DOE-STD-1063-97, Establishing and Maintaining a Facility Representative Program at DOE Facilities
Functional areas: Facilities, Representatives
This standard defines the duties, responsibilities and qualifications for DOE Facility Representatives, based on facility hazard classification; risks to workers, the public, and the environment; and the operational activity level. This standard provides the guidance necessary to ensure that DOE facilities have sufficient staffing of technically-qualified Facility
Representatives to provide day-to-day oversight of contractor operations. The information contained in this standard, as well as any additional facility-specific requirements, should be incorporated into site-specific implementation procedures
for DOE Facility Representatives.
Unknown Block text
Superseded By:
DOE-STD-1063-2000, Facility Representatives on Mar 31, 2000
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE-STD-1063-2000Facility Representatives (Mar 31, 2000)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
TS
NOT MEASUREMENT
SENSITIVE
DOE-STD-1063-97
October 1997
Supersedes
DOE-STD-1063-93
DOE STANDARD
ESTABLISHING AND MAINTAINING A
FACILITY REPRESENTATIVE PROGRAM AT
DOE FACILITIES
U.S. Department of Energy AREA FACR
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
WELCOME
This Portable Document Format (PDF) file contains bookmarks, thumbnails, and hyperlinks to help you navigate through the document. All items listed in the Contents are linked to the corresponding sections. In addition, if you click on a section heading while you are reading the text, you will return to the Contents. Click on the DOE seal below to move to the Contents page.
This document has been reproduced directly from the best available copy.
Available to DOE and DOE contractors from the Office of Scientific and
Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401.
Available to the public from the U.S. Department of Commerce, Technology
Administration, National Technical Information Service, Springfield, VA
22161; (703) 487-4650.
Order No. DE98001286
DOE-STD-1063-97
iii
FOREWORD
1. This Department of Energy standard is approved for use by all DOE Components.
2. The Revision to this DOE standard was developed by a working group consisting of
headquarters and field participants. Beneficial comments (recommendations, additions,
deletions) and any pertinent data that may improve this document should be sent to:
Facility Representative Program Manager, Office of Field Services and Liaison, Office of
Field Management (FM-10).
3. DOE technical standards, such as this standard, do not establish requirements. However,
all or part of the provisions in a DOE standard can become requirements if they are explicitly
stated to be requirements in a DOE requirements document, or the organization makes a
commitment to meet a standard in a contract or in an implementation plan or program plan
required by a DOE requirements document.
4. Throughout this standard, the word "shall" is used to denote actions which must be
performed if the objectives of this standard are to be met. If the provisions in this standard are
made requirements through one of the two ways discussed above, then the "shall" statements
would become requirements. It is not appropriate to consider that any "should" statements
would automatically be converted to "shall" statements, as this action would violate the
consensus process used to approve this standard.
DOE-STD-1063-97
iv
INTENTIONALLY BLANK
DOE-STD-1063-97
v
CONTENTS
PAGE
1. SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.2 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.3 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2. REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.1 Government Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2.2 Order of Precedence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Section 2
3. DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.1 Activity Level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.2 Core Training Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.3 Contractor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.4 Department or DOE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.5 Nuclear Facility Hazard Classifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.6 Facility Representative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.7 Facility Representative . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.8 Field Element or Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.9 Hazard . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.10 Hazardous Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.11 Interim Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.12 Line Organization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.13 Nonreactor Nuclear Facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.14 Nuclear Facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.15 Occurrence Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.16 Proficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.17 Program Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.18 Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.19 Qualifying Official . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.20 Reactor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.21 Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.22 Safety Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.23 Safety Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.24 Secretarial Officer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.25 Training Equivalency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.26 Training Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.27 Walkthrough . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Section 3
4. GENERAL REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.1 Purpose and Coverage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.2 Unencumbered Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4.3 Responsibilities and Authorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4.4 Supervision, Management, and Authority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4.5 General Training and Qualification Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4.6 Facility Representative Program Performance Assessment and Feedback . . . . . . 10
DOE-STD-1063-97
vi
5. DETAILED REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
5.1 Facility Coverage and Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
5.2 Duties and Responsibilities of a Facility Representative . . . . . . . . . . . . . . . . . . . . . 14
5.3 Authority Granted to Facility Representatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5.4 Facility Assessments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5.5 Operational Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
5.6 Relationship of the Facility Representative with other DOE Managers . . . . . . . . . . 16
5.7 Relationship of Facility Representative with Operating Contractor . . . . . . . . . . . . . 16
5.8 Specific Education and Experience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
5.9 Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
5.10 Qualification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
6. NOTES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
6.1 Intended Use . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
6.2 Key Word Listing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
APPENDICES
Appendix A Facility Representative Performance Indicators . . . . . . . . . . . . . . . . . . . . . A-1
Appendix B Facility Representative Program Assessment Guide . . . . . . . . . . . . . . . . . B-1
DOE-STD-1063-97
1
1. SCOPE
1.1 Scope. This standard, "ESTABLISHING AND MAINTAINING A FACILITY
REPRESENTATIVE PROGRAM AT DOE FACILITIES,” DOE-STD-1063-97, defines
the duties, responsibilities and qualifications for DOE Facility Representatives, based
on facility hazard classification; risks to workers, the public, and the environment;
and the operational activity level. This standard provides the guidance necessary to
ensure that DOE facilities have sufficient staffing of technically-qualified Facility
Representatives to provide day-to-day oversight of contractor operations. The
information contained in this standard, as well as any additional facility-specific
requirements, should be incorporated into site-specific implementation procedures
for DOE Facility Representatives.
Section 4
1.2 Purpose. The purpose of this standard is to help ensure that DOE Facility
Representatives are selected based on consistently high standards and from the
best qualified candidates available, that they receive the training required for them to
function effectively, and that their expected duties, responsibilities, and authorities
are well understood and accurately documented. To this end, this guidance provides
the following practical information:
a. An approach for use in determining the required facility coverage.
b. The duties, responsibilities and authorities expected of a Facility Representative.
c. The training and qualifications expected of a Facility Representative.
d. Elements necessary for successful Facility Representative Programs at DOE
Field Offices.
1.3 Applicability. This standard is intended for use by all DOE Components in
establishing and maintaining Facility Representative programs at DOE owned,
contractor-operated facilities. This guidance is not intended for facilities operated
exclusively by DOE Federal employees. Although this guidance was written primarily
to address Facility Representatives at nuclear facilities, applicable portions of this
standard should be applied to hazardous non-nuclear facilities, as deemed
appropriate by Field Element Managers and Secretarial Officers. Field Element
Managers and Secretarial Officers may develop additional guidance regarding
Facility Representative requirements.
DOE-STD-1063-97
2
2. REFERENCES
2.1 Government Documents. The following Orders, Standards, and Manuals are
references to the extent specified herein.
2.1.1 DOE Orders.
DOE O 151.1 Comprehensive Emergency Management
DOE O 232.1 Occurrence Reporting and Processing of Operations Information
DOE O 360.1 Training
DOE O 420.1 Facility Safety
DOE 5480.19 Conduct of Operations Requirements for DOE Facilities
DOE 5480.23 Nuclear Safety Analysis Reports
2.1.2 DOE Standards.
DOE-STD-1009-92 Guide to Good Practices for the Development of Test Items
DOE-STD-1011-92 Guide to Good Practices for the Design, Development, and
Implementation of Examinations
DOE-STD-1027-92 Hazard Classification and Accident Analysis Techniques for
Compliance with DOE 5480.23, Nuclear Safety Analysis
Reports
2.1.3 DOE Manuals.
DOE M 411.1-1 DOE Safety Management Functions, Responsibilities, and
Authorities (FRA) Manual [including the Level I document, and
those lower level FRA Manuals specific to the field element]
2.1.4 Other.
DOE-HR Handbook Recruiting, Hiring, and Retaining High Quality Technical
Staff -- A Manager’s Guide to Administrative Flexibilities.
DOE Facility Representative Personnel Guide, April 03, 1995.
2.2 Order of Precedence. In the event of conflict between the text of this document and
DOE Order, the DOE Order takes precedence. Nothing in this document supersedes
applicable laws and regulations.
DOE-STD-1063-97
3
3. DEFINITIONS
3.1 Activity Level. The level of operational activity within the facility. Activity refers to
handling or moving hazardous material, or otherwise creating an opportunity for the
occurrence of a reportable event.
3.2 Core Training Requirements. The portion of the training program designed to cover
the DOE-wide, generic subjects on which all Facility Representatives are expected to
be knowledgeable. This includes the DOE General Technical Base Qualification
Standard and the DOE Facility Representative Functional Area Qualification
Standard.
Section 5
3.3 Contractor. Any person under contract or subcontract with the Department of Energy
with the responsibility to perform activities in connection with any facility, laboratory,
or program at a DOE-owned or leased facility.
3.4 Department or DOE. The Department of Energy.
3.5 Nuclear Facility Hazard Classifications. A systematic grouping of facility hazards into
three categories, described in DOE-STD-1027-92:
Category 1 Hazard. The hazard analysis shows the potential for significant
off-site consequences.
Category 2 Hazard. The hazard analysis shows the potential for significant
on-site consequences.
Category 3 Hazard. The hazard analysis shows the potential for only
significant localized consequences.
DOE-STD-1027-92 provides guidance for determining the Hazard Category of a
facility.
3.6 Facility Representative. For each major facility or group of lesser facilities, an
individual assigned responsibility by the Field Element Manager (or designee) for
monitoring the safety performance of the facility and its operations. This individual
shall be the primary point of contact with the contractor and shall be responsible to
the facility’s DOE Line Manager.
3.7 Facility Representative Coverage. The degree of attention a Facility Representative
is expected to devote to an assigned facility. Coverage is usually expressed in terms
of the amount of time, including back shift and weekend time, that the Facility
Representative is expected to routinely spend in the facility.
3.8 Field Element or Organization. A DOE Operations Office, Field/Area/Site Office, or
Project Office as opposed to DOE Headquarters.
3.9 Hazard. (10CFR830.3) Hazard means a source of danger (i.e., material, energy
source, or operation) with the potential to cause illness, injury, or death to personnel
DOE-STD-1063-97
4
or damage to a facility or to the environment (without regard to the likelihood or
credibility of accident scenarios or consequence mitigation).
3.10 Hazardous Materials. (DOE O 420.1) Any solid, liquid, or gaseous material that is
chemical, toxic, explosive, flammable, radioactive, corrosive, chemically reactive, or
unstable upon prolonged storage in quantities that could pose a threat to life,
property, or the environment.
3.11 Interim Qualification. Specific requirements that must be met prior to a Facility
Representative being assigned to provide limited coverage in a facility for which he
or she is not fully qualified.
3.12 Line Organization. The unbroken chain of command that extends from the Secretary
through the Under Secretary, to the Secretarial Officers who set program policy and
plans and develop assigned programs, to the Program and Field Element Managers
who are responsible for execution of these programs, and to the contractors who
conduct the programs. Environment, Safety, and Health (ES&H) are integral parts of
each program. Accordingly, responsibility for ES&H functions resides with the line
organizations.
3.13 Nonreactor Nuclear Facility. (10CFR830.3) Nonreactor nuclear facility means those
activities or operations that involve radioactive and/or fissionable materials in such
form and quantity that a nuclear hazard potentially exists to the employees or the
general public. Incidental use and generating of radioactive materials in a facility
operation (e.g., check and calibration sources, use of radioactive sources in research
and experimental and analytical laboratory activities, electron microscopes, and
X-ray machines) would not ordinarily require the facility to be included in this
definition. Transportation of radioactive materials, accelerators and reactors and their
operations are not included. The application of any rule to a nonreactor nuclear
facility shall be applied using a graded approach. Included are activities or operations
that:
Section 6
(a) Produce, process, or store radioactive liquid or solid waste, fissionable materials,
or tritium;
(b) Conduct separations operations;
(c) Conduct irradiated materials inspection, fuel fabrication, decontamination, or
recovery operations;
(d) Conduct fuel enrichment operations;
(e) Perform environmental remediation or waste management activities involving
radioactive materials; or
(f) Design, manufacture, or assemble items for use with radioactive materials and/or
fissionable materials in such form or quantity that a nuclear hazard potentially exists.
3.14 Nuclear Facility. (10CFR830.3) Nuclear facility means reactor and nonreactor
nuclear facilities.
DOE-STD-1063-97
5
3.15 Occurrence Report. A documented evaluation of an event or condition that is
prepared in sufficient detail to enable the reader to assess its significance,
consequences, or implications and to evaluate the actions being proposed or
employed to correct the condition or to avoid recurrence.
3.16 Proficiency. The process by which a qualified Facility Representative stays current
on technical knowledge, assigned facilities, procedures, etc. Regaining proficiency
may be required after an absence from Facility Representative duties, a period of
inactivity at a given facility, as an ongoing training, or based on length of time
between the Facility Representative’s full qualification and next requalification date.
3.17 Program Manager. (DOE Glossary) A Headquarters organization responsible for
executing program management functions, and for assisting and supporting field
elements in safety and health, administrative, management, and technical areas.
(The Program Manager holds signature authority to provide technical direction
through DOE field elements to contractors for these facilities. The Program Manager
is a member of the Line Organization.)
3.18 Qualification. The process of completing requirements determined to be vital to
performing the Facility Representative role in a given facility. This process will
include acknowledgment of the required education and experience, completion of the
core knowledge requirements to perform Facility Representative duties, facility-
specific requirements determined by the field element, and oral and written
examinations.
3.19 Qualifying Official. An individual, designated by the Field Element Manager, or
designee, authorized to sign the Qualification Card after verifying the candidate
possesses the appropriate level of knowledge or skills for such signature.
3.20 Reactor. (10CFR830.3) Reactor means, unless it is modified by words such as
containment, vessel, or core, the entire nuclear reactor facility, including the housing,
equipment, and associated areas devoted to the operation and maintenance of one
or more reactor cores. Any apparatus that is designed or used to sustain nuclear
chain reactions in a controlled manner, including critical and pulsed assemblies and
research, test, and power reactors, is defined as a reactor. All assemblies designed
to perform subcritical experiments that could potentially reach criticality are also to be
considered reactors. Critical assemblies are special nuclear devices designed and
used to sustain nuclear reactions. Critical assemblies may be subject to frequent
core and lattice configuration change and may be used frequently as mockups of
reactor configurations.
3.21 Risk. (DOE 5480.23) Risk means the quantitative or qualitative expression of
possible loss that considers both the probability that a hazard will cause harm and
the consequences of that event.
Section 7
DOE-STD-1063-97
6
3.22 Safety Analysis. A documented process:
a. to provide systematic identification of hazards within a given DOE operation;
b. to describe and analyze the adequacy of measures taken to eliminate,
control, or mitigate identified hazards; and
c. to analyze and evaluate potential accidents and their associated risks.
3.23 Safety Analysis Report. That report, fully defined in 10CFR830, which documents
the adequacy of safety analysis to ensure that the facility can be constructed,
maintained, shut down, and decommissioned safely and in compliance with
applicable laws and regulations.
3.24 Secretarial Officer. (DOE Manual 411.1-1) The head of a first-tier organization; a
DOE Headquarters employee reporting directly to the Secretary, the Under
Secretary, or the Deputy Secretary. The following designations are also used to
identify Secretarial Officers with specific responsibilities in various areas: 1) a
Program Secretarial Officer is a Head of a Departmental Element who has
responsibility for a specific program or facility(ies). These include the Assistant
Secretaries for Defense Programs, Energy Efficiency and Renewable Energy,
Environmental Management, and Fossil Energy; and the Directors of the Offices of
Civilian Radioactive Waste Management, Energy Research, and Nuclear Energy;
and 2) a Cognizant Secretarial Officer is a DOE official at the Assistant Secretary
level who is responsible for the assignment of work, the institutional overview of any
type of facility, or the management oversight of a laboratory.
3.25 Training Equivalency. The completion of training requirements by an individual
through the means of prior experience or training, which results in comparable
knowledge or capabilities, equivalent to that which would be gained by complying
with the specified requirements. Prior experience and training must be evaluated
and documented to demonstrate equivalency to the specified requirements.
3.26 Training Program. A planned, organized sequence of activities designed to prepare
persons to perform their jobs, to meet a specific position or classification need, and
to maintain or improve their performance on the job.
3.27 Walkthrough. A tour through a facility with a qualifying official for the purpose of
verifying a Facility Representative candidate’s knowledge of the facility.
DOE-STD-1063-97
7
4. GENERAL REQUIREMENTS
4.1 Purpose and Coverage. Because of the importance of the Facility Representative
program to the Department's overall commitment to the safe operation of its facilities,
this DOE standard has been developed with the intent of placing increased
emphasis on recruiting, selection, and training efforts to ensure that Facility
Representative positions are filled by highly qualified personnel. This standard
provides the guidance necessary to ensure that DOE facilities have sufficient staffing
of technically-qualified Facility Representatives to provide day-to-day oversight of
contractor operations. This standard should be followed in the establishment and
maintenance of Facility Representative programs for DOE facilities to ensure that:
a. Facility Representatives are selected based on consistently high standards
and from the best qualified candidates available;
b. Facility Representatives receive the training required to function effectively;
and
c. Facility Representative duties, responsibilities and authorities are well
understood and accurately documented.
Section 8
4.1.1 DOE Facility Representatives. DOE Facility Representatives perform DOE
line management oversight of their assigned facilities to ensure that:
a. the contractor is operating facilities safely and efficiently (i.e., within
the boundaries of those controls invoked in the facility authorization
basis);
b. the contractor's management system is effectively controlling conduct
of operations; and
c. effective lines of communication between DOE and its operating
contractors are maintained during periods of normal operation, and
following reportable events, in accordance with DOE Orders and
requirements.
4.1.2 Facility Coverage and Staffing. This standard is designed to provide flexibility
to field elements in how they choose to use their available resources in
applying this standard for a Facility Representative Program. Facility
Representatives should be assigned to facilities based on programmatic
importance and potential environmental, safety, and/or health impact.
a. Most hazard category 1 nuclear facilities require one or more full time
Facility Representatives. For hazard category 2 or 3 nuclear facilities,
a Facility Representative may be assigned to two or more facilities. At
non-nuclear facilities the level of coverage should be established
consistent with the nature of the work and the hazards. In unusual
situations, when it is impractical to assign a sufficient number of
facilities to occupy a person full-time, the duties of a Facility
Representative may be performed part-time as a collateral function.
DOE-STD-1063-97
8
The field element is responsible for preparing staffing plans to
document these assignments and supporting rationale.
b. It is important that a Facility Representative's primary duty of providing
DOE an on-site presence not be diminished. Administrative duties
should not detract from a Facility Representative's primary duties as
provided in Section 5.2. Facility Representatives should spend a
significant portion of their time in their assigned facility(s). It is
preferable that Facility Representative offices be located within the
facility of primary responsibility. Administrative work should not
prevent Facility Representatives from performing their primary function
of monitoring the performance of the facility and its operations.
c. The number of Facility Representatives assigned to facilities is based
on the number of buildings or areas involved, their size, complexity,
hazard levels and risks, level of operational activity, and uncertainties
associated with the aforementioned factors.
d. It is important for the field element to ensure the proper number of
Facility Representative positions are established to maintain adequate
coverage. The Secretarial Officers are responsible for allocating staff
and necessary resources to provide adequate Facility Representative
coverage per Section 4.1.2.c above. Additionally, to the degree that
Facility Representatives are advanced or otherwise lost from the
program, field elements should take necessary steps to ensure
departing Facility Representatives are replaced in a timely manner.
4.2 Unencumbered Access. Facility Representatives shall have independent and direct
access to contractor personnel, facilities, and records, as necessary, to carry out
their assigned responsibilities. Unencumbered and immediate access does not
preclude a Facility Representative from following industrial safety, emergency action,
radiation protection, safeguards and security, or operational requirements and
controls of the facility. Facility Representatives shall adhere to these requirements
and controls when discharging their duties.
Section 9
a. Facility Representatives shall have immediate unannounced access to every
assigned facility. They shall maintain the proper clearances, training,
personal protective equipment, and physical qualifications for such access.
b. Contractor management should afford the Facility Representative the
opportunity to attend all meetings, training classes, operator certification
boards/examinations, etc., that may contribute to the execution of the duties
and responsibilities of the Facility Representative.
c. Access to some records may be limited due to Privacy Act considerations.
d. Due to safeguards and security requirements, access to some areas may
require that more than one properly trained and cleared individual be present
before access can be gained to those areas.
DOE-STD-1063-97
9
4.3 Responsibilities and Authorities. Responsibilities and Authorities for key positions at
DOE Headquarters and Field Element Managers with respect to the Facility
Representative program are defined in DOE Order 232.1, Occurrence Reporting and
Processing of Operations Information, and DOE Order 5480.19, Conduct of
Operations for DOE Facilities, and the Level I and Level II DOE M 411.1-1, DOE
Safety Management Functions, Responsibilities, and Authorities (FRA) Manuals.
Specifically, the Field Element Managers shall ensure that Facility Representatives
are assigned appropriately and have the required support to carry out the functions
of the position.
4.4 Supervision, Management, and Authority. Clear lines of supervision, management,
and authority shall be established between the Facility Representative, the field
element, and the Secretarial Officer. The Facility Representative shall have the
authority to represent line management to the contractor regarding operational safety
issues, except where this would change scope, cost, or schedule. Each field
element should develop specific guidance that covers the duties and responsibilities
of the Facility Representatives for situations specific to their facilities. DOE line
management is responsible for safety at DOE facilities. Well-managed, well-trained
Facility Representatives are an important line management tool for ensuring safe
operations.
4.5 General Training and Qualification Requirements. A Facility Representative shall be
qualified by education, experience, and training to carry out the duties and
responsibilities of the position. Facility Representatives are required to meet
stringent and comprehensive qualification standards. Facility Representatives
should possess a broad technical knowledge in a variety of disciplines and be able to
demonstrate an understanding of the management, processes, practices, regulatory
requirements, and operating limits of their assigned facilities.
4.5.1 Qualifications. The field element will develop the overall qualification
program, in accordance with DOE Order 360.1, Training, including training
elements specific to the assigned facilities and systems. The qualifications,
and authority of personnel involved in the training of Facility Representatives
should be defined and documented.
4.5.2 Training Requirements. Facility Representatives directly interface with facility
management and supervisory personnel. Therefore, Facility Representatives
shall have a high level of technical knowledge regarding facility operations in
order to intelligently evaluate and discuss the subject with the contractor and
DOE management.
Section 10
4.5.2.1 Tailored Program. Development of qualified Facility
Representatives shall be accomplished by means of a formal
program in which the training requirements are tailored to the
specific needs of the facilities involved and shall include:
a. The minimum educational and experience requirements for entry
into the Facility Representative Training and Qualification
Program;
DOE-STD-1063-97
10
b. A core training program that will cover the generic subjects in
which the Facility Representative must be knowledgeable; and
c. The facility-specific training necessary to effectively perform the
duties of the Facility Representative.
4.5.2.2 Training Objectives and Scope. Training should be directed
toward developing an understanding of the technical and
management aspects of a facility's operation, and a familiarity
with the assigned facility.
4.5.2.3 Training Progression. When designing a Facility Representative
training program, each field element should consider the
desirability of establishing a standard training progression for
prospective Facility Representative positions.
4.5.2.4 Advancement Considerations. As qualified Facility
Representatives gain experience, they become a valuable
resource of DOE. Field elements should take necessary steps to
ensure that Facility Representative positions are career
enhancing and remain desirable to Facility Representative
candidates. This includes incentives to maintain qualification, and
the encouragement of skills enhancement through continuing
training, graduate study, and professional certifications. In
addition, opportunities to develop management skills should be
made available. This experience and training should make them
prime candidates for positions of higher responsibility both in the
field and at DOE Headquarters. Field elements and
Headquarters should account for this in the personnel
development plans for their organizations, and in the Facility
Representatives’ Individual Development Plans. The DOE-HR
Handbook, Recruiting, Hiring, and Retaining High Quality
Technical Staff -- A Manager’s Guide to Administrative
Flexibilities, provides various mechanisms that can be used to
retain these valuable resources.
4.5.3 Training of Field Element Management. Field element managers should take
steps to ensure that all field element line management personnel understand
the functions, responsibilities, and authorities of Facility Representatives.
4.6 Facility Representative Program Performance Assessment and Feedback. Periodic
evaluation and adjustment of the program is necessary to ensure a high and
continuously improving level of performance. It is the responsibility of the Cognizant
Secretarial Office and the Field Element Manager to ensure that performance
assessments are accomplished, and any indicated corrective actions are completed.
This function is monitored by the DOE Headquarters Facility Representative Program
Manager, Office of Field Services and Liaison, FM-10, and accomplished using the
following methods:
DOE-STD-1063-97
11
4.6.1 Performance Indicators. Carefully chosen performance indicators (PI) can
provide valuable measures of the effectiveness of Facility Representative
Programs. The performance measures should address compliance to
program requirements, improvements to safety, and performance
effectiveness. DOE-wide Performance Indicators are shown in Appendix A.
Field elements shall submit quarterly PI data to Program Offices at DOE-HQ,
with a copy to the Facility Representative Program Manager, FM-10. PI's for
the preceding quarter are due to HQ on the first working day of February,
May, August, and November. These PIs can be used by FM-10 to evaluate
DOE-wide program effectiveness. FM-10 will then compile a department-
wide PI report that will be disseminated to all field elements.
Section 11
4.6.2 Field Element Self-Assessments. Each field element shall periodically (not to
exceed three years) evaluate its Facility Representative Program relative to
the requirements in Sections 4 and 5 of this Standard. Results of these Self-
Assessments should be sent to the responsible Program Office at DOE-
Headquarters, with a copy to Facility Representative Program Manager, FM-
10. Guidance for the performance of these assessments is provided in
Appendix B.
4.6.3 Peer Reviews. Field elements should invite Facility Representatives and/or
Facility Representative management from other sites to perform peer reviews
of their Facility Representative Programs. These reviews will provide a
mutual benefit through sharing lessons learned. In addition they will foster a
more consistent Facility Representative program throughout the DOE.
4.6.4 Annual Facility Representative Workshop. FM-10 will host an Annual Facility
Representative Workshop to promote sharing lessons learned from Facility
Representative Programs across the complex, and foster the growth of the
Facility Representative community. Each field element should encourage as
many Facility Representatives and Facility Representative Program Managers
as possible to attend the workshops to share information with other sites and
identify potential improvements for use in their own programs.
DOE-STD-1063-97
12
5. DETAILED REQUIREMENTS
5.1 Facility Coverage and Assignment. Each nuclear facility shall be evaluated by the
field element to determine an appropriate level of coverage by a Facility
Representative. This determination should be based on an assessment of the
hazards presented by each facility and documented in field element staffing plans.
This assessment will consider risks to the public, workers, and the environment
resulting from operation of the facility; the operational status and activity level of the
facility; as well as other factors specified in this section. The evaluation of hazards
will consider radiological, chemical, and physical dangers to workers, the public, and
the environment, as well as the barriers against these dangers provided by the
facility. Field elements may also elect to include certain non-nuclear facilities in this
evaluation. Secretarial Officers should validate the facility coverage and
assignments for field elements, since they are responsible for allocating staff and
necessary resources to provide adequate Facility Representative coverage.
a. Existing safety analysis and hazard assessment documentation (such as that
required by DOE 5480.23 and DOE-STD-1027-92 for nuclear facilities)
should be used to determine hazard categorization for each facility. This
information provides a basis for the risks associated with the facility and a
starting point for selecting the appropriate level of Facility Representative
coverage. Hazard categories are defined in Section 3.5.
b. Once the facility hazard has been categorized, the initial Facility
Representative coverage is determined by the operational status and activity
level of the facility. Three activity levels are used.
HIGH: Facilities that daily to weekly involve activities related to hazardous
operations.
MEDIUM: Facilities that weekly to monthly involve activities related to
hazardous operations.
LOW: Facilities that monthly to quarterly involve activities related to
hazardous operations.
c. Table 1 is the matrix used for determining an appropriate level of coverage.
Section 12
TABLE 1. Recommended Facility Representative Coverage
Hazard Activity Level
Classification High Medium Low
Category 1 Hazard Continual Frequent Intermittent
Category 2 Hazard Frequent Intermittent Occasional
Category 3 Hazard Intermittent Occasional Seldom
d. Table 2 provides definitions for each of the coverage terms.
DOE-STD-1063-97
13
TABLE 2. Coverage Definitions
Continual The Facility Representative is present daily. If a Facility Representative
is gone for one week or longer, a temporary replacement should be
named. This coverage may require the complete attention of one or
more individuals and may require back shift, weekend, or 24-hour
coverage.
Frequent The Facility Representative is present approximately half of the time.
The Facility Representative can be gone for up to two weeks without
requiring a temporary replacement. One person can cover multiple
facilities.
Intermittent The Facility Representative is present at least one day per week. One
person can cover several such facilities.
Occasional The Facility Representative should visit the facility 12-24 days a year.
Seldom The Facility Representative should visit the facility 6-12 days a year.
e. Following establishment of the coverage for each facility, it may be necessary
to adjust the level of coverage, taking into consideration factors such as those
listed below:
1. History of contractor performance for similar activities
2. Potential for DOE or public interest
3. The risks to successful mission accomplishment
4. Financial risks
5. Complexity of the facility and facility operations
6. Hazardous work environments for workers
7. Age, maintenance condition, and level of uncertainty of the facility
8. Anticipated changes in operational status of facility
9. Number of significant accidents/incidents on site.
f. The level of Facility Representative coverage could increase or decrease
based on the above additional considerations. Additionally, if personnel
resource limitations affect the number of available Facility Representatives,
the Secretarial Officer and Field Element Manager should agree as to which
facilities require coverage with the available resources. It may also depend
on provisions made for extra or special coverage. This means that, as the
degree of hazard, complexity, or other governing factors is reduced, the
number of processes, facilities, buildings or areas covered by a single
individual may be increased. Hazard category 1 nuclear facilities may each
be assigned a single or multiple Facility Representatives. Or, if the facility is
sufficiently complex, it might be subdivided and assigned to more than one
individual. If the contractor has established a building or facility manager
concept, it may be appropriate to assign Facility Representatives on a similar
basis. Facilities with many configuration changes (like test facilities, for
example) require closer observation than facilities with very stable
DOE-STD-1063-97
14
configurations. Also, it may be possible to use special coverage for a facility
that operates only intermittently.
5.2 Duties and Responsibilities of a Facility Representative. The following paragraphs
describe the duties and responsibilities normally expected of a Facility
Representative. Additional duties and responsibilities should be tailored to reflect the
specific requirements of the site, the facility, the operational activities, and the
involved organizations.
Section 13
a. The Facility Representative shall maintain frequent communication with field
element supervision. The Facility Representative shall ensure that DOE line
management is cognizant of current facility conditions. Facility
Representatives should spend the majority of their time in their assigned
facilities observing operations and assessing operating conditions.
b. A Facility Representative shall be thoroughly familiar with site and facility
characteristics, operating procedures, and key process control personnel.
The Facility Representative shall be aware of major work in progress and in
planning. The Facility Representative shall know the personnel controlling
the work, what procedures will be used, whether the workers are trained and
qualified, and whether the activity is being performed safely. This knowledge
is primarily acquired by walking through the facility, observation of work in
progress, review of facility records and documentation, and attendance at
appropriate management meetings of the operating contractor. The Facility
Representative shall be apprised by the contractor of planning, scheduling,
maintenance, operations review, and safety review meetings.
c. The Facility Representative shall be available to respond to facility events and
serve as the DOE presence for special operations. The operating contractor
shall have easy access to the Facility Representative to facilitate the
notification, if required, and reporting of occurrences and any safety or
operational concerns.
d. A Facility Representative shall not be responsible for the preparation of the
budget or schedule for the facility assigned and, therefore, should be in a
position to provide information to DOE line management independent of
programmatic responsibilities. When it is impractical to assign a Facility
Representative as a full-time duty, the separation of programmatic
responsibilities, though desirable, may not be possible. The Field Element
Manager or designee should approve assigning Facility Representatives to
programmatic responsibilities.
e. The Facility Representative shall observe, evaluate, and report on the
effectiveness of the operating contractor in several areas. These areas
include operational performance, quality assurance, management controls,
emergency response readiness activities, and assurance of worker health
and safety. Additionally, the Facility Representative shall evaluate the overall
effectiveness of the operating contractor in implementing corrective actions to
deficiencies identified by facility reviews. The frequent presence of a Facility
Representative in the facility should improve communication between DOE
DOE-STD-1063-97
Any condition or practice such that a hazard exists that could reasonably be expected to1
cause death or serious physical harm to employees (permanent or prolonged impairment of
the body or temporary disablement or requiring hospitalization), unless immediate actions are
taken to mitigate the effects of the hazard and/or remove employees from the hazard.
15
and the operating contractor. This should lead to a better understanding of
DOE expectations by the contractor, and aid in the implementation of
enhancements to facility work practices and operating conditions.
f. While there can be beneficial oversight achieved by walking through assigned
facilities with contractor facility managers, certain benefits are lost when
Facility Representative presence is 100% predictable and always with facility
managers.
Section 14
5.3 Authority Granted to Facility Representatives. The Facility Representative is
assigned to monitor the performance of facility operations and management. The
Facility Representative is a direct safety oversight extension of DOE line
management to each respective facility. The authority provided to each Facility
Representative shall be defined by the responsible field element. Facility
Representatives shall have the authority to "Stop Work" in the facility, except as
expressly limited in governing contracts with the operating contractor. This authority
shall cover work performed by the contractor and subcontractors. The Field Element
Manager shall ensure that contractors and subcontractors are aware that Facility
Representatives have this authority. The Facility Representative shall "Stop Work" in
the following instances, as a minimum:
a. Conditions exist that pose an imminent danger to the health and safety of1
workers or the public.
b. Conditions exist, that if allowed to continue, could adversely affect the safe
operation of, or could cause serious damage to, the facility.
c. Conditions exist, that if allowed to continue, could result in the release, from
the facility to the environment, of radiological or chemical effluents that
exceed regulatory limits.
5.4 Facility Assessments. The Facility Representative Program should be
proceduralized and may include a set of oversight assessment requirements.
Annual assessment plans may be developed to ensure that a broad-based and
systematic review of all aspects of facility operations is conducted over an
established period of time. Guidance may be derived from Conduct of Operations
resources, such as the DOE-EM-STD-5505-96, Operations Assessments. These
assessments are not intended to conflict with or duplicate other Field Office
assessment efforts nor are they intended to unduly restrict the Facility
Representative’s day-to-day oversight of assigned facilities.
5.5 Operational Reports. The Facility Representative is the primary point of contact for
the contractor to notify DOE of reportable occurrences as prescribed in DOE Order
232.1. For the Secretarial Officers and field elements to realize the maximum benefit
DOE-STD-1063-97
16
from the Facility Representative program, carefully considered reporting
requirements should be established for each Facility Representative position,
including a Facility Representative’s log. Guidance should be provided on the
content of periodic or special reports. Care should be taken to ensure that reporting
does not become an onerous task that unduly limits the management activities of the
Facility Representative. In order to facilitate a direct communications link with senior
contractor management, the Facility Representative and DOE management should
meet with senior contractor management on a periodic basis to report the results of
Facility Representative assessments. The purpose of the meeting should be to
discuss trends and systemic issues.
5.6 Relationship of the Facility Representative with other DOE Managers. The Facility
Representatives’ relationship with DOE managers within the field element shall be
clear and defined in writing. Each facility’s operation should be clearly assigned to a
Facility Representative, a Program/Line Manager, and a Secretarial Officer. The
Facility Representative should have access to the Program/Line manager to provide
information related to the assigned facilities. It is highly desirable that each Facility
Representative only be assigned facilities under a single Program/Line Manager and
Secretarial Officer. This may not be practical at multi-program facilities, or when
more than one facility is involved.
Section 15
5.7 Relationship of Facility Representative with Operating Contractor. The relationship
between the Facility Representative and the facility operator shall be clearly defined
and understood by both parties. Facility Representatives occupy a unique position in
the transmission of information between DOE and its contractors. Facility
Representatives should be able to communicate effectively with all levels of the
contractor organization. They should be familiar with the contractor chain of
command for facility operations. However, the Facility Representatives should not
become subverted to the contractor's interests nor simply verify compliance with
DOE requirements. Facility Representatives should represent DOE to the contractor
and ensure the contractor carries out DOE operational safety policies. In defining
the relationship between a Facility Representative and contractor, the following
points are emphasized:
a. The Facility Representative functions as a part of DOE line management, and
therefore should exercise authority consistent with specific program and
management guidance established by the field element.
b. The contractor is responsible for the safety and efficient operation of the
facility. The contractor is accountable to DOE to perform its operations in a
manner that ensures the safety and health of personnel and protection of the
environment. No Facility Representative activity or inactivity can diminish the
contractor's responsibility.
c. The Facility Representative is responsible for determining that the contractor
is operating the facility in a safe manner. Facility Representatives fulfill this
responsibility by assessing the contractor's performance and discussing
identified deficiencies and corrective action with contractor management.
DOE-STD-1063-97
17
d. Although the Facility Representative identifies deficiencies, the ultimate
responsibility for identifying and correcting deficiencies rests with the
operating contractor. The contractor shall never rely solely on the Facility
Representative to identify or correct deficiencies.
e. Minor events or problems are frequently clues that indicate more general
problems in the contractor's organization, management, personnel abilities, or
practices. Therefore, attention to detail in the identification and correction of
minor problems can result in significant improvements in the contractor's
performance. When corrective actions are called for, DOE management
should initiate formal action with the operating contractor. Additionally, the
Facility Representative should also provide input to formal mechanisms such
as confirmation of actions or orders, if necessary.
f. The Facility Representative shall adhere to certain rules of conduct, or
protocol, while performing assigned duties, including the facility’s approved
conduct of operations procedures. A formal protocol should be established
for Facility Representatives and should include the following:
1. Facility Representatives should avoid interrupting operators in their
work. The Facility Representative should wait for opportune times to
deal with facility operators. If the Facility Representative is observing
operations or activities, the observation should be performed
unobtrusively. Operators carry the true burden of safety, and a
diversion from their duties could adversely affect plant operations.
Section 16
2. The Facility Representative should maintain frequent contact with
facility management. When Facility Representatives observe
something that raises a safety concern, they should discuss their
concerns with the facility management. If the contractor response is
deemed unsatisfactory, the Facility Representative should discuss the
concern with DOE management for appropriate action.
3. All Facility Representative requests for action should go through
established chains of command, except when exercising “Stop Work”
authority.
4. Facility Representatives shall keep a record of their activities and
observations. This record should be periodically reviewed to
determine if a systemic or recurring problem exists with contractor
activities at one or more facilities. This record is subject to review in
audits or appraisals and may be a source of information for the
contractor evaluation process.
5.8 Specific Education and Experience. In order for individuals to enter a Facility
Representative training and qualification program with the greatest opportunity for
successful completion, they should meet certain education and experience
requirements. Several mechanisms available to assist field elements in the
recruitment and retention of high quality candidates necessary for their program are
identified in the DOE Facility Representative Personnel Guide and the DOE-HR
DOE-STD-1063-97
18
Handbook, “Recruiting, Hiring, and Retaining High Quality Technical Staff -- A
Manager’s Guide to Administrative Flexibilities.”
5.8.1 Education Requirements. Educational requirements are necessary to ensure
that the individuals possess the baseline knowledge to successfully complete
the training program, the ability to function independently in the field, and the
ability to understand scientific principles and communicate in technical terms.
The expected minimum education is that which the field element determines
is necessary to provide competent technical assessment of the contractor.
This will normally be a Baccalaureate degree or extensive experience in a
directly related field such as naval nuclear power, commercial nuclear power,
radioactive waste management, nuclear weapons, nuclear research, or
accelerator facility programs.
5.8.2 Experience Requirements. Facility-specific experience criteria should be
developed and applied as part of the selection criteria for Facility
Representative candidates. The facility-specific experience criteria should
reflect the complexity, hazard classification, and activity level of the facility
and be commensurate with the responsibilities, authority and duties of the
assigned position.
5.9 Training. Facility Representative training and qualification programs shall be in
accordance with DOE Order 360.1, “Training”, with additional requirements defined
in this Standard.
5.9.1 Needs Analysis. The first step in the design of a formal training program for a
Facility Representative candidate is to identify and document the
requirements of the specific position to be filled. Many of these requirements
are generic in nature, since they are common to most Facility Representative
positions. However, facility-specific requirements should be defined and
added to the generic list. An analysis of the candidate's training needs is
then conducted. This is the process by which the tasks, duties, and
responsibilities of the position are analyzed to identify formal or informal
training, self-study, seminars, on-the-job-training, briefings, rotational
assignments, or other types of training necessary for effective job
performance.
Section 17
5.9.2 Self-Study Documents. The Facility Representative should be
knowledgeable of all relevant DOE Rules, Orders, Directives, Notices, etc.,
and the Federal and state regulations under which the assigned facility
operates. In addition, the Facility Representative should be familiar with
pertinent national and consensus standards, facility operating procedures,
and the facility safety documentation. The list of self-study documents
identified for each Facility Representative should, therefore, be extensive.
Each document listed should have a standard of achievement that defines
the level of knowledge necessary.
5.9.3 Formal training. Certain competencies associated with the Facility
Representative qualification standards are of such complexity or significance
that formal training should be required to satisfy them. The field element is
DOE-STD-1063-97
19
responsible for ensuring that the Facility Representative receives the training
necessary for the position. Frequently, appropriate courses and training can
be found within the DOE complex, other Federal agencies, or from non-
government sources within the scientific community. Headquarters, in
coordination with the field elements, will develop additional training courses
and material to help meet the non-facility-specific Facility Representative
training needs. Close collaboration among field elements and Headquarters
Line Management is encouraged to minimize development costs for courses.
In cases where formal course work is not practical, Field Element Managers
should ensure that informal training provides Facility Representatives the
required level of knowledge. The following training elements should be
addressed in formal training:
a. Environmental laws and regulations, including the Resource
Conservation and Recovery Act, Clean Air Act, Clean Water Act, and
others as appropriate;
b. Safety and health laws and regulations, including the Occupational
Safety and Health Act;
c. DOE Conduct of Operations;
d. DOE Conduct of Maintenance;
e. Quality Assurance;
f. Radiation protection;
g. Fire protection;
h. Electrical safety;
I. Industrial hygiene and waste management concerns related to
chemical hazards;
j. Observation, Assessment, Investigation techniques;
k. Occurrence Reporting and Processing Systems;
l. Facility Authorization Basis, Safety Analysis Reports, Technical Safety
Requirements and Unreviewed Safety Questions;
m. Provisions of the governing contract;
n. Configuration management;
o. Stop Work Authority;
p. Price Anderson Amendment Act Rules;
q. Facility Emergency Management Procedures;
r. Facility-Specific Access Requirements; and
s. Facility Safeguards and Security Requirements.
5.9.4 On-the-Job Training. Each field element should establish the “on-the-job”
training requirements, regarding the controls, activities, processes, and
specialized procedures necessary for qualification. These should be
demonstrated to a qualifying individual.
5.9.5 Training Equivalency. Each field element shall develop a system (based on
requirements in DOE Order 360.1) for granting equivalency for training
requirements on the basis of prior experience or education. Justification
should be provided for each equivalency, which will include appropriate
support documentation, such as transcripts or certificates of completion. A
copy of the approved equivalency shall be maintained in the Facility
Representative's Qualification Record.
DOE-STD-1063-97
20
Section 18
5.10 Qualification. The Facility Representative position requires a great deal of education,
experience and training. In order to document and certify that a Facility
Representative has achieved this high level of technical competence, Facility
Representatives will undergo a formal qualification process.
5.10.1 Qualification Card. Field elements should establish a Facility Representative
Qualification Card (Qual-Card) for each major facility or group of lesser
facilities for which they are responsible. The Qual-Card contains a list of all of
the training elements or learning objectives, a corresponding standard
detailing the required level of knowledge for each objective, and provisions
for signatures to attest to satisfactory completion of each objective to the
appropriate level of knowledge. Learning objectives should be designated by
the Facility Representative's immediate supervisor based on an analysis of
training needs, elements of the position description, and facility-specific
requirements.
5.10.2 Generic and Facility-Specific Requirements. Field elements should identify
any additional core training requirements on a Generic Qualification Card,
and supplement that with a Facility-Specific Qual-Card designed to meet the
needs of the individual facility. It is also acceptable to have one Qual-Card
that covers both generic and facility-specific requirements. Additionally, the
Field Element Manager should designate qualifying officials who are
authorized to sign the Qual-Card after verifying the candidate possesses the
appropriate level of knowledge for each requirement. The Qual-Card should
include the following:
a. Self study. All facility related DOE Orders and Standards, Federal and
State safety and environmental protection regulations applicable to
the assigned facility, the facility safety documentation, and all facility-
specific documents and procedures that are pertinent to the
responsibilities of the Facility Representative.
b. Formal training. All formal training, both on-site and off, necessary for
the Facility Representative to function effectively. The training may be
presented by DOE, contractors, other Federal Agencies, or private
firms.
c. On-the-job training. All knowledge of facility processes, systems
requirements, and specialized procedures that must be demonstrated
to a qualifying official.
d. Facility walkthroughs. A walkthrough of the assigned facilities, in the
presence of a qualifying official, for the purpose of demonstrating
practical skills and thorough knowledge of selected key elements or
systems of the facility.
5.10.3 Interim Qualification. DOE field elements shall establish the specific
requirements that must be met prior to a Facility Representative candidate
being assigned to provide interim coverage in a facility for which he or she is
not fully qualified. The field element shall formally define and document the
DOE-STD-1063-97
21
duties and authorities which may be assigned to an Interim Qualified Facility
Representative. The Interim Qualification process shall be documented. The
time spent as a Facility Representative under Interim Qualification should be
minimized. The field element should also determine what compensatory
measures will be implemented during interim periods while no fully qualified
Facility Representative is assigned to a given facility.
Section 19
5.10.4 Examinations. Formal procedures should be developed by the field element
for the administration of facility walkthroughs, and written and oral
examinations. Additional information on examinations is available in DOE-
STD-1011-92 and DOE-STD-1009-92.
5.10.4.1 Facility walkthroughs. Facility walkthroughs of assigned facilities
at selected points in the Facility Representative qualification
process shall require demonstrating to a qualifying official
practical skills and knowledge of selected key elements, including
safety systems, structures, and components of the facility.
5.10.4.2 Written Examinations. Upon satisfactory completion of all Qual-
Card requirements, the Facility Representative shall take a
written examination. The examination should include only
subjects on the Facility Representative core and facility-specific
Qual-Cards. The minimum passing grade should be 80%.
5.10.4.3 Oral Examinations. Upon satisfactory completion of the written
examination by the Facility Representative candidate, the Field
Element Manager or his designee will convene and chair a
Qualification Board for the purpose of conducting an oral
examination of the candidate. The composition of the Board will
be determined by the Field Element Manager or designee. Board
members should ask critical questions intended to integrate
identified learning objectives during qualification. Additionally,
follow-up questions may help the Board determine how the
candidates ‘think on their feet’. Formal guidance for the
Qualification Board should be developed by the field element and
include: the standards for Qualification, the use of technical
advisors by the Board, the questioning procedures or protocol,
pass/fail criteria, the voting authorization and procedures, and the
Board deliberation and documentation process. The Board may
conduct the oral interview as a group or individually. The
minimum passing grade should be 80%. Any questions and
answers that result in an oral exam failure should be explicitly
documented.
5.10.4.4 Failure of Written or Oral Examinations. Failure to pass a written
or oral examination will cause the Facility Representative
candidate to go on a special study program designed to
strengthen each area of weakness revealed in the examination.
The candidate will then be reexamined, with concentration in the
identified weak areas. Facility Representative candidates who
DOE-STD-1063-97
22
repeatedly fail examinations, should be reassigned by the field
element to a non-Facility Representative position. The final
reassignment decision should be made by the Field Element
Manager, who may wish to take any extenuating circumstances
into consideration before rendering a decision.
5.10.5 Full Qualification. Upon completion of all elements of qualification, line
management within the field element should review and confirm satisfactory
completion of the training requirements and eligibility of the candidate to
become a Facility Representative. Qualification is granted by the Field
Element Manager or designee. Upon assignment to a different or additional
facility or site, it is necessary for a Facility Representative to complete the
appropriate additional qualification requirements for that facility or site.
5.10.6 Requalification. Facility Representatives shall be required to requalify every
three years. DOE field elements will establish the specific requalification
training designed to update and maintain the qualifications of Facility
Representatives. The requalification process shall be documented and as a
minimum consist of the following:
Section 20
a. Items added to the Facility Representative Qualification Card since the
individual’s last qualification or requalification.
b. A comprehensive examination covering new material and selected
material from the initial qualification process.
5.10.7 Proficiency. Field elements shall formally define proficiency requirements.
These requirements shall include actions required to regain proficiency
following periods of inactivity as a Facility Representative, and the length of
time which triggers a need for proficiency training.
5.10.8 Continuing Training. Field elements should establish continuing training to
enhance and strengthen the knowledge, skills and abilities of facility
representatives. The continuing training program serves to improve the
overall technical capabilities and credibility of the Facility Representative and
the organization. Field elements should also ensure that opportunities to
develop management skills are made available.
DOE-STD-1063-97
23
6. NOTES
This section contains information of a general or explanatory nature that may be helpful, but is
not mandatory.
6.1 Intended Use. This standard is intended for the use of DOE managers responsible
for establishing and maintaining a Facility Representative program at DOE nuclear
facilities with the goal of ensuring that the Department's Facility Representatives are
selected based on consistently high standards and from the best qualified
candidates available, that they receive the training required for them to function
effectively, and that their expected functions, responsibilities and authority are well
understood and accurately documented. Guidance is provided in the following
areas:
a. Assessing Facility Representative coverage,
b. Defining Facility Representative qualifications,
c. Defining Facility Representative functions, responsibilities and authorities,
d. Establishing Facility Representative training requirements,
e. Establishing Facility Representative training programs,
f. Formal examination of Facility Representatives, and
g. Facility Representative Program Performance Assessment.
6.2 Key Word Listing.
a. Facility Representative
b. Facility Representative coverage
c. Hazard classification
d. Line management
e. Occurrence reporting
f. Operational activity
g. Performance Indicator
h. Program manager
I. Qualification
j. Safety analysis
k. Self study
l. Stop work
m. Training
DOE-STD-1063-97
24
INTENTIONALLY BLANK
DOE-STD-1063-97
APPENDIX A
A-1
FACILITY REPRESENTATIVE PERFORMANCE INDICATORS
Scope: Carefully chosen Performance Indicators (PI) can provide valuable measures of the
effectiveness of Facility Representative (FacRep) Programs. These PIs will be used by DOE-
HQ to evaluate DOE-wide program effectiveness. Other PIs may be useful at a local level to
determine the need for local program changes, depending on circumstances that may be
unique to a site.
DOE-wide Facility Representative PIs are relatively few in number, easy to measure and
report, applicable to all FacRep Programs, and resistant to misinterpretation. Since
effectiveness in providing contractor oversight may be difficult to capture in measurable terms,
some subjective measures are used.
General Points:
1. The attached Performance Indicators are for DOE-wide use. Field elements may use
additional, local PIs that suit their own needs.
2. PIs for DOE-wide use are divided into the following categories: Staffing, Training and
Qualification, Facility Representative Program Accomplishments, and Fulfilling the Facility
Representative Role.
Section 21
3. PIs that measure contractor performance have been avoided as measures of FacRep
program effectiveness.
4. PIs should be reported to program offices quarterly, with copy sent to the Facility
Representative Program Manager, Office of Field Services and Liaison (FM-10). At the
close of a given quarter, one month is allocated to assemble PI reports, which are then
due on the first working day of the months of February, May, August, and November.
5. Performance Indicators, their methods of calculation, and goals (or targets) are presented
in the following tables.
DOE-STD-1063-97
APPENDIX A
A-2
STAFFING
TYPE INDICATOR NAME HOW TO CALCULATE GOAL
DOE-wide Staffing level (%) Number of FacRep positions filled 100% of [#FacReps]
-----------------------------------
Number of FacRep positions* * per DOE-STD-1063-97
DOE-wide Attrition Number of FacReps leaving the N/A
program this quarter. Include a
comment regarding reason (e.g.
promoted, resignation from DOE,
lateral transfer, etc.)
TRAINING AND QUALIFICATION
TYPE INDICATOR NAME HOW TO CALCULATE GOAL
DOE-wide % of FacReps Core Qualified Number of FacReps Core Qualified No GOAL specified
-----------------------------------
Number of FacReps
DOE-wide % of FacReps Interim Qualified (if Number of FacReps Interim Qualified No GOAL specified
applicable) ---------------------------------------
Number of FacReps
DOE-wide % of FacReps Fully Qualified Number of Fully Qualified FacReps Greater than 75%
-----------------------------------
Number of FacReps
FACILITY REPRESENTATIVE PROGRAM ACCOMPLISHMENTS
TYPE INDICATOR NAME HOW TO CALCULATE GOAL
DOE-wide Accomplishments Any accomplishments of note during N/A
the quarter This is an optional field.
FULFILLING THE FACILITY REPRESENTATIVE ROLE
TYPE INDICATOR NAME HOW TO CALCULATE GOAL
DOE-wide FacRep Time Spent in the Plant/Field Average number of hours spent in Greater than 40%
(plant walkthroughs, surveillances, the plant/ field this quarter
assessments, etc.) ------------------------------ * Denominator only includes
Overtime/comptime hours count in both quarter* DOE-STD-1063-97, if the
numerator and denominator FacRep is a part-time
Number of available work hours this number of hours expected by
FacRep.
DOE-wide FacRep Time Spent Performing Average number of hours FacReps Greater than 60%
Contractor Oversight (includes time in spend performing contractor
plant/field as above, and procedure oversight this quarter
reviews at desk, ORPS activities at desk, ------------------------------
etc.) Number of available work hours
Overtime/comptime hours count in both
numerator and denominator
this quarter*
* Denominator only includes
number of hours expected by
DOE-STD-1063-97, if the
FacRep is a part-time
FacRep.
DOE-STD-1063-97
APPENDIX A
A-3
Example Performance Indicator Submittal.
RED RUN Site
Performance Indicators for First Quarter CY97 (Jan 97 through Mar 97).
Submitted May 01, 1997.
STAFFING
TYPE INDICATOR NAME INDICATOR GOAL
DOE-wide Staffing level (%) 90% of 10 FacReps 100%
DOE-wide Attrition 1 - Promotion N/A
TRAINING AND QUALIFICATION
TYPE INDICATOR NAME INDICATOR GOAL
DOE-wide % of FacReps Core Qualified 100% [9 OF 9] No GOAL specified
DOE-wide % of FacReps Interim Qualified (if 89% [8 OF 9] No GOAL specified
applicable)
DOE-wide % of FacReps Fully Qualified 78% [7 OF 9] Greater than 75%
FACILITY REPRESENTATIVE PROGRAM ACCOMPLISHMENTS
TYPE INDICATOR NAME INDICATOR GOAL
Section 22
DOE-wide Accomplishments 30% Reduction in ORPS review times N/A
for FY97. This is an optional field.
FULFILLING THE FACILITY REPRESENTATIVE ROLE
TYPE INDICATOR NAME INDICATOR GOAL
DOE-wide FacRep Time Spent in the Plant/Field 55% Greater than 40%
DOE-wide FacRep Time Spent Performing 70% Greater than 60%
Contractor Oversight
DOE-STD-1063-97
APPENDIX A
A-4
INTENTIONALLY BLANK
DOE-STD-1063-97
APPENDIX B
B-1
FACILITY REPRESENTATIVE PROGRAM ASSESSMENT GUIDE
The Department of Energy has implemented its Facility Representative Program, and is now
looking to improve the program’s effectiveness DOE-wide. An effective Facility Representative
Program has many elements, as spelled out in DOE-STD-1063-97, “Establishing and
Maintaining a Facility Representative Program at DOE Facilities”. These elements are
intended to yield a program which provides DOE facilities with well-trained Facility
Representatives, who spend appropriate amounts of time in their facilities, and can work
effectively with their contractor management counterparts. The program, to be effective, must
have the functional support of management and must be able to assess its own performance
using this guide. Any assessment of a Facility Representative Program should determine the
extent to which these objectives are being met, and provide recommendations on improving
the program’s effectiveness.
Objectives:
1) Well-trained, qualified Facility Representatives.
2) Adequate coverage for DOE facilities.
3) Effective relationships with the Contractor.
4) Adequate functional support from the Field Element Management.
5) Performance assessment and feedback program in place.
Purpose:
The purpose of this guide is to provide the Department with a consistent set of guidelines to
assess the effectiveness of Facility Representative Programs.
Scope:
This guide should be used by DOE HQ and Field Elements to assess the effectiveness of their
Facility Representative Programs as described in DOE STD-1063-97.
References:
The following references should be used in conjunction with this guide:
DOE-STD-1063-97
General Technical Base Qualification Standard
Facility Representative Qualification Standard
Applicable Field Element site-, and facility-specific qualification standards
Applicable Field Element site-, and facility-specific program implementing documents
Applicable Field Element Facility Representative Program Performance Indicators
DOE-STD-1063-97
APPENDIX B
B-2
I. ASSESSMENT LINES OF QUESTION
The following Lines of Question examine the strength and maturity of the Field Element’s
Facility Representative Program and the effectiveness of its Facility Representatives
(FacReps) by assessing performance at meeting the five objectives of the Facility
Representative Program. That is, once in place, how well does the Field Element implement
the Program?
1. Well-trained, qualified Facility Representatives.
Do training records show that Facility Representatives, who are listed as qualified, have the
proper education and experience, and that they have completed all qualification
requirements as specified in General Technical Base Qualification Standard, Facility
Representative Qualification Standard, and local directives? Are the qualifications
approved by line management? Do the training records show that Facility Representatives
complete all requalification requirements at the periodicity specified in the program
directive?
Section 23
Are the personnel involved in training and qualifying FacReps formally identified?
What is the process used to ensure that qualified FacReps maintain or regain proficiency,
and is it effective?
How many FacReps have failed to qualify within the time allowed by the program directive?
How many have failed to requalify? What actions were taken by the responsible Field
Element Management?
How is test bank adequacy and security verified for all qualification areas and facilities?
Do written examinations challenge candidates sufficiently to ensure the proper level of
knowledge?
Does the oral examination process challenge the candidate sufficiently to verify the proper
level of knowledge of all qualification areas and facilities? Do they test the FacRep’s
technical understanding of facility processes, judgement and decision-making abilities, and
ability to communicate expectations to the Contractor?
How well does the FacRep understand his/her roles and responsibilities under the Field
Element’s Facility Representative Program?
What continuing training is conducted for Facility Representatives? Does it cover topics
germane to FacRep duties and responsibilities?
DOE-STD-1063-97
APPENDIX B
B-3
2. Adequate coverage for DOE facilities.
Is FacRep Staffing in accordance with DOE-STD-1063-97? If not, is a written agreement
with the Program Office in place?
What is done to recruit and hire satisfactory candidates to fill known or projected FacRep
vacancies? Are sufficient numbers of FacRep candidates undergoing qualification to fill
known or projected FacRep vacancies? Is there a FacRep “pipeline” to train new FacRep
candidates?
How long have current FacRep vacancies existed?
What is the trend of the reported time spent in the facility and time performing oversight?
What methods are used by the Field Element to ensure that adequate facility coverage is
maintained by qualified FacRep during periods of leave, attrition, or downsizing?
DOE-STD-1063-97
APPENDIX B
B-4
3. Effective relationships with the Contractor.
Do FacReps actually have unencumbered access and “Stop Work” authority to their
assigned facilities? Has this been communicated formally to the contractor?
Has “Stop Work” authority been exercised? Was it appropriate? Was it effective? Are
there occasions that it should have been, but was not used?
What is the effectiveness of the FacReps as verified by observing selected qualified
personnel who are monitoring training, operations, or maintenance evolutions?
Are reviews of occurrence reports accomplished in a timely manner while ensuring that the
root cause has been determined and effective action proposed?
Do FacReps accomplish facility assessments, surveillances and audits as scheduled and
are the findings meaningful and consistent with facility performance? Do assessments limit
the amount of time the FacRep can spend on day-to-day facility oversight?
How effective is the process for correcting deficiencies when comparing reported dates
against the completed action dates? Have all completed actions actually been performed?
How is tracking, follow-up, and closure of FacRep findings performed? Is there follow-up
on issues informally identified by the FacRep?
How effective is the documentation of FacRep activities (e.g., reports, log keeping)
How are FacRep findings reported (formally and informally) to the contractor? Are the
reports provided to the contractor consistent with the information recorded by the
FacReps? How clear is the process of reporting findings to the contractor?
Section 24
Does the FacRep have access to all levels of facility management? How often does the
FacRep discuss facility operations issues with the facility manager? Do the FacReps
regularly interface with facility operations personnel?
Are FacRep to contractor interactions formal or informal; collegial or confrontational; helpful
or adversarial? Are these interactions effective or harmful to operational safety?
Does a process exist for ensuring the continued objectivity of FacReps assigned to a given
facility?
DOE-STD-1063-97
APPENDIX B
B-5
4. Adequate functional support from the Field Element Management.
What are the reasons for any FacRep attrition? Are FacRep’s leaving for promotions,
laterals, downsizing?
What steps has management taken to ensure that the FacRep positions are career
enhancing? Are there senior or supervisory FacRep opportunities?
What continuing education is actively supported?
What role does Field Element Management have in the qualification process? Does
management provide the resources necessary to qualify FacReps within the time allowed
by the program directive?
How does line management support the actions taken by the FacReps at the respective
facilities? What is interface relationship between the FacReps and each level of DOE line
management? How often does line management ‘walk the spaces’ with the FacReps.
How does DOE line management track and follow up on issues raised by the FacReps?
What local processes exist to allow FacReps access to Field Element technical expertise
regarding Contractor issues?
What local Performance Indicator data is used to provide indication of the FacRep program
status? What trending and analysis is done on Performance Indicator data? How is this
information used?
What incentive programs are in place and used effectively for the FacRep position? Do
these programs make the Facility Representative position desirable and career enhancing?
DOE-STD-1063-97
APPENDIX B
B-6
5. Performance assessment and feedback program in place.
How often does the Field Element conduct self-assessments of the entire Facility
Representative program? How are peer reviews incorporated into the self-assessment
process?
How well does the self-assessment program ensure that the evaluators have adequate
knowledge and experience to conduct meaningful reviews?
Based on self-assessment reports, have adequate reviews been conducted to be able to
properly evaluate the assigned area of assessment? Have the self-assessments
generated meaningful recommendations for improvement and corrective actions?
How is the accomplishment of self-assessment actions tracked? Are corrective actions
being completed in a timely manner?
How are the FacReps kept informed on changes to their facilities and their operating
practices? How are lessons learned from facility events disseminated to FacReps?
How are lessons learned from facility events at other DOE facilities sought and
disseminated to FacReps? Are lessons learned from other relevant industrial events
disseminated to FacReps?
DOE-STD-1063-97
APPENDIX B
B-7
II. APPROACH
The approach to be used in performing the Facility Representative Program assessment will
vary between Field Elements. In order to obtain a valuable assessment of the program, the
following methodology is presented.
Documentation. Much information can be determined in advance of the assessment by careful
review of program documentation. This can include:
Section 25
1. Program directive(s)
2. Performance Indicators (DOE-wide and locally generated)
3. Qualification tracking data
4. Significant Occurrence Reports
5. Performance Assessments including the Facility Representative Program Self-Assessment
6. Training records (including continuing training)
7. Qualification records
8. Facility Representative logs
9. Facility Representative reports
10. Management tracking system for Facility-Representative-reported issues
11. Written and oral examination question banks
Interviews. By discussing the program with its participants, a determination can be made
about program performance ‘on paper’ as opposed to ‘in reality’. Consideration should be
given to interviewing:
1. Facility Representative Program managers
2. Facility Representatives
3. Facility Representative supervisors
4. Line managers
5. Contractor facility managers
6. Technical Expertise support (health physics, explosive safety, etc)
Walkthroughs. Much information can be determined by performing walkthroughs with the
Facility Representatives. Walkthroughs can provide indication of:
1. Level of Facility Representative qualification
2. Actual practices of the facility
3. Interactions with contractor personnel
4. Log-keeping and reporting practices
5. Corrective action verification
Other methods. The preceding list of methods is for example purposes. Additional methods
exist which may help in assessing program performance. These methods should be used as
appropriate.
DOE-STD-1063-97
APPENDIX B
B-8
III. REPORT
This section contains the report format which can be used to document these reviews of
Facility Representative Programs. The report will be in narrative format and include the
following:
Report header:
Date of report
Facility Representative Program Review
Field Organization
Date(s) of review
Summary:
Includes a brief synopsis of the program assessment including activities observed, personnel
interviewed (by position), and documents reviewed. Each section of the report should be
evaluated as adequate, marginal, or unsatisfactory. An overall grade for the assessment
(satisfactory or unsatisfactory) should be assigned. The report should specifically identify
excellent practices worth sharing as well as significant, or key weaknesses noted. A rationale
should be provided for the grade given, based on current program status, progress made, and
achievement of the program objectives.
Discussion:
For each of the listed program objectives, provide a report of current status, progress made in
this area, grade assigned, and recommendations for improvement.
1. Well-trained, qualified Facility Representatives.
2. Adequate coverage for DOE facilities.
3. Effective relationships with the Contractor.
4. Adequate functional support from the Field Element Management.
5. Performance assessment and feedback program in place.
DOE-STD-1063-97
CONCLUDING MATERIAL
Review Activities: Preparing Activity:
DOE-DP DOE-FM
EE
EH
EM
ER
FE Project Number:
FM
HR FACR-0019
NE
RW
AL
CH
ID
NV
OAK
OH
OR
RF
RL
SPRO
SR
FOREWORD
CONTENTS
1. SCOPE
1.1 Scope
1.2 Purpose
1.3 Applicability
2. REFERENCES
2.1 Government Documents
2.2 Order of Precedence
Section 26
3. DEFINITIONS
3.1 Activity Level
3.2 Core Training Requirements
3.3 Contractor
3.4 Department or DOE
3.5 Nuclear Facility Hazard Classifications
3.6 Facility Representative
3.7 Facility Representative Coverage
3.8 Field Element or Organization
3.9 Hazard
3.10 Hazardous Materials
3.11 Interim Qualification
3.12 Line Organization
3.13 Nonreactor Nuclear Facility
3.14 Nuclear Facility
3.15 Occurrence Report
3.16 Proficiency
3.17 Program Manager
3.18 Qualification
3.19 Qualifying Official
3.20 Reactor
3.21 Risk
3.22 Safety Analysis
3.23 Safety Analysis Report
3.24 Secretarial Officer
3.25 Training Equivalency
3.26 Training Program
3.27 Walkthrough
4. GENERAL REQUIREMENTS
4.1 Purpose and Coverage
4.2 Unencumbered Access
4.3 Responsibilities and Authorities
4.4 Supervision, Management, and Authority
4.5 General Training and Qualification Requirements
4.6 Facility Representative Program Performance Assessment and Feedback
5. DETAILED REQUIREMENTS
5.1 Facility Coverage and Assignment
5.2 Duties and Responsibilities of a Facility Representative
5.3 Authority Granted to Facility Representatives
5.4 Facility Assessments
5.5 Operational Reports
5.6 Relationship of the Facility Representative with other DOE Managers
5.7 Relationship of Facility Representative with Operating Contractor
5.8 Specific Education and Experience
5.9 Training
5.10 Qualification
6. NOTES
6.1 Intended Use
6.2 Key Word Listing
APPENDIX A
APPENDIX B
CONCLUDING MATERIAL