DOE-STD-5503-94, EM Health and Safety Plan Guidelines
Functional areas: HAZWOPER, Health and Safety Plan, Health and Safety Guidelines
These guidelines have been developed by a working group consisting of both field and headquarters personnel to provide new direction to the EM-40 program in the preparation of site-specific Health and Safety Plans (HASPs). While based on the minimum requirements of 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER) and DOE Orders, these guidelines have been developed with the express purpose of implementing a high quality safety and health program.
Canceled due to FY 2001 Sunset Review. Project Number DOE-EM-STD-5503-94.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
TS
NOT MEASUREMENT
SENSITIVE
DOE-STD-5503-94
December 1994
DOE STANDARD
EM HEALTH AND SAFETY PLAN
GUIDELINES
U.S. Department of Energy AREA SAFT
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
WELCOME
This Portable Document Format (PDF) file contains bookmarks, thumbnails, and hyperlinks to help you navigate through the document. All items listed in the Contents are linked to the corresponding sections. In addition, if you click on a section heading while you are reading the text, you will return to the Contents. Click on the DOE seal below to move to the Contents page.
This document has been reproduced directly from the best available copy.
Available to DOE and DOE contractors from the Office of Scientific and
Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401.
Available to the public from the U.S. Department of Commerce, Technology
Administration, National Technical Information Service, Springfield, VA 22161;
(703) 487-4650.
Order No. DE95004760
DOE-EM-STD-5503-94
i
TABLE OF CONTENTS
LIST OF FIGURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . viii
LIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix
LIST OF ACRONYMS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . x
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.0. REGULATORY FRAMEWORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.2. Site-Specific HASP Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.2.1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.2.2. Key Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.2.3. Hazard Assessment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.2.4. Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.2.5. Personal Protective Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.2.6. Temperature Extremes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.2.7. Medical Surveillance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1.2.8. Exposure Monitoring and Air Sampling . . . . . . . . . . . . . . . . . . . . . 1-5
1.2.9. Site Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1.2.10. Decontamination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6
1.2.11. Emergency Response/Contigency Plan . . . . . . . . . . . . . . . . . . . . . . 1-6
1.2.12. Emergency Action Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7
1.2.13. Confined Space Entry. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7
1.2.14. Spill Containment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8
1.3. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-8
Section 2
2.0. KEY PERSONNEL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.2. Organizational Structure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.3. Onsite Essential Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
2.3.1. Project Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
2.3.2. Site Safety and Health Officer . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
2.3.3. Safety and Health Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
2.3.4. Field Team Leader . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
2.3.5. Command Post Supervisor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2.3.6. Emergency Response Coordinator . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2.3.7. Decontamination Station Officer . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2.3.8. Security Officer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
DOE-EM-STD-5503-94
ii
2.3.9. Specialty Teams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.4. Optional Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.4.1. Industrial Hygienist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.4.2. Fire Fighters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.4.3. Health Physicist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.4.4. Scientific Advisor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.4.5. Logistics Officer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.4.6 Photographer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.4.7. Record Keeper . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.4.8. Public Information Officer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.4.9. Multidisciplinary Advisors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.4.10. Medical Support. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.4.11. Bomb Squad Expert . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10
2.5. Communications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10
2.6. Other Source of Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11
2.7. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12
3.0. HAZARD ASSESSMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3.2. Hazard Identification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2
Section 3
3.2.1. Hazards List. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3
3.3. Examples of Hazard Assessment Methods. . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
3.4. Hazard Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
3.4.1. Engineering Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5
3.4.2. Administrative Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5
3.4.3. Personal Protective Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6
3.5. Hazard Assessment Documentation Format. . . . . . . . . . . . . . . . . . . . . . . . . 3-6
3.6. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9
4.0. TRAINING REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.2. General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.3. Training Requirements for Personnel at ER Sites . . . . . . . . . . . . . . . . . . . . . 4-2
4.4. Training Requirements for Personnel at RCRA TSD Sites. . . . . . . . . . . . . . 4-2
4.5. Training Requirements for Personnel Conducting Emergency Responses
to Hazardous Substance Releases. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4.6. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8
5.0. PERSONAL PROTECTIVE EQUIPMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.2. General Provisions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
DOE-EM-STD-5503-94
iii
5.3. Selection of Personal Protective Equipment . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5.4. Levels of PPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.4.1. Level A PPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4
5.4.2. Level B PPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4
5.4.3. Level C PPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5.4.4. Level D PPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
5.5. Use of PPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.5.1. PPE Selection Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.6. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
6.0. EXTREME TEMPERATURE DISORDERS OR CONDITIONS. . . . . . . . . . . . . . 6-1
6.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.2. Heat Stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2
Section 4
6.2.1. Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-2
6.2.2. Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4
6.3. Cold Exposure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-4
6.3.1. Control Measures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.3.2. Physiological Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.4. Prevention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
6.4.1. Physiological Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.5. Integration with Other Elements of the HASP . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.6. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
7.0. MEDICAL SURVEILLANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
7.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
7.2. Information for the Medical Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2
7.3. Examination Content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3
7.4. Baseline (Initial) Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5
7.4.1. Baseline/Periodic Medical Examination Parameters . . . . . . . . . . . . 7-5
7.5. Periodic Medical Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5
7.6. Examination After Illness or Injury . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8
7.7. Termination Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8
7.8. Maintenance and Availability of Medical Records. . . . . . . . . . . . . . . . . . . . . 7-8
7.9. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9
8.0. EXPOSURE MONITORING/AIR SAMPLING . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1
8.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1
8.2. General Guidance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1
8.2.1. Personnel Qualifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2
8.3. Air Contaminants . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3
8.4. Methods and Instrumentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
DOE-EM-STD-5503-94
iv
8.4.1. Direct-Reading Monitoring Instruments . . . . . . . . . . . . . . . . . . . . . 8-5
8.4.2. Time-Integrated Sampling Instruments . . . . . . . . . . . . . . . . . . . . . . 8-6
Section 5
8.5. Worker Exposure Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6
8.6. Level of Protection Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-7
8.7. Offsite Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8
8.8. Perimeter Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8
8.9. Meteorological Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8
8.10. Quality Assurance/Quality Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8
8.11. Recordkeeping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-8
8.12. Time-Integrated Sampling Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9
8.13. Direct-Reading Air Monitoring Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-9
8.14. Final Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10
8.15. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-10
9.0. SITE CONTROL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1
9.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1
9.2. Development of the Site Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2
9.3. Establishment of Work Zones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2
9.3.1. The Exclusion Zone . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3
9.3.2. The Contamination Reduction Zone . . . . . . . . . . . . . . . . . . . . . . . 9-4
9.3.3. The Support Zone. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4
9.4. Using the Buddy System. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-4
9.5. Communication Network and Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5
9.6. Worker Safety Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5
9.7. Medical Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6
9.8. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6
10.0. DECONTAMINATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.2. General Consideration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.3. Location and Layout . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2
10.4. Determining Decontamination Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-3
10.5. Standard Operating Procedures to Minimize Worker Contact . . . . . . . . . . . 10-5
10.6. Collection, Storage and Disposal Procedures . . . . . . . . . . . . . . . . . . . . . . . 10-6
10.7. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-6
Section 6
11.0. EMERGENCY RESPONSE/CONTINGENCY PLAN . . . . . . . . . . . . . . . . . . . . . 11-1
11.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-1
11.2. Pre-Emergency Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-2
11.3. Personnel Roles, Lines of Authority, and
Communications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-2
DOE-EM-STD-5503-94
v
11.3.1. Facility Emergency Coordinator. . . . . . . . . . . . . . . . . . . . . . . . . . 11-3
11.3.2. Emergency Contacts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3
11.3.3. Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-3
11.3.4. Emergency Communications . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5
11.4. Emergency Recognition and Prevention . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5
11.5. Safe Distances and Places of Refuge. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-5
11.6. Site Security and Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6
11.7. Evacuation Routes/Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-6
11.8. Decontamination Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-7
11.9. Emergency Medical Treatment/First Aid . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-7
11.10. Emergency Alerting/Response Procedures . . . . . . . . . . . . . . . . . . . . . . . . . 11-8
11.10.1. Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8
11.10.2. Evaluation of the Situation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-8
11.10.3. Rescue/Response Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-9
11.11. Critique of Response and Follow-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-10
11.11.1. Critique . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-10
11.11.2. Maintaining Readiness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-10
11.12. PPE and Emergency Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-10
11.13. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-11
12.0. EMERGENCY ACTION PLAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1
12.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1
12.2. Emergency Escape Route Assignment . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-1
12.3. Procedures for Critical Operations Personnel . . . . . . . . . . . . . . . . . . . . . . . 12-3
12.4. Procedures to Account for All Employees . . . . . . . . . . . . . . . . . . . . . . . . . 12-3
12.5. Rescue and Medical Duties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-3
12.6. Reporting Fires and Other Emergencies . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4
12.7. EAP Contact Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4
12.8. Emergency/Evacuation Alarm System . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4
12.9. EAP Training Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-4
12.10. Fire Provention Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5
Section 7
12.10.1 Housekeeping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-5
12.10.2 Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-6
12.10.3 Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-6
12.11 Procedures for the Review and Update of the EAP . . . . . . . . . . . . . . . . . . . 12-6
12.12. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12-6
13.0. CONFINED SPACE ENTRY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1
13.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1
13.2. Duties and Responsibilities. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1
13.2.1. Project Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-1
DOE-EM-STD-5503-94
vi
13.2.2. Confined Space Coordinator. . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2
13.2.3. Field Team Leader . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-2
13.2.4. Entry Supervisors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-3
13.2.5. Employees Entering Confined Space . . . . . . . . . . . . . . . . . . . . . . 13-3
13.2.6. Attendant . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-4
13.2.7. Rescue Team . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-4
13.3. Identification and Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-4
13.3.1. Hazard Re-Evaluation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5
13.4. Hazard Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5
13.5. Hazard Controls. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-5
13.5.1. Engineering Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-6
13.5.2. Work Practice (Administrative) Controls . . . . . . . . . . . . . . . . . . . 13-6
13.5.3. Personal Protective Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-6
13.6. Entry Permits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-6
13.6.1. Key Elements for Entry Permits . . . . . . . . . . . . . . . . . . . . . . . . . . 13-7
13.7. Entry Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8
13.8. Opening a Confined Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-8
13.9. Atmospheric Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-9
13.9.1. Evaluation Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-9
13.9.2. Verification Testing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-9
13.9.3. Acceptable Limits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-10
13.10. Isolation and Lockout/Tagout Safeguards . . . . . . . . . . . . . . . . . . . . . . . . . . 13-10
13.11. Ingress/Egress Safeguards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-10
13.12. Warning Signs and Symbols . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-11
13.13. Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-11
Section 8
13.13.1. General Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-11
13.13.2. Specific Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-12
13.14. Emergency Response . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-13
13.14.1. Emergency Response Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-13
13.14.2. Retrieval Systems or Methods to Facilitate
Non-entry Rescue . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-13
13.15. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13-13
14.0. SPILL CONTAINMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1
14.1. Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1
14.2. Preplanning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-1
14.3. Reporting and Initial Personnel Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2
14.4. Initial Spill Action. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2
14.5. Spill Response Evaluation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-2
14.6. Organizing a Spill Response. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-3
14.7. Spill Cleanup Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-3
DOE-EM-STD-5503-94
vii
14.8. Post Incident Follow-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-3
14.9. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14-4
APPENDIX A HASP Glossary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
APPENDIX B Concluding Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1
APPENDIX C Training Tables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1
APPENDIX D EM-40 Hazardous Materials Training Program Memorandum. . . . . . D-1
APPENDIX E Other Sources of Hazard Assessment Methods. . . . . . . . . . . . . . . . . E-1
APPENDIX F Sample Decontaimination Layouts and Procedures for Levels of
Protection A through C . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-1
DOE-EM-STD-5503-94
viii
LIST OF FIGURES
Figure 2-1 Example of a Health and Safety Plan Organizational Structure . . . . . . . . . . . 2-2
Figure 2-2 Emergency Contact Personnel Names and Phone Numbers
Example Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
Figure 4-1 EM-40 Definitions and Graphic Depictions of Installation,
Facility, and Site. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
Figure 7-1 Medical Surveillance Process. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-2
Figure 10-1 Example Layout of Contamination Reduction Corridors . . . . . . . . . . . . . . . . 10-2
Figure 10-2 Decision Aid for Evaluating Health and Safety Aspects of Decontamination
Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-4
Section 9
DOE-EM-STD-5503-94
ix
LIST OF TABLES
Table 2-1 Onsite Essential or Key Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10
Table 2-2 Optional Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11
Table 3-1 Sample Hazard Assessment: Cleaning the Inside Surface of a
Chemical/Radioactive Contaminated Tank - Top Manhole Entry . . . . . . . . . . 3-6
Table 4-1 Minimum Training Requirements for Personnel Engaged at EM-40 Sites . . . 4-4
Table 4-2 Minimum Training Requirements for Personnel Engaged at
RCRA TSD Sites. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6
Table 4-3 Minimum Training Requirements for Personnel Engaged in EM-40
Emergency Responses to Hazardous Substance Releases. . . . . . . . . . . . . . . 4-7
Table 5-1 Respiratory PPE Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9
Table 5-2 Clothing PPE Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-9
Table 6-1 Suggested Frequency of Physiological Monitoring for Fit and
Acclimatized Workers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-3
Table 6-2 Windchill Index . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-5
Table 6-3 Maximum Daily Time Limits for Exposure at Low Temperatures. . . . . . . . . 6-6
Table 7-1 Example of Periodic Examination Based on Job Task . . . . . . . . . . . . . . . . . . 7-4
Table 7-2 Hazardous Substances Expected to be Encountered, the Target Organ,
Potential Health Effects, and Recommended Medical Monitoring . . . . . . . . . 7-6
Table 8-1 Framework for Presenting Staff Responsibilities. . . . . . . . . . . . . . . . . . . . . . 8-3
Table 8-2 Air Contaminants - Summary of Properties and Frequency
of Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
Table 8-3 Air Contaminants - Action Levels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
Table 8-4 Direct-Reading Instruments for Site XX . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-6
Table 9-1 General Equivalency of Work Zones . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1
Table 11-1 Emergency Contacts and Phone Numbers . . . . . . . . . . . . . . . . . . . . . . . . . . 11-4
Table 11-2 Emergency Equipment and Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11-11
DOE-EM-STD-5503-94
x
LIST OF ACRONYMS
ACGIH American Conference of Governmental Industrial Hygienists
AIHA American Industrial Hygiene Association
ALARA As Low As Reasonably Achievable
ANSI American National Standards Institute
CDC Centers for Disease Control
CERCLA Comprehensive Environmental Response, Compensation and Liability Act
Section 10
(also known as Superfund)
CFR Code of Federal Regulations
CPR Cardio Pulmonary Resuscitation
CRC Contamination Reduction Corridor
CRZ Contamination Reduction Zone
DHHS Department of Health and Human Services
DOE Department of Energy
DOT Department of Transportation
EAP Emergency Action Plan
EKG Electrocardiogram
EPA Environmental Protection Agency
ER Environmental Restoration
ERP Emergency Response Plan
HASP Health and Safety Plan
HAZMAT Hazardous Material
HAZWOPER Hazardous Waste Operations and Emergency Response
HEPA High Efficiency Particulate Air
IDLH Immediately Dangerous to Life or Health
LEL/LFL Lower Explosive Limit/Lower Flammable Limit
M&O Contractor Management and Operations Contractor
MSDS Material Safety Data Sheets
MSHA Mine Safety and Health Administration
NCP National Oil and hazardous Substances Pollution Contingency Plan
NIEHS National Institute of Environmental Health Sciences
NIOSH National Institute for Occupational Safety and Health
NRC Nuclear Regulatory Commission
OSH Occupational Safety and Health
OSHA Occupational Safety and Health Administration
OTA Office of Technology Assessment
OU Operable Unit
PC Protective Clothing
PEL Permissible Exposure Limits
PPE Personal Protection Equipment
DOE-EM-STD-5503-94
xi
RCRA Resource Conservation and Recovery Act
REL Recommended Exposure Limits
S&H Officer Safety and Health Officer
SARA Superfund Amendments and Reauthorization Act
SCBA Self-Contained Breathing Apparatus
SSHO Site Safety and Health Officer
SOP Standard Operating Procedure
SOSG Standard Operating Safety Guide
SSO Site Safety Office
TLV Threshold Limit Values
TLV-STEL Threshold Limit Value-Short-Term Exposure Limit
TLV-TWA Threshold Limit Value-Time-Weighted Average
TSD Treatment, Storage and Disposal
UEL/UFL Upper Explosive Limit/Upper Flammable Limit
USCG United States Coast Guard
DOE-EM-STD-5503-94
xii
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
1
INTRODUCTION
These guidelines have been developed by a working group consisting of both field and
headquarters personnel to provide new direction to the EM-40 program in the preparation of site-
specific Health and Safety Plans (HASPs). While based on the minimum requirements of 29 CFR
1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER), and DOE
orders, these guidelines have been developed with the express purpose of implementing a high
quality safety and health program. These EM-40 HASP Guidelines are a "living document" to be
modified and updated as new regulations and other requirements are issued. Guiding the
development of this document has been the principle that an effective and high-quality HASP
must provide:
• A clear chain of command for safety and health activities,
• Accountability for safety and health performance,
• Well defined headquarters expectations regarding safety and health,
• Well defined task and operational hazards/risks,
• Comprehensive hazard prevention and control methods, and
• Recordkeeping requirements to track program progress.
As this document was developed the working group applied the following assumptions:
• It is a generic document to be adapted on a site-by-site basis,
• An adequate site characterization and comprehensive workplan exists at each field site,
• Operations analysis and risk identification methods are adequate,
• A written site safety and health program exists as required in 29 CFR 1910.120 (b),
• Written site Standard Operating Procedures exist, and
• Site specific information is available.
Section 11
Each chapter of these guidelines represents an element listed in 29 CFR 1910.120(b)(4)(ii) for a
HASP. The first chapter, Regulatory Framework, provides direction on what should be included
in a site-specific HASP. 29 CFR 1910.120(b)(4) has been issued as the minimum criteria, and
starting point. In several instances this guidance goes beyond this requirement. In addition to the
requirements of 29 CFR 1910.120(b)(4) the guidance is based on good industry practice,
Environmental Protection Agency recommendations, specific DOE need (radiation protection),
and DOE orders and directives. Chapters 2 through 14 provide guidance on how to meet the
requirements specified in Chapter 1.
Each chapter provides detailed information on a particular component of a site-specific HASP.
When utilizing this guidance to prepare site-specific HASPs, the preparer of the HASP should be
able to provide appropriate documentation on how decisions were made relative to the relevant
sections of the guidance. In some cases, the requirements of different sections overlap. The
preparer of a site-specific HASP need not repeat overlapping information but should indicate by
reference where the information is located.
DOE-EM-STD-5503-94
2
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
1-1
1.0. REGULATORY FRAMEWORK
1.1. BACKGROUND
In the 1986 amendments to the Comprehensive Environmental Response, Compensation, and
Liability Act (CERCLA), Congress tasked the Administrators of the Environmental Protection
Agency (EPA) and Occupational Safety and Health Administration (OSHA), the Secretary of the
Department of Transportation (DOT), and the Director of the National Institute for Occupational
Safety and Health (NIOSH) to modify the National Contingency Plan (NCP) (40 CFR 300) to
provide for protection of health and safety of employees involved in response actions. To satisfy
this directive, standards requiring the development of a site-specific health and safety plan
(HASP) were established by OSHA in 29 CFR 1910.120, Hazardous Waste Operations and
Emergency Response (HAZWOPER), and incorporated into the NCP (40 CFR 300.150).
Additionally, the NCP requires compliance with standards and regulations of the Occupational
Safety and Health Act, including such standards as Construction Safety (29 CFR 1926) and
General Industry Standards (29 CFR 1910), where applicable. DOE Orders 5480.1B and
5483.1A require compliance with these standards.
This guidance document is intended to assist in the preparation of site-specific HASPs that will
meet or exceed the requirements of 29 CFR 1910.120.
This chapter summarizes the regulatory framework upon which the site-specific HASPs for EM-
40 facilities will be based. It is the intent of this chapter to provide clear, concise direction
regarding compliance with 29 CFR 1910.120(b)(4)(ii) as applied to EM-40 facilities.
Some sections of this chapter describe techniques or modifications that are not specifically
included in the HAZWOPER standard. EM-40 has adopted these additions, based on industry
practice, perceived operational weaknesses, other occupational safety and health standards, or
other considerations. If an existing HASP at any EM-40 site meets or exceeds the requirements
of this chapter, no modifications to that HASP are necessary. Unless otherwise noted, the
information requirements shall be included in at least one section and references made in other
sections, as necessary.
1.2. SITE-SPECIFIC HASP REQUIREMENTS
Section 12
1.2.1. Introduction
The site-specific HASP should include an introduction to the plan. The main purpose of the
introduction is to describe the site the HASP will encompass and its applicability to operations. In
developing this description the preparer should include:
• A brief description,
• Background information (e.g., site history, prior site activities),
DOE-EM-STD-5503-94
1-2
• Known site contamination,
• Synopsis of site characterization, and
• Site operations to be performed.
While all of the following sections should be included in the HASP, a site may determine that a
portion of a section does not apply (e.g., cold temperature extremes for a tropical climate). If a
portion of a section is not applicable, it may not need to be addressed, but an explanation of non-
applicability should be provided.
1.2.2. Key Personnel
The HAZWOPER standard does not require a listing of key personnel in the site-specific HASP.
However, due to the importance of this list of individuals to the overall safety and health effort at
a hazardous waste site, a listing of key personnel shall be included in the site-specific HASP for
EM-40 sites. The DOE Project Manager, as well as key personnel, shall be identified at the DOE,
contractor and subcontractor level.
It is an accepted practice that the number of key personnel shall be kept to a minimum. However,
the key personnel responsibilities must be assigned and accounted for at any hazardous waste site.
Both of these concerns may be accomplished, at the discretion of the Project Manager, by
assigning one person to several positions.
At a minimum, the key personnel section to be included in the site-specific HASP shall identify
the:
• Overall Project Manager,
• Site Safety and Health Officer (SSHO),
• Additional Safety and Health Personnel,
• Field Team Leader,
• Command Post Supervisor,
• Emergency Response Coordinator,
• Decontamination Station Officer,
• Security Officer, and
• Specialty Team Personnel.
More specific information regarding Key Personnel is contained in Chapter 2.
1.2.3. Hazard Assessment
The HAZWOPER standard does not give specific guidance as to the methodology to be used to
meet the requirements of 29 CFR 1910.120(b)(4)(ii)(A). For the purpose of the EM-40 site-
specific HASP the hazard assessment approach identified below shall be used.
DOE-EM-STD-5503-94
1-3
Hazard assessment is a methodology used to identify inherent or potential hazards which may be
encountered in the work environment associated with accomplishing a job. At a minimum, the
hazard assessment shall include the following steps:
• Identification of an operation or job to be assessed,
• Break down of the job or operation,
• Identification of the hazards associated with each task, and
• Determination of the necessary controls for the hazards.
Other more detailed hazard assessment procedures are also acceptable. More specific information
on the hazard assessment process is contained in Chapter 3.
1.2.4. Training
In 29 CFR 1910.120(e) different levels of training are required, depending on the task to be
performed. Training for EM-40 employees and contractors at EM-40 hazardous waste sites
exceeds these requirements, as specified by the EM memorandum in Appendix D.
The training program (40 hour offsite and 3 day onsite supervision), at a minimum, shall address:
Section 13
• Key personnel responsible for site safety and health;
• Safety, health and other hazards present on site;
• Use of Personal Protective Equipment (PPE);
• Safe work practices and site Standard Operating Procedures (SOPs);
• Safe use of onsite engineering controls and equipment;
• Medical surveillance program requirements, including signs/symptoms of overexposure;
• Site decontamination procedures;
• Site emergency response/action plan;
• Confined space entry procedures; and
• Site spill containment program/procedures.
Management and supervisors, as identified in the Key Personnel section, will receive an additional
8 hours of training as specified in 29 CFR 1910.120(e)(4).
Additionally, 29 CFR 1910.120 (b)(4)(iii) specifies that a pre-entry briefing be given to each site
worker, manager, supervisor and/or any other individual associated with the site. Documentation
of these briefings shall be maintained at the site command post.
Additional information on training requirements is contained in Chapter 4 and Appendix C.
DOE-EM-STD-5503-94
1-4
1.2.5. Personal Protective Equipment (PPE)
Careful selection and use of PPE is essential to protect the health and safety of workers. The
purpose of PPE is to shield or isolate workers from the chemical, physical, radiological, and
biological hazards that may be encountered at the site.
The PPE program contained in the site-specific HASP shall, at a minimum, address:
• PPE selection based on site hazards;
• PPE use and limitations;
• Work mission duration;
• Maintenance and storage;
• Decontamination and disposal;
• Training and proper fitting;
• Donning and doffing procedures;
• Inspection procedures prior to, during, and after use;
• Effectiveness evaluation procedures; and
• Limitations due to temperature extremes, and other appropriate medical and physical
concerns.
Additional information on PPE is contained in Chapter 5.
1.2.6. Temperature Extremes
Limitations due to temperature extremes often result in the necessity to modify work schedules,
work hours or otherwise reduce the time employees shall spend in chemically protective clothing.
Chapter 6 is devoted to hazards relating to temperature extremes; it provides guidance on how to
make these determinations and evaluate the potential for temperature related disorders or
conditions. Chapter 7 provides guidance on medical surveillance procedures. The temperature
extreme program, should, at a minimum address:
• Identification of potential hazards early in the planning phase of the development and
operation of required contingency plans.
• Proper monitoring of worker physiology.
• Implementation of preventive measures and Standard Operating Procedures (SOPs) early
in the operations so that sound worker practices are developed and followed.
• Proper initial training of workers to recognize the symptoms of temperature extreme
related disorders or conditions in themselves and their fellow workers.
• Implementation of a "buddy system", and
• Proper acclimatization of all workers to new or changing work conditions.
Additional information on temperature extremes can be found in Chapter 6.
DOE-EM-STD-5503-94
1-5
1.2.7. Medical Surveillance
Medical Surveillance of workers at hazardous waste sites is necessary to protect the health of the
worker, establish fitness for duty, and ensure documentation of exposure to hazardous materials.
The elements of the medical surveillance program contained in the site-specific HASP shall, at a
minimum, address:
Section 14
• Employees covered by the program,
• Frequency of medical exams/consultations,
• Content of medical exams/consultations,
• Information provided to the physician,
• Physician's written opinion, and
• Recordkeeping requirements.
More specific information regarding medical surveillance is contained in Chapter 7.
1.2.8. Exposure Monitoring and Air Sampling
The monitoring component of the site-specific HASP shall be based on all chemical, physical and
radiological hazards identified in the site characterization. At a minimum, it shall address:
• Sampling strategy and schedule for personal monitoring (breathing zone), air monitoring
(level of protection) and environmental sampling (offsite migration),
• Instrumentation and equipment to be used,
• Calibration and maintenance of instruments and equipment, and
• QA/QC procedures and analytical methods.
More specific information on exposure monitoring and air sampling is contained in Chapter 8.
1.2.9. Site Control
The site control program is used to control movement of people and equipment in order to
minimize worker exposure to hazardous substances.
The site control measures program contained in the site-specific HASP shall, at a minimum,
include:
• Site map,
• Site work zones,
• Definition and use of the "buddy system",
• Site communication procedures, including emergency procedures,
DOE-EM-STD-5503-94
1-6
• Safe work practices and/or SOPs, and
• Location of nearest medical assistance.
Additional information on site control is contained in Chapter 9.
1.2.10. Decontamination
29 CFR 1910.120(k) does not contain specific procedural development requirements in the area
of decontamination. The working group has adopted the methodology presented in the U. S.
Environmental Protection Agency (EPA) document titled "Standard Operating Safety Guide"
(SOSG). The SOSG establishes the decontamination layout and required procedures based on the
level of PPE used at the site.
The decontamination elements contained in the site-specific HASP shall, at a minimum, include:
• Training;
• Location and layout of decontamination stations and areas;
• Decontamination methods;
• Required decontamination equipment;
• SOPs to minimize worker contact with contaminants during decontamination;
• SOPs for decontamination line personnel; and
• Procedures for collection, storage and disposal of clothing, equipment and any other
materials that have not been completely decontaminated.
Additional information on decontamination is contained in Chapter 10.
1.2.11. Emergency Response/Contingency Plan
The site management must develop and implement an Emergency Response Plan (ERP) in
accordance with requirements of 29 CFR 1910.120(l), if the employees at an EM-40 site are
expected to respond to emergencies at that site.
The ERP to be included in the site-specific HASP shall, at a minimum, address:
• Pre-emergency planning;
• Personnel roles, responsibilities, and lines of communication;
• Emergency recognition, preparedness drills, and follow-up procedures;
• Safe distances and places of refuge;
• Site security and control;
• Evacuation routes and procedures;
• Decontamination procedures that are not covered in the site-specific HASP;
• Emergency medical treatment and first aid;
• Emergency alerting and response procedures;
DOE-EM-STD-5503-94
1-7
• Critique of response and prevention procedures;
• PPE and emergency equipment;
• Site topography and layout;
• Incident reporting procedures;
• List of local emergency response contacts; and
• Potential worst case weather by season.
Section 15
Additional information regarding the ERP is contained in Chapter 11.
1.2.12. Emergency Action Plan
If employees are expected to evacuate the site and not participate in emergency response
activities, the site must have an Emergency Action Plan (EAP) in accordance with requirements of
29 CFR 1910.38(a).
The EAP to be included in the site-specific HASP shall, at a minimum, address:
• Emergency escape procedures and route assignments;
• Procedures to be followed by personnel who stay behind to conduct critical operations
before they evacuate;
• Procedures to account for all employees after evacuation;
• Rescue and medical duties for assigned personnel;
• Names and phone numbers of personnel and organizations to be contacted for further
information;
• Description of the alarm procedures used to alert personnel of emergency and evacuation
situations;
• EAP training requirements and methods to evaluate employee knowledge of the plan, and
• Procedures and frequency for rehearsal, review, and update of the plan.
Additional information regarding the Emergency Action Plan is contained in Chapter 12.
1.2.13. Confined Space Entry
The confined space entry procedures for the EM-40 HASP Guidelines are derived from 29 CFR
1910.146, American National Standards Institute (ANSI) Recommendation Z117.1-1989, and
applicable DOE orders.
The confined space entry program portion of the site-specific HASP shall, at a minimum, address:
• Personnel duties and responsibilities;
• Identification, posting and evaluation of confined spaces on site;
• Hazard controls (engineering, administrative and PPE);
DOE-EM-STD-5503-94
1-8
• Entry permit contents, requirements, and approval;
• Entry procedures;
• Lockout/tagout requirements and procedures;
• Additional safeguards and emergency procedures; and
• Training requirements.
Additional information regarding confined space entry is contained in Chapter 13.
1.2.14. Spill Containment
The spill containment program provides procedures to contain and isolate the entire volume of a
hazardous substance spill and minimizes worker exposure to hazardous substance spills.
The spill containment program to be included in the site-specific HASP shall, at a minimum,
address:
• Initial spill actions and response,
• Spill cleanup procedures,
• Organization of the response team, and
• Post-incident review and evaluation.
Additional information on spill containment is contained in Chapter 14.
1.3. REFERENCES
1. U.S. EPA 1984 Standard Operating Safety Guides. Office of Emergency and Remedial
Response, Hazardous Response Support Division, Edison, N.J. November, 1984.
2. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
3. 29 CFR 1910.146, Permit Required Confined Spaces.
4. American National Standards Institute (ANSI) Recommendation Z117.1-1989, Safety
Requirements of Confined Spaces.
5. 29 CFR 1910.38, Employee Emergency Plans and Fire Prevention Plans.
6. Whitfield, P., EM-40 Hazardous Materials Training Program, memorandum of
February 3, 1994.
7. Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities,
NIOSH/OSHA/USCG/EPA, October 1985 (Four-Agency Document).
DOE-EM-STD-5503-94
1-9
8. DOE Order 5480.1B, Environment, Safety, and Health Program for Department of Energy
Operations.
9. DOE Order 5483.1A, Occupational Safety and Health Program for DOE Contractor
Employees at Government-Owned Contractor Operated (GOCO) Facilities.
DOE-EM-STD-5503-94
1-10
Section 16
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
2-1
2.0. KEY PERSONNEL
2.1. BACKGROUND
This chapter provides guidance to assist in the preparation of the Key Personnel portion of the
site-specific HASP. In this section, the HASP should:
• Identify an individual who has the authority to direct all activities;
• Identify the other personnel needed for the project and assign their general functions and
responsibilities;
• Show lines of authority, responsibility, and means of contact; and
• Identify the interface with the response community.
2.2. ORGANIZATIONAL STRUCTURE
The HASP should specifically identify the names and organizational relationships among the
DOE, contractor, and subcontractor key personnel, such as the Project Manager, Field Team
Leader, and Site Safety and Health Officer (SSHO). Designated alternates for the key personnel,
responsibilities, lines of authority, methods of communication, and an organizational structure
should be identified. If specific key job responsibilities listed in this chapter are not needed, or
more than one function is to be performed by a person, those responsibilities should be addressed
in the HASP.
During the first stages of planning, an organizational structure that supports the overall objectives
of the project should be developed. An explanation of the structure including the chain of
command and overall responsibilities of supervisors and employees in carrying out the health and
safety program should be included in the HASP. An organizational chart should be developed
depicting the structure and identifying all key personnel and other onsite and offsite personnel (see
Figure 2-1). The chart should be placed in a central location, and included in the HASP. At a
minimum, the organizational chart should include the Project Manager, the SSHO, the Field Team
Leader, the Command Post Supervisor, the Decontamination Station Officer(s), site security, and
the specialty team. In addition, it is recommended that a list of DOE and contractor personnel
and a list of offsite organizations (see Figure 2-2) to be contacted in the event of an emergency be
included with the organizational chart.
As the project progresses, it may be necessary to modify some organizational aspects, such as
personnel responsibilities and authorities, so that individual tasks can be performed as efficiently
and safely as possible. Any changes to the overall organizational structure should be recorded in
the appropriate sections of the HASP that are developed for individual phases or tasks. These
specific changes should be communicated to all parties involved.
DOE-EM-STD-5503-94
FIGURE 2-1
Example of a Health and Safety Plan (HASP) Organizational Structure
2-2
DOE-EM-STD-5503-94
2-3
FIGURE 2-2
Emergency Contact Personnel Names and Phone Numbers
Example Chart
Organization Contact Telephone
Ambulance:
Local Police:
Fire:
State Police:
Hospital (Primary)
Hospital (Secondary)
Poison Control Center:
Regional EPA:
EPA Emergency Response
Team: 908-321-6660
State Authority:
National Response Center: 800-424-8802
Center for Disease Control: 404-488-4100
Chemtrec: 800-424-9555
Site Emergency Operations
Center:
DOE Emergency Operations 202-896-8100
Center (National Center):
DOE-EM-STD-5503-94
2-4
2.3. ONSITE ESSENTIAL PERSONNEL
2.3.1. Project Manager
Section 17
The name and position of the individual who has the authority to direct all activities should be
identified (i.e., Project Manager, Project Team Leader, or Site Supervisor). A designated
alternate for this position should be identified by name. A general description including areas of
responsibility (i.e., assumes total control over site activities, authority to direct response
operations) should be provided for the Project Manager who should be considered an "onsite
essential" person. The specific responsibilities of the Project Manager should be stated. These
responsibilities should include, but are not limited to:
• Management of the project;
• Preparation of the work plan, preparation of the HASP, and designation of the field team;
• Designation of an individual within each project to act as the confined space coordinator;
• Identification of work-site confined spaces;
• Designation of an individual to act as the medical program administrator;
• Access permission for visitors, new hires, etc., and coordinates activities with appropriate
officials;
• Confirmation of each team member's suitability for work based on employees training and
physician's recommendation;
• Briefing field teams on their specific assignments;
• Coordination with the SSHO on safety and health requirements;
• Preparation of the final report and support files on the response activities;
• Liaison with public officials; and
• Maintenance of a daily site log.
2.3.2. Site Safety and Health Officer
The Site Safety and Health Officer (SSHO) should be identified by name for each DOE,
contractor, and subcontractor organization. A designated alternate for each SSHO should be
identified by name. A DOE point of contact, if appropriate, should also be identified. A general
description of duties, including lines of authority (i.e., stop work authority) should be provided.
The SSHO should be an "onsite essential" person. The specific responsibilities of the SSHO
should include, but are not limited to:
• Managing the safety and health program for the site;
• Periodically inspecting protective clothing and equipment;
• Monitoring and evaluating HASP implementation;
• Monitoring protective clothing and equipment to ensure that they are properly stored and
maintained;
• Monitoring entry and exit to the exclusion zone;
DOE-EM-STD-5503-94
2-5
• Verifying each team member's suitability for work based on employee's training and
physician's recommendation;
• Monitoring the work parties for signs of stress, such as cold exposure, heat stress, and
fatigue;
• Advising medical personnel of potential exposures and consequences;
• Participating in the preparation and implementation of the HASP;
• Conducting periodic inspections to verify if the HASP is being properly implemented;
• Verifying that the "buddy" system is being implemented;
• Knowing emergency procedures, evacuation routes, and the telephone numbers of the
ambulance, local hospital, poison control center, fire department, and police department;
• Notifying local public emergency officials when necessary; and
• Coordinating emergency medical care.
2.3.3. Safety and Health Personnel
Names and responsibilities of other personnel that have safety and health duties should be listed.
These should include, but are not limited to:
• Construction safety experts,
• Safety specialists/technicians,
• Health physicists, and
• Industrial Hygienists.
2.3.4. Field Team Leader
Section 18
The individual who is responsible for field team operations and safety should be identified by
name. In some cases, the Field Team Leader may also be the same person as the Project Manager
and may be a member of the specialty team. A designated alternate for the should be identified by
name. A DOE point of contact, if appropriate, should also be identified. A general description,
including areas of responsibility (i.e., responsible for field team operations and safety) should be
provided for the Field Team Leader, who should be considered an "onsite essential" person. The
specific responsibilities of the Field Team Leader should be stated. These responsibilities include,
but are not limited to:
• Managing field operations;
• Executing the work plan and schedule;
• Enforcing safety procedures;
• Coordinating with the SSHO in determining protection levels;
• Enforcing site control;
• Documenting field activities, including sample collection; and
• Serving as liaison with public officials where there is no Public Affairs official
designated.
DOE-EM-STD-5503-94
2-6
2.3.5. Command Post Supervisor
The individual who is responsible for communications and emergency assistance should be
identified by name. In some cases, the Command Post Supervisor may be the same person as the
Field Team Leader. A designated alternate should be identified by name. A DOE point of
contact, if appropriate, should also be identified. A general description, including areas of
responsibility (i.e., responsible for communications and emergency assistance) should be provided
for the Command Post Supervisor, who should be considered an "onsite essential" person. The
specific responsibilities of the Command Post Supervisor should be stated. These responsibilities
should include, but are not limited to:
• Notifying emergency response personnel by telephone or radio in the event of an
emergency;
• Assisting the SSHO in rescue operations, if necessary;
• Maintaining a log of communication and site activities;
• Assisting other field team members in the clean areas, as needed; and
• Maintaining line-of-sight and communication contact with the work parties via walkie-
talkies, signal horns, or other means.
2.3.6. Emergency Response Coordinator
The individual who has the authority to direct, control, and evaluate site emergency
response/emergency activities should be identified. A designated alternate should be identified by
name. A DOE point of contact, if appropriate, should be identified. The Emergency Response
Coordinator should be considered an "on-site essential" person. A general description including
areas of authority and responsibilities should be provided. These responsibilities should include,
but are not limited to:
• Developing, implementing, and updating the emergency response/emergency action plan;
• Conducting rehearsals, employee training, evaluations of responses/actions; and
• Assuring the evacuation, emergency treatment, emergency transport of site personnel and
notifying emergency response units and the appropriate management staff.
2.3.7. Decontamination Station Officer
Section 19
The individual who is responsible for decontamination procedures, equipment, and supplies
should be identified by name. In some cases, the Decontamination Station Officer may be the
same person as the Field Team Leader. A designated alternate should be identified by name. A
DOE point of contact, if appropriate, should also be identified. A general description, including
areas of responsibility (i.e., responsible for decontamination procedures, equipment, and
supplies) should be provided for the Decontamination Station Officer, who should be considered
an "onsite essential" person. The specific responsibilities of the Decontamination Station Officer
should be stated. These responsibilities should include, but are not limited to, the following:
DOE-EM-STD-5503-94
2-7
• Setting up decontamination lines and the decontamination solutions appropriate for the
type of chemical contamination on site;
• Controlling the decontamination of all equipment, personnel, and samples from the
contaminated areas;
• Assisting in the disposal of contaminated clothing and materials;
• Ensuring all required equipment is available and in working order; and
• Providing for collection, storage and disposal of waste.
2.3.8. Security Officer
The individual who is responsible for managing site security should be identified by name.
A designated alternate and DOE point of contact, if appropriate, should be identified by name. A
general description, including areas of responsibility (i.e., maintains site security) should be
provided for the Security Officer, who should be considered an "onsite essential" person.
Specific responsibilities of the Security Officer should be stated. These responsibilities should
include, but are not limited to:
• Conducting routine area patrols,
• Controlling facility access and egress,
• Assisting with communication during an emergency,
• Securing accident/incident scenes, and
• Maintaining a log of site access and egress.
2.3.9. Specialty Teams
Specialty Teams, consisting of field team members (e.g., to include rescue teams for retrieving
personnel from dangerous situations, and sampling teams for obtaining samples of potentially
hazardous materials) who complete the onsite tasks required to fulfill the work plan, should be
identified. A general description, including areas of responsibility and stopwork authority (i.e.,
any or all of the field team may be in the Specialty Team and should consist of at least two
people) should be provided. Specialty Team personnel should be considered "onsite essential"
personnel. Specific responsibilities of the Specialty Teams should be stated. These
responsibilities should include, but are not limited to:
• Safely completing the onsite tasks required to fulfill the work plan,
• Complying with HASP, and
• Notifying the SSHO or supervisor of unsafe or potentially unsafe conditions.
2.4. OPTIONAL PERSONNEL (onsite or offsite as needed)
DOE-EM-STD-5503-94
2-8
2.4.1. Industrial Hygienist
The employee who is trained to anticipate, recognize, evaluate and control environmental factors
or stresses in the workplace, should be identified by name. A qualified and designated alternate
for the Industrial Hygienist should be identified by name.
Specific responsibilities of the Industrial Hygienist should be provided. The responsibilities should
include, but are not limited to:
• Conducting health hazard assessments,
• Providing advice on adequate health protection, and
• Conducting tests to determine worker exposures to hazardous substances.
Section 20
2.4.2. Fire Fighters
The means of contacting the Fire Department should be provided in the document, and this
information should be conspicuously posted at locations throughout the site. Responsibilities of
the fire department should be stated. These responsibilities include, but are not limited to:
• Having Emergency Medical Technicians on response teams,
• Responding to fires that occur on site, and
• Standing by for response to potential fires and performing rescues.
2.4.3. Health Physicist
The individual who is trained in radiation physics (effects, and protection) should be identified
by name. A designated alternate for the Health Physicist should be identified by name. Specific
responsibilities of the Health Physicist, such as evaluating radiation health hazards and
recommending appropriate action, should be stated.
2.4.4. Scientific Advisor
The advisor that guides the Project Manager in technical or scientific matters should be named.
A general description should be provided for the Scientific Advisor (i.e, reports to the Project
Manager, may be located on site or off site). The specific responsibilities of the Scientific
Advisor should be stated. These responsibilities include, but are not limited to:
• Providing advice for field monitoring,
• Sample collection, and
• Remedial plans.
DOE-EM-STD-5503-94
2-9
2.4.5. Logistics Officer
The employee who oversees all logistics for the operation should be named. A general
description should be provided for the Logistics Officer (i.e., reports to the Project Manger, may
be located on site or off site). The specific responsibilities of the Logistics Officer should be
stated. These responsibilities include, but are not limited to the planning and mobilization of the
facilities, materials, and personnel required for the response.
2.4.6. Photographer
The employee who is responsible for all site photography should be named. A general
description should be provided for the Photographer (i.e., reports to the Project Manager, may be
located on site or off site). The specific responsibilities of the Photographer should be stated.
These responsibilities include, but are not limited to, providing photographs of site conditions
and archiving photographs.
2.4.7. Recordkeeper
The employee who oversees all recordkeeping for the operation should be named. A general
description should be provided for the Recordkeeper (i.e, reports to the Project Manager, may be
located on site or off site.) The specific responsibilities of the Recordkeeper should be stated.
These responsibilities include, but are not limited to, maintaining the official records of site
activities.
2.4.8. Public Information Officer
The employee who oversees the release of public information should be named. A general
description should be provided for the Public Information Officer (i.e., reports to the Project
Manager, may be located on site or off site.) The specific responsibilities of the Public
Information Officer should be stated.
2.4.9. Multidisciplinary Advisors
The list and general description of multidisciplinary advisors should be provided. This list
includes representatives from upper level management and onsite management, field team
members, and technical experts. Specific responsibilities should also be stated. These
responsibilities include, but are not limited to, providing advice on the design of the work plan
and the HASP.
2.4.10. Medical Support
Section 21
The general description of the types of medical support personnel required should be provided,
such as consulting physicians, medical personnel at local hospitals and clinics, and ambulance
DOE-EM-STD-5503-94
2-10
personnel. The specific responsibilities of medical support personnel should be stated. These
include:
• Being familiar with the types of materials on site, the potential for worker exposures and
recommending the medical program for the site;
• Providing emergency treatment and decontamination procedures for the specific type of
exposures that may occur at the site; and
• Providing emergency treatment procedures appropriate to the onsite hazards.
2.4.11. Bomb Squad Expert
The general description of this function should be provided (i.e., reports to the Project Manager
when requested to perform site-related functions). The specific responsibilities of the Bomb
Squad Expert should be stated (e.g., providing advice on methods of handling explosive materials
and assisting in safely detonating or disposing of explosive materials).
2.5. COMMUNICATIONS
The site-specific HASP should identify the location of and describe the use of all communication
equipment that could be utilized in an emergency situation (e.g., telephones, radios, PA systems).
The HASP should identify how key personnel and optional personnel can be contacted including
work phone, home phone, radio, etc. Examples are provided in Tables 2-1 and 2-2.
TABLE 2-1
Onsite Essential or Key Personnel
Position Organization or Numbers Alternate or Numbers of Contact or Numbers
Name and Radio Phone Radio Phone DOE Point Radio Phone
Pager (H) & (W) Pager (H) & (W) Pager (H) & (W)
DOE Project Manager
Contractor Project
Manager
Safety & Health Officer
Field Team Leader
Command Post
Supervisor
Decon. Station Officer
Emergency Response
Coordinator
Specialty Team
Security Officer
Other (as appropriate)
DOE-EM-STD-5503-94
2-11
TABLE 2-2
Optional Personnel
Position Name and Organization Phone Numbers Alternate Phone Numbers (H) & (W)
(H) & (W)
Multidisciplinary Advisor
Medical Support Personnel
Bomb Squad Expert
Emergency Response
Center Personnel
Regulatory Specialist
Medical Support Personnel
Contractor S&H Staff
Industrial Hygienist
Fire Fighter
Health Physicist
Scientific Advisor
Logistics Officer
Photographer
Recordkeeper
Public Information Officer
2.6. OTHER SOURCES OF ASSISTANCE
Procedures for contacting the Emergency Response Center should be established and identified.
A general description for contacting the communications personnel other than the Emergency
Response Center, such as Civil Defense organizations, local radio and television stations, and
local emergency service networks, should also be provided. A protocol for contacting the
organizations stated above should be established and stated. The specific responsibilities of the
Emergency Response Center include providing communication with the public in the event of an
emergency and providing communication links for mutual aid.
Other organizations such as Chemtrec, EPA, and the NRC may provide additional assistance and
should be identified. An overview of the services and information available from these
organizations should be provided. Services that may be available include providing advice on
properties of materials, contaminant control materials, dangers of chemical mixtures that may
DOE-EM-STD-5503-94
2-12
Section 22
result from site activities, and providing immediate advice to those at the scene of a chemical or
radiological emergency.
2.7. REFERENCES
1. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
2. Department of Health and Human Services (DHHS) (NIOSH) Publication No. 85-115,
Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities,
NIOSH/OSHA/USCG/EPA, 1985 (Four-Agency Document).
3. EPA 9285.8-01, Health and Safety Plan (HASP) User's Guide, Office of Emergency and
Remedial Response, USEPA, 1992 (and ERT Health and Safety Plan Planner, Ver. 3.0C,
1993).
4. EPA/540/G-89/010, Health and Safety Audit Guidelines, SARA Title I, Section 126, Office
of Emergency and Remedial Response, USEPA, 1989.
5. EPA Publication No. 9285.1-03, Standard Operating Safety Guides, Chapter 8, Office of
Emergency and Remedial Response, USEPA, 1992.
DOE-EM-STD-5503-94
3-1
3.0. HAZARD ASSESSMENT
3.1. BACKGROUND
The overall objectives of the Hazard Assessment chapter are to provide guidance on:
• The development of site-specific procedures designed to effectively identify, assess, and
control site hazards;
• The identification of all onsite operations, jobs and related tasks that are hazardous due to
their inherent characteristics;
• The development of a system for assessing the safety and health hazards identified at the
site;
• The identification and use of engineering and administrative controls, and Personal
Protective Equipment (PPE) to minimize worker exposure to site hazards; and
• The establishment of site-specific hazard control evaluation activities.
Hazards at EM-40 sites pose a multitude of safety and health concerns. The hazards are a
function of the nature of the site and the work being performed. Examples of such hazards
include, but are not limited to:
• Chemical exposure (irritation, organ/tissue damage, and central nervous system
depression);
• Radioactive exposure (tissue damage or cancer);
• Safety/Construction hazards (fire and explosion, excavating/trenching, electrical hazards,
and slip/trip/fall);
• Machinery (rotating, crushing, digging and drilling);
• Transportation (accidents, spills);
• Biological hazards (poisonous plants, animals, snakes, insects, and pathogens);
• Physical hazards (noise, eyes, feet, head, oxygen deficiency, temperature extreme stress-
heat stress/cold exposure);
• Weather (ice/mud/flooding, high winds, tornados, hurricanes, electrical storms);
• Confined spaces (oxygen deficiencies, chemical exposure hazards);
• Ergonomic/Repetitive motion (back injuries, carpal tunnel syndrome);
• Asbestos (asbestosis, mesothelioma);
• Material handling (storage, housekeeping).
Due to the nature of a hazardous waste site, these hazards may be severe, and may occur in a
large variety of forms and locations. Their recognition and evaluation is necessary for planning
and managing operations at a site.
DOE-EM-STD-5503-94
3-2
Hazard assessment, the process of identifying and evaluating the hazards associated with
operational activities, can be divided into four broad, interacting categories or elements:
• Selection of the operation or job to be assessed,
• Breakdown of the operation or job into constituent tasks,
• Identification of hazards associated with each task, and
• Determination of the necessary hazard controls.
Section 23
To effectively manage hazardous activities and substances, and to assure worker safety and
health, site personnel should understand the processes to be used to develop each of these
elements. As new hazards in the workplace are identified and assessed, hazard controls should
be implemented, and as improved hazard abatement methodologies and hazard controls are
identified, as appropriate, they should be implemented.
Once the hazard assessment is completed, all significant identified hazards should be controlled
as quickly as reasonably feasible.
3.2. HAZARD IDENTIFICATION
Management (DOE and contractor) should provide for the identification of and have an
understanding of the occupational safety and health hazards associated with their programs. This
will enable them to make effective and efficient decisions related to facilities, processes,
procedures, and the allocation of resources to protect the safety and health of workers.
The hazard identification section should contain the process(es) to be used to identify all actual
and potential hazards which exist at the site. The comprehensive workplan, as required by 29
CFR 1910.120(b), and site characterization should be used as a basis for the identification.
Determining present safety and health hazards is important (critical) to the overall evaluation of
remedial action sites. Therefore, each hazard associated with activities to be conducted at these
sites should be identified to ascertain the physical, safety, construction, chemical, radiological,
and other properties which may result in causing harm. These inherent properties establish the
anticipated problems associated with the activity.
Evaluation and identification of hazards should take place:
• Initially, during the site characterization;
• Immediately after initial site entry. The assessment should be a more detailed "real time"
evaluation and used to further define existing site hazards and aid in the selection of
appropriate engineering and administrative controls and PPE;
• Prior to changes in jobs, tasks, and/or processes;
• As required by changing site conditions; and
• Continually, as appropriate.
DOE-EM-STD-5503-94
3-3
Additionally, DOE and contractors should conduct routine compliance inspections of their
worksites and subcontractor worksites to identify new or previously overlooked OSH hazards or
failures to control known hazards.
3.2.1. Hazards List
A list of hazards should be developed which describes:
• Safety hazards associated with the site's operations (e.g., equipment, processes);
• Hazardous substances, radiological hazards, and other health hazards, involved or
expected at the site; and
• Anticipated exposure levels for each job/task.
This list, which uses the information contained in the site characterization and comprehensive
workplan, should identify everything that has the potential for causing injury or illness to
workers.
3.2.1.1. Operations
The hazards list should contain a description of operations, including items such as:
• Type of equipment,
• Activities conducted near hazards, and
• Type and nature of material.
The intent is not to fully describe systems operations nor to provide an operating manual but to
give an overview in relation to hazards, operational events that may "trigger" them, and the
controls that may be needed. Adequate details necessary for later identification of hazards, as
well as the reasonableness of controls, should be presented.
Section 24
Part of the description of the site's operations may involve determining where these operations
are located or performed. Site location may have a strong bearing on the possible impacts a
hazard may have, events that might lead to the actual realization of impacts, or the nature of
controls that may be implemented.
3.2.1.2. Hazardous substances, radiological hazards, and other health hazards
All suspected hazardous substances that may cause injury/illness or that are Immediately
Dangerous to Life or Health (IDLH), or other health hazards that may cause death or serious
harm, should be identified and included in the hazards list. To help identify hazardous materials
which should be considered, the following criteria may be used:
DOE-EM-STD-5503-94
3-4
• Quantity of the hazardous material;
• Type, nature, and form of the hazardous materials (e.g., radioactive, toxicological,
chemical, liquid, or solid);
• Location of the material;
• Conditions under which the material is processed, handled, or stored (e.g. temperature,
pressure, handling systems); and
• Specific hazards associated with the material.
3.2.1.3. Job/Task
Each job and related task should be analyzed to determine the hazards that may be present. For
example: Trenching (job) may require the operation of machinery (task). In addition to the
obvious hazards associated with trenching (e.g., cave-ins), the hazards associated with operation
of the machinery should be assessed. The information obtained from the assessment of site
operations and the identification of hazardous substances should be considered when analyzing
the various tasks at the site. Jobs and their related tasks should form the basis for documenting
the information obtained during the hazard assessment (see section 3.5).
3.3. EXAMPLES OF HAZARD ASSESSMENT METHODS
Many techniques are available in the literature for performing hazard assessments. A list of
several methods that can be used for the assessment of identified hazards and subsequent
assignment of risk significance are contained in Appendix E.
3.4. HAZARD CONTROL
The most efficient way to protect workers from workplace hazards is to first remove obvious
hazards that can be eliminated without significant effort. Within the scope of clean-up activities,
this can sometimes be difficult, since the objective of these activities is the actual removal of
hazards.
Hazards should be controlled by the following hierarchy of methods:
• Engineering controls;
• Work practices and administrative controls, except where prohibited by standards, orders
or regulations; and
• PPE.
Often, physical hazards discovered through preliminary evaluations and site/facility
walkthroughs can be eliminated without significant effort or cost. These hazards should be
removed to the extent possible before actual work at the site begins. Examples of ways to
eliminate physical hazards associated with the site include:
DOE-EM-STD-5503-94
3-5
• Removing of unnecessary debris;
• Guarding exposed electrical wiring, or sharp or protruding objects;
• Securing objects near elevated surfaces and combustible materials; and
• Eliminating slippery surfaces, dangerous flooring, and uneven terrain.
Hazards that cannot be readily eliminated should be properly controlled through engineering
and/or administrative means. The primary objective of these controls is to reduce worker
exposure to safe levels, thereby avoiding the need for PPE.
3.4.1. Engineering Controls
Section 25
Hazards subject to engineering controls generally include those which present a high potential
for illness or injury to workers. These hazards present levels of concern in the following areas:
• Frequency of hazard (i.e., how often such a hazard is likely to occur at the work site);
• Effect of hazard (i.e., whether exposure to such a hazard would result in an injury or
illness);
• Extent of injury or illness resulting from the hazard; and
• Range of effect of the hazard.
Engineering controls, such as radiation shielding, are intended to address major hazards and are
the preferred control method. These controls consist primarily of systems which are necessary to
reduce worker exposure and prevent propagation of contaminants to "clean" areas. Other
examples of engineered controls include process enclosures maintained at negative pressure with
High Efficiency Particulate Air (HEPA)-filtered ventilation and surface water drainage systems.
Protection of the public though engineered controls should also take into consideration the safety
and health of workers. For example, when designing or selecting systems for mitigating
dispersal of contaminants to outside areas, attention should also be given to effects on workers
within the contaminated zone. Area enclosures can concentrate airborne contaminants if not
properly ventilated.
3.4.2. Administrative Controls
The purpose of administrative controls is to encourage safe work practices. This is first
accomplished by controlling the movement of personnel within hazardous areas. Establishment
and demarkation of exclusion areas and physical access controls will prevent workers from
unnecessarily entering hazardous areas. These controls should also include operating procedures
and training programs which address safety precautions to be followed by workers when working
in hazardous areas. Workers should be certified for the particular equipment they are operating.
It should be noted that some standards prohibit the use of administrative controls as a means for
controlling a hazard.
DOE-EM-STD-5503-94
3-6
3.4.3. Personal Protective Equipment (PPE)
PPE is a common method used in hazard control. Therefore, an entire chapter has been devoted
to this topic. Please refer to Chapter 5 for further guidance on this subject.
3.5. HAZARD ASSESSMENT DOCUMENTATION FORMAT
The information obtained during the Hazard Assessment should be documented in a manner that
readily identifies: the hazards associated with the task, and the controls required to safely carry
out the task. Table 3-1 provides a sample format for documenting the findings of a hazard
assessment. In the sample, the job has been broken down into the various tasks (e.g., set up
equipment, install ladder in tank) required to complete the job. Each hazard associated with a
given task has been identified, and the required control measures are specified.
TABLE 3-1
Sample Hazard Assessment: Cleaning the Inside Surface of a Chemical/Radioactive
Contaminated Tank – Top Manhole Entry
Step Hazard Controls
1. Select and train Operator respiratory or heart problems; other Examination by industrial physician for suitability to work.
operators. physical limitation.
Untrained operator; failure to perform task. Occupational Safety and Health (NIOSH) Doc. #80-406)
Train operators. Dry run. (Reference: National Institute for
2. Empty Tank Gas or liquid in tank. Approved written operating procedures.
Improper valve line-up. Empty tank through existing piping.
Section 26
3. Assess conditions: Explosive gas. Obtain work permit signed by safety and maintenance supervisors.
determine what is in the
tank, what process is Improper oxygen level. Test air by qualified person.
going on in the tank, and
what hazards these pose. Chemical exposure. Ventilate to 19.5% - 23.5% oxygen and less than 10% LEL of any
Gas, dust, vapor: then ventilating, as previously described, may be required.
irritant
toxic Provide appropriate respiratory equipment - SCBA or air line
Liquid: respirator.
irritant
toxic Provide protective clothing for head, eyes, body and feet.
corrosive
Solid: Provide parachute harness and lifeline. (Reference: OSHA
irritant standards 1910.106, 1926.100, 1926.21(b)(6); NIOSH Doc. #80-
corrosive 406)
Radiological exposure, ingestion, contact. Tanks should be cleaned from outside if possible.
NOTE: This column should contain specific Provide PPE as stated in RADCON Manual.
information about the material to be
encountered, i.e., chemical/radioactive material ALARA
name, quantity, anticipated length of exposure,
etc.
flammable gas. Steaming inside of tank, flushing and draining,
DOE-EM-STD-5503-94
TABLE 3-1
Sample Hazard Assessment: Cleaning the Inside Surface of a Chemical/Radioactive
Contaminated Tank – Top Manhole Entry
Step Hazard Controls
3-7
4. Stage equipment. Slips/trips/falls. Provide ladders, harness, railings. (OSHA CFR 1910)
Heavy equipment operations. Trained equipment operators.
5. Set up equipment. Electrical hazards, motors not locked out and Arrange hoses, cords, lines and equipment in orderly fashion, with
tagged. room to maneuver safely.
Heavy equipment operations. Use ground-fault circuit interrupter.
Trip or fall. Have lockout and tag procedures.
Install blanks in flanges in piping to tank. (Isolate tank.)
Follow hoisting and rigging requirements.
Use mechanical-handling equipment.
Provide guardrails around work positions at tank top.
Provide lighting for tank (Class 1, Div. 1).
6. Prepare to enter tank. Gas or liquid in tank. Review emergency procedures.
Training.
Open tank.
Contamination control.
Perform a check of job site by industrial hygienist or safety
professional.
Test atmosphere in tank by qualified person (long probe).
DOE-EM-STD-5503-94
TABLE 3-1
Sample Hazard Assessment: Cleaning the Inside Surface of a Chemical/Radioactive
Contaminated Tank – Top Manhole Entry
Step Hazard Controls
3-8
7. Enter tank. Gas or liquid in tank. Provide personal protective equipment for conditions found.
Explosive gas. CFR 1910.134)
Improper oxygen level. Provide outside helper to watch, instruct and guide operator
Chemical exposure. emergency.
Gas, dust, vapor:
irritant
toxic
Liquid:
irritant
toxic
corrosive
Solid:
irritant
corrosive
Radiological exposure,ingestion, contact.
Exposure to hazardous atmosphere.
Tripping hazard.
NOTE: This column should contain specific
information about the material to be
encountered (e.g., chemical/radioactive material
name, quantity, anticipated length of exposure).
(Reference: RADCON Manual, NIOSH Doc. #80-406; OSHA
entering tank, with capability to lift operator from tank in
8. Clean tank. Chemical/radiological exposure internal and Provide protective clothing and equipment for all operators and
external. helpers.
Heat Stress. Provide exhaust ventilation (contamination control).
Failure of life support. Provide air supply to interior of tank.
Exhaustion. Continuous monitoring of air in tank for radioactivity and oxygen
Section 27
Reaction of chemicals/radioactive material,
causing mist or expulsion of air contaminant. Replace operator or provide rest periods.
concentration.
Provide means of communication to get help, if needed.
Provide two-man standby for any emergency.
DOE-EM-STD-5503-94
TABLE 3-1
Sample Hazard Assessment: Cleaning the Inside Surface of a Chemical/Radioactive
Contaminated Tank – Top Manhole Entry
Step Hazard Controls
3-9
9. Cleanup/ Handling of equipment, causing injury. Dry run.
Decontamination.
Spread of Contamination. Follow Decon procedures in RADCON Manual.
Use material-handling equipment.
3.6. REFERENCES
1. 29 CFR 1910, Occupational Safety and Health Standards.
2. 29 CFR 1926, Safety and Health Regulations for Construction.
3. ACGIH Threshold Limit Values for Chemical Substances and Physical Agents and
Biological Exposure Indices, Latest Edition.
4. DOE Order 5480.1B, Environment, Safety, and Health Program for Department of Energy
Operations.
5. DOE Order 5480.4, Environmental Protection, Safety, and Health Protection Standards.
6. DOE Order 5480.9, Construction Safety and Health Program.
7. DOE Order 5481.1, Environmental Protection, Safety, and Health Protection Information
Reporting Requirements.
8. NIOSH/OSHA Pocket Guide to Chemical Hazards, NIOSH Publication #90-117, 1985.
9. OSHA Chemical Information Manual, ACGIH Publication #0881, 1988.
10. Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities,
NIOSH/OSHA/USCG/EPA, October 1985 (Four-Agency Document).
11. DOE Order 5480.19, Conduct of Operations.
DOE-EM-STD-5503-94
3-10
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
4-1
4.0. TRAINING REQUIREMENTS
4.1. BACKGROUND
The Training Requirements portion of the HASP should cover OSHA training regulations and
training requirements in applicable DOE Orders for personnel working, auditing, touring, and
visiting DOE hazardous waste sites under the cognizance of EM-40. Activities addressed under
these requirements include:
• Environmental Restoration (ER) activities regulated under RCRA corrective action
authority and/or CERCLA;
• Treatment, Storage, and Disposal (TSD) activities regulated under RCRA; and
• Hazardous substance release response activities under Section 303 of the Superfund
Amendments and Reauthorization Act (SARA) of 1986 (Emergency Planning and
Community Right-to-Know Act of 1986, 42 U.S.C. 11003).
Applicable DOE Orders and OSHA regulations should be consulted to ensure full compliance
with all training requirements. However, in some cases, training beyond the requirements of
OSHA is required for certain EM-40 employees and contractor employees (see Appendix D).
The Training chapter has two main objectives. One is to provide the minimum training
requirements (in compliance with 29 CFR 1910.120, DOE Orders, and applicable federal, state,
and local codes and standards) for personnel engaged in the activities listed above. The second is
to recommend personnel not to participate in field activities until appropriately trained.
4.2. GENERAL
Section 28
DOE Order 5480.4 Environmental Protection, Safety, and Health Protection Standards, and
5483.1A Occupational Safety and Health Program for DOE Contractor Employees at
Government-Owned Contractor-Operated Facilities, require both DOE employees and
contractors at DOE-owned contractor-operated facilities to comply with OSHA standards
established in 29 CFR 1910.120. The 29 CFR 1910.120 standards provide regulations to ensure
the safety of employees involved in hazardous waste operations. Subsections (e) and (p) of 29
CFR 1910.120 specify training requirements for all employees who may be exposed to safety or
health hazards at ER sites and RCRA TSD sites respectively. Subsection (q) specifies training
requirements for employees who participate in emergency responses to hazardous substance
releases. This chapter provides the specific training required for EM-40 employees and
contractor employees involved in these types of operations.
EM-40 has adopted, and in some cases exceeded, OSHA training standards for its employees and
contractor employees. All general employees working at ER sites, RCRA TSD sites, and those
responding to hazardous substance releases should receive a minimum of 40 hours of initial
safety and health training and further should receive a minimum of three days (24 hours) of
DOE-EM-STD-5503-94
4-2
appropriately-supervised field (hands-on) experience. EM-40 employees and contractors at the
Headquarters, Field Program, Project Manager, and Supervisor levels are also required to have
40 hours of training. Site supervisors and managers involved in or associated with site-related
activities are required to have the same training and certifications as hazardous waste workers.
In addition, site management personnel are required to have 8 hours of supervisory training.
Training requirements for Visitors/Non-Workers who may require access to ER sites and RCRA
TSD sites are also addressed in this chapter and in Appendix C.
OSHA does not currently certify or accredit training programs. However, a January 26, 1990,
Notice of Proposed Rulemaking addresses accreditation of 29 CFR 1910.120 training programs
for employees covered by 29 CFR 1910.120. It does not address accreditation of training
programs for employees engaged in emergency response activities. Until this proposed
regulation becomes a final rule, employers should assess the adequacy of training programs
based on training criteria addressed in 29 CFR 1910.120(e)(2).
Training documentation should be maintained in accordance with DOE Order 5480.20 and DOE
Order 1324.2A and applicable OSHA Standards.
4.3. TRAINING REQUIREMENTS FOR PERSONNEL AT ER SITES
Training requirements for DOE employees and contractor employees are summarized in Table 4-
1. Personnel should be prohibited from participating in field activities until appropriately
trained.
The terms "installation," "facility," and "site" are defined in the Glossary, (Appendix A), and
graphically depicted in Figure 4-1. Some facilities may contain a number of individual sites
which, in turn, can be linked through a facility-wide integrator site.
4.4. TRAINING REQUIREMENTS FOR PERSONNEL AT RCRA TSD SITES
The training requirements for personnel at RCRA TSD sites are summarized in Table 4-2.
Personnel should be prohibited from participating in RCRA TSD sites activities until appropriate
training has been received.
4.5. TRAINING REQUIREMENTS FOR PERSONNEL CONDUCTING EMERGENCY
RESPONSES TO HAZARDOUS SUBSTANCE RELEASES
Section 29
Table 4-3 summarizes the minimum training requirements for personnel conducting emergency
responses to hazardous substance releases.
DOE-EM-STD-5503-94
FIGURE 4-1
EM-40 Definitions and Graphic Depictions of Installation, Facility, and Site
INSTALLATION: Any DOE Property (i.e., “inside the fence.”)
EM-40 FACILITY: Any DOE installation or portion of an installation operated, funded
or otherwise controlled by EM-40.
SITE: An area where physical work is being performed, including TSD Operations,
where the potential of exposure to contaminants exists, which requires the use of chemical
protective clothing and/or radiological protective clothing and/or respirators.
4-3
DOE-EM-STD-5503-94
TABLE 4-1
Minimum Training Requirements for Personnel Engaged at EM-40 Sites
4 - 4
DOE-EM-STD-5503-94
TABLE 4.1 (Cont.)
Minimum Training Requirements for Personnel Engaged at EM-40 Sites
4-5
DOE-EM-STD-5503-94
TABLE 4-2
Minimum Training Requirements for Personnel Engaged at RCRA TSD Sites
1
This training is required for all EM-40 employees and EM-40 contractors (See Appendix D )
2
This training is required for all visitors/non-workers who enter the TSD site where Levels A, B, or C PPE is required This training is not required for
visitors/non-workers who only enter the TSD site where either Level D or no PPE IS required. (See Appendlx D.)
3
The supervisor training iS required for these Individuals only if they act in a supervisory capacity or are the designated alternate for a supervisory position.
4-6
DOE-EM-STD-5503-94
TABLE 4-3
Minimum Training Requirements for Personnel Engaged in EM-40 Emergency Responses
at Hazardous Substance Releases
1
2
This training requirement, which exceeds the OSHA requirements at all levels, must be met by all EM-40 employees and
contractor employees engaged in emergency responses to hazardous substance releases.
EM-40 employees or contractors classified as First Responders at the Awareness Level will have 24 hours of HAZWOPER
training. First Responders at the Awareness Level take no action beyond notifying appropriate authorities of the release. (See
Appendix D.)
4 - 7
DOE-EM-STD-5503-94
4-8
4.6. REFERENCES
1. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
2. 29 CFR 1910.1200, Hazard Communication.
3. 40 CFR 264.16, Standards for Owners and Operators of Hazardous Waste Treatment,
Storage, and Disposal Facilities - Personnel Training.
4. 40 CFR 265.16, Interim Status Standards for Owners and Operators of Hazardous Waste
Treatment, Storage, and Disposal Facilities - Personnel Training.
5. 40 CFR 300.150, National Oil and Hazardous Substances Pollution Contingency Plan -
Worker Health and Safety.
6. 55 FR 2776, Notice of Proposed Rulemaking, Accreditation of Training Programs for
Hazardous Waste Operations (29 CFR 1910.121), January 26, 1990.
7. DOE Order 3790.1B, Federal Employees Occupational Safety and Health Program.
8. DOE Order 5000.3B, Occurrence Reporting and Processing of Operations Information.
9. DOE Order 1324.2A, Records Disposition.
10. DOE Order 5480.4, Environmental Protection Safety, and Health Protection Standards.
11. DOE 5480.20, Personnel Selection, Qualifications, Training, and Staffing Requirements at
DOE Reactor and Non-Reactor Nuclear Facilities, February 20, 1991.
12. DOE Order 5480.11, Radiation Protection for Occupational Workers.
13. DOE Order 5483.1A, Occupational Safety and Health Program for DOE Contractor
Employees at Government-Owned Contractor-Operated Facilities.
Section 30
14. DOE EH-0227P, OSHA Training Requirements for Hazardous Waste Operations, Office of
Environmental, Safety and Health, USDOE, 1991.
15. DOE EH-0256T, USDOE Radiological Control Manual, Office of Environmental, Safety
and Health, USDOE, 1992.
DOE-EM-STD-5503-94
4-9
16. DOE Memorandum from EH-40 to Under Secretary dated January 5, 1993, Implementation
of Section 3131 of the National Defense Authorization Act for Fiscal Years 1992 and 1993,
Public Law 102-190, (discusses the NIEHS hazardous materials training program).
17. DOE Memorandum from EM-40 to distribution dated February 3, 1994, Hazardous
Materials Training Program.
18. DOE Memorandum from EM-40 to EM-42, EM-43, EM-44, and EM-45 dated June 10,
1993, Hazardous Materials Training Program.
19. DOE Memorandum from EM-40 to Distribution dated August 30, 1993, Hazardous
Materials Training Program.
20. EPA/540/G-89/010, Health and Safety Audit Guidelines, SARA Title I, Section 126, Office
of Emergency and Remedial Response, USEPA, 1989.
21. EPA Publication No. 9285.1-03, Standard Operating Safety Guides, Office of Emergency
and Remedial Response, USEPA, 1992.
22. NIEHS Memorandum addressing DOE adoption of OSHA standards for training EM-40
employees and EM-40 contractor employees and supervisors, NIEHS, Research Triangle
Park, NC, February 12, 1993.
23. Department of Health and Human Services (DHHS) (NIOSH) Publication No. 85-115,
Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities,
NIOSH/OSHA/USCG/EPA, 1985 (Four-Agency Document).
24. OSHA 2254 (Revised), Training Requirements in OSHA Standards and Training
Guidelines, OSHA, 1992.
25. Superfund Amendments and Reauthorization Act of 1986 (SARA), Section 126, (Pub.L. 99-
499).
DOE-EM-STD-5503-94
4-10
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
5-1
5.0. PERSONAL PROTECTIVE EQUIPMENT
5.1. BACKGROUND
The purpose of personal protective clothing and equipment (PPE) is to shield or isolate
individuals from the chemical, physical, radiological, and biological hazards that may be
encountered at a hazardous waste site when engineering and other controls are not feasible or
cannot provide adequate protection. Careful selection and use of adequate PPE should protect
the health of EM-40 employees.
No single combination of PPE is capable of protecting against all hazards. Therefore, PPE
should be used in conjunction with, not in place of, other protective methods, such as
engineering controls and safe work practices. A written PPE program, as required by 29 CFR
1910.120(g)(5) should be in place at all EM-40 hazardous waste sites. The effectiveness of the
PPE program should be evaluated regularly. The use of PPE can itself create significant worker
hazards, such as heat stress, physical and psychological stress, impaired vision, reduced mobility,
and distorted communication. In general, the higher the level of PPE protection, the greater are
the risks associated with use of PPE. For any given situation, PPE should be selected to provide
an adequate level of protection. Over-protection as well as under-protection can be hazardous
and should be avoided.
The overall objectives of this chapter are:
• To describe the PPE program that will provide EM-40 hazardous waste site workers with
protection from chemical, physical, biological and radiological hazards;
• To comply with applicable DOE and regulatory requirements; and
• To establish the selection, use, upgrade/downgrade, and training requirements for the PPE
Section 31
program.
5.2. GENERAL PROVISIONS
Personal protective equipment should be utilized when:
• It is not possible and/or feasible to implement engineering controls and work practices
that will ensure the safety and health of workers;
• It is necessary to reduce and maintain employee exposure to below the permissible
exposure limits (PELs) in 29 CFR 1910, Subparts G and Z, and/or below the threshold
limit values (TLVs) established by the American Conference of Governmental Industrial
Hygienists (ACGIH); or in the absence of PELs or TLVs, below the recommended
exposure limits published in the National Institute for Occupational Safety and Health
(NIOSH) publication, NIOSH Recommendations for Occupational Health Standards
dated 1992;
DOE-EM-STD-5503-94
5-2
• Handling radiological materials with removable contamination in excess of levels
established in the DOE Radiological Control Manual, or manuals implementing these
requirements, or when working in radiologically controlled areas in which PPE
requirements have been established; or
• Existing or potential physical and/or biological hazards pose a threat to worker safety and
health.
Required PPE should be discussed with site workers prior to the start of work. Employees
should be trained and have passed a baseline medical examination for the use of prescribed PPE.
The HASP should implement a written PPE program containing operating procedures that
comply with the applicable requirements of 29 CFR 1910.120, DOE 5480.4, and the DOE
Radiological Control Manual. If such a written PPE program consistent with those requirements
is not already in place, written procedures and requirements for the use of PPE should be
included in the HASP.
5.3. SELECTION OF PERSONAL PROTECTIVE EQUIPMENT (PPE)
Selection of PPE, based on requirements of 29 CFR 1910 and applicable DOE Orders, is key to
protecting the safety and health of site personnel. This should be done by qualified and
knowledgeable professionals to insure that selected PPE protects workers from site-specific
hazards posed by their task and work zone.
The use, maintenance and disposal of radiological PPE is governed by the DOE Radiological
Control Manual.
Selection of the most appropriate level of protection and combinations of respiratory protection
and protective clothing will depend on:
• Level of knowledge of onsite chemical and radiological hazards;
• Properties such as toxicity, radioactivity, route of exposure, and matrix of the
contaminants known or suspected of being present;
• Type and measured concentrations of the contaminants that are known or suspected of
being present;
• Potential for exposure to contaminants in air, liquids, soils, or by direct contact with
hazardous materials;
• Physical hazards;
• Climatic conditions; and
• Biological hazards.
Based on the evaluation of potential hazards that will vary with individual field activities, PPE
should be selected for specific tasks and work areas (e.g., Exclusion Zone, Contamination
Reduction Zone). The specific PPE required for each work area and/or task should be
DOE-EM-STD-5503-94
5-3
determined and listed by a qualified (preferably certified) industrial hygienist in consultation
with a qualified (preferably certified) health physicist.
Section 32
The industrial hygienist, in coordination with the health physicist, should provide a listing of the
chemicals/radioactive materials and corresponding types and/or characteristics of protective
clothing (e.g., material or brand name). This list should be referred to when hazardous materials
may be encountered to determine appropriate chemical/radiological resistant PPE. The industrial
hygienist should specify the type of cartridges to be used and the frequency with which the
cartridges should be changed, along with information on any limitations or restrictions for use,
when air-purifying respirators are determined to be appropriate.
Personal protective equipment is divided into two broad categories; respiratory protective
equipment and personal protective clothing. Both of these categories are incorporated into the
four levels of protection (Levels A, B, C, and D), based on the potential severity of the hazard.
The following sections provide detail and explanation of those categories. Modifications to these
levels should be made under the direction of the Site Safety and Health Officer (SSHO) in
consultation with a qualified industrial hygienist and/or health physicist. Such modifications are
routinely employed during site work activity to maximize efficiency and to meet site-specific
needs without compromising worker safety and health. The SSHO and Project Manager should
make the final determination on the appropriate level of PPE.
Respiratory protective gear and protective clothing should compliment one another. Section
5.5.1. provides guidelines for determining appropriate PPE.
5.4. LEVELS OF PPE
The specific levels of PPE and necessary components for each level have been divided into four
categories according to the degree of protection afforded. General guidelines for use are:
Level A: Worn when the highest level of respiratory, skin, and eye protection is needed.
Level B: Worn when the highest level of respiratory protection is needed, but a lesser level
of skin protection is needed.
Level C: Worn when the criteria for using air-purifying respirators are met, and a lesser
level of skin protection is needed.
Level D: Refers to work conducted without respiratory protection. This level should be
used only when the atmosphere contains no known or suspected airborne
chemical or radiological contaminants and oxygen concentrations are between
19.5%, and 23%.
The following section describes the elements of the basic levels of protective equipment.
DOE-EM-STD-5503-94
5-4
5.4.1. Level A PPE
5.4.1.1. Respiratory Protection
Level A respiratory protection is positive pressure, full face-piece self-contained breathing
apparatus (SCBA), or positive pressure supplied air respirator (with escape bottle for
immediately dangerous to life or health (IDLH) or potential IDLH atmosphere).
5.4.1.2. Protective Clothing
Protective clothing provides maximum skin protection. It is used when the potential exists for
splash or immersion by chemicals and/or radiologically contaminated liquids, or for exposure to
vapors, fumes, gases, or particulates that are harmful to skin or capable of being absorbed
through the skin. This class of protection is acceptable for radiological work activities
categorized as "High" involving pressurized or large volume liquids, or closed system breach
(see DOE Radiological Control Manual). Level A protective clothing includes:
Section 33
• Totally encapsulating non-permeable, chemical-resistant suit;
• Coveralls inner suit;
• Modest clothing under coveralls (e.g., shorts and T-shirt/long underwear);
• Disposable gloves and boot covers (worn over fully encapsulating suit);
• Boots, chemical-resistant, steel toe and shank (depending on suit construction, worn
over or under suit boot);
• Hard hat (under suit); and
• Hearing protection (as needed).
5.4.1.3. Other Protective Apparatus
Other protective apparatus which may be used includes:
• Cooling unit/system,
• 2-way radio communications,
• Cold weather gear/clothing, and
• Protection from biological hazards/pests.
5.4.2. Level B PPE
5.4.2.1. Respiratory Protection
Level B respiratory protection is positive pressure, full face-piece self-contained breathing
apparatus (SCBA), or a positive pressure supplied air respirator (with escape bottle for
immediately dangerous to life or health (IDLH) or potential IDLH atmosphere).
DOE-EM-STD-5503-94
5-5
5.4.2.2. Protective Clothing
Level B protective clothing provides a high level of skin protection. It is used when the potential
exists for contact with chemicals and/or radiologically contaminated liquids that could
saturate/penetrate cloth coveralls (e.g., immersion or inundation of contaminants). Also,
potential vapors, fumes, gases, or dusts containing levels of chemicals harmful to skin or capable
of being absorbed through the skin are not anticipated. This class of protection is acceptable for
radiological work activities categorized as "High" involving pressurized or large volume liquids,
or closed system breach (see DOE Radiological Control Manual). Level B protective clothing
includes:
• Hooded one-piece non-permeable, chemical resistant outer suit;
• Coveralls inner suit(s);
• Modest clothing under coveralls (e.g., shorts and T-shirt/long underwear);
• Outer chemical resistant work gloves (rated for contaminants) taped to outer suit;
• Inner gloves of light weight PVC or latex rubber taped to inner suit (cotton liners
optional);
• Chemical resistant steel-toe boots taped to inner suit;
• Disposable outer boot covers (booties) taped to outer suit;
• Hard hat (as needed); and
• Hearing protection (as needed).
5.4.2.3. Other Protective Apparatus
Other protective apparatus which may be used includes:
• Cooling unit/system,
• Cold weather gear/clothing, and
• Protection from biological hazards/pests.
5.4.3. Level C PPE
5.4.3.1. Respiratory Protection
Level C respiratory protection includes an air-purifying respirator, full-face or half-mask,
cartridge- or canister-equipped (MSHA/NIOSH approved).
5.4.3.2. Protective Clothing
Level C protective clothing provides a moderate level of skin protection. It is used when the
potential exists for contact with chemicals and/or radiologically contaminated materials, but
when protection from liquids (chemical and/or radioactive) is not required. It is used when
potential vapors, fumes, gases, or dusts are not suspected of containing levels of chemicals
DOE-EM-STD-5503-94
5-6
harmful to skin or capable of being absorbed through the skin. This class of protective clothing is
appropriate for most routine radiological work activities (see DOE Radiological Control
Manual). Level C protective clothing includes:
Section 34
• Coveralls (Radiological Control Manual),
• Modest clothing under coveralls (e.g., shorts and T-shirt/long underwear),
• Rubber/chemical resistant outer gloves rated for contaminant,
• Inner gloves of light weight PVC or latex rubber,
• Safety glasses or safety goggles (not required with full face respirator),
• Face-shield if splash hazard exists (not required with full face respirator),
• Steel-toe rubber boots,
• Outer disposable booties,
• Hood may be required for radiological work. (See DOE Radiological Control Manual),
• Hard hat (as needed), and
• Hearing protection (as needed).
5.4.3.3. Other Protective Apparatus
Other Level C protective apparatus which may be used includes:
• Cooling unit/system,
• Cold weather gear/clothing, and
• Protection from biological hazards/pests.
5.4.4. Level D PPE
5.4.4.1. Respiratory Protection
There is no Level D PPE required for respiratory protection due to the nature of the hazard.
5.4.4.2. Protective Clothing
Level D protective clothing provides a low level of skin protection. It is used when there is no
potential for contact with hazardous levels of chemicals or radiological contamination. This
level should not be worn in the Exclusion Zone or the Contamination Reduction Zone. Oversight
personnel not in zoned areas, as well as site visitors, may be required to wear Level D modified
PPE.
Level D protective clothing includes:
• Coveralls,
• Modest clothing under coveralls,
• Work gloves where appropriate,
DOE-EM-STD-5503-94
5-7
• PVC or latex rubber surgical/light weight gloves when sampling or handling any
potentially contaminated surface or item,
• Safety glasses or safety goggles,
• Steel-toe rubber boots where wet decontamination methods are required or steel-toe
leather boots and outer boot covers, and
• Hard hat.
5.4.4.3. Other Protective Apparatus
Other Level D protective apparatus which may be used include:
• Cold weather gear/clothing,
• Protection from biological-hazards/pests, and
• Hearing protection.
5.5. USE OF PPE
Written site operating procedures for the use of PPE should include:
• Training;
• Establishing work mission duration;
• Personal use factors;
• Fit testing;
• Donning and doffing;
• In-use monitoring of personnel/equipment;
• Inspection before, during, and after use;
• Storage and maintenance;
• Upgrading/downgrading of PPE; and
• Decontamination and disposal.
These procedures should be referenced and/or included in the HASP.
No changes to the specified levels of protection should be made without the approval of the
SSHO and the Project Manager. A list of approval steps for upgrade/downgrade of PPE should
be included that specifically include the SSHO and Project Manager as key to the approval
process.
5.5.1. PPE Selection Process
Sequential steps to facilitate the selection of PPE for hazardous waste site operations are:
1. Identify work area and job-specific hazard potential (e.g. chemical, radiological, physical,
mechanical),
DOE-EM-STD-5503-94
5-8
2. Determine type of exposure for the work areas and specific work activities,
3. Determine level of respiratory protection for the work areas and specific work activities (see
Section 5.4),
3a. Select the respirator cartridge(s) for Level C,
4. Determine level of protective clothing for the work areas and specific work activities (see
Section 5.4),
4a. Evaluate the chemical resistant characteristics needed for the potential exposures and select
clothing with the appropriate protection factor,
Section 35
5. Evaluate potential physical hazards associated with the work areas and specific work
activities (e.g., walking/working surfaces, electrical installations/lines, noise exposure) and
select PPE to mitigate identified hazards,
6. Consider climatic conditions and select PPE to accommodate the conditions (e.g., cooling
units, insulated clothing/footwear),
7. Evaluate potential biological hazards (e.g., snakes, insects) and select PPE to mitigate
identified hazards, and
8. Evaluate type and level of work (e.g. heavy, moderate, light) and select PPE for the work,
9. Evaluate PPE for both chemical and radiological hazards when mixed waste is involved.
Table 5-1 presents the level of protection required for respiratory PPE, based on specific hazards.
Table 5-2 presents the level of PPE based on specific hazards for selection of protective clothing.
DOE-EM-STD-5503-94
5-9
TABLE 5-1
Respiratory PPE Selection
Hazard Level of Protection
Immediately Dangerous to Life or Health. Gaseous A, B
and/or Particulate. Radioactive and/or Chemical.
Not Immediately Dangerous to Life or Health. C
Particulate. Radioactive and/or Chemical. High efficiency respirator cartridge.
Not Immediately Dangerous to Life or Health. Gases C
or Vapors. Radioactive and/or Chemical. Respirator cartridge rated for isotope or chemical
concentration.
Not Immediately Dangerous to Life or Health. Gaseous C
and/or particulate. Radioactive and/or Chemical. Combination chemical and high efficiency respirator
cartridge.
TABLE 5-2
Clothing PPE Selection
Hazard Level of Protection
Potential for skin contact with substances with a high degree of hazard to the A
skin.
High potential for splash, immersion, or exposure to unexpected vapors, gases,
fumes or dusts that are harmful to, or readily absorbed by the skin.
High levels of radiological contamination.*
Potential for contact with wet, contaminated surfaces/material that can saturate B
cloth.
Vapors or gases do not contain a high level of chemicals harmful to, or readily
absorbed by, the skin.
Moderate levels radiological contamination.*
Atmospheric contaminants, liquid splashes or other direct contact will not C
adversely affect, or be absorbed by exposed skin.
Low levels of radiological contamination.*
No anticipated immersion, splashes, or potential for unexpected contact with D
hazardous levels of any chemicals or radiological contamination.
* Protective clothing for high, moderate and low radiological contamination roughly corresponds to Levels A, B, C,
and D PPE. However, this may be modified by level of activity and isotope. The appropriate selection should be
made using the DOE Radiological Control Manual.
DOE-EM-STD-5503-94
5-10
5.6. REFERENCES
1. 29 CFR 1910, Subpart G, Occupational Health and Environmental Control.
2. 29 CFR 1910, Subpart Z, Toxic and Hazardous Substances.
3. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
4. 29 CFR 1910.132, Eye and Face Protection.
5. 29 CFR 1910.134, Respiratory Protection.
6. 29 CFR 1910.135, Occupational Head Protection.
7. 29 CFR 1910.136, Occupational Foot Protection.
8. 29 CFR 1910.137, Electrical Protective Devices.
9. American Conference of Governmental Industrial Hygienist (ACGIH), Threshold Limit
Values for Chemical and Physical Agents and Biological Indices, Current edition.
10. American National Standards Institute (ANSI) Z 41.1, Safety Toe Footwear, Current edition.
11. ANSI Z 87.1, Eye and Face Protection, Current edition.
Section 36
12. ANSI Z 88.2, Standard Practices for Respiratory Protection, Current edition.
13. ANSI Z 88.6, Physical Qualifications for Respirator Use, Current edition.
14. ANSI Z 89.1, Safety Requirements for Industrial Head Protection, Current edition.
15. National Institute for Occupational Safety and Health (NIOSH), Recommendations for
Occupational Health Standards, 1986.
16. DOE Radiological Control Manual.
DOE-EM-STD-5503-94
6-1
6.0. TEMPERATURE EXTREME DISORDERS OR CONDITIONS
6.1. BACKGROUND
The primary objective of this section on Temperature Extreme Disorders or Conditions is to
provide the guidance necessary for protection of contractors/employees from the occurrence of
temperature extreme related disorders or conditions. Other objectives are to:
• Provide a description of the overall temperature extreme related disorders or conditions
program,
• Integrate the program with other elements of the HASP, and
• Provide guidance on the proper training levels necessary for operational workers and
supervisors.
The added burden of PPE required for hazardous waste operations in a temperature extreme
condition increases the potential for worker disorders or conditions that can result in injury or
illness. Disorders or conditions associated with work conducted in temperature extreme
conditions can be controlled through proper planning and effective monitoring of personnel.
Factors that could affect a worker's ability to function in extreme temperatures include, but are
not limited to:
• Physical fitness,
• Acclimatization,
• Age,
• Obesity,
• Alcohol consumption,
• Drug use,
• Infections, and
• Disease.
An effective temperature extreme program is a requirement and should be integrated with other
elements of the HASP. Pre-existing health conditions of workers, for example, can be identified
in the medical surveillance program (see Chapter 7). It is necessary to be aware of the potential
occurrence of heat or cold related disorders or conditions in confined space entry or emergency
response operations.
A temperature extreme disorders prevention program should be developed and included in the
site-specific HASP. The following elements should be addressed in the program:
• Identification of potential hazards early in the planning phase of the development and
operation of required contingency plans,
• Proper monitoring of worker physiology,
DOE-EM-STD-5503-94
6-2
• Implementation of preventive measures and Standard Operating Procedures (SOPs) early
in the operations so that sound work practices are developed and followed,
• Proper initial training of workers to recognize the symptoms of temperature extreme
related disorders or conditions in themselves and their fellow workers,
• Implementation of a "buddy system", and
• Proper acclimatization of all workers to new or changing work conditions.
6.2. HEAT STRESS
Increased physical demands on workers occur as a result of increased air temperature and
humidity. Wearing PPE also increases the demands on workers, due to:
• Added weight of the equipment,
• Reduced visibility,
• Reduced mobility,
• Loss of the body's natural cooling processes,
• Increased energy consumption by the body, and
• Lack of sufficient fluid replenishment.
Other factors that influence the occurrence of heat related disorders or conditions include
environmental conditions, clothing, workload, and the individual characteristics of workers.
Workers should be pre-screened prior to beginning operations. Once baseline values are
obtained, they can be used to effectively assess the health of workers during and immediately
after operations (e.g., pulse, blood pressure, body temperature, body weight).
Section 37
Because of the variability of these factors and the compounding effect that each may have on an
individual's health, a physiological monitoring program should be established.
6.2.1. Monitoring
Personnel who are not required to wear PPE are not immune to the potential hazards of heat
related disorders or conditions and should be included in the monitoring program.
The guidance for workers wearing permeable clothing is specified in the current version of the
American Conference of Governmental Industrial Hygienists' (ACGIH) Threshold Limit Values
for Heat Stress. If actual clothing differs from the ACGIH standard ensemble in insulation value
and/or wind and vapor permeability, changes should be made to the monitoring requirements and
work rest period to account for these differences. Table 6-1 provides the suggested frequency of
physiological monitoring for fit and acclimatized workers.
The ACGIH TLV guide contains a separate table for workers wearing semipermeable and
impermeable encapsulating clothing. In these situations, refer to this table.
DOE-EM-STD-5503-94
6-3
TABLE 6-1
Suggested Frequency of Physiological Monitoring for Fit and
Acclimatized Workers
Adjusted Temperature Normal Work Clothing Impermeable Clothing
Calculation
90( F (32.2( C) or above After each 45 minutes of work After each 15 minutes of work
87.5( - 90.0( F After each 60 minutes of work After each 30 minutes of work
(30.8( - 32.2( C)
82.5( - 87.5( F After each 90 minutes of work After each 60 minutes of work
(28.1( - 30.8( C)
77.5( - 82.5( F After each 120 minutes of work After each 90 minutes of work
(25.3( - 28.1( C)
72.5( - 77.5( F After each 150 minutes of work After each 120 minutes of work
(22.5( - 25.3( C)
The following parameters should be used when monitoring workers:
• Heart rate - Count the radial pulse as early as possible in the rest period to ensure a more
accurate reading. If the heart rate exceeds 110 beats per minute at the beginning of the
rest period, shorten the next work cycle by one-third and keep the rest period at the same
length. If, at the end of the following work period, the heart rate still exceeds 110 beats
per minute, shorten the work period again by one-third.
• Oral Temperature - The utilization of oral temperature applies to the time immediately
after the worker leaves the contamination reduction zone. Using a clinical thermometer,
take the temperature for three minutes. If the oral temperature exceeds 99.6( F (37.6(
C), shorten the next work cycle by one-third, without a change to the rest period. If the
oral temperature still exceeds 99.6( F (37.6( C) at the end of the following work period,
shorten the next work cycle by one-third. Do not permit a worker to perform duties
requiring a semipermeable or impermeable garment if the oral temperature exceeds 100.6(
F (38.1( C).
• Ear Canal Readings - Ear canal readings are a valid method to monitor the temperature of
workers who remain in the contamination reduction zone.
• Body Water Loss - Measure body weight to see if enough fluids are being consumed to
prevent dehydration.
DOE-EM-STD-5503-94
TABLE 6-1
Suggested Frequency of Physiological Monitoring for Fit and
Acclimatized Workers
Adjusted Temperature Normal Work Clothing Impermeable Clothing
Calculation
90° F (32.2 C) or above After each 45 minutes of work After each 15 minutes of work
87.5 - 90.0 F After each 60 minutes of work After each 30 minutes of work
(30.8° - 32.2 C)
82.5 -87.5 F After each 90 minutes of work After each 60 minutes of work
Section 38
(28.1° - 30.8° C)
77.5 - 82.5 F After eachl20 minutes of work Afteeach 90 minutes of work
(25.3° - 28. C)
72.5 -77.5 F After eachL50 minutes of work Afteeach120 minutes of work
(22.5° - 25.3 C)
The following parameters should be used when monitoring workers:
Heart rate Count the radial pulse as early as possible in the rest period to ensure a more
accurate reading. If the heart rate exceeds 110 beats per minute at the beginning of the
rest period, shorten the next work cycle by one-third and keep the rest period at the same
length. If, at the end of the following work period, the heart rate st#eds 110 beats
per minute, shorten the work period again by one-third.
Oral Temperature The utilization of oral temperature applies to the time immediately
after the worker leaves the contamination reduction zone. Using a clinical thermometer,
take the temperature for three minutes. If the oral temperature exceedB $9766
C), shorten the next work cycle by one-third, without a change to the rest period. If the
oral temperature still eeeds 99.6F (37.6 C) at the end of the following work period,
shorten the next work cycle by one-third. Do not permit a worker to perform duties
requiring a semipermeable or impermeable garment if the oral temperature exceets 100.6
F (38. C).
Ear Canal ReadingsEar canal readings are a valid method to monitor the temperature of
workers who remain in the contamination reduction zone.
Body Water Loss Measure body weight to see if enough fluids are being consumed to
prevent dehydration.
6-3
DOE-EM-STD-5503-94
6-4
6.2.2. Training
Worker training is an essential element of an effective temperature extreme program. Workers
who are able to identify the symptoms of early heat stress will be able to prevent heat related
disorders or conditions and possible death to themselves and their fellow workers. Workers
should be trained to identify the following symptoms:
• Heat Rash - Caused by continuous exposure to heat or humid air. Can be recognized by
the occurrence of small red pimples on the skin. Typically found in sensitive areas of the
body where the potential for rubbing can occur (e.g., underarm, groin area).
• Heat Cramps - Caused by heavy sweating and inadequate electrolyte replacement. Signs
to look for include muscle spasms and pain in the extremities, such as hands and feet, and
in the abdomen.
• Heat Exhaustion - Caused by increased stress on various parts of the body, including
inadequate blood circulation due to cardiovascular insufficiency or dehydration. Signs to
look for include:
• Pale, cool, moist skin;
• Heavy sweating;
• Dizziness;
• Nausea; and
• Fainting.
• Heat Stroke - This is the most serious of all temperature related disorders or conditions
since temperature regulation fails and the body temperature rises to critical levels.
Immediate action should be taken to cool the body before serious injury or death occurs.
Competent medical help should be obtained. Signs to look for include:
• Red, hot, usually dry skin;
• Lack of or reduced perspiration;
• Nausea;
• Dizziness and confusion; and
• In extreme situations, coma.
6.3. COLD EXPOSURE
Exposure to cold temperatures increases the likelihood and potential for worker disorders or
conditions that could result in injury or illness. Extreme low temperatures may not be the only
element necessary to create the potential for cold exposure disorders or conditions; strong wind
accompanied by cold temperatures can lead to these types of disorders or conditions.
Section 39
DOE-EM-STD-5503-94
6-5
The windchill factor is the cooling effect of any combination of temperature and wind velocity or
air movement. The windchill index (Table 6-2) should be consulted when planning for exposure
to low temperatures and wind. The windchill index does not take into account the specific part
of the body exposed to cold, the level of activity which affects body heat production, or the
amount of clothing being worn.
TABLE 6-2
Windchill Index
ACTUAL THERMOMETER READING (F)
Wind Speed
in mph 50 40 30 20 10 0 -10 -20 -30 -40
EQUIVALENT TEMPERATURE (F)
calm 50 40 30 20 10 0 -10 -20 -30 -40
5 48 37 27 16 6 -5 -15 -26 -36 -47
10 40 28 16 4 -9 -21 -33 -46 -58 -70
15 36 22 9 -5 -18 -36 -45 -58 -72 -85
20 32 18 4 -10 -25 -39 -53 -67 -82 -96
25 30 16 0 -15 -29 -44 -59 -74 -88 -104
30 28 13 -2 -18 -33 -48 -63 -79 -94 -109
35 27 11 -4 -20 -35 -49 -67 -82 -98 -113
40 26 10 -6 -21 -37 -53 -69 -85 -100 -116
Over 40 mph
(little added
effect)
LITTLE I NCREASING GREAT
DANGER DANGER DANGER
(for properly clothed person) (Danger from freezing of exposed flesh)
The human body senses "cold" as a result of both the air temperature and the wind velocity. Cooling of exposed flesh
increases rapidly as the wind velocity goes up. Frostbite can occur at relatively mild temperatures if wind penetrates the
body insulation. For example, when the actual air temperature of the wind is 40( F (4.4( C) and the velocity is 30 mph
(48 km/h), the exposed skin would perceive this situation as an equivalent still air temperature of 13( F (-11( C).
The generally recognized cold disorders or conditions are frostbite and hypothermia.
Contributing factors to these disorders or conditions are:
• Exposure to humidity,
• High winds,
• Contact with wetness,
DOE-EM-STD-5503-94
6-6
• Inadequate clothing, and
• Poor worker health.
The physical conditions that effect cold exposure disorders or conditions are the same as those
associated with heat disorders or conditions, such as physical fitness, alcohol or drug use, and
disease.
6.3.1. Control Measures
The presence of dead air space between the warm body and clothing and the outside air is
essential. Many layers of relatively light clothing with an outer shell of windproof material
maintains body temperature much better than a single heavy outer garment worn over ordinary
indoor clothing. The more air cells each clothing layer has, the more efficient it insulates against
body heat loss. Clothing also needs to allow some venting of perspiration. In addition to
adequate clothing, whenever possible, full use should be made of windbreaks and heat tents.
Table 6-3 gives the recommended time limits for working in various low temperature ranges.
TABLE 6-3
Maximum Daily Time Limits for Exposure at Low Temperatures
Temperature Range Maximum Daily Exposure
Celsius Fahrenheit
0 to -18 30 to 0 No limit, providing that the person is properly clothed.
-18 to -34 0 to -30 Total work time: 4 hours. Alternate 1 hour in and 1 hour out of the low-
temperature area.
-34 to -57 -30 to -70 Two periods of 30 minutes each at least 4 hours apart. Total low
temperature work time allowed is 1 hour.
-57 to -73 -70 to -100 Maximum permissible work time is 5 minutes during an 8-hour working
day. At these extreme temperatures, completely enclosed headgear,
equipped with a breathing tube running under the clothing and down the
leg to preheat the air, is recommended.
Section 40
6.3.2. Physiological Monitoring
Early recognition of the symptoms of cold exposure stress is essential in preventing serious or
permanent disorders or conditions. Workers and managers involved in cold weather operations
should be adequately trained to recognize the following conditions and related symptoms:
DOE-EM-STD-5503-94
6-7
• Hypothermia - The first symptoms of this condition are uncontrollable shivering and the
sensation of cold, irregular heart beat, weakened pulse, and change in blood pressure.
Severe shaking of rigid muscles may be caused by a burst of body energy and changes in
the body's chemistry. Vague or slow, slurred speech, memory lapses, incoherence, and
drowsiness are some of the additional symptoms. Symptoms noticed before complete
collapse are cool skin, slow and irregular breathing, low blood pressure, apparent
exhaustion, and fatigue even after rest.
As the core body temperature drops, the victim may become listless and confused, and
may make little or no attempt to keep warm. Pain in the extremities can be the first
warning of dangerous exposure to cold. If the body core temperature drops to about 85(
F, a significant and dangerous drop in the blood pressure, pulse rate, and respiration can
occur. In extreme cases, death will occur.
• Frostbite - Frostbite can occur, in absence of hypothermia, when the extremities do not
receive sufficient heat from central body stores. This can occur because of inadequate
circulation and/or insulation. Frostbite occurs when there is freezing of fluids around the
cells of the body tissues due to extremely low temperatures. Damage may result,
including loss of tissue around the areas of the nose, cheeks, ears, fingers, and toes. This
damage can be serious enough to require amputation or result in permanent loss of
movement.
The potential for both heat and cold related disorders or conditions can occur in many common
situations. Cold early morning temperatures can give way to warm daily temperatures, resulting
in heavy perspiration within protective clothing. As temperatures cool again in the evening, the
potential for cold related disorders or conditions can occur. Managers should be aware of the
potential for this occurrence and should monitor workers accordingly.
6.4. PREVENTION
Preventive measures are the best approach to avoiding the types of disorders or conditions
associated with temperature extreme conditions. Many of the measures are similar for both heat
and cold extremes. Proper training and preventive measures are critical in temperature extreme
conditions to avert illness, injury and potential loss of worker productivity.
The following steps are recommended for ensuring/protecting workers involved in temperature
extreme conditions:
DOE-EM-STD-5503-94
6-8
• Closely monitor and modify/adjust work/rest worker schedules;
• Maintain proper worker body fluids in both cold and hot weather by:
- Maintaining drinking water temperature at 50( to 60( F (10( to 15.6(C),
- Urging workers to drink 16 ounces of fluid before beginning work, and
- Urging workers to drink at least 4 ounces of water every 15 to 20 minutes at each
monitoring break (1 to 1.6 gallons of water a day is recommended);
• Weigh workers before and after each work session to determine if fluid
intake/replenishment is adequate;
• Encourage workers to maintain an optimal level of physical fitness;
• Encourage workers to maintain normal/constant weight (significant weight loss can be a
Section 41
strong indication of physical problems);
• Advise workers that heavy alcohol intake may significantly increase their risk of heat
stroke (i.e., dehydration);
• Use cooling/heating devices that aid in natural body heat exchange, such as:
- Heating or cooling tents,
- Showers or hoses, and
- Cooling vests, jackets, or suits.
6.4.1. Physiological Monitoring
The worker's ability to physiologically adjust to work under temperature extreme conditions
affects his/her ability to perform work. Acclimatized workers have lower heart rates and body
temperatures, sweat more profusely than unacclimatized workers, and are, therefore, better able
to function in these specific working conditions. Managers need to be aware of the importance of
acclimatizing workers before they can be added to a regular work schedule. Although the
phenomenon of acclimatization is an important consideration for heat stress, it has not been
recognized for cold stress. The added burden of PPE may increase the time to acclimatize
workers.
Acclimatization can occur within a few days. NIOSH recommends a progressive, 6-day
acclimatization period for workers before allowing them to perform a full work load.
Under this regimen, the first day of work should be conducted using only 50% of the anticipated
workload and exposure time. This level should be increased 10% each day for the following 5
days.
Managers need to be aware that workers can lose their acclimatization, and that the work
regimen will need to be adjusted to accommodate these changes. Managers may determine that
other factors impact the acclimatization period, including the use of PPE and the relative fitness
of workers.
DOE-EM-STD-5503-94
6-9
6.5. INTEGRATION WITH OTHER ELEMENTS OF THE HASP
The area of temperature extreme disorders or conditions impacts other areas of the HASP.
Temperature extreme considerations should be integrated with other concerns, such as personnel
protective equipment (PPE) early in the planning phase of any operation, and proper contingency
planning should be undertaken. Integrated areas should include:
• Monitoring,
• Medical surveillance,
• Emergency response,
• Confined space entry,
• Buddy systems,
• Decontamination of personnel, and
• Site characterization operations.
The potential hazards associated with temperature extreme conditions can cause problems for
even the best designed work plan, and the potential for worker injury or death is always present.
Changes in ambient air temperatures, humidity, wind, and precipitation, can change a typical
operation into an immediate health hazard to workers. It may require logistical requirements to
supplement normal operations, including requirements such as increased water supply, on-call
medical personnel, and the ability for injured-worker retrieval teams to enter exclusionary zones.
6.6. REFERENCES
1. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
2. DHHS (NIOSH) Publication No. 85-115, Occupational Safety and Health Guidance Manual
for Hazardous Waste Site Activities, NIOSH/OSHA/USCG/EPA, 1985 (Four-Agency
Document).
3. EPA Publication No. 9285.1-03, Standard Operating Safety Guides, Chapter 8, Office of
Emergency and Remedial Response, USEPA, 1992.
4. American Conference of Governmental Industrial Hygienist (ACGIH), Threshold Limit
Values for Chemical and Physical Agents and Biological Indices, Current edition.
Section 42
5. Ramsey, J.D. 1976. NIOSH, Standards Advisory Committee on Heat Stress - Recommended
Standard for Work in Hot Environments. Appendix C in Standards for Occupational
Exposure to Hot Environments, proceedings of symposium, Cincinnati, OH.
DOE-EM-STD-5503-94
6-10
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
7-1
7.0. MEDICAL SURVEILLANCE
7.1. BACKGROUND
The Medical Surveillance Program is a regulatory requirement designed to ensure that the health
of employees working on hazardous waste sites is, at a minimum, monitored and documented
before, during, and at termination of work on the site.
The medical surveillance requirements have been derived from numerous sources, including the
Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities (also
referred to as the Four-Agency Document NIOSH/OSHA/USCG/EPA, 1985), DOE Order
5480.8A, Contractor Occupational Medical Program, and generally accepted work practices.
For sites that contain mixed wastes, DOE orders and standards should be consulted for
radiological requirements. These requirements should be incorporated into the medical
surveillance program. The medical surveillance program requirements include:
• Baseline or pre-assignment examination,
• Periodic monitoring,
• Examination after illness or injury,
• Termination examination, and
• Maintenance of medical records.
Medical surveillance programs are designed to:
• Establish the baseline medical condition of employees and fitness for duty,
• Determine the ability to work while wearing protective equipment,
• Track the physiological conditions of employees on an established schedule and at
termination of the project or employment, and
• Ensure documentation of employee exposure and medical conditions is provided and
maintained as a part of the employee's medical record.
The overall objectives of the Medical Surveillance chapter are to identify:
• All personnel covered by the medical surveillance program;
• The decision-making needs of the personnel involved in the medical surveillance program;
• Pertinent details regarding the baseline, periodic, after-illness/injury, and termination
examinations;
• Which medical records are to be maintained;
• The confidentiality of medical records.
The sequence of events associated with the medical surveillance process is shown in Figure 7-1.
Employee & Supervisor Notified of
Employee Fitness/Restrictions
Job Identified
Job Description
Evaluated
Hazard Assessment Performed
Exam Period
Based on
30-Day
Exposure
Contents
Based on
Hazard
Assessment
Employee
Reassigned
Employee Assigned
To Job
Medical Examination
Performed
Periodic Medical
Monitoring
Termination Medical
Examination
DOE-EM-STD-5503-94
7-2
FIGURE 7-1
Medical Surveillance Process
7.2. INFORMATION FOR THE MEDICAL PROGRAM
The Medical Program Administrator should be provided with the following information by the
SSHO for technical evaluation by a physician prior to an employee examination:
• A tour of representative sites,
• All data related to expected or known employee exposure levels to hazardous and
radiological substances,
• A description of Personal Protective Equipment (PPE) expected to be worn by the
employee,
DOE-EM-STD-5503-94
7-3
• A description of the duties expected to be performed by the employee,
• Available information from previous medical surveillance examinations, and
• Updated medical and occupational history.
Section 43
For hazardous waste work, the following site employees should be included in the Medical
Surveillance Program:
• All employees who are exposed to hazardous substances or health hazards above
published exposure limits (e.g., OSHA PELs, ACGIH TLVs, NIOSH RELs) without
regard to the use of respirators, for 30 days or more a year;
• All employees who wear a respirator for 30 days (or fractions of days) or more a year or
as required by 29 CFR 1910.134;
• All employees who are injured, become ill, or develop signs or symptoms due to possible
overexposure involving hazardous substances or health hazards from an emergency
response or hazardous waste operation; and
• Members of HAZMAT teams.
Each contractor should implement DOE Quality Assurance and Records Management
requirements with respect to medical records and medical surveillance records. In addition, the
physician(s) should document that they have a copy of the Occupational Safety and Health
Administration regulations, 29 CFR 1910.120, Hazardous Waste Operations and Emergency
Response, and 29 CFR 1910.20, Access to Employee Exposure and Medical Records.
7.3. EXAMINATION CONTENT
Medical examinations should include a medical and work history with special emphasis on
symptoms related to exposure to hazardous substances or radiological materials and their health
effects, and on fitness for duty when conducting project tasks. The content of the medical
examinations should be based on applicable laws, regulations, and known or potential exposure
to contaminants. Where possible, the content should be determined by a licensed physician
certified in Occupational Medicine by the American Board of Preventive Medicine. However, at
a minimum, the physician making the determination should be knowledgeable and experienced
in occupational medicine screening and surveillance. If no physician is on the staff of the
employer, the content of the examination is determined by the Medical Program Administrator in
concert with a contract physician.
An example of a matrix of medical examination by job task is shown in Table 7-1.
aeudoidde ajeudoidde aeudoidde aveudoidde | aieudoidde | ayeudoidde | ayeudoidde | aeudosdde | syeudoidde aeudoidde aeudoidde aeudoidde
se se se SE se se se se se se se se BIO
aeudoidde avudoidde aeudoidde
se se xX x xX X X x se Xx Xx xX Joloqe’}
Joalig
a0yyoeg
areudoidde ayeudoidde ayeudoidde 10 Japeoy
se SP xX xX xX X xX X se xX xX xX pud-1u014
aretdoidde aeudordde aeudosdde WAU
se se x x xX X x xX se x x x yoru |
Jojeiadg
aeudoidde aeudoidde aenudoidde quowidinby
se se x X x xX x xX se x X x AaeoH
ayeudoidde aeudoidde aieudoidde areudoidde | ayeudoidde | ayeudoisdde | ayeudoidde aeudoidde | aeudoidde | ayeudoidde
se se se se Se se se se se se xX xX IWBIsI9ZAO
ayeudoidde ayeudosdde aeudoidde $10199{[0
se se xX x x X xX x se X X Xx Bed
aeiidoidde aeudoidde ayeuidoidde aieudoidde | aeudoisdde | ayeudoidde | ayeudoidde aeudoidde | aseudoidde | aeudoidde “Ws
se se se se se se se se se se ».4 xX yaloig
A.10}STH]
ANSI uonuny YOM
Aessvoig SIEDIA “way SISA[e wed WIBXxy Are "Wexy pue
BYO “peu Aaeay pooig uly) -oIpny aka Ma Abl-x | -uoung | yeaiskyq | [eorpay
SEL Gor uo paseg voneurmexy dIpolsiag Jo adwexy
I-L ATaV LL
b6-£0SS-G.LS-NA-AOd
DOE-EM-STD-5503-94
7-5
7.4. BASELINE (INITIAL) EXAMINATION
The employee should receive a baseline or initial medical examination based on an activity hazard assessment prior to
being assigned to a hazardous or potentially hazardous activity (e.g., exposure to toxic substances or radiological
materials, repetitive motion, heat/cold stress). The examination should include, at a minimum, the items listed below.
Section 44
7.4.1. Baseline/Periodic Medical Examination Parameters
The baseline medical examination parameters are determined by the Medical Program Administrator or the physician,
after review of the activity hazard assessment. However, at a minimum, the following should be included:
• Complete medical and work history,
• Physical examination,
• Pulmonary function test,
• Eye examination,
• EKG,
• Audiogram,
• Urinalysis,
• Blood chemistry,
• Heavy metal screen (as appropriate),
• Radiological bioassay (as appropriate), and
• Evaluation of stresses related to repetitive motion.
It may be beneficial to develop a table of hazardous substances expected at the work site, the target organs affected, the
potential health effects, and the medical monitoring to be performed. An example is provided in Table 7-2. (The
information in the table should be consistent with information in the hazard assessment.)
7.5. PERIODIC MEDICAL MONITORING
Employees working on hazardous waste sites, which may include chemical, physical and/or radiological hazards, should
be provided with medical examinations every 12 months, unless the physician believes a shorter or longer duration is
needed or required. The content of the examination is:
• Based on applicable laws and regulations,
• Determined by the physician,
• Designed to detect change from the baseline examination, and
• Designed to identify physiological changes.
Employee site-specific exposure data, parameters identified above, official dosimetry records, and a hazard assessment
should be provided to the examining physician.
D
O
E
-E
M
-S
T
D
-5
50
3-
94
7-
6
T
A
B
LE
7
-2
H
az
ar
do
us
S
ub
st
an
ce
s
E
xp
ec
te
d
to
b
e
E
nc
ou
nt
er
ed
, t
he
T
ar
ge
t O
rg
an
,
P
ot
en
tia
l H
ea
lth
E
ffe
ct
s,
a
nd
R
ec
om
m
en
de
d
M
ed
ic
al
M
on
ito
rin
g
H
az
ar
do
us
S
ub
st
an
ce
T
ar
ge
t O
rg
an
P
ot
en
tia
l H
ea
lth
E
ffe
ct
s
M
ed
ic
al
M
on
ito
rin
g
H
yd
ro
ca
rb
on
s
(s
pe
ci
fic
h
yd
ro
ca
rb
on
s
a
re
id
en
tif
ie
d
he
re
)
T
o
lu
en
e
C
N
S
,
an
d
sk
in
C
N
S
d
ep
re
ss
io
n,
d
er
m
at
iti
s
H
is
to
ry
o
f p
hy
si
ca
l e
xa
m
fo
cu
si
ng
o
n
ne
rv
o
us
s
ys
te
m
a
nd
ch
an
ge
s
in
s
ki
n
T
ric
hl
o
ro
et
he
ne
Li
ve
r,
C
N
S
,
ki
dn
ey
s,
liv
er
d
is
ea
se
a
nd
k
id
ne
y
in
ju
ry
,
H
is
to
ry
fo
r
pr
e-
ex
is
tin
g
liv
er
re
sp
ira
to
ry
,
sk
in
de
rm
at
iti
s,
C
N
S
,
de
pr
es
si
o
n,
di
se
as
e
o
r
de
cr
ea
se
d
lu
ng
ca
nc
er
,
ve
nt
ric
ul
ar
fu
nc
tio
ns
,
m
ea
su
re
m
en
t
o
f l
iv
er
ar
rh
yt
hm
ia
s
en
zy
m
es
a
nd
li
ve
r
fu
nc
tio
n,
ur
in
e
sc
re
en
,
ph
ys
ic
al
e
xa
m
fo
cu
si
ng
o
n
ne
rv
o
us
s
ys
te
m
,
sk
in
a
nd
r
es
pi
ra
to
ry
s
ys
te
m
H
ea
vy
M
et
al
s
(s
pe
ci
fic
h
ea
vy
m
et
a
ls
a
re
id
en
tif
ie
d
he
re
)
Le
ad
ki
dn
ey
,
bl
o
o
d,
C
N
S
,
re
na
l s
ys
te
m
d
is
fu
nc
tio
n,
ur
in
e
sc
re
en
,
m
ea
su
re
m
en
t
o
f
G
I
tr
ac
t
ge
ne
ra
l C
N
S
im
pa
irm
en
t
ki
dn
ey
fu
nc
tio
n
w
he
re
r
el
ev
an
t,
C
B
C
,
hi
st
o
ry
a
nd
p
hy
si
ca
l
ex
am
fo
cu
si
ng
o
n
C
N
S
D
O
E
-E
M
-S
T
D
-5
50
3-
94
T
A
B
LE
7
-2
H
az
ar
do
us
S
ub
st
an
ce
s
E
xp
ec
te
d
to
b
e
E
nc
ou
nt
er
ed
, t
he
T
ar
ge
t O
rg
an
,
P
ot
en
tia
l H
ea
lth
E
ffe
ct
s,
a
nd
R
Section 45
ec
om
m
en
de
d
M
ed
ic
al
M
on
ito
rin
g
H
az
ar
do
us
S
ub
st
an
ce
T
ar
ge
t O
rg
an
P
ot
en
tia
l H
ea
lth
E
ffe
ct
s
M
ed
ic
al
M
on
ito
rin
g
7-
7
H
er
bi
ci
de
s
(s
pe
ci
fic
h
er
bi
ci
de
s
a
re
id
en
tif
ie
d
he
re
)
2,
4-
D
sk
in
,
P
N
s
ch
lo
ra
cn
e,
p
er
ip
he
ra
l
hi
st
o
ry
a
nd
p
hy
si
ca
l e
xa
m
ne
ur
o
pa
th
y
fo
cu
si
ng
o
n
sk
in
n
er
vo
us
sy
st
em
,
ur
in
al
ys
is
R
ad
io
nu
cl
id
es
(s
pe
ci
fic
r
a
di
on
u
cl
id
es
a
re
id
en
tif
ie
d
he
re
)
P
lu
to
ni
um
bo
ne
,
lu
ng
s
lu
ng
c
an
ce
r
hi
st
o
ry
fo
cu
si
ng
o
n
pr
io
r
ex
po
su
re
t
o
io
ni
zi
ng
r
ad
ia
tio
n,
ba
se
lin
e
bi
o
as
sa
y
an
d
pe
rio
di
c
bi
o
as
sa
y
m
o
ni
to
rin
g
DOE-EM-STD-5503-94
7-8
7.6. EXAMINATION AFTER ILLNESS OR INJURY
Follow-up examinations should be provided as soon as possible to the employee due to any of
the following situations:
• Notification to the supervision, management, the Medical Program Administrator or
physician that the employee has developed signs or symptoms indicating sensitivity or
overexposure,
• Potential exposure above the permissible exposure limit or published exposure limit,
• Lost time illness of three working days or more,
• Any recordable injury to the employee, or
• Contamination incident.
In the case of injury or illness, the Site Safety and Health Officer (SSHO) or his/her
designated alternate is responsible for notifying the Medical Program Administrator of the
incident and the suspected substance involved. If the substance is unknown, it should be
identified as such.
The examination will be carried out by a licensed occupational medical provider. The scope
of the examination will be determined by the physician. The employee will not return to work
until the physician certifies that the employee is fit to return to work, activity restrictions are
identified, and documentation of fitness for duty is provided.
7.7. TERMINATION EXAMINATION
The employer should provide a termination medical examination when an employee is
terminated or reassigned to an area or activity where the employee is not exposed to hazardous
substances or radiological constituents. The termination examination content will be
determined by the physician. If termination occurs within six months of a periodic
examination, the physician may determine that an additional examination is not necessary.
Documentation of the decision not to provide a termination examination, and its basis, should
be provided in the medical file for the employee.
7.8. MAINTENANCE AND AVAILABILITY OF MEDICAL RECORDS
The employee should be notified of recommended limitations upon his/her assigned work.
The physician should provide a written opinion to the records indicating that the employee has
been informed of the results of the exam and of any medical conditions which require further
examination or treatment. In addition, the following specific records should be maintained:
• Name and Social Security number of employee;
• Physician's written opinion, recommended limitations and results of exam;
DOE-EM-STD-5503-94
7-9
• Employee medical complaints related to exposure to hazardous substances;
• Information provided to the physician from the employer (not standard or appendices);
and
• Engineering controls, work practices and PPE for employee protection.
Section 46
Personnel medical records and exposure monitoring records should be maintained according to
DOE orders and the requirements of 29 CFR 1910.120 (f)(8) and 29 CFR 1910.20. Access to
medical records should be consistent with the requirements of 29 CFR 1910.20. The
employee medical records will be held in confidence by the employer to the extent permitted
by law.
7.9. REFERENCES
1. 29 CFR 1910.20, Access to Employee Exposure and Medical Records.
2. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response.
3. 29 CFR 1910.134, Respiratory Protection.
4. 29 CFR 1910.1000, Subpart Z, Toxic and Hazardous Substances.
5. American Conference of Governmental Industrial Hygienists (ACGIH), Threshold Limit
Values for Chemical Substances and Physical Agents and Biological Exposure Indices,
Current edition.
6. DHHS (NIOSH) Publication No. 85-115, Occupational Safety and Health Guidance
Manual for Hazardous Waste Site Activities, NIOSH/OSHA/USCG/EPA, 1985 (Four-
Agency Document).
7. DOE N 5480.6, U.S. DOE Radiological Control Manual.
8. DOE Order 3790.1B, Federal Employee Occupation Safety and Health Program.
9. DOE Order 5000.3A, Occurrence Reporting and Processing of Operations Information.
10. DOE Order 5480.4, Environmental Protection, Safety, and Health Protection Standards.
11. DOE Order 5480.8A, Contractor Occupational Medical Program.
12. DOE Order 5480.10, Contractor Industrial Hygiene Program.
13. DOE Order 5480.11, Radiation Protection for Occupational Workers.
DOE-EM-STD-5503-94
7-10
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
8-1
8.0. EXPOSURE MONITORING/AIR SAMPLING
8.1. BACKGROUND
Hazardous waste activities generate the potential for employee exposure to, and/or off-site
migration of, hazardous concentrations of airborne substances. This section provides the general
HASP guidance for the exposure monitoring/air sampling program and specific activities that
should take place during hazardous waste activities.
The overall objectives of the exposure monitoring/air sampling section are:
• Describe the overall exposure monitoring and air sampling program by providing general
information about the purpose of the exposure monitoring and air sampling program,
regulatory requirements, and guidance documents; and
• Identify the different components of the exposure monitoring/air sampling program,
including personnel qualifications, air contaminants, instrumentation, worker exposure,
level of protection, and offsite, perimeter, and meteorological monitoring, quality
assurance/quality control, and recordkeeping.
The objectives of exposure monitoring/air sampling are to accurately determine:
• Exposure levels for site workers,
• Work areas generating the most significant airborne contaminants,
• Whether migration is occurring, and
• Whether modified levels of protection or engineering controls are required.
This section of the HASP should be prepared in accordance with guidelines contained in the EPA
Standard Operating Safety Guides, June 1992; EPA, Office of Emergency and Remedial
Response, Air Surveillance for Hazardous Materials; and the NIOSH Manual of Analytical
Methods (latest edition).
8.2. GENERAL GUIDANCE
Section 47
An exposure monitoring/air sampling program should be prepared and implemented to identify
and quantify airborne levels of potentially hazardous substances. Appropriate direct-reading
(i.e., real time) air monitoring and time-integrated (e.g., 8 hour time-weighted average, 15 minute
short term exposure limit) air sampling should be conducted in accordance with applicable
regulations (e.g., OSHA, EPA, State, NRC). Both direct-reading and time-integrated sampling
should be used to test for the presence of air contaminants. Compounds which are found by
time-integrated sampling, but are not detected by direct reading air monitors, may warrant
modification of both the monitoring program and the levels of protection.
DOE-EM-STD-5503-94
8-2
Work area air monitoring within the Exclusion Zone should be conducted to determine if pre-
established action levels are being exceeded. If the action levels are being exceeded, additional,
appropriate controls should be implemented or workers should upgrade PPE to the appropriate
level of protection. Worker exposure monitoring with time-integrated sampling should be
conducted during the clean-up phase and where otherwise appropriate to accurately assess
worker exposure to specific chemicals.
A combination of offsite, perimeter, and work area samples should be used to assess the release
of air contaminants. While the primary objective of work area air monitoring is to assist in
protecting onsite personnel from airborne contaminants, these data can also be used to assess the
potential for detectable offsite emissions. Upwind and downwind offsite and perimeter
monitoring should be conducted. Air contaminant levels should be established upwind around
the site perimeter in order to define the reference point or baseline to which downwind
monitoring data can be compared. Comparisons of air monitoring data with these reference data
may indicate areas which generate air contaminant levels above established action levels. When
action levels are exceeded, appropriate actions should be taken, such as, increasing engineering
controls or making community notifications.
As appropriate, air samples should be taken according to the requirements of
10 CFR 20.103(a)(3), Exposure of Individuals to Concentrations of Radioactive Materials in Air
in Restricted Areas, and DOE’s Radiological Control Manual (latest edition) to identify the
radioactive isotopes and corresponding radiation types (alpha, beta, gamma) in the workplace
atmosphere and at the perimeter of the site. The principles of ALARA (as low as reasonably
achievable) should be utilized to assure worker and public protection from atmospheric
emissions.
8.2.1. Personnel Qualifications
The exposure monitoring/air sampling program should be developed by an industrial hygienist,
preferably one who is certified by the American Board of Industrial Hygiene, or otherwise board
eligible, or who has a minimum of three years experience in developing such programs for
hazardous waste sites. In addition, where exposures to radioactive materials are anticipated, a
health physicist, preferably one who is certified by the American Board of Health Physics, or
otherwise board eligible, or who has a minimum of three years relevant experience, should assist
in the development of the exposure monitoring/air sampling program.
Section 48
Staff should be experienced in implementing an air monitoring program for the type of activities
to be conducted. The staff should also be experienced in implementing an air monitoring
program designed to evaluate worker exposure to airborne contaminants. The Site Safety and
Health Officer (SSHO) should be responsible for implementing the exposure monitoring/air
sampling program, and all activities should be conducted under the direction of the SSHO. Other
air monitoring staff may include air monitoring specialists and field technicians. The air
monitoring staff should be provided site-specific training regarding the site-specific air sampling,
DOE-EM-STD-5503-94
8-3
monitoring, instrumentation, sample shipping procedures, and other duties assigned by the
SSHO. The responsibilities for each staff position and the minimum requirements for the SSHO
and other air monitoring staff should be developed and presented in tables similar to those shown
in Table 8-1.
TABLE 8-1
Framework for Presenting Staff Responsibilities
Position Number Qualifications Responsibilities
SSHO 2 1.
(including alternates)
(training, education,
experience)
2.
3.
Field Technicians 1.
2.
3.
8.3. AIR CONTAMINANTS
The air contaminants to be monitored/sampled and the locations and frequency of monitoring
should be specified. The following should be included as appropriate, depending on site-specific
conditions:
• Classes of chemicals,
• Specific contaminants for individual identification and analysis,
• Oxygen content,
• Flammable atmospheres,
• Total and respirable dust,
• Specific radioisotopes and corresponding types of radiation, and
• Noise.
A table should be provided which summarizes the contaminants to be monitored, key chemical,
radiological, physical, and toxicological properties for each contaminant, and the
frequency/schedule for monitoring each contaminant. An example is provided in Table 8-2. A
table of pre-established action levels for each contaminant, corresponding actions to be taken
when action levels are exceeded, and the basis for choosing an action level should be developed.
DOE-EM-STD-5503-94
8-4
An example is shown in Table 8-3. In addition, written justification and a rationale for the action
level and actions identified should be available for review.
TABLE 8-2
Air Contaminants - Summary of Properties and Frequency of Monitoring
Air Contaminant:
Physical Properties
Chemical Properties
Toxicological Properties
Type of Sampling (e.g., direct-reading at
perimeter, time-integrated worker exposure)
Frequency
Locations
TABLE 8-3
Air Contaminants - Action Levels
Air Contaminant:
Action Level Action Basis For Action Level
Air Contaminant:
Action Level Action Basis For Action Level
8.4. METHODS AND INSTRUMENTATION
Air monitoring specialists should be responsible for operating air monitoring instruments under
the supervision of the SSHO. These individuals should be required to demonstrate proficiency in
DOE-EM-STD-5503-94
8-5
the use, care, limitations, and operating characteristics of air monitoring instruments. These
individuals should also be responsible for the maintenance and calibration of all air monitoring
equipment.
Calibrations should be in accordance with methods indicated in NIOSH’s Manual of Analytical
Methods (latest edition), EPA methods, and/or methods recommended by the equipment
manufacturer. Maintenance of instruments should be in accordance with methods recommended
by the equipment manufacturer or by the SSHO.
Section 49
The EPA methods to be used for ambient air monitoring should be specified, as well as the use of
NIOSH methods for worker exposure monitoring/sampling. The use of analytical laboratories
accredited by EPA and/or the American Industrial Hygiene Association (AIHA), should be
specified. Samples collected using NIOSH methods should be analyzed only by laboratories
currently accredited by the AIHA. When radiological samples are to be analyzed, laboratories
with appropriate accreditation should be used.
The following sections discuss in more detail the detection principle, limitations, and features of
instruments which should be utilized during environmental restoration projects. For selection of
all instruments, a number of factors should be considered such as:
• Accuracy,
• Mobility,
• Potential interferences on performance,
• Alarms,
• Remote sensing,
• Battery life,
• Calibration required,
• Explosion proofing, and
• Sampling range.
8.4.1. Direct-Reading Monitoring Instruments
Unlike time-integrated sampling devices, which are used to collect samples for subsequent
analysis in a laboratory, direct-reading instruments (the term direct-reading is used
synonymously for the term real-time) provide information at the time of sampling, thus enabling
rapid decision-making. Data obtained from direct-reading monitors can often be used to assure
proper selection of personnel protection equipment, engineering controls and work practices. The
instruments can often provide the trained and experienced user the capability to determine if site
personnel are potentially exposed to concentrations which exceed exposure limits or action levels
for specific hazardous materials.
Direct-reading monitors can be useful in identifying oxygen deficient atmospheres, IDLH
conditions, toxic levels of airborne contaminants, flammable atmospheres, and radioactive
DOE-EM-STD-5503-94
8-6
hazards. Periodic monitoring of airborne levels with real-time monitors is critical, especially
before and during new work activities.
Where appropriate, screening with direct-reading instruments for ionizing radiation should be
conducted prior to and during site activities. Where appropriate, the type of radioactive isotopes
present should also be identified to assure that action levels, worker exposure and environmental
standards are not exceeded.
A summary of direct-reading instruments to be used and their specific operating parameters
should be developed. An example is provided in Table 8-4.
TABLE 8-4
Direct-Reading Instruments for Site XX
Instrument:
Number Provided at Site:
Contaminant Monitored:
Application:
Detection Method:
General Care/Maintenance:
Typical Operating Time:
8.4.2. Time-Integrated Sampling Instruments
Time-integrated sampling for chemical and radiation hazards should be performed prior to and
during site activities. The equipment and collection media to monitor each hazard should be
specified. Time-integrated sampling may include pumps, collection media (MCE filters, AA
filters, sorbent tubes), and badge-type passive samplers.
8.5. WORKER EXPOSURE MONITORING
The sampling strategy chosen to assess worker exposure through time-integrated sampling and
the sampling results should be documented. Sections 8.11 through 8.14 contain additional
guidance on documentation and recordkeeping. Personal monitoring samples for both
radioactive isotopes and chemicals should be collected in the worker’s breathing zone.
Representative sampling of those employees with the greatest risk of exposure is required in
accordance with 1910.120(h)(4). The sampling strategy should be documented and changed as
Section 50
DOE-EM-STD-5503-94
8-7
appropriate if the operation or tasks change or if exposures potentially increase. Changes to the
sampling strategy should also be documented. Monitoring/sampling of employees in all work
zones (Exclusion Zone, Contamination Reduction Zone, and Support Zone) should be included.
All employees working within a radiologically controlled area should receive appropriate
dosimetry monitoring for radiation exposure according to the requirements of DOE's
Radiological Control Manual or 10 CFR 20, Subpart F, Surveys and Monitoring. The
monitoring program should include information on the record keeping of employee's exposure to
external radiation according to the requirements of DOE's Radiological Control Manual,
Determination of Prior Occupational Dose. Each employee’s radiation exposure history should
be reviewed, according to the requirements of DOE's Radiological Control Manual, for
compliance with exposure standards prior to allowing the employee access to a radiologically
controlled area. The employee's exposure history should be continuously documented and
available for the employee's review.
8.6. LEVEL OF PROTECTION MONITORING
When and how often monitoring/sampling should be performed to assess the level of protection
should be specified. Frequencies and durations should be specified for all of the following:
• Upon initial entry,
• When new operations begin,
• When work begins on a different portion of the site,
• When different contaminants are being handled,
• When working in areas with obvious liquid contamination, and
• When entering or working in confined spaces.
The use of direct-reading and time-integrated monitoring should be considered to assure that
airborne concentrations of contaminants do not exceed the protection factors of the PPE in use.
Standard industrial hygiene practice dictates that the background levels be taken to accurately
determine the levels of exposure resulting from site activities. The following monitoring should
be conducted during:
• Initial site entry when the site evaluation shows the potential for ionizing radiation;
• IDLH conditions; or
• When the site is not adequately characterized to eliminate these possible conditions:
- Monitoring with direct-reading instruments for ionizing radiation;
- Monitoring with direct-reading instruments for IDLH and other conditions (e.g.,
combustible, explosive, oxygen deficient, toxic substances) that may cause death or
serious injury; and/or
- Visual observations for signs of actual or potential IDLH or other dangerous
conditions.
DOE-EM-STD-5503-94
8-8
8.7. OFFSITE MONITORING
Locations of offsite monitoring stations should be determined in the field by the SSHO. In
general, at least three stations (one upwind and two downwind) should be used at pre-established
distances, in accordance with the predominant wind directions recorded at the site.
Monitoring at downwind locations should be conducted a minimum of once each workday
following the establishment of ambient background levels. Ambient background levels should
be established at the upwind offsite monitoring station. The mean value of three separate
readings should be recorded as the ambient background level.
8.8. PERIMETER MONITORING
Perimeter monitoring is intended to detect any migration of pollutants outside of the Exclusion
Zone. Both direct-reading and time-integrated monitoring/sampling should be considered.
8.9. METEOROLOGICAL MONITORING
Section 51
Accurate information on temperature, precipitation, wind speed, and wind direction should be
provided by existing site resources or a portable meteorological station. Data obtained should be
used to aid in determining the daily monitoring strategy (e.g., determining sampling locations).
8.10. QUALITY ASSURANCE/QUALITY CONTROL
Procedures should be developed in accordance with DOE Order 5700.6C, Quality Assurance,
and EPA requirements for quality assurance/quality control of samples and sample results from
equipment calibration through the sample collection, sample shipment, and reporting of sample
results should be specified. The procedures should include:
• Sample packaging and shipping,
• Chain of custody,
• Record keeping,
• Quality review checks of sampling data and calculations,
• Data corrections,
• Field sample blanks, and
• Sample duplicates.
8.11. RECORD KEEPING
An important aspect of any data generation is accurate record keeping. The air monitoring staff
should be responsible for the completeness and storage of all records. Forms used to record
pertinent data should contain the information specified in the following sections. When any
DOE-EM-STD-5503-94
8-9
personal samples are taken, worker name and social security number should be added to these
forms.
8.12. TIME-INTEGRATED SAMPLING DATA
The following information, at a minimum, should be specified in time-integrated sampling data
forms:
• Site Location/Date,
• Work Area/Operation Name,
• NIOSH Method Used,
• Air Flow Calibration Record,
• Instrument Calibration Record,
• Temperature, Pressure, Humidity,
• Area/Sampling Location Diagram,
• Area Sample Description/Location,
• Sampling Data,
• Pump I.D.,
• Flow Rate,
• Sample Filter/Tube Number,
• Pump On/Off (Time),
• Volume Air Collected (Liters),
• Sample Submission Number,
• Laboratory Sample Number,
• Analyte Results (mg/m , ppm, or f/cc),3
• Field Notes,
• Description of Operation and Complaints/Symptoms,
• Chemicals/Materials/Equipment in Use,
• Engineering/Administrative Controls in Effect,
• Personal Protective Equipment in Use,
• Sampling Observations/Comments,
• AIHA Accredited Laboratory Name,
• Laboratory Location,
• Chemist/Industrial Hygienist Name,
• Principal Air Monitor, and
• Reviewer.
8.13. DIRECT-READING AIR MONITORING DATA
The following information, at a minimum, should be specified in direct-reading air monitoring data
forms:
• Site Location/Date;
DOE-EM-STD-5503-94
8-10
• Work Process/Operation Name;
• Instrument Used - type, manufacturer, model, I.D.;
• Instrument Calibration Record;
• Sample Location - description, diagram;
• Sampling Conditions - temperature, humidity, pressure;
• Interferences;
• Direct Reading Data - time, reading (units);
• Field Notes;
• Principal Air Monitor Name; and
• Reviewer.
8.14. FINAL REPORT
A final report document should be prepared by the SSHO and should be submitted as part of the
site records. This document should contain the following information:
• Chain of Custody,
• Laboratory Results (raw data),
• Calculated Results (air contaminant concentrations),
• Meteorological Data,
• Daily Log,
• Air Sampling and Monitoring Forms, and
• Equipment Calibration and Maintenance Records.
8.15. REFERENCES
1. 10 CFR 20, Standards for Protection Against Radiation.
2. 29 CFR 1910, Occupational Safety and Health Standards.
3. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
4. 29 CFR 1910.1000, Air Contaminants.
Section 52
5. 29 CFR 1926, Safety and Health Regulations for Construction.
6. American Conference of Governmental Industrial Hygienist (ACGIH), Threshold Limit
Values for Chemical Substances and Physical Agents and Biological Exposure Indices,
Current edition.
7. DHHS (NIOSH) Publication No. 85-115, Occupational Safety and Health Guidance
Manual for Hazardous Waste Site Activities, NIOSH/OSHA/USCG/EPA, 1985
(Four-Agency Document).
DOE-EM-STD-5503-94
8-11
8. DOE EH-0256T, U.S. DOE Radiological Control Manual, Office of Environmental, Safety
and Health, USDOE, 1992.
9. DOE Order 5480.4, Environmental Protection Safety, and Health Protection Standards.
10. DOE Order 5480.9, Construction Project Safety and Health Management.
11. DOE Order 5480.10, Contractor Industrial Hygiene Program.
12. DOE Order 5482.1B, Environment, Safety and Health Appraisal Program.
13. DOE Order 5483.1A, Occupational Safety and Health Program for DOE Contractor
Employees at Government-Owned Contractor-Operated Facilities.
14. DOE Order 5700.6C, Quality Assurance.
15. EPA Publication No. 9285.1-03, Standard Operating Safety Guides, Office of Emergency
and Remedial Response, USEPA, 1992.
16. EPA-600-4-84-041, Compendium of Methods for the Determination of Toxic Organic
Compounds in Ambient Air, USEPA, Most recent edition for each method.
17. ICAO Regulations for shipment of hazardous materials on international air cargo transport
planes (supersedes DOT regulations when using air transport).
18. NIOSH Publication No. 84-100, NIOSH Manual of Analytical Methods (1984, Supplements
1985, 1987, 1988, and 1990).
DOE-EM-STD-5503-94
8-12
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
9-1
9.0. SITE CONTROL
9.1. BACKGROUND
The site control program at hazardous waste sites is used to control the activities and movement
of people and equipment in order to minimize the potential for worker exposure to hazardous
substances. The provisions of 29 CFR 1910.120(d) require that an appropriate site control
program be developed prior to the implementation of cleanup operations.
The site control program should be established during the planning stages of a hazardous waste
operation. It should be modified as new information becomes available. The appropriate
sequence for implementing site control measures should be determined on a site-specific basis.
It may be necessary to implement several measures concurrently. Care should be taken to ensure
that the posting requirements of the DOE Radiological Control Manual are properly addressed
and that procedures are implemented. For the purpose of this chapter, a Radiological Area will
generally equate to an Exclusion Zone, a Radiological Buffer Area will generally equate to a
Contamination Reduction Zone, and a Controlled Area will generally equate to a Support Zone.
This equivalency is identified in Table 9-1.
TABLE 9-1
General Equivalency of Work Zones
RAD Contamination Areas Hazardous Substance
(DOE Radiological Control Manual) Contamination Zones
Controlled Area Support Zone
Radiological Buffer Area Contamination Reduction Zone
Radiological Area Exclusion Zone
The overall objective of the site control component of the HASP is to specify procedures to
minimize employee exposure and protect the public from hazardous substances and to prevent
unauthorized access to the site.
Procedures to meet the objectives of the site control program should include the following:
Section 53
• Coordination with site management in the establishment of site boundaries,
• Development of a map of the hazardous sites which represents a central source of
information about the site,
• Establishment of work zones to prevent unauthorized personnel from entering controlled
zones,
DOE-EM-STD-5503-94
9-2
• Reducing accidental spread of hazardous substances from equipment in the contaminated
area(s) by workers,
• Confining work activities to the appropriate areas,
• Facilitating the location and evacuation of personnel in case of an emergency,
• Establishment of the "buddy system",
• Establishment of appropriate communication systems,
• Implementation of worker safety procedures, and
• Identification of the nearest medical facilities.
9.2. DEVELOPMENT OF THE SITE MAP
The purpose of the site map is to assist site personnel in planning and organizing response
activities. Site maps should be updated during the course of site operations to reflect:
• New information, such as information gained after initial site entry or from subsequent
sampling and analysis activities; and
• Changes in site conditions, including changes resulting from accidents, ongoing site
operations, hazards not previously identified, new materials introduced on site,
unauthorized entry or vandalism, and weather conditions.
The site map should be developed prior to the initial site entry using information obtained during
the preliminary evaluation. The map should include:
• Prevailing wind direction;
• Site drainage points;
• All natural and man-made topographic features including the location of buildings,
containers, impoundments, pits, ponds, and tanks;
• Location of specific work zones including radiological and non-radiological postings;
• Any other site features;
• Locations of all potential hazards that were identified through the interview/records
research;
• The perimeter reconnaissance;
• The initial onsite survey should be plotted on the site map;
• Observed and suspected hazards;
• Onsite and offsite air and soil sampling results; and
• Potential exposure pathways.
9.3. ESTABLISHMENT OF WORK ZONES
One of the basic elements of an effective site control program is the delineation of work zones at
the site. The purpose of establishing work zones is to:
DOE-EM-STD-5503-94
9-3
• Reduce the accidental spread of hazardous substances by workers or equipment from the
contaminated areas to the clean areas;
• Confine work activities to the appropriate areas, thereby minimizing the likelihood of
accidental exposures;
• Facilitate the location and evacuation of personnel in case of an emergency; and
• Prevent unauthorized personnel from entering controlled areas.
When establishing the work zones at a site, the site map can provide a useful format for compiling
the relevant data. In the absence of sampling results, site maps can provide essential information
on potential and suspected hazards and potential exposure pathways.
Although a site may be divided into as many zones as necessary to ensure minimal employee
exposure to hazardous substances, the three most frequently identified zones are the Exclusion
Zone (or "hot zone"), the Contamination Reduction Zone, and the Support Zone (or "clean
zone"). Movement of personnel and equipment between these zones should be minimized and
restricted to specific access control points to prevent cross-contamination.
9.3.1. The Exclusion Zone
Section 54
The Exclusion Zone is the area where contamination is either known or expected to occur and
where the greatest potential for exposure exists. The outer boundary of the Exclusion Zone,
called the Hotline, separates the area of contamination from the Contamination Reduction Zone.
The Hotline should initially be established by visually surveying the site and determining the
extent of hazardous substances, discoloration, or any drainage, leachate, or spilled material
present. Other factors to consider in establishing the Hotline include:
• Providing sufficient space to protect personnel outside the Exclusion Zone from potential
fire or explosion,
• Allowing an adequate area within which to conduct site operations, and
• Reducing the potential for contaminant migration.
The Hotline should be physically secured (e.g., using chains, fences, or ropes) or clearly marked
(e.g., using lines, placards, hazard tape, and/or signs). During subsequent site operations, the
boundary may be modified and adjusted as more information becomes available. In addition, the
Exclusion Zone may also be subdivided into different areas of contamination based on the known
or expected type and degree of hazards or the incompatibility of waste streams. If the Exclusion
Zone is subdivided in this manner, additional demarcations (e.g., "Hazards Present" or
"Protection Required") may be necessary. For sites where radiological contamination exists,
procedures for establishing and posting of radiological zones should be developed and included
in this chapter. Procedures should be in accordance with the DOE Radiological Control Manual.
Access to and from the Exclusion Zone should be restricted to Access Control Points at the
Hotline. Access Control Points are used to regulate the flow of personnel and equipment into
DOE-EM-STD-5503-94
9-4
and out of the contaminated area and to verify that site control procedures are followed. Separate
entrances and exits should be established to separate personnel and equipment movement into
and out of the Exclusion Zone.
All persons who enter the Exclusion Zone should wear the appropriate level of Personal
Protective Equipment (PPE) for the degree and types of hazards present (see Chapter 5). If the
Exclusion Zone is subdivided, different levels of PPE may be appropriate. Each subdivision of
the Exclusion Zone should be clearly marked to identify the hazards and the required level of
PPE.
9.3.2. The Contamination Reduction Zone
The Contamination Reduction Zone is the area in which decontamination procedures take place.
It is the transition area between the Exclusion Zone and the Support Zone. The purpose of the
Contamination Reduction Zone is to reduce the possibility that the Support Zone will become
contaminated or affected by the site hazards.
The Contamination Control Line marks the boundary between the Contamination Reduction
Zone and the Support Zone and separates the clean areas of the site from those areas used to
decontaminate workers and equipment. Access Control Points between the Contamination
Reduction Zone and the Support Zone should be established to ensure workers entering the
Contamination Reduction Zone are wearing the proper PPE and that workers exiting the
Contamination Reduction Zone to the Support Zone remove or decontaminate all potentially
contaminated PPE.
9.3.3. The Support Zone
Section 55
The Support Zone is the uncontaminated area where workers are unlikely to be exposed to
hazardous substances or dangerous conditions. Because the Support Zone is free from
contamination, personnel working within it may wear normal work clothes. Any potentially
contaminated clothing, equipment, and samples (outer containers) should remain inside the
Contamination Reduction Zone or the Exclusion Zone.
Designation of the Support Zone should be based on all available site characterization data and
should be located upwind from the Exclusion Zone. The Support Zone should be in an area that
is known to be free of elevated (i.e., higher than background) concentrations of hazardous
substances.
9.4. USING THE BUDDY SYSTEM
When carrying out activities in the Exclusion Zone, workers should use the "buddy system" to
ensure that rapid assistance can be provided in the event of an emergency. The "buddy system"
is an approach used to organize workgroups so that each worker is designated to be observed by
DOE-EM-STD-5503-94
9-5
at least one other worker. During initial site entry, it may be appropriate to utilize a "buddy
system" in which additional workers are assigned to provide safety backup.
The Field Team Leader, who is responsible for enforcing the "buddy system", should implement
the system at the Access Control Point for workers entering the Exclusion Zone.
As part of the buddy system, workers should remain in close proximity and maintain visual
contact with each other to provide assistance in the event of an emergency. Should an
emergency situation arise, workers should use prearranged communication signals agreed upon
prior to entering the contaminated area. The responsibilities of workers utilizing the buddy
system include:
• Providing his or her partner with assistance,
• Observing his or her partner for signs of chemical or heat exposure,
• Periodically checking the integrity of his or her partner's PPE, and
• Notifying the Project Manager or other site personnel if emergency assistance is needed.
Workers should not rely entirely on the "buddy system" to ensure that help will be provided in
the event of an emergency. To augment this system, workers in contaminated areas should
remain in line-of-sight or direct communication contact with the command post or Field Team
Leader at all times.
9.5. COMMUNICATION NETWORK AND PROCEDURES
Communication systems should be established for both internal and external communication.
Internal communication refers to communication among workers operating in the Exclusion
Zone or Contamination Reduction Zone, or between the Command Post and those workers.
Routine checking for proper operation should be addressed.
An internal communication system may be established using standard communication devices
such as radio, noisemakers, or visual signals. Verbal communication can be difficult as a result
of onsite background noise and the use of PPE. Therefore, pre-arranged commands and audio or
visual cues should be developed prior to entering the Exclusion Zone. A secondary set of non-
verbal signals should be established for use when communication devices fail or when
emergency situations occur.
External communication refers to communication between onsite and offsite personnel. An
external communication system should be maintained in order to:
• Coordinate emergency response efforts with offsite responders,
• Report progress or problems to management, and
• Maintain contact with essential offsite personnel.
Section 56
DOE-EM-STD-5503-94
9-6
The primary means of external communication are telephone and radio.
9.6. WORKER SAFETY PROCEDURES
As part of the site control plan, procedures should be established to ensure worker safety.
Worker safety procedures include preparation of the site for response activities, engineering
controls and safe work practices, and Standard Operating Procedures (SOPs). Worker safety
procedures should be prepared in advance of conducting onsite response operations and should
be available at the site command post.
Engineering controls and safe work practices should be implemented to reduce and maintain
employee exposure levels at or below the permissible exposure limits (PELs) and published
exposure limits for those hazardous substances at the site. If engineering controls and safe work
practices are insufficient to adequately protect against exposure, PPE should be used to protect
employees against possible exposure to hazardous substances.
9.7. MEDICAL ASSISTANCE
As part of the site control program, the Project Manager should assure that the identification and
location of the nearest medical facilities where response personnel can receive assistance in the
event of an emergency are posted. Information such as the names, phone numbers, addresses,
and procedures for contacting the facilities should be maintained. This information should be
posted conspicuously throughout the site, as well as near telephones or other external
communication devices.
9.8. REFERENCES
1. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
2. Department of Health and Human Services (DHHS) (NIOSH) Publication No. 85-115,
Occupational Safety and Health Guidance Manual for Hazardous Waste Site Activities,
NIOSH/OSHA/USCG/EPA, 1985 (Four-Agency Document).
3. EPA Publication No. 9285.1-03, Standard Operating Safety Guides, Chapter 4, Office of
Emergency and Remedial Response, USEPA, 1992.
4. EPA 9285.8-01, Health and Safety Plan (HASP) User's Guide, Chapter 8, Office of
Emergency and Remedial Response, USEPA, 1992 (and ERT Health and Safety Plan
Planner, Ver. 3.0C, 1993).
DOE-EM-STD-5503-94
10-1
10.0. DECONTAMINATION
10.1. BACKGROUND
Decontamination involves physically removing contaminants from personnel and equipment
and/or chemically converting them into innocuous substances. The extent of decontamination
depends on a number of factors, the most important of which is the types of contaminants
involved. The more harmful the contaminant, the more extensive and thorough the
decontamination. The combination of decontamination, correct donning of protective clothing,
and zoning of site work areas, minimizes cross-contamination from the protective clothing to
wearer, from equipment to personnel, and from one area to another. Only general guidance can
be given on methods and techniques for decontamination. The exact procedure is determined by
evaluating a number of factors specific to the incident and/or site. The site should refer to the
DOE Radiological Control Manual for detailed radiological decontamination requirements.
The requirements and procedures need to be addressed and implemented for both chemical and
radiological contamination. For the purpose of this document, a Radiological Area should
generally equate to an Exclusion Zone, a Radiological Buffer Area should generally equate to a
Contamination Reduction Zone, and a Controlled Area generally equates to a Support Zone (see
Table 9-1). Contamination of personnel, equipment and/or material can occur from both a
radiological and hazardous material. When decontamination is required in such areas,
procedures should be developed which will accommodate both contamination types and
minimize the amount of mixed waste.
Section 57
The overall objectives of the Decontamination chapter are to:
• Determine and implement the decontamination methods for personnel and equipment that
are effective for the specific hazardous/radioactive substance(s) present,
• Ensure the decontamination procedure itself does not pose any additional safety or health
hazards,
• Provide pertinent information on the locations and layouts of decontamination stations
and equipment,
• Establish procedures for the collection, storage and disposal of clothing and equipment
that has not been completely decontaminated, and
• Provide for the periodic evaluation of the plan against the existing site hazards.
10.2. GENERAL CONSIDERATION
The HASP should specify the level of decontamination necessary for personnel and equipment at
the site. The decontamination plan for personnel and equipment is based on the assumption that
all personnel and equipment leaving the Exclusion Zone/Radiological Area (area of potential
contamination) are grossly contaminated. The plan includes a system for washing, and rinsing, at
least once, all of the mechanical and protective equipment until they are decontaminated. If
Contamination
Reduction
Zone
Support Zone
Dress Redress
Hotline
Contamination Control Line
LEGEND
= Access Control Points
_ _
DOE-EM-STD-5503-94
10-2
clothing or equipment is contaminated with both radiological and hazardous material and this
process is used, mixed waste may be generated. Special precautions should be taken to ensure
this waste is properly handled, treated, stored and disposed.
10.3. LOCATION AND LAYOUT
An area within the Contamination Reduction Zone/Radiological Buffer Area is normally
designated the Contamination Reduction Corridor (CRC). The CRC controls access into and out
of the Exclusion Zone/Radiological Area and confines personnel decontamination activities to a
limited area. A separate CRC should be established for equipment. Figure 10-1 provides a
graphical depiction of an example layout of CRCs in relation to work zones.
FIGURE 10-1
Example Layout of Contamination Reduction Corridors
Professional judgment should be exercised in determining how the CRC should be organized and
what decontaminants should be used. Factors that should be considered include:
• The extent and type of the expected hazard,
• Meteorological conditions (wind direction),
• Topography,
• Levels of protection selected, and
• Availability of equipment and supplies.
DOE-EM-STD-5503-94
10-3
The size of the corridor depends on:
• The wind direction (corridor needs to remain upwind),
• Number of stations in the decontamination procedure,
• The overall dimension of work control zones (i.e., Exclusion Zone, Contamination
Reduction Zone, Support Zone), and
• The amount of space available at the site.
A corridor of 75 feet by 15 feet should be adequate for the most extensive decontamination.
Whenever possible, it should be a straight path.
The CRC boundaries should be conspicuously marked, with entry and exit restricted. The far
end is the Hotline--the boundary between the Exclusion Zone and the Contamination Reduction
Zone. Personnel and equipment exiting the Exclusion Zone should go through the designated
CRC. Anyone in the CRC should be wearing the appropriate level of protection designated for
the decontamination crew.
Section 58
Protective clothing, respirators, monitoring equipment, sampling supplies, and other equipment
should be maintained in the support area outside of the CRC. Personnel don their protective
equipment away from the CRC and enter the Exclusion Zone through a separate access control
point at the Hotline. Appendix F recommends the decontamination layouts, procedures, and
equipment needed for PPE Levels A through C.
10.4. DETERMINING DECONTAMINATION METHODS
The need for, and extent of decontamination depends upon the reason for an employee leaving
the Exclusion Zone/Radiological Area. A worker leaving the Exclusion Zone/Radiological Area
to pick up or drop off tools or instruments and immediately returning may not require full
decontamination. A worker leaving to get a new air cylinder or change a respirator or canisters,
however, would require some degree of decontamination. The time required for personnel
decontamination should be ascertained and incorporated into the scheduling of site activities.
Individuals departing the CRC to the Support Zone should be thoroughly decontaminated.
Personnel wearing a self-contained breathing apparatus should leave the work area with
sufficient air to walk to the CRC and go through decontamination.
A flow chart for evaluating safety and health aspects of a decontamination method is depicted in
Figure 10-2. Once decontamination procedures have been established, all personnel requiring
decontamination should be given precise instructions and should practice moving through the
decontamination line.
DOE-EM-STD-5503-94
FIGURE 10-2
Decision Aid for Evaluating Health and Safety Aspects of Decontamination Methods
10-4
DOE-EM-STD-5503-94
10-5
The type of decontamination equipment, materials, and supplies are generally selected on the
basis of availability, the ease of decontamination, and disposability. Most equipment and
supplies can be easily procured. Some commonly used articles are:
• Soft-bristle scrub brushes or long-handled brushes to remove contaminants;
• Buckets of water or garden sprayers for rinsing;
• Large galvanized wash tubs, stock tanks, or children's wading pools for washing and
rinsing solutions;
• Large plastic garbage cans or similar containers lined with plastic bags for the storage of
contaminated clothing and equipment;
• Metal or plastic cans or drums for the temporary storage of contaminated liquids; and
• Paper or cloth towels for drying protective clothing and equipment.
Heavy equipment such as bulldozers, trucks, backhoes, and drilling equipment are difficult to
decontaminate. Decontamination Pad design and construction should reflect consideration for
overspray and pad strength durability to accommodate heavy equipment decontamination. The
methodology generally employed involves washing the equipment on a sloped concrete or plastic
covered pad with a soapy water solution followed by a thorough water rinse. The wash and rinse
solutions are applied through the use of a high pressure spray unit. Particular attention should be
given to tires, scoop, and other components which directly contact the contaminated areas. Wipe
tests should be employed to determine the effectiveness of the decontamination procedure.
Section 59
Protective equipment, sampling tools, and other equipment are usually decontaminated by
scrubbing with detergent water using a soft-bristle brush followed by rinsing with a copious
quantity of water. While this process may not be fully effective in removing some contaminants
(in some cases, the contaminants may react with water), it is a relatively safe option compared to
the use of a decontaminating solution. The contaminant should be identified before a
decontamination chemical is used, as reactions of the chemical with unidentified substances or
mixtures could be hazardous or more difficult to dispose. A decontamination solution should be
selected based on the recommendations of an experienced chemist.
10.5. STANDARD OPERATING PROCEDURES TO MINIMIZE WORKER CONTACT
The minimization of worker contact with contaminants during decontamination actually starts
with Standard Operating Procedures (SOPs). Site workers who use general safe work practices
are less likely to be contaminated than site workers who do not use these practices. Workers can
take steps to minimize their exposure during decontamination through using contact
minimization techniques such as:
• Remote handling,
• An outer layer of disposable clothing,
• Encasing tools/equipment in plastic, and.
• General safe work practices.
DOE-EM-STD-5503-94
10-6
The HASP should incorporate all of the appropriate contact minimization techniques addressed in
the site-specific decontamination plan.
Once workers reach the decontamination line, they should strictly adhere to proper doffing
procedures. This includes minimizing contact (grabbing, holding, touching, etc.) between
contaminated site workers and decontamination line workers.
10.6. COLLECTION, STORAGE AND DISPOSAL PROCEDURES
All items (including clothing, equipment, liquids) used in the decontamination procedure that
cannot be completely decontaminated should be considered radioactive, hazardous, or mixed
waste, as appropriate. Clothing and equipment should be collected, treated, stored, and disposed
of based on the type and level of contamination according to applicable Federal, state and local
regulations. Drainage and/or collection systems for contaminated liquids should be established
and approved containers should be used. Wash water should be collected for proper disposal.
Procedures to contain contaminated water or decontamination fluids (i.e., collection of
contaminated runoff, containment of overspray) should be developed and included as part of the
decontamination plan. Waste minimization should be a consideration, secondary only to worker
safety and health protection requirements, when designing the decontamination procedure.
10.7. REFERENCES
1. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
2. DHHS (NIOSH) Publication No. 85-115, Occupational Safety and Health Guidance Manual
for Hazardous Waste Site Activities, Chapter 10 and Appendix B, Section I,
NIOSH/OSHA/USCG/EPA, 1985 (Four-Agency Document).
3. DOE Radiological Control Manual, Chapter 3, Part 7, "Construction and Restoration
Projects," June 1992.
4. EPA Publication No. 9285.1-03, Standard Operating Safety Guides, Chapter 9, Office of
Emergency and Remedial Response, USEPA, 1992.
5. EPA 9285.8-01, Health and Safety Plan (HASP) User's Guide, Chapter 9, Office of
Emergency and Remedial Response, USEPA, 1992 (and ERT Health and Safety Plan
Planner, Ver. 3.0C, 1993).
6. Resource Conservation and Recovery Act (RCRA), 42 U.S.C. 6901.
Section 60
7. Toxic Substances Control Act (TSCA) 15 U.S.C. 2601.
DOE-EM-STD-5503-94
11-1
11.0. EMERGENCY RESPONSE/CONTINGENCY PLAN
11.1. BACKGROUND
The site-specific Emergency Response/Contingency Plan, also referred to as Emergency
Response Plan (ERP), should be designed as a separate section of the HASP and should be
compatible and integrated with the disaster, fire, and emergency response plans of local, state,
and Federal agencies. Where applicable, the plan should be coordinated with other DOE
elements at the installation. The purpose of the ERP is to protect workers in emergency
situations resulting from the release of all types of hazardous substances, including Extremely
Hazardous Substances, CERCLA hazardous substances, RCRA hazardous wastes, and any
substance listed by the U.S. Department of Transportation as a hazardous material. The
requirements for an ERP at hazardous waste sites are codified in 29 CFR 1910.120. The ERP
should be developed and implemented prior to beginning site operations. Hazardous waste site
operations should not begin until the ERP is in place.
Sites with RCRA permitted treatment, storage, and disposal facilities for hazardous waste,
having the required contingency plan meeting the requirements of their permit, would not need to
duplicate the same planning elements. Those items of the ERP that are properly addressed in the
permit contingency plan may be substituted into the ERP required by 29 CFR 1910.120.
The objective of this chapter is to describe the minimum required elements of the ERP, which are
as follows:
• Pre-emergency planning;
• Personnel roles, lines of authority, and communication;
• Emergency recognition and prevention;
• Safe distances and places of refuge;
• Site security and control;
• Evacuation routes and procedures;
• Decontamination procedures;
• Emergency medical treatment/first aid;
• Emergency alerting and response procedures;
• Critique of response and follow-up;
• PPE and emergency equipment; and
• Procedures for reporting incidents to local, state, and Federal governmental agencies.
Elements identified above may require data that has already been created and documented in
other chapters of the HASP (i.e., site characterizations, hazard assessments, maps, transportation
routes, etc.). Copies of this documentation should be incorporated into the ERP.
DOE-EM-STD-5503-94
11-2
11.2. PRE-EMERGENCY PLANNING
The objective of pre-emergency planning is to be prepared to safely respond to anticipated
emergencies prior to commencement of hazardous waste operations. Additionally,
29 CFR 1910.120(1)(3)(B)(iii) establishes pre-planning to ensure that the ERP is compatible and
integrated with the disaster, fire, and/or emergency response plans of local, state, and Federal
agencies.
To ensure the complete integration of emergency response activities with outside organizations,
this section of the ERP should include the following:
• An explanation of the relationship between site organizations and local governmental
response agencies (e.g., host, county, state);
• A list of all emergency plans affecting the site;
• A description of the relationship between this plan and other plans affecting the site;
• A description of the ways in which all ERPs are integrated with local response plans;
• A description of the function and responsibilities of all local response organizations at the
site (e.g., public and private sectors, volunteer organizations, and charitable
organizations); and
Section 61
• A listing of all mutual agreements and other arrangements for sharing data and response
resources.
The following technical items should be considered during pre-planning and included in this
section of the ERP:
• Scenarios for potential credible accidents which may take place during site operations or
along transportation routes;
• Operations at the site that possess hazardous substances/activities and the transportation
routes along which these substances should move;
• Other facilities/activities which may contribute to the overall site risk;
• Site topography, layout, and prevailing weather conditions;
• Potential off-site impacts [e.g., special populations (infants, the aged) and sensitive
institutions (hospitals, schools, daycare center)]; and
• ERP rehearsals and drills.
The ERP should be reviewed and revised on a regular basis.or as necessary, by the Site Safety
and Health Officer (SSHO). This will ensure the plan is adequate and consistent with prevailing
site conditions.
11.3. PERSONNEL ROLES, LINES OF AUTHORITY, AND COMMUNICATIONS
This section of the ERP, used in conjunction with Chapter 2, Key Personnel, should identify and
define the roles of all personnel, organizations, and teams, both onsite and offsite, who will
DOE-EM-STD-5503-94
11-3
participate in emergency response. Local, state, and Federal response organizations with
oversight responsibility should be identified and an explanation included for integration and
coordination into a single, workable response plan. Depending upon the nature and scope of the
emergency, the size of the site, and the number of personnel, emergency response may require
small or large teams, or several interacting teams. In all cases, the organizational structure
should:
• Show a clear chain-of-command,
• Ensure every person knows his/her position and authority,
• Be flexible enough to handle multiple emergencies, and
• Clearly identify specific roles and responsibilities.
11.3.1. Facility Emergency Coordinator
The Facility Emergency Coordinator assumes primary responsibility for responding to and
coordinating emergency situations. This includes taking appropriate measures to ensure the
safety of site personnel and the public. Possible actions may involve evacuation of personnel
from the site area and evacuation of adjacent residents. The Facility Emergency Coordinator is
additionally responsible for implementing corrective measures, notification of appropriate
authorities, and completion of follow-up reports. The SSHO may be called upon to act on the
behalf of the Facility Emergency Coordinator, and direct responses to any medical emergency.
Individual contractor organizations are responsible for assisting the Facility Emergency
Coordinator and/or SSHO in his/her mission within the parameters of their scope of work. These
positions should be considered mandatory and alternate(s) should be specified.
11.3.2. Emergency Contacts
A contact list should be developed for notification. This list should be updated continually and
made available to all emergency response personnel and site employees (see example list in
Table 11-1).
11.3.3. Reporting
Reporting requirements vary depending upon the type and severity of the accident/incident.
Procedures should be developed for reporting accidents/incidents that occur at EM sites. These
procedures are found in the DOE 5000 Series Orders, and include notification requirements
within DOE, and to other Federal, state, and local organizations.
Section 62
DOE-EM-STD-5503-94
11-4
TABLE 11-1
Emergency Contacts and Phone Numbers
Organization Contact Telephone
Ambulance:
Police:
Fire:
State Police:
Hospital 1:
Hospital 2:
Poison Control Center:
Regional EPA:
EPA Emergency Response
Team: 908-321-6660
State Authority:
National Response Center:
800-424-8802
Center for Disease Control:
404-488-4100
Chemtrec:
Site Emergency Operations
Center:
DOE Emergency Operations
Center (National Center): 202-896-8100
800-424-9555
DOE-EM-STD-5503-94
11-5
11.3.4. Emergency Communications
Communications systems to be used for internal and external communications during an
emergency should be described including types and combinations of systems, their use, and back-
up systems.
An internal network of communications should be developed to alert workers to danger, convey
safety information, and maintain site control. Any effective system or combination of systems
may be employed. External communications systems and procedures should be clear and
accessible to all workers. All personnel should be familiar with the protocol for communication
systems.
11.4. EMERGENCY RECOGNITION AND PREVENTION
A system to alert personnel to potentially hazardous situations should be established. Site
briefings should be held as necessary to brief all employees of new developments, tasks, and
hazards associated with work at the site. These briefings should include:
• Tasks to be performed;
• Specific chemical and physical hazards that may be encountered, including their effects,
how to recognize symptoms or monitor them, concentration limits, or other danger
signals;
• Transportation routes along which hazardous substances move;
• Additional hazards as a direct result of site activities, as well as prevention and control
techniques/mechanisms; and
• Emergency procedures.
Personnel should be familiar with techniques of hazard recognition from pre-assignment training
and site-specific briefings.
Personnel should also be knowledgeable of the fire hazards associated with the materials and
processes to which they are exposed. Details on fire prevention planning are provided in Chapter
12, of this guidance document.
11.5. SAFE DISTANCES AND PLACES OF REFUGE
The requirements for determining safe distances and places of refuge at a specific site should be
established. This section should consider the amount and type of substance(s) at the site as well
as the potential impact on workers and the public. Safe distances should be estimated based on
emergency scenarios developed during the pre-planning phase. Actual safe distances can only be
established at the time of an emergency, based on a combination of site-specific and incident-
specific factors. Some factors that may need to be considered are:
DOE-EM-STD-5503-94
11-6
• The toxicological/radiological properties of the substance,
• The physical state of the substance,
• The quantity and rate of release,
• The method of release,
• The atmospheric conditions, and
• Local topography.
Onsite refuges should be identified and provided with proper equipment for localized
emergencies not requiring site evacuation. Examples of equipment a refuge might contain are:
• Water for decontamination,
• Communications network with site emergency operations center,
• Emergency personal protection equipment,
• First-aid supplies,
• Required special monitoring devices, and
• Fire extinguisher.
Section 63
11.6. SITE SECURITY AND CONTROL
In an emergency, the Facility Emergency Coordinator should ascertain who is on site, and
control the entry of personnel into hazardous areas. In an emergency, as in daily work activities,
the site should be divided into three areas: Exclusion Zone, Contamination Reduction Zone, and
Support Zone. Only necessary rescue and response personnel should be allowed into the
Exclusion Zone. A personal locator system should be used to locate all personnel on site.
Checkpoints (or a series of checkpoints) should be established through which all personnel
entering or exiting the emergency site should pass. Checkpoint information should include:
• Name (affiliation),
• Time of entry/exit,
• Zones or areas to be entered,
• Tasks to be performed, and
• Protective equipment worn and air time remaining.
11.7. EVACUATION ROUTES/PROCEDURES
Primary and alternate routes should be established for evacuating victims and endangered
personnel. Routes should be directed from the Exclusion Zone, through an upwind
Contamination Reduction Corridor to a Support Zone, then to an offsite location.
The following guidelines should be used to assist in establishing safe emergency evacuation
routes and developing procedures for their use:
DOE-EM-STD-5503-94
11-7
• Place evacuation routes predominately upwind from the Exclusion Zone;
• Run evacuation routes through the Contamination Reduction Zone;
• Consider the accessibility of potential routes;
• Develop two or more routes, separate from each other;
• Clearly mark all evacuation routes;
• Check clearances of access ports, crawlspaces, hatches, manholes, tunnels, etc., to ensure
personnel wearing PPE can get through; and
• Establish a routine for ensuring all evacuation routes are kept clear.
A map should be provided which depicts evacuation routes for the site and immediate area.
Assembly areas and safe distances in the event of a major incident should also be included. This
information should be included in the overall training program.
11.8. DECONTAMINATION PROCEDURES
This section specifically addresses decontamination procedures necessary in emergency response
situations. If the general Decontamination section of the HASP adequately addresses emergency
response decontamination, that section may be reproduced and inserted into the ERP section of
the HASP. Additional emergency decontamination procedures should be developed if
appropriate.
The following items should be considered when developing emergency decontamination
procedures:
• Decontamination of ill or injured personnel,
• Reporting of all injuries and illnesses to the Project Manager,
• Protection of emergency medical personnel,
• Decontamination and/or disposal of contaminated protection equipment and
contaminated solutions,
• Providing specific decontamination procedures to a clinic or hospital treating ill or
injured personnel, and
• Decontamination of emergency equipment.
11.9. EMERGENCY MEDICAL TREATMENT/FIRST AID
In emergencies, toxic exposures and hazardous situations that cause injuries and illnesses will
vary from site to site. Medical treatment may range from bandaging of minor cuts and abrasions
to life-saving techniques. In many cases, essential medical help may not be immediately
available. For this reason, it is vital to train onsite emergency personnel in on-the-spot treatment
techniques, to establish and maintain telephone contact with medical experts (e.g., physicians,
toxicologists), and to establish liaisons with local hospitals and ambulance services. When
designing this program, the following should be included:
Section 64
DOE-EM-STD-5503-94
11-8
• Training of personnel in emergency treatment such as first aid and CPR,
• Establishing liaison with local medical personnel,
• Informing and educating local medical personnel about site-specific hazards, and
• Establishing onsite emergency first-aid stations.
11.10. EMERGENCY ALERTING/RESPONSE PROCEDURES
Requirements should be established for developing procedures which alert onsite personnel to
the emergency, activate the onsite emergency response team, and establish the actions to be taken
by emergency response personnel. Procedures contained in this section should comply with
requirements for employee alarm systems as specified at 29 CFR 1910.165. If physically
impaired individuals are employed at the site, alternate alarm methods may be necessary.
11.10.1. Notification
When notifying onsite emergency response personnel, all available information on the incident
should be provided. This may include:
• Location,
• Time of occurrence,
• Description of incident (including contaminants involved),
• Injuries or fatalities,
• Extent of damage,
• Actions taken, and
• Identified response needs.
11.10.2. Evaluation of the Situation
As quickly as possible, available information about the incident and emergency response
capabilities should be evaluated by the Facility Emergency Coordinator and the Emergency
Response Team. The following information should be determined, to the extent possible:
What happened:
• Type of incident;
• Cause of incident;
• Extent of chemical release and transport; and
• Extent of damage to structures, equipment, and terrain.
Casualties:
• Victims (number, location, and condition);
• Treatment required; and
• Missing personnel.
DOE-EM-STD-5503-94
11-9
What could happen?
• Types of chemicals on site;
• Potential for fire, explosion, and release of hazardous substances;
• Location of all personnel on site relative to hazardous areas; and
• Potential for danger to offsite population or environment.
What can be done?
• Equipment and personnel resources needed for victim rescue and hazard mitigation;
• Number of uninjured personnel available for response;
• Resources available on site;
• Resources available from outside groups and agencies;
• Time for outside resources to reach the site; and
• Hazards involved in rescue and response.
11.10.3. Rescue/Response Action
Based on the available information, the type of action required should be determined and the
necessary steps implemented. Some actions may be done concurrently. No one should attempt
emergency response or rescue until back-up personnel and evacuation routes have been
identified. Rescue/response actions include:
• Enforce the buddy system;
• At all times, retain personnel in the Exclusion Zone in line-of-sight or communications
contact with the Command Post Supervisor or designee;
• Locate all victims and assess their condition;
• Determine resources needed for stabilization and transport;
• Assess existing and potential hazards to site personnel and to the offsite population;
• Allocate onsite personnel and equipment to rescue and incident response operations;
• Contact the needed offsite personnel or facilities, such as the ambulance, fire department,
and police;
• Bring the hazardous situation under complete or temporary control, and use measures to
prevent the spread of the emergency;
• Remove or assist victims from the area;
• Use established procedures to decontaminate uninjured personnel in the Contamination
Section 65
Reduction Zone, or if the emergency makes this area unsafe, establish a new
decontamination area at an appropriate distance;
• Administer any medical procedures that are necessary to stabilize victims before moving;
• Stabilize or permanently fix the hazardous condition, and attend to the cause of the
emergency and anything damaged or endangered by the emergency;
• Take measures to minimize contamination of the victims, transport vehicle(s) and
ambulance and hospital personnel; and
• Move site personnel to a safe distance upwind of the incident, monitor the incident for
significant changes, and take additional actions to protect personnel, if necessary.
DOE-EM-STD-5503-94
11-10
11.11. CRITIQUE OF RESPONSE AND FOLLOW-UP
11.11.1. Critique
Review the incident and revise all aspects of the ERP according to new site conditions and
lessons learned from the emergency response. When reviewing the information, consider typical
questions such as:
• What caused the emergency?
• Was it preventable? If so, how?
• Were procedures for prevention of the emergency adequate? If not, how can they be
improved?
• Were all phases of the response adequate? How could it have been improved?
• How did the incident affect the site profile? How were other site cleanup activities
affected?
• Was the public safety protected?
11.11.2. Maintaining Readiness
Before normal site activities are resumed, personnel should be fully prepared and equipped to
handle another emergency. Also, equipment and supplies should be restocked, damaged
equipment should be repaired or replaced, and equipment should be cleaned and refueled for
future use. A regular schedule should be established for testing and inspecting emergency
equipment and systems.
11.12. PPE AND EMERGENCY EQUIPMENT
An up-to-date list of all emergency equipment should be maintained. Personal Protective
Equipment (PPE) should be selected, sized, fitted, maintained and used in accordance with the
PPE section of the site-specific HASP. Additionally, PPE training should be conducted as
specified in the HASP training section. Individuals should receive required PPE training prior to
being allowed to perform work on site. A map that shows the location of emergency equipment
should be made readily available to all personnel.
Specific procedures for the maintenance, fueling, parking, and availability of regular equipment,
which doubles as emergency equipment, should be developed. Adoption of the following work
procedures should be considered:
• Refuel all heavy equipment once the tanks have been lowered to one-half to one-quarter
tank;
• Require equipment repairs to take place upon discovery;
• Park similar pieces of heavy equipment (e.g., bulldozers, trucks, forklifts) in separate
locations, and do not use them at the same location at the same time;
DOE-EM-STD-5503-94
11-11
• Inspect all emergency equipment at each shift change; and
• Ensure all equipment operators are thoroughly briefed on the procedures and requirements
for relinquishing vehicles to emergency response personnel.
The basic emergency equipment and supplies, shown in Table 11-2, should be made available at
the site, as required.
TABLE 11-2
Emergency Equipment and Supplies
Personal Protection Medical Response Equipment
� Escape SCBA or SCBA, which � Air splints � Fire-fighting equipment and
can be brought to the victim to � Antiseptics supplies
replace or supplement his or her � Blankets � Spill-containment equipment, such
SCBA � Decontamination solutions as absorbents and oil booms
Section 66
� PPE and clothing specialized for appropriate for onsite chemical � Special hazardous-use tools such
known site hazards hazards as remote pneumatic impact
� Emergency eye wash wrenches, nonsparking wrenches
� Emergency showers or wash and picks
stations � Containers to hold contaminated
� Fist aid kits materials including overpacks
� Ice � Communication equipment such
� Reference books containing basic as public, site, and mobile phones,
first-aid procedures and information two-way radios
on treatment of specific chemical � Sampling equipment including air
injuries monitors, such as Combustible
� Resuscitator Gas Indicators, Photoionization
� Safety harness Detectors
� Stretchers
� Water, in portable containers
� Wire basket litter (stokes litter)
which can be used to carry a victim
in bad weather and on difficult
terrain, allows easy
decontamination of the victim, and
is itself easy to decontaminate
Special equipment should be obtained depending upon the specific types of emergencies which
may occur, and the capabilities of response personnel. When determining the type and quantities
of special equipment, the following factors should be considered:
• The number and qualifications of response personnel;
• The worst case emergency scenario;
• Type of hazards, mitigation, containment, and protective measures;
• Capabilities and response times of offsite response personnel; and
• Number of possible victims.
11.13. REFERENCES
1. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
DOE-EM-STD-5503-94
¢ Inspect all emergency equipment at each shift change; and
e Ensure all equipment operators are thoroughly briefed on the procedures and requirements
for relinquishing vehicles to emergency response personnel.
The basic emergency equipment and supplies, shown in Table 11-2, should be made available at
the site, as required.
TABLE 11-2
Emergency Equipment and Supplies
which can be used to carry a victim
in bad weather and on difficult
terrain, allows easy
decontamination of the victim, and
is itself easy to decontaminate
Personal Protection Medical Response Equipment
e@ Escape SCBA or SCBA, which ee. Air splints Fire-fighting equipment and
can be brought to the victim to e = Antiseptics supplies
replace or supplement his or her e Blankets Spill-containment equipment, such
SCBA e Decontamination solutions as absorbents and oil booms
e@ ~~ PPE and clothing specialized for appropriate for onsite chemical Special hazardous-use tools such
known site hazards hazards as remote pneumatic impact
@ Emergency eye wash wrenches, nonsparking wrenches
e@ Emergency showers or wash and picks
stations Containers to hold contaminated
e_ -Fist aid kits materials including overpacks
e = Ice Communication equipment such
e@ Reference books containing basic as public, site, and mobile phones,
first-aid procedures and information two-way radios
on treatment of specific chemical Sampling equipment including air
injuries monitors, such as Combustible
e _ Resuscitator Gas Indicators, Photoionization
e ~—s Safety harness Detectors
e = Stretchers
e Water, in portable containers
e@ Wire basket litter (stokes litter)
Special equipment should be obtained depending upon the specific types of emergencies which
may occur, and the capabilities of response personnel. When determining the type and quantities
of special equipment, the following factors should be considered:
Section 67
¢ The number and qualifications of response personnel;
¢ The worst case emergency scenario;
¢ Type of hazards, mitigation, containment, and protective measures;
¢ Capabilities and response times of offsite response personnel; and
¢ Number of possible victims.
11.13. REFERENCES
1. 29 CFR 1910.12Qazardous Waste Operations and Emergency Res|épiAsA/VOPER).
11-11
DOE-EM-STD-5503-94
11-12
2. 29 CFR 1910.165, Employee Alarm Systems.
3. 29 CFR 1910.1000, Air Contaminants.
4. DHHS (NIOSH) Publication No. 85-115, Occupational Safety, and Health Guidance
Manual for Hazardous Waste Site Activities, NIOSH/OSHA/USCG/EPA, 1985 (Four-
Agency Document).
5. DOE 5483.XX, Occupational Safety and Health Program for DOE Contractor Employees
(Draft).
6. DOE Order 5000.3B, Occurrence Reporting and Processing of Operations Information.
7. DOE 5500.1B, Emergency Management System.
8. DOE 5500.2B, Emergency Categories, Classes, and Notification and Reporting
Requirements.
9. DOE 5500.3A, Planning and Preparedness for Operational Emergencies.
10. DOE 5500, 4A, Public Affairs Policy and Planning Requirements for Emergencies.
11. DOE 5500.5A, Public Affairs Policy and Planning Requirements for a Fuel Supply
Disruption Emergency.
12. DOE 5500.6B, Shutdown of Departmental Operations Upon Failure by Congress to Enact
Appropriations.
13. DOE 5500.7B, Emergency Operating Records Protection Program.
14. DOE 5500.8A, Energy Emergency Planning and Management.
15. DOE 5500.9A, Emergency Planning, Preparedness, and Response to Continuity of
Government Emergencies.
16. DOE 5500.10, Emergency Readiness Assurance Program.
17. EPA Publication No. 9285.1-03, Standard Operating Safety Guides, Office of Emergency
and Remedial Response, US EPA, 1992.
18. NFPA, Hazardous Materials Emergency Response Handbook, 1992.
DOE-EM-STD-5503-94
12-1
12.0. EMERGENCY ACTION PLAN
12.1. BACKGROUND
Not all EM-40 sites have the organizational capability for responding to emergencies. Most
organizations at EM-40 sites should, in fact, evacuate employees and only perform such
activities as emergency shut-down or first aid/CPR. Therefore, it is not necessary for these sites
to prepare an emergency response plan. Instead, these sites should prepare an Emergency Action
Plan (EAP) that meets the requirements of 29 CFR 1910.38(a).
The EAP should describe those actions to be taken to assure safety from fire, hurricanes,
blizzards, toxic chemical releases, floods, and other emergencies. The Plan should be totally
integrated and coordinated with the landlord's emergency response plan, and should contain, at a
minimum, the following elements:
• Emergency escape procedures, and emergency escape route assignments;
• Procedures to ensure that all contractors on site coordinate their EAPs to prevent conflicts
and confusion;
• Procedures to be followed by personnel who stay behind to conduct critical operations
(i.e., shutdown) before they evacuate;
• Procedures to account for all employees after emergency evacuation has been completed;
• Rescue and medical duties (first aid, CPR, etc.) for those individuals who are to perform
them;
• Methods for reporting fires and other emergencies;
• Names and phone numbers of personnel and organizations to be contacted for further
information or explanation of duties under the Plan;
• Alarm system to be used to alert personnel to the emergency/evacuation;
• Training each employee should receive in order to effectively carry out the requirements
Section 68
of the EAP, and the methods for evaluating employee knowledge of the plan;
• Fire prevention plan; and
• Procedures for the review and update of the Plan (e.g., schedule, rehearsal).
12.2. EMERGENCY ESCAPE ROUTE ASSIGNMENT
This section of the EAP should contain the information necessary for the safe, orderly evacuation
of site employees. The contents of this section should focus on the procedures for evacuation
and the establishment of emergency escape routes. Primary and alternate routes to be used for
the evacuation of personnel should be established.
The following guidelines should be used in establishing safe emergency evacuation routes:
• Routes should be directed from the Exclusion Zone, through an upwind Contamination
Reduction Zone to a Support Zone, and from the Support Zone to an offsite location,
should conditions require a general site evacuation;
DOE-EM-STD-5503-94
12-2
• Place direct evacuation routes predominately upwind from the Exclusion Zone. In some
cases, as at very large sites, some exits may be placed in the downwind fenceline.
Workers should be informed during training that they are not safe until they have reached
the designated safety area;
• Establish evacuation routes through the Contamination Reduction Zone. This should
allow a mechanism for accountability of all personnel, even if there is not enough time to
process evacuees through decontamination;
• Consider the accessibility of potential routes. Obstructions such as locked gates,
trenches, pits, drums, tanks, and other barriers should be considered, as well as the
additional time and equipment needed to maneuver around or through them;
• Develop two or more routes, separate from each other, which lead to safe areas. Ensure
that routes do not overlap or intersect;
• Mark routes as "safe" or "not safe" on a daily basis, depending on wind direction and
other conditions at the site; and
• Mark all evacuation routes. No unsafe routes should be used for evacuation (e.g., low
ground, streams, trenches).
Consider mobility limitations for personnel wearing PPE and other emergency equipment
including:
• Develop procedures to use ladders and other material to traverse hazardous terrain (e.g.,
ditches, heights, trenches); and
• Check clearances of access ports, crawlspaces, hatches, manholes, tunnels, to ensure
personnel wearing protective equipment can get through.
A routine should be established for ensuring all evacuation routes are kept clear. In the event of
an emergency which necessitates an evacuation of the site, a procedure similar to the one below
should be used.
• Make evacuation alarm notification supplemented by the use of hand held radios. All
personnel should evacuate upwind of any activities along established "safe" evacuation
routes. Proceed to the predetermined location so that all personnel can be accounted for;
and
• Ensure that personnel proceed to the closest exit with their buddy, and proceed to the safe
distance area associated with the evacuation route. Personnel should remain at that area
until the re-entry alarm is sounded or an authorized individual provides further
instructions.
A map should be provided which depicts evacuation routes for the site and immediate area. In the
event of a major incident, assembly areas and safe distances should also be indicated on the
map.
DOE-EM-STD-5503-94
12-3
12.3. PROCEDURES FOR CRITICAL OPERATIONS PERSONNEL
Section 69
Procedures should be developed which clearly identify critical operations, critical operations
personnel, and actions required of those personnel performing critical operations during site
evacuation. This section should contain:
• A listing of all critical operations, the personnel assigned to perform them, and the
procedure for updating the listing;
• A description of any additional training requirements for designated personnel;
• A step-by-step procedure to complete the critical tasks;
• Estimated time required for the employee to complete the assigned critical tasks;
• Procedures for delayed evacuation (if different from normal evacuation procedures),
• Procedures for reporting to the designated safe area; and
• Procedures for emergency communications during the conduct of critical tasks and
delayed evacuation.
12.4. PROCEDURES TO ACCOUNT FOR ALL EMPLOYEES
Procedures should be developed which account for all personnel immediately following an
evacuation. These procedures should:
• Contain the requirements to account for and report the number of personnel evacuated,
• Provide a means for notifying the SSHO and emergency personnel when employees are
missing, and
• Include procedures for accounting for personnel performing critical operations.
12.5. RESCUE AND MEDICAL DUTIES
Personnel may need to perform life saving CPR or emergency first aid prior to the arrival of the
local emergency personnel (e.g., fire, medical, rescue teams). This section of the EAP should
describe the actions to be taken by site personnel with first aid/CPR responsibilities. At a
minimum, this section should contain:
• A current listing of all personnel with first aid/CPR duties,
• Training requirements for personnel with first aid/CPR duties,
• Description of conditions under which employees perform first aid/CPR,
• Description of medical and rescue duties taken until the arrival of the emergency response
personnel,
• Procedures for notifying emergency personnel, and
• Procedures for reporting the incident to the appropriate personnel.
DOE-EM-STD-5503-94
12-4
12.6. REPORTING FIRES AND OTHER EMERGENCIES
All personnel at the site should be knowledgeable regarding the means by which emergencies are
reported. This section of the EAP should contain the information needed for personnel to report
fires and other emergencies at the site. At a minimum, this section should contain:
• A description and location of communications equipment available at the site for
emergency reporting,
• Procedures for the use of site communications equipment,
• Procedures for reporting the emergency, and
• Complete listing of emergency telephone numbers, radio frequencies, emergency signals,
etc.
12.7. EAP CONTACT PERSONNEL
A list of primary and alternate key personnel should be developed which identifies individuals
and organizations with the expertise to explain and provide technical information on the use of
the EAP. These personnel/organizations, and applicable alternates, should be listed by name,
title, and telephone number. This list should be continually updated and made available to all
employees and visitors. Additionally, the list should include the names and addresses of site
safety personnel and their alternates (e.g., Project Manager, SSHO).
12.8. EMERGENCY/EVACUATION ALARM SYSTEM
Section 70
This section should contain a complete description of all alarms and signals (and related back-up
systems) to notify personnel of an emergency. All applicable alarms and signals (e.g.,
evacuation, radiation, take cover, standard alert), as well as, the actions to be taken in the event
the alarm is sounded should be fully explained. Alarm systems and back-up systems should be
in compliance with 29 CFR 1910.165.
12.9. EAP TRAINING REQUIREMENTS
Each employee at the site should be properly trained in all aspects of the EAP. Additionally,
critical operations personnel or those personnel with first aid/CPR responsibilities should receive
additional training necessary to effectively carry out their duties. This training should be
conducted and documented in accordance with the training section of the site-specific HASP.The
following items in this section of the EAP should be performed and documented:
• Designate and train a sufficient number of persons to assist in the safe and orderly
emergency evacuation of employees,
• Identify critical operations and designate and train a sufficient number of persons to
conduct those operations,
DOE-EM-STD-5503-94
12-5
• Train all personnel working at the site in evacuation and other required emergency
procedures, as applicable,
• Provide a listing of all required training to be completed prior to beginning work, and
• Coordinate unique training requirements with the SSHO and provide a description of all
required training not covered by the training section of the HASP.
All personnel should receive required training prior to beginning work at the site. The methods
for evaluating personnel competency in carrying out the requirements of the EAP should be
reviewed with each individual covered by the Plan at the following times:
• Initially, when the plan is developed,
• Upon initial assignment,
• Whenever the employee's responsibilities or designated actions under the plan change,
and
• Whenever the plan is changed.
12.10. FIRE PREVENTION PLAN
This section should contain procedures that reduce the vulnerability of the workplace to fire.
Fire prevention plan requirements are specified by OSHA in 29 CFR 1910.38 and include
discussions of housekeeping, training and maintenance. The plan should be updated as hazards
change. In addition to the categories listed above, the plan should include:
• A list of the major workplace fire hazards,
• Names or titles of personnel responsible for the control of workplace hazards,
• List of types of fire protection equipment or systems and the hazards they control, and
• Pre-fire planning in coordination with the local emergency response services to
familiarize them with workplace process hazards.
The fire prevention plan discussion satisfies part of the administrative requirements of an overall
Fire Protection Program as outlined in DOE Order 5480.7A, Fire Protection. This section of the
HASP should ensure that all requirements of DOE 5480.7A are followed or integrated into the
HASP.
12.10.1. Housekeeping
Procedures should be developed to control accumulations of material and residues so that they
are not the source of a fire emergency. Fire prevention housekeeping plans include:
• Proper handling, storage and control procedures for flammable and combustible waste
materials;
• List of potential ignition sources (e.g., welding) and their control procedures; and
• Housekeeping procedures that maintain the means of egress free of obstructions.
Section 71
DOE-EM-STD-5503-94
12-6
12.10.2. Training
Personnel should be informed of the fire hazards associated with the materials and processes to
which they are exposed. Personnel should be trained on response procedures for fires. For
example, in addition to evacuation, personnel may be expected to use fire extinguishing
equipment and/or activate manual alarms.
12.10.3. Maintenance
Proper maintenance, inspection and testing of fire protection equipment and systems are key to
eliminating or controlling fire development. Equipment should be maintained according to
manufacturers' specifications. In addition, National Fire Protection Association (NFPA) 25,
Inspection, Testing and Maintenance of Water-Based Fire Protection System and other NFPA
codes covering the particular equipment or device should be consulted. Whether maintenance is
performed in-house or contracted, the individuals performing the work should be properly
trained. Names or titles of personnel responsible for maintenance should be kept on file.
Maintenance, inspection and testing procedures apply to:
• Equipment installed to detect fuel leaks, control heating, and control pressurized systems
(e.g., flame arresters on furnaces, high temperature/pressure switches on dip tanks);
• Portable extinguishers, automatic sprinkler systems and fixed extinguishing systems (e.g.,
sprinkler control valves, fire pumps);
• Detection systems for smoke, heat, or flame;
• Fire alarm and annunciation systems; and
• Emergency back up systems and the equipment they support.
12.11. PROCEDURES FOR THE REVIEW AND UPDATE OF THE EAP
This section should contain the procedures to review and update the EAP. As a minimum, this
section should describe procedures for:
• The periodic review/update of the plan;
• Training employees on the latest changes to the plan; and
• Coordinating and integrating the latest version of the EAP with the HASP, site
emergency response organizations, and the host ERP (if applicable).
12.12. REFERENCES
1. 29 CFR 1910.38, Employee Emergency Plans and Fire Prevention Hazards.
2. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
3. 29 CFR 1910.165, Employee Alarm Systems.
DOE-EM-STD-5503-94
12-7
4. DOE Order 5000.3B, Occurrence Reporting and Processing of Operations Information.
5. National Fire Protection Association (NFPA) 25, Inspection, Testing and Maintenance of
Water-Based Fire Protection Systems.
DOE-EM-STD-5503-94
12-8
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
13-1
13.0. CONFINED SPACE ENTRY
13.1. BACKGROUND
A confined space is defined as any location that has limited openings for entry and egress, is not
intended for continuous employee occupancy, and is so enclosed that natural ventilation may not
reduce air contaminants to levels below the threshold limit value (TLV). Examples of confined
spaces include: manholes, stacks, pipes, storage tanks, trailers, tank cars, pits, sumps, hoppers,
and bins. Entry into confined spaces without the proper precautions could result in injury and/or
impairment or death due to:
• An atmosphere that is flammable or explosive,
• Lack of sufficient oxygen to support life,
• Contact with or inhalation of toxic materials, or
• General safety or work area hazards such as steam or high pressure materials.
The overall objectives of this chapter are to provide the minimum safety requirements to be
followed while entering, exiting and working in confined spaces during environmental restoration
work. This chapter provides pertinent details on the following:
Section 72
• Duties and responsibilities,
• Identification and evaluation,
• Hazard assessment,
• Hazard controls,
• Entry permits,
• Entry procedures,
• Opening a confined space,
• Atmospheric testing,
• Isolation and lockout/tagout safeguards,
• Ingress/egress safeguards,
• Warning signs and symbols,
• Training, and
• Emergency response.
13.2. DUTIES AND RESPONSIBILITIES
13.2.1. Project Manager
The Project Manager should assign an individual within each project to act as the project
Confined Space Coordinator. This individual should be responsible for implementing the confined
space program in accordance with this chapter.
DOE-EM-STD-5503-94
13-2
13.2.2. Confined Space Coordinator
The Confined Space Coordinator should be responsible for implementing the confined space
program and should:
• Ensure that a list of confined spaces is maintained,
• Ensure that cancelled permits are reviewed for lessons learned,
• Ensure training of personnel is conducted,
• Ensure coordination with outside responders,
• Ensure equipment is in compliance with standards, and
• Maintain a master inventory of identified confined spaces.
13.2.3. Field Team Leader
The Field Team Leader in charge of any confined space work should:
• Ensure requirements for entry have been completed before entry is authorized;
• Ensure confined space monitoring is performed by personnel qualified and trained in
confined space entry procedures;
• Ensure a list of monitoring equipment and personnel qualified to operate the equipment is
maintained by the Safety and Occupational Health Office;
• Ensure that the rescue team has simulated a rescue in a confined space within the past
twelve months;
• Know the hazards that may be faced during entry, including the mode, signs or
symptoms, and consequences of exposure;
• Fill out a permit;
• Determine the entry requirements;
• Require a permit review and signature from the authorized entry supervisor;
• Notify all involved employees of the permit requirements;
• Post the permit in a conspicuous location near the job;
• Renew the permit or have it reissued as needed (a new permit is required every shift);
• Determine the number of attendants required to perform the work;
• Ensure the attendant knows how to communicate with the entrants and how to obtain
assistance;
• Post any required barriers and signs;
• Remain alert to changing conditions that might affect the conditions of the permits, (i.e.,
require additional atmospheric monitoring or changes in personal protective equipment);
• Change and reissue the permit, or issue a new permit as necessary;
• Ensure periodic atmospheric monitoring is done according to permit requirements;
DOE-EM-STD-5503-94
13-3
• Ensure that personnel doing the work and all support personnel adhere to permit
requirements;
• Ensure the permit is canceled when the work is done; and
• Ensure the confined space is safely closed and all workers are cleared from the area.
13.2.4. Entry Supervisors
An Entry Supervisor is a qualified person authorized to approve confined space entry permits.
This person should be responsible for:
• Determining if conditions are acceptable for entry,
• Authorizing entry and overseeing entry operations,
• Terminating entry procedures as required,
• Serving as an attendant, as long as the person is trained and equipped appropriately for
that role,
• Ensuring measures are in place to keep unauthorized personnel clear of the area,
• Checking the work at least twice a shift to verify and document permit requirements are
Section 73
being observed (more frequent checks should be made if operations or conditions are
anticipated that could affect permit requirements),
• Ensuring that necessary information on chemical hazards is kept at the work site for the
employees or rescue team,
• Ensuring a rescue team is available and instructed in their rescue duties (e.g., an onsite
team or a prearranged outside rescue service), and
• Ensuring at least one member of the rescue team has current certification in first aid and
CPR.
13.2.5. Employees Entering Confined Space
Employees who are granted permission to enter a confined space should:
• Read and observe the entry permit requirements;
• Stay alert to the hazards that could be encountered in a confined space;
• Use the protective equipment required by the permit;
• Immediately exit the confined space when:
- Ordered to do so by the attendant,
- Automatic alarms sound,
- They perceive they are in danger, or
- They notice physiological stresses or changes in themselves or co-workers (e.g.,
dizziness, blurred vision, shortness of breath).
DOE-EM-STD-5503-94
13-4
13.2.6. Attendant
The Attendant should be stationed outside the work space and should:
• Be knowledgeable of, and be able to recognize potential confined space hazards;
• Maintain a sign-in/sign-out log with a count of all persons in the confined space and
ensure all entrants sign in/sign-out;
• Monitor surrounding activities to ensure the safety of personnel;
• Maintain effective and continuous communication with personnel during confined space
entry, work and exit;
• Order personnel to evacuate the confined space if he/she:
- Observes a condition which is not allowed on the entry permit;
- Notices the entrants acting strangely, possibly as a result of exposure to hazardous
substances;
- Notices a situation outside the confined space which could endanger personnel;
- Notices within the confined space a hazard which has not been previously recognized
or taken into consideration;
- Must leave his/her work station; or
- Must focus attention on the rescue of personnel in some other confined space that
he/she is monitoring;
• Immediately summon the Rescue Team if crew rescue becomes necessary; and
• Keep unauthorized persons out of the confined space, order them out, or notify authorized
personnel of the unauthorized entry.
13.2.7. Rescue Team
The Rescue Team members should:
• Complete a training drill using mannequins or personnel in a simulation of the confined
space prior to the issuance of an entry permit for any confined space and at least annually
thereafter;
• Respond immediately to rescue calls from the Attendant or any other person recognizing a
need for rescue from the confined space;
• In addition to emergency response training, receive the same training as that required of
the authorized entrants; and
• Have current certification in first-aid and CPR.
13.3. IDENTIFICATION AND EVALUATION
The Project Manager should ensure a survey is conducted of the work site to identify confined
spaces. This survey can be partially completed from initial and continuing site characterizations,
as well as other available data (e.g. blueprints, job safety analysis). The purpose of the survey is
to develop an inventory of those locations and/or equipment that meet the definition of a
DOE-EM-STD-5503-94
13-5
Section 74
confined space. This information should be communicated to personnel and appropriate
procedures developed prior to entry. The initial surveys should include air monitoring to
determine the air quality in the confined spaces. The following situations should be evaluated by
competent personnel:
• Flammable or explosive potential,
• Oxygen deficiency, and
• Presence of toxic and corrosive material.
13.3.1. Hazard Re-Evaluation
The Project Manager should ensure the identification and re-evaluation of the hazards based on
possible changes in activities, and/or other physical or environmental conditions, which could
adversely affect work. A master inventory of confined spaces should be maintained. Any
change in designation of a confined space will be routed through the Site Safety and Health
Officer (SSHO) for review, prior to the change being made.
13.4. HAZARD ASSESSMENT
A hazard assessment should be completed prior to any entry into a confined space. The hazard
assessment should identify the sequence of work to be performed in the confined space, the
specific hazards known or anticipated, and the control measures to be implemented to eliminate or
reduce each of the hazards to an acceptable level. No entry should be permitted until the
hazard assessment has been reviewed and discussed by all persons engaged in the activity.
Personnel who enter confined spaces should be informed of known or potential hazards
associated with the confined spaces to be entered.
13.5. HAZARD CONTROLS
Hazard controls include changes in the work processes and/or working environment with the
objective of:
• Controlling the health hazards either by eliminating the responsible agents,
• Reducing health hazards below harmful levels, and
• Preventing the contaminants from coming into contact with the workers.
The following order of precedence should be followed in reducing confined space risks:
• Engineering controls, such as ventilation to limit exposure to hazards;
• Work practice controls, such as wetting of hazardous dusts, frequent cleaning; and
• Use of PPE, such as air purifying or supplied-air respirators.
DOE-EM-STD-5503-94
13-6
13.5.1. Engineering Controls
Engineering controls are those controls which eliminate or reduce the hazard through
implementation of sound engineering practices.
Ventilation is one of the most common engineering controls used in confined spaces. When
ventilation is used to remove atmospheric contaminants from the confined space, the space
should be ventilated until the atmosphere is within the acceptable ranges. Ventilation should be
maintained during the occupancy if there is a potential for the atmospheric conditions to move
out of the acceptable range. When ventilation is not possible or feasible, alternate protective
measures or methods to remove air contaminants and protect occupants should be determined by
the qualified person prior to authorizing entry. Conditions regarding continuous forced air
ventilation should be used as follows:
• Employees should not enter the space until the forced air ventilation has eliminated any
hazardous atmosphere,
• Forced air ventilation should be so directed as to ventilate the immediate areas where an
employee is or will be present within the space,
• Continuous ventilation is maintained until all employees have left the space, and
• Air supply for forced air ventilation should be from a clean source.
13.5.2. Work Practice (Administrative) Controls
Section 75
Work practice (administrative) controls are those controls which eliminate or reduce the hazard
through changes in the work practice (e.g., rotating workers, reducing the amount of worker
exposure, housekeeping). Confined spaces should be cleaned/decontaminated of hazardous
materials to the extent feasible before entry. Cleaning/decontamination should be the preferred
method of reducing exposure to hazardous materials. Where this is not practicable, PPE should
be worn by the entry personnel to provide appropriate protection against the hazards which may
be present.
13.5.3. Personal Protective Equipment (PPE)
If the hazard cannot be eliminated or reduced to a safe level through engineering and/or work
practice controls, PPE should be used. A qualified person should determine PPE needed by all
personnel entering the confined space, including rescue teams. PPE which meet the
specifications of applicable standards should be selected in accordance with the requirements of
the job to be performed.
13.6. ENTRY PERMITS
The Confined Space Entry Permit is the major tool in assuring safety during entry in confined
spaces with known hazards or with unknown or potentially hazardous atmospheres. The entry
DOE-EM-STD-5503-94
13-7
permit process guides the supervisor and workers through a systematic evaluation of the space to
be entered. The permit should be used to establish appropriate conditions. Before each entry
into a confined space, an entry permit will be completed by a qualified person and the contents
communicated to all employees involved in the operation and conspicuously posted near the
work location. A standard entry permit should be used for all entries.
13.6.1. Key Elements for Entry Permits
A standard entry permit should contain the following items:
• Permit space to be entered;
• Purpose of the entry;
• Date of the permit and the authorized duration of the entry permit,
• Name of authorized entrants within the permit space;
• Means of identifying authorized entrants inside the permit space, e.g., rosters or tracking
systems;
• Personnel, by name, currently serving as attendants,
• Individual, by name, currently serving as entry supervisor, with a space for the signature
or initials of the entry supervisor who originally authorized entry,
• Hazards of the permit space to be entered,
• Measures used to isolate the permit space and to eliminate or control permit space
hazards before entry, e.g., lockout or tagout of equipment and procedures for purging,
inerting, ventilating, and flushing permit spaces;
• Acceptable entry conditions,
• Results of initial and periodic tests performed, accompanied by the names or initials of
the testers and by an indication of when the tests were performed;
• Rescue and emergency services that can be summoned and the means, (e.g., equipment to
use, phone numbers to call) for summoning those services,
• Communication procedures used by authorized entrants and attendants to maintain
contact during the entry,
• Equipment to be provided for compliance with this section, (e.g., PPE, testing,
communications, alarm systems, and rescue);
• Other information whose inclusion is necessary, given the circumstances of the particular
confined space, in order to ensure employee safety; and
• Additional permits, such as for hot work, that have been issued to authorize work in the
permit space.
Appendix D of 29 CFR 1910.146 provides an example permit containing these items.
Section 76
A permit is only valid for one shift. For a permit to be renewed, several conditions should be
met before each re-entry into the confined space. First, atmospheric testing should be conducted
and the results should be within acceptable limits. If atmospheric test results are not within
acceptable limits, precautions to protect entrants against the hazards should be addressed on the
DOE-EM-STD-5503-94
13-8
permit and should be in place. Second, a qualified person should verify that all precautions and
other measures called for on the permit are still in effect. Finally only operations or work
originally approved on the permit should be conducted in the confined space.
A new permit should be issued or the original permit reissued whenever changing work
conditions or work activities introduce new hazards into the confined space. The employer
should retain each cancelled entry permit for at least one year to facilitate the review of the
confined space entry program. Any problems encountered during an entry operation should be
noted on the pertinent permit so that appropriate revisions to the confined space permit program
can be made.
13.7. ENTRY PROCEDURES
Whenever entry into a confined space is needed, either an Entry Supervisor or the person in
charge of the job may initiate entry procedures, including the completion of a confined space
entry permit. Entry into a confined space should follow the standard entry procedure.
The following are requirements for standard entry:
• Training to establish personnel proficiency in the duties required,
• Atmospheric testing for entry, and
• Atmospheric monitoring during the entry.
Before an employee enters the space, the internal atmosphere should be tested with a calibrated,
direct-reading instrument. If a hazardous atmosphere is detected during entry:
• The space should be evaluated to determine how the hazardous atmosphere developed,
and
• Measures should be implemented to protect employees before any subsequent entry takes
place.
Personnel should be prohibited from entering hazardous atmospheres without wearing proper
respiratory equipment as determined by qualified entry supervisors. The entire confined space
entry permit should be completed for a standard entry. Entry should be allowed only when all
requirements of the permit are met and it is reviewed and signed by an Entry Supervisor.
13.8. OPENING A CONFINED SPACE
Any conditions making it unsafe to remove an entrance cover should be eliminated before the
cover is removed. When entrance covers are removed, the opening should be promptly guarded
by a railing, temporary cover, or other temporary barrier that will prevent anyone from falling
through the opening. This barrier or cover should protect each employee working in the space
DOE-EM-STD-5503-94
13-9
from foreign objects entering the space. If it is in a traffic area, adequate barriers should be
erected.
13.9. ATMOSPHERIC TESTING
Atmospheric test data is needed prior to entry into any confined space. Atmospheric testing is
required for two distinct purposes: evaluation of the hazards of the permit space and verification
that acceptable conditions exist for entry into that space. If a person must go into the space to
obtain the needed data, then Standard Confined Space Entry Procedures should be followed (i.e.,
rescue team, attendant, entry supervisor). Before entry into a confined space, a qualified person
should conduct testing for hazardous atmospheres. The internal atmosphere should be tested
with a calibrated, direct-reading instrument for the following, in the order given:
Section 77
• Oxygen content,
• Flammable gases and vapors, and
• Potential toxic air contaminants.
Testing equipment used in specialty areas should be listed or approved for use in such areas. This
listing or approval should be from nationally recognized testing laboratories such as Underwriters
Laboratories or Factory Mutual Systems.
13.9.1. Evaluation Testing
The atmosphere of a confined space should be analyzed using equipment of sufficient sensitivity
and specificity The analysis should identify and evaluate any hazardous atmospheres that may
exist or arise, so that appropriate permit entry procedures can be developed and acceptable entry
conditions stipulated for that space. Evaluation and interpretation of these data and development
of the entry procedure should be done by, or reviewed by, a technically qualified professional
(e.g., OSHA consultation service, certified industrial hygienist, registered safety engineer, certified
safety professional).
13.9.2. Verification Testing
A confined space which may contain a hazardous atmosphere should be tested for residues of all
identified or suspected contaminants. The evaluation testing should permit specified equipment
to determine that residual concentrations at the time of testing and entry are within acceptable
limits. Results of testing (i.e., actual concentration) should be recorded on the permit. The
atmosphere should be periodically retested to verify that atmospheric conditions remain within
acceptable entry parameters. Initial testing of atmospheric conditions and subsequent tests after a
job has been stopped should be done with the ventilation systems shut down. If the confined
space is vacated for any period of time, the atmosphere of the confined space should be retested
before re-entry is permitted. Further testing should be conducted with ventilation systems turned
DOE-EM-STD-5503-94
13-10
on to ensure the contaminants are removed and that the ventilation system is not causing a
hazardous condition.
13.9.3. Acceptable Limits
The atmosphere of the confined spaces should be considered within acceptable limits whenever
the following conditions are maintained:
• Oxygen - 19.5% to 23.5%,
• Flammability - less than 10% of the Lower Flammable Limit (LFL), and
• Toxicity - less than recognized ACGIH exposure limits or other published exposure
levels (e.g. OSHA PELs, NIOSH RELs).
Whenever testing of the atmosphere indicates levels of oxygen, flammability, or toxicity that are
not within acceptable limits, entry should be prohibited until appropriate controls are
implemented. If the source of the contaminant cannot be determined, precautions should be
adequate to deal with the worst possible condition in the confined space. If there is the
possibility that the confined space atmosphere can become unacceptable while the work is in
progress, the atmosphere should be constantly monitored and procedures and equipment should
be provided to allow the employees to quickly and safely exit the confined space.
13.10. ISOLATION AND LOCKOUT/TAGOUT SAFEGUARDS
All energy sources which are potentially hazardous to confined space entrants should be secured,
relieved, disconnected and/or restrained before personnel are permitted to enter the confined
space. Equipment systems or processes should be locked out or tagged out or both per 29 CFR
1910.147 and ANSI Z244.1-1982, Lockout/Tagout of Energy Sources prior to permitting entry
into the confined space. The current lockout/tagout program being used at the site should be
used as guidance. In confined spaces where complete isolation is not possible, provisions should
be made for as rigorous an isolation as practical. Special precautions should be taken when
entering double walled, jacketed, or internally insulated confined spaces that may discharge
hazardous material through the vessel's internal wall.
Section 78
Where there is a need to test, position or activate equipment by temporarily removing the lock or
tag or both, a procedure should be developed and implemented to control hazards to the
occupants. Any removal of locks, tags, or other protective measures should be done in
accordance with ANSI Z244.1-1982.
13.11. INGRESS/EGRESS SAFEGUARDS
Means for safe entry and exit should be provided for confined spaces. Each entry and exit point
should be evaluated to determine the most effective methods and equipment to be utilized to
enable employees to safely enter and exit the confined space.
DOE-EM-STD-5503-94
13-11
Appropriate retrieval equipment or methods should be used whenever a person enters a confined
space. Use of retrieval equipment may be waived by the designated qualified persons if use of
the equipment increases the overall risks of entry or does not contribute to the rescue. A
mechanical device should be available to retrieve personnel from vertical type confined spaces
greater than five feet in depth.
13.12. WARNING SIGNS AND SYMBOLS
All confined spaces that could be inadvertently entered should have signs identifying them as
confined spaces. Signs should be maintained in a legible condition. The signs should contain a
warning that a permit is required before entry. Accesses to all confined spaces should be
prominently marked.
13.13. TRAINING
The employer should provide training so that all employees whose work is regulated by this
section acquire the understanding, knowledge, and skills necessary for the safe performance of
their duties in confined spaces. Training should be provided to each affected employee:
• Before the employee is first assigned duties under this section,
• Before there is a change in assigned duties,
• Whenever there is a change in permit space operations that presents a hazard for which an
employee has not been trained, and
• Whenever the employer has reason to believe either that there are deviations from the
permit space entry procedures required in this section or that there are inadequacies in the
employee's knowledge or use of these procedures.
The training should establish employee proficiency in the duties required by this section and
should introduce new or revised procedures, as necessary, for compliance with this section.
13.13.1. General Training
All employees who will enter confined spaces should be trained in entry procedures. Personnel
responsible for supervising, planning, entering or participating in confined space entry and rescue
should be adequately trained in their functional duties prior to any confined space entry.
Training should include:
• Explanation of the general hazards associated with confined spaces;
• Discussion of specific confined space hazards associated with the facility, location or
operation;
• Reason for, proper use, and limitations of PPE and other safety equipment required for
entry into confined spaces;
DOE-EM-STD-5503-94
13-12
• Explanation of permits and other procedural requirements for conducting a confined space
entry;
• A clear understanding of what conditions would prohibit entry;
• How to respond to emergencies;
• Duties and responsibilities as a member of the confined space entry team; and
• Description of how to recognize symptoms of overexposure to probable air contaminants
in themselves and co-workers, and method(s) for alerting attendants.
Refresher training should be conducted as needed to maintain employee competence in entry
procedures and precautions.
Section 79
13.13.2. Specific Training
13.13.2.1. Training for Atmospheric Monitoring Personnel
Training should include proper use of monitoring instruments such as:
• Proper use of the equipment;
• Knowledge of calibration;
• Knowledge of sampling strategies and techniques; and
• Knowledge of PELs, TLVs, LELs, UELs, etc.
13.13.2.2. Training For Attendants
Training should include the following:
• Procedures for summoning rescue or other emergency services, and
• Proper utilization of equipment used for communicating with entry and emergency/rescue
personnel.
13.13.2.3. Training for Emergency Response Personnel
Training should include:
• Rescue plan and procedures developed for each type of confined space that are
anticipated to be encountered,
• Use of emergency rescue equipment,
• First aid and CPR techniques, and
• Work location and confined space configuration to minimize response time.
DOE-EM-STD-5503-94
13-13
13.13.2.4. Verification of Training
Periodic assessment of the effectiveness of employee training should be conducted by a qualified
person. Training sessions should be repeated as often as necessary to maintain an acceptable
level of personnel competence.
13.14. EMERGENCY RESPONSE
13.14.1. Emergency Response Plan
A plan of action should be written with provisions to conduct a timely rescue for individuals in a
confined space should an emergency arise.
13.14.2. Retrieval Systems or Methods to Facilitate Non-entry Rescue
Retrieval systems should be used whenever an authorized person enters a permit space, unless the
equipment increases the overall risk of entry or the equipment would not contribute to the
rescue of the entrant. Retrieval systems should have a chest or full body harness and a
retrieval line attached at the center of the back near shoulder level or above the head. If
harnesses are not feasible or create a greater hazard, wristlets may be used in lieu of the harness.
The retrieval line should be firmly fastened outside the space so that rescue can begin as soon as
anyone is aware that retrieval is necessary. A mechanical device should be available to retrieve
personnel from vertical confined spaces more than five feet deep.
13.15. REFERENCES
1. 29 CFR 1910.146, Permit-required Confined Spaces.
2. National Safety Council Data Sheet 12304-0704, Confined Space Entry Control System for
Research and Development Operations.
3. American National Standard Institute (ANSI) Z117.1-1989, Safety Requirements for
Confined Spaces.
4. DHHS (NIOSH) Publication No. 87-113, Working With Confined Spaces.
5. ANSI Z 244.1-1982, Lockout/Tagout of Energy Sources.
6. 29 CFR 1910.147, The Control of Hazardous Energy (Lockout/Tagout).
DOE-EM-STD-5503-94
13-14
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
14-1
14.0. SPILL CONTAINMENT
14.1. BACKGROUND
The intent of this section of the HASP is to meet the requirements of
29 CFR 1910.120 (b)(4)(ii)(j). The spill containment program should address all hazardous
substance spill scenarios that are likely to occur at the site. In addition, the spill containment
program should also provide procedures to contain and isolate the entire volume of any hazardous
substance spilled in the course of a transfer, accident, or onsite release.
The overall objectives of the Spill Containment chapter are to:
• Identify the minimum requirements of the spill containment program that may be relevant
to the site and provide methods to contain and isolate the entire volume of any hazardous
substance spilled in the course of a transfer, major spill, or an onsite release; and
Section 80
• Provide information on the initial spill action, spill response evaluation and organization,
and spill clean-up procedures.
14.2. PREPLANNING
In order to develop a successful spill containment program, an assessment should be conducted
of the site conditions, current operations, and planned activities. The assessment should carefully
examine all hazardous materials on site for where and how the materials are:
• Stored (e.g., location, type of container),
• Handled (e.g., processed, used, transferred), and
• Transported (e.g., mode, routes).
As part of the assessment, each area or activity should be analyzed for potential accidental
releases or spills. Examples of situations that have potential for spill or release are:
• Bulging or corroded containers,
• Transfer line connections (e.g., leaking seals, misaligned connections),
• Metal fatigue of storage tanks,
• Leaking or inoperable valves, and
• Poor housekeeping (e.g., drums improperly staged).
Many potential spills can be avoided through application of proper engineering controls to
hazards identified in the assessment. In areas where storage, handling, and transportation
activities occur, preplanning to contain the largest volume of material that could be released in
the area will minimize worker exposure. The containment measure should be appropriate to the
hazardous material(s) identified and should be installed in the area or located nearby. The
following examples are measures most frequently used:
DOE-EM-STD-5503-94
14-2
• Absorbent materials, (e.g., pads, booms, powders);
• Salvage containers (e.g., overpack drums);
• Bermed, lined pads;
• Concrete pad and dike;
• Inflatable containment (e.g., "kiddie" pools, bladders); and
• Associated equipment (e.g., pumps, hoses, shovels, hoists).
Procedures should be developed to properly maintained and replace, as necessary, all spill
containment equipment and fixtures.
14.3. REPORTING AND INITIAL PERSONNEL SAFETY
Upon discovery of a hazardous substance spill, personnel should be instructed to:
• Immediately summon help by notifying the Field Team Leader, the Site Safety and
Health Officer (SSHO), and/or the Project Manager;
• Take action to ensure the safety of nearby personnel;
• Proceed to a safe location;
• If anyone is seriously injured, immediately contact emergency medical services; and
• Keep unauthorized personnel out of the area.
14.4. INITIAL SPILL ACTION
Factors that limit the employee's response at the site of a spill are:
• Level of training,
• Personal safety,
• Available personal protective equipment (PPE), and
• Knowledge of the substance.
Employees should limit their actions to:
• Shutting off equipment or pumps,
• Closing valves,
• Blocking drains within the path of the spill, and
• Using spill kit materials to dam or impede the flow of the spill.
Unauthorized persons should be excluded from the area.
14.5. SPILL RESPONSE EVALUATION
The identity and hazards of the spilled material should be determined before decisions regarding
spill containment and control are made. The SSHO or Project Manager should evaluate the
DOE-EM-STD-5503-94
14-3
hazards associated with the spill and decide whether project employees or external response
organizations should conduct the cleanup. If the Project Manager determines that project
response personnel cannot safely perform the spill cleanup, the Project Manager should notify
and request the assistance of, the Emergency Response Coordinator, and the ERP should be
activated.
Section 81
14.6. ORGANIZING A SPILL RESPONSE
If the Project Manager determines that cleanup can be performed safely with project response
personnel, the SSHO may act as the spill team leader and designate required procedures. Safety
practices for small spill operations closely parallel procedures implemented during routine
hazardous materials handling operations. Before work begins, the SSHO should conduct a
hazard identification and assessment with response personnel. The following should be
discussed and established:
• Levels of PPE and safety procedures,
• Safety and work zones,
• All steps of the response activities,
• Most effective procedures or methods for cleanup,
• Means of containment,
• Leak or spill control,
• Decontamination procedures, and
• Emergency decontamination.
14.7. SPILL CLEANUP PROCEDURES
After care of injured personnel, containment of the released hazardous material should be the
next consideration to limit its effect on the safety of personnel, the public, and the environment.
The SSHO should determine the methods of control which depend upon the nature and extent of
the spill. Actions documented in Chapter 11, Emergency Response/Contingency Plan should
also be consulted. Decontamination should be accomplished in accordance with Chapter 10,
Decontamination and disposal of contaminated materials should meet all regulatory
requirements.
14.8. POST INCIDENT FOLLOW-UP
The Project Manager or SSHO should implement necessary steps to ensure that the incident is
properly documented and that spill response equipment is replenished. The Project Manager
should direct the necessary corrective actions to prevent recurrence and evaluate the response.
DOE-EM-STD-5503-94
14-4
14.9. REFERENCES
1. 29 CFR 1910.120, Hazardous Waste Operations and Emergency Response (HAZWOPER).
2. EPA Publication No. 9285.1-03, Standard Operating Safety Guides, Chapter 10, Office of
Emergency and Remedial Response, USEPA, 1992.
3. DHHS (NIOSH) Publication No. 85-115, Occupational Safety and Health Guidance Manual
for Hazardous Waste Site Activities, Chapter 11, NIOSH/OSHA/USCG/EPA, 1985 (Four-
Agency Document).
4. UEFPC OU 3 RI Work Plan, p. 9-60, Y-12 Plant, Environmental Restoration Program,
Health and Safety Plan, Rev. 0.
5. EPA 9285.8-01, Health and Safety Plan (HASP) User's Guide, Chapter 12, Office of
Emergency and Remedial Response, USEPA, 1992 (and ERT Health and Safety Plan
Planner, Ver. 3.0C, 1993).
DOE-EM-STD-5503-94
A-1
APPENDIX A
HASP Glossary
Acceptable Entry: Those conditions that should exist in a confined space that allow entry and
ensure that employees can safely work within and exit the space.
Access Control Point: An opening in the physical boundary between work zones which is used
to regulate movement of personnel or equipment between the zones.
Acclimatization: A process that helps an employee adjust to work under extreme conditions
(e.g., temperature, altitude).
Action Level: A contaminant concentration at which additional measures are implemented to
protect the worker. The protective measures may include medical surveillance, training, and
modification of the level of protection.
Activity Hazard Assessment (AHA): The process to identify and evaluate the operational
activities and their associated hazards. The process includes implementing control measures to
eliminate or reduce each hazard to an acceptable level.
Section 82
Administrative Controls : Provisions related to the organization and management, procedures,
recordkeeping, assessment, and reporting necessary to ensure safe operation of a facility.
Assessment: The evaluation or appraisal of a process, program, or activity to determine
compliance with the relevant standard, DOE order, rule, code, regulation, or other appropriate
criteria.
Attendant: The individual stationed outside a confined space who monitors the authorized
entrants, controls access into the confined space, and is alert to any hazards that may arise.
Authorized Entrant : An employee who is authorized by the employer to enter a confined space.
Biological Hazards: Agents presenting hazard to the well-being of humans or other animals,
either directly through infection or indirectly through disruption of the environment. Hazards
include plant exposures (e.g., poison ivy and poison oak) and animal exposures (e.g., bee stings
and snake bites).
DOE-EM-STD-5503-94
A-2
Buddy System: A system for organizing employees into work groups in such a manner that each
member of the work group is designated to be observed by at least one other member of the
group at all times. The purpose of the buddy system is to provide rapid assistance to employees
in the event of an emergency.
Chemical Hazard: The exposure of employees to any regulated or non-regulated hazardous
materials (solids, liquids, and gases; natural and man-made), with the potential for causing harm to
people, the environment, or property when released.
Confined Space: An enclosed area that has one or more of the following characteristics:
� It is not intended for continuous occupancy,
� It has restricted entry and exit, and
� It may contain potential or known hazards.
Contamination Reduction Corridor: The area that controls access into and out of the
Exclusion Zone/Radiological Area and where personnel decontamination activities take place.
Contamination Reduction Zone: The transition area between the Exclusion Zone and Support
Zone. The area where decontamination procedures take place.
Controls: Changes in the work processes and/or working environment with the objective of
controlling the hazards either by eliminating the responsible agents, or reducing them to levels
believed not to be harmful to health, as well as by preventing exposure to workers.
Critical Operations: Those emergency operations necessary for the safe emergency shutdown of
an operation, site, task, or piece of machinery.
Critical Operations Personnel: Those personnel identified in writing and trained to accomplish
emergency shutdown operations. These personnel may be required to delay their own evacuation
of the site during an emergency.
Emergency (Confined Space): Any occurrence (including any failure of hazard control or
monitoring equipment) or event internal or external to the confined space that could endanger
entrants.
Emergency (Site): A sudden and unexpected event, taking place on the site, and requiring
urgent action for control or remediation in order to minimize the danger to workers, the public,
the environment, or property.
DOE-EM-STD-5503-94
A-3
Engineering Controls: Methods of controlling employee exposure to safety and health hazards
by modifying the source of exposure or reducing the quantity of contaminants released into the
work area. Examples include piping, containment, ventilation, filtration and shielding.
Section 83
Engulfment: The surrounding and effective capture of a person by a liquid or finely divided
(flowable) solid substance that can be aspirated to cause death by filling or plugging the
respiratory system, or that can exert enough force on the body to cause death by strangulation,
constriction, or crushing.
Entry Permit (Permit ): The written document that allows and controls entry into a confined
space. It is a systematic evaluation of the confined space; it describes purpose of entry,
authorized personnel, hazards, work controls and equipment.
Entry Supervisor: The person (such as the employer, foreman, or crew chief) who determines if
acceptable entry conditions are present at a confined space, authorizes entry, oversees entry
operations, and terminates entries as required.
Exclusion Zone: A controlled area, located on the site, where contamination is either known or
expected to occur and where the greatest potential for exposure exists. Also known as the "Hot
Zone."
Facility : Any DOE installation or portion of an installation operated, funded, or otherwise
controlled by EM-40.
Hazard: An act, condition, or phenomenon posing a source of actual or potential physical,
chemical, radiological, or biological harm to a person.
Hazard Evaluation: A process to assess the severity, and likelihood of exposure to known,
and/or potential occupational safety and health hazards, at or in the work environment.
Hazardous Atmosphere: An atmosphere that may expose employees to the risk of death,
incapacitation, impairment of ability to self-rescue (that is, escape unaided from a confined space),
injury, or acute illness from one or more of the following causes:
• Flammable gas, vapor, or mist in excess of 10 percent of its lower flammable limit (LFL);
• Airborne combustible dust at a concentration that meets or exceeds its LFL; NOTE: This
concentration may be approximated as a condition in which the dust obscures vision at a
distance of 5 feet (1.52 m) or less;
• Atmospheric oxygen concentration below 19.5 percent or above 23.5 percent;
DOE-EM-STD-5503-94
A-4
• Atmospheric concentration of any substance for which a dose or a permissible exposure
limit is published in Subpart G, Occupational Health and Environmental Controls, or in
Subpart Z, Toxic and Hazardous Substances, of 29 CFR 1910, and which could result in
employee exposure in excess of its dose or permissible exposure limit.
Hotline: The outer boundary of the Exclusion Zone. It separates the area of highest
contamination from the Contamination Reduction Zone. It provides an adequate area in which to
conduct site operations taking into account potential contaminant migration.
Hot Work : Work that produces arcs, sparks, flames, heat, or other sources of ignition.
Hot Work Permit : The employer's written authorization to perform operations (for example,
riveting, welding, cutting, burning, and heating) capable of providing a source of ignition.
Immediately Dangerous to Life or Health (IDLH): Any condition or exposure that poses an
immediate or delayed threat to life or that would cause irreversible adverse health effects.
Inerting : The displacement of the atmosphere in a confined space by a non-combustible gas
(such as nitrogen) to such an extent that the resulting atmosphere is non-combustible. This
procedure produces an IDLH oxygen-deficient atmosphere. However, the procedure is used to
isolate the space and control hazards before entry.
Section 84
Installation : Any DOE property (i.e., "inside the fence.")
Isolation: The process by which a permit space is removed from service and is completely
protected from release of energy and material into the space. Common methods of isolation are
misaligning or removing sections of lines, pipes, or ducts; closing off or venting valves;
providing lockout or tagout of all sources of energy; and disconnecting all mechanical linkages.
Job: The detailed steps required to carry out a task.
Key Personnel: Those personnel/organizations considered to be essential to ensure the safe
operation of the facility, site, project, or task.
LEL/LFL and UEL/UFL : Lower explosive limit/lower flammable limit and upper explosive
limit/upper flammable limit describe the explosion or combustion limits, respectively for
flammable gas or vapor mixtures in air. For example, a concentration below the lower
flammable limit is not sufficient to support combustion, and above the upper flammable limit the
mixture is too "rich" to burn.
Line Breaking: The intentional opening of a pipe, line, or duct that is or has been carrying
flammable, corrosive, or toxic material, an inert gas, or any fluid at a volume, pressure, or
temperature capable of causing injury.
DOE-EM-STD-5503-94
A-5
Lockout/Tagout: A procedure for placing a lock/tag on the energy isolating device to indicate
that the process system or equipment should not be operated.
Major Spill : The uncontrolled release of a hazardous substance into the environment to such a
degree that operations personnel can not control or contain the spill, and that requires
mobilization of emergency response personnel.
Onsite Essential Personnel: Those required personnel, available on the site, who by virtue of
their position, responsibilities, and/or expertise, are considered essential to the overall safe
operation of the site.
Oxygen Deficient Atmosphere: An atmosphere containing less than 19.5% oxygen by volume.
Oxygen Enriched Atmosphere: An atmosphere containing more than 23.5% oxygen by volume.
Permissible Exposure Limit (PEL): The employee's permitted exposure to any material listed
in Table Z-1, Z-2, or Z-3 of OSHA Regulations found at 29 CFR 1910.1000, Air Contaminants.
Personal Protective Equipment (PPE): Clothing and equipment used to shield or isolate
individuals from the chemical, physical, and biological hazards that may be encountered at a
hazardous waste site. PPE should protect the respiratory system, skin, eyes, face, hands, feet,
head, body, and hearing. PPE may also stand for personal protective clothing and equipment.
Physical Controls: Physical barriers put into place, which limit personnel exposure to hazards.
Physical Hazards: Those work-related sources of actual or potential danger (e.g., machinery,
trip and fall, hoisting and rigging, shoring and trenching) to which employees may be exposed.
Project: A unique major effort within a program which has firmly scheduled beginning,
intermediate, and ending date milestones; prescribed performance requirements; prescribed costs;
and close management, planning, and control. A project is a basic building block within a
program which is individually planned, approved, and managed. A project is not constrained to
any specific element of the budget structure (e.g., operating expense or plant and capital
equipment).
Project Manager: The individual who has authority to direct all site activities. The project
manager has authority to direct site response and assures overall management of projects.
Section 85
Qualified Person: A person who, by reason of training, education and experience, is
knowledgeable in the operation to be performed and is competent to judge the hazards involved.
DOE-EM-STD-5503-94
A-6
Radiological Hazard: A source of actual or potential danger to a person(s) which occurs or
could occur because of exposure to radiation.
Recommended Exposure Limit: The NIOSH equivalent of OSHA PELs and ACGIH TLVs to
be used in the absence of PELs and TLVs.
Rescue Service: Offsite personnel designated to rescue employees from permit spaces, or other
hazardous areas when the onsite rescue team is not available.
Site: An area where physical work is being performed and where the potential of exposure to
contaminants exists, requiring the use of chemical protective clothing and/or radiological
protective clothing and/or respirators.
Site-Specific Training: Predefined training, unique to a particular site.
Spill: The uncontrolled release of a hazardous substance into the environment that onsite
personnel are capable of containing. Distinguished from a major spill.
Standard Entry Procedure: A procedure for entry into confined spaces which utilizes the
complete array of entry measures. It is characterized by use of trained personnel, atmospheric
testing before and during entry, use of proper protective equipment, and completion of the entry
permit.
Storage: The temporary placement of a hazardous material in a location which provides some
protection to personnel or the environment.
Support Zone: Uncontaminated area where workers are unlikely to be exposed to hazardous
substances or dangerous conditions.
Task: A well defined unit of work having an identifiable beginning and end with two or more
elements. A task is a series of jobs performed in support of a particular project.
Threshold Limit Value (TLV) : An exposure limit established by the American Conference of
Governmental Industrial Hygienists (ACGIH) under which most people can work consistently for
8 hours a day, day after day, with no harmful effect.
Threshold Limit Value-Short-Term Exposure Limit (TLV-STEL) : The concentration to
which workers can be exposed continuously, for a short period of time, without suffering from
irritation, chronic or irreversible tissue damage, or narcosis, provided that the daily TLV-TWA is
not exceeded.
DOE-EM-STD-5503-94
A-7
Threshold Limit Value-Time-Weighted Average (TLV-TWA) : The time-weighted average
concentration for a normal 8-hour workday and a 40-hour workweek to which nearly all workers
may be repeatedly exposed, day after day, without adverse effects.
Toxic Atmosphere: An atmosphere containing a concentration of a substance above the
published or otherwise known safe levels, such as the Threshold Limit Value, Permissible
Exposure Limit, Recommended Exposure Limit, or the Immediately Dangerous to Life or Health
level.
Work : The process of performing a defined task or activity; for example, research and
development, operations, maintenance and repair, administration, software development and use,
inspection, safeguards and security, data collection, and analysis.
Work Plan : That part of a comprehensive Site Health and Safety Program which addresses the
tasks and objectives of site operations, including logistics and resources.
DOE-EM-STD-5503-94
A-8
INTENTIONALLY BLANK
B-1
DOE-EM-STD-5503-94
APPENDIX B
CONCLUDING MATERIAL
Section 86
Review Activity: Preparing Activity:
DOE Field Offices DOE-EM-20
AD AL
BPA CH
CE FN
DP ID Agent:
EH NV
EM OR
ER RL
FE SF
GC SR
IE
IG National Laboratories Project Number:
NE ANL DOE-EM-STD-5503-94
NS BNL
RW FNAL
SA INEL
WAPA LBL
LANL
LLNL
NREL
ORNL
PNL
SNL
B-2
DOE-EM-STD-5503-94
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
C-1
APPENDIX C
TABLE I
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
Operational Personnel Training Requirement Reference(s)
EM-40 employees directly involved in
hazardous waste operations on a daily
or occasional basis, such as supervising
the work, supervising contractor
employees and evaluating program
outcome at the site.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994 and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994 and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994 and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-2
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
Project Manager (PM) directly
responsible for hazardous waste
operation including employees at the
site and has authority to direct response
operations.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994 and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9),
requires a minimum of Site-Specific DOE 1993b, DOE 1993c, DOE
Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994 and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994 and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Section 87
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-3
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
Field Supervisor (FS) who has the
responsibility and authority to direct all
hazardous waste operations and
supervises employees engaged in
hazardous waste operations at the site.
This individual may be the same person
as the Project Manager and may be a
member of the work party.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994 and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9),
requires a minimum of Site-Specific DOE 1993b, DOE 1993c, DOE
Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994 and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994 and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-4
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
Site Safety and Health Officer
(SSHO) involved in taking total control
over site activities. SSHO has authority
to direct response operations and reports
to upper level management.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994 and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9),
requires a minimum of Site-Specific DOE 1993b, DOE 1993c, DOE
Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994 and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994 and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-5
Operational Personnel Training Requirement Reference(s)
Section 88
EM-40 Contractor or Subcontractor
Industrial Hygienist (IH) responsible
for implementation of all aspects of
Health and Safety Plan and verification
of compliance with applicable safety and
health requirements at the site. Tasks
include enforcement of air monitoring
tests to determine worker response to
hazardous substances, advice on
adequate health protection and
evaluation of health hazard assessments
at the site.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994 and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4), DOE
requires a minimum of 8 hours 1993b, DOE 1993c, DOE 1994
Supervisor Training where and NIEHS 1993
applicable.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994 and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994 and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-6
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
Health Physicist (HP) responsible for
implementation of all aspects of
radiation protection for workers at the
site and verifies compliance with
applicable federal regulations and DOE
orders. Typical task includes evaluation
of internal and external radiation health
hazards and recommendation of
appropriate action for workers at the
site.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994, and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training where 1994 and NIEHS 1993
applicable.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9),
requires a minimum of Site-Specific DOE 1993b, DOE 1993c, DOE
Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994 and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994 and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58 (k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
DOE-EM-STD-5503-94
Section 89
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-7
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
Command Post Supervisor. In some
cases, the Command Post Supervisor
may be the same person as the Field
Team Leader. The Command Post
Supervisor is responsible for
communications and emergency
assistance and assists the SSHO in
rescue operations, if necessary.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994 and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training. 1994 and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994 and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994 and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-8
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
Site Emergency Response
Coordinator responsible for
implementing the emergency plan,
whenever conditions at the site warrant
such action. The Site Emergency
Response Coordinator, who may be the
same person as the Site Supervisor,
conducts activities such as evacuation,
emergency treatment, emergency
transport of site personnel, as necessary,
and notification of emergency response
units and appropriate management staff.
The Site Emergency Response
Coordinator is certified in first aid/CPR
by the American Red Cross or
equivalent.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994, and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training. 1994, and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9),
requires a minimum of Site-Specific DOE 1993b, DOE 1993c, DOE
Training. 1994, and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994, and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
Section 90
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58 (k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-9
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
Site Decontamination Station Officer
responsible for implementing Initial Health and Safety Training and1994, and NIEHS 1993
decontamination procedures for large 24 hours supervised field experience.
and small equipment, supplies and
personnel involved in clean-up activities
including visitors. Typical tasks include
set up of decontamination lines and
decontamination solutions appropriate
for the type of chemical contamination
on site, and control of the
decontamination of all equipment (small
and large), personnel, and samples from
the contaminated areas.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training. The 1994, and NIEHS 1993
Decontamination Station Officer need
8 hours Supervisor Training in the
event this individual supervises other
members in this operation.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9),
requires a minimum of Site-Specific DOE 1993b, DOE 1993c, DOE
Training. 1994, and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994, and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c,DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58 (k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c,DOE
1994, and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-10
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
Site Security Officer responsible for
managing site security. The specific
responsibilities include, but are not
limited to, the following: establishing
routine area patrols, monitoring access
and egress, and assisting with
communication during an emergency.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994, and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training where 1994, and NIEHS 1993
applicable.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994,
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994, and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
Section 91
1994, and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58 (k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-11
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
optional personnel on site. Typical
titles include Scientific Advisor (guides
the Project Manager in scientific
matters), Logistics Officer (plans and
mobilizes the facilities, materials and
personnel required for the response),
Photographer (provides photographs of
site conditions and archives
photographs), Public Information
Officer (releases information to the
news media and the public concerning
site activities) and Record Keeper
(maintains the official records of site
activities). See Chapter 2 for a list of
optional personnel and corresponding
responsibilities.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994, and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training where 1994, and NIEHS 1993
applicable.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994,
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994, and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58 (k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-12
Operational Personnel Training Requirement Reference(s)
EM-40 As-needed offsite personnel.
EM-40 typical titles include Bomb
Squad Experts (advise on methods of
handling explosive materials), Fire
fighters (respond to fires that occur on-
site and perform rescue), Hazardous
Chemical Experts (provide immediate
advice to those at the scene of a
chemical related emergency), and
Toxicologists (advise on toxicological
properties and health effects of
chemicals on-site).
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994, and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training where 1994, and NIEHS 1993
applicable.
Section 92
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994,
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994, and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58 (k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-13
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
general site workers (such as
equipment operators and general
laborers) engaged in hazardous
substances removal and other activities
such as field sampling, drilling, and
installation of monitoring wells.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 40 hours DOE 1993b, DOE 1993c, DOE
Initial Health and Safety Training and 1994, and NIEHS 1993
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training where 1994, and NIEHS 1993
applicable.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994,
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994, and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-14
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
workers on a site occasionally for a
specific or limited task (such as, but
not limited to, groundwater monitoring,
land surveying, or geophysical
surveying) and who are unlikely to be
exposed over OSHA permissible
exposure limits (PELs) and published
exposure limits.
29 CFR 1910.120(e)(3)(ii) requires 29 CFR 1910.120(e)(3),
minimum training requirements of 24 DOE 1993b, DOE 1993c, DOE
hours of instruction off-site and a 1994, and NIEHS 1993
minimum of one day of actual field
experience for occasional clean-up
workers. However, EM-40 adoption
of OSHA standards requires a
minimum of 40 hours Initial Health
and Safety Training and 24 hours
supervised field experience.
Section 93
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training where 1994, and NIEHS 1993
applicable.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994,
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994, and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-15
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
workers who work regularly on a site
in areas which have been monitored and hours of instruction off-site and a 1994, and NIEHS 1993
fully characterized indicating that minimum of one day of actual field
exposures are under OSHA PELs and experience for occasional clean-up
published exposure limits where workers. However, EM-40 adoption
respirators or other PPE are not of OSHA standards requires a
necessary, and the characterization minimum of 40 hours Initial Health
indicates that there are no health hazards and Safety Training and 24 hours
or the possibility of an emergency supervised field experience
developing.
29 CFR 1910.120(e)(3)(iii) requires 29 CFR 1910.120(e)(3),
minimum training requirements of 24 DOE 1993b, DOE 1993c, DOE
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(4),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Supervisor Training where 1994, and NIEHS 1993
applicable.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9), DOE
requires a minimum of Site-Specific 1993b, DOE 1993c, DOE 1994,
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE
Annual Refresher Training. 1994, and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(e)(7),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
Lead and Asbestos Abatement 29 CFR 1910.1001(j)(5),
Training, if applicable. 29 CFR 1926.58(k)(3),
29 CFR 1910.1025(l)(1) and (2),
DOE 1993b, DOE 1993c, DOE
1994, and NIEHS 1993
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-16
Operational Personnel Training Requirement Reference(s)
EM-40 Visitors/Non-Workers who
enter an exclusion/decontamination
zone or other areas where Level A or
Level B personal protective
equipment (PPE) is required.
Visitors/Non-Workers are on the site
only occasionally, for a specific or
limited task such as observing work
activities. PPE should be issued to all
Visitors/Non-Workers, and they should
be instructed on its proper use. All
Visitors/Non-Workers should be
escorted by trained personnel. Non-
Workers are EM-40 employees and off-
site personnel not directly involved with
site hazardous waste operations.
Section 94
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(3),
requires a minimum of 40 hours DOE 1991, DOE 1993b,
Initial Health and Safety Training and DOE 1993c, DOE 1994, and
24 hours supervised field experience. NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9),
requires a minimum of Site-Specific DOE 1991, DOE 1993b,
Training. DOE 1993c, DOE 1994, and
NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1991, DOE 1993b,
Annual Refresher Training. DOE 1993c, DOE 1994, and
NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-17
Operational Personnel Training Requirement Reference(s)
EM-40 Visitor/Non-Workers who
enter an exclusion/decontamination
zone or other areas where Level C
(PPE) is required. Visitors/Non-
Workers are on the site only
occasionally, for a specific or limited
task such as inspecting operations at the
site. PPE should be issued to all
Visitors/Non-Workers, and they should
be instructed on its proper use. All
Visitors/Non-Workers are EM-40
employees and Contractors not directly
involved with site hazardous waste site
operations.
OSHA requires a minimum training 29 CFR 1910.120(e)(3),
requirement of 24 hours of instruction DOE 1991, DOE 1993b,
off-site and a minimum of one day DOE 1993c, DOE 1994, and
actual field experience for NIEHS 1993
Visitors/Non-Workers. However,
EM-40 adoption of OSHA standards
requires a minimum of 40 hours
Initial Health and Safety Training and
24 hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(9),
requires a minimum of Site-Specific DOE 1991, DOE 1993b,
Training. DOE 1993c, DOE 1994, and
NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(e)(8),
requires a minimum of 8 hours DOE 1991, DOE 1993b,
Annual Refresher Training. DOE 1993c, DOE 1994, and
NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, and NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE I (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 Sites
C-18
Operational Personnel Training Requirement Reference(s)
EM-40 Visitor/Non-Workers who
enter designated clean areas of the
site where either Level D or no PPE is
required for tasks such as observing
activities in clean portions of the sites.
PPE should be issued, when necessary,
to all Visitors/Non-Workers, and they
should be instructed on its proper use.
All Visitors/Non-Workers should be
escorted by trained personnel. Non-
Workers are EM-40 employees and
Contractors not directly involved with
site hazardous waste operations.
Site-Specific Training. DOE 1991, DOE 1993b, DOE
1993c, DOE 1994, and NIEHS
1993
DOE-EM-STD-5503-94
C-19
TABLE II
Minimum Training Requirements
for Personnel Engaged at EM-40 RCRA TSD Sites
Operational Personnel Training Requirement Reference(s)
EM-40 employees directly
involved in TSD facilities
operations on a daily or occasional
basis, i.e., supervising contractor
employees and evaluating program
outcome.
Section 95
29 CFR 1910.120(p)(7)(i) and (ii) 29 CFR 1910.120(p)(7)(i) and (ii),
require a minimum of 24 hours DOE 1993b, DOE 1993c, DOE 1994,
Initial Health and Safety Training, or and NIEHS 1993
equivalent instruction, for current
employees. However, EM-40
adoption of OSHA standards
requires a minimum of 40 hours
Initial Health and Safety Training
and 24 hours supervised field
experience.
EM-40 requires a minimum of DOE 1993b, DOE 1993c, DOE 1994,
8 hours Supervisor Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p), DOE 1991, DOE
requires a minimum of Facility- 1993b, DOE 1993c, DOE 1994, and
Specific Training. NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p)(7)(i),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE 1994,
Annual Refresher Training. and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(p)(8)(iv),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE 1994,
and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992, DOE
applicable. For details, see DOE 1993b, DOE 1993c, DOE 1994, and
Radiological Control Manual NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE II (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 RCRA TSD Sites
C-20
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or
Subcontractor TSD Facility
Manager (FM) responsible for
operations such as handling
drums or containers. The TSD
FM is also responsible for
supervising TSD employees and
has authority to direct response
operations.
29 CFR 1910.120(p)(7)(i) and (ii) 29 CFR 1910.120(p)(7)(i) and (ii),
require a minimum of 24 hours Initial DOE 1993b, DOE 1993c, DOE 1994,
Health and Safety Training, or and NIEHS 1993
equivalent instruction, for current
employees. However, EM-40 adoption
of OSHA standards requires a minimum
of 40 hours Initial Health and Safety
Training and 24 hours supervised field
experience.
EM-40 requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE 1994,
Supervisor Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p), DOE 1991,
requires a minimum of Facility-Specific DOE 1993b, DOE 1993c, DOE 1994,
Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p)(7)(ii),
requires a minimum of 8 hours Annual DOE 1993b, DOE 1993c, DOE 1994,
Refresher Training. and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(p)(8)(iv),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE 1994,
and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE 1994,
Radiological Control Manual and NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE II (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 RCRA TSD Sites
C-21
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or
Subcontractor Facility Safety
and Health Officer (FSHO)
responsible for implementation of equivalent instruction, for current
all aspects of Safety and Health Plan employees. However, EM-40
at the facility. The FSHO is also adoption of OSHA standards
responsible for implementing the requires a minimum of 40 hours
Emergency Response Plan Initial Health and Safety Training
whenever warranted at the facility. and 24 hours supervised field
FSHO has authority to direct experience.
response operations and reports to
upper level management.
Section 96
29 CFR 1910.120(p)(7)(i) and (ii) 29 CFR 1910.120(p)(7)(i) and (ii),
require a minimum of 24 hours DOE 1993b, DOE 1993c, DOE 1994,
Initial Health and Safety Training, or and NIEHS 1993
EM-40 requires a minimum of DOE 1993b, DOE 1993c, DOE 1994,
8 hours Supervisor Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p), DOE 1991,
requires a minimum of Facility- DOE 1993b, DOE 1993c, DOE 1994,
Specific Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p)(7)(ii),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE 1994,
Annual Refresher Training. and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(p)(8)(iv),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE 1994,
and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE 1994
Radiological Control Manual and NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE II (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 RCRA TSD Sites
C-22
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or
Subcontractor Designated
Emergency Response Person
(DERP) certified in first aid/CPR
by the American Red Cross, or
equivalent. The DERP is assigned
to the facility crew to provide first
aid and CPR services and is on the
facility whenever employees are
working at the facility.
29 CFR 1910.120(p)(7)(i) and (ii) 29 CFR 1910.120(p)(7)(i) and (ii),
require a minimum of 24 hours DOE 1993b, DOE 1993c, DOE 1994,
Initial Health and Safety Training, or and NIEHS 1993
equivalent instruction, for current
employees. However, EM-40
adoption of OSHA standards
requires a minimum of 40 hours
Initial Health and Safety Training
and 24 hours supervised field
experience.
EM-40 requires a minimum of DOE 1993b, DOE 1993c, DOE 1994
8 hours Supervisor Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p), DOE 1991,
requires a minimum of Facility- DOE 1993b, DOE 1993c, DOE 1994,
Specific Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p)(7)(ii),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE 1994,
Annual Refresher Training. and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(p)(8)(iv),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE 1994,
and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE 1994,
Radiological Control Manual and NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE II (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 RCRA TSD Sites
C-23
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or
Subcontractor Facility
Command Post Supervisor or
Facility Emergency Coordinator
(FEC) responsible for
implementing the emergency plan,
whenever conditions at the facility
warrant such action. The FEC who
may be the same person as the TSD
Facility Manager conducts activities
such as evacuation, emergency
transport of facility personnel, as
necessary, and notifies emergency
response units and appropriate
management staff.
29 CFR 1910.120(p)(7)(i) and (ii) 29 CFR 1910.120(p)(7)(i) and (ii),
require a minimum of 24 hours DOE 1993b, DOE 1993c, DOE 1994,
Initial Health and Safety Training, or and NIEHS 1993
equivalent instruction, for current
employees. However, EM-40
adoption of OSHA standards
requires a minimum of 40 hours
Initial Health and Safety Training
and 24 hours supervised field
experience.
Section 97
EM-40 requires a minimum of DOE 1993b, DOE 1993c, DOE 1994,
8 hours Supervisor Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p), DOE 1991,
requires a minimum of Facility- DOE 1993b, DOE 1993c, DOE 1994,
Specific Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p)(7)(ii),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE 1994,
Annual Refresher Training. and NIEHS 1993
Emergency Response and Periodic 29 CFR 1910.120(p)(8)(iv),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE 1994,
and NIEHS 1993
Hazard Communication Training. 29 CFR 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE 1994,
Radiological Control Manual and NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE II (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 RCRA TSD Sites
C-24
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or
Subcontractor facility operators
engaged in activities such as Initial Health and Safety Training, or and NIEHS 1993
handling drums or containers, or equivalent instruction, for current
operation of a treatment unit such as employees. However, EM-40
an incinerator or activated carbon adoption of OSHA standards
adsorption system. requires a minimum of 40 hours
29 CFR 1910.120(p)(7)(i) and (ii) 29 CFR 1910.120(p)(7)(i) and (ii),
require a minimum of 24 hours DOE 1993b, DOE 1993c, DOE 1994,
Initial Health and Safety Training
and 24 hours supervised field
experience.
EM-40 requires a minimum of DOE 1993b, DOE 1993c, DOE 1994,
8 hours Supervisor Training where and NIEHS 1993
applicable.
EM-40 adoption of OSHA standards 29 CFR 1910.120(p), DOE 1991,
requires a minimum of Facility- DOE 1993b, DOE 1993c, DOE 1994,
Specific Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(p)(7)(ii),
requires a minimum of 8 hours DOE 1993b, DOE 1993c, DOE 1994,
Annual Refresher Training. and NIEHS 1993
Emergency Response and Periodic OSHA 1910.120(p)(8)(iv),
Rehearsal Training. DOE 1993b, DOE 1993c, DOE 1994,
and NIEHS 1993
Hazard Communication Training. OSHA 1910.120,
29 CFR 1926.59
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE 1994,
Radiological Control Manual and NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE II (Continued)
Minimum Training Requirements
for Personnel Engaged at EM-40 RCRA TSD Sites
C-25
Operational Personnel Training Requirement Reference(s)
EM-40 Visitors/Non-Workers
who enter the facility. PPE should
be issued to all Visitors/Non-
Workers, and they should be
instructed on its proper use. All
EM-40 employees and offsite
personnel not directly involved with
TSD facility operations, are
Visitors/Non-Workers.
OSHA requires no minimum DOE 1993b, DOE 1993c, DOE 1994,
training for Visitors/Non-Workers and NIEHS 1993
who enter the facility. However,
EM-40 requires a minimum of
40 hours Initial Health and Safety
Training and 24 hours supervised
field experience.*
Facility-Specific Training DOE 1991, DOE 1993b, DOE 1993c,
DOE 1994, and NIEHS 1993
8 hours Annual Refresher Training.* DOE 1993b, DOE 1993c, DOE 1994,
and NIEHS 1993
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE 1994,
Radiological Control Manual and NIEHS 1993
(DOE/EH-0256T).
Section 98
* This training is required for all visitors/nonworkers who enter an exclusion/decontamination zone or other areas where Level A,
B, or C PPE is required. This training is not required for visitors/non-workers who only enter areas where either Level D or no
PPE is required. See memo from Mr. Pat Whitfield, EM-40 to EM-40 Offices, dated February 2, 1994.
DOE-EM-STD-5503-94
C-26
TABLE III
Minimum Training Requirements for Personnel
Engaged at Emergency Responses to Hazardous Substances Releases
Operational Personnel Training Requirement Reference(s)
EM-40 Contractor or Subcontractor
First Responder (FR-AW) at the
awareness level. This individual is likely
to witness or discover a hazardous
substance release. The FR-AW takes no
action beyond notifying appropriate
authorities of the release.
OSHA requires sufficient training to 29 CFR 1910.120(q)(6)(i),
initiate an emergency response DOE 1994
sequence by notifying the proper
authorities of the release (or) has
sufficient experience to objectively
demonstrate competency in the areas
listed in 1920.120(q)(6)(i).
EM-40 Contractor or Subcontractor
First Responder (FR-OP) at the
operation level. This individual responds
to releases or potential releases of
hazardous substances as part of the initial
response at the site in order to mitigate
the effects of these substances on human
health and the environment.
OSHA requires a minimum of 8-hours 29 CFR 1910.120(q)(6)(ii), DOE
of training to respond in a defensive 1994
manner without actually trying to stop
the release; or sufficient experience to
objectively demonstrate competency in
the areas listed in 29 CFR
1920.120(q)(6)(i) and (ii) and
competency certification by the
employer are required. However, EM-
40 requires a minimum of 40-hours
Initial Health and Safety Training and
24-hours supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120 (e)(4), DOE
requires a minimum of 8 hours 1993b, DOE 1993c, DOE 1994
Supervisor Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(q)(8), DOE
requires an annual refresher training, 1993b, DOE 1993c, DOE 1994,
at a minimum. NIEHS 1993
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1993b, DOE 1993c, DOE
Radiological Control Manual 1994, NIEHS 1993
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE III (cont.)
Minimum Training Requirements for Personnel
Engaged at Emergency Responses to Hazardous Substances Releases
Operational Personnel Training Requirement Reference(s)
C-27
EM-40 Contractor or Subcontractor
Hazardous Materials Technician
(HMT) . This individual responds to a
release or potential release for the
purpose of preventing or stopping the
release. The HMT approaches the point
of release in order to plug, patch, or
otherwise stop the release of a hazardous
substance.
OSHA requires a minimum of 24- 29 CFR 1910.120(q)(6)(iii),
hours of training equal to the FR DOE 1994
operations level described in
1920.120(q)(6)(ii). In addition,
competency in the areas listed in
1910.120(q)(6)(iii) and competency
certification by the employer are
required. However, EM-40 requires a
minimum of 40-hours Initial Health
and Safety Training and 24-hours
supervised field experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120(q)(8),
requires an annual refresher training. DOE 1994
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1994
Radiological Control Manual
(DOE/EH-0256T).
Section 99
DOE-EM-STD-5503-94DOE-EM-STD-5503-94
TABLE III (cont.)
Minimum Training Requirements for Personnel
Engaged at Emergency Responses to Hazardous Substances Releases
Operational Personnel Training Requirement Reference(s)
C-28
EM-40 Contractor or Subcontractor
Hazardous Materials Specialists
(HMS). This individual responds to and
provides support for HMTs. This
position requires a focused or specific
knowledge of the various substances
which may be present at the site or
facility.
OSHA requires a minimum of 24 29 CFR 1910.120(q)(6)(iv), DOE
hours training equal to the HMT level. 1993b, DOE 1993c, DOE 1994
In addition, competency in the areas and NIEHS 1993
listed in 1910.120 (q)(6)(iv) and
competency certification by the
employer are necessary. However,
EM-40 requires a minimum of 40
hours Initial Health and Safety
Training and 24 hours supervised field
experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120 (e)(4), DOE
requires a minimum of 8 hours 1993b, DOE 1993c, DOE 1994
Supervisor Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120 (q)(8), DOE
requires an annual refresher training. 1994
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1994
Radiological Control Manual
(DOE/EH-0256T).
DOE-EM-STD-5503-94
TABLE III (cont.)
Minimum Training Requirements for Personnel
Engaged at Emergency Responses to Hazardous Substances Releases
Operational Personnel Training Requirement Reference(s)
C-29
EM-40 Contractor or Subcontractor
On-Scene Incident Commander. This
individual assumes responsibility for
control of the incident scene beyond the
FR awareness level.
OSHA requires a minimum of 24- 29 CFR 1910.120(q)(6)(v), DOE
hours training equal to the FR 1994
operations level described in
1910.120(q)(6)(ii). In addition,
competency in the areas listed in
1910.120(q)(6)(iii) and certification
by the employer are necessary.
However, EM-40 requires a minimum
of 40-hours Initial Health and Safety
Training and 24-hours supervised field
experience.
EM-40 adoption of OSHA standards 29 CFR 1910.120 (e)(4), DOE
requires a minimum of 8 hours 1993b, DOE 1993c, DOE 1994
Supervisor Training. and NIEHS 1993
EM-40 adoption of OSHA standards 29 CFR 1910.120(q)(8),
requires an annual refresher training. DOE 1993b, DOE 1993c, DOE
1994 and NIEHS 1993
Radiological Worker Training, if DOE Notice 5480.6, DOE 1992,
applicable. For details, see DOE DOE 1994
Radiological Control Manual
(DOE/EH-0256T).
DOE-EM-STD-5503-94
C-30
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
APPENDIX D
EM-40 Hazardous Materials Training Program Memorandum
D-1
DOE-EM-STD-5503-94DOE-EM-STD-5503-94
D-2
INTENTIONALLY BLANK
DOE-EM-STD-5503-94DOE-EM-STD-5503-94
E-1
APPENDIX E
Other Sources of Hazard Assessment Methods
1. Guidelines for Hazard Evaluation Procedure, Second Ed., with Worked Examples, American
Institute of Chemical Engineers, 1992.
2. DOE Standard - Preparation Guide for U.S. Department of Energy Non-reactor Nuclear
Facility Safety Analysis Reports.
3. DOE Standard - 1027-92, on compliance with DOE 5480.23, Nuclear Safety Analysis
Reports.
4. Laboratory Integration and Prioritization System (Lawrence Livermore National Laboratory,
Sandia National Laboratories, and Los Alamos National Laboratory).
5. Office of Energy Research, ES&H Risked-Based Priority Model.
6. Draft DOE 5483.XX, Occupational Safety and Health Program for DOE Operations, with
respect to the Risk Assessment Code Methodology, November 12, 1993.
Section 100
DOE-EM-STD-5503-94DOE-EM-STD-5503-94
E-2
INTENTIONALLY BLANK
DOE-EM-STD-5503-94
APPENDIX F
SAMPLE DECONTAMINATION LAYOUTS AND PROCEDURES
FOR LEVELS OF PROTECTION A THROUGH C
The objective of these procedures is to minimize the risk of exposure to
hazardous substances in the field. Protective equipment must be worn by
personnel when response activities involve known or suspected hazardous
substances. The procedures for decontaminating personnel upon leaving the
contaminated area are discussed for personal protective equipment levels A
through C. The procedures given are for the maximum and minimum amount of
decontamination used for each level of protection.
The maximum decontamination procedures for all levels of protection consist of
specific activities at 19 stations. Each station emphasizes an important aspect of
decontamination. When establishing a decontamination line, each aspect should
be incorporated separately or combined with other aspects into a procedure with
fewer steps (such as the minimum decontamination procedures).
Decontamination lines are site-specific and vary depending on the types of
contamination and work activities conducted on-site. When the decontamination
line is no longer required, contamination wash and rinse solutions and
contaminated articles must be contained and disposed of as hazardous wastes in
compliance with State and Federal regulations.
F-1
DOE-EM-STD-5503-94
APPENDIX F
Sample Decontamination Layouts and Procedures for Levels of Protection A through C
Equipment Needed to Perform Maximum Decontamination
Measures for Levels A, B, and C
a:
b.
c.
d.
Containers (20-30 Gallons)
Plastic Liners
Bench or Stools
Boot Jack
Station 1:
Station 2:
Station 3:
Station 4:
Station 5:
Station 6:
Station 7:
Station 8:
Station 9:
Various Size Containers
Plastic Liners
Plastic Drop Cloths
Station 10:a.
b.
c.
a:
b.
c.
a.
b.
c.
a.
b.
a.
b.
c.
a.
b.
a.
b.
c.
a.
b.
c.
a.
b.
c.
d.
Containers (20-30 Gallons)
Decon Solution or Detergent
Water
2-3 Long-Handled, Soft-Bristled
Scrub Brushes
Station 11: Rack
Drop Cloths
Bench or Stools
a.
b.
c.
Station 12:
Station 13:
Tablea.
Containers (20-30 Gallons
OR
Water
2-3 Long-Handled, Soft-Bristled
Scrub Brushes
Basin or Bucket
Decon Solution
Small Table
a.
b.
c.
Station 14: Water
Basin on Bucket
Small Table
a.
b.
c.
Containers (20-30 Gallons)
Plastic Liners
Containers (20-30 Gallons)
Plastic Liners
Bench or Stools
Station 15:
Station 16:
Station 17:
Station 18:
Containers (20-30 Gallons)
Plastic Liners
a.
b.
Containers (20-30 Gallons)
Plastic Liners
a.
b.Containers (20-30 Gallons)
Plastic Liners
Containers (20-30 Gallons)
Plastic Liners
a.
b.Containers (20-30 Gallons)
Decon Solution or Detergent
Water
2-3 Long-Handled, Soft-Bristled
Scrub Brushes
Water
Soap
Small Table
Basin or Bucket
Field Showers
Towels
a.
b.
c.
d.
e.
f.
Containers (20-30 Gallons)
OR
Water
2-3 Long-Handled, Soft-Bristled
Scrub Brushes
Station 19: Dressing Trailer is Needed in
Inclement Weather
Tables
Chairs
Lockers
Cloths
a.
b.
c.
d.
e.
Air Tanks or Face Masks and
Cartridge Depending on Level
Tape
Boot Covers
Gloves
F-2
DOE-EM-STD-5503-94
Station 1:
Station 2:
Station 3:
Station 4:
a.
b.
c.
a.
b.
c.
d.
a.
b.
c.
a.
b.
c.
Equipment Needed to Perform Minimum Decontamination
Measures for Levels A, B, and C
Various Size Containers
Plastic Liners
Plastic Drop Cloths
Containers (20-30 Gallons)
Decon Solution
Rinse Water
2-3 Long-Handled, Soft-
Bristled Scrub Brushes
Section 101
Containers (20-30 Gallons)
Plastic Liners
Bench or Stools
Air Tanks or Masks and
Cartridges Depending Upon
Level
Tape
Boot Covers
Station 5: a. Containers (20-30 Gallons)
b. Plastic Liners
c. Bench or Stools
Station 6: a. Plastic Sheets
b. Basin or Bucket
c. Soap and Towels
d. Bench or Stools
Station 7: a. Water
b. Soap
c. Tables
d. Wash Basin or Bucket
d. Gloves
F-3
DOE-EM-STD-5503-94
Maximum Measures for Level A Decontamination
Station 1:
Station 2:
Station 3:
Station 4:
Station 5:
Station 6:
Station 7:
Station 8:
Station 9:
Station 10:
Station 11:
Station 12:
Station 13:
Station 14:
Station 15:
Station 16:
Station 17:
Station 18:
Station 19:
Segregated
Equipment Drop
Boot Cover and Glove
Wash
Boot Cover and Glove
Rinse
Tape Removal
Boot Cover Removal
Outer Glove Removal
Suit and Boot Wash
Suit and Boot
Tank Change
Safety Boot Removal
Fully Encapsulating
Suit and Hard Hat
Removal
SCBA Backpack
Removal
Inner Glove Wash
Inner Glove Rinse
Face Piece Removal
Inner Glove Removal
Inner Clothing
Removal
Field Wash
Redress
Deposit equipment used on-site (tools, sampling devices and containers,
monitoring instruments, radios, clipboards, etc.) on plastic drop cloths or in
different containers with plastic liners. During hot weather operations, a cool-
down station may be set up within this area.
Scrub outer boot covers and gloves with decon solution or detergent/water.
Rinse off decon solution from station 2 using copious amounts of water.
Remove tape around boots and gloves and deposit in container with plastic
liner.
Remove boot covers and deposit in container with plastic liner.
Remove outer gloves and deposit in container with plastic liner.
Wash encapsulating suit and boots using scrub brush and decon solution or
detergent/water. Repeat as many times as necessary.
Rinse off decon solution using water. Repeat as many times as necessary.
If an air tank change is desired, this is the last step in the decontamination
procedure. Air tank is exchanged, new outer gloves and boot covers are
donned, and joints are taped. Worker returns to duty.
Remove safety boots and deposit in container with plastic liner.
Fully encapsulated suit is removed with assistance of a helper and is laid out
on a drop cloth or hung up. Hard hat is removed. Hot weather rest station
may be set up within this area for personnel returning to site.
While still wearing facepiece, remove backpack and place on table.
Disconnect hose from regulator valve and proceed to next station.
Wash with decon solution that will not harm the skin. Repeat as often as
necessary.
Rinse with water. Repeat as many times as necessary.
Remove face piece. Deposit in container with plastic liner. Avoid touching
face with fingers.
Remove inner gloves and deposit in container with liner.
Remove clothing and place in lined container. Do not wear inner clothing off-
site since there is a possibility that small amounts of contaminants might have
been transferred in removing the fully-encapsulating suit.
Shower if highly toxic, skin-corrosive or skin-absorbable materials are known
or suspected to be present. Wash hands and face if shower is not available.
Put on clean clothes.
F-4
DOE-EM-STD-5503-94
Maximum Decontamination Layout for Level A Protection
F-5
DOE-EM-STD-5503-94
Minimum Measures for Level A Decontamination
Station 1: Equipment Drop
Station 2:
Station 3:
Station 4:
Station 5:
Station 6:
Station 7:
Section 102
Outer Garment, Boots,
and Gloves Wash and
Rinse
Outer Boot and Glove
Removal
Tank Change
Boot, Gloves, and
Outer Garment
Removal
SCBA Removal
Field Wash
Deposit equipment used on-site (tools, sampling devices and containers,
monitoring instruments, radios, clipboards, etc.) on plastic drop cloths.
Segregation at the drop reduces the probability of cross contamination.
During hot weather operations, cool-down stations may be set up within this
area.
Scrub outer boots, outer gloves and fully-encapsulating suit with decon
solution or detergent and water. Rinse off using copious amounts of water.
Remove outer boots and gloves. Deposit in container with plastic liner.
If worker leaves Exclusion Zone to change air tank, this is the last step in the
decontamination procedure. Worker’s air tank is exchanged, new outer gloves
and boot covers are donned, joints are taped, and worker returns to duty.
Boots, fully-encapsulating suit, and inner gloves are removed and deposited in
separate containers lined with plastic.
SCBA backpack and facepieces are removed (avoid touching face with
fingers). SCBA is deposited on plastic sheets.
Hands and face are thoroughly washed. Shower as soon as possible.
F-6
DOE-EM-STD-5503-94
Minimum Decontamination Layout for Levels A & B Protection
F-7
DOE-EM-STD-5503-94
Maximum Measures for Level B Decontamination
Station 1:
Station 2:
Station 3:
Station 4:
Station 5:
Station 6:
Station 7:
Station 8:
Station 9:
Station 10:
Station 11:
Station 12:
Station 13:
Station 14:
Station 15:
Station 16:
Station 17:
Station 18:
Station 19:
Segregated
Equipment Drop
Boot Cover and Glove
Wash
Boot Cover and Glove
Rinse
Tape Removal
Boot Cover Removal
Outer Glove Removal
Suit and Safety Boot
Wash
Suit, SCBA, Boot, and
Glove Rinse
Tank Change
Safety Boot Removal
SCBA Backpack
Removal
Splash Suit Removal
Inner Glove Wash
Inner Glove Rinse
Face Piece Removal
Inner Glove Removal
Inner Clothing
Removal
Field Wash
Redress
Deposit equipment used on-site (tools, sampling devices and containers,
monitoring instruments, radios, clipboards, etc.) on plastic drop cloths or in
different containers with plastic liners. Segregation at the drop reduces the
probability of cross-contamination. During hot weather operations, cool-down
stations may be set up within this area.
Scrub outer boot covers and gloves with decon solution or detergent and
water.
Rinse off decon solution from Station 2 using copious amounts of water.
Remove tape around boots and gloves and deposit in container with plastic
liner.
Remove boot covers and deposit in container with plastic liner.
Remove outer gloves and deposit in container with plastic liner.
Wash chemical-resistant splash suit, SCBA, gloves, and safety boots. Scrub
with long-handle scrub brush and decon solution. Wrap SCBA regulator (if
belt mounted type) with plastic to keep out water. Wash backpack assembly
with sponges or cloths.
Rinse off decon solution using copious amounts of water.
If worker leaves exclusion zone to change air tank, this is the last step in the
decontamination procedure. Worker’s air tank is exchanged, new outer glove
and boot covers are donned, joints are taped, and worker returns to duty.
Remove safety boots and deposit in container with plastic liner.
While still wearing facepiece, remove backpack and place on table.
Disconnect hose from regulator valve.
With assistance of helper, remove splash suit. Deposit in container with plastic
liner.
Section 103
Wash inner gloves with decon solution.
Rinse inner gloves with water.
Remove face piece. Deposit in container with plastic liner. Avoid touching
face with fingers.
Remove inner gloves and deposit in container with liner.
Remove inner clothing. Place in container with liner. Do not wear inner
clothing off-site since there is a possibility that small amounts of contaminants
may have been transferred in removing the fully-encapsulating suit.
Shower if highly toxic, skin-corrosive or skin-absorbable materials are known
or suspected to be present. Wash hands and face if shower is not available.
Put on clean clothes.
F-8
DOE-EM-STD-5503-94
Maximum Decontamination Layout for Level B Protection
F-9
Station 1:
Station 2:
Station 3:
Station 4:
Station 5:
Station 6:
Station 7:
DOE-EM-STD-5503-94
Minimum Measures for Level B Decontamination
Equipment Drop
Outer Garment, Boots,
and Gloves Wash and
Rinse
Outer Boot and Glove
Removal
Tank Change
Boot, Gloves, and
Outer Garment
Removal
SCBA Removal
Field Wash
Deposit equipment used on-site (tools, sampling devices and containers,
monitoring instruments, radios, clipboards, etc.) on plastic drop cloths.
Segregation at the drop reduces the probability of cross contamination.
During hot weather operations, cool-down station may be set up within this
area.
Scrub outer boots, outer gloves, and chemical-resistant splash suit with decon
solution or detergent water. Rinse off using copious amounts of water.
Remove outer boots and gloves. Deposit in container with plastic liner.
If worker leaves exclusion zone to change air tank, this is the last step in the
decontamination procedure. Worker’s air tank is exchanged, new outer gloves
and boot covers are donned, joints are taped, and worker returns to duty.
Boots, chemical-resistant splash suit, and inner gloves are removed and
deposited in separate containers lined with plastic.
SCBA backpack and facepiece are removed. Avoid touching face with finger.
SCBA is deposited on plastic sheets.
Hands and face are thoroughly washed. Shower as soon as possible.
F-10
DOE-EM-STD-5503-94
Minimum Decontamination Layout for Levels A & B Protection
F-11
Station 1:
Station 2:
Station 3:
Station 4:
Station 5:
Station 6:
Station 7:
Station 8:
Station 9:
Segregated
Equipment Drop
DOE-EM-STD-5503-94
Maximum Measures for Level C Decontamination
Boot Cover and Glove
Wash
Boot Cover and Glove
Rinse
Tape Removal
Boot Cover Removal
Outer Glove Removal
Suit and Boot Wash
Suit, Boot, and Glove
Rinse
Canister or Mask
Change
Station 10: Safety Boot Removal
Station 11: Splash Suit Removal
Station 12: Inner Glove Removal
Station 13: Inner Glove Wash
Station 14: Face Piece Removal
Station 15: Inner Glove Removal
Station 16: Inner Clothing
Removal
Station 17: Field Wash
Station 18: Redress
Deposit equipment used on-site (tools, sampling devices and containers,
monitoring instruments, radios, clipboards, etc.) on plastic drop cloths or in
different containers with plastic liners. Segregation at the drop reduces the
probability of cross contamination. During hot weather operations, a cool-
down station may be set up within this area.
Scrub outer boot covers and gloves with decon solution or detergent and
water.
Rinse off decon solution from Station 2
Remove tape around boots and gloves
liner.
using copious amounts of water.
and deposit in container with plastic
Remove boot covers and deposit in containers with plastic liner.
Section 104
Remove outer gloves and deposit in container with plastic liner.
Wash splash suit, gloves, and safety boots. Scrub with long-handle scrub
brush and decon solution.
Rinse off decon solution using water. Repeat as many times as necessary.
If worker leaves exclusion zone to change canister (or mask), this is the last
step in the decontamination procedure. Worker’s canister is exchanged, new
outer gloves and boot covers are donned, and joints are taped. Worker
returns to duty.
Remove safety boots and deposit in container with plastic liner.
With assistance of helper, remove splash
liner.
suit. Deposit in container with plastic
Wash inner gloves with decon solution.
Rinse inner gloves with water.
Remove face piece. Deposit in container with plastic liner. Avoid touching
face with fingers.
Remove inner gloves and deposit in lined container.
Remove clothing soaked with perspiration and place in lined container. Do not
wear inner clothing off-site since there is a probability that small amounts of
contaminants might have been transferred in removing the fully-encapsulating
suit.
Shower if highly toxic, skin-corrosive, or skin-absorbable materials are known
or suspected to be present. Wash hands and face if shower is not available.
Put on clean clothes.
F-12
DOE-EM-STD-5503-94
Maximum Decontamination Layout for Level C Protection
F-13
Station 1: Equipment Drop
DOE-EM-STD-5503-94
Minimum Measures for Level C Decontamination
Station 2: Outer Garment, Boots,
and Gloves Wash and
Rinse
Station 3: Outer Boot and Glove
Removal
Station 4: Canister or Mask
Change
Station 5: Boot, Gloves and
Outer Garment
Removal
Station 6: Face Piece Removal
Station 7: Field Wash
Deposit equipment used on-site (tools, sampling devices and containers,
monitoring instruments, radios, clipboards, etc.) on plastic drop cloths.
Segregation at the drop reduces the probability of cross contamination.
During hot weather operations, a cool-down station may be set up within this
area.
Scrub outer boots, outer gloves, and splash suit with decon solution or
detergent water. Rinse off using copious amounts of water.
Remove outer boots and gloves. Deposit in container with plastic liner.
If worker leaves exclusive zone to change canister (or mask), this is the last
step in the decontamination procedure. Worker’s canister is exchanged, new
outer gloves and boot covers are donned, joints are taped, and worker returns
to duty.
Boots, chemical-resistant splash suit, and inner gloves are removed and
deposited in separate containers lined with plastic.
Facepiece is removed. Avoid touching face with fingers. Facepiece is
deposited on plastic sheet.
Hands and face are thoroughly washed. Shower as soon as possible.
F-14
DOE-EM-STD-5503-94
Minimum Decontamination Layout for Level C Protection
F-15
TABLE OF CONTENTS
LIST OF FIGURES
LIST OF TABLES
LIST OF ACRONYMS
INTRODUCTION
1.0. REGULATORY FRAMEWORK
1.1. BACKGROUND
1.2. SITE-SPECIFIC HASP REQUIREMENTS
1.2.1. Introduction
1.2.2. Key Personnel
1.2.3. Hazard Assessment
1.2.4. Training
1.2.5. Personal Protective Equipment (PPE)
1.2.6. Temperature Extremes
1.2.7. Medical Surveillance
1.2.8. Exposure Monitoring and Air Sampling
1.2.9. Site Control
1.2.10. Decontamination
1.2.11. Emergency Response/Contingency Plan
1.2.12. Emergency Action Plan
1.2.13. Confined Space Entry
1.2.14. Spill Containment
1.3. REFERENCES
Section 105
2.0. KEY PERSONNEL
2.1. BACKGROUND
2.2. ORGANIZATIONAL STRUCTURE
2.3. ONSITE ESSENTIAL PERSONNEL
2.3.1. Project Manager
2.3.2. Site Safety and Health Officer
2.3.3. Safety and Health Personnel
2.3.4. Field Team Leader
2.3.5. Command Post Supervisor
2.3.6. Emergency Response Coordinator
2.3.7. Decontamination Station Officer
2.3.8. Security Officer
2.3.9. Specialty Teams
2.4. OPTIONAL PERSONNEL (onsite or offsite as needed)
2.4.1. Industrial Hygienist
2.4.2. Fire Fighters
2.4.3. Health Physicist
2.4.4. Scientific Advisor
2.4.5. Logistics Officer
2.4.6. Photographer
2.4.7. Recordkeeper
2.4.8. Public Information Officer
2.4.9. Multidisciplinary Advisors
2.4.10. Medical Support
2.4.11. Bomb Squad Expert
2.5. COMMUNICATIONS
2.6. OTHER SOURCES OF ASSISTANCE
2.7. REFERENCES
3.0. HAZARD ASSESSMENT
3.1. BACKGROUND
3.2. HAZARD IDENTIFICATION
3.2.1. Hazards List
3.3. EXAMPLES OF HAZARD ASSESSMENT METHODS
3.4. HAZARD CONTROL
3.4.1. Engineering Controls
3.4.2. Administrative Controls
3.4.3. Personal Protective Equipment (PPE)
3.5. HAZARD ASSESSMENT DOCUMENTATION FORMAT
3.6. REFERENCES
4.0. TRAINING REQUIREMENTS
4.1. BACKGROUND
4.2. GENERAL
4.3. TRAINING REQUIREMENTS FOR PERSONNEL AT ER SITES
4.4. TRAINING REQUIREMENTS FOR PERSONNEL AT RCRA TSD SITES
4.5. TRAINING REQUIREMENTS FOR PERSONNEL CONDUCTING EMERGENCY RESPONSES TO HAZARDOUS SUBSTANCE RELEA
4.6. REFERENCES
5.0. PERSONAL PROTECTIVE EQUIPMENT
5.1. BACKGROUND
5.2. GENERAL PROVISIONS
5.3. SELECTION OF PERSONAL PROTECTIVE EQUIPMENT (PPE)
5.4. LEVELS OF PPE
5.4.1. Level A PPE
5.4.2. Level B PPE
5.4.3. Level C PPE
5.4.4. Level D PPE
5.5. USE OF PPE
5.5.1. PPE Selection Process
5.6. REFERENCES
6.0. TEMPERATURE EXTREME DISORDERS OR CONDITIONS
6.1. BACKGROUND
6.2. HEAT STRESS
6.2.1. Monitoring
6.2.2. Training
6.3. COLD EXPOSURE
6.3.1. Control Measures
6.3.2. Physiological Monitoring
6.4. PREVENTION
6.4.1. Physiological Monitoring
6.5. INTEGRATION WITH OTHER ELEMENTS OF THE HASP
6.6. REFERENCES
7.0. MEDICAL SURVEILLANCE
7.1. BACKGROUND
7.2 INFORMATION FOR THE MEDICAL PROGRAM
7.3. EXAMINATION CONTENT
7.4 BASELINE (INITIAL) EXAMINATION
7.4.1 Baseline/Periodic Medical Examination Parameters
7.5 PERIODIC MEDICAL MONITORING
7.6. EXAMINATION AFTER ILLNESS OR INJURY
7.7. TERMINATION EXAMINATION
7.8. MAINTENANCE AND AVAILABILITY OF MEDICAL RECORDS
7.9. REFERENCES
8.0. EXPOSURE MONITORING/AIR SAMPLING
8.1. BACKGROUND
8.2. GENERAL GUIDANCE
8.2.1. Personnel Qualifications
8.3. AIR CONTAMINANTS
8.4. METHODS AND INSTRUMENTATION
8.4.1. Direct-Reading Monitoring Instruments
8.4.2. Time-Integrated Sampling Instruments
8.5. WORKER EXPOSURE MONITORING
8.6. LEVEL OF PROTECTION MONITORING
8.7. OFFSITE MONITORING
8.8. PERIMETER MONITORING
8.9. METEOROLOGICAL MONITORING
8.10. QUALITY ASSURANCE/QUALITY CONTROL
8.11. RECORD KEEPING
8.12. TIME-INTEGRATED SAMPLING DATA
8.13. DIRECT-READING AIR MONITORING DATA
8.14. FINAL REPORT
8.15. REFERENCES
9.0. SITE CONTROL
9.1. BACKGROUND
9.2. DEVELOPMENT OF THE SITE MAP
9.3. ESTABLISHMENT OF WORK ZONES
9.3.1. The Exclusion Zone
9.3.2. The Contamination Reduction Zone
9.3.3. The Support Zone
9.4. USING THE BUDDY SYSTEM
9.5. COMMUNICATION NETWORK AND PROCEDURES
9.6. WORKER SAFETY PROCEDURES
9.7. MEDICAL ASSISTANCE
9.8. REFERENCES
Section 106
10.0. DECONTAMINATION
10.1. BACKGROUND
10.2. GENERAL CONSIDERATION
10.3. LOCATION AND LAYOUT
10.4. DETERMINING DECONTAMINATION METHODS
10.5. STANDARD OPERATING PROCEDURES TO MINIMIZE WORKER CONTACT
10.6. COLLECTION, STORAGE AND DISPOSAL PROCEDURES
10.7. REFERENCES
11.0. EMERGENCY RESPONSE/CONTINGENCY PLAN
11.1. BACKGROUND
11.2. PRE-EMERGENCY PLANNING
11.3. PERSONNEL ROLES, LINES OF AUTHORITY, AND COMMUNICATIONS
11.3.1. Facility Emergency Coordinator
11.3.2. Emergency Contacts
11.3.3. Reporting
11.3.4. Emergency Communications
11.4. EMERGENCY RECOGNITION AND PREVENTION
11.5. SAFE DISTANCES AND PLACES OF REFUGE
11.6. SITE SECURITY AND CONTROL
11.7. EVACUATION ROUTES/PROCEDURES
11.8. DECONTAMINATION PROCEDURES
11.9. EMERGENCY MEDICAL TREATMENT/FIRST AID
11.10. EMERGENCY ALERTING/RESPONSE PROCEDURES
11.10.1. Notification
11.10.2. Evaluation of the Situation
11.10.3. Rescue/Response Action
11.11. CRITIQUE OF RESPONSE AND FOLLOW-UP
11.11.1. Critique
11.11.2. Maintaining Readiness
11.12. PPE AND EMERGENCY EQUIPMENT
11.13. REFERENCES
12.0. EMERGENCY ACTION PLAN
12.1. BACKGROUND
12.2. EMERGENCY ESCAPE ROUTE ASSIGNMENT
12.3. PROCEDURES FOR CRITICAL OPERATIONS PERSONNEL
12.4. PROCEDURES TO ACCOUNT FOR ALL EMPLOYEES
12.5. RESCUE AND MEDICAL DUTIES
12.6. REPORTING FIRES AND OTHER EMERGENCIES
12.7. EAP CONTACT PERSONNEL
12.8. EMERGENCY/EVACUATION ALARM SYSTEM
12.9. EAP TRAINING REQUIREMENTS
12.10. FIRE PREVENTION PLAN
12.11. PROCEDURES FOR THE REVIEW AND UPDATE OF THE EAP
12.12. REFERENCES
13.0. CONFINED SPACE ENTRY
13.1. BACKGROUND
13.2. DUTIES AND RESPONSIBILITIES
13.2.1. Project Manager
13.2.2. Confined Space Coordinator
13.2.3. Field Team Leader
13.2.4. Entry Supervisors
13.2.5. Employees Entering Confined Space
13.2.6. Attendant
13.2.7. Rescue Team
13.3. IDENTIFICATION AND EVALUATION
13.3.1. Hazard Re-Evaluation
13.4. HAZARD ASSESSMENT
13.5. HAZARD CONTROLS
13.5.1. Engineering Controls
13.5.2. Work Practice (Administrative) Controls
13.5.3. Personal Protective Equipment (PPE)
13.6. ENTRY PERMITS
13.6.1. Key Elements for Entry Permits
13.7. ENTRY PROCEDURES
13.8. OPENING A CONFINED SPACE
13.9. ATMOSPHERIC TESTING
13.9.1. Evaluation Testing
13.9.2. Verification Testing
13.9.3. Acceptable Limits
13.10. ISOLATION AND LOCKOUT/TAGOUT SAFEGUARDS
13.11. INGRESS/EGRESS SAFEGUARDS
13.12. WARNING SIGNS AND SYMBOLS
13.13. TRAINING
13.13.1. General Training
13.13.2. Specific Training
13.14. EMERGENCY RESPONSE
13.14.1. Emergency Response Plan
13.14.2. Retrieval Systems or Methods to Facilitate Non-entry Rescue
13.15. REFERENCES
14.0. SPILL CONTAINMENT
14.1. BACKGROUND
14.2. PREPLANNING
14.3. REPORTING AND INITIAL PERSONNEL SAFETY
14.4. INITIAL SPILL ACTION
14.5. SPILL RESPONSE EVALUATION
14.6. ORGANIZING A SPILL RESPONSE
14.7. SPILL CLEANUP PROCEDURES
14.8. POST INCIDENT FOLLOW-UP
14.9. REFERENCES
APPENDIX A HASP GLOSSARY
APPENDIX B CONCLUDING MATERIAL
APPENDIX C TRAINING TABLES
APPENDIX D EM-40 hAZARDOUS MATERIALS TRAINING PROGRAM MEMORANDUM
APPENDIX E OTHER SOURCES OF HAZARD ASSESSMENT METHODS
APPENDIX F SAMPLE DECONTAIMINATION LAYOUTS AND PROCEDURES FOR LEVELS OF PROTECTION A THROUGH C