requirements and Qualifications.
h. Augmentation Force Requirements and Qualifications.
i. Administration.
(1) Pay.
(2) Per Diem.
(3) Transportation.
(4) Rental Cars.
9. TRAINING PLAN.
a. Responsibilities.
b. Requirements Analysis.
c. Auxiliary Force Training Records Review.
d. Augmentation Force Requirements and Records Review.
e. Instructor Requirements.
f. Administrative Requirements.
(1) Classrooms.
(2) Equipment.
(3) Support.
(4) Documentation.
(5) Training Maintenance
g. Specific Site Requirements.
h. National Training Center (NTC) Support Requirements.
10. SITE ENTRANCE AND EXIT PLAN.
a. Picketed Gate.
b. Non-picketed Gate.
c. Vendor-Refusal-to-Enter Procedures.
DOE-STD-1213-2014
C-5
d. Transshipment Procedures.
11. REQUIRED OPERATIONAL AND SUPPORT ACTIVITIES.
a. Operational.
b. Offsite Support.
(1) DOE Headquarters.
(2) Office of Secure Transportation.
(3) NTC.
c. Site Support.
d. Administrative.
e. Emergency.
f. Other Site Activities.
g. Communications.
h. Coordination.
12. OVERSIGHT AND OPERATIONAL TESTING.
a. COC.
(1) Staffing.
(2) Operation
(3) Training.
b. Limited-Scope Performance Tests.
c. Force-on-Force Performance Tests.
d. Roll Call Training.
e. Post and Patrol Surveillance.
13. CONTINGENCY PROCEDURES.
a. Possible Violence.
b. Possible Work Stoppage Sympathy Support.
DOE-STD-1213-2014
C-6
(1) Onsite.
(2) Offsite.
c. Site Emergency Operations Center.
14. PLAN ACTIVATION AND EXECUTION.
a. PF Post and Patrol Relief Procedures.
b. Posts, Vehicles, Equipment Turn-Ins.
c. Firearms and Equipment Turn-Ins.
d. COC Activation.
e. Records Management.
f. Security Self-Evaluations.
15. PROTECTIVE FORCE RECOVERY OPERATIONS FOLLOWING EMERGENCIES.
Section 29
a. Post and Patrol Transfer.
b. Debriefing.
(1) Security Interests.
(2) Security Incident Response Plans
(3) Safeguards and Security Systems.
c. Interviews for After-action Report and Lessons Learned.
d. COC Draw Down.
e. After-action Report and Lessons Learned.
16. SUGGESTED ATTACHMENTS (Samples Not Included).
Attachment 1 Post and Patrol Staffing Requirements
Attachment 2 Post and Patrol Closure Priority List
Attachment 3 Contingency Operations Center
Procedure
Attachment 4 Post and Patrol Orientation and Briefing
Attachment 5 Contingency Protective Force Training Schedule
DOE-STD-1213-2014
C-7
Attachment 6 Contingency Force Performance Test
Plan
Attachment 7 Contingency Force Training Job Performance
Measures
Attachment 8 Key Personnel Alert and Notification Roster
Attachment 9 Contingency Protective Force Requirements and Qualifications
Checklist
Attachment 10 Contingency Protective Force In-Processing and Out-Processing
Checklists
DOE-STD-1213-2014
C-8
This page intentionally left blank.
DOE-STD-1213-2014
D-1
APPENDIX D. SAMPLE TASK LIST
Functional Area Task/Activity/Action Responsibility Completio
n Date
Plans Develop a draft contingency
protective force (CPF)
operations plan
Integrate the CPF operations plan
with site facility management
contractor operations
Integrate the CPF operations plan
with the Department of Energy field
element
Develop task list
Develop post/patrol priority closing
list
Develop Augmentee requirements
Develop employee briefings
Conduct self-assessment of
contingency operations
Develop format for after-action
report
Develop format for lessons learned
report
Conduct records maintenance
Plan protective force (PF) change-
out
Plan CPF relief
Provide initial employee briefings
Operations Direct Contingency Operations
Center activities
Compile records/forms/reports
Conduct PF change-out
Conduct CPF relief
Develop CPF staffing assignments
Monitor overtime expenditures
Develop limited-scope performance
tests
Maintain local law enforcement
liaison
Training Screen all auxiliary force training
DOE-STD-1213-2014
D-2
Functional Area Task/Activity/Action Responsibility Completio
n Date
records
Screen all Augmentee
force training records
Develop training plan
Develop training schedules
Training Conduct auxiliary force training
Conduct Augmentee force training
Conduct access control training
Conduct all necessary
certifications and qualifications
Conduct central alarm station and
secondary alarm station training
Verify training readiness of the CPF
Maintain all training records
Logistics Develop CPF equipment
requirements
Develop required seasonal
uniform requirements
Verify availability of required
uniforms and equipment
Develop CPF firearms requirements
Develop CPF transportation
requirements
Develop rental car requirements
Develop lodging plan and make
lodging arrangements
Develop severe weather
provision requirements
Develop hand receipt system for the
CPF
Develop damage claim procedures
Internal Security Develop CPF Human Reliability
Program requirements
Develop and implement plan for
security clearance validation
Develop and implement
badging and accountability
card requirements
Conduct operations
security/counter intelligence
activities before work
stoppage
Internal Security Conduct operations
DOE-STD-1213-2014
D-3
Functional Area Task/Activity/Action Responsibility Completio
n Date
Section 30
security/counter intelligence
activities during work stoppage
Security Develop site-specific security
operations nondisclosure forms
Finance and
Accounting
Develop costs and budget for
anticipated contingency operations
Obtain funding for contingency
operations
Set up contingency operations
budget and cost accounting system
in accordance with all applicable
rules and regulations
Identify and plan for all salary-
/pay-related issues, including
overtime rates and per diem issues
Designate point of contact and
coordinate with other sites for
funding and salary issues
Maintain records in accordance
with all rules and regulations
Public Affairs Develop media plan
Develop and issue initial press
releases
Issue site notifications
Issue information and status papers
Environment,
Safety and
Health
Coordinate all training
requirements with training
organization
Monitor working conditions and
CPF activities
Quality Assurance Develop limited-scope performance
tests
Conduct limited-scope performance
tests
Legal Prepare restraining orders
Review local law enforcement
agency jurisdictional
responsibilities
Management
and Operating
Contractor
Coordinate reduced operations
Coordinate reduced
access control restrictions
Coordinate with offsite
DOE-STD-1213-2014
D-4
Functional Area Task/Activity/Action Responsibility Completio
n Date
vendors and suppliers
Management
and Operating
Contractor
Coordinate with subcontractors
Coordinate lockdown of special
nuclear material locations
Coordinate site-wide employee
notifications
Coordinate special nuclear
material vault opening and
closing schedule
Ensure site emergency
operations center staffing
Develop plans for transshipment
point
DOE/NNSA Field
Elements
Ensure site emergency
operations center activation
Approve requests for restraining
orders
DOE-STD-1213-2014
E-1
APPENDIX E. SAMPLE POST/SHIFT ASSIGNMENT MATRIX
List in order of importance or priority of staffing all posts, patrols, entry control points,
towers, supervisory positions, special response teams, dog teams, and helicopter crews
that will be required during the emergency and contingency protective force personnel
assigned to each. (The lowest priority positions will be candidates for possible closing, if
required.)
PRIORITY
POST/PATROL
DAY
SHIFT
(0600
NIGHT
SHIFT
(1800 0600)
RELIEF SHIFT
1 Material
Access Area
Auxiliary
R. Smith
Auxiliary
R. Jones
Auxiliary
A. Green
2 Material
Access Area
Augmentee
L. Samuel
Augmentee
S. Williams
Auxiliary
A. Hunter
3 North Portal Auxiliary
D. Sanchez
Augmentee
P. Brown
Auxiliary
J. Lee
4 Tower 1 Not staffed Augmentee Augmentee
5 Property
Protectio
Augmentee Augmentee Augmentee
Auxiliary—Auxiliary Force Personnel
Augmentee—Augmentation Force Personnel
DOE-STD-1213-2014
E-2
This page intentionally left blank.
DOE-STD-1213-2014
F-1
APPENDIX F. SAMPLE WORK STOPPAGE QUESTIONS AND ANSWERS
INFORMATION SHEET
If questions and answers are to be distributed, the following may provide a helpful starting
point. They should be reviewed carefully.
Q. How long will the stoppage last?
A. The length of the work stoppage cannot be forecast. Historically, Departmental
protective force work stoppages have lasted from several days to more than 6 weeks.
Q. If protective force members want to cross the picket line, will they be allowed?
A. Security police officers have been advised by management of their options. This
Section 31
includes crossing the picket line, but significant numbers are not expected.
Q. Is mediation being considered?
A. A Federal mediator was involved in negotiations before the work stoppage.
Q. I understand that some members of the contingency force are from other sites.
What is the position of their unions?
A. The contingency protective force members from other sites are not members of other
collective bargaining units.
Q. Is the contingency force well trained?
A. Yes. All contingency force members meet Department of Energy requirements for
qualifications and training.
Q. I heard that you are arming secretaries and clerks. Is this true?
A. No. All armed individuals are fully trained and qualified and meet Department of
Energy qualifications for their positions. Administrative personnel may be providing
administrative support such as answering telephones in the secondary alarm station or
checking badges at outer gates.
Q. What is the status of the posts? Are they all staffed?
A. All security posts required to maintain the safety and security of the site are being
staffed 24 hours per day.
Q. Did the guards just abandon their posts?
A. No. Security police officers were relieved from their posts and their union gave them
written procedures to follow.
Q. How does the walkout affect security here onsite?
A. A fully trained and qualified contingency protective force, consisting of security officers
and security police officers from other sites, current protective force supervisors, former
security police officers who have requalified as required by Department of Energy
requirements, and other individuals with military and law enforcement backgrounds, has
been assembled to ensure adequate security levels are maintained during this work
DOE-STD-1213-2014
F-2
stoppage. All individuals involved have received site-specific training and meet
Department of Energy qualification requirements.
Q. Is there a danger to the public?
A. There is no risk to the public. The security of Department of Energy assets will be
constantly reviewed to ensure there is no degradation.
Q. Should members of the public be concerned?
A. No. The facility is fully secured by qualified personnel; adequate security will be
maintained.
Q. What about the special nuclear material stored there?
A. The special nuclear material is secure, with our graded security approach and
operational system in place and fully functional.
Q. Is there a concern about sabotage?
A. Our mission is to protect the site assets from sabotage. Security systems are operational,
and the level of concern remains unchanged.
Q. What do you mean, “Security systems”?
A. The protective force uses a graded security system approach that includes electronic
equipment as well as security police officers. All these elements combined make up the
security systems.
Q. What are you doing to prevent sabotage?
A. Ensuring that all systems remain operational.
Q. Do you feel that the site is safe?
A. Site security is being maintained by an experienced, trained, and qualified contingency
protective force.
Q. If it is safe with the reduced number of people, why under normal circumstances are
there more?
A. Normally, the additional individuals are required for relief factors such as vacations and
shift rotation. The shift schedule has been modified and no vacations or planned
absences are being allowed. Certain operations have been limited.
Section 32
Q. Is it true that language exists in the contract proposal that would allow the company to
lay off protective force employees and rehire them at a lower hire rate?
A. No.
NOTE: These questions are not all-inclusive nor are they required in any way to be
published. The Office of Public Affairs and Chief Counsel will review
them before publication.
DOE-STD-1213-2014
G-1
APPENDIX G. SAMPLE BRIEFING
TOPICS
• Date of Work Stoppage
• Contingency Protective Force
- Auxiliary Force
- Augmentation Force (Sites Supporting)
• Contingency Protective Force Planning
- Rotation Policy
- Overtime
- Shift Length
• Cost Schedule (1 Week, 4 Weeks, 8 Weeks)
• Contingency Protective Force Training
- Length
- Site Familiarization/Orientation
- Environmental Safety and Health
- Limited-Scope Performance Testing
- Force-on-Force Exercises
• Local Law Enforcement Liaison
• Other Assistance
- National Training Center
- Department of Energy Headquarters
- Office of Secure Transportation
• Contingency Protective Force Testing
DOE-STD-1213-2014
G-2
• Work Stoppage Status
• Work Stoppage Impact on the Site
• After-Action Report
- Self-Assessment
- Lessons Learned
DOE-STD-1213-2014
H-1
APPENDIX H. SAMPLE LETTERS
ADVANCE NOTICE OF POSSIBLE
WORK STOPPAGE
Subject: Advance Notice of Possible Protective Force Work Stoppage at .
To: See Distribution List
The current collective bargaining agreement between the protective force contractor,
, and the union expires
.
In the event that a new agreement has not been successfully negotiated, a work stoppage
could be called by the union. A detailed contingency plan has been developed to
ensure that adequate security levels are maintained during such an event. The
implementation of the plan will require non-bargaining-unit personnel from other
Department of Energy facilities to serve as replacements for striking protective force
bargaining unit members. An analysis of security operations indicated that
additional protective force employees would be required
from other sites to support this contingency plan. This is the minimum number needed to
ensure safeguards and security requirements at are
maintained.
Pertinent information.
The DOE point of contact is John Smith. He can be contacted by
, fax , or pager .
It is requested that other participating Department of Energy offices appoint a protective
force contractor point of contact and make logistical arrangements directly with Mr.
Smith.
It is anticipated that participating protective force personnel will work 12-hour shifts but no
more than 60 hours in a 7-day period. The planned tour of duty is 30 days.
Participating protective force personnel should make travel arrangements that permit
them to arrive onsite no later than on . In the event that a
work stoppage appears likely and the plan is activated, participants will be required to
attend
Orientation and site-specific training from
to .
Lodging will be arranged by local protective force management.
DOE-STD-1213-2014
H-2
Per diem and pay rates (both regular and overtime) will be based on participating
organization policies.
Rental cars will be authorized at the ratio of one car per every three participants.
It will be necessary for each participant to send (fax) copies of his/her most current
firearms and physical readiness qualification records to Mr. Smith by . Only
participants who have records showing current and complete qualifications are
acceptable.
Section 33
All individuals must bring their weapons authorization credentials.
Participants must be qualified with the .
will be provided.
Participants must provide their own duty weapons (sidearms only), intermediate force
weapons, leather gear, and uniforms. Cleaning and maintenance of uniforms will be
provided onsite.
Each participating site’s point of contact will be contacted no later than
a
nd as required thereafter concerning the status of the support required until all labor issues
are resolved.
Security clearance information for all participants will be validated through the
classified visitor control system.
Please identify your points of contact and have them contact Mr. Smith at their earliest
convenience. To facilitate contingency planning efforts, we request that you respond no
later than with the number of participants that you will provide. Individual
names, social security numbers, and other personal information are requested by
to facilitate clearance and Personnel Security Assurance
Program/Personnel Assurance Program transfers.
Your assistance in this effort is greatly appreciated.
Sincerely,
Site Manager
DOE-STD-1213-2014
H-3
STATUS UPDATE ON POSSIBLE WORK
STOPPAGE AT ________________________
Subject: Status Update on Possible Work Stoppage at .
To: See Distribution List
Negotiations will soon commence between the protective force
contractor and the union. The current collective bargaining agreement expires on
.
We very much appreciate the commitments made by many of your respective protective force
contractor organizations to supply non-bargaining-unit personnel to assist in the event that
work stoppage seems likely. Your collective workforce commitments, augmented by
qualified onsite non-bargaining-unit members, will provide a sufficient number of personnel
to ensure our protection requirements can continue to be met in the event of a work stoppage.
All Augmentees should arrive no later than____________in order to allow for
training and performance testing.
Your continued assistance in this effort is greatly appreciated.
Sincerely,
Site Manager
DOE-STD-1213-2014
H-4
ACKNOWLEDGMENT AND INFORMATION LETTER TO AUGMENTEE
Dear Augmentee:
I have recently been notified that you have volunteered to participate on the
contingency protective force. Mr. J. R. Smith has been established as an overall point of
contact to ensure your in-processing runs smoothly and that your time spent in support of the
contingency protective force is well managed. After you arrive onsite, Mr. Smith will be your
primary focal point for any inquiries or problems that may arise.
Lodging and transportation have been arranged, and you should contact your local point
of contact for the specifics.
You will be working 12-hour shifts with adequate time off to relax. No contingency
protective force member will work more than 60 hours in a 7-day period.
It is expected that your tour of duty will be 30 days. If needed, another detachment of
personnel will arrive and be trained.
Your continued assistance in this effort is greatly appreciated.
Sincerely,
Protective Force Contract Manager
DOE-STD-1213-2014
I-1
APPENDIX I. SAMPLE CHECKLISTS
AUGMENTEE QUALIFICATIONS/CERTIFICATIONS AND
SITE REQUIREMENTS
NAME: SOC. SEC. NO.: HOME SITE:
1. Physical readiness qualification scores
YES NO
2. Semiannual firearms qualification scores
3. Intermediate force weapons record of training or qualification
4. Respirator card issuance
Section 34
5. Badging
6. Clearance
7. Human Reliability Program
8. Accountability cards
9. Site post and patrol training
10. Special nuclear material recognition training
11. Nuclear criticality safety training
12. Building orientation training
The following are commonly recurring documentation inconsistencies.
• Physical readiness qualification scores not recorded in individual training records.
• Semiannual weapons qualification scores not recorded in individual training records.
• Soon-to-expire weapons qualifications.
DOE-STD-1213-2014
I-2
AUGMENTEE IN-PROCESSING
NAME: SOC. SEC. NO.: HOME SITE:
Documentation on
Hand. YES NO
Physical readiness training results
Training records
Clearance
Human Reliability Program documentation
Respirator card
Weapons authorization credentials
Driver’s license
Firearms.
Duty handgun
Auxiliary firearm
Other special assigned firearms
Intermediate force weapons
Uniforms and Equipment.
Uniform Boots Overcoat
Leather gear/web gear
Safety glasses
Vest
Personal protective equipment (e.g., respirator, gloves, boots)
Dosimeter
Site Requirements.
Security badge
Accountability badge
Accommodations
arranged Transportation
coordinated
DOE-STD-1213-2014
I-3
AUGMENTEE OUT-PROCESSING
NAME: SOC. SEC. NO.: HOME SITE:
Office
Clearance. YES NO SIGNATURE
Internal Security
Procurement (supply room)
Environment, Safety, and
Health (Respirator) Armory
Badging (security badge and
accountability badge)
Receipts.
Weapons shipment
Lodging Car rental
NOTE: Each individual is responsible for obtaining signatures from each of the above-
listed offices before departure. Any missing equipment will be reported to the
home site for payment or replacement.
DOE-STD-1213-2014
I-4
CONTINGENCY OPERATIONS CENTER ACTIVATION
INITIALS TIME
1. Notify Shift
Supervisor 1a. Brief
Supervisors
2. Notify Department of Energy Operations Office (safeguards
and security organization)
2a. Notify Site Emergency Operations Center
2b. Notify Department of Energy Headquarters (Department of
Energy/National Nuclear Security Administration/program
offices)
3. Notify Site Facility Management
Contractor 3a. Notify Lock and Key
3b. Notify Motor Pool (vehicle maintenance)
4. Notify Protective Force Manager
5. Notify Local Law Enforcement Agencies
6. Notify Lead Augmentees at Lodging Site
7. Notify Augmentee Home Site
NOTES: 1. Messages left on pager systems or voicemail are
not considered notifications.
2. Sub-notifications (e.g., 2a) may be the responsibility of the
primary office/agency.
DOE-STD-1213-2014
J-1
APPENDIX J. SAMPLE REFRESHER TRAINING REQUIREMENTS
AND VERIFICATION FOR AUXILIARY (SITE) FORCE PERSONNEL
NAME:
SUPERVISOR/TRAINER: INSTITUTIONAL KNOWLEDGE/ADMINISTRATION
Supervisor Verified by: (Initials and date)
Report time and location Shift
briefing
Fitness-for-duty inspection/requirements
Chain-of-command knowledge
Time card procedures and overtime reporting Human
Reliability Program
Dosimeter issuance/update
Site protection strategy and alarm/intrusion response
ARMORY OPERATIONS.
Armory location/weapon issuance policy
Weapon-loading procedures/demonstrated
LEGAL ISSUES.
Deadly force conditions/ review
Force continuum/understanding
Arrest authority/understanding Local
Rules of Engagement
WEAPONS.
Primary duty weapons current
Secondary duty weapons current
Intermediate force weapon current
POSTING OPERATIONS.
Section 35
Staging area Transportation Access control
Post/key/radio exchange
Searching requirements/understands
Package search/understands Vehicle
search/demonstrated Personnel
search/understands Contraband
seizure/understands
DOE-STD-1213-2014
J-2
EQUIPMENT/OPERATION TESTING.
X-ray operation/understands Stationary
metal detector/understands
Hand-held metal detector/demonstrated
Stationary radiometric/understands
Hand-held radiometric/demonstrated
Central alarm station radio/base station/demonstrated
Central alarm station radio/portable/demonstrated Perimeter
Intrusion Detection Assessment System sector
monitor/demonstrated
Auxiliary weapons locations
Auxiliary weapons access
Auxiliary weapons inventory
Mobile unit auxiliary access
CRITICAL FACILITY AWARENESS.
Building orientation Command
and control
Radiological sabotage defense strategy
Emergency response responsibilities
Non-security emergency responses
Containment responsibilities
Areas of responsibilities
Tactical deployment
ENVIRONMENT, SAFETY, AND HEALTH REQUIRED TRAINING.
First responder
Applicable Radiological Worker (I or II) Building/Protected
Area/Material Access Area orientation
NOTE: Auxiliary force personnel will have various levels of current training
and experience. Required knowledge must be individually
evaluated.
DOE-STD-1213-2014
K-1
APPENDIX K. SAMPLE TRAINING SCHEDULE FOR
AUGMENTATION FORCE PERSONNEL
DAY ONE
TIME SUBJECT INSTR. LOC.
0600-0730 In-processing, badging, and administrative subjects
0730-0830 Welcome—comprehensive briefing, work
stoppage or emergency status
0830-0930 Site orientation, maps, diagrams, and
windshield tour
0930-1130 Respirator training, testing, and fitting
1130-1300 Lunch and travel
1300-1600 Site-specific mandatory training for all new
employees
1600-1630 Bomb threat procedures
1630-1800 Dinner and travel
1800-2000 Deadly force, force continuum, arrest authority, rules
of engagement
DAY TWO
TIME SUBJECT INSTR. LOC.
0600-0730 In-processing and administrative follow up
0730-0830 Human Resources, Finance in-processing
0830-1000 Post/patrol assignment/orientation, shift assignment,
issuance of post/patrol orders
1000-1100 Site protection strategy and alarm/intrusion response
responsibilities
1100-1130 Armory tour, orientation, and procedures
1130-1300 Lunch and travel
1300-1530 Building orientations
1530-1630 Special nuclear material recognition
1630-1730 Communication operation and procedures
1730-1900 Dinner and travel
1900-2100 Access control, pass and badge system, operation
(overview) of metal detectors and X-ray scanner,
inspections
DOE-STD-1213-2014
K-2
DAY THREE
TIME SUBJECT INSTR. LOC
0600-0630 Weapon carry refresher
0630-0700 Reports and forms
0700-0730 Restraint and cuffing refresher
0730-1100 First responder awareness to emergency situations
1100-1230 Lunch and travel
1230-1600 Nuclear criticality and alarm recognition and
response procedures
1600-1730 Post/patrol operations and familiarity, building
orientation and tour
NOTE: Comfort breaks are taken at the discretion of the instructor.
Subjects are generic in nature and may not be all-inclusive for
every site or location.
DOE-STD-1213-2014
L-1
APPENDIX L. SAMPLE WORK EXPERIENCE FORM
NAME: HOME SITE: .
The following information is solicited to better apply your experience and knowledge on the
contingency protective force.
DEPARTMENT OF ENERGY EXPERIENCE AS A MEMBER OF A PROTECTIVE
FORCE.
Number of years: Locations:
Positions/duties:
Section 36
EXPERIENCE AND TRAINING IN A CIVILIAN LAW ENFORCEMENT AGENCY.
Number of years: Type agency: ____________________________________
Locations: ____________________________________________________________
Highest rank achieved: ________________________________________________
Type and length of training: ____________________________________
MILITARY SERVICE.
Experience or training related to protective force operations:
Highest rank achieved: _________________________________________________________
SUPERVISORY EXPERIENCE.
Military: __________________________________________________________________
Department of Energy protective force: __________________________________________
OTHER EXPERIENCE OR SPECIAL TRAINING.
Former member of special response team: __________________________________________
Explosive training: ______________________________________________________
Antiterrorism training: ______________________________________________________
DOE-STD-1213-2014
L-2
Locksmith: _______________________________________________________________
Armorer: _______________________________________________________________
Intrusion detection system repair: _____________________________________________
DOE-STD-1213-2014
L-3
This page intentionally left blank.
DOE-STD-1213-2014
M-1
APPENDIX M. Lessons Learned Template
Based on input from___________________Management, as well as the off-site POC, the overall
management of the Strike Plan went__________________. Every effort was made to keep
personnel informed as to the status prior to, during, and after the strike. The communications and
pre-planning meetings proved __________as ___________worked through this event.
EXECUTIVE SUMMARY
SITE/FACILITY OVERVIEW
PRE-STRIKE PLANNING
Observations:
Lesson Learned:
STRIKE
Observations:
Lesson Learned:
RECOVERY
Observations:
Lesson Learned:
TIMELINE
SELF-ASSESSMENT
LESSONS LEARNED
CONCLUSION
SUMMARY OF FINDINGS
DOE-STD-1213-2014
CONCLUDING MATERIAL
Review Activity
EM
Policy (AU-
51) EHSS
MA
NE
NN
SA
SC
Preparing Activity
Office of Security Policy (AU-51)
Field and Operations Offices
C
H
I
D
NNSA Service Center
ORO
RL
SRO
Project Number
SANS-P2013-003
Site/Field Offices
AN
L
IN
L
LS
O
LL
SO
NS
O
OR
PS
O
RL
SO
SR
SO
SS
O
YS
O
External Agency
DOE-STD-1213-2014 Chg Notice 1
Attachment 1
Table of Contents
Foreward
1. Introduction
1.1 Purpose
1.2 Scope
1.3 General
2. Planning
2.1 General
2.2 Initial Planning
2.3 Action Plan
2.4 Contingency Operations Plan
2.5 Task List
2.6 Self-Assessments
2.7 Planning Considerations
2.8 Policy Decisions
2.9 Site Operations Review
2.10 Contingency Protective Force Scheduling
2.11 Requests for Assistance
2.12 Special Planning Considerations
3. Coordination
3.1 General
3.2 Communication
3.2 Department of Energy
3.4 Department of Energy Field Elements
3.5 Site Facility Management Contractor
3.6 Protective Force Contractor
3.7 Contingency Operations Center
3.8 Teamwork Concept
3.9 Meetings
41. Liaison with Other Agencies
4.1 General
4.2 Local Law Enforcement Agency Offices
4.3 State Agencies
4.4 Federal Agencies
4.5 Coordination Meetings
4.6 Site Access Monitoring
5. Augmentee Selection and Requirement Standards
5.1 General
5.2 Requests for Assistance
5.3 Required Qualifications
5.4 Augmentee Identification
5.5 Home Site Support
5.6 Reporting Date Coordination
5.7 Logistics
5.8 Augmentee Welcome Package
5.9 Augmentee In-Processing
5.10 Badging
Section 37
6. Contingency Protective Force Training
6.1 General Training Requirements
6.2 Training Plan
6.3 Auxiliary Force Training
6.4 Augmentation Force Training
6.5 Site-Specific Training Requirements
6.6 National Training Center Support
6.7 Retraining and Remediation Policy
6.8 Follow-On Training
6.9 Contingency Protective Force Validation Test Plan
6.10 Replacement Training
6.11 Training Records
7. Contingency Protective Force Deployment
7.1 General
7.2 Contingency Operations Center Operations
7.3 Work Stoppage Deployment and Relief Planning
7.4 Contingency Protective Force Deployment Preparations
7.5 Protective Force Equipment and Weapons Turn-In Procedures
8.1 Management Response to Work Stoppage Activities
8.1 General
8.2 Rumor Control
8.3 Crossing Picket Lines
8.4 Guidelines for Crossing Picket Lines
8.5 Damage Claims
8.6 Operations Security
8.7 Bomb Threat Procedures
9. Deployment of the Site Protective Force
9.1 General
9.2 Protective Force Records Review
9.3 Contingency Protective Force Change-Out
9.4 Contingency Protective Force Out-Processing
10. After-Action Report and Lessons Learned
10.1 General
10.2 Daily Journals
10.3 Management Briefing Book
10.4 Meeting Minutes and Notes
10.5 Security Self-Evaluation From Contingency Protective Force Members
10.6 After-Action Report and Lessons Learned
Appendix A. References
Appendix B. Definitions
Appendix C. Sample Contingency Protective Force Operations Plan
Appendix D. Sample Task List
Appendix E. Sample Post/Shift Assignment Matrix
Appendix F. Sample Work Stoppage Questions and Answers Information Sheet
Appendix G. Sample Briefing Topics
Appendix H. Sample Letters
Appendix I. Sample Checklists
Appendix J. Sample Refresher Training Requirements and Verification for Auxiliary (Site) Force Personnel
Appendix K. Sample Training Schedule for Augmentation Force Personnel
Appendix L. Sample Work Experience Form
Appendix M. Lessons Learned Template
Conculding Material