DOE-STD-3007-93 Chg Notice 1, Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities
Functional areas: Criticality Safety, Non-Reactor Nuclear Facilities, Performance Assurance Project Office, Technical Information
Contained in this document are guidelines that should be followed when preparing Criticality Safety Evaluations that will be used to demonstrate the safety of operations performed at Department of Energy (DOE) Non-Reactor Nuclear Facilities. Superseded by DOE-STD-3007-2007.
Unknown Block text
Version history and related documents
Superseded by
A newer version replaces this document.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
TS
NOT MEASUREMENT
SENSITIVE
DOE-STD-3007-93
November 1993
CHANGE NOTICE NO. 1
September 1998
DOE STANDARD
GUIDELINES FOR PREPARING
CRITICALITY SAFETY EVALUATIONS AT
DEPARTMENT OF ENERGY NON-REACTOR
NUCLEAR FACILITIES
U.S. Department of Energy AREA SAFT
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
This document has been reproduced directly from the best available copy.
Available to DOE and DOE contractors from the Office of Scientific and
Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401.
Available to the public from the U.S. Department of Commerce, Technology
Administration, National Technical Information Service, Springfield, VA 22161;
(703) 605-6000.
Order No. DE98003918
Change Notice No. 1 DOE-STD-3007-93
September 1998
Guidelines for Preparing Criticality Safety Evaluations at Department of Energy
Non-Reactor Nuclear Facilities
Page/Section Change
p. iii / Foreword to the Revised Edition This section was added.
p. 1 / Overview / first paragraph
The reference to DOE O 420.1, Section 4.3
was added.
p. 2 / Definitions / Note section
The note on DOE O 420.1, Section 4.3 was
added.
p. 4 / Section 3.0 / first paragraph
The reference to DOE O 420.1, Section 4.3
was added.
p. 6 / Section 5.0 / item 2
The reference to DOE O 420.1, Section 4.3
was added.
p. 5-1 / Example 5 The example was added.
p. 6-1 / Example 6 The example was added.
Concluding Material
The Preparing Activity was changed from
DOE-DP-62 to DOE-EH-34.
DOE-STD-3007-93
iii
FOREWORD TO THE REVISED EDITION
This revision to the Standard was prepared in accordance with the DOE Implementation Plan for Defense
Nuclear Facility Safety Board (DNFSB) Recommendation 97-2. The Department committed to revise and
reissue DOE-STD-3007-93 to include specific annotated examples of criticality safety evaluations that rely
upon comparative analysis to existing data and calculations to emphasize the acceptability of this
approach. Two examples (five and six) have been added to the appendix of the standard fulfilling this
commitment. The examples are actual criticality safety evaluations from DOE sites. These two were
selected from approximately a dozen candidates submitted for consideration by the DOE Criticality Safety
Support Group (CSSG) formed by the DOE Implementation Plan. The DOE Office of Environment,
Safety and Health, Office of Nuclear and Facility Safety, prepared the revision. The CSSG members were:
Jerry N. McKamy, Revision Task Leader
U.S. Department of Energy
Environment, Safety, and Health
Adolf S. Garcia, CSSG Chair
U.S. Department of Energy – Idaho
Richard E. Anderson
Los Alamos National Laboratory
Dennis E. Cabrilla
U.S. Department of Energy
Environmental Management
Calvin M. Hopper
Oak Ridge National Laboratory
Thomas P. McLaughlin
Los Alamos National Laboratory
James A. Morman
Argonne National Laboratory
Thomas A. Reilly
Westinghouse Safety Management Solutions
Robert M. Westfall
Oak Ridge National Laboratory
Robert E. Wilson
Safe Sites of Colorado
DOE-STD-3007-93
iv
Intentionally Blank
DOE-STD-3007-93
v
FOREWORD
This Department of Energy (DOE) standard is approved for use by all components of DOE. It contains
guidelines that should be followed when preparing Criticality Safety Evaluations that will be used to
demonstrate the safety of operations performed at DOE Non-Reactor Nuclear Facilities. Adherence with
these guidelines will provide consistency and uniformity in Criticality Safety Evaluations (CSEs) across the
complex and will document compliance with DOE Order 5480.24 requirements as they pertain to CSEs.
Section 2
This DOE Standard was prepared by a working group with the following organizational structure:
Dae Y. Chung, Project Manager
U. S. Department of Energy
Defense Programs
J. Blair Briggs, Working Group Chairman
Idaho National Engineering Laboratory
Lori Scott, Project Administrator
Idaho National Engineering Laboratory
PARTICIPANTS AFFILIATION
C. Apperson.....................................................................................................................................................Savannah River
M. Buckner ......................................................................................................................................................Savannah River
M. L. Cowen....................................................................................................................................................Savannah River
I. E. Fergus, Jr.....................................................................................................U. S. Department of Energy - Head Quarters
G. R. Handley ........................................................................................................................................Oak Ridge Y-12 Plant
D. P. Heinrichs.........................................................................................................Lawrence Livermore National Laboratory
C. M. Hopper..........................................................................................................................Oak Ridge National Laboratory
P. J. Larsen ...................................................................................................................................................Rocky Flats Plant
S. Love...................................................................................................................................................Oak Ridge Y-12 Plant
T. P. McLaughlin..................................................................................................................Los Alamos National Laboratory
W. C. McQuiston..............................................................................................................U. S. Department of Energy - Idaho
J. F. Mincey .....................................................................................................................................................Savannah River
D. W. Nigg .................................................................................................................Idaho National Engineering Laboratory
G. T. Paulson ........................................................................................................................Idaho Chemical Processing Plant
S. Payne ................................................................................................................U. S. Department of Energy - Albuquerque
J. S. Pearson.............................................................................................................Lawrence Livermore National Laboratory
D. A. Reed .............................................................................................................................................Oak Ridge Y-12 Plant
V. Risner.......................................................................................................................................................Rocky Flats Plant
S. Rosenbloom....................................................................................................U. S. Department of Energy - Head Quarters
P. Sentieri..............................................................................................................................Idaho Chemical Processing Plant
J. Stachew...................................................................................................................Idaho National Engineering Laboratory
J. T. Taylor............................................................................................................................Idaho Chemical Processing Plant
R. G. Taylor ...........................................................................................................................................Oak Ridge Y-12 Plant
P. Vescovi ........................................................................................................................................................Savannah River
R. G. Vornehm.......................................................................................................................................Oak Ridge Y-12 Plant
K. R. Yates ......................................................................................................................................................Savannah River
S. Zeigler ..........................................................................................................................U. S. Department of Energy - Idaho
Section 3
Beneficial comments (recommendations, additions, deletions) which may be of use in improving this document
should be addressed to: Director, Defense Programs, Systems Engineering Division, Office of Engineering and
Operations Support.
DOE-STD-3007-93
vi
Intentionally Blank
DOE-STD-3007-93
vii
CONTENTS
I. Overview....................................................................................................................................1
II. Definitions..................................................................................................................................2
III. Format and Content of Criticality Safety Evaluations ................................................................3
IV. Examples of Contingency Analyses............................................................................................9
V. Examples of Criticality Safety Evaluations
That Meet the Intent of the Department of Energy
Non-Reactor Nuclear Facility Guidelines.................................................................................12
DOE-STD-3007-93
viii
Intentionally Blank
DOE-STD-3007-93
1
I. OVERVIEW
Contained in this document are guidelines that should be followed when preparing Criticality
Safety Evaluations that will be used to demonstrate the safety of operations performed at
Department of Energy (DOE) Non-Reactor Nuclear Facilities. Adherence with these guidelines
will provide consistency and uniformity in Criticality Safety Evaluations (CSEs) across the
complex and will document compliance with the requirements of DOE Orders 420.1, Section 4.3,
and 5480.24 that pertain to CSEs as given in the following documents.
ANS-8.1 4.1.2 - Process Analysis
4.2 - Technical Practices
4.3 - Validation of Calculational Method
5. - Single Parameter Limits for Fissile Nuclides
6. - Multiparameter Control
ANS-8.19 8. - Process Evaluation For Nuclear
(8.1-8.3) Criticality Safety
5480.24 7.a.(2)(a) - Double Contingency
7.c (First Paragraph) -
“... contractors shall perform detailed nuclear criticality safety
analyses for specific operations, storage arrangements, and the
handling and transportation of fissionable material.”
420.1 4.3.2 - General Requirements
4.3.3.h - Application of DOE-STD-3007-93
These guidelines become effective 180 days after issuance by DOE-HQ. Rewriting existing
evaluations solely to comply with these guidelines is not required.
In accordance with Section 3.2 of ANS-8.1-1983, the word “shall” is used in these guidelines to
denote a requirement, the word “should” to denote a recommendation, and the word “may” to
denote permission, neither a requirement nor a recommendation.
DOE-STD-3007-93
2
II. DEFINITIONS
BIAS - A measure of the systematic disagreement between the results calculated by a method and
experimental data. The uncertainty in the bias is a measure of both the precision of the
calculations and the accuracy of the experimental data.
CALCULATIONAL METHOD - The mathematical equations, approximations, assumptions,
associated numerical parameters (e.g., neutron cross sections), and calculational procedures that
yield the calculated results.
CONTINGENCY - A possible but unlikely change in a condition/control important to the
nuclear criticality safety of a fissionable material operation that would, if it occurred, reduce the
number of barriers (either administrative or physical) that are intended to prevent an accidental
nuclear criticality.
Section 4
CRITICALITY SAFETY EVALUATION (CSE) - A documented process that establishes the
technical basis for nuclear criticality safety and provides subcritical operating values.
CREDIBLE - Offering reasonable grounds for being believed on the basis of commonly
acceptable engineering judgment. Assigning a numerical probability that defines credible is not
required when demonstrating compliance with the double contingency principle.
DESIGN FEATURES - Passive or active features that are necessary to prevent or reduce the
probability of a criticality accident.
DOUBLE-CONTINGENCY PRINCIPLE [Per DOE 5480.24 7a(2)(a)*] - Process designs
shall incorporate sufficient factors of safety to require at least two unlikely, independent, and
concurrent changes in process conditions before a criticality accident is possible. Protection shall
be provided by either:
1. The control of two independent process parameters (which is the preferred approach, if
practical) or
2. A system of multiple (at least two) controls on a single parameter.
In all cases, no (credible) single failure shall result in the potential for a criticality accident.
*NOTE: DOE 5480.24 has been replaced by DOE O 420.1, Section 4.3.
PROCESS PARAMETER - A physical property whose value affects the nuclear reactivity of a
system. Parameters include the mass, density, and isotopic enrichment of fissionable material; the
geometry, reflection, and interaction conditions of the system; and the moderation, composition
and neutron absorption characteristics of the fissionable material mixture and other system
materials.
DOE-STD-3007-93
3
III. FORMAT AND CONTENT OF CRITICALITY SAFETY EVALUATIONS
Criticality safety evaluations that are prepared for Department of Energy (DOE) Non-Reactor
Nuclear Facilities should conform to the format and content guidelines provided in this section.
An outline of an evaluation is given below. All evaluations used to demonstrate facility safety
shall contain, at an appropriate level of detail, the information embodied in these major sections.
These sections should appear in the specified order whenever practical. [Criticality safety
evaluations for transportation packages that are required to follow a pre-specified Nuclear
Regulatory Commission (NRC) format are exceptions.] Subsections may be used at the author's
discretion to provide order and clarity. A description of each section of an evaluation follows the
outline.
1.0 INTRODUCTION
2.0 DESCRIPTION
3.0 REQUIREMENTS DOCUMENTATION
4.0 METHODOLOGY
5.0 DISCUSSION OF CONTINGENCIES
6.0 EVALUATION & RESULTS
7.0 DESIGN FEATURES (PASSIVE & ACTIVE) AND
ADMINISTRATIVELY CONTROLLED LIMITS &
REQUIREMENTS
8.0 SUMMARY & CONCLUSIONS
9.0 REFERENCES
APPENDIX A: MATERIALS & COMPOSITIONS
APPENDIX B: TYPICAL INPUT LISTINGS
APPENDIX C, D,... ETC.:
OPTIONAL APPENDICES PROVIDING SUPPLEMENTAL
INFORMATION
DOE-STD-3007-93
4
1.0 INTRODUCTION
The purpose and scope of the evaluation shall be stated in this section. Relevant background
information should also be provided.
2.0 DESCRIPTION
The system or process should be described in Section 2.0. The description should contain
sufficient detail, clarity, and lack of ambiguity to allow a peer reviewer either to independently
evaluate the system/process or to independently assess the adequacy and accuracy of the existing
evaluation. (In most cases, firsthand knowledge obtained through facility visits is required to
supplement the written documentation.) Drawings and/or sketches should be provided as needed
to provide clarity.
Section 5
References, including drawings, should be provided to allow a reviewer the opportunity to further
research the system being evaluated and to verify the accuracy of the descriptive information
provided. References should be specific and should include page numbers if possible. Multiple
levels of references should be avoided. (i.e., References should be original documents and not
documents that reference other documents.)
It may not be practical to provide this level of detail in evaluations of very complicated systems or
processes. For such evaluations, documents that do provide this level of detail should be
incorporated by reference. Sufficient information should be provided for the system or process to
allow adequate support of the assumptions used in the evaluation.
3.0 REQUIREMENTS DOCUMENTATION
Indicate the specific DOE Orders or Guides, ANS standards, Code of Federal Regulations, or
internal requirement documents that are uniquely applicable to the evaluation. (NOTE: General
requirement documentation such as DOE Order 5480.24, DOE O 420.1, Section 4.3, ANS-8.1,
or ANS-8.19 apply to all evaluations. These types of documents need not be referenced or
discussed in every evaluation unless certain sections require emphasis.)
Examples of specific requirements documents are: ANS-8.5 (applicable to evaluations that involve
Raschig rings) and 10 CFR Part 71 (applicable to evaluations of shipping containers that require
NRC licensing). Where specific requirements are involved, they should be identified (e.g., “For a
Fissile Class I package, Section 71.55 of 10 CFR Part 71 requires ...”).
Exemptions to DOE Orders should also be discussed in this section.
DOE-STD-3007-93
5
4.0 METHODOLOGY
In order to establish that a proposed system or process will be subcritical under the normal
conditions and under postulated process upset conditions, it is first necessary to establish
acceptable subcritical values for the operation and then show that the proposed operation will not
exceed those values. There are currently four acceptable methods for the establishment of these
values. They are:
1. By reference to national standards that present Subcritical Limits.
2. By reference to widely accepted handbooks of Subcritical Limits.
3. By reference to experiments with appropriate adjustments to ensure subcriticality when the
uncertainties of parameters reported in the experiment documentation are considered.
4. By validated calculational techniques.
The method used in a given evaluation must be supported in the text of this section.
When employing methods 1 or 2, simply provide the reference giving the Subcritical Limit. When
employing method 3, provide the references giving the critical parameters, and fully explain your
consideration of uncertainty in the reported critical parameters when determining limits.
When employing method 4, indicate the specific methods that were used in the assessment of
subcriticality. References should be provided to allow a reviewer the opportunity to further
research the methods used in the evaluation. It is not necessary to describe the theory behind any
calculational methods used. (This should be done by reference.) It is only necessary to indicate
what methods were used.
Examples of calculational methods are: the three-dimensional Monte Carlo code, KENO-V.a or
MCNP; the one-dimensional Sn discrete-ordinates transport theory code, ANISN; and hand
calculation methods such as limited surface density, density analog, or solid angle methods.
Section 6
When applicable, identify the nuclear cross section data that were used and the methods used to
process these data.
Compliance with Section 4.3, “Validation of a Calculational Method,” of ANS-8.1 should also be
demonstrated in this section. Reference can be made to more detailed validation reports;
however, the results of these validation reports should be summarized, the method used to
determine the bias (if any) should be described, and the overall conclusion(s) of validation efforts
and how the conclusions were applied to the evaluation results should be stated.
When computer neutronics calculations were used, the type of computing platform should be
stated along with relevant code configuration control information. This information may be
provided by reference.
DOE-STD-3007-93
6
For Example: All calculations documented in this evaluation were performed on an IBM
Model 320 RISC 6000 workstation operating under AIX Version 3.1 with
Version 1.1 of the Fortran Compiler. Configuration Release 1.10 of the KENO-
V.a code with Hansen-Roach cross section data were used for this evaluation.
More detailed configuration information is given in Reference .
5.0 DISCUSSION OF CONTINGENCIES
Compliance with the double contingency principle, as stated in DOE Order 5480.24 and
DOE O 420.1, Section 4.3, and the requirements of Section 4.1.2 of ANS-8.1 should be
demonstrated in this section. This may be done by several different methods. Two possible
methods are listed below.
1. List the independent unlikely events, at least two of which must occur concurrently before
a criticality accident could be possible. Describe the controls, conditions, etc. that ensure
that no credible single failure will result in a criticality. An illustration of this method is
given below (format shown is not a requirement).
Contingency
No. Description Barriers
1 Unlikely Event # 1 Controls, conditions, etc. that make Event
# 1 unlikely
2 Unlikely Event # 2 Controls, conditions, etc. that make Event
# 2 unlikely
2. If control of two independent parameters is not practical, DOE 5480.24 and
DOE O 420.1, Section 4.3, allow a system of multiple controls (at least two) on a single
parameter. The overall likelihood of concurrent failure of these controls should be
comparable to two unlikely events as discussed in Method 1. The basis for controlling a
single parameter as opposed to the preferred method of controlling two independent
process parameters should also be documented in this section. An illustration of this
method is given below (format shown is not a requirement).
Controls
Control Parameter No. Description
Parameter 1 Describe Control # 1
.
.
.
N Describe Control # N
DOE-STD-3007-93
7
[Note: Examples of each method are given in Section IV of this document.]
Contingency analysis, in general, is not required for incredible upset conditions.
Some systems will remain subcritical during any combination of credible upset conditions. For
such systems, simply state the fact in this section. (e.g., “As shown in Section 6.0, this system
will remain subcritical under any combination of credible upset conditions.”)
6.0 EVALUATION & RESULTS
After the establishment of appropriate and sufficient subcritical limits (see Section 4.0), it must be
shown that both the normal and worst-case postulated upset conditions (may be limited to
credible conditions only) will be equal to or less than those values. If the actual conditions differ
from those used to establish the subcritical limits, it must be shown that the comparison is
conservative.
Section 7
If calculational techniques are used, a detailed description of the models should be presented in
this section. The level of detail should be sufficient to allow an independent reviewer to easily
reconstruct the computational model, compare the model with the descriptive information in
Section 2.0, and determine if the overall model is conservative. Sketches showing relevant model
dimensions should be included. (Very simple modeling that can clearly be described in a few
sentences is an exception.) Significant assumptions and simplifications should be stated. Mesh
spacing, quadrature order, the order of the Legendre scattering expansion, and other parameters
pertinent to numerical techniques should be specified or incorporated by reference.
All material compositions used in the evaluation should be specified in Appendix A. Typical input
listings should be given in Appendix B. Any of this information may be incorporated into the text
or by reference.
All calculational results should be reported in this section. Estimated uncertainties in the
methodology (e.g., statistical uncertainties associated with Monte Carlo calculations) and
sensitivities to modeling simplifications (e.g., effects of homogenization, dimension or geometry
modifications, etc.) should be stated.
7.0 DESIGN FEATURES (PASSIVE & ACTIVE) AND
ADMINISTRATIVELY CONTROLLED LIMITS &
REQUIREMENTS
Design features (passive and active) and administratively controlled limits and requirements for
the purpose of preventing or reducing the probability of a criticality accident should be stated in
this section or should be incorporated by reference.
DOE-STD-3007-93
8
8.0 SUMMARY & CONCLUSIONS
The overall criticality safety assessment of the system being analyzed should be summarized in this
section. The range of applicability and special limitations in the evaluation should be stated.
A statement about the application of Double Contingency should also be provided. (e.g., “As
indicated in Section 6.0, this operation adheres to the Double Contingency Principle;” or “as
discussed in Section 6.0, this system will remain subcritical under all credible upset conditions.”)
If unique requirements must be satisfied (those discussed in Section 3.0), a statement of
compliance with these requirements should be given.
When applicable, reference to normal and abnormal ranges of operational parameters may also be
made. Portions of the evaluation that have been deferred to other efforts or documents should be
restated.
9.0 REFERENCES
To the extent practical, a criticality safety evaluation should stand on its own. However,
references may be used liberally so all external technical information (information from handbooks
or information from other reports that is beyond the scope of the evaluation) and relevant
descriptive information can easily be verified. Private communications, as references, should be
avoided, and crucial conclusions of the evaluation shall not depend on private communications.
APPENDIX A
MATERIALS & COMPOSITIONS
All materials used in computations should be identified and atom densities should be given. When
applicable, nuclide library IDs should be included. All other information, such as assumed bulk or
theoretical densities, that is required to duplicate the atom densities used in the evaluation should
also be given. This information may be incorporated by reference.
APPENDIX B
TYPICAL INPUT LISTINGS
Section 8
Typical input listings for all major perturbations in modeling should be included in this appendix.
If cross section preprocessing is performed, typical input listings for all cross section codes (e.g.,
NITAWL, BONAMI, XSDRNPM, COMBINE/PC) that are used in the evaluation should also be
included. This information may be incorporated by reference.
DOE-STD-3007-93
9
APPENDIX C, D,... ETC.
OPTIONAL APPENDICES PROVIDING
SUPPLEMENTAL INFORMATION
Other appendices providing supplemental information may be provided at the author's discretion.
IV. EXAMPLES OF CONTINGENCY ANALYSES
EXAMPLE # 1 Contingency analysis for a dry storage cask that is used to store irradiated
PWR or BWR fuel assemblies.
Contingency
No. Description Barriers
1 Flood Cask Interiora Cask is sealed; lid is well above flood
plainb
2 Loss of Neutron Poison from
Inserta
Insert is in a noncorrosive environmentb
a. The degree of flooding or the magnitude of poison loss required to have a
criticality accident is discussed in Section 6.0.
b. Surveillance is required to ensure the integrity of this barrier. Details of
surveillance procedures are documented in Reference .
EXAMPLE # 2 Contingency analysis for a large dissolver vessel. Criticality safety margins are
maintained by controlling the mass of fissile material and the concentration of
neutron poison inside a large dissolver vessel. Inadvertent criticality can occur
by exceeding the fissile mass, dilution or improper makeup of soluble neutron
poison, or by a combination of the two.
Controlsa
Control Parameter No. Description
Fissile Mass (U-235) 1. Mass Balance System # 1
2. Mass Balance System # 2
3. Visual Inspection
OR
Concentration of Neutron Poison 1. Poison Monitor # 1
2. Poison Monitor # 2
3. Sampling
a. A more detailed description of these controls is given in Reference __. At least two
controls are required; no further significance should be placed on the number of controls
listed in this example.
DOE-STD-3007-93
10
EXAMPLE # 3 Contingency analysis for a dry fuel element staging area.
Contingency
No. Description Barriers
1 Floodinga Only water source is fire suppression
system - fire or malfunction is required to
actuate.
Flow alarms on the fire water, heat and
smoke detectors in the staging area.
Doors do not impede reasonable water flow
rates. Water will not build up on the floor.
2 Item Limit Violationa Administratively controlled limits and
written procedures.
Operator training and certification.
Independent observation
a. The degree of flooding or the magnitude of item limit violation required to
have a criticality accident is discussed in Section 6.0.
EXAMPLE # 4 Contingency analysis for fuel handling in a storage pool.
Controlsa
Control Parameter No. Description
Item Limit (Number of fuel handling units
out of storage)
1. Administratively controlled
limits & procedures
2. Operator training &
certification
3. Pre-job briefing
4. Independent observation
a. A more detailed description of these controls is given in Reference __. At least two
controls are required; no further significance should be placed on the number of controls
listed in this example.
DOE-STD-3007-93
11
EXAMPLE # 5 Contingency analysis for a hypothetical process area operation involving
loading of fissile parts into a container.
Contingency
No. Description Barriers
1 Loss of Mass Control By: Administratively controlled limits and
requirementsa
Section 9
1a Exceeding Number of Parts in
a Container
OR
1b Exceeding Mass of Part
2 Loss of Moderator Control
By:
Administratively controlled limits and
requirementsa (These events must occur
during loading operation, or an operator
must fail to close to the container.)
2a Failure of Sprinkler Head
OR
2b Sprinkler Activation Because
of Fire
OR
2c Roof Leak During Rainfall
a. A detailed description of these administratively controlled limits and
requirements are given in Reference _.
DOE-STD-3007-93
12
EXAMPLE # 6 Contingency analysis for a hypothetical process area operation involving
loading of fissile parts into a container where flooding is incredible (i.e., there
are no liquid sources and container cannot hold liquid).
Controls
Control Parameter No. Description
Number of Parts Administratively controlled
limits & requirements
1. Limit on number of parts in
loading area.
2. Limit on number of parts in
container.
OR
Mass of Parts Administratively controlled
limits & requirements
1. Limit on mass of parts
2. Mass verification of parts
(Weighing Requirements)
V. EXAMPLES OF CRITICALITY SAFETY EVALUATIONS THAT MEET
THE INTENT OF THE DEPARTMENT OF ENERGY NON-REACTOR
NUCLEAR FACILITY GUIDELINES
Examples of criticality safety evaluations that have been adapted to follow the Department of
Energy Non-Reactor Nuclear Facility Guidelines for preparing Criticality Safety Evaluations are
included in this section. These evaluations were prepared at various DOE facilities. They are
presented here for illustration purposes only, with no endorsement of fissile material limits or the
methods of derivation. Use of these examples for other purposes (i.e., quoting results to
demonstrate the safety of other systems or use of requirements that may apply only to specific
facilities) is not authorized. Document Control Numbers, review and approval signatures,
implementation documentation, etc., are not addressed in these guidelines and are not illustrated
in these examples.
Notes contained in brackets [ ] either relate information contained within an example to the
guidelines or highlight illustrative weaknesses in an example.
DOE-STD-3007-93
1-1
EXAMPLE 1
Provided by
Oak Ridge Y-12 Plant
CRITICALITY SAFETY EVALUATION FOR
DISTRIBUTION TRAP F-1202
FOR SOLUTION TRANSFER TO D-WING
DOE-STD-3007-93
1-2
Intentionally Blank
DOE-STD-3007-93
1-3
1.0 INTRODUCTION
The following analysis has been performed to document the technical basis for the
approval of distribution trap F-1202, which is used to transfer product solution from Room 1021
scrap recovery operation to the D-1 wing or to safe bottles.
2.0 DESCRIPTION
Operation
To transfer solution into F-1202, valves are set as appropriate to receive solution from
either F-1000 (the accountability tank) or F-1202 A-D (west wall storage tanks). Wet vacuum is
applied to deliver solution to F-1202, using intermediate vacuum trap F-1201. F-1201 has a high
level probe interlocked with a block valve in the vacuum line to stop overflow from F-1202.
Vacuum to F-1202 is supplied by the final process area wet vacuum trap located in the northwest
corner of Room 1022; this trap has an audible alarm.
Solution in F-1202 may be drained to a safe bottle or the F-400 tanks in D-Wing. As each
safe bottle is filled, it is transferred to an approved storage rack or dolly. For transfer to D-Wing,
valves in D-Wing are set to deliver solution to any tanks F-400-1 through F-400-3, or F-400-6
Section 10
through F-400-10.
In Room 1021, the transfer line to D-Wing passes over the Room 1021 fissile storage
array. Over this array, the stainless steel transfer line is encased in a PVC pipe that is sealed at
either end and provided with a drain on the lower end. This drain is routed to a single safe bottle
mounted near the stairway at the scrubber system.
The transfer line to D-Wing is also double-walled from the Room 1022 wall penetration
all the way to the entrance to D-Wing. Any transfer line leaks in this section will drain to a safe
bottle located on the north wall of D-Wing.
DOE-STD-3007-93
1-4
The entire floor area underneath the Room 1021 west wall tanks and accountability tank,
and the area in front of the tray dissolver hoods has a stainless steel floor bordered with a 0.75”
high dike. This floor area is intended to contain leaks or spills and to aid in contamination
control.
Equipment
F-1202 is a standard 4” Pyrex pipe, 3’ tall. F-1202 is located 2’ south of tank F-1200-A.
Reference Drawings (not necessarily as-built)
J2E-XXXXX,P2E-XXXXX.
Reference Operation Procedures
OP-XXXXX.
3.0 REQUIREMENTS DOCUMENTATION
There are no unique requirements for this analysis.
4.0 METHODOLOGY
J. T. Thomas, ed., “Nuclear Safety Guide, TID-7016, Revision 2,” NUREG/CR-0095
(ORNL/NUREG/CSD-6), June 1978 - Figure 2.3.
5.0 DISCUSSION OF CONTINGENCIES AND EVALUATION
Parameters
Criticality safety of the distribution trap and transfer operations depends on controlling
geometry.
DOE-STD-3007-93
1-5
NOTE: Equipment approved by this CSA is limited to (a) Trap F-1202 and various
connecting lines for feed and vacuum, and (b) the transfer line to D-Wing and the safe bottle near
the Room 1021 scrubber.
Final wet vacuum traps (i.e., northwest corner of Room 1022) and the wet vacuum
equipment in the Headhouse fan room, other Room 1021 tanks, D-Wing tanks, and the safe bottle
used in D-Wing as a drain collection for the second double wall section are currently approved by
other CSAs.
The operational steps specifically analyzed here are transfers into F-1202 and transfers
from F-1202 to D-Wing tanks. Safe bottle handling and storage, dolly handling and storage, area
cleanup and mopping, etc. are standard area activities that are not unique to this operation. These
are addressed in Y/DD-395, “Basic Nuclear Criticality Safety Guidelines.”
Controls
The following controls are identified for the above parameter.
• The dimensions of the trap and its location relative to other tanks are fixed by design.
All transfer lines are 1.5” diameter or less. The double-walled pipe sections have
sleeve diameters of either 3” (steel jacket in D-1 Wing and Room 1010 plenum areas
or 4” (CPVC pipe over the Room 1021 fissile storage array).
• A spill or a leak would result in relocation of uranium solution to another safe
geometric configuration. Near the west wall of Room 1021, the solution would spill
into the diked area underneath the storage tanks and other equipment. Over the Room
1021 fissile storage array, the liquid would drain into the 4” CPVC pipe jacket and
drain into a safe bottle in the diked scrubber area. In the Room 1010 plenum or D-1
Wing, the liquid would enter the 3” stainless steel pipe jacket and drain into a safe
bottle in D-Wing. Overfill of this safe bottle, D-Wing tank overfill, or tank or line
DOE-STD-3007-93
1-6
leakage in D-Wing would result in a simple solution spill onto the stainless steel floor
Section 11
of the D-Wing solution storage area.
• Except for the double-walled line section Room 1010 plenum and D-1 Wing, all areas
near transfer lines, the trap or D-Wing storage tanks are identified as unsafe container
exclusion areas: open, large geometry containers are strictly prohibited without
specific Criticality Safety approval.
• Administrative control is exercised for use of the wet vacuum for transfers.
Procedurally, the operator is to observe F-1202 to avoid overfill. Minor carryover
(splatter, etc.) to F-1201 would be routinely expected. Occasionally, overfill of F-
1202 might briefly occur. In such case, engineered operational controls (level alarm
plus interlocked block valve on vacuum line) are provided for F-1201. These
operational controls are not considered to be required from a criticality safety
standpoint - the primary point of criticality safety control is that the final wet vacuum
trap in the northwest section of Room 1022 must not be allowed to overfill. As
required by other CSAs, any alarm of this trap requires that use of wet vacuum
immediately stop. (Manual block valves are present at the trap.) The solution source
must be identified and corrected before use of the wet vacuum may resume. Weekly
testing is required for the alarm system on this final trap.
• Selection of the correct container (safe bottle) for drainage of solution is an
administrative control. The use of proper equipment for spill cleanup (4-liter beakers
or process area mop buckets) is also an administrative control.
NOTE: Detailed interaction considerations are not warranted here. The analyses of other
CSAs provide interaction considerations for all fixed process equipment in the west area of Room
1021, including F-1202.
DOE-STD-3007-93
1-7
Likewise, the elevation of the small volume trap (well above manually handled containers
near floor level) avoids the need to consider portable process containers in contact with the trap.
The trap is fabricated of standard 4” diameter x 36” tall Corning conical Pyrex glass. Based on
Corning vendor data1, the design outside diameter is 4 17/32” with a 17/64” wall, giving an inside
diameter of 4”. The trap volume is thus only 7.4 liters. The trap base is elevated about 11’8”
above the Room 1021 floor.
There is no ready means for operator access to the trap. There is no operational incentive
to have a process container in close proximity to the trap.
CONTINGENCIES
1. Loss of geometry control
(a) Transfer line leak, valve leak, trap breakage, etc., near the west wall of Room 1021
(b) Leak in transfer line to D-Wing
(c) Overfill of D-Wing storage tanks, line leak, etc., in D-Wing
(d) Loss of liquid to the wet vacuum system
(e) Use of an improper container for solution drainage from the trap
ANALYSIS
Contingency 1a
Any fissile solution release from the process equipment along the west wall of
Room 1021 will result in a simple solution spill into a safe geometry slab.
The other analyses demonstrate that this diked area could retain the entire solution
inventory of the Room 1201 west wall solution process equipment without exceeding a solution
depth of 0.75”. Room 1021 is identified as an unsafe container exclusion area; large, open
containers are prohibited without specific Criticality Safety approval. Posting is present regarding
this limitation.
DOE-STD-3007-93
1-8
Contingency 1b
Any leak of the transfer line to D-Wing will result in solution drainage into safe
Section 12
bottles or a spill into a safe slab configuration.
The jacket diameters of the double walled sections (3” and 4”) are less than the subcritical
fissile solution diameter limits given on Figure 2.3 of TID-70162. The jackets (like the transfer
line) are continuously sloped to avoid solution holdup, and are designed of material compatible
with the nitric-acid based fissile solution. Minor leakage would drain to the safe bottles; monthly
inventory efforts include checking such bottles for material. Should the liquid not be detected in a
partially loaded bottle, or if the leak were at a greater rate, either bottle could overfill and result in
a simple solution spill onto the floor in areas designed for safe spill retention.
Any leak from a non-jacketed section of the transfer line (from the west wall area of Room
1021 to the west edge of the storage array, or from the east edge of the storage array to the
Room 1022 wall penetration) would result in a simple solution leak in a process area that excludes
unsafe geometry containers. Established practices exist and would be strictly followed for
material cleanup (use 4-liter beakers or process area mop buckets).
Contingency 1c
Overfill of the D-Wing solution storage tanks will result in a simple spill of fissile
solution into a safe slab geometry.
D-Wing is designed as a dedicated fissile solution storage area, therefore, such a spill
should be of no consequence for a criticality safety standpoint. Mop buckets or 4-liter beakers
would be used for material cleanup.
Contingency 1d
Adequate controls are in place to preclude criticality due to misuse of the wet
vacuum system.
DOE-STD-3007-93
1-9
A reasonable level of operational control is present to avoid routine transfer of solution to
the final Special Process area trap in the northwest area of Room 1022.
Significant solution bypass of the final trap would require gross system misoperation for
the transfer efforts to F-1202, coupled with either alarm failure or lack of personnel response to
the alarm. In the Headhouse, the final wet vacuum equipment provides a significant safe
geometry surge volume (multiple 6-inch diameter steel traps in parallel), as discussed in CSA HH-
123, followed by two alarmed 6-inch glass traps in series. Upon liquid detection by these final
alarms, automatic block valves in the main vacuum header close to prevent fissile solution transfer
to the jet vacuum producers. This alarm system and interlocked block valve is formally
designated as a safety system. The surge volume plus safety system serve to positively preclude
loss of geometry control fissile solution, by preventing loss of fissile material to the storm sewer
drain system.
Contingency 1e
Use of an improper container for drainage of solution from F-1202 is precluded by
operator training and supervisory oversight.
A situation whereby an operator intentionally transfers fissile solution from F-1202 into a
large geometry container is precluded by the strict nature of operator training and supervisory
oversight for this process area. Operator training emphasizes the immediate danger of such
action. Such an event would be expected only as the result of either sabotage or suicidal action,
which are outside the bounds of the analysis.
6.0 RESULTS
The distribution trap is approved for use as described.
DOE-STD-3007-93
1-10
7.0 DESIGN FEATURES AND ADMINISTRATIVELY
CONTROLLED LIMITS AND REQUIREMENTS
Section 13
Criticality safety of this operation depends on maintaining all solution in safe geometry.
1. Proper spacing (at least 12-inches edge-to-edge) must be maintained between
multiple process containers, or between process containers, safe tanks, and vacuum
traps.
2. Spills or leaks must be collected in approved solution containers such as safe bottles
or 4-liter beakers.
3. If the final wet vacuum trap is in the northwest corner of Room 1022 alarms, vacuum
transfer must be immediately stopped. The source of solution must be determined
and corrected before further use of wet vacuum.
4. Large geometry containers or equipment (internal volume available for solution
holdup exceeding 4 liters) are not permitted near this process equipment without
Criticality Safety approval.
8.0 SUMMARY AND CONCLUSIONS
It has been shown in section 5.0 that the proposed trap is a safe geometry and meets the
requirements of the double contingency principle.
9.0 REFERENCES
1. Corning Process Systems, “Process Fittings and Hardware,” July 1985.
2. J. T. Thomas, ed., “Nuclear Safety Guide, TID-7016, Revision 2, “NUREG/CR-0095
(ORNL/NUREG/CSD-6), June 1978.
DOE-STD-3007-93
2-1
EXAMPLE 2
Provided By
Idaho Chemical Processing Plant (ICPP)
CRITICALITY SAFETY EVALUATION FOR
STORAGE OF BORAX V
ON CPP-603 NORTH AND MIDDLE BASIN FLOOR
DOE-STD-3007-93
2-2
Intentionally Blank
DOE-STD-3007-93
2-3
CONTENTS
1.0 INTRODUCTION..................................................................................................................2-7
2.0 DESCRIPTION ......................................................................................................................2-7
3.0 REQUIREMENTS DOCUMENTATION...........................................................................2-13
4.0 METHODOLOGY...............................................................................................................2-13
5.0 DISCUSSION OF CONTINGENCIES ...............................................................................2-19
6.0 EVALUATION AND RESULTS ........................................................................................2-19
7.0 DESIGN FEATURES AND ADMINISTRATIVE LIMITS...............................................2-27
7.1 Design Features ........................................................................................................2-27
7.2 Administrative Limits................................................................................................2-27
8.0 SUMMARY AND CONCLUSIONS...................................................................................2-27
9.0 REFERENCES.....................................................................................................................2-28
APPENDICES ..................................................................................................................................2-29
A. Number Density Calculations...................................................................................2-29
B. Sample KENO V.A Inputs.......................................................................................2-29
DOE-STD-3007-93
2-4
Intentionally Blank
DOE-STD-3007-93
2-5
FIGURES
1. CPP-603 Fuel Storage Facility Layout..................................................................................2-10
2. North/Middle Basin Concrete Dividers.................................................................................2-11
Section 14
3. Example of Monorail Hanger - STR with Typical Storage Bucket.......................................2-12
4. BORAX V Superheater Fuel Assembly................................................................................2-16
5. 4 x 4 Array of BORAX V Superheater Fuel Assemblies.......................................................2-17
6. SPERT-D Fuel Element........................................................................................................2-18
7. BORAX V Superheater Fuel Subassembly...........................................................................2-22
8. Various Water Reflected BORAX V Fuel Assembly Arrays................................................2-23
9. X-Y View of Various Water & Concrete Reflected
BORAX V Fuel Assembly Arrays.........................................................................................2-25
10. 3 x 3 Array of BORAX V Superheater Fuel Assemblies
With Varied Spacing Between Assemblies............................................................................2-26
TABLES
1. Reactivity as a Function of Distance Between
BORAX V Fuel Assemblies..................................................................................................2-26
DOE-STD-3007-93
2-6
Intentionally Blank
DOE-STD-3007-93
2-7
Criticality Safety Evaluation for
Storage of BORAX V on
CPP-603 North and Middle Basin Floor
1.0 INTRODUCTION
The purpose of this evaluation is to provide a basis to store BORAX V Superheater fuel in
the Idaho Chemical Processing Plant (ICCP) Building 603 north and middle basins, with no
spacing restrictions between fuel storage buckets within a single row. As a result of the age and
degradation of the Building 603 fuel storage facility, failure of a BORAX V fuel storage bucket
hanger occurred in July 1992, thus causing the loaded storage bucket to fall to the floor. Due to
the lower reactivity of BORAX V Superheater fuel, there exists a possibility that the spacing
provided at one time by the basin monorail fuel storage system might not be necessary. If this
spacing is deemed unnecessary, the definition of approved storage for BORAX V fuel elements
could possibly be changed to eliminate the requirement for spacing within a given row. The
redefinition of approved storage would entail the placement of storage buckets, containing three
or fewer BORAX V Superheater fuel elements, onto the basin floor. This redefinition would
apply only to rows exclusively containing BORAX V Superheater fuel elements. With this
redefinition all spacing restrictions between storage buckets could be removed.
Considered in this evaluation are various arrangements of BORAX V Superheater fuel
assemblies within a single storage row. Only BORAX V Superheater fuels are considered in this
evaluation.
2.0 DESCRIPTION
The Building 603 fuel storage facility consists of three underwater storage basins, the
north, middle, and south. (See Figure 1).1 The south storage basin consists of a series of storage
racks. The two basins of concern are the north and middle basins, since those basins contain the
monorail fuel storage system. The north and middle basins are 40 feet (12.2 m) by 60 feet (18.3
m), with a water depth of 21 feet (6.4 m). The middle and north basins consist of a series of
DOE-STD-3007-93
2-8
channels, 12 inches in width (30.48 cm), through which the monorail system runs. Each channel
is separated by a concrete divider that is 12 inches in width (30.48 cm) and 30 inches high (76.2
Section 15
cm), as shown in Figure 2.1 The current age of the facility and degradation due to corrosion
problems have led to failures of the monorail fuel storage system, such that the loss of spacing
provided by the monorail system can no longer be considered a contingency.
Fuel is currently stored in the north and middle basins by one of two methods. The first
method, common to most of the navy fuels, consists of fuel hanging from a single hook
arrangement. A standard is placed through the center of the fuel assembly and hung directly on
the hook. In the second method, which is used for the BORAX V fuel, the fuel assemblies are
placed into a bucket that is then hung from the monorail system.
An example of a monorail hanger system and a typical bucket is given in Figure 3.1 The
buckets are constructed of either aluminum or stainless steel, depending upon fuel types stored in
the bucket, thus assuring materials compatibility.
The failure of the monorail storage system is directly related to the corrosion problems in
the north and middle basins. Earlier corrosion problems led to modification of some monorail
hangers. Some of these modifications included the cutting of carbon steel hanger systems and the
replacement of the carbon steel hooks with stainless steel hooks.
In the process of attaching the stainless steel hooks to the carbon steel hanger assemblies,
a galvanic couple was created. With existing corrosion problems and loss of structural integrity
due to the galvanic couple, the load present caused a failure to occur.
Due to the loss of the engineered safety feature (spacing) provided by this system,
evaluation of a new fuel configuration was required. Considered in this evaluation are various
arrangements of BORAX V fuel elements without the spacing that was once maintained by the
monorail storage system. In addition to the loss of spacing between storage buckets, the
reactivity effects due to reflection from the concrete storage channel walls was also evaluated. A
DOE-STD-3007-93
2-9
more detailed description of the 603 Underwater Fuel Storage Facility can be found in the Plant
Safety Document (PSD) Section 4.6.1 A more detailed description of the BORAX V Superheater
fuel and the computational models used in this evaluation can be found in the “Evaluation and
Results” section of this report and References 3, 4, 5, 6 and 7.
DOE-STD-3007-93
2-10
Figure 1. CPP 603 Fuel Storage Facility Layout.
DOE-STD-3007-93
2-11
Figure 2. North/Middle Basin Concrete Dividers.
DOE-STD-3007-93
2-12
Figure 3. Example of Monorail Hangar – STR with Typical Storage Bucket.
DOE-STD-3007-93
2-13
3.0 REQUIREMENTS DOCUMENTATION
No unique requirements are applicable to this evaluation.
4.0 METHODOLOGY
The calculations listed in this evaluation were performed using the CSAS25 module of the
SCALE4 package. The CSAS25 module contains three programs that were utilized, BONAMI-
II, NITAWL-II, and KENO V.a.2
BONAMI-II and NITAWL-II are cross section processing codes that are utilized to create
resonance corrected problem dependent cross sections for use in the KENO V.a program.
The system was modeled using the 3-dimensional neutron transport code KENO V.a, as
found in the SCALE4 package. KENO V.a is a Monte Carlo based computational method that
can be used in the determination of effective multiplication factors, keff, of various systems.
KENO V.a can utilize the problem dependent cross sections, as mentioned previously, in the
Section 16
determination of keff. Various geometrical configurations can be modeled in KENO V.a.
The 27 group ENDF/B-IV cross section library, used for this evaluation, was collapsed
from the 218 group ENDF/B-IV library. This library contains 13 thermal energy groups (below
3ev) and 14 epithermal and fast groups (above 3 ev).
All calculations listed in this evaluation were performed on a Data General Avion Series
500 or Series 400 workstation operating under Data General Unix Version 5.4. The SCALE4
package was compiled using the Green Hills Fortran compiler, Version 1.8.5.
As part of the validation for this report a calculation was performed, using the above
described computer platform and code package, on an actual critical experiment performed in the
Borax V reactor.3 As outlined in “BORAX V Neutronics Report,” (ANL-6964)3, an attempt to
DOE-STD-3007-93
2-14
create a critical configuration with the peripheral BORAX V Superheater fuel assemblies was
made. At the time of the attempt only sixteen peripheral assemblies existed. The sixteen
peripheral assemblies were configured in a 4 x 4 array as shown in Figure 5. As shown by the
results given in that report this array was slightly subcritical. Estimation by the inverse count rate
curves showed that seventeen assemblies would be critical and eighteen assemblies would be
supercritical.
The resulting multiplication factor for the 4 x 4 array was calculated to be
keff ± 1s = 1.0032 ± 0.0034. This array was modeled using KENO V.a along with 27 group
ENDF/B-IV cross section library. As discussed previously, this array was shown by experiment
to be slightly subcritical, but was shown in the KENO V.a model to be critical thus indicating no
code bias compensation is needed for this case.
The second part of the validation for this report involved the modeling of two critical
experiments involving arrays of SPERT-D fuel elements. The SPERT-D fuel is a uranium-
aluminum plate type fuel. Each fuel element contained about 300 g of U235 in twenty two
aluminum-clad flat plates. Each fuel plate consisted of a uranium-aluminum alloy core (93.17
weight % U - Al), containing 23.8 w/o uranium, completely clad with 0.02 inches (0.0508 cm)
thick type 6061 aluminum. Each fuel plate slid into a set of grooved side plates contained inside a
3 inch (7.62 cm) square, type 6060-T6 aluminum tubing, 27.625 inches (70.1675 cm) long. An
example of the SPERT-D fuel is given in Figure 6. A more detailed description of this fuel can be
found in Reference 8.
The critical arrays assembled consisted of a combination of full and partial fuel assemblies.
Each of the critical arrays were moderated and reflected with demineralized water. Two arrays
were modeled for the purposes of validation. The first of the arrays modeled was listed as the 4 x
3.16 x 1 array with the 0.25 inches (0.635 cm) water gap. (The 3.16 indicates that only four of
the possible twenty two fuel plates were present in four of the fuel assemblies present in the
array.) The effective multiplication factor was calculated to be keff ± 1s = 1.0016 ± 0.0033.
DOE-STD-3007-93
2-15
The second of the arrays modeled was listed as the 4 x 3.09 x 1 array with the 0.5 inches
(1.27 cm) water gap. (The 3.09 indicates that only two of the possible twenty two fuel plates
were present in four of the fuel assemblies present in the array.) The effective multiplication
factor was calculated to be keff ± 1s = 1.0055 ± 0.0031.
Section 17
As shown by the results listed in these two examples both critical systems were shown to
be critical in the KENO V.a models. These results along with the BORAX V Superheater results
lead to the conclusion that no bias compensation is needed in this evaluation.
The configuration of the critical systems modeled for the purposes of validation and
applicability were similar to the modeled configurations used in this evaluation. The actual critical
configurations consisted of arrays of full and partial BORAX-V and SPERT-D fuel elements, as
previously described. The models in the evaluation consisted of arrays of BORAX-V fuel
elements as described in the text of this report. Also, the SPERT-D fuel elements consisted of a
uranium stainless steel fuel matrix similar to the BORAX-V elements.
In addition to the described critical experiments, various other critical experiments9,10,11
were modeled in an attempt to validate the applicability bounds of the previously described code
and cross section package. The critical experiments consisted of various uranium forms (metal,
oxide, and liquid), moderator ratios, reflector materials, and single units and various array sizes.
Concrete reflection existed in some of the critical examples which, although are not exact
comparisons, can be used to validate the applicability of the code and cross section package for
reflected systems as modeled in this evaluation.
DOE-STD-3007-93
2-16
Figure 4. BORAX V Superheater Fuel Assembly.
DOE-STD-3007-93
2-17
Figure 5. 4 x 4 Array of BORAX V Superheater Fuel Assemblies3.
DOE-STD-3007-93
2-18
Figure 6. SPERT-D Fuel Element.
DOE-STD-3007-93
2-19
5.0 DISCUSSION OF CONTINGENCIES
A detailed outline of the various contingencies supporting criticality safety can be found in
the Plant Safety Document (PSD), Section 4.6, “Underwater Fuel Storage”.1 In this section
various contingencies are specifically called out along with the results from, and references to,
criticality safety analyses supporting these contingencies.
6.0 EVALUATION AND RESULTS
As discussed previously, the purpose of this evaluation was to determine the reactivity of a
single row of storage buckets placed on the floor of a storage channel in the middle or north basin
of CPP 603. The middle and north basins consist of a series of channels, 12 inches in width
(30.48 cm), through which the monorail system runs. As shown in Figure 21, each channel is
separated by a concrete divider that is 12 inches in width (30.48 cm) and 30 inches high (76.2
cm). Only buckets containing BORAX V Superheater fuel assemblies are considered in this
evaluation.
The BORAX V superheater fuel is a UO2-stainless steel cermet fuel, consisting of highly
enriched uranium (93 weight % U235) dispersed in a stainless steel matrix. A superheater fuel
element is made of five subassemblies of fuel plates with intervening water gaps. Each
subassembly contains four fuel plates. The dimension of each fuel plate is listed as 3.665 inches x
0.030 inches x 25.25 inches (9.309 cm x 0.0762 cm x 64.14 cm), with the fuel meat thickness of
0.014 inches (0.03566 cm) and a stainless steel (304L) cladding thickness of 0.008 inches
(0.02032 cm). Each fuel plate is spaced 0.062 inches (0.1575 cm) apart. The water volume
fraction of a fuel assembly is given as 64.5%. A main underlying assumption of this evaluation is
that the BORAX V Superheater fuel has maintained its structural integrity such that its physical
Section 18
form does not grossly deviate from that listed in this evaluation. Past basin history indicates that
the stainless steel material which has been stored in the CPP-603 basin environment has good
structural integrity.
DOE-STD-3007-93
2-20
As stated previously, each subassembly consisted of four fuel plates. Each subassembly
has an insulating air gap of 0.030 inches (0.0762 cm) between the outer fuel plates and the outer
cladding. The dimensions of a subassembly are given as 3.665 inches x 0.426 inches x 25.25
inches (9.309 cm x 1.082 cm x 64.140 cm). A full BORAX V Superheater fuel assembly consists
of five subassemblies and has dimensions given as 3.633 inches x 3.875 inches x 25.462 inches
(9.228 cm x 9.843 cm x 64.674 cm). The superheater fuel assembly was modeled as previously
described and shown in Figures 4, 5, & 7.
Currently 34 BORAX V Superheater Fuel Elements are in inventory at the ICPP. This
inventory consists of a combination of central and peripheral fuel elements, each at a U235
enrichment of approximately 93%. The maximum U235 loading per assembly is listed as 679
grams for a peripheral assembly and 429 grams per central assembly. Several series of
calculations were performed to determine reactivity effects. The calculational models considered
in this evaluation consisted only of the highly loaded peripheral assemblies.
Evaluated in the first series of cases were various arrays surrounded only by water. This
was done to determine the minimum number of assemblies needed to achieve a critical system. A
pictorial representation of reactivity as a function of array size is given in Figure 8. Each block
represents one BORAX V Superheater fuel assembly. As shown in Figure 8, a 3 x 3 x 1 array of
fuel assemblies exceeded the keff+ 2s > 0.95 safety limit criteria and a 3 x 4 x 1 array is shown to
be critical with keff+ 2s > 1.0.
Considered in the next series of calculations were arrays that were reflected not only by
water but also by concrete. Due to the physical dimensions of the fuel assemblies and the width
of the concrete channel walls, it was only possible to store fuels in arrays that were either one or
two assembly units wide. In this series of calculations, in which the concrete12 channel walls and
basin floors were modeled, various arrangements of fuel assemblies were evaluated. These
arrangements are shown in Figure 9. As shown in Figure 9, a 2 x infinite x 1 array of fuel
elements placed in a water filled concrete storage channel gives a keff+ 2s = 1.0386. Current
technical specifications (TS/S 4.6A1) limit each storage bucket to four BORAX V Superheater
DOE-STD-3007-93
2-21
fuel assemblies. Current inventory fuel storage maps indicate that no more than three assemblies
are stored per bucket. Since only three fuel assemblies are stored per bucket, a more realistic
configuration is given at the bottom of Figure 9. As shown in this case, the fuel assemblies are
arranged in a staggered configuration. The result calculated in this case yields an effective
multiplication factor of keff+ 2s = 0.9340, which is within the ICCP acceptance criteria.
A revision to the current technical specification, TS/S 4.6A1, will allow only three
assemblies per bucket when stored on the basin floor. This revision will redefine approved
storage to allow these buckets to be stored on the floor of a storage channel with no spacing
restriction between buckets.
DOE-STD-3007-93
Section 19
2-22
Figure 7. BORAX V Superheater Fuel Subassembly.
DOE-STD-3007-93
2-23
Figure 8. Various Water Reflected BORAX V Fuel Assembly Arrays.
DOE-STD-3007-93
2-24
In all calculations, the actual storage buckets were ignored, thus allowing the assemblies
to be placed side by side. In reality, a spacing device exists that is connected to the monorail
hanger, which provides a small amount of spacing between the assemblies. For the purposes of
this evaluation, this spacing was ignored.
The last configurations to be evaluated were those in which the spacing between the fuel
assemblies was varied to determine reactivity effects. For this set of calculations the 3 x 3 x 1
water reflected array was modeled. The distance between the fuel assemblies was varied from 0
cm to 1.0 cm by 0.1 cm increments and from 1.0 cm to 4.0 cm by 1.0 cm increments. An example
of this configuration is shown in Figure 10, with X being the distance between fuel assemblies.
The results of these calculations are given in Table 1. As shown by these results, the increase in
spacing between fuel assemblies had an indistinguishable effect on reactivity. This result was
expected due to the large water volume fraction of a BORAX V Superheater fuel assembly and
already present moderator gaps inherent to the design.
DOE-STD-3007-93
2-25
Figure 9. X-Y View of Various Water & Concrete Reflected
BORAX V Assembly Arrays.
DOE-STD-3007-93
2-26
Figure 10. 3 x 3 Array of BORAX V Superheater Fuel Assemblies
with Varied Spacing Between Assemblies.
Table 1. Reactivity as a Function of distance Between BORAX V Fuel Assemblies.
Distance Between Fuel Assemblies Keff + 2s
0.0 cm 0.9581
0.1 cm 0.9572
0.2 cm 0.9605
0.3 cm 0.9601
0.4 cm 0.9603
0.5 cm 0.9498
0.6 cm 0.9649
0.7 cm 0.9541
0.8 cm 0.9590
0.9 cm 0.9499
1.0 cm 0.9508
2.0 cm 0.9222
3.0 cm 0.8699
4.0 cm 0.8248
DOE-STD-3007-93
2-27
7.0 DESIGN FEATURES AND ADMINISTRATIVE LIMITS
The following design features and administratively controlled limits are necessary to
ensure the criticality safety of the system. Operation safety limits are set in the Plant Safety
Document (PSD) and the Technical Specifications (TS/S) associated with that operation.
7.1 Design Features
1. The BORAX V Superheater fuel has uranium gram loadings and enrichments at or below
those listed in this evaluation.
2. The BORAX V Superheater fuel has maintained its structural integrity, due to its material
compositions, such that its physical form does not grossly deviate from that listed in this
evaluation.
7.2 Administrative Limits
1. Each storage bucket stored on the basin floor will be limited to three BORAX V Superheater
fuel assemblies.
2. Storage buckets suspended from the monorail system will be limited to four Borax V
Superheater assemblies provided the buckets are preventively rigged to avoid dropping to the
basin floor. If the remaining hanging buckets are not preventively rigged, the limit per bucket
will be set at three BORAX V assemblies.
3. A row containing storage buckets placed on the floor will be limited to buckets containing
only BORAX V Superheater fuel assemblies. No other fuel types will be allowed in this row.
8.0 SUMMARY AND CONCLUSIONS
The summary and conclusions from this evaluation are given below:
• Storage buckets that contain three (3) BORAX V Superheater fuel assemblies may be
stored on the floor of the north and middle basins without any restrictions upon spacing
between the storage buckets.
Section 20
• Only BORAX V Superheater peripheral and central assemblies were considered in the
evaluation. The storage of a single row of buckets containing BORAX V Superheater
fuel assemblies was evaluated. Interaction with other fuel types within the row was not
considered since other fuel types in a single row will be restricted through administrative
controls.
DOE-STD-3007-93
2-28
9.0 REFERENCES
1. Idaho Chemical Processing Plant Safety Document, Underwater Fuel Storage, Section
4.6.
2. Staff of Technical Applications, Computing and Telecommunications Division at ORNL,
SCALE: A Modular Code System for Performing Standardized Computer Analysis for
Licensing Evaluations, Vols. 1-3, CCC-545.
3. J. I. Hagen and R. W. Goin (Argonne National Laboratory), BORAX V Neutronics,
ANL-6964, December 1965.
4. W. C. Kramer and C. H. Bean (Argonne National Laboratory), Fabrication of UO2-
Stainless Steel Dispersion Fuel For BORAX V Nuclear Superheat, ANL-6649, December
1963.
5. (Argonne National Laboratory), Design and Hazards Summary Report Boiling Reactor
Experiment V (BORAX V), ANL-6302, May 1961.
6. BORAX-V Project Staff (Argonne National Laboratory), Experiments with Central
Superheater Core CSH-1, ANL-6961, January 1965.
7. K. E. Plumlee, Q. L. Baird, G. S. Stanford, and P. I. Amundson (Argonne National
Laboratory), Critical Experiment with BORAX V Internal Superheater, ANL-6691,
December 1965.
8. E. B. Johnson and R. K. Reedy (Oak Ridge National Laboratory), Critical Experiments
With SPERT-D Fuel Elements, ORNL-TM-1207, July 14, 1965.
9. B. M. Palmer, C. Crawford, Validation of the CSAS25 Module of Scale, Part I: Highly
Enriched Uranium Solutions, CSS-91-005, Westinghouse Idaho Nuclear Company, July
1991.
10. B. M. Palmer, C. Crawford, Validation of the CSAS25 Module of Scale, Part II: Highly
Enriched Uranium Solutions, CSS-91-013, Westinghouse Idaho Nuclear Company,
September 1991.
11. B. M. Palmer, C. Crawford, Validation of the CSAS25 Module of Scale, Part III: Highly
Enriched Uranium Solutions, CSS-91-015, Westinghouse Idaho Nuclear Company,
October 1991.
12. Letter from J. E. Tanner to G. T. Paulson, Subject: “Best CPP Concrete Formula,” JET-
03-91, September 9, 1991.
DOE-STD-3007-93
2-29
APPENDICES
A. Number Density Calculations
UO2 - Stainless Steel Fuel Matrix - Full Peripheral Fuel Plates
Nuclide Atom Density Nuclide I.D.
U235 5.8990 x 10-3 92235
U238 4.3840 x 10-4 92238
O 1.2967 x 10-2 8016
Cr 1.2918 x 10-3 24304
Mn 4.4162 x 10-2 25055
Fe 5.7442 x 10-3 26304
Ni 1.2670 x 10-2 28304
\--
UO2 - Stainless Steel Fuel Matrix - Half Peripheral Fuel Plates
Nuclide Atom Density Nuclide I.D.
U235 3.1430 x 10-3 92235
U238 2.3360 x 10-4 92238
O 1.5036 x 10-2 8016
Cr 1.4979 x 10-3 24304
Mn 5.1208 x 10-2 25055
Fe 6.6607 x 10-3 26304
Ni 6.7530 x 10-2 28304
304 Stainless Steel (Density = 7.92 g/cc)
Nuclide Atom Density Nuclide I.D.
Cr 1.7428 x 10-2 24304
Mn 1.7363 x 10-3 25055
Fe 5.9358 x 10-2 26304
Ni 7.7207 x 10-3 28304
Water (Density = 0.9982 g/cc)
Nuclide Atom Density Nuclide I.D.
H 6.6751 x 10-2 1001
O 3.3375 x 10-2 8016
B. Sample KENO V.a Inputs
Section 21
Sample Input 1- Example of Single BORAX V Assembly
=CSAS25
BORAX
27G INF
U-235 1 0 5.899-03 END
U-238 1 0 4.384-04 END
SS304 1 0.7440 END
O 1 0 1.267-02 END
U-235 2 0 3.143-03 END
U-238 2 0 2.336-04 END
SS304 2 0.8627 END
O 2 0 6.753-03 END
SS304 3 1.0 END
H2O 4 1.0 END
SS304 5 0.6 END
H2O 5 0.4 END
END COMP
KENOV.A
READ PARAM
GEN=153 NPG=300
END PARAM
READ GEOM
UNIT 1
COM=*0.03 IN INSIDE FUEL PLATE*
CUBOID 1 1 0.03556 0.0 8.8773 0.0 60.96 0.0
CUBOID 3 1 0.05588 -0.02032 9.09315 -0.21585 62.55 -1.59
UNIT 2
COM=*0.03 IN OUTSIDE FUEL PLATE*
CUBOID 2 1 0.03556 0.0 8.8773 0.0 60.96 0.0
CUBOID 3 1 0.05588 -0.02032 9.09315 -0.21585 62.55 -1.59
UNIT 3
COM=*0.062 IN SPACE BETWEEN PLATES*
CUBOID 4 1 0.15748 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 4
COM=*0.03 IN INSULATING GAP*
CUBOID 4 1 0.07620 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 5
COM=*0.03 IN SIDE PLATES*
CUBOID 3 1 0.07620 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 6
COM=*0.37575 IN MODERATOR GAP*
CUBOID 4 1 0.95441 0.0 9.35990 -0.48260 62.55 -1.59
UNIT 7
ARRAY 1 3*0.0
REFLECTOR 5 1 2*0.0 2*0.26675 2*0.0 1
UNIT 8
ARRAY 2 3*0.0
GLOBAL
ARRAY 3 3*0.0
REFLECTOR 4 2 6*3.0 10
END GEOM
READ BIAS ID=500 2 11 END BIAS
READ ARRAY ARA=1 NUX=11 NUY=1 NUZ=1
FILL
5 4 2 3 1 3 1 3 2 4 5
END FILL
ARA=2 NUX=9 NUY=1 NUZ=1
FILL
7 6 7 6 7 6 7 6 7
END FILL
ARA=3 NUX=1 NUY=1 NUZ=1
FILL
8
END FILL
END ARRAY
END DATA
END
Sample Input 2 - Example of BORAX V Array With Concrete Reflector Present
=CSAS25
BORAX
27G INF
U-235 1 0 5.899-03 END
U-238 1 0 4.384-04 END
SS304 1 0.7440 END
O 1 0 1.267-02 END
U-235 2 0 3.143-03 END
U-238 2 0 2.336-04 END
SS304 2 0.8627 END
O 2 0 6.753-03 END
SS304 3 1.0 END
H2O 4 1.0 END
SS304 5 0.6 END
H2O 5 0.4 END
C 6 0 1.6000-3 END
O 6 0 3.9700-2 END
NA 6 0 5.5000-4 END
AL 6 0 1.6000-3 END
SI 6 0 1.5200-2 END
S 6 0 5.0000-5 END
CA 6 0 3.1000-3 END
FE 6 0 3.8000-4 END
H2O 6 DEN=0.114 END
END COMP
KENOV.A
READ PARAM
GEN=153 NPG=300
END PARAM
READ GEOM
UNIT 1
COM=*0.03 IN INSIDE FUEL PLATE*
CUBOID 1 1 0.03556 0.0 8.8773 0.0 60.96 0.0
CUBOID 3 1 0.05588 -0.02032 9.09315 -0.21585 62.55 -1.59
UNIT 2
COM=*0.03 IN OUTSIDE FUEL PLATE*
CUBOID 2 1 0.03556 0.0 8.8773 0.0 60.96 0.0
CUBOID 3 1 0.05588 -0.02032 9.09315 -0.21585 62.55 -1.59
UNIT 3
COM=*0.062 IN SPACE BETWEEN PLATES*
CUBOID 4 1 0.15748 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 4
COM=*0.03 IN INSULATING GAP*
CUBOID 4 1 0.07620 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 5
COM=*0.03 IN SIDE PLATES*
CUBOID 3 1 0.07620 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 6
COM=*0.37575 IN MODERATOR GAP*
CUBOID 4 1 0.95441 0.0 9.35990 -0.48260 62.55 -1.59
UNIT 7
ARRAY 1 3*0.0
REFLECTOR 5 1 2*0.0 2*0.26675 2*0.0 1
UNIT 8
DOE-STD-3007-93
2-30
Section 22
ARRAY 2 3*0.0
UNIT 9
CUBOID 4 1 9.2278 0.0 9.8425 0.0 64.14 0.0
GLOBAL
ARRAY 3 3*0.0
REFLECTOR 6 1 0.0 0.0 30.48 0.0 0.0 0.0 1
REFLECTOR 4 1 0.0 0.0 0.0 10.7900 0.0 0.0 1
REFLECTOR 6 1 0.0 0.0 0.0 30.48 0.0 15.24 1
REFLECTOR 4 2 2*0.0 3*3.0 0.0 10
END GEOM
READ BOUNDS
XFC=MIRROR
END BOUNDS
READ BIAS ID=500 2 11 END BIAS
READ ARRAY ARA=1 NUX=11 NUY=1 NUZ=1
FILL
5 4 2 3 1 3 1 3 2 4 5
END FILL
ARA=2 NUX=9 NUY=1 NUZ=1
FILL
7 6 7 6 7 6 7 6 7
END FILL
ARA=3 NUX=2 NUY=2 NUZ=1
FILL
9 8
8 8
END FILL
END ARRAY
END DATA
END
Sample Input 3 - Example of BORAX V Superheater Fuel Critical Experiment
=CSAS25
BORAX
27G INF
U-235 1 0 5.899-03 END
U-238 1 0 4.384-04 END
SS304 1 0.7440 END
O 1 0 1.267-02 END
U-235 2 0 3.143-03 END
U-238 2 0 2.336-04 END
SS304 2 0.8627 END
O 2 0 6.753-03 END
SS304 3 1.0 END
H2O 4 1.0 END
SS304 5 0.6 END
H2O 5 0.4 END
AL 6 1.0 END
END COMP
KENOV.A
READ PARAM
GEN=153 NPG=300
END PARAM
READ GEOM
UNIT 1
COM=*0.03 IN INSIDE FUEL PLATE*
CUBOID 1 1 0.03556 0.0 8.8773 0.0 60.96 0.0
CUBOID 3 1 0.05588 -0.02032 9.09315 -0.21585 62.55 -1.59
UNIT 2
COM=*0.03 IN OUTSIDE FUEL PLATE*
CUBOID 2 1 0.03556 0.0 8.8773 0.0 60.96 0.0
CUBOID 3 1 0.05588 -0.02032 9.09315 -0.21585 62.55 -1.59
UNIT 3
COM=*0.062 IN SPACE BETWEEN PLATES*
CUBOID 4 1 0.15748 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 4
COM=*0.03 IN INSULATING GAP*
CUBOID 0 1 0.07620 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 5
COM=*0.03 IN SIDE PLATES*
CUBOID 3 1 0.07620 0.0 9.09315 -0.21585 62.55 -1.59
UNIT 6
COM=*0.37575 IN MODERATOR GAP*
CUBOID 4 1 0.95441 0.0 9.35990 -0.48260 62.55 -1.59
UNIT 7
ARRAY 1 3*0.0
REFLECTOR 5 1 2*0.0 2*0.26675 2*0.0 1
UNIT 8
ARRAY 2 3*0.0
REFLECTOR 4 1 2*0.46609 2*0.15875 2*0.0 1
UNIT 9
COM=*WATER INSTEAD OF FUEL ASSEMBLY*
CUBOID 4 1 10.16002 0.0 9.67740 -0.48260 62.55 -1.59
UNIT 10
COM=*CENTER FOUR*
ARRAY 3 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
UNIT 11
ARRAY 4 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
UNIT 12
ARRAY 5 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
UNIT 13
ARRAY 6 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
UNIT 14
ARRAY 7 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
UNIT 15
ARRAY 8 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
UNIT 16
ARRAY 9 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
UNIT 17
ARRAY 10 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
UNIT 18
ARRAY 11 3*0.0
REFLECTOR 6 1 4*0.396875 2*0.0 1
REFLECTOR 4 1 4*0.238125 2*0.0 1
REFLECTOR 6 1 4*0.396875 2*0.0 1
GLOBAL
ARRAY 12 3*0.0
REFLECTOR 4 2 6*3.0 10
END GEOM
READ BIAS ID=500 2 11 END BIAS
READ ARRAY ARA=1 NUX=11 NUY=1 NUZ=1
FILL
5 4 2 3 1 3 1 3 2 4 5
END FILL
ARA=2 NUX=9 NUY=1 NUZ=1
FILL
7 6 7 6 7 6 7 6 7
END FILL
ARA=3 NUX=2 NUY=2 NUZ=1
FILL
8 8
8 8
END FILL
ARA=4 NUX=2 NUY=2 NUZ=1
FILL
9 9
9 8
END FILL
ARA=5 NUX=2 NUY=2 NUZ=1
FILL
9 9
8 8
END FILL
ARA=6 NUX=2 NUY=2 NUZ=1
FILL
9 9
8 9
END FILL
ARA=7 NUX=2 NUY=2 NUZ=1
FILL
8 9
8 9
END FILL
ARA=8 NUX=2 NUY=2 NUZ=1
FILL
8 9
9 9
END FILL
ARA=9 NUX=2 NUY=2 NUZ=1
FILL
8 8
9 9
END FILL
ARA=10 NUX=2 NUY=2 NUZ=1
FILL
Section 23
DOE-STD-3007-93
2-31
9 8
9 9
END FILL
ARA=11 NUX=2 NUY=2 NUZ=1
FILL
9 8
9 8
END FILL
ARA=12 NUX=3 NUY=3 NUZ=1
FILL
11 12 13
18 10 14
17 16 15
END FILL
END ARRAY
END DATA
END
Sample Input 4 - Example of SPERT-D Fuel Critical Experiment
=CSAS25
SPERT #2
27G INF
U-235 1 0 1.849-03 END
U-238 1 0 1.339-04 END
AL 1 0.9189 END
AL 2 1.0 END
H2O 3 1.0 END
END COMP
KENOV.A
READ PARAM
GEN=153 NPG=500
END PARAM
READ GEOM
UNIT 1
COM=*0.06 IN FUEL PLATE*
CUBOID 1 1 6.23316 0.0 0.0508 0.0 60.96 0.0
CUBOID 2 1 6.41096 -0.17780 0.10160 -0.0508 62.3888
-1.42875
UNIT 2
COM=*0.0645714 IN GAP BETWEEN PLATES*
CUBOID 3 1 6.41096 -0.17780 0.16401 0.0 62.3888 -1.42875
UNIT 3
COM=*0.06 IN HUNK OF WATER*
CUBOID 3 1 6.41096 -0.17780 0.10160 -0.0508 62.3888
-1.42875
UNIT 4
COM=*COMPLETE ELEMENT*
ARRAY 1 3*0.0
REFLECTOR 3 1 2*0.0 2*0.24892 2*0.0 1
REFLECTOR 2 1 2*0.34290 4*0.0 1
REFLECTOR 2 1 4*0.15748 2*0.0 1
REFLECTOR 3 1 4*0.31750 2*0.0 1
UNIT 5
COM=*INCOMPLETE ELEMENT*
ARRAY 2 3*0.0
REFLECTOR 3 1 2*0.0 2*0.24892 2*0.0 1
REFLECTOR 2 1 2*0.34290 4*0.0 1
REFLECTOR 2 1 4*0.15748 2*0.0 1
REFLECTOR 3 1 4*0.31750 2*0.0 1
GLOBAL
ARRAY 3 3*0.0
COM=*SURROUNDING WATER*
REFLECTOR 3 2 6*3.0 10
END GEOM
READ BIAS ID=500 2 11 END BIAS
READ ARRAY ARA=1 NUX=1 NUY=43 NUZ=1
LOOP
1 1 1 1 1 43 2 1 1 1
2 1 1 1 2 42 2 1 1 1
END LOOP
ARA=2 NUX=1 NUY=43 NUZ=1
LOOP
1 1 1 1 1 43 1 1 1 1
2 1 1 1 2 42 2 1 1 1
3 1 1 1 9 43 2 1 1 1
END LOOP
ARA=3 NUX=4 NUY=4 NUZ=1
FILL
4 4 4 4
4 4 4 4
4 4 4 4
5 5 5 5
END FILL
END ARRAY
END DATA
END
DOE-STD-3007-93
2-32
Intentionally Blank
DOE-STD-3007-93
3-1
EXAMPLE 3
Provided by
Los Alamos National Laboratory
CRITICALITY SAFETY EVALUATION OF THE DEVICE FOR THE
IMAGINARY EVENT, PIT SHIPMENT AND NEVADA TEST SITE HANDLING
DOE-STD-3007-93
3-2
Intentionally Blank
DOE-STD-3007-93
3-3
1.0 INTRODUCTION
The purpose of this evaluation is to provide a documented basis for demonstrating subcriticality
during shipment and Nevada Test Site (NTS) handling of the device for the Imaginary Event.
2.0 DESCRIPTION
The device for the Imaginary Event is shown on drawings 18Y-123456 and 18Y-123457. These
drawings also contain mass and dimension information sufficient to readily demonstrate that the
device poses no unusual criticality concerns and in fact will remain subcritical even in the presence
of water internal to and surrounding the device.
For shipment of the pit for this device, the AL-R81 packaging is planned.
3.0 REQUIREMENTS DOCUMENTATION
There are no requirements that are unique to this evaluation; however, shipment of the device for
the Imaginary Event will be in compliance with the Fissile Class I requirements of 10 CFR Part
71.
4.0 METHODOLOGY
Evaluation of this device will be done by comparison with a previously evaluated and approved
device.
5.0 CONTINGENCY ANALYSIS
Assembly and handling of components and the complete device at the NTS do not pose any
unusual criticality concerns. Stated differently, no upset conditions or abnormal environments can
be foreseen whereby criticality is a credible event.
DOE-STD-3007-93
3-4
6.0 EVALUATION AND RESULTS
The most reactive pit condition during normal, planned operations is when it is enclosed in High
Explosives (HE). Since water is a better neutron reflector than HE, regardless of the thickness,
thick water reflection is a bounding condition for normal operations that permits ease of analysis.
Section 24
The fissile mass in this pit is substantially less than the water reflected critical mass as published in
LA-10860-MS2, Table XYZ.
Internal pit flooding is arguably an incredible upset condition for planned operations at the NTS.
However, even this condition, combined with thick water reflection, is easily demonstrated to be
far subcritical based on comparisons to critical mass data in Figures XX and YY of LA-10860-
MS2.
For the pit shipment in an AL-R8 container, a comparative analysis demonstrates that a transport
index of zero is appropriate for criticality control. By comparing fissile masses and dimensions, it
is obvious that the Imaginary Pit is less reactive than the type ABC pit that has been previously
analyzed, shown to have a transport index of zero for criticality control, and approved for
shipment in the AL-R81,3.
7.0 DESIGN FEATURES (PASSIVE & ACTIVE) AND ADMINISTRATIVELY
CONTROLLED LIMITS AND REQUIREMENTS
Beyond the design features inherent to the AL-R8, there are no design features or administratively
controlled limits that are required to ensure criticality safety during shipment of the device for the
Imaginary Event. For operations at the NTS, assembly procedures4 limit the number of fissile
components present at any location such that no credible criticality threat is foreseeable.
DOE-STD-3007-93
3-5
8.0 SUMMARY & CONCLUSIONS
For transportation of the pit for the Imaginary Event in the AL-R8 packaging, a transport index of
zero is appropriate for criticality control. Criticality during transport or handling of this pit is
considered to be incredible.
9.0 REFERENCES
1. F.E. Adcock, Rocky Flats Container, Model AL-R8, SARP, RFP-8801, April 1988.
2. H. C. Paxton and N. L. Pruvost, Critical Dimensions of Systems Containing 235U, 239Pu,
and 233U, 1986 Revision, LA-10860-MS, July 1987.
3. T. P. McLaughlin, Memo HS-6-86-51, March 12, 1986.
4. WX-3, Standard Operation Procedures for Handling Fissile Items, Most Current Revision.
DOE-STD-3007-93
3-6
Intentionally Blank
DOE-STD-3007-93
4-1
EXAMPLE 4
Provided By
Idaho National Engineering Laboratory
CRITICALITY SAFETY EVALUATION FOR
SHIPMENT OF RADIOACTIVE
WASTE WITHIN THE BOUNDARIES OF THE INEL
DOE-STD-3007-93
4-2
Intentionally Blank
DOE-STD-3007-93
4-3
CONTENTS
1.0 INTRODUCTION..................................................................................................................4-7
2.0 DESCRIPTION......................................................................................................................4-7
3.0 REQUIREMENTS DOCUMENTATION.............................................................................4-8
4.0 METHODOLOGY.................................................................................................................4-9
5.0 DISCUSSION OF CONTINGENCIES...............................................................................4-11
6.0 EVALUATION AND RESULTS........................................................................................4-12
7.0 DESIGN FEATURES (PASSIVE AND ACTIVE) AND
ADMINISTRATIVELY CONTROLLED LIMITS AND REQUIREMENTS ..................4-17
8.0 SUMMARY AND CONCLUSIONS...................................................................................4-17
9.0 REFERENCES.....................................................................................................................4-19
APPENDIX A: Materials and Compositions....................................................................................4-21
Section 25
APPENDIX B: Typical ANISN/PC Input Listings ..........................................................................4-25
DOE-STD-3007-93
4-4
Intentionally Blank
DOE-STD-3007-93
4-5
FIGURES
1. Calculated k-effective versus H/Pu-239 ratio for polyethylene
(60 vol.%) - water (40 vol.%) moderated and reflected spheres...........................................4-15
2. Maximum calculated k-effective versus Pu-239 mass for polyethylene
(60 vol.%) - water (40 vol.%) moderated and reflected spheres...........................................4-16
TABLES
1. Results of ANISN benchmark calculations with Hansen-Roach
16-energy-group cross section data.......................................................................................4-10
2. Contingency Analysis............................................................................................................4-11
3. Results of ANISN calculations for spheres of Pu-239 reflected and
moderated with a polyethylene-water composition ...............................................................4-14
A-1. Summary of materials and compositions...............................................................................4-23
DOE-STD-3007-93
4-6
Intentionally Blank
DOE-STD-3007-93
4-7
Criticality Safety Evaluation for
Shipment of Radioactive
Waste within the Boundaries of the INEL
1.0 INTRODUCTION
Shipments of radioactive waste within the boundaries of the INEL are made in a variety of
shipping casks. The purpose of this report is to establish appropriate limits and demonstrate that
these limits are in compliance with the criticality safety requirements stated in DOE-ID 5480.5A1
and 10 CFR Part 712, Sections 71.55 and 71.61, for a Fissile Class III shipment.
2.0 DESCRIPTION
Shipments of radioactive waste may be made within the boundaries of the INEL in several
different types of shipping casks. One such cask, TRUPACT-II, is licensed for Fissile Class I
shipments with up to 325 Fissile Gram Equivalent (FGE) of Pu-2393. Any number of
TRUPACT-II packages may be simultaneously transported.
Other shipping casks that do not have formally established fissile material limits may also
be used to make waste shipments, one-cask-at-a-time, with no more than 160 FGE of Pu-239 per
shipment. Loading of a second cask will not take place until the first cask is removed from the
area. The casks involved are typically constructed of concentric regions of lead and steel or
depleted uranium and steel. Limits for shipments involving these casks will be conservatively
based on generic minimum critical mass data. Therefore, details of the various cask designs are
not pertinent. However, if the limits identified in this evaluation are to be exceeded, an evaluation
specific to the cask shall be required.
[Note: The description section of this example evaluation does not include the level of detail (i.e.,
cask dimensions and sketches) that would normally be found in an evaluation due to the generic
nature of the evaluation.]
DOE-STD-3007-93
4-8
3.0 REQUIREMENTS DOCUMENTATION
Shipments of radioactive waste in casks for which this evaluation is used as the basis for
criticality safety will be limited to one cask per shipment with no more than 160 FGE Pu239 per
cask. Therefore, criticality safety margins will be maintained for these shipments by controlling
the number of casks per shipment and by controlling the amount (mass) of fissile material per
Section 26
cask. Compliance with the following DOE-ID and Code of Federal Regulations (CFR)
requirements will be demonstrated.
1. DOE-ID 5480.5A “For a system to be considered critically safe by mass alone, it
shall not have more than 75 percent of the critical mass assuming the system is in
its most reactive credible state. If over batching is credible, 45 percent of the
critical mass shall be used.” (Acceptable keff values must also be # 0.95.)
2. 10 CFR Part 71 Section 71.55(b) “...a package used for the shipment of fissile
material must be so designed and constructed and its contents so limited that it
would be subcritical if water were to leak into the containment system...so that,
under the following conditions, maximum reactivity of fissile material would be
attained:
a. The most reactive credible configuration consistent with chemical
and physical form of the material;
b. Moderation by water to the most reactive credible extent; and,
c. Close reflection by water on all sides.”
3. 10 CFR Part 71 Section 71.61 “A package for Fissile Class III shipment must be
so designed and constructed and its contents so limited, and the number of
packages in a Fissile Class III shipment must be so limited, that:
a. Twice this number of undamaged packages would be subcritical if
stacked together in any arrangement, assuming close reflection on
all sides of the stack by water; and
b. This number of packages would be subcritical if stacked together in
any arrangement, closely reflected on all sides of the stack by water,
and with optimum interspersed hydrogenous moderation....Each
package must be considered to have been subjected to the tests
specified in 10 CFR 71.73 (Hypothetical Accident Conditions).”
DOE-STD-3007-93
4-9
This analysis is designated as Quality Level A (according to the EG&G Idaho Quality
Manual) and is intended to comply with NQA-1. As required by the Nuclear Engineering
Standard Practice, NE-SP-24, any operational limits or procedures that result from or are based
on information contained in this report must be reviewed by Reactor and Radiation Physics
personnel to ensure that the technical information given in this Criticality Safety Evaluation has
been properly incorporated into the limits or procedures.
[Note: Many of the requirements discussed in this evaluation are site specific and company
specific].
4.0 METHODOLOGY
All calculations were performed with the one-dimensional Sn (n = 8) discrete-ordinates
transport theory code, ANISN5. Sixteen-energy-group Hansen-Roach6 cross section data were
used as input to the ANISN code. The calculations were performed on an IBM PS/2 Model 60
with a version of the ANISN code that was developed at the INEL, ANISN/PC.
Six thermal reactor benchmarks, PNL-1 through PNL-5 and PNL-7, were evaluated with
the ANISN code and the 16-energy-group Hansen-Roach data set. These experiments are
documented in Reference 7. PNL-1 through PNL-5 are experiments with unreflected spheres of
plutonium nitrate solutions with H/Pu-239 ratios ranging from 131 to 1204. PNL-7 is an
experiment with a water reflected (30-cm-thick) stainless steel sphere of plutonium nitrate with an
H/Pu ratio of 980. These PNL experiments provide adequate validation of the methods and cross
sections used to derive the limits established in this report for the following reasons:
Section 27
1. The geometric configurations of the fuel regions are spherical in both the
benchmark experiments and in this analysis.
2. Both the benchmark experiments and the systems evaluated are hydrogen
moderated. The benchmarks are moderated with nitrate solution. A polyethylene
(60 vol.%) - water (40 vol.%) composition was assumed for this analysis.
DOE-STD-3007-93
4-10
3. H/Pu ratios range from 131 to 1204 for the benchmarks. H/Pu ratios range from
700 to 1100 for this analysis. Optimum values occurred between 800 and 900 for
reflected systems. The predominant cross section data for Pu-239 at optimum
conditions are associated with Hansen-Roach Library ID 94913. Hansen-Roach
Library ID 94913 is used for analysis of experiments PNL-1, PNL-3, PNL-4, and
PNL-7.
All ANISN benchmark calculations were performed with a quadrature order of 8 and 100
mesh intervals in the fuel region. For PNL-7, 100 mesh intervals were also represented in the
reflector region with 10 mesh intervals in the thin stainless steel wall.
The results of the ANISN benchmark calculations with Hansen-Roach 16-energy-group
cross section data are summarized in Table 1.
The results of the ANISN calculations agree well with the experimental values(1.0). The
largest deviation occurs for PNL-3 with an H/Pu ratio of 1204 and agreement in this case is
within 0.8%. Results for PNL-1, PNL-4, and PNL-7 indicate little (less than 0.15%) or no bias
for H/Pu ratio between 700 and 900 (enveloping optimal values of this evaluation). Inclusion of a
bias of this magnitude is inconsequential [Note: A more detailed bias determination is often
required]. There are no statistical uncertainties associated with Sn discrete ordinates methods.
Table 1. Results of ANISN benchmark calculations with Hansen-
Roach 16-energy-group cross section data.
Benchmark
ID Description H/Pu-239
ANISN
Calculated
k-effective
PNL-1 Bare sphere 700 1.0051
PNL-2 Bare sphere 131 1.0069
PNL-3 Bare sphere 1204 0.9918
PNL-4 Bare sphere 911 0.9985
PNL-5 Bare sphere 578 0.9979
PNL-7 Reflected
sphere
980 1.0023
DOE-STD-3007-93
4-11
All calculations documented in this evaluation were performed on an IBM PS/2 Model 60
operating under DOS Version 3.10 with Version 1.0 of the IBM PRO FORTRAN Compiler.
Configuration Release 3.0 of the ANISN/PC code was used for the evaluation and was verified
for proper operation on the IBM PS/2 Model 60 computational platform by repeating the 21
sample problems as detailed in the Software Quality Assurance Package. A more detailed
description of this verification effort is given in Reference 8.
5.0 DISCUSSION OF CONTINGENCIES
As required by DOE1, “The double contingency principle shall be used as a minimum to
ensure that a criticality accident is an extremely unlikely event. Compliance with the double
contingency principle requires that two unlikely, independent, and concurrent changes in process
or system conditions occur before a criticality accident is possible.”
As shown in Table 2 and the results in Section 6.0, the requirements of the double
contingency principle are met for the proposed shipment of radioactive waste within the
boundaries of the INEL. The barriers associated with these contingencies (i.e., accident
prevention and fissile inventory verification measures) are yet to be determined.
Table 2. Contingency Analysis.
Contingencies (unlikely events)
No. Description Barriers
Section 28
1 An accident that causes all plutonium in a shipment
to form into a homogenous mixture of polyethylene
(60 vol.%), water (40 vol.%), and Pu-239 in
optimally moderated and reflected spherical
geometry. (This scenario is considered incredible
by itself.)
Accident prevention measures
(to be determined)
2 Exceeding the operating mass limit (160 FGE of
Pu-239) by a factor of at least 2.5 (405 FGE of Pu-
239 can result in a k-effective value of 1.0 under
optimally moderated, reflected, and configured
conditions). Waste shipments will typically contain
only a few grams Pu per shipment.
Fissile mass verification
measures (to be determined)
DOE-STD-3007-93
4-12
6.0 EVALUATION AND RESULTS
Calculations for this evaluation were taken directly from the Safety Analysis Report for
the TRUPACT-II4 and are reported in this section for completeness. The calculations were
performed to establish limits for the shipment of radioactive waste in casks covered by this
evaluation.
A summary of materials and compositions used for this analysis is given in Appendix A.
Typical ANISN input listings are given in Appendix B.
Calculations to determine the minimum mass of Pu-239 required to obtain k-effective
values of 0.95 and 1.0 were performed with the one-dimensional Sn discrete-ordinates transport
theory code, ANISN. The model consisted of a sphere of Pu-239, polyethylene, and water
surrounded by a 30-cm-thick (12-in.-thick) polyethylene-water reflector. A 60 vol.%
polyethylene - 40 vol.% water composition was used in the centrally located fuel sphere and in the
external reflector. This composition was used as an upper bound on mechanically compacted
polyethylene [Note: Information such as this should be referenced; however, a reference is not
available in this instance] and, for relatively small quantities of plutonium, conservatively
represents transuranic waste. Displacement by plutonium was conservatively neglected (the
actual effect of this assumption is insignificant). The radius of the fuel sphere was determined
from the mass of plutonium in the sphere and the desired H/Pu ratio, both of which were varied
parametrically. All plutonium was represented as Pu-239.
A quadrature order of 8 and a relative convergence criterion of 0.0001 was used in all
calculations. One hundred mesh intervals were used in both the fuel sphere and in the reflector
region. The width of each mesh interval is, therefore, 0.30 cm in the reflector and less than 0.20
cm in the fuel. The 16-energy-group Hansen-Roach cross section data have a Legendre scattering
expansion order of 1.
DOE-STD-3007-93
4-13
With this model, the minimum masses of Pu-239 required to obtain k-effective values of
0.95 and 1.0 in a polyethylene (60 vol.%) - water (40 vol.%) environment were determined from
calculations in which the mass of Pu-239 in a polyethylene - water reflected and moderated sphere
was varied parametrically between 300 and 425 g. For each Pu-239 mass value, the H/Pu ratio
was varied parametrically between 700 and 1100. The results of these calculations are
summarized in Table 3 and are shown graphically in Figure 1. As indicated from the results in
Figure 1, maximum calculated k-effective values occur for H/Pu ratios between 800 and 900. The
maximum calculated k-effective values from Figure 1 were used to plot maximum k-effective
versus Pu-239 mass and the results are shown in Figure 2. From Figure 2, the minimum masses
Section 29
of Pu-239 that are required to obtain k-effective values of 0.95 and 1.0 are shown to be about 325
g and 405 g, respectively. Therefore, a value of 325 g was selected as the safety limit (k = 0.95)
and 160 g was very conservatively selected as the operating limit in order to be in compliance
with the requirements of both DOE-ID Order 5480.5A [mass limit < 45% of the failure mass
(k=1.0)] and 10 CFR Part 71 Section 71.61 (twice the number of allowed undamaged packages
are safely subcritical when optimally configured with close water reflection on all sides). As
indicated by the results of benchmark calculations reported in Section 5.0 and the conservative
nature of the evaluation, a bias is not warranted.
Thick steel and lead reflectors, when positioned tightly around fissile regions, are often
more effective than water reflectors. However, in a cask, these types of reflectors would not fit
tightly around the fissile material as does the polyethylene-water reflector used in the evaluation.
The thick, tight-fitting polyethylene-water reflector conservatively represents actual reflector
conditions.
The materials to be transported in these casks is “waste” that will not normally contain
superior reflector materials such as beryllium. Waste containing more than trace amounts of
beryllium shall not be transported in these casks without additional review and approval.
DOE-STD-3007-93
4-14
Table 3. Results of ANISN calculations for spheres of Pu-239 reflected and
moderated with a polyethylene-water composition.
Case
ID
Pu Mass
(g)
H/Pu Sphere Radius
(cm) k-effective
1 300 700
800
900
1000
1100
11.93127
12.47435
12.97377
13.43755
13.87125
0.9257
0.9311
0.9332
0.9324
0.9298
2 325 700
800
900
1000
1100
12.25389
12.81164
13.32464
13.80092
14.24642
0.9438
0.9489
0.9506
0.9494
0.9464
3 350 700
800
900
1000
1100
12.56036
13.13208
13.65783
14.14067
14.60264
0.9606
0.9653
0.9665
0.9651
0.9616
4 400 700
800
900
1000
1100
13.13206
13.72979
14.27948
14.78994
15.26729
0.9904
0.9944
0.9950
0.9928
0.9887
5 425 700
800
900
1000
1100
13.40014
14.01007
14.57098
15.09186
15.57895
1.0039
1.0076
1.0078
1.0053
1.0008
DOE-STD-3007-93
4-15
Figure 1. Calculated k-effective versus H/Pu-239 ratio for
polyethylene (60 vol.%) - water (40 vol.%) moderated and reflected spheres.
DOE-STD-3007-93
4-16
Figure 2. Maximum calculated k-effective versus Pu-239 mass for polyethylene
(60 vol.%) - water (40 vol.%) moderated and reflected spheres.
DOE-STD-3007-93
4-17
7.0 DESIGN FEATURES (PASSIVE AND ACTIVE) AND ADMINISTRATIVELY
CONTROLLED LIMITS AND REQUIREMENTS
There are no engineered safety features associated with these shipments that are required
to maintain criticality safety margins. The following controls shall be implemented prior to
beginning shipments of radioactive waste in generic casks that have fissile material limits based on
the data presented in this evaluation.
1. Prior to loading a cask, an Operation Specialist shall verify that the intended
contents contain less than 160 Fissile Gram Equivalents (FGE) Pu-239.
2. Only one cask shall be in the loading area at a time. The cask shall be separated
from other fissile material by at least 12 feet.
3. No more than trace amounts of superior reflector/moderator materials such as
beryllium shall be loaded into the casks without additional review and approval.
The means of verification are yet to be determined.
Section 30
[Note: The intent of this evaluation is not to obtain an NRC license, but to demonstrate, from a
criticality safety standpoint, that NRC requirements can be satisfied. Additional transportation
requirements may be required if an NRC license is sought for a particular cask.]
8.0 SUMMARY AND CONCLUSIONS
The analytical techniques applied to the evaluation of radioactive waste shipments at the
INEL are considered to be very conservative and postulated accident scenarios are considered to
be incredible. Based on the results of the calculations presented in this evaluation, adequate safety
margins exist for the shipment of a single cask containing no more than 160 FGE of Pu-239.
DOE-STD-3007-93
4-18
The following limits have been established:
Failure Limit (k = 1.0) 405 FGE Pu-239
Operating Limit 160 FGE Pu-239
(<45% of failure limit)
[Note: The term “Failure Limit” is local to the INEL]
Compliance with the following DOE-ID and CFR requirements has been demonstrated:
1. DOE-ID 5480.5A
a. Double Contingency Principle (see Section 6.0)
b. Mass Control (operating limit < 45% of critical mass)
2. 10 CFR Part 71 Sections 71.55 and 71.61
a. Optimum moderation, reflection, and geometry was analyzed (71.55).
b. Twice the number of allowed packages (undamaged or damaged) is
subcritical when optimally configured, moderated, and reflected (i.e., twice the
operating limit of 160 FGE of Pu-239 or 320 g Pu-239 is less than the
minimum mass of Pu-239 required to obtain a k-effective value of 0.95 in a
polyethylene-water environment under optimum conditions (71.61)).
From a criticality safety view point, shipments of radioactive waste that are limited to a
single cask containing no more than 160 FGE of Pu-239 may be safely made within the
boundaries of the INEL. Specific limits for casks that have their own approved criticality safety
evaluation supersede the limits established by this analysis.
DOE-STD-3007-93
4-19
9.0 REFERENCES
1. Safety of Nuclear Facilities, U.S. Department of Energy Idaho Operations Office, DOE-
ID 5480.5A, August 2, 1990.
2. Packaging and Transportation of Radioactive Materials, Code of Federal Regulations,
10 CFR 71, August 24, 1983.
3. Nuclear Packaging Safety Analysis Report for the TRUPACT-II Shipping Package, NRC
Docket 71-9218, U.S. Nuclear Regulatory Commission, February 1989.
4. Nuclear Engineering Standard Practice, Criticality Safety Analysis, NE-SP-2 Rev. 2,
October 14, 1991.
5. D. K. Parsons, ANISN/PC Manual, EGG-2500, EG&G Idaho, Inc., April 1987.
6. Norman L. Pruvost, Melvin L. Prueitt, The Hansen-Roach Cross Sections, A Graphical
Representation, LALP-88-20, October 1988.
7. ENDF-202 Cross-Section Evaluation Working Group Benchmark Specifications, BNL
19302, Brookhaven National Laboratory, November 1974, Rev. September 1982.
8. ANISN/PC Version 3.2, Software Configuration Control Package, A00004, January
2, 1991. (EG&G Idaho internal documentation)
DOE-STD-3007-93
4-20
Intentionally Blank
DOE-STD-3007-93
4-21
APPENDIX A
Materials and Compositions
DOE-STD-3007-93
4-22
Intentionally Blank
DOE-STD-3007-93
4-23
Table A-1. Summary of materials and compositions.
Descriptiona,b
Nuclide or
Material
KENO
Lib. ID.
Atoms/barn-cm or
(Volume Fraction)
Pu-239, polyethylene, &
water fuel material with
H/Pu = 700
Pu-239 94912
94913
4.39875E-05
6.22368E-05
Pu-239, polyethylene, &
water fuel material with
H/Pu = 800
Pu-239 94912
94913
1.74460E-05
7.55002E-05
Section 31
Pu-239, polyethylene, &
water fuel material with
H/Pu = 900
Pu-239 94913
94914
8.10202E-05
1.59868E-06
Pu-239, polyethylene, &
water fuel material with
H/Pu = 1000
Pu-239 94913
94914
6.45010E-05
9.85602E-06
Pu-239, polyethylene, &
water fuel material with
H/Pu = 1100
Pu-239 94913
94914
5.09852E-05
1.66120E-05
Polyethylene-water reflector
H = 7.43570-2
C = 2.38296-2
O = 1.33488-2
CH2
H2O
402
502
(0.60)
(0.40)
a. The masses of Pu-239, when represented in ANISN calculations, depends on the radii
of the spheres that are tabulated in Table 3.
b. Unless specifically stated otherwise, all plutonium bearing compositions were
moderated with 60 vol.% polyethylene (ID = 402) and 40 vol.% water (ID = 502). A
moderator volume fraction of 1.0 was used in all cases.
DOE-STD-3007-93
4-24
Intentionally Blank
DOE-STD-3007-93
4-25
APPENDIX B
Typical ANISN/PC
Input Listings
DOE-STD-3007-93
4-26
Intentionally Blank
DOE-STD-3007-93
4-27
Listing 1. ANISN input listing for Case 2 of Table 3; H/Pu – 900.
PU IN CH2-H2O SPHERE: H/X=900 M=325 R=13.32464
15$$ 0 0 1 8
3 1 0 2
200 1 16 3
4 9 16 0
52 56 0 0
0 0 0 50
0 1 0 0
50 0 0 0
0 0 1 0
16** +1.00000E+00 +0.00000E-01 +1.00000E-04 4R+0.00000E-01
+1.00000E+00 +0.00000E-01 +5.00000E-01 +2.00000E-04
3R+0.00000E-01
T
13$$ 1 2 3 4
5 6 7 8
9 10 11 12
13 14 15 16
17 18 19 20
21 22 23 24
25 26 27 28
29 30 31 32
33 34 35 36
37 38 39 40
41 42 43 44
45 46 47 48
49 50 51 52
T
2** F+1.00000E+00
T
1** +2.25000E-01 +3.47000E-01 +1.61000E-01 +1.70000E-01
+8.40000E-02 +1.30000E-02 10R+0.00000E-01
4** +0.00000E-01 +1.33246E-01 +2.66493E-01 +3.99739E-01
+5.32986E-01 +6.66232E-01 +7.99478E-01 +9.32725E-01
+1.06597E+00 +1.19922E+00 +1.33246E+00 +1.46571E+00
+1.59896E+00 +1.73220E+00 +1.86545E+00 +1.99870E+00
+2.13194E+00 +2.26519E+00 +2.39844E+00 +2.53168E+00
+2.66493E+00 +2.79817E+00 +2.93142E+00 +3.06467E+00
+3.19791E+00 +3.33116E+00 +3.46441E+00 +3.59765E+00
+3.73090E+00 +3.86415E+00 +3.99739E+00 +4.13064E+00
+4.26389E+00 +4.39713E+00 +4.53038E+00 +4.66362E+00
+4.79687E+00 +4.93012E+00 +5.06336E+00 +5.19661E+00
+5.32986E+00 +5.46310E+00 +5.59635E+00 +5.72960E+00
+5.86284E+00 +5.99609E+00 +6.12933E+00 +6.26258E+00
+6.39583E+00 +6.52907E+00 +6.66232E+00 +6.79557E+00
+6.92881E+00 +7.06206E+00 +7.19531E+00 +7.32855E+00
+7.46180E+00 +7.59505E+00 +7.72829E+00 +7.86154E+00
+7.99478E+00 +8.12803E+00 +8.26128E+00 +8.39452E+00
+8.52777E+00 +8.66102E+00 +8.79426E+00 +8.92751E+00
+9.06076E+00 +9.19400E+00 +9.32725E+00 +9.46049E+00
DOE-STD-3007-93
4-28
Listing 1. Continued.
+9.59374E+00 +9.72699E+00 +9.86023E+00 +9.99348E+00
+1.01267E+01 +1.02600E+01 +1.03932E+01 +1.05265E+01
+1.06597E+01 +1.07930E+01 +1.09262E+01 +1.10595E+01
+1.11927E+01 +1.13259E+01 +1.14592E+01 +1.15924E+01
+1.17257E+01 +1.18589E+01 +1.19922E+01 +1.21254E+01
+1.22587E+01 +1.23919E+01 +1.25252E+01 +1.26584E+01
+1.27917E+01 +1.29249E+01 +1.30581E+01 +1.31914E+01
+1.33246E+01 +1.36246E+01 +1.39246E+01 +1.42246E+01
+1.45246E+01 +1.48246E+01 +1.51246E+01 +1.54246E+01
+1.57246E+01 +1.60246E+01 +1.63246E+01 +1.66246E+01
+1.69246E+01 +1.72246E+01 +1.75246E+01 +1.78246E+01
+1.81246E+01 +1.84246E+01 +1.87246E+01 +1.90246E+01
+1.93246E+01 +1.96246E+01 +1.99246E+01 +2.02246E+01
+2.05246E+01 +2.08246E+01 +2.11246E+01 +2.14246E+01
+2.17246E+01 +2.20246E+01 +2.23246E+01 +2.26246E+01
+2.29246E+01 +2.32246E+01 +2.35246E+01 +2.38246E+01
+2.41246E+01 +2.44246E+01 +2.47246E+01 +2.50246E+01
+2.53246E+01 +2.56246E+01 +2.59246E+01 +2.62246E+01
+2.65246E+01 +2.68246E+01 +2.71246E+01 +2.74246E+01
+2.77246E+01 +2.80246E+01 +2.83246E+01 +2.86246E+01
+2.89246E+01 +2.92246E+01 +2.95246E+01 +2.98246E+01
+3.01246E+01 +3.04246E+01 +3.07246E+01 +3.10246E+01
+3.13246E+01 +3.16246E+01 +3.19246E+01 +3.22246E+01
+3.25246E+01 +3.28246E+01 +3.31246E+01 +3.34246E+01
+3.37246E+01 +3.40246E+01 +3.43246E+01 +3.46246E+01
+3.49246E+01 +3.52246E+01 +3.55246E+01 +3.58246E+01
+3.61246E+01 +3.64246E+01 +3.67246E+01 +3.70246E+01
+3.73246E+01 +3.76246E+01 +3.79246E+01 +3.82246E+01
+3.85246E+01 +3.88246E+01 +3.91246E+01 +3.94246E+01
+3.97246E+01 +4.00246E+01 +4.03246E+01 +4.06246E+01
+4.09246E+01 +4.12246E+01 +4.15246E+01 +4.18246E+01
+4.21246E+01 +4.24246E+01 +4.27246E+01 +4.30246E+01
+4.33246E+01
Section 32
5** F+1.00000E+00
6** +0.00000E-01 +6.04938E-02 +9.07407E-02 +1.37037E-01
2R+2.11728E-01 +1.37037E-01 +9.07407E-02 +6.04938E-02
7** -9.75900E-01 -9.51190E-01 -7.86796E-01 -5.77350E-01
-2.18218E-01 +2.18218E-01 +5.77350E-01 +7.86796E-01
+9.51190E-01
8$$ 1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
DOE-STD-3007-93
4-29
Listing 1. Continued.
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
2 2 2 2
9$$ 53 55
10$$ 53 54 53 54
53 54 53 54
53 54 55 56
55 56 55 56
11$$ 1 2 3 4
7 8 45 46
47 48 1 2
3 4 7 8
12** 2R+7.43570E-02 2R+2.38296E-02 2R+1.33488E-02 2R+8.10202E-05
2R+1.59868E-06 2R+7.43570E-02 2R+2.38296E-02 2R+1.33488E-02
19$$ 1 1 1
T T
DOE-STD-3007-93
4-30
Listing 2. ANISN input listing for Benchmark PNL-7.
PNL-7 BENCHMARK CALCULATION; HR XSEC; REFLECTED SPHERE; H/X=980
15$$ 0 0 1 8
3 1 0 3
210 1 16 3
4 9 26 0
52 58 0 0
0 0 0 50
0 1 0 0
50 0 0 0
0 0 1 0
16** +1.00000E+00 +0.00000E-01 +1.00000E-04 4R+0.00000E-01
+1.00000E+00 +0.00000E-01 +5.00000E-01 +2.00000E-04
3R+0.00000E-01
T
13$$ 1 2 3 4
5 6 7 8
9 10 11 12
13 14 15 16
17 18 19 20
21 22 23 24
25 26 27 28
29 30 31 32
33 34 35 36
37 38 39 40
41 42 43 44
45 46 47 48
49 50 51 52
T
2**F+1.00000E+00
T
1** +2.25000E-01 +3.47000E-01 +1.61000E-01 +1.70000E-01
+8.40000E-02 +1.30000E-02 10R+0.00000E-01
4** +0.00000E-01 +1.77800E-01 +3.55600E-01 +5.33400E-01
+7.11200E-01 +8.89000E-01 +1.06680E+00 +1.24460E+00
+1.42240E+00 +1.60020E+00 +1.77800E+00 +1.95580E+00
+2.13360E+00 +2.31140E+00 +2.48920E+00 +2.66700E+00
+2.84480E+00 +3.02260E+00 +3.20040E+00 +3.37820E+00
+3.55600E+00 +3.73380E+00 +3.91160E+00 +4.08940E+00
+4.26720E+00 +4.44500E+00 +4.62280E+00 +4.80060E+00
+4.97840E+00 +5.15620E+00 +5.33400E+00 +5.51180E+00
+5.68960E+00 +5.86740E+00 +6.04520E+00 +6.22300E+00
+6.40080E+00 +6.57860E+00 +6.75640E+00 +6.93420E+00
+7.11200E+00 +7.28980E+00 +7.46760E+00 +7.64540E+00
+7.82320E+00 +8.00100E+00 +8.17880E+00 +8.35660E+00
+8.53440E+00 +8.71220E+00 +8.89000E+00 +9.06780E+00
+9.24560E+00 +9.42340E+00 +9.60120E+00 +9.77901E+00
+9.95681E+00 +1.01346E+01 +1.03124E+01 +1.04902E+01
+1.06680E+01 +1.08458E+01 +1.10236E+01 +1.12014E+01
+1.13792E+01 +1.15570E+01 +1.17348E+01 +1.19126E+01
+1.20904E+01 +1.22682E+01 +1.24460E+01 +1.26238E+01
DOE-STD-3007-93
4-31
Listing 2. Continued.
+1.28016E+01 +1.29794E+01 +1.31572E+01 +1.33350E+01
+1.35128E+01 +1.36906E+01 +1.38684E+01 +1.40462E+01
+1.42240E+01 +1.44018E+01 +1.45796E+01 +1.47574E+01
+1.49352E+01 +1.51130E+01 +1.52908E+01 +1.54686E+01
+1.56464E+01 +1.58242E+01 +1.60020E+01 +1.61798E+01
+1.63576E+01 +1.65354E+01 +1.67132E+01 +1.68910E+01
+1.70688E+01 +1.72466E+01 +1.74244E+01 +1.76022E+01
+1.77800E+01 +1.77927E+01 +1.78054E+01 +1.78181E+01
+1.78308E+01 +1.78435E+01 +1.78562E+01 +1.78689E+01
+1.78816E+01 +1.78943E+01 +1.79070E+01 +1.82070E+01
+1.85070E+01 +1.88070E+01 +1.91070E+01 +1.94070E+01
+1.97070E+01 +2.00070E+01 +2.03070E+01 +2.06070E+01
+2.09070E+01 +2.12070E+01 +2.15070E+01 +2.18070E+01
+2.21070E+01 +2.24070E+01 +2.27070E+01 +2.30070E+01
+2.33070E+01 +2.36070E+01 +2.39070E+01 +2.42070E+01
+2.45070E+01 +2.48070E+01 +2.51070E+01 +2.54070E+01
+2.57070E+01 +2.60070E+01 +2.63070E+01 +2.66070E+01
+2.69070E+01 +2.72070E+01 +2.75070E+01 +2.78070E+01
+2.81070E+01 +2.84070E+01 +2.87070E+01 +2.90070E+01
+2.93070E+01 +2.96070E+01 +2.99070E+01 +3.02070E+01
+3.05070E+01 +3.08070E+01 +3.11070E+01 +3.14070E+01
+3.17070E+01 +3.20070E+01 +3.23070E+01 +3.26070E+01
+3.29070E+01 +3.32070E+01 +3.35070E+01 +3.38070E+01
+3.41070E+01 +3.44070E+01 +3.47070E+01 +3.50070E+01
+3.53069E+01 +3.56069E+01 +3.59069E+01 +3.62069E+01
+3.65069E+01 +3.68069E+01 +3.71069E+01 +3.74069E+01
+3.77069E+01 +3.80069E+01 +3.83069E+01 +3.86069E+01
+3.89069E+01 +3.92069E+01 +3.95069E+01 +3.98069E+01
+4.01069E+01 +4.04069E+01 +4.07069E+01 +4.10069E+01
+4.13069E+01 +4.16069E+01 +4.19069E+01 +4.22069E+01
+4.25069E+01 +4.28069E+01 +4.31069E+01 +4.34069E+01
+4.37069E+01 +4.40069E+01 +4.43069E+01 +4.46069E+01
+4.49069E+01 +4.52069E+01 +4.55069E+01 +4.58069E+01
+4.61069E+01 +4.64069E+01 +4.67069E+01 +4.70069E+01
+4.73069E+01 +4.76069E+01 +4.79069E+01
Section 33
5** F+1.00000E+00
6** +0.00000E-01 +6.04938E-02 +9.07407E-02 +1.37037E-01
2R+2.11728E-01 +1.37037E-01 +9.07407E-02 +6.04938E-02
7** -9.75900E-01 -9.51190E-01 -7.86796E-01 -5.77350E-01
-2.18218E-01 +2.18218E-01 +5.77350E-01 +7.86796E-01
+9.51190E-01
8$$ 1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
DOE-STD-3007-93
4-32
Listing 2. Continued.
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
1 1 1 1
2 2 2 2
2 2 2 2
2 2 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3 3 3
3 3
9$$ 53 55 57
10$$ 53 54 53 54
53 54 53 54
53 54 53 54
53 54 53 54
55 56 55 56
55 56 57 58
57 58
DOE-STD-3007-93
4-33
Listing 2. Continued.
11$$ 1 2 5 6
7 8 11 12
25 26 27 28
45 46 47 48
9 10 11 12
13 14 1 2
7 8
12** 2R+6.50060E-02 2R+7.51140E-04 2R+3.45140E-02 2R+1.54570E-06
2R+0.00000E-01 2R+3.56890E-07 2R+5.86600E-05 2R+7.34200E-06
2R+1.65800E-02 2R+6.17500E-02 2R+8.15800E-03 2R+6.66300E-02
2R+3.33200E-02
19$$ 1 1 1
T T
DOE-STD-3007-93
4-34
Intentionally Blank
DOE-STD-3007-93
5-1
EXAMPLE 5
Provided By
Rocky Flats Environmental Technology Site
Building 371 Caustic Waste Treatment System
DOE-STD-3007-93
5-2
Intentionally Blank
DOE-STD-3007-93
5-3
TABLE OF CONTENTS
1.0 INTRODUCTION........................................................................................................5-5
2.0 DESCRIPTION............................................................................................................5-5
3.0 REQUIREMENTS DOCUMENTATION ....................................................................5-6
4.0 METHODOLOGY.......................................................................................................5-6
5.0 DISCUSSION OF CONTINGENCIES ........................................................................5-6
6.0 EVALUATION RESULTS ..........................................................................................5-8
7.0 DESIGN FEATURES AND ADMINISTRATIVELY
CONTROLLED LIMITS AND REQUIREMENTS ...................................................5-18
8.0 SUMMARY AND CONCLUSIONS..........................................................................5-20
9.0 REFERENCES ..........................................................................................................5-21
DOE-STD-3007-93
5-4
Intentionally Blank
DOE-STD-3007-93
5-5
1.0 INTRODUCTION
This evaluation has been performed for the Caustic Waste Treatment System (CWTS) in Building
371 and is intended for any liquid wastes which currently exist or could be generated within the
facility. These wastes include liquids in bottles and tanks or from spills, maintenance, etc.
Activities within the scope of this evaluation include direct draining of tanks into the CWTS,
operation of the CWTS, and subsequent shipment of effluents to Building 374. The vacuum
source for the CWTS is the PROVE Vacuum System which was evaluated in NMSL-940110 and
thus will not be further addressed in this evaluation. Tasks such as material handling, drum
loading, spill response, etc., are conducted per building general comments and miscellaneous
limits. This evaluation was originally performed in accordance with procedure 3-B69-NSPM-5B-
01 and revised in accord with SSOC-NCSI-040.
Section 34
In this revision, controls were added to allow caustic liquids to be received and filtered in the
CWTS.
2.0 DESCRIPTION
The CWTS is a RCRA permitted treatment process which is designed to reduce fissionable
content of waste liquids to within discard limit for transfer to Building 374 liquid waste treatment
processes. Reference Appendix F for a flow diagram and room layouts of the CWTS. Waste
streams are fed into a manifold in glovebox 2401 via hardpiping, tygon tubing, or from other
sources, such as a “portable fill station” or four-liter bottle, and vacuum transferred to shielded
annular tanks D-2401 A/B/C/D where they are mixed, sampled, adjusted to 25 g Pu/l or less, and
transferred to clarifier columns T2411 A/B in glovebox 18 by use of pumps P2401 A/B in
glovebox 2402. A caustic in powder form, such as Magnesium Hydroxide, is added to the liquids
in these columns to neutralize the acidity and precipitate Pu out of the solutions. The contents of
the clarifier columns are then filtered through R6 filter FL2431 in glovebox 18 and the supernate
solution is collected in decant columns T2411 C/D, also in glovebox 18.
Plutonium Hydroxide precipitate from FL2431 is placed into nominal 2” high pans and passed to
glovebox 23 for drying on hotplate W-2. Dried material is placed into 8801 type cans, bagged
out, and managed in accordance with the appropriate limits, i.e. approved shipping container, cart,
etc. Used R6 filter media (pad) from FL2431 is dried in glovebox 18 and/or glovebox 23. The
dry filter media is then bagged out and managed in accordance with appropriate limits.
Supernate liquids in decant columns T2411 C/D are pumped by pump P2411 in glovebox 18
across either of two banks of 1 micron bag filters, i.e., FL2416-1,2,3 A/B in glovebox 2404, into
shielded annular tanks D-2402 A/B. Contents of these tanks are sampled and vacuum transferred
into shielded annular tank D-2403 if less than the Building 374 waste transfer limit of 4x10-3 g/l
fissionable material. If solutions do not meet the waste transfer limit, they are vacuum transferred
to tanks D-2401 A/B/C/D and reprocessed in the CWTS.
DOE-STD-3007-93
5-6
Liquids in tank D-2403 are sampled and, if less than the waste transfer limit, pumped by pumps
P2403 A/B in glovebox 2403 into Building 374 receiving tanks D811 A/B. Liquids which do not
meet the waste transfer limit are either further filtered or vacuum transferred into tanks D-2401
A/B/C/D and reprocessed in the CWTS.
The system has only been in operation for a relatively short amount of time, such that any hold-up
of fissionable material would be contamination only. Also, the CWTS is in locations with
appropriate criticality detector coverage.
For further details of this system please reference procedures 4-U84-C0-6090, “Building 371
Caustic Waste Treatment System” and 4-R76-WO-5017, “Caustic Waste Transfer from Building
371”.
3.0 REQUIREMENTS DOCUMENTATION
There are no unique documentation requirements for this evaluation.
4.0 METHODOLOGY
4.1 The CWTS was designed with geometrically favorable tanks and equipment. Thus,
evaluation methodology consists primarily of identification of components which meet established
standards and criteria for geometrically favorable equipment. In addition, this evaluation
discusses tank draining in Building 371 and waste transfer to Building 374.
4.2 The following assumptions were used in this evaluation.
Section 35
4.2.1 No fissionable solution ever overflowed into the building process vacuum system. This was
substantiated during conversation with Jack D. Weaver on 11/16/95. Mr. Weaver was one of the
supervisors of the building processes during facility startup and the duration in which the
processes were operated. Also, as the criticality engineer for Building 371 from 1983 through
1988, I did not respond to or observe any fissionable solution overflows into the building process
vacuum system.
5.0 DISCUSSION OF CONTINGENCIES
Tanks, equipment in gloveboxes, and the activities associated with waste transfer to Building 374
and draining of Building 371 tanks are individually evaluated in section 6.0. Unlikely
contingencies are summarized as follows. Note that there are no credible criticality scenarios
associated with glovebox 18, since columns and filters are critically safe by dimension. In
addition, seismic events would only cause glass columns to break in glovebox 18 and that liquid
would be restricted to a critically safe 2” depth in the glovebox due to the criticality drain.
DOE-STD-3007-93
5-7
Equipment Contingencv Barrier
Shielded Annular Tanks 1. Misconstruction 1. Physical Verification
a. Annulus >3” a. Verified as < 3”
b. Insufficient Shielding b. Verified by TES to meet
design criteria.
2. Annulus Bulges 2. Significant bulging not
credible since tanks are
vented and certified to meet
pressurization from vacuum
transfers and low pressure
diaphragm pump.
Reference Appendix O for
tank certification.
3. Loss of Shielding 3. Materials encased in
stainless steel, which is
observed to be intact with
no corrosion.
4. Seismic Activity 4. Tanks are neutronically
isolated.
5. Overbatching to 300 g/l. 5. Tanks are limited to 150
g/l. Liquids required to be
characterized as less than
150 g/l before introduced
into tanks D-240 1 A/B/C/D
and the CWTS process.
6. Precipitation in tanks 6a. Caustic liquid not
from addition of caustic. accepted unless receiving
tank is empty and isolated
from other tanks.
6b. Inlet valve to tanks D-
2401 A/B/CID to be closed
when greater than four liters
of caustic is collected or
stored in any glovebox or
room which drains to CDS
“A”. Liquid may be drained
into CDS “A” per 6a.
GB-2401/GB-2402 1. Fissionable Solutions in 1. Equipment is subcritical
(equipment) excess of 150 g/l. with no spacing and nominal
GB-23 water reflection for
concentrations up to 300 g/l.
2. Full water reflection 2. Criticality drain.
DOE-STD-3007-93
5-8
Equipment Contingencv Barrier
1. Too many containers/material 1. Limited to three 2” deep
pileup from seismic activity, etc. pans, two 1-liter containers,
and three used filters.
Operations are also only
performed by specially trained
process specialists, i.e., Core
team.
2. Fissionable material 2. It would be unlikely for the
overbatch following barriers to
simultaneously fail.
a. Only precipitate from one
“run” per pan.
b. Clarifier columns limited to
a maximum of 25 g/l
fissionable liquids.
c. Fissionable liquid
concentrations known before
blending in tanks D-2401
A/B/C/D.
d. l-liter containers limited to
a maximum of 1000 grams
net weight.
e. Process design results in
clarifier column operating
volume less than 20 liters.
3. Reflection 3. Criticality drain.
6.0 EVALUATION RESULTS
Tanks, equipment, and waste transfer activities involved with the CWTS are shown double
contingent as follows.
Section 36
6.1.1 SAT Design: SATs were designed at RFETS for the critically safe storage of large
volumes of high-level fissionable solutions. The design consists of a nominal 3”annular tank
surrounded on both sides by shielding composed of a 2.5” annulus of polyethylene sandwiched
between two 1/8” annual nuclear poison regions. This shielding is fully encased by stainless steel
to assure its integrity and as a fire barrier. Reference figure 1 for a cross section view of a SAT.
Note that the robust nature of the cladded shielding precludes loss of the poison/moderator
regions, such that further verification of those regions is not required. Note also that no corrosion
of the shielding is observed.
Various monte-carlo computer calculations (KENO analyses, reference Appendix G), were
performed in support of SAT design. The shielding uses a polyethylene moderator to thermalize
DOE-STD-3007-93
5-9
neutrons and optimize the effect of neutron absorbers located on either side of the moderator.
This configuration results in neutronic isolation of the SAT tank, thus there are no spacing
requirements. Note that this isolation also precludes seismic contingencies from tank shifting.
These analyses, contained in evaluations JNM-25 and JNM-28, became the basis for the SAT
design criteria, which is included in Appendix H.
Validation of KENO analyses in JNM-25 and JNM-28 was completed by Critical Mass
Laboratory (CML) experimentation as reported in Appendix I. Though initial design analyses
used KENOIV and CML validation used KENOV, there is no significant difference in code usage
as reported in Appendix J. Note that CML experimentation was specifically conducted to validate
poison and moderator application in the Shielded Annular Tanks, thus U235 solution was used in
the critical mass experiments. This is appropriate as cross sections for Pu and U235 solutions in
annular tanks have been previously validated in CML experiments at RFETS and within the
complex.
Figure 1
DOE-STD-3007-93
5-10
6.1.2 SATs D2401 A/B/C/D, D-2402 A/B, D-2403: The CWTS exclusively uses these seven
tanks for storage of fissionable solutions. Each tank can contain approximately 725 liters of liquid
and is nominally 64.24” OD by 87.25” H. These tanks meet design criteria as follows.
Accordingly, CWTS SATs are subcritical for any contingency, including overbatching to 1000 g/l
fissionable solution. (reference Appendix G).
6.1.2.1 All CWTS SATs met the criteria for solution annular thickness of 2.88” +/- 1/8”.
Verification using a digital ultrascope at six different heights for each of eight radial positions can
be found in Appendix K.
6.1.2.2 Pure polyethylene with a density of 0.92 g/cc was used in the CWTS SATs. A
certification letter to this effect is in Appendix K. In addition, the Tank Evaluation System (TES)
was used to verify the presence of required polyethylene in these tanks. Reference Appendix K
for TES results.
6.1.2.3 Type 238Z Flex/Boron (silicone based rubber mixed uniformly with Boron Carbide)
manufactured by Reactor Experiments, Inc. was used as the nuclear poison in the CWTS SATs.
An elemental analysis of the Flex/Boron is in Appendix K. In addition, TES was used to verify
the presence-of required nuclear poisons in these tanks. Reference Appendix K for TES results.
Section 37
6.1.2.4 Since tanks which could be drained to the CWTS were operated at less than 150 g/l Pu
and the highest fissionable solution currently in Building 371 tanks is less than 10 g/l Pu, the
maximum credible solution concentration is 150 g Pu/l. In addition, liquids from other facilities
are to be sampled to contain less than 150 g/l fissionable material, i.e., Pu + U235, before
accepted into Building 371. Thus the 150 g/l fissionable material limit for tanks D-2401 A/B/C/D
can be maintained during collection of liquids. In addition, liquids received by tanks D-2402 A/B
have undergone precipitation to remove fissionable materials and supernate liquid has been
filtered through an R6 filter and three 1-micron bag filters. Caustic liquids are only filtered since
materials are suspended and not dissolved.
6.1.2.5 Overbatching of collection tanks D-2401 A/B/C/D as the result of precipitation due to the
introduction of caustic liquids would not exceed 1000 g Pu/l, thus tanks D-2401 A/B/C/D would
remain subcritical. Reference correspondence in Appendix R. Precipitation in tanks is prevented
by ensuring the receiving tank is empty and isolated from other tanks prior to introduction of
caustic liquids. Also, inlet valves to these tanks are required to be closed when greater than four
liters of caustic is present in any glovebox or room which drains to Criticality Drain System “A”.
In addition, caustic liquids are not allowed to be used in decontamination activities in rooms with
drains to Criticality Drain System “A” or disposed in it. Reference the criticality safety evaluation
for Criticality Drain System “A”.
6.1.2.6 Overbatching of tanks D-2401 A/B/C/D as the result of plutonium polymer formation
(water added to tanks containing high concentration plutonium nitrate solution) would not exceed
1000 g Pu/l, thus tanks D-2401 A/B/C/D would remain subcritical. Reference correspondence in
Appendix R. This is also judged to bound density increases due to freezing of tank contents.
DOE-STD-3007-93
5-11
6.1.2.7 Tank D-2403 is limited to a total of 200 grams Pu and U235 in support of Building 374
waste transfer contingencies. Reference section 6.8 for this discussion.
6.2 Glovebox 2401 (GB-2401): GB-2401 is located in room 1105. It is constructed of stainless
steel with 0.25” lead and is nominally 17’ long x 2.33’ wide x 4’ high. This glovebox contains a
pipe manifold which has fifteen nominal ¾” ID inlet feed pipes (tie-points) from specific building
tanks joined to a nominal 2” ID header pipe, which in turn, is connected to a nominal ¾” ID
outlet pipe to tanks D-2401 A/B/C/D and a separate nominal ¾” return pipe from pumps P2401
A/B. Currently only tie point 45 (Process Support Tanks), tie point 46 (PROVE Vacuum Tanks),
Tygon-tubing tie point, and the outlet pipe to tanks D-2401 A/B/C/D are connected (reference
CWTS Solution Collection Process sketch in Appendix F). A vacuum pickup wand connected to
fulflo filter Fl-2403 (filter housing is nominally 3.75” ID x 10” H) for spill pickup and transfer to
tanks D-2401 A/B/C/D is also in this glovebox. Since the maximum credible concentration in
Building 371 is 150 g/l, thus meeting the concentration limit on the D-2401 A/B/C/D tanks, the
vacuum pickup wand may be used for spills both internal and external to GB2401. A standard
SG-508 criticality drain is installed in GB-2401, thus flooding above a two inch depth is
precluded.
Section 38
In Appendix M it was shown that the cross sectional area of the equipment in GB-2401 is
equivalent to that of 7.82” diameter cylinder, which per TID-7016 is subcritical with nominal 1”
water reflection up to 300 g/l or twice the maximum credible concentration. Note that full
reflection of this cylinder would be at least double contingent since it would require the criticality
drain to clog and a source of liquid to fill the glovebox. Note that 3 used ful-flo filters were
included in the calculation to address the removal of ful-flo filters, as was a 3/4” ID tygon tubing
for direct draining of Building 371 tanks.
In reality, the fixed equipment in GB-2401 is well spread out and at least 12” off of the glovebox
floor. Thus it would contribute only negligible reactivity to items on the glovebox floor.
Accordingly, these items can be grouped together and evaluated separately. The total volume of
two 4.4 liter containers and 6 used ful-flo filters (each approximately 800 ml) was estimated at
13.6 liters. The total volume increases to 15.8 liters with the addition of a 2.2 liter container of
kimwipes used to collect spills. This volume is subcritical for the maximum credible concentration
of 150 g/l in an equivalent hemispherical volume with 1” of water reflection. As calculated in
Appendix O, a nominally reflected hemispherical volume of 20.2 liters is equivalent to a 10.5 liter
nominally reflected sphere, which is subcritical for a concentration up to at least 1000 g Pu/l.
Note that the hemispherical volume calculation was selected to more realistically envelope
available containers in the glovebox. Note that 6 used ful-flo filters were considered, as stated
above, with the solution containers to account for filters stored on the glovebox floor. It can,
thus, be concluded that one 4-liter container in GB-2401 is double contingent, as unlikely
contingencies of overbatch and extra container, together, are subcritical. The double contingency
argument for the 4-liter container clearly bounds contingencies of overbatch and extra container
for the 2-liter container of kimwipes due to its smaller volume.
DOE-STD-3007-93
5-12
A large bag-in-bag, connected from a gloveport to a 55-gallon drum, could be used to move one
bottle of fissionable liquid at a time into the glovebox with existing limits, as it is considered part
of the glovebox. Clearly, if the liquid were to leak from the bottle into the bag, it would still only
be a 4 liter volume already bounded by the previous paragraph. Any leak from the bottle into the
drum must be considered in the criticality safety evaluation for the drum. Note that the bag-in bag
itself, per bag-in procedures, must be secured such that it does not collect fissionable liquids when
unattended.
6.3 Glovebox 2402 (GB-2402): GB-2402 is located in room 1103. It is constructed of -stainless
steel with 0.25” lead and is nominally 12’ long x 2.5’ wide x 4.74’ high. This glovebox contains
two maximum-size l -liter pumps (P2401 A/B), one vacuum pick-up wand with fulflo filter
FL2406, and additional fulflo filter FL2407 installed on the return line from pumps P2401 A/B to
tanks D-2401 A/B/C/D. Process sampler, ME-2403, is used to sample tanks D-2401 A/B/C/D.
Samples are collected in three 20 ml vials and removed via sample drop. A standard SG-508
criticality drain is installed in GB-2402, thus flooding above a two-inch depth is precluded. Since
the maximum credible concentration in Building 371 is 150 g/l, thus meeting the concentration
limit on the D-2401 A/B/C/D tanks, the vacuum pickup wand may be used for spills both internal
and external to GB-2402.
Section 39
In Appendix M the total volume of two pumps, two filter housings, three used fulflo filters, and
200 ml of samples in GB-2402 was estimated at 8.2 liters. Increasing the sample volume to 1000
ml will result in a total volume of 9 liters. The total volume further increases to 11.2 liters with
the addition of a 2.2 liter container-of kimwipes used to collect spills. This is clearly subcritical,
even in a spherical volume, for concentrations up to at least 250 g/l, as referenced in figure 32 of
LA-10860. Note that full reflection of this sphere would be at least double contingent since it
would require the criticality drain to clog (unlikely) and a large source of liquid to fill the
glovebox, such as a major pipe leak or fire suppression liquid (either also unlikely). While this
curve from figure 32 is for unreflected spherical volumes, the conservatism of using a combined
spherical volume as opposed to individual containers in a on-layer planar array, as well as, the
assumption of the 2 liter container of kimwipes being 150 g/l Pu solution, is judged to well bound
the nominal reflection of operator hands. Further note that at 250 g/l, a spherical volume of over
15 liters is required before criticality is possible.
6.4 Glovebox 18: GB- 18 is located in room 1115. It is constructed of stainless steel, 1/8” lead,
and 2” waterwall, and is nominally 11’ long x 3’ wide x 10’ high. Reference Appendix F for a
layout of this glovebox. Solution is received into two nominally 6” ID x 66” high clarifier
columns spaced approximately 35” center-to-center from each other. A caustic, such as
Mg(OH)2, is added and the liquid filtered through an R6 filter (nominally 18” ID x 2” H) located
over two feet away at the other end of the glovebox. Supernate liquid is collected in two nominal
6” ID x 66” high decant columns spaced on approximate 32” centers from each other. Nearest
spacing between decant columns and clarifier columns is approximately 17” center-to-center from
each other. A vacuum pickup wand and fulflo filter FL-2434 is approximately 15” edge-to-edge
above and approximately 14” center-to-center horizontally from the R6 filter. A maximum-size 1-
liter pump (P-2411) is also located in this box. A standard SG-508 criticality drain is installed in
DOE-STD-3007-93
5-13
GB-18, thus flooding above a two-inch depth is precluded. The following conditions are thus
evaluated.
Section 40
6.4.1 Normal Condition: There is clearly no criticality safety issue, due to favorable geometry,
for the columns or equipment containing supernate liquid from the R6 filter. Due to the large
spacings between these components, each column can be evaluated individually. Accordingly,
each 6” column is subcritical for concentrations up to about 2500 grams Pu/l, with one inch water
reflection, as referenced in figure 3.7 of TID-7016. Even with an additional 3 centimeters to
account for tolerances in diameter, each column is still subcritical for concentrations up to 1000
grams Pu/l. Since the maximum upset mass from section 6.5 is 6000 grams, concentrations
greater than 1000 grams Pu/l in each column are still subcritical, since the minimum subcritical
mass for concentrations greater than 1000 grams Pu/l is about 10.1 kg in a one inch water
reflected sphere, reference figure 3.5 of TID-7016. The R6 filter assembly is over two feet away
from the clarifier columns, thus it is also evaluated individually with a one-layer planar array of
three 2” pans loaded with precipitate from the R6. The 2” height of the R6 filter assembly, pans,
and used R6 filters is bound by an infinite 2” slab, which is, per figure 3.8 of TID-7016, subcritical
for all concentrations up to at least 5 kg Pu/l, even with one inch of water reflection. The 2” slab
also bounds any precipitate or materials which could be spilled onto the glovebox floor. The used
R6 filter media is very thin, i.e., <1/4” thick, and six of them would, together, be less than two
inches thick, even if folded up. Six used R6 filter media were evaluated, in the unlikely event that
two additional filters were present. Note that precipitate in pans is restricted to the approximate
height of each pan, though it is reasonable for small amounts to be slightly above the pan height as
a result of pan loading or handling. Fulflo filter FL-2434 with two used filter cartridges in contact
would have a cross sectional area equal to a 5.16 inch D cylinder, which is critically safe, as
referenced in TID-7016, for the small amount of fissionable material in the filters. Finally, the 1 -
liter pump is critically safe as referenced in LA- 10860, assuming a spherical volume.
It should be noted that a significant margin exists between the critical concentration for a 6”
diameter cylinder (reference TID-7016) and the maximum credible concentration available to
columns in the CWTS, i.e., > 1000 g Pu/l versus 150 g Pu/l. Note that concentrations in excess
of 150 Pu/l, though evaluated as an upset condition in paragraph 6.1.2.5 and 6.1.2.6, would notbe
credible in the columns, since liquids are verified as less than 25 g/l from the D-2401 A/B/C/D
tanks, thus any upset concentration would be detected. These significant margins are supportive
of the approach taken with interaction in the preceding paragraph.
Further review of criticality safety evaluation HD-20, “Precipitation and Calcination”, also
substantiates the subcriticality of glovebox 18 components. In HD-20, KENO calculations for six
6” diameter by 72” precipitators, each directly above a stacked 3” filter boat and 1-3/8” catch
pan, arrayed circularly on 32” centers resulted in a k-effective of 0.8346 +/0.0062. In this case
200 g Pu/l solution was in each precipitator, 2.101 kg Pu/l was in each filter boat, and 4.708 kg
Pu/l was in each pan. This arrangement is clearly more reactive than that in glovebox 18, as there
was no spacing between precipitators and filter boat/pan combinations as there is between the
columns and R6 filter/pans in glovebox 18. Also, spacing between precipitators in HD-20 is,
overall, closer than that between columns in glovebox 18.
Section 41
DOE-STD-3007-93
5-14
6.4.2 Seismic: In a seismic event, it is judged that the glass columns would break and up to 2” of
liquid could fill the floor. This is subcritical, as can be seen in TID-7016.
6.4.3 Samples: 1-liter of samples may be taken and handled in this glovebox, since the relatively
small volume of liquid would be bounded by the unrealistically high concentrations for which
equipment in this glovebox has been evaluated. In effect, the most reactive configuration of the
samples would be either next to the R6 filter assembly, evaluated unrealistically to 5000 g/l, or
any of the columns, unrealistically evaluated to 1000 g/l, thus clearly bounding the maximum
credible concentration of 150 g/l in the 1 liter of samples.
6.5 Glovebox 23: GB-23 is located in room 1115. It is constructed of stainless steel with ¼”
lead and 2” waterwall. Precipitate in nominal 2” deep pans from glovebox 18 is dried on a
hotplate in this glovebox. Dried material is then collected into 1-liter containers and bagged out.
Used bag filters and cartridge filters from the CWTS are also dried in this box. This glovebox has
an approved criticality drain and is also open to GB18, which has a standard criticality drain, thus
flooding above a two-inch depth is precluded.
6.5.1. Normal Condition: Normally, a maximum fissionable concentration of 25 g/l is processed
in approximately 20 liter batches in each clarifier column in glovebox 18. This amount of liquid is
measured by a timed metering pump. Before adding Magnesium Oxide for precipitation, each
column is adjusted to remove any liquid in excess of 20 liters. Note that about 7 liters of up to
150 g/l fissionable liquid could be introduced into the columns, instead of 7 liters of 25 g/l
fissionable liquid. This is due to a small amount of liquid which could be left in common tank
transfer lines after blending and sampling. Reference Appendix O. Accordingly, precipitate from
the two columns or processing “run”, would have a maximum fissionable mass of 1875 grams (33
liters x 25 g/l + 7 liters x 150 g/l). As only one “run” is allowed in each pan, the three pans
allowed in glovebox 23 would contain a combined fissionable mass of 5625 grams. Since material
is bulk weighed into the two maximum-size one-liter cans and assuming the material is Plutonium
Oxide (Pu atomic weight of 239/Plutonium Oxide atomic weight of 271=88 wt%), the
contribution of fissionable material from the two cans is 1760 grams. The addition of fissionable
material in the three filters is expected to provide no more than 150 grams, particularly as
operators are trained to efficiently scrape precipitate from the R6 filter media, as bag filters
receive only low level filtrate, and as ful-flo filters accumulate less than 50 grams fissionable
material. Reference Appendix O. Thus, the normal fissionable mass loading in glovebox 23 is
7535 grams. This amount of fissionable material is bounded by the mass overbatch condition.
6.5.2 Mass Overbatch: There are four credible means of mass overbatch in glovebox 23. The
first means is by processing the maximum credible solution of 150 g/l in 20 liter batches in each
clarifier column. This overbatch would result in one pan containing 6000 grams of fissionable
material. The second means is by loading two “runs” into one pan for a fissionable mass of 3750
grams. The third overbatch would involve completely filling each clarifier column to its full 30.6
liter capacity with 25 g/l fissionable solution, such that the fissionable mass available to one pan
would be 2405 grams (includes 7 liters at 150 g/l). The fourth overbatch results in the unlikely
event that two pans or 3750 grams of fissionable mass were put into one can before the error was
identified. The first overbatch was evaluated since its higher fissionable material mass bounds the
Section 42
DOE-STD-3007-93
5-15
other three. Accordingly, the total fissionable mass in glovebox 23 for this condition would be
4125 grams more than the normal condition or 11660 grams. In three approximate 1.9 liter pans
(6”x 9.5” x 2”), two 1.1 liter cans (10% variance added), and three approximate 800 ml filters or
a total volume of 10.3 liters, this total fissionable material would have a density of about 1132 g/l,
which is subcritical, per figure 3.6 of TID-7016, when reflected with one inch of water in a
spherical volume. Thus, the mass overbatch condition is subcritical. Note also that this bounds
interaction with items such as handcarry and carts.
Extra container: The unlikely addition of two pans, three cans, or four filters (or an equivalent
volume combination), provides an additional 3.8 liters to the allowed 10.3 liters of containers in
glovebox 23. The bounding case for this contingency would be two additional pans, each with
1875 grams Pu, brought in from glovebox 18. The total available fissionable mass (11285 grams)
in 14.1 liters would have a density of about 800 g/l, which is subcritical for an equivalent
hemispherical volume with 1” of water reflection. As calculated in Appendix O, a nominally
reflected hemispherical volume of 20.2 liters is equivalent to a 10.5 liter nominally reflected
sphere, which is subcritical for a concentration up to at least 1000 g Pu/l. Note that the
hemispherical volume calculation was selected to more realistically envelope available containers
in the glovebox. Also note that a concentration of 1000 g/l accounts for varying concentrations
of fissionable material, particularly in the one liter cans. Thus the extra container condition is
subcritical.
6.6 Glovebox 2404:
6.6.1 GB-2404 is located in room 1115. It is constructed of 1/8” lead shielding sandwiched
between two 1/8” stainless steel layers and is nominally 11’ 8” long x 3’ ¾” wide x 4’ 6” high.
Additional shielding by 2” water walls is on the front and back sides of the box. This glovebox
contains two parallel banks with three 1-micron bag filters connected in series per bank. Each bag
filter canister FL2416-1, 2, 3 (A/B) is nominally 4.5” ID by 18” in height and is spaced as shown
in figure 2. This glovebox also has a vacuum pickup wand connected to fulflo filter Fl-2417 (filter
housing is nominally 3.75” ID x 8” H) for spill pickup and transfer to tanks D-2401 A/B/C/D.
Two standard SG-508 criticality drains are installed in GB-2404, thus flooding above a two inch
depth is precluded.
6.6.2 Supernate liquid from the R6 filter in glovebox 18 is further filtered in this glovebox.
Fissionable materials in this liquid have previously removed via precipitation in clarifier columns
T2411 A/B and filtration through the R6 filter in glovebox 18. Testing of this process, reference
correspondence from L. L. Martella to B. S. Mo, “Filtrate Concentration OffR-6 Filter”, dated
December 13, 1995, in Appendix O, has shown that this liquid is expected to be less than gram
Fulflo filter
0.64 cm
R6.985
104.68 cm 80.82 cm 72.38 cm
Precipitate Filters 33.65 cm
Figure 2 GB2404 Filter
DOE-STD-3007-93
5-16
value, i.e., typically 10-2 g/l Pu. However, in the event that upset conditions result in gram value
concentrations of fissionable material, i.e., greater than 7 g/l fissionable solution introduced into
the clarifier columns, failure to precipitate in the clarifier columns, and failure to use the R6 filter,
equipment in glovebox 2404 has been configured with geometrically favorable equipment and
large spacings such that subcriticality is maintained. Individual equipment is discussed as follows.
Section 43
6.6.3 Bag-filters FL2416-1,-2,-3 (A/B): Each bag-filter canister is nominally 4.5” ID by 18” H
and is configured as shown in figure 2. Since minimum center-to-center spacing between filters
nominally ranges from 33 to 83 centimeters, bag-filter canisters are individually evaluated as
follows. The worst case physical configuration for an individual bag-filter canister is in contact
with four 4” D bag-filters (an extra is included in consideration of a limit violation). Per section
6.5.1, each bag filter contains at most 50 grams fissionable material. Accordingly, four bag filters
next to the bag filter canister would have a maximum fissionable mass of 250 grams which is less
than the minimum subcritical mass limit of 450 grams as referenced in TID-7016. 200 ml of
samples may be taken and handled as the small volume would not significantly affect reactivity.
6.7 Glovebox 2403: GB-2403 is located in room 1103. It is constructed of stainless steel with
0.25” lead and is nominally 15’ long x 2’ 5” wide x 4’ 9” high. This glovebox contains two
maximum-size 1-liter pumps (P2403 A/B), one vacuum pick-up wand with fulflo filter FL2410,
and fulflo filter FL2411 installed on the return line from pumps P2403 A/B to tanks D-2401
A/B/C/D. Process sampler, ME-2404, is used to sample tanks D-2402 A/B. Samples are
collected and removed via sample drop. Bag filter FL-2422 does not require a filter from a
criticality standpoint, since wastes transferred to Building 374 have already been repeatedly
filtered. A standard SG-508 criticality drain is installed in GB-2403, thus flooding above a two-
inch depth is precluded. The vacuum pickup wand may be used for spills both internal and
external to GB-2403. Note that external spills may only be picked up with the wand if sample
analysis shows liquids to be less than 4x10-3 g/l Pu and U-235. These requirements are in place
to support double contingency of liquids transferred to Building 374.
In Appendix M the total volume of two pumps, two filter housings, three used fulflo filters, and
200 ml of samples in GB-2403 was estimated at 8.2 liters. Increasing the sample volume to 1000
ml will result in a total volume of 9 liters. This is clearly subcritical, even in a spherical volume,
for concentrations up to at least 250 g/l, as referenced in figure 32 of LA- 10860. This is a
reasonable upper bound since the highest concentration of Pu is less than 10 g/l in tank D-55B;
process tanks operated at a limit of 150 g/l; high-level Pu solutions are no longer generated in
Building 371, liquids are sampled as less than 150 g/l fissionable material before introduced into
the CWTS process, and solutions handled in this glovebox have been filtered through an R6 filter
and three 1-micron bag filters. Note also that full water reflection is only possible in the unlikely
event that the glovebox criticality drain becomes blocked. Thus it is asserted that equipment in
GB-2403 is subcritical for any credible contingency.
6.8 Transfer of waste liquid to Building 374:
6.8.1 Waste liquids which are transferred to tanks D-811 A/B must contain less than the Building
374 waste transfer limit of 4 x 10-3 g/l Pu + U-235 since these tanks are critically unsafe. Though
DOE-STD-3007-93
5-17
Section 44
effluent liquids from the CWTS have undergone precipitation to remove Plutonium, and supernate
liquids from glovebox 18 have been filtered through an R6 filter and three l-micron bag filters,
rigorous controls have been instituted to preclude any likely contingency in the CWTS which
could cause concentrations exceeding the waste transfer limit to be inadvertently sent to tanks D-
811 A/B. Note that caustic liquids are only filtered since particles are suspended and not
dissolved. Valve MV-24425 is closed and locked out, and valves MV-24401 and MV-24527 are
verified as closed when solution is pumped into clarifier columns T-2411 A/B to preclude bypass
of the precipitation process in glovebox 18. Note that residual liquid between closed valves
would not pose a criticality safety issue as it would be of small volume. Also note that
correspondence from T.E. Boyd to L. Martella, “Precipitation of Plutonium with Magnesium
Hydroxide: TES 008.97”, October 10, 1997, shows that supernate liquid from precipitation of 25
g/l fissionable liquids would be less than 7 g Pu/l. Reference Appendix O.
6.8.2 Supernate liquid from clarifier columns T2411 C/D are pumped through either of the banks
of three 1 -micron bag filters FL2416-1, 2, 3 (A/B) into either of tanks D-2402 A/B. It would be
unlikely for this liquid to be in excess of 7 g/l Pu since it would require a combination of upset
conditions, including failure to precipitate, failure to use the R6, and/or failure to use the one or
more of the l -micron bag filters. This forms the first contingency.
6.8.3 Waste liquid in tank D-2402 A or B is mixed via vacuum sparge and sampled by the
Building 371 operating group prior to transfer to tank D-2403. If lab results show the liquid to be
less than the waste transfer limit, valve AOV-213, which is normally locked out in the closed
position, is opened and the tank contents transferred to tank D-2403. Liquid above the waste
transfer limit is recycled back to tanks D-2401 A/B/C/D and reprocessed in the CWTS. Waste
liquid in tank D-2403 is then mixed via vacuum sparge and sampled twice by the Liquid Waste
Treatment organization from Building 374, with additional mixing between samples. If both of
these samples are less than the waste transfer limit, valves AOV-201, AOV-206, and MV-0884,
all normally locked in the closed position, are opened and the waste liquid is pumped to tanks D-
811 A/B in Building 374. In addition, tank D-2403 is limited to a maximum of 200 grams total
fissionable material (39% of the minimum critical mass of Pu-239) and assayed on a bi-monthly
basis as additional barriers. Since two independent organization have multiple opportunities to
verify waste liquid concentration, numerous independent samples would have to be misanalyzed,
and several normally locked closed valves would have to fail or be left open, it is judged that
failure to transfer only waste liquids below the waste transfer limit from tank D-2403 to tanks D-
811 A/B is unlikely. This forms the second contingency.
6.9 Direct draining of Building 371 tanks to tanks D-2401 A/B/C/D:
One method of draining Building 371 tanks involves the installation of a tap in the outlet of a
tank, which is then directly connected to tanks D-2401 A/B/C/D via nominal ¾” tygon tubing into
the manifold in GB-2401. The contents of the target tank are then drained into the CWTS using
gravity assisted by the vacuum (PROVE Vacuum System) on tanks D-2401 A/B/C/D. This
activity can be conducted with Building 371 General Comments and Miscellaneous
NMSL/CSOLs. Since Building 371 tanks were pumped systems and no fissionable solution was
introduced into the vacuum system by overfilling tanks, no specific criticality controls are
Section 45
DOE-STD-3007-93
5-18
required. Note that tanks currently connected via hard piping into GB-2401, reference section
6.2, may be drained into the CWTS. Also note that mixing of tanks prior to draining is not
addressed as there is no operational requirement for it. Finally, this evaluation does not authorize
the violation of USQDs which are in effect.
6.10 Processing of liquids from Tank D-452, Bldg 771: Liquids drained from tank D452,
Building 771 have been well characterized as less than 6 g/l fissionable material. Reference
Appendix P. Therefore, the existing safety basis and controls established for a maximum credible
concentration of 150 g/l fissionable material well bound this evolution.
6.11 Processing of liquids from other facilities: Liquids from other facilities which are
characterized as less than 150 g/l fissionable material are bounded by the safety basis and controls
established in this evaluation for a maximum credible concentration of 150 g/l fissionable material.
7.0 DESIGN FEATURES AND ADMINISTRATIVELY CONTROLLED LIMITS AND
REQUIREMENTS
7.1 Design Features: The technical basis for each engineered safety feature is addressed in
sections 5.0 and 6.0.
7.1.1 GB-2401: Piping manifold per drawing D-25321-001, floor pickup wand with fulflo filter
configured to return liquid to tanks D-2401 A/B/C/D, and standard criticality drain.
7.1.2 GB-2402: Maximum 1 -liter pumps (P2401 A/B), floor pickup wand with fulflo filter
configured to return liquid to tanks D-2401 A/B/C/D, and standard criticality drain.
7.1.3 GB-2403: Maximum 1-liter pumps (P2403 A/B), floor pickup wand configured to return
liquid to tanks D-2402 A/B, and standard criticality drain.
7.1.4 GB-2404: Each bag filter canister, FL-2416-1,2,3 (A&B), is nominally 4.5” ID by 18” H
and is configured per drawing D-50407-451. Two standard criticality drains are installed on this
box. This box also includes a floor pickup wand with fulflo filter configured to return liquid to
tanks D-2401 A/B/C/D. Bag filters not to exceed 1 micron.
7.1.5 GB-18: Each column,T2411 A/B/C/D, is nominally 6” ID by 66” H. The R6 filter
assembly is a maximum of 2 inches deep. Equipment is configured per drawings D-50407-0462
through -0467. The pump is timed to deliver no more than about 20 liters of liquid to each
clarifier column. A standard criticality drain is installed on this box.
7.1.6 D-2401 A/B/C/D; D-2402 A/B; D-2403: Each shielded annular tank is constructed per
drawings D41005-501 through -505.
7.2 Administrative Controls (Posted Limits): The technical basis for each of these controls is
discussed in sections 5.0 and 6.0.
DOE-STD-3007-93
5-19
7.2.1 GB-2401: Liquids introduced into the manifold are limited to a maximum of 150 g/l
fissionable material. Six used fulflo filters may be present outside the cartridge filter housing. One
maximum-size 4-liter container of maximum 150 g/l fissionable material may also be in GB-2401.
Floor pickup wand may be used to clean up spills inside and outside the glovebox. One
maximum-size 2-liter container of kimwipes used for spill collection (free liquid is allowed) may
also be present. 200 ml of samples may be taken and handled in this glovebox.
7.2.2 GB-2402: Three used fulflo filters may be present outside cartridge filter housings. 1000
ml of samples may be taken and handled in this glovebox. Floor pickup wand may be used to
clean up spills inside and outside the glovebox. One maximum-size 2-liter container of kimwipes
(free liquid is allowed) used for spill collection may also be present.
Section 46
7.2.3 GB-2403: Three used fulflo filters may be present outside cartridge filter housings. 1000
ml of samples may be taken and handled in this glovebox. Floor pickup wand may be used to
clean up spills inside and outside the glovebox. Samples from liquid outside the glovebox must
show liquid to be less than 4 x 10-3 g/l Pu and U-235 prior to spill clean up.
7.2.4 GB-2404: Three used filters may be present outside filter housings. 200 ml of samples may
be taken and handled in this glovebox.
7.2.5 GB-18: Tank contents must be characterized as less than 25 g/l Pu before transferred to
the clarifier columns (T2411 A/B). Material (precipitate) from the R6 filter may be placed into a
one-layer planar array of three maximum dimension 6”x 9.5”x 2” pans. Only precipitate from one
processing “run” (2 columns) is allowed into any single pan. Precipitate is restricted to the
approximate height of each pan, however, it is acceptable for small amounts to heap slightly
above the pan height during loading or as a result of pan handling. Four used R6 filters may be
present in addition to the one in the R6 filter housing. Two used fulflo filters may be present
outside of the cartridge filter housing. 1-liter of samples (any number of containers less than or
equal to l-liter combined volume) may be taken and handled in this glovebox. No stacking.
7.2.6 GB-23: Limited to two maximum-size 1-liter containers, each limited to a maximum of
1000 grams net weight, and three maximum dimension 6”x 9.5” x 2” pans of precipitate from
glovebox 18. Precipitate is restricted to the approximate height of each pan, however, it is
acceptable for small amounts to heap slightly above the pan height during loading or as a result of
pan handling. In addition, three used R6, fulflo, and/or bag filters from the CWTS may be present
in this box. No stacking of pans allowed.
7.2.7 Tank D-2403: Limited to a maximum of 200 g Pu + U235. Tank must be assayed every 2
months.
7.3 Administrative Controls (Procedural):
7.3.1 Sampling and valve-positions for waste transfers to Building 374, as required in section
6.8.3, are controlled by procedure 4-R76-WO-5017.
DOE-STD-3007-93
5-20
7.3.2 Precipitation in GB-18 is controlled by procedure 4-U84-CO-6090.
7.3.3 Manual valves MV-24401 and MV-24527 are closed when clarifier columns T2411 A/B
are filled, per section 7.1 of procedure 4-U84-C0-6090.
7.3.4 Operations order or procedure requires fissionable liquids to be characterized as less than
150 g/l Pu before acceptance by Bldg 371 Operations for processing.
7.3.5 Bag-in procedures require bag-in bags to be secured such that fissionable liquids cannot
accumulate within them when unattended.
7.3.6 Procedure 4-U84-CO-6090 is to provide instructions that precipitate from only one
processing “run” is to be placed into any single pan.
7.3.7 Procedure 4-U84-CO-6090 is to provide instructions that each column is to be adjusted to
a volume of 20 liters or less before Magnesium Oxide is added for precipitation.
7.3.8 Procedure 4-U84-CO-6090 does not allow bottles of caustic liquid from other facilities
without approval from Building 371 Operations and can only be introduced into the system if the
receiving tank is empty.
7.3.9 Procedure 4-U84-C0-6090 requires inlet to tanks D-2401 AIB/C/D to be valved closed if
greater than four liters of caustic liquid is in any glovebox or room which drains to CDS “A”. A
tank may only receive these liquids if it is empty and isolated from the other tanks.
Section 47
7.4 Other Administrative Controls
7.4.1 Valve MV-24425 is closed and locked out per HSP-2.08.
8.0 SUMMARY AND CONCLUSIONS
The Caustic Waste Treatment System (CWTS) is comprised of tanks and equipment of
geometrically favorable dimension which have been demonstrated subcritical for fissionable
solutions well in excess of historical and future generated process liquids in Building 371. In
addition, the processing of liquids from other facilities characterized as less than 150 g/l Pu +
U235 are bounded by the controls and safety basis in this evaluation. Waste transfers to Building
374 are conducted using multiple samplings by several independent organizations and interim tank
transfers. The activities associated with direct draining of tanks, CWTS operations, and waste
transfer to Building 374 are accordingly double contingent.
DOE-STD-3007-93
5-21
9.0 REFERENCES
9.1 WDW-01.3
9.2 LA-10860
9.3 TID-7016
9.4 Procedure 4-U84-C0-6090, “Building 371 Caustic Waste Treatment System”
9.5 Procedure 4-R76-WO-5017, “Caustic Waste Transfer from Building 371”
9.6 LA-12808
9.7 GSR-043
9.8 HD-20
DOE-STD-3007-93
5-22
Intentionally Blank
DOE-STD-3007-93
6-1
EXAMPLE 6
Provided By
Savannah River Site
Nuclear Criticality Safety Evaluation:
Experimental Breeder Reactor (EBR)-II & Taiwan
Research Reactor (TRR) Fuel Dissolving in F-Canyon
DOE-STD-3007-93
6-2
Intentionally Blank
DOE-STD-3007-93
6-3
TABLE OF CONTENTS
1.0 INTRODUCTION........................................................................................................6-5
2.0 DESCRIPTION............................................................................................................6-5
2.1 DISSOLVER...............................................................................................................6-5
2.2 PORT INSERTS .........................................................................................................6-6
2.3 MATERIALS TO BE DISSOLVED............................................................................6-6
2.4 DISSOLUTION PROCESS.........................................................................................6-9
3.0 REQUIREMENTS DOCUMENTATION ..................................................................6-10
4.0 METHODOLOGY.....................................................................................................6-10
5.0 DISCUSSION OF CONTINGENCIES ......................................................................6-10
6.0 EVALUATION AND RESULTS...............................................................................6-13
6.1 PLUTONIUM EQUIVALENCY FACTOR ...............................................................6-13
6.2 ANALYSIS FOR NO URANIUM IN SOLUTION....................................................6-14
6.3 ANALYSIS WITH URANIUM IN SOLUTION........................................................6-16
6.4 CONSERVATIVE ASSUMPTIONS.........................................................................6-18
6.5 TRANSPORTATION ...............................................................................................6-18
7.0 DESIGN FEATURES (PASSIVE & ACTIVE) AND ADMINISTRATIVELY
CONTROLLED LIMITS & REQUIREMENTS.........................................................6-19
8.0 SUMMARY AND CONCLUSIONS..........................................................................6-20
9.0 REFERENCES ..........................................................................................................6-21
Section 48
DOE-STD-3007-93
6-4
Intentionally Blank
DOE-STD-3007-93
6-5
1.0 Introduction
. .
F-canyon personnel are planning to dissolve Experimental Breeder Reactor II (EBR-II) bundle
DU006 in the annular dissolver in F-canyon. This bundle contains a failed bundle of 41 rods, each
containing fuel slugs exposed in the blanket of EBR-II. The Nuclear Materials Stabilization
Program Division has decided to dissolve this bundle, along with 81 failed Taiwan Research
Reactor (TRR) fuel rods that are also targeted for processing, to eliminate the possibility of future
leakage problems and eliminate the vulnerabilities presented by these materials as identified by the
DNFSB in the 94-1 decision.
Though the EBR-II bundle contains depleted uranium, and the TRR fuel rods contain natural
uranium, there is still a criticality concern because of the bred plutonium that they contain.
Previous studies (Ref. 1 and 2) have proven that natural uranium TRR rods containing plutonium
can be dissolved in a critically safe manner. The difference between this current study, and those
previous studies, is the presence of the EBR-II bundle. Due to its size, the EBR-II bundle must
be inserted into the dissolver without using an insert to hold it. Therefore, it must be assumed
that the EBR-II bundle is able to fall over in the dissolver. This causes additional criticality
concerns that are not present when only TRR rods are in the dissolver, since they have a small
enough diameter to fit into the inserts. But the BR-II fuel in bundle DU006 has a similar
equivalent U-235 enrichment to the fuel in the TRR bundles (0.77 % vs. 0.79 %), so that
including the EBR-II bundle in the dissolution is a relatively small perturbation on what has been
dissolved in the past.
This document records the results of the nuclear criticality safety evaluation (NCSE), including
consideration of contingencies, for the dissolution of BR-II bundle DU006 along with 81 TRR
bundles in the F-canyon annular dissolver in four dissolver batches. It was found that the fissile
enrichment, including U-235 and Pu-239, is low enough to assure the criticality safety for this
EBR/TRR dissolution.
2.0 Description
2.1 Dissolver
The EBR-II bundle DU006 and TRR bundles are to be dissolved in one of the two annular
dissolvers in building 221-F (F-canyon). This NCSE applies to either dissolver tank 6.1 or 6.4
since they both have the same size and geometry. Any difference between these two tanks is not
relevant to their criticality safety. Each of these dissolver tanks, shown in Figure 1, is constructed
of stainless steel and concrete consisting of an outer annulus section (approximately 10 feet
diameter by 13 feet high), an inner annulus section (8 by 20 feet), and a hollow center section (6
by 20 feet). The lower portion of the vessel contains an 8-inch concrete neutron shield (5.5 by 8
feet). The outer annulus contains heating and cooling coils in addition to instrumentation tubing
that is used to detect liquid level, specific gravity, and differential pressure. The inner annulus
DOE-STD-3007-93
6-6
contains a fuel crib where the fuel sits during dissolution. The bottom of the dissolver contains an
air sparge ring which provides agitation.
2.2 Port Inserts
Section 49
There are four access ports, 90° apart, around the top of the dissolver (Figure 2) which are used
to place material into the inner annulus of the dissolver. Mark-42 inserts (each containing two
TRR inserts as shown in Figure 3) and a 3-well insert (Figure 4) will be placed into the dissolver
ports to hold TRR bundles, with each TRR bundle holding one TRR rod. Each Mark-42/TRR
insert has locations to hold six TRR bundles. The 3-well insert contains three cylindrical tubes
(wells) which can each hold a TRR bundle. The inside diameter-of each well in the 3-well insert is
5.487”. It is planned to place the EBR-II bundle into the dissolver without using an insert in the
port, since the EBR-II bundle is too large to fit into either of these inserts. The EBR-II bundle
will simply be lowered by the crane through one of the ports to sit on the bottom of the dissolver.
2.3 Materials to be Dissolved
Each assembly used in the blanket of EBR-II contained 19 rods, each containing 5 depleted
uranium (0.22% U-235) slugs, 0.433 inch OD x 11 inches long, sodium bonded to 304 stainless
steel cladding. As a result of irradiation in EBR-II, these slugs bred varying amounts of
plutonium, depending on their location and residence time in the blanket of EBR-II. At
Rocketdyne in the mid 1980s, these EBR-II blanket assemblies were processed by removing the
steel cladding and sodium from the blanket slugs, and loading them into thin-walled aluminum
tubes (up to 14 slugs per tube). These aluminum tubes containing the slugs were bundled
together, with each bundle containing 41 tubes. Each bundle was then placed into a welded
aluminum can. Each can was 14 ft. long, with a diameter small enough to fit into the wells of the
3-well insert (< 5.375 in.). Each bundle in a can could hold the slugs from up to 6 blanket
assemblies (6 x 19 x 5 = 570 slugs). EBR-II can DU006 was produced by this process, and was
originally received at SRS in 10-86. In June 1992, can DU006 was found to have failed due to a
lid weld defect. The can was then encapsulated in a vented overpack bundle, and isolated on 11-
17-92 in row 15 of Bundle and Test Tube Storage at the Receipt Basin for Offsite Fuels (RBOF).
The OD of the overpack bundle is 6.469 inches. This dimension is too large to fit into a dissolver
insert well, so that DU006 will have to be placed into the dissolver without using an insert in the
port. The heavy metal weights in DU006 are given in Table 1 as 285 kg of uranium, 0.628 kg U-
235, and 0.789 kg of plutonium. The plutonium composition should be greater than 98% Pu-239.
It is planned to dissolve this bundle during the dissolving of failed Taiwan Research Reactor
(TRR) fuel that is also targeted for processing.
TRR fuel is natural uranium metal rods (1.36” OD and 120” long) in aluminum cladding (1.52”
OD), and has historically had nominal weights of 1.45 kg Al, 0.065 kg Pu, and 53.6 kg U per rod
(Ref. 3). The TRR fuel to be processed consists of 81 failed fuel rods currently stored in RBOF.
The condition of these rods ranges from those which are still intact but have an indication of
breached cladding, to those that are fully oxidized, to bits and pieces mixed with oxide. These 81
DOE-STD-3007-93
6-7
Section 50
failed rods are stored in aluminum bundles (each “bundle” is a cylindrical can which is 131” long)
with one rod per bundle. Of the 81 bundles, 54 bundles have an inside diameter (ID) of 2.75
inches, and 27 bundles have an ID of 4.00 inches. Though it is possible for a 4.00 inch ID bundle
to contain up to four TRR rods (Ref. 14), there is only one TRR rod in each of the 81 TRR
bundles that will be in this dissolution. The normal 5.00 inch bundle, which can contain up to
seven TRR rods, will not be used in this dissolution. Both the 2.75 inch ID bundles, and the 4.00
inch ID bundles can fit into either the Mark-42/TRR insert or the 3-well insert. The total heavy
metal weights of U, U-235, and Pu in the 54 bundles and the 27 bundles are given in Table 1,
based on data in Ref. 15.
It is planned to dissolve the EBRn bundle DU006 and the 81 TRR bundles in four batches, as
given in Table 2. In all four batches, six TRR bundles will be placed into each of three Mark-
42/TRR inserts (Figure 3), which are to be located in three of the four loading ports. In batches
one, two, and four, three TRR bundles will also be placed into a three well insert (Figure 4),
which is to be located in the remaining port. The EBR-II bundle DU006 will be placed by itself
into the dissolver port in batch 3 without the use of a loading port insert.
The data in Tables 1 and 2 can be used to calculate the expected average loadings for each insert
and for each batch. These are given in Tables 3 and 4. In Table 3, for example, the average
amount of uranium that would be expected in a Mark-42/TRR insert was calculated from data in
Table 1 to be (2758 + 1180) x 6 / (54 + 27) = 291.7 kg, and the average amount of U-235 is
(17.02 + 7.299) x 6 / (54 + 27) = 1.802 kg. In Tables 1, 3, and 4, a conservative value of 2.0 is
used for the Plutonium Equivalency Factor (see Section 6.1) to calculate the equivalent U-235
loading or enrichment. For example, the average value for the equivalent U-235 loading in the
Mark-42URR insert, as listed in Table 3, is (1.802 + 2.0 x 0.246) = 2.29 kg, using the average U-
235 loading (1.802 kg) and the average plutonium loading (0.246 kg) also listed in Table 3. The
equivalent U-235 enrichment is then 2.29 / (291.7 + 0.246) = 0.79 %. In Table 4, the expected
uranium loading in the third batch can be calculated from data in Table 3 to be (3 x 291.7) + 285
= 1160.1 kg.
As listed in Table 3, the maximum fissile content of the TRR rods must also be considered in this
NCSE. Previous data (Ref. 1 and 14) have indicated that the highest plutonium content in a TRR
rod was 79 grams at 0.1475 wt. % Pu. For this rod, the heavy metal weight must have been
79 /.001475 = 53560 grams, which would have had a U-235 weight of (53560 - 79) x 0.0072 =
385 g. If it is assumed that all of the 79 grams plutonium is Pu-239, then the equivalent U-235
enrichment for this rod would be (385 + 2.0 x 79) / 53560 = 1.01 %. If six of these maximum
plutonium TRR rods were loaded into a Mark-42 / TRR insert, then the total uranium loading
would be 6 x (53560 - 79) = 320.9 kg, and the Pu-239 loading would be 6 x 0.079 kg = 0.474 kg.
These values are listed in Table 3 for the “Max. Pu” case for the Mark-42/TRR insert.
DOE-STD-3007-93
6-8
Table 1. Materials to be Dissolved (Based on Ref. 15)
Weights in Kg
Fuel Items Length Diameter Total U U-235Total Pu Equivalent
U-235
Enrichment
Section 51
EBR-II 1 bundle 14’ 2.25” 6.469” OD 285 0.628 0.789 0.77 %
TRR 54 bundles 131” 2.75” ID 2758 17.02 2.341 0.79 %
TRR 27 bundles 131” 4.00” ID 1180 7.299 0.985 0.78 %
Total: 82 bundles 4223 24.95 4.115 0.78 %
Table 2. Number of Bundles Loaded During Each Batch
First Port Second Port Third Port Fourth Port Entire
Dissolver
Batch TRR EBR-II TRR EBR-II TRR EBR-II TRR EBR-II TRR EBR-II
1 6 0 6 0 6 0 3 0 21 0
2 6 0 6 0 6 0 3 0 21 0
3 6 0 6 0 6 0 0 1 18 1
4 6 0 6 0 6 0 3 0 21 0
Total 81 1
Table 3. Heavy Metal Loadings Per Port
Batches Fuel Loadings Per Port (kg) Equivalent Equivalent
Type of That Insert Fuel in Type U-235 U-235
Insert Are Present Insert Assumed Total U Pu-239 Loading Enrichment
Mark-42 1, 2, 3, 4 TRR Average
Max. Pu
291.7
320.9
1.802
2.310
0.246
0.474
2.29
3.26
0.79 %
1.01 %
3-Well 1, 2, 4 TRR Average
Max. Pu
145.9
160.5
0.901
1.155
0.123
0.237
1.15
1.63
0.79 %
1.01 %
No Insert 3 EBR-II Total 285 0.628 0.789 2.21 0.77 %
Table 4. Average Loadings Per Batch
Average Loadings Per Batch (kg) Equivalent
U-235
Equivalent
U-235
Batch Total U U-235 Pu-239 Loading (kg) Enrichment
1 1021.0 6.305 0.862 8.03 0.79 %
2 1021.0 6.305 0.862 8.03 0.79 %
3 1160.0 6.033 1.528 9.09 0.78 %
4 1021.0 6.305 0.862 8.03 0.79 %
Total 4223.0 24.95 4.115 33.18 0.78 %
DOE-STD-3007-93
6-9
2.4 Dissolution Process
In the first batch, the aluminum bundle and cladding will be dissolved using 50% sodium
hydroxide (NaOH), and the aluminum waste products will be transferred to waste. The U-Pu
metal will then be dissolved with nitric acid (HNO3), according to the following chemical
reactions:
U + 4(HNO3) ? UO2(NO3)2 + 2(NO) + 2(H2O)
U + 8(HNO3) ? UO2(NO3)2 + 6(NO2) + 4(H2O)
Pu + 4(HNO3) ? Pu(NO3)4 + 2H2
so that the uranium and plutonium, when they are dissolved, will be in solution as either
UO2(NO3)2 or Pu(NO3)4. The nitric acid solution present in the dissolver at the end of the first
batch will remain in the dissolver, and additional nitric acid and mercury as a catalyst will be
added to dissolve the materials in the second batch. After dissolution of the second batch is
completed, the product solution will be processed as for TRR dissolution solutions in the past.
For the third batch, the three well insert will be removed from the dissolver port, and the EBR-II
bundle DU006 and the 18 TRR bundles will be loaded into the dissolver. NaOH will again be
used to dissolve the aluminum bundles and cladding, and the aluminum waste products will be
transferred to waste. It should be noted that the individual fuel slugs in the EBR-II bundle will
fall to the bottom of the dissolver as the aluminum in the bundle and cladding is dissolved. The
0.5 inch spacing of the slats at the outer bottom of the charging crib will restrict pieces of the
EBR-II fuel from escaping the inner annulus of the dissolver until most of the fuel has been
dissolved. After the aluminum solution has been removed from this third batch, nitric acid will
again be used to dissolve the U-Pu metal. At the start of batch 4, the three well insert is replaced
into the dissolver port, and the 21 TRR bundles are loaded into the four ports. Nitric acid and
mercury as a catalyst will be added to the solution remaining from the third batch to dissolve all
the materials of the fourth batch. When these materials are all dissolved, the product solution will
be processed as for TRR dissolution solutions in the past.
Section 52
During each batch discussed above, nitric acid in excess of that required to dissolve the uranium
and estimated aluminum will be added to the dissolver to minimize the possibility of acid deficient
dissolver solution causing plutonium polymerization. After the nitric acid is added to the
dissolver, the solution is heated to its specified temperature range and maintained there until
dissolution is complete. During the dissolution, the specific gravity is monitored, and at the end
point, sampling is used to calculate the concentration of the uranium and plutonium that is
present. A material balance is then done to confirm the completeness of dissolution before
subsequent charges are made. In the event that a significant discrepancy (> 10%) exists between
the known mass of the material charged and the measured mass in the solution, the dissolver will
be probed using the probing device, and an additional dissolution cycle (without additional fissile
charges) will be made.
DOE-STD-3007-93
6-10
3.0 Requirements Documentation
This evaluation was completed according to procedure manual WSRC-SCD-3 “WSRC Criticality
Safety Manual” (Ref. 4). Inherent in the requirements of SCD-3 are applicable ANS standards
and DOE Order 5480.24 (Ref. 5).
4.0 Methodology
Computer code calculations were not needed for this NCSE due to the low fissile enrichment of
the EBR-II and TRR fuel rods being dissolved. Since these rods contain both U-235 and
plutonium, an equivalent U-235 content and enrichment was calculated for various configurations
of these rods, which were then compared to “safe” subcritical limits (13.1 kg U-235 for < 1.0 %
enriched, and 10.0 kg for 1.01 % enriched) published in national standards and other published
criticality data. These limits of 13.1 and 10.0 kg U-235 were obtained from an optimally
moderated and reflected lattice in a spherical configurations. In general, a critically “safe”
configuration means that the calculated K = 0.95. However, for this NCSE, a critically “safe” K =
0.98 was accepted for data coming from Ref. 6 and 7 because of their wide acceptance and long
use as sources of valid nuclear criticality data. A critically safe limit of 19 MT of uranium was
also used based on KENO calculations (Ref. 1) for the actual annular dissolver geometry and
steel material in the dissolver walls.
Since the dissolution of the EBR-II bundle is the main difference from previous campaigns where
TRR rods have been dissolved, the previous double contingency analysis (DCA) for TRR rods
(Ref. 2) was used for initiating events that are common between this EBR/TRR dissolution and
previous TRR dissolution. Possible initiating events that were altered by the presence of the
EBR-II bundle in this EBR/TRR dissolution, compared to the previous TRR dissolution, include
the EBR-II bundle falling over in the dissolver, a missing insert, and double batching. The
criticality safety of these events was considered, and it was found that these events can not cause
a criticality. The only new initiating event that could be found that might cause a criticality was
starting the EBR/TRR dissolution with a significant amount of fissile material already in the
dissolver solution from the previous dissolver campaign. A criticality safety limit, and criticality
safety controls, were specified to preclude this initiating event from occurring.
5.0 Discussion of Contingencies
Section 53
DOE Order 5480.24 Ref. 5) and WSRC Nuclear Criticality Safety Manual (Ref. 4) require
sufficient factors of safety so that at least two unlikely, independent, and concurrent changes in
process conditions shall occur before a criticality is possible. The protection factors shall provide
either two independent process parameter controls or multiple controls (defenses) of a single
controlled parameter.
DOE-STD-3007-93
6-11
The envelope of criticality safety for dissolution of the EBR-II bundle and the TRR bundles is
summarized in Table 5, based on consideration of the nine criticality control parameters (fissile
mass, moderation, geometry, spacing, concentration / fissile density, neutron absorption,
enrichment, reflection, and temperature). Table 5 lists the bounding assumptions (BA) and
criticality safety limits (CSL) for the nine criticality control parameters. Since the average
equivalent enrichments of the EBR-II and TRR materials are both so low (0.77 % and 0.79 %;
respectively), the restrictions that had to be assumed in the criticality safety evaluation (Section 6)
are minimal: no limits were assumed on the moderation, spacing, neutron absorbers, reflection, or
temperature. The fissile mass and the enrichment are controlled only in the sense that the items
allowed to be loaded into the dissolver are restricted to the specified EBR-II bundle and TRR
bundles. The concentration / fissile density is controlled two ways: (1) The beginning of the first
batch will contain 5 0.1 gram fissile per liter in the jet heel after the last rinse just prior to the first
batch. This limit only applies if the enrichment of the materials in the previous dissolution
campaign > 0.9635 %.
Table 5
Summary of Criticality Safety Envelope for dissolution
Of EBR-II bundle and TRR Bundles
Criticality Control
Parameter
Bounding Assumption (BA) Criticality Safety Limit
(CSL)
Fissile Mass Unrestricted, except that only the
TRR bundles and EBR-II bundle
may be loaded into the dissolver.
Moderation Unrestricted
Geometry Fuel rods are unrestricted.
Annular dissolver geometry is
assumed.
Spacing Unrestricted
Concentration, Fissile Density Fuel rods are unrestricted. Nitric acid concentration is high
enough in the dissolver to prevent
Pu polymerization. Must be
< 0.1 g fissile/liter in jet heel after
last rinse prior to first batch.
Absorbers Unrestricted
Enrichment Uranium is depleted (EBR-II
bundle) or is natural (TRR
bundles), since only the TRR
bundles and EBR-II bundle may
be loaded into the dissolver.
Reflection Unrestricted
Temperature Unrestricted
DOE-STD-3007-93
6-12
And, (2) the nitric acid concentration in the dissolver will be maintained high enough to prevent
plutonium in solution from polymerizing. The geometry is assumed to be that of the annular
dissolver. Since the EBR-II bundle will not be placed into an insert, there is no geometry control
to prevent it from falling over in the dissolver. This is an allowed condition, and is shown to be
critically safe in Sections 6.2 and 6.3. Process changes (initiating events) which can challenge the
criticality safety of the EBR/TRR dissolution can only come from exceeding or violating the
assumptions / limits in Table 5. Based on these assumptions and limits, only three process
changes can challenge criticality safety. These possible initiating events are:
IE #1. Other than the intended EBR-II and TRR material could, by mistake, be loaded into the
dissolver.
Section 54
IE #2. The dissolver solution may not be maintained sufficiently acidic. This could cause a local
concentration of plutonium to build up due to polymerization of the plutonium in the
dissolver solution.
Initiating events IE #1 and IE #2 are common to the previous campaign which dissolved
only TRR rods, i.e. the presence of one EBR-II bundle does not make these initiating
events more severe than they were in the TRR campaign. This means that the double
contingency analysis (DCA) for these initiating events for the EBR/TRR dissolution is
already covered by the DCA for dissolution of only TRR rods, which is given in Ref. 2.
By adopting the administrative controls from the TRR dissolution for the EBR/TRR
dissolution, the results of a DCA for the above two initiating events will automatically be
incorporated into the administrative controls for the EBR/TRR dissolution. Therefore,
there is no need to repeat that documentation here.
IE #3. The dissolver solution at the start of the first EBR/TRR batch could already contain
significant (defined below) fissile material, at a significant fissile enrichment (> 0.9635 %),
from the previous dissolver campaign. This initiating event only applies if the enrichment
of the materials in the previous dissolution campaign > 0.9635 %, i.e. was plutonium
without uranium.
As shown in Section 6.3, initial dissolver solutions containing fissile enrichments
< 0.9635 % can only decrease the dissolver K-eff, so that there are no additional criticality
safety requirements for these low enriched (E < 0.9635 %) solutions. But it is also
possible for the fissile enrichment of the initial dissolver solution to be > 0.9635 %. For
example, this may be due to the previous dissolution of the sand, slag, and crucible
(SS&C) material that contains plutonium but no uranium. If the fissile enrichment is
above 0.9635 % in the dissolver solution just prior to the first batch, then sampling must
be done to prove that the amount of fissile material in solution is insignificant. Since an
average equivalent U-235 loading for the first batch will be approximately 8.03 kg (Table
4), a value of 0.01 kg = 10 grams fissile in solution will have a very insignificant effect on
the dissolver K-eff. 10 grams of fissile material in solution thus qualifies as an
“insignificant amount”. Therefore, if E > 0.9635 %, then during the last rinse after the
previous dissolution campaign, and before loading the first batch for the EBR/TRR
DOE-STD-3007-93
6-13
dissolution, the rinse solution must be sampled to assure that it contains < 0.1 grams fissile
(U-235 + Pu) per liter. When the pump removes the rinse from the dissolver, it will leave
approximately 100 liters of the solution, called the jet heel, in the bottom of the dissolver
tank. So if the fissile concentration is measured to be < 0.1 g/liter, then < 10 grams of
fissile material (0.1 g/liter x 100 liters) will be present in the dissolver just before the
EBR/TRR material is loaded for the first batch. This value of < 0.1 gram fissile/liter is the
criticality safety limit (CSL) for IE #3 to assure criticality safety.
If the fissile material in the previous dissolution campaign has an enrichment > 0.9635 %,
then the process operator must have dual independent sampling and chemical analysis
(blue label) to determine the fissile concentration of the last rinse prior to the EBR/TRR
material loading. The process operator must be assured that both values of the chemical
analysis of the fissile concentration are < 0.1 grams per liter in the last rinse of the
previous dissolution solution, and that this last rinse is transferred out of the dissolver (this
would leave a jet heel of approximately 100 liters) before the new liquids for the
EBR/TRR dissolution are brought into the dissolver.
Section 55
Second Defense: The second sampling and analysis acts as a defense against the first
sampling and analysis producing a wrong value for the fissile concentration in the solution.
As a defense against operator error, a second individual such as a supervisor must
independently verify whether dual independent sampling and analysis was needed or not
(based on the enrichment of the material in the previous dissolution), and if it was needed,
whether dual independent sampling was done during the last rinse of the previous
dissolution campaign, whether the dual independent analysis values were both < 0.1 grams
fissile per liter, and whether the last rinse was transferred out of the dissolver. Only after
the completion of these items (as needed) shall loading of the EBR/TRR material be
approved.
Common Mode Failure (CMF) Potential: For both individuals to independently be
mistaken about the need for dual independent sampling and analysis is very unlikely, since
they would both know, or have access to information regarding the material that was
dissolved in the previous campaign. There are no other obvious CMF paths.
6.0 Evaluation and Results
6.1 Plutonium Equivalency Factor
. .. .. , F. . .
Since the TRR and EBR-II fuel being dissolved contain both U-235 and plutonium, and Pu-239 is
more reactive than U-235, the determination of the nuclear criticality safety of the materials was
based on consideration of the equivalent U-235 enrichment This is defined as (U-235 + F x Pu ) /
(U + Pu ) wt. ≅ % U-235 + F x wt. % Pu-239, where F = Plutonium Equivalency Factor is the
effectiveness of an atom of Pu-239 in increasing the system K-eff compared to the effectiveness of
an atom of U-235.
DOE-STD-3007-93
6-14
In the past (Ref. 8), a value of F = 2.0 was used based on calculations (Ref. 9) of the limiting
concentration of PuO2 mixed homogeneously with natural UO2 and H2O. And a value of F = 1.6
is used in the 221-F Building Technical Standards (Ref. 17). For a heterogeneous system of
EBR-II blanket rods, a “best” value of F = 1.71 was calculated (Ref. 10). To assure that a
conservative value of the equivalent U-235 enrichment would be used for this NCSE, the most
conservative value of F = 2.0 was assumed. Using 2.0 for the Plutonium Equivalency Factor
gives average equivalent U-235 enrichments of 0.77% for the EBR-II blanket rods in bundle
DU006, and 0.79 % for the TRR rods in the 54 and 27 TRR bundles, as shown in Table 1. These
values of the enrichment can then be used with published curves and tables to assure the criticality
safety of possible configurations.
6.2 Analysis for No Uranium in Solution
For the case where there is initially no fissile material in solution, then standard criticality figures
and tables for lattices in water can be used. The curve for uranium metal lattices in water, given
in Figure 5 (taken from Figure 1 of Ref. 6), indicates that optimally configured fuel rods with a U-
235 enrichment of 1.0 wt. % will be critically safe with up to approximately 12 or 13 kg of U-
235. The uncertainty about this value is a result of the difficulty in interpolating on the
logarithmic vertical scale in Figure 5. Since this figure is based on the data in Appendix B of Ref.
7, the exact value for 1.0 wt. % uranium metal lattices can be obtained from Table 6 of Ref. 7.
This value is 13.1 Kg U-235 to produce a safe K-eff of 0.98 with any rod diameter, any rod
spacing, and optimal water moderation in a spherical configuration with full water reflection. t
Since the equivalent U-235 enrichment of EBR-II bundle DU006 is less than 1.0 %, the rods in
DU006 will be critically safe (K < 0.98) in any configuration with full flooding as long as there is
less than 13.1 kg of U-235, or its equivalent. The equivalent U-235 weight in the EBR-II bundle
DU006 can be calculated to be 0.628 + (2.0 x 0.789) = 2.21 kg (Table 3), which is much less than
13.1 kg U-235. Therefore, if the rods in DU006 are isolated from other fissile material, they will
always be critically safe. This will be true whether they are intact in the bundle, or whether the
aluminum bundle and cladding have been dissolved and the EBR-II fuel slugs have fallen to the
bottom of the inner annulus in the dissolver.
Section 56
By the same reasoning, six average TRR bundles that have been loaded into a Mark42/TRR insert
can not go critical. With an effective U-235 enrichment of 0.79 °/e, the limit is again 13.1 kg U-
235. The effective U-235 content in a Mark-42/TRR insert, according to Table 3, for average
TRR rods is 2.29 kg. This value is far below the 13.1 kg limit for criticality safety.
Variations in the fissile content of the TRR rods must also be considered. According to Table 3, a
Mark-42/TRR insert could contain an equivalent U-235 loading of up to 3.26 kg if all of the TRR
rods in it had a maximum plutonium content. The equivalent U-235 enrichment of this material
would be 1.01 %. From Figure 5, for a lattice of optimally configured and flooded uranium metal
rods at 1.01 % U-235, the critically safe mass limit for U-235 is at least 10 kg. This 10 Kg limit is
far larger than the 3.26 kg of U235 that could be present in a Mark-42/TRR insert. Therefore,
maximum plutonium TRR rods in a Mark-42/TRR insert will be critically safe. Maximum
plutonium TRR rods placed into the 3-well insert will also be critically safe for the same reason.
DOE-STD-3007-93
6-15
There are three events related to the EBR/TRR dissolution which require special consideration for
criticality safety. These events are: 1) the EBR-II bundle falling over in the dissolver, 2) a
missing insert, and 3) double batching. It is shown below that none of these events can lead to a
criticality.
_ , y
Since the EBR-II bundle will not be placed into an insert in the inner annulus of the dissolver,
there is no control to prevent it from falling over in the dissolver toward one of the Mark-42/TRR
inserts containing TRR fuel, especially during dissolution of the bundle aluminum during the
NaOH strike. Though the flat bottom of the EBR-II bundle could make it unlikely that the bundle
would fall over, the annular geometry of the dissolver and the diameter of the EBR-II bundle
would make it possible for the top of the EBR-II bundle to fall against one of the Mark 12/TRR
inserts. To bracket this possibility, let us assume that the EBR-II bundle DU006 were, in some
unspecified way, to come into a close parallel orientation to the Mark-42/TRR insert containing
six TRR rods, each containing the maximum amount of Pu-239. According to Table 3, the
equivalent U-235 content of the combined EBR-II bundle and six TRR rods would be 2.21 kg +
3.26 kg = 5.47 kg. The equivalent U-235 enrichment would be 5.47 / (320.9 + 285) = 0.90 %.
The 5.47 kg equivalent U-235 is much below the appropriate 13.1 kg limit for < 1.0 %
enrichment, so that criticality can not occur under any condition with this low fissile content and
low enrichment.
An insert may not be present in one of the dissolver ports when it is required. It should be noted
that if the insert is not present in the dissolver port, then it would be very difficult for the crane
operator to lower six TRR bundles into the port without the inserts to guide them. But if six TRR
bundles could be inserted into the port even though the Mark-42/TRR insert is not present, they
could fall over toward one of the other inserts containing TRR rods. If the EBR-II bundle also
falls (there are no controls against this) toward the same insert, then according to Table 3, the
total equivalent U-235 content (for the maximum plutonium case) could be up to 3.26 + 3.26 +
2.29 = 8.81 kg, which is less than the 10 kg limit for < 1.01 % enriched material. This condition
will therefore be critically safe.
Double batching of materials into the same port may take place. The worst hypothetical double
batching event is to place 12 TRR rods into a Mark-42/TRR insert, instead of 6 TRR rods.
Though this may not be possible due to spacing constraints, it is simply assumed to occur for this
argument. According to