DOE-STD-1212-2019, Chg Notice 1, Explosives Safety (Invoked)
Provides the basic technical requirements for an explosives safety program necessary to ensure safe operations involving explosives, explosives assemblies, pyrotechnics and propellants, and assemblies containing these materials. Establishes safety controls and standards not addressed in other existing DOE or non-DOE regulations and is intended to close the safety gap created by DOE's unique activities to govern the DOE explosives safety process and ensure explosives safety is commensurate with the risk. This standard is based on the Cardinal Principle of Explosives Safety, which is to limit exposure to a minimum number of personnel, for a minimum amount of time, to a minimum amount of explosives, consistent with safe and efficient operations.
Version history and related documents
Superseded by
A newer version replaces this document.
- DOE-STD-1212-2025Explosives Safety (Jan 02, 2025)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DOE TECHNICAL
STANDARD
EXPLOSIVES SAFETY
DOE-STD-1212-2019
NOVEMBER 2019
CHANGE NOTICE NO. 1
DECEMBER 2021
MEASUREMENT
SENSITIVE
U.S. Department of Energy AREA SAFT
Washington, D.C.20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is
unlimited.
L..___I ___JI
(This page left intentionally blank.)
DOE-STD-1212-2019
ATTACHMENT 1
Change Notice No. 1 DOE-STD-1212-2019
December 2021
Explosives Safety Standard
Table of Changes
Page/Section Change
Page 1/Section 2.3
Added “With the exception of explosives storage and
transportation, this Technical Standard does not apply
to commercial activities such as routine construction or
routine tunnel blasting”
Page 6/Paragraph 5.7.4
Deleted “Approve equivalencies that provide
equivalent safety” and replaced with “Approves
equivalencies that do not introduce additional risk.”
Page 15/Paragraph 7.6.4
Added “DDESB TP-26” to the list of resource
documents.
Deleted “AD 411445” from the list.
Page 25/Part 11.2.6.1
Added “Note 1: Above ground tanks containing 500
gallons or less of petroleum that serve equipment (such
as oil heaters or diesel generators) located in or near
explosives buildings shall be located a minimum of 50 ft
from explosives locations and comply with NFPA 30.
Note 2: Tanks located near intentional detonation areas
should be barricaded. Similar underground tanks
complying with NFPA 30 do not require separation from
explosives facilities.
Note 3: In both cases (Note 1 and Note 2), the tanks
shall be equipped with an anti-siphoning device, unless
siphoning is impossible.”
Page 33/Paragraph 16.1.1 Added “Sandia National Laboratories” to the list of
proponent organizations.
Page 34/Table 16.1 Deleted the footnote “Minimum of 20 drops per test
series”
Page 43/Paragraph 17.1.7
Deleted “Suitable guards shall be provided for all glass
or fragile equipment that shall withstand reduced or
elevated pressure" and replaced with “Suitable guards
shall be provided for all glass or fragile equipment
intended to withstand reduced or elevated pressure."
Page 48/Section 18.3
Deleted “Equipment Inspection Design and Operation”
and replaced with “Inspection Equipment Design and
Operation.”
Page 49/Section 19.2.2
Deleted “The quantities of materials that may be
handled in each phase shall be limited as specified
below in Table 19.1” and replaced with “The quantities
of materials that may be handled in each phase shall be
limited.”
Page 50/Paragraph 19.2.4 Added “Guidelines for establishing this procedure are
contained in Table 19.1.”
Page 63/Paragraph 22.3.3 Deleted “Alarms shall be provided on the melt
temperature and on melt kettle agitation when the
DOE-STD-1212-2019
ATTACHMENT 1
Change Notice No. 1 DOE-STD-1212-2019
operation shall be left unattended” and replaced with
“Alarms shall be provided on the melt temperature and
on melt kettle agitation when the operation is left
unattended.”
Page 65/Part 23.1.10.1
Deleted “Before an elastomeric container or mandrel
constructed of a new material is introduced into a
pressing operation (where it shall contact explosives),
the material shall be evaluated for compatibility with
the explosives” and replaced with “Before an
elastomeric container or mandrel constructed of a new
material is introduced into a pressing operation (where
it contacts explosives), the material shall be evaluated
for compatibility with the explosives.”
Page 86/Paragraph 30.10.4
Section 2
Deleted “The firing circuit should be interlocked with
the containment apparatus access door latch so that
the door shall be closed and latched before the
explosive can be fired” and replaced with “The firing
circuit should be interlocked with the containment
apparatus access door latch.”
Page 108/Section 33.1 Note 1
Deleted “Onsite movements of explosives shall be in
accordance with this Technical Standard, local onsite
packaging, and the site’s motor vehicle safety program”
and replace with “Onsite movements of explosives shall
be in accordance with this Technical Standard, local
onsite packaging and transportation procedures, and
the site’s motor vehicle safety program.”
Page 110/Part 33.3.2.1
Deleted “Backfire deflectors shall be the oil‑bath or
screen type (certain types of air cleaners shall serve the
purpose) and shall be attached securely on the throat
of the carburetor” and replaced with “Backfire
deflectors shall be the oil‑bath or screen type (certain
types of air cleaners serve the purpose) and shall be
attached securely on the throat of the carburetor.”
Page 111/Paragraph 33.4.4
Deleted “No smoking is allowed in or within 25 ft of any
vehicle containing Explosives” and replaced with
“Smoking shall not be allowed in or within 25 ft of any
vehicle containing explosives.”
Page 118/Paragraph 36.3.1
Deleted “Mutual hazards may exist where explosives
facilities are located near electrical supply lines and
stepping equipment. To protect against these hazards,
NFPA 70 and the following requirements apply to all
new construction or major modifications, and should
be considered for existing facilities” and replaced with
“Mutual hazards may exist where explosives facilities
are located near electrical supply lines and stepping
equipment. To protect against these hazards, NFPA 70
and the following requirements shall apply to all new
construction or major modifications, and should be
considered for existing facilities.”
DOE-STD-1212-2019
ATTACHMENT 1
Change Notice No. 1 DOE-STD-1212-2019
Page 131/Paragraph 40.2.1
Deleted “The following fire protection criteria shall be
required for all new facilities or redesign of existing
facilities where changes in activities shall result in a
higher hazardous classification” and replaced with “The
following fire protection criteria shall be required for all
new facilities or redesign of existing facilities where
changes in activities result in a higher hazardous
classification.”
Page 137/Paragraph 42.4.3
Deleted “Contractor Facility Management shall
determine in advance of any lightning threat those
activities that shall be paused and at what threat level
the pause for each identified activity shall begin” and
replaced with “Contractor Facility Management shall
determine in advance of any lightning threat those
activities to be paused and at what threat level the
pause for each identified activity is to begin.”
Page 140/Part 43.1.1.2 Note 3
Deleted “Where nitrated organic explosives (which may
form sensitive explosive compounds with some alkalis)
are involved, the use of cleaning agents containing
those alkalis is prohibited” and replaced with “Where
nitrated organic explosives (which may form sensitive
explosive compounds with some alkalis) are involved,
the use of cleaning agents containing those alkalis shall
be prohibited.”
Page 142/Paragraph 44.1.6
Deleted “Disposal of waste generated shall be
coordinated with site environmental/waste
management personnel” and replaced with “Disposal
of waste generated during decontamination shall be
coordinated with site environmental/waste
management personnel.”
Section 3
Page 143/Paragraph 44.3.1 Note
Deleted “Any explosives contamination of concern shall
be visible to the unaided eye and shall have dimensions
(length, width, and depth)” and replaced with “Any
explosives contamination of concern is visible to the
unaided eye and has dimensions (length, width, and
depth).”
Page 154/Paragraph 48.1.8
Deleted “Based on past experience or analysis, a layer
of excelsior or similar material may need to be placed
on the bottom of the pit or pad where the explosives
waste shall be placed” and replaced with “Based on
past experience or analysis, a layer of excelsior or
similar material may need to be placed on the bottom
of the pit or pad where the explosives waste is placed.”
Page 155/Paragraph 48.3.1
Deleted “If the ignition system fails to fire, treat it the
same as an explosives misfire (see Section 31.1)” and
replaced with “If the ignition system fails to fire, it
should be treated the same as an explosives misfire
(see Section 31.1).”
Page 155/Paragraph 48.3.2 Deleted “If the squibs fire but fail to ignite the ignition
train, remotely survey the area, and wait at least 30
DOE-STD-1212-2019
ATTACHMENT 1
Change Notice No. 1 DOE-STD-1212-2019
minutes” and replaced with “If the squibs fire but fail to
ignite the ignition train, the area should be remotely
surveyed, and a 30 minute wait time should be
observed.”
Page 155/Paragraph 48.3.2 Note
Deleted “When it appears safe to emerge from the
control shelter, disconnect, shunt, and ground the firing
circuit, and inspect the squibs, firing system, or ignition
train” and replaced with “When it appears safe to
emerge from the control shelter, the firing circuit
should be disconnected, shunted, grounded, and the
squibs, firing system or ignition train should be
inspected.”
Page 158/Section 49.1 Deleted “Placards and Fire Symbols” and replaced with
“Fire Symbols.”
Page 158/Paragraph 49.1.1
Deleted “Placards and fire symbols as specified in DESR
6055.09 shall be displayed on either buildings, work
areas, or multi-building areas to warn of potential
hazards from explosives and to provide information for
emergency situations” and replaced with “Fire symbols
as specified in DESR 6055.09 shall be displayed on
either buildings, work areas, or multi-building areas to
warn of potential hazards from explosives and to
provide information for emergency situations.”
Page 158/Paragraph 49.1.2
Deleted “These placards and symbols shall be readily
visible upon approach” and replaced with “Fire symbols
shall be readily visible upon approach.”
Page 158/After Paragraph 50.3.
Added “When required for defense against hostile
forces, and in support of response and contingency
plans, limited quantities of authorized response force
ammunition may be pre-positioned at locations other
than bulk-storage magazine areas.
Compliance with quantity-distance and compatibility
criteria is not required during a heightened security
condition.
Ammunition shall be kept in their original shipping
containers unless operational necessity dictates
otherwise.
Personnel charged with the responsibility of overseeing
storage of ammunition at guard stations and
contingency deployment sites shall be trained in
explosives storage and transportation.”
Page 166/Appendix B
Deleted “DUAL RATED. Equipment and wiring which
can be used for both Class I, Division 1 and Class II,
Division 2 electrical hazard areas” and replaced with
“DUAL RATED. Equipment and wiring which can be
used for both Class I, Division 1 and Class II, Division 1
electrical hazard areas.
Section 4
Page 177/Appendix D
Deleted “AD 411445: Industrial Engineering Study to
Establish Safety Design Criteria for Use in Engineering of
Explosives Facilities and Operations, Process
DOE-STD-1212-2019
ATTACHMENT 1
Change Notice No. 1 DOE-STD-1212-2019
Engineering Branch, APMED Picatinny Arsenal, Dover,
NJ; Defense Technical Information Center, Defense
Logistics Agency, Cameron Station, Alexandria, VA
22314 (current version)”
Page 178/Appendix D
Deleted “DDESB TP-16: Department of Defense
Explosives Safety Board Technical Paper 16, Approved
Protective Construction, (current version)” and replaced
with “DDESB TP-16: Department of Defense Explosives
Safety Board Technical Paper 16, Methodologies for
Calculating Primary Fragment Characteristics, (current
version)”
Added “DDESB TP-26: Department of Defense
Explosives Safety Board Technical Paper 26, Guidance
for Explosives Safety Site Plans (current version)”
Throughout Document Corrected formatting, spelling, and grammatical errors.
DOE-STD-1212-2019
i
FOREWORD
1. This Department of Energy (DOE) Standard has been approved to be used by DOE,
including the National Nuclear Security Administration, and their contractors.
2. Comments (recommendations, additions, and deletions) and data, that may be of
use in improving this document, should be e-mailed to
thomas.garcia@nnsa.doe.gov or sent to:
NA-513
U.S. Department of Energy
National Nuclear Security Administration
P.O. Box 5400
Albuquerque, NM 87185-5400
3. This Standard is the successor to DOE-STD-1212-2012. It provides requirements
for an Explosives Safety Program.
4. This official version of the Standard may be found online at:
https://www.standards.doe.gov/standards-browse
mailto:thomas.garcia@nnsa.doe.gov
https://www.standards.doe.gov/standards-browse
DOE-STD-1212-2019
ii
(This page left intentionally blank.)
DOE-STD-1212-2019
iii
Table of Contents
1. Scope/Purpose……………………………………………………….………….. 1
2. Applicability …..……………………………………………………..…………… 1
3. Administration and Management …..…………………………………............ 2
3.1. Office of Primary Interest Designation …...…………………………………… 2
3.2. Exemption ………………………………………………..………….…………... 2
3.3. Equivalency ………………………………………..……………….…………… 3
3.4. Waiver ….….….……………………………………………………….…………. 4
4. Explosives Safety Program Requirements ……………………..................... 4
4.1. ESP Content ……………………………………………….……………………. 4
5. Roles and Responsibilities …..…………………………………….………...... 5
5.1. NNSA Associate Administrator for Safety, Infrastructure, and Operations . 5
5.2. Central Technical Authority ………………………………………................... 5
5.3. Explosives Approval Authority ………………………………………………… 5
5.4. Head of DOE Field Element ……………………………………….................. 5
5.5. Explosives Safety Subject Matter Expert (DOE/NNSA Sites) ……………… 6
5.6. DOE/NNSA Explosives Safety Committee Chair ...………………………….. 6
5.7. Contractor Facility Manager ………………………………………………….... 6
5.8. Contractor Facility Management ………………………………………………. 7
5.9. Contractor Explosives Safety Program Manager ……………………………. 7
5.10. Contractor Explosives Safety Authority Having Jurisdiction ……………….. 7
6. General Operational Safety ………………………….………………………… 8
6.1. Cardinal Principle …………………………………………………………......... 8
6.2. Protection of Explosives …………………………………………………..…… 8
6.3. Equipment Checks ……………………………………………………………… 8
6.4. Inspection Frequency …………………………………………………………... 9
6.5. Hazard Identification and Communication …………………………………… 9
6.6. Work Environment ……………………………………………………………… 9
6.7. General Explosives Area Controls ……………………………………………. 10
6.8. Concurrent Contact Operations …………………………………………......... 10
6.9. Contamination Prevention ……………………………………….…………..… 11
7. Explosives Facility Design/Site Criteria ………………………….……........... 12
7.1. Explosives Facilities ………………………………………………………......... 12
7.2. Blast Resistant Design ………………………………………………………..... 12
7.3. Criteria for Lightning Protection Systems ………………………………......... 12
7.4. Unproven Facility Design ……………………………………………..……….. 13
7.5. Design of New Facilities ……………………………………………………..… 13
7.6. Site and General Construction Plans …………………………………..…….. 14
8. Hazard Analysis ………………………………..………………………..……… 15
8.1. Hazard Analysis ……………………………………………………………….... 15
8.2. Similar Processes ………………………………………………………………. 16
8.3. High Risk ………………………………………………………………………… 16
8.4. Electrical Hazard Classification Analysis …………………………………….. 17
9. Operating Procedures ………………………………………………………...... 17
9.1. Procedures ………………………………………………………………………. 17
Section 5
DOE-STD-1212-2019
iv
9.2. Approval …….……………………………………………………………………. 18
9.3. Operating Procedures Content ………………..………………………………. 18
9.4. Special or Experimental Procedures ………………………………………….. 19
10. Training …………………………………………………………………………… 19
10.1. Explosives Safety Training ……………………………………………………... 19
10.2. Training and Qualification Programs ………………………………………….. 20
10.3. Unexploded Ordnance (UXO) Qualification ...………………………………... 20
11. Quantity-Distance ……………………………………………………….….….... 21
11.1. Explosives Safety Site Plan Submission and Approval …………………..…. 21
11.2. Quantity-Distance Criteria …………………………………..………………….. 22
12. Level-of-Protection Criteria ……………………………………..……………… 25
12.1. Required Level-of-Protection ………………………………………..…………. 25
12.2. Hazard Class 0 ………………………………………………………………….. 26
12.3. Hazard Class I …………………………………………………………………... 26
12.4. Hazard Class II ……………………………………..…………………………… 27
12.5. Hazard Class III …………………………………….………………………….... 28
12.6. Hazard Class IV ………………………………………..………………………... 29
13. Remote Operations ……………………………………..………………………. 29
13.1. Personnel Protection ……………………………………..……………............. 29
13.2. Access and Equipment Controls ………………………………………............ 30
14. Limits and Control ………………………………………………..……………... 30
14.1. Explosives Limits …………………………………………….………………….. 30
14.2. Personnel Limits ………………………………………..………………............. 31
14.3. Limit Control ………………………………………….………………………….. 31
15. Personal Protective Equipment ………………………………..….…………... 32
15.1. Clothing …………………………………………………………….…………….. 32
15.2. Footwear …………………………………………………………………………. 33
15.3. Wristbands ………………………………………………………….……………. 33
16. Insensitive High Explosives Qualification ………………………………......... 33
16.1. Revisions to Insensitive High Explosives Test Description and Criteria …... 33
16.2. Insensitive High Explosive Materials ………………………………………….. 33
16.3. IHE Qualification Testing ……………………………………………………….. 34
16.4. IHE Qualification Process ………………………………………………........... 35
16.5. IHE Subassemblies Testing ……………………………………………............ 36
16.6. IHE Subassembly Qualification Process ……………………………………... 38
16.7. IHE Weapons ……………………………………………………………………. 40
17. Laboratory Operations ………………………………………………………….. 43
17.1. Operational Requirements ……………………………………………………... 43
17.2. Blast Shields ……………………………………………………………………... 43
17.3. Heating Operations ……………………………………………………………... 45
17.4. Laboratory Setups ………………………………………………………………. 46
17.5. Low Concentration of Explosives in Solution ………………………………… 46
17.6. Explosives Sample Control …………………………………………………….. 47
17.7. De minimis or Residual Quantities …………………………………………….. 47
17.8. Laboratory Wiring and Equipment …………………………………………….. 47
18. Inspection ………………………………………………………………………... 48
DOE-STD-1212-2019
v
Section 6
18.1. Inspections ……………………………………………………………………….. 48
18.2. Inspection Methods ……………………………………………………………... 48
18.3. Inspection Equipment Design and Operation ………………………………... 48
19. Explosives Development and Formulation Scaleup …………………………. 49
19.1. Contractor Explosives Development Committee …………………………….. 49
19.2. Development Process …………………………………………………………... 49
19.3. Sensitivity Testing ……………………………………………………………….. 51
19.4. Compatibility Testing ……………………………………………………............ 51
19.5. Phase I-Preliminary Development …………………………………………….. 51
19.6. Phase II-Experimental Characterization and Development ……………….... 52
19.7. Phase III-Full-Scale Testing and Production Development ………………… 53
20. Synthesis and Formulation …………………………………………………….. 53
20.1. Synthesis …………………………………………………………………........... 53
20.2. Formulation ………………………………………………………………............ 56
21. Heating, Drying, and Thermal Conditioning ………………………………….. 58
21.1. Hazards of Heating Explosives ………………………………………………... 58
21.2. Critical Temperature and Thermal Analysis Methodology ………………….. 58
21.3. Heating and Drying Equipment ………………………………………………... 60
21.4. Heating and Drying Operations ………………………………………………... 61
22. Dry Screening, Blending, and Melting ……………………………………….... 62
22.1. Dry Screening ……………………………………………………………........... 62
22.2. Blending ………………………………………………………………………….. 63
22.3. Melting ……………………………………………………………………………. 63
23. Pressing and Extruding …………………………………………………………. 64
23.1. Pressing ………………………………………………………………………….. 64
23.2. Extruding …………………………………………………………………………. 67
24. Machining ………………………………………………………………………... 67
24.1. Equipment Requirements ………………………………………………............ 67
24.2. Contact or Remote Operations ………………………………………………... 68
24.3. Setup and Preparation Prior to Machining ……………………………........... 70
24.4. Operations Requirements ………………………………………………........... 71
24.5. Drilling …………………………………………………………………………….. 72
24.6. Coring …………………………………………………………………………….. 73
24.7. Sawing ……………………………………………………………………............ 73
25. Low Pressure Fluids …………………………………………………………….. 74
25.1. Use of Low Pressure Fluids ……………………………………………………. 74
26. Laser Ablation …………………………………………………………………… 74
26.1. Laser Ablation Operations …….……………………………………………….. 74
27. Hand Cutting and Finishing …………………………………………………….. 75
27.1. Hand-Cutting and Finishing Operations ………………………………............ 75
28. Assembly and Disassembly ……………………………………………............ 75
28.1. Tools ……………………………………………………………………………… 75
28.2. Assembly Operations ………………………………………………………….... 75
28.3. Loading Assemblies with Plastic or Extrudable Explosives ……………….... 76
28.4. Disassembly Operations ……………………………………………………….. 76
28.5. Personnel Protection for Disassembly Operations ………………………….. 76
DOE-STD-1212-2019
vi
Section 7
29. Testing ………………………………………………………………………….... 77
29.1. Test Planning ……………………………………………………………………. 77
29.2. Firing Areas ………………………………………………………………........... 77
29.3. Checkout of Dynamic Engineering Test Equipment ………………………… 78
29.4. Testing of Explosives and Hazardous Radioactive Materials ………........... 78
29.5. Heating of Explosives Test Specimens ……………………………………….. 79
29.6. Instrumentation ………………………………………………………………….. 79
29.7. Explosives Accumulation Limits ……………………………………………….. 80
30. Test Firing ………………………………………………………………………... 80
30.1. General Range Standards ……………………………………………………... 80
30.2. Grass Fires ………………………………………………………………………. 81
30.3. Test Setup ……………………………………………………………………….. 82
30.4. Pin Switches and Other Non-initiating Circuits ………………………………. 82
30.5. Low-Energy Electro-explosive Devices ……………………………………….. 83
30.6. Explosives Storage in Firing Areas ……………………………………............ 83
30.7. Firing Leads …………………………………………………………………….... 83
30.8. Unattended Test Assemblies ………………………………………................. 84
30.9. Firing Control Circuit Criteria …………………………………………………... 84
30.10. Test Firing in Containment Apparatus ………………………………………... 85
30.11. Gun Firings ………………………………………………………………………. 86
30.12. Drop Testing …………………………………………………………….............. 87
30.13. Post-firing Controls …………………………………………………………….... 87
30.14. Contamination of Firing Areas …………………………………………………. 88
31. Test Failures and Misfires ……………………………………………………… 89
31.1. Explosives Misfire ……………………………………………………………….. 89
31.2. Misfire of a Remotely Fired Gun ………………………………………………. 89
32. Explosives Storage ……………………………………………………………... 90
32.1. Storage Magazine Facilities ……………………………………………............ 90
32.2. Storage Magazine Operations …………………………………………............ 91
32.3. Storage Review Program ………………………………………………………. 94
32.4. Storage Compatibility ………………………………………………………….... 94
32.5. Onsite Containers ……………………………………………………………….. 98
32.6. Storage in Buildings Other Than Storage Magazines ………………………. 99
33. Transportation …………………………………………………………………… 108
33.1. Explosives Transportation …………………………………………………….... 108
33.2. Onsite Shipments ……………………………………………………………….. 109
33.3. Materials Handling Equipment ………………………………………............... 110
33.4. General Operation Requirements ……………………………………………... 111
33.5. Hazardous Conditions …………………………………………………............. 111
34. Materials Receipt ………………………………………………………………... 112
34.1. Motor Vehicles …………………………………………………………………... 112
34.2. Damaged Shipments ……………………………………………………........... 114
35. Materials Handling ………………………………………………………………. 114
35.1. Material Handling ………………………………………………………………... 114
35.2. Manual Handling of Bare Consolidated Explosives …………………………. 115
35.3. Carts or Hand Trucks ………………………………………………………….... 115
DOE-STD-1212-2019
vii
35.4. Vacuum Handling ……………………………………………………………….. 116
36. Electrical ………………………………………………………………………….. 116
36.1. Electrical Equipment and Wiring ………………………………………………. 116
36.2. Electrical Hazard Classification for Explosives Operations or Activities …... 117
36.3. Electrical Supply System ……………………………………………………….. 118
36.4. Electrical Equipment and Instrumentation ……………………………………. 120
36.5. Hand-held, Battery-Powered Lights and Instruments ……………………….. 121
36.6. Non-Rated Extension Lighting …………………………………………............ 122
37. Electrical Test Instruments ……………………………………………………... 122
37.1. Terminology Specific to this Chapter ………………………………………….. 122
37.2. Classification …………………………………………………………………….. 123
37.3. Approval and Certification ……………………………………………………… 123
37.4. Electrical Instruments for Use with Initiating Electrical Circuits …………….. 124
37.5. Electrical Instruments for Use with Non-Initiating Electrical Circuits ………. 125
38. Electro-Explosive Devices ……………………………………………………... 125
38.1. Protection from Electromagnetic Radiation …………………………………... 125
39. Static Electricity ………………………………………………………………….. 127
39.1. Bonding and Grounding of Equipment ………………………………………... 127
39.2. Testing Bonded Equipment Grounds …………………………………………. 127
39.3. Conductive Floors, Shoes, Mats, and Wristbands …………………………... 128
39.4. Conductive Floor, Shoes, Work Surface, Wristband, and Rubber Hose
Section 8
Specifications ……………………………………………………………............ 128
39.5. Conductive Floor, Shoes, Work Surface, and Wristband Tests ……............ 129
39.6. Humidification ……………………………………………………………............ 130
40. Fire Protection ………………………………………………………………….... 131
40.1. Vegetation Control ………………………………………………………............ 131
40.2. Fire Protection Criteria ………………………………………………………….. 131
41. Facility Egress ………………………………………………………………….... 132
41.1. Personnel Protective Restrictions and Requirements ………………………. 132
41.2. Requirements for Existing Facilities …………………………………………... 132
41.3. Requirements for New Facilities ………………………………………………. 133
41.4. Single Exits ………………………………………………………………………. 133
41.5. Blast Resistant Doors …………………………………………………………... 134
41.6. Slide Escapes ……………………………………………………………........... 135
42. Lightning Protection …………………………………………………………….. 136
42.1. Lightning Protection Systems ………………………………………………….. 136
42.2. Conditions Where Lightning Protection Is Not Required ……………............ 136
42.3. Lightning Warning and Protection Plan ……………………………………….. 137
42.4. Lightning Threat Actions ………………………………………………………... 137
42.5. Pause of Operations ……………………………………………………………. 139
43. Building and Equipment Maintenance ……………...……………………....... 140
43.1. Cleaning ………………………………………………………………………….. 140
43.2. Maintenance and Repair ……………………………………………………….. 141
43.3. Hot Work Permits ……………………………………………………………….. 142
44. Decontamination and Cleaning ………………………………………………... 142
44.1. Cleaning Operations ……………………………………………………………. 142
DOE-STD-1212-2019
viii
44.2. Cleaning Screw Threads ……………………………………………………….. 143
44.3. Final Decontamination and Disposal of Equipment …………………………. 143
44.4. Inspection ………………………………………………………………………... 144
44.5. Identification and Control of Decontaminated Items ………………………… 144
45. Collection Systems …………………………………………………………….... 145
45.1. Vacuum Equipment ……………………………………………………………... 145
45.2. Explosives Dust Exhaust Ventilation and Collection Systems ……………... 146
46. Drains and Sumps ……………………………………………….………........... 147
46.1. Collection …………………………………………………………………........... 147
46.2. Effluent ……………………………………………………………………........... 149
47. Waste Collection ……………………………………….………………………... 149
47.1. Removal of Explosives Waste …………………………………………………. 149
47.2. Solid Wastes …………………………………………………………………….. 149
47.3. Vacuum Collection of Explosives Dusts ………………………………........... 150
47.4. Explosives Slurries ……………………………………………………………… 152
47.5. Metal Scrap ………………………………………………………………………. 152
47.6. Salvaged Explosives ……………………………………………………………. 153
48. Waste Disposal ………………………………………..……………………….... 153
48.1. Preparation for Open Burning ………………………………………………….. 153
48.2. Destruction by Burning or Flashing ……………………………………........... 154
48.3. Ignition System Malfunctions …………………………………………………... 155
48.4. Post-burn Operations ………………………………………………………….... 155
48.5. Disposal Area ……………………………………………………………………. 156
48.6. Destruction by Detonation …………………………………………………….... 157
48.7. Use of Solvents ………………………………………………………………….. 157
49. Emergency Control ………………………………………..……………………. 158
49.1. Fire Symbols …………………………………………………………………….. 158
49.2. Emergency Plans ……………………………………………………………….. 158
50. Security Response Force Ammunition ………………………………............. 158
50.1. Security Vehicles and Personnel Carrying HD 1.1/1.2 Ammunition ……….. 158
50.2. Security Ammunition Surveillance …………………………………………….. 158
50.3. Pre-positioned Storage …………………………………………………………. 158
50.4. Security Working Dog Explosives Training Aids …………………………….. 159
Appendix A: Acronyms …………………………………………………………………… 161
Appendix B: Definitions……………………………………………………………………. 164
Appendix C: Measurement Abbreviations ………………………..…………………….. 175
Appendix D: References ………………………………………….………….................. 177
Section 9
DOE-STD-1212-2019
ix
(This page left intentionally blank.)
DOE-STD-1212-2019
1
1. SCOPE/PURPOSE
1.1. This Technical Standard provides the basic technical requirements for
an explosives safety program necessary to ensure safe operations
involving explosives, explosives assemblies, pyrotechnics and
propellants, and assemblies containing these materials.
1.2. This Technical Standard establishes safety controls and standards not
addressed in other existing DOE or non-DOE regulations and is
intended to close the safety gap created by DOE’s unique activities to
govern the DOE explosives safety process and ensure explosives
safety is commensurate with the risk.
1.3. This Technical Standard is based on the Cardinal Principle of
Explosives Safety, which is to limit exposure to a minimum number of
personnel, for a minimum amount of time, to a minimum amount of
explosives, consistent with safe and efficient operations.
2. APPLICABILITY
2.1. This Technical Standard applies to all DOE sites engaged in any of the
following activities involving explosives, pyrotechnics, or propellants as
well as assemblies containing these materials:
• Developing
• Manufacturing
• Handling
• Storing
• Transporting
• Processing
• Testing
2.2. Existing facilities that do not meet the requirements of this technical
standard may continue to be used for the balance of their functional
lives if the following two conditions are met and documented:
2.2.1. The current operation presents no significantly greater risk than that
assumed when the facility was originally designed.
2.2.2. It can be demonstrated clearly that a modification to bring the facility
into compliance is not feasible.
2.3
With the exception of explosives storage and transportation, this
Technical Standard does not apply to commercial activities such as
routine construction or routine tunnel blasting.
DOE-STD-1212-2019
2
3. ADMINISTRATION AND MANAGEMENT
3.1. NA-513 Office of Worker Safety and Health Services is the National
Nuclear Security Administration (NNSA) Office of Primary Interest (OPI)
for this Technical Standard. NA-513 shall act as the Preparing Activity
for this Technical Standard. The DOE/NNSA Explosives Safety
Committee (ESC) shall review, evaluate, and recommend proposed
changes to this Technical Standard. The changes shall be consonant
with state-of-the-art technical changes in the field and include lessons
learned from DOE/NNSA, other Governmental, and Industry
experience and mishaps. NA-513 shall evaluate proposed changes to
this Technical Standard on an annual basis. The OPI may decide to
submit a section into RevCom for review and approval.
3.1.1. The DOE/NNSA ESC shall evaluate proposed changes at the request
of the OPI.
3.1.2. Throughout this Standard, requirements are denoted by the words
“shall” and “should.”
Note: The use of the word “may” with reference to application of a
procedure or method denotes an acceptable means of performing the
task.
3.1.2.1. “Shall” requirements are mandatory.
Note 1: Relief from a "shall" requirement requires an exemption (see
section 3.2 of this chapter).
Note 2: A contractor may use an approved equivalency as an
alternative approach to meet a "shall" requirement, (see section 3.3 of
this chapter).
3.1.2.2. “Should” requirements are advisory.
Note: Relief from a “should” requirement requires a waiver (see section
3.4 of this chapter).
3.2. Exemption
3.2.1. Exemptions are the release from requirements in this Standard.
Section 10
3.2.2. Exemptions are approved by the Head of DOE Field Element
(DOE/NNSA Field/Operations/ Production Office) or designee, and
documented for the OPI in a memorandum.
DOE-STD-1212-2019
3
3.2.3. Central Technical Authority (CTA) or designee concurrence is required
prior to the granting of exemptions for nuclear safety directives or
successor documents identified in the current version of DOE O 410.1,
Central Technical Authority Responsibilities Regarding Nuclear Safety
Requirements. CTA or designee concurrence is required for
exemptions involving hazard category 1, 2, or 3 nuclear facilities.
3.2.4. Exemptions are processed by the Head of the DOE Field Element or
designee. Follow DOE-O-251.1D Appendix E for the Exemption
Process.
3.3. Equivalency
3.3.1. Equivalencies represent an alternative approach to meeting a “shall”
requirement of the Standard intended to achieve an equivalent level of
safety.
3.3.2. Required documentation for an equivalency:
• Description of the condition.
• Requirement(s) being affected.
• Reason why requirement cannot be achieved.
• Alternate approach.
• Contractor Explosives Safety Authority Having Jurisdiction (AHJ)
determination of equivalent safety.
• Contractor Explosives Safety AHJ explanation of additional risk (if
applicable).
3.3.3. The Contractor Explosives Safety AHJ shall evaluate, determine, and
document that the proposed alternate approach complies with the
intent of the provisions of this Standard.
3.3.4. The Contractor Explosives Safety AHJ shall provide a determination of
equivalent safety.
3.3.4.1. If the equivalency introduces additional risk, the Contractor Explosives
Safety AHJ shall include an explanation of the additional risk.
3.3.5. Equivalencies shall be coordinated with the Federal Explosives Safety
Subject Matter Expert (SME) (DOE/NNSA Sites).
3.3.6. Equivalencies that do not introduce additional risk are approved by the
Contractor Facility Manager.
3.3.6.1. Equivalencies that introduce additional risk are approved by the Head
of DOE Field Element.
DOE-STD-1212-2019
4
3.4. Waiver
3.4.1. A Waiver provides relief from a “should” requirement.
3.4.2. A Waiver is where the conditions, practices, means, methods, or
processes to be used are determined to be safe and necessary.
3.4.3. The Contractor Explosives Safety AHJ shall evaluate, determine, and
document that the proposed waiver complies with the intent of the
provisions of this Standard. This documentation shall include a
determination regarding the safety and necessity of the waiver.
3.4.4. Waivers are approved by Contractor Facility Management.
3.4.5. Required documentation for a waiver:
• Description of the condition.
• Requirement being affected.
• Reason why compliance is not achieved.
• Compensatory measures taken to provide protection.
• Any proposed corrective actions and schedule.
• Contractor Explosives Safety AHJ determination.
• Duration of the waiver.
4. EXPLOSIVES SAFETY PROGRAM (ESP) REQUIREMENTS
4.1. All DOE sites within the scope of this Technical Standard shall establish
and maintain a site-specific ESP based on the requirements in this
Technical Standard and 10 CFR 851.24. ESPs shall address all
applicable explosives operations and activities. The ESP shall include:
4.1.1. The organizational structure for site Explosives Safety operations and
activities. Address the following committees as they apply:
4.1.1.1. A Contractor Explosives Development Committee to approve each
phase of an explosives development program.
Section 11
4.1.1.2. A Contractor Explosives Storage Review Committee to establish and
approve storage review intervals for all bulk explosives stored at the
facility.
4.1.2. The process to resolve technical conflicts between Explosives Safety
requirements and other functional area technical requirements.
4.1.3. The process to apply specific Explosives Safety provisions to meet
Level-of-Protection criteria.
DOE-STD-1212-2019
5
4.1.4. The process to interact with other safety disciplines supporting
explosives operations and activities performed at the site.
4.1.5. The hazard analysis process in support of explosives operations and
activities, with a graded approach.
4.1.6. The training and qualification program to support explosives operations
and activities.
5. ROLES AND RESPONSIBILITIES
5.1.
5.1.1.
5.1.2.
5.2.
5.2.1.
5.3.
5.3.1.
5.4.
5.4.1.
5.4.2.
NNSA Associate Administrator for Safety, Infrastructure, and
Operations.
Designates Explosives Approval Authority (EAA) to approve
qualification of Insensitive High Explosive (IHE) Material and/or
Subassembly.
Exercises responsibilities delegated by the Administrator under this
Standard.
Central Technical Authority (CTA)
Concurs with exemptions to this Technical Standard involving hazard
category 1, 2, or 3 nuclear facilities.
Explosives Approval Authority (EAA)
Approves Qualification of Insensitive High Explosive Material and/or
Subassembly.
Head of DOE Field Element (DOE/NNSA
Field/Operations/Production Office)
Verifies that the facilities, activities, and programs under their purview
operate in compliance with the requirements of this Technical
Standard.
Approves exemptions to this Technical Standard.
5.4.2.1. Exemptions involving hazard category 1, 2, or 3 nuclear facilities
require CTA concurrence.
5.4.3. Approves equivalencies to this Technical Standard that introduce
additional risk.
5.4.4. Approves Explosives Safety Site Plans.
DOE-STD-1212-2019
6
5.4.5.
5.4.6.
5.4.7.
5.5.
5.5.1.
Approves site and general construction plans for explosives facilities.
Provides oversight of the Contractor ESP.
Appoints a primary and alternate field element representative to the
DOE/NNSA Explosives Safety Committee (ESC). Ensures an
appointed member attends each DOE/NNSA ESC Meeting.
Federal Explosives Safety Subject Matter Expert (SME)
(DOE/NNSA Sites)
Reviews and recommends approval or disapproval to the Head of DOE
Field Element or designee for:
5.5.1.1. Exemptions to this Technical Standard.
5.5.1.2. Equivalencies to this Technical Standard that introduce additional risk.
5.5.2.
5.5.3.
5.5.4.
5.6.
5.6.1.
5.7.
5.7.1.
5.7.2.
5.7.3.
5.7.4.
Reviews the Explosives Safety Site Plans (ESSP) and recommends
approval or disapproval to the Head of DOE Field Element or designee.
Performs assessments of the Contractor ESP in accordance with DOE
O 226.1, Implementation of Department of Energy Oversight Policy
(current version).
Familiarizes themselves with the Contractor ESP and the explosives
operations and activities under their contract.
DOE/NNSA ESC Chair
Performs duties identified in this Technical Standard and the approved
DOE/NNSA ESC Charter.
Contractor Facility Manager
Establishes and maintains a site-specific ESP.
Assigns a Contractor Explosives Safety Program Manager.
Appoints a primary and alternate Explosives Safety Subject-Matter-
Expert as the Contractor Explosives Safety AHJ and Voting Member on
the DOE/NNSA Explosives Safety Committee. Ensures an appointed
member attends each DOE/NNSA ESC Meeting.
Section 12
Approves equivalencies that do not introduce additional risk.
DOE-STD-1212-2019
7
5.8. Contractor Facility Management
5.8.1. Implements the Explosives Safety requirements of this Technical
Standard into operations and activities involving explosives.
5.8.2. Verifies that the site training and qualification program addresses
explosives workers.
5.8.3. Verifies that explosives-related activities performed on-site by entities
other than DOE/NNSA contractors/subcontractors are coordinated
through the Contractor Explosives Safety AHJ.
5.8.4. Transmits the ESSP to the Head of DOE Field Element or Designee for
review and approval.
5.8.5. Selects hazard analysis methodology and addresses the results.
5.8.6. Approves explosives area electrical hazard classification analyses.
5.8.7. Establishes the levels of approval required for operating procedures,
based on the operation’s inherent risk.
5.8.8. Establishes the frequency/interval of inspections, operational checks,
storage review, and other items as identified in this Technical Standard.
5.8.9. Approves waivers.
5.9. Contractor Explosives Safety Program Manager
5.9.1. Assists Contractor Facility Management in implementing the
requirements of this Technical Standard.
5.9.2. Performs site-specific explosives safety assessments to verify
compliance with the requirements of this Technical Standard.
5.9.3. Recommends approval of the ESSP to Contractor Facility
Management.
5.10. Contractor Explosives Safety Authority Having Jurisdiction (AHJ)
5.10.1. Assists Contractor Facility Management so that the level of explosives
safety provided to site-specific explosives operations and activities is
commensurate with the requirements of this Technical Standard.
5.10.2. Provides site-specific determinations, interpretations, and clarifications
to the requirements of this Technical Standard.
DOE-STD-1212-2019
8
5.10.3. Interfaces with other disciplines to resolve site-specific conflicts
between national codes and standards and this Technical Standard.
5.10.4. Reviews and recommends approval of electrical hazard classification
analyses.
5.10.5. Provides documented determinations and recommendations to
Contractor Facility Management regarding proposed equivalencies and
waivers to the requirements of this Technical Standard.
6. GENERAL OPERATIONAL SAFETY
6.1. Cardinal Principle
6.1.1. The Cardinal Principle of Explosives Safety is to limit exposure to a
minimum number of personnel, for a minimum amount of time, to a
minimum amount of explosives, consistent with safe and efficient
operations.
6.1.2. The Cardinal Principle shall be observed at any location or in any
operation involving explosives.
6.2. Protection of Explosives
6.2.1. Explosives are energetic materials that can react violently and should
be protected from abnormal stimuli or environments, including:
• Friction forces;
• Excessive pressures and temperatures;
• Impact, shock, and pinching;
• Deformation;
• Electrical sparks, abrasive or welding sparks, and open flame;
• Contamination; and
• Contact with incompatible materials.
6.3. Equipment Checks
6.3.1. Before being used in the explosives process, and at established
intervals, processing and test equipment shall be checked for:
• Proper design;
• Proper function;
• Specified clearances between parts in relative motion;
• Abnormal metal to metal rubbing of moving parts potentially
contacting explosive materials;
• Cracks, voids, or screw threads where explosives may accumulate;
Section 13
and
DOE-STD-1212-2019
9
• Contamination that is incompatible with the process materials.
6.3.2. This checkout may require the use of mock explosives in process or
test conditions.
6.3.3. Explosive materials shall not be pinched or confined between
equipment lids or covers and their mating surfaces. These surfaces
shall be cleaned before cover placement. This includes pressing
operations.
6.4. Inspection Frequency
6.4.1. When this Technical Standard calls for an inspection, but the inspection
interval is not specified, Contractor Facility Management shall establish
the inspection interval.
6.4.2. Inspection intervals shall be modified when operational experience
dictates a need.
6.5. Hazard Identification and Communication
6.5.1. Contractor Facility Management shall identify and maintain a current list
of explosives and other hazardous materials used in conjunction with
their operations.
6.5.2. Contractor Facility Management shall educate and train employees in
the hazards and precautions required for handling explosives and
materials used in conjunction with explosives.
6.6. Work Environment
6.6.1. Where solid bare explosive pieces are handled:
6.6.1.1. The floor should be resilient or covered with a resilient material.
6.6.1.2. All hard objects that explosives could strike in a handling incident
should be covered with a resilient material where practical.
Note: Physical safety systems demonstrated to preclude the explosives
from being dropped or struck could meet these requirements.
6.6.2. A procedure should be established to account for hand tools that may
be inadvertently dropped into an explosives processing operation, thus
creating a hazard.
DOE-STD-1212-2019
10
6.6.3. Personnel shall be assigned in such a manner that each worker’s
presence is monitored frequently and assistance can be provided or aid
summoned in the event of an emergency.
6.7. General Explosives Area Controls
6.7.1. Smoking, Matches, Lighters, Metal Articles
6.7.1.1. There shall be no smoking in explosives storage, processing, or test
areas, except in designated locations.
6.7.1.2. No matches, lighters, or other fire, flame, or spark producing devices
shall be taken into an explosives control area except with written
authorization. If authorized to be carried, matches shall be contained in
a metal carrying device too large to fit into pockets. “Strike anywhere”
matches shall not be used.
6.7.1.3. Operating personnel should not carry metal articles (e.g., keys, jewelry,
knives, coins) in explosives processing areas where such items could
constitute a hazard if dropped into the process.
6.7.2. Cooking and Eating
6.7.2.1. Food or beverages shall not be consumed in explosives buildings,
except in designated areas.
6.7.2.2. There shall be no personal dishes or utensils in an explosives building,
except in designated eating areas.
6.7.2.3. Coffee pots, hot plates, ovens (including microwaves), and portable
electric heaters shall not be permitted in rooms where:
• Explosives may be present.
• Combustible vapors or dust may be present.
• Electrical classification of appliances is not compatible with the
area.
6.7.3. Access to Explosives Areas
6.7.3.1. Access control procedures shall be established for entry to all
explosives areas.
6.8. Concurrent Contact Operations
6.8.1. The preferred setup for explosives operations is to perform each
operation in a separate location to preclude any adverse operation
DOE-STD-1212-2019
11
Section 14
interaction. Because such an arrangement is frequently impractical,
concurrent operations may be permitted if the following conditions exist:
6.8.1.1. Potential equipment-operator interactions between the two operations
have been analyzed and the risk is not appreciably greater than that for
both operations considered separately.
6.8.1.2. Explosive materials in either operation are not exposed to stress
conditions such as elevated temperature (melting or heat conditioning),
elevated pressures (pressing or extruding), or deformation/shear
(machining or cutting).
6.8.1.3. Mixing of materials in the concurrent operations does not create
compatibility problems.
6.8.1.4. Each operator is aware at all times of concurrent operations in his or
her area.
6.9. Contamination Prevention
6.9.1. Precautions shall be taken to avoid mutual contamination when two or
more incompatible explosives or materials are handled on a single line
or within one building or room.
Note 1: This includes vacuum systems and explosives scrap collection.
Note 2: Inadvertent mixing of incompatible explosives materials can be
hazardous not only to manufacturing facilities and personnel but also to
the user if such materials are loaded into explosives devices.
6.9.2. When two or more explosives are used in a line or within a building and
mixing is not intended, the materials shall be segregated in separate
locations.
6.9.2.1. Containers shall be clearly marked with the weight and contents
identified.
6.9.2.2. Care shall be exercised to properly segregate material in service
magazines and in operating buildings.
6.9.3. When a different explosive is to be used in process equipment, the
equipment shall be thoroughly cleaned, and excess explosive from the
previous job should be removed from the bay.
Note: This eliminates the hazards caused by mixing materials.
DOE-STD-1212-2019
12
6.9.4. In any explosives operation, permanent service lines shall be labeled
as to their contents.
6.9.4.1. Valves and switches on service lines whose operation can result in a
hazardous situation shall be labeled as to their function.
7. EXPLOSIVES FACILITY DESIGN/SITE CRITERIA
7.1. Explosives Facilities
7.1.1. Permanent explosives facilities shall comply with Unified Facilities
Criteria (UFC) 3-340-02.
7.1.1.1. DOE/TIC-11268 may be used as a supplement as it often resolves
some special DOE design considerations and may result in a more
economical design.
Note: As an example, it describes how to reduce blast overpressure
from an explosion due to a high-altitude location.
7.1.2. Portable magazines should be ventilated and resistant to water, fire,
and theft.
7.1.2.1. Portable magazines may be made of any material that meets these
requirements.
Note: Type 2 portable magazines that comply with 27 Code of Federal
Regulations (CFR) Part 555.208 meet these criteria.
7.1.3. Portable magazines shall be sited per Department of Defense
Explosives Safety Regulation (DESR) 6055.09 as aboveground
magazines.
7.2. Blast Resistant Design
7.2.1. Blast-resistant design for personnel and facility protection shall be
based on the TNT (Trinitrotoluene) equivalency of the maximum
quantity of explosives and propellants.
7.2.2. TNT equivalency shall be increased by 20% for design purposes in
accordance with UFC 3-340-02.
7.3. Criteria for Lightning Protection Systems
7.3.1. Lightning protection shall be designed in accordance with National Fire
Protection Association (NFPA) 780, Standard for the Installation of
Section 15
DOE-STD-1212-2019
13
Lightning Protection Systems, and Chapter 42 of this Technical
Standard.
7.4. Unproven Facility Design
7.4.1. For an unproven facility design, either a validated model or full-scale
test is required to validate structural adequacy unless a high degree of
confidence can be provided by calculations or other technical bases.
7.4.1.1. Prior to full-scale testing, test plans shall be provided to the Head of
DOE Field Element (DOE/NNSA Field/Operations/Production Office)
for concurrence.
7.5. Design of New Facilities
7.5.1. The design of new explosives facilities and major modifications to
existing explosives facilities shall conform to the following:
7.5.1.1. The requirements established in this Technical Standard.
7.5.1.2. The methods of analysis and design, as well as protective design
features specified in UFC 3-340-02.
Note: It is not intended that existing physical facilities be changed
arbitrarily to comply with these provisions, except as required by law.
7.5.1.3. The following documents may be used to assist the design and
analysis of blast-resistant design. The most current and updated
version should be used.
• DOE/TIC-11268
• DDESB TP-12
• DDESB TP-13
• DDESB TP-15
• DDESB TP-16
• DDESB TP-17
7.5.2. Studies necessary to provide the technical basis for location,
engineering, design, and operation (under normal and potential design
basis accident conditions) of buildings shall follow the stricter of this
Technical Standard or DESR 6055.09 for establishing explosives
quantity-distance (QD) separation.
7.5.3. To maintain maximum, long‐term flexible use of facilities, Contractor
Facility Management is encouraged to consider installing dual‐rated
(i.e., Class I, Division 1 and Class II, Division 1) permanent wiring and
DOE-STD-1212-2019
14
equipment in explosives operating rooms. As a minimum, installation
should allow for easy conversion to dual‐rated wiring and equipment.
7.6. Site and General Construction Plans
7.6.1. Site and general construction plans for explosives facilities, as well as
plans for changes in utilization of facilities or mission changes that
adversely affect the explosives QD requirements, shall be submitted to
the Head of DOE Field Element (DOE/NNSA Field/Operations/
Production Office) for review and approval. Plans shall be forwarded
for:
7.6.1.1. New construction or major modifications of facilities for explosives
activities.
Note: When modifications or rehabilitation plans for existing facilities do
not introduce additional hazards or do not increase the net explosives
capacity or chemical agent hazard for which the facility was designed
or sited, site and general construction plans are not required to be
submitted to the Head of DOE Field Element (DOE/NNSA
Field/Operations/Production Office) for review.
7.6.1.2. Facilities for activities not involving explosives that are in such proximity
to explosives as to be exposed to hazards or for which a reasonable
doubt may exist regarding possible exposure to hazards.
7.6.1.3. Facilities for activities not involving explosives that become exposed to
blast, fire, or fragment hazards; or potential toxic chemical agent
release due to change in facility mission or facilities usage.
7.6.2. When the review of site and general construction plans is required,
Contractor Facility Management shall:
7.6.2.1. Indicate specifically in the letter of transmittal its approval of the
proposal, along with changes, modifications, or specific precautionary
measures considered necessary.
Section 16
7.6.2.2. Comply with applicable requirements of DESR 6055.09 for site plan
submission.
7.6.2.3. Retain a copy of the complete site plan and the final safety submission,
together with DOE/NNSA Field/Operations/Production Office letter(s) of
approval, as a permanent record at the facility/site of origin.
7.6.2.4. Keep facility maps current with the latest site plan approval and
reconciled with the facility master planning document.
DOE-STD-1212-2019
15
7.6.3. DESR 6055.09 identifies minimum distances for protection from
fragment hazards and blast overpressure.
7.6.3.1. The methods of calculation presented in DDESB TP-13 may be used to
establish a smaller fragment exclusion zone.
Note: It is not intended that these minimum fragment distances be
applied to operating facilities or dedicated support functions within an
operating line. For these exposures, the DOE criteria presented in this
Technical Standard for Class I, II, III, or IV Level-of-Protection activities
with appropriate QD separations are the required protection levels.
7.6.4. In addition to this Technical Standard, the following are resource
documents for the siting and design of explosives facilities:
• DOE Order 420.1
• DOE Order 430.1
• 10 CFR Part 830
• UFC 3-340-02
• DOE/TIC-11268
• DESR 6055.09
• DDESB TP-13
• DDESB TP-26
• AMCR 385-100
• TR-828
• AFWL-TR-74-102
• HNDM-1110-01-2
8. HAZARD ANALYSIS
8.1. Hazard Analysis
8.1.1. Before starting any operation involving explosives, a documented
hazard analysis shall be performed per 10 CFR 851.21.
8.1.1.1. Hazard analyses shall be performed using a graded approach
applicable to the specific explosives operation.
8.1.2. When an explosives operation changes, new hazards shall be
addressed in a supporting hazard analysis which then becomes part of
the original hazard analysis.
8.1.3. When modifying facility or process equipment, a documented analysis
shall be performed to validate uniform standards are adhered to
throughout the facility.
DOE-STD-1212-2019
16
8.1.4. Contractor Facility Management shall address the results of a hazard
analysis. Hazard prevention and abatement shall be conducted per 10
CFR 851.22.
8.2. Similar Processes
8.2.1. A single hazard analysis may be performed for similar processes
performed in a single facility, provided that the “worst case” process is
the basis for the hazard analysis.
8.2.1.1. Selection criteria for the worst-case process are:
• Sensitivity of materials;
• Quantity of materials;
• Number of personnel potentially affected; and
• Impact on other operations and activities.
8.2.1.2. As a new process is considered for inclusion under an existing hazard
analysis, each step of the new process shall be evaluated to determine
if it is within the scope of the existing hazard analysis, and to identify
any hazards not addressed in the existing hazard analysis.
8.3. High Risk
8.3.1. Hazard analysis supporting explosives synthesis, formulation,
manufacturing, testing, or disposal operations shall be performed and
revalidated as a team effort. The team shall consist of a minimum of
three personnel, to include at least one technical member and one
operator. The following makeup is recommended:
• Team Leader, who is familiar with the analysis methodology used.
• Technical Member(s), who is familiar with the process being
analyzed.
• Scribe, who writes notes of meetings and interviews and drafts
reports.
• Operator who actually performs the work being analyzed.
• Explosives Safety Subject Matter Expert.
Section 17
Note: A technical member is an individual who has expertise in a
particular technical discipline (e.g. engineering, chemistry, physics, and
safety).
8.3.2. Contractor Facility Management shall select the analysis methodology
used (e.g., What if Analysis, Fault Tree Analysis, Event Tree Analysis).
8.3.3. Employees and employee representatives shall be consulted on the
hazard analysis.
DOE-STD-1212-2019
17
8.3.4. The result of the hazard analysis shall be provided to employees
involved in or affected by the operation.
8.3.5. The hazard analysis shall be updated and revalidated at least every
five years.
8.4. Electrical Hazard Classification Analysis
8.4.1. If a documented analysis is used to determine the electrical hazard
classification for areas where explosives operations or activities are
conducted, the analysis shall be reviewed by the Contractor Explosives
Safety AHJ and approved by Contractor Facility Management.
8.4.2. The scope of the analysis shall identify the specific location and specific
explosives operation or activity.
8.4.3. The analysis should be limited to the following:
• Enclosed areas, (e.g. rooms, bays, chambers).
• Normal operating conditions.
8.4.4. The analysis should consider the following:
• The physical configuration of the explosives, (encased, bare,
consolidated, powder, packaged, unpackaged).
• The explosives operation or activity being conducted.
• Other activities or operations being conducted in the same area.
• Migration of explosive or ignitable gases, vapors or dust mixtures to
or from adjacent areas.
Note: The analysis shall be updated and revalidated if any of these
change.
9. OPERATING PROCEDURES
9.1. Procedures
9.1.1. Operating procedures shall be written and approved for each operation
involving explosives.
9.1.2. Operating procedures shall implement all applicable controls derived
from supporting hazard analysis prior to the procedure being approved
for use.
Note: Operating procedures that were not prepared using the current
hazard analysis shall be evaluated to verify that all applicable controls
(new or revised) derived from the current hazard analysis are
implemented prior to the procedure being approved for use.
DOE-STD-1212-2019
18
9.2. Approval
9.2.1. New or revised operating procedures shall be reviewed and approved
prior to use.
9.2.2. Contractor Facility Management should establish levels of approval
based on the operation’s inherent risk.
9.2.3. The review and approval process shall include line and safety
organizations.
9.3. Operating Procedures Content
9.3.1. The introduction to the procedure should include the following:
9.3.1.1. A statement of the scope, nature of the operation and its objectives,
and defining what facilities and equipment are covered.
9.3.1.2. The name of the department responsible for the operation and the
procedure.
9.3.1.3. If the procedure serves as the basis for an exemption, equivalency, or
waiver from the requirements of this Technical Standard, a statement to
this effect and a specific reference shall be included.
9.3.2. The materials and equipment section should present the following
information:
9.3.2.1. All significant tools, supplies, chemicals, and equipment necessary to
perform the operation should be listed in the procedure or in a separate
required document.
9.3.2.2. Specifications for approved chemicals, supplies, tooling, and equipment
should be referenced where applicable.
Section 18
9.3.2.3. An explanation of any specific hazard involved in the handling of
chemicals or explosives, or a reference to a document that describes
the hazards.
9.3.3. The safety section of the procedure should present the following
information or reference a safety document that specifies the
requirements:
9.3.3.1. General safety rules to be observed and techniques to be applied that
verify safety of operations, prevent personnel injury or illness, and
prevent equipment damage.
DOE-STD-1212-2019
19
9.3.3.2. Additional or specific emergency controls not addressed by the facility
emergency plan.
9.3.3.3. Protective equipment used during the operation.
9.3.3.4. The number of personnel (workers and casuals) and explosives weight
limits associated with the operation being conducted.
9.3.4. The operations section should consist of sequential directions written or
pictured in clear, concise steps that describe how to perform a
particular operation:
9.3.4.1. General directions for operation of all major explosives handling
equipment.
9.3.4.2. Particular emphasis should be placed on safety interlocks and controls,
and their proper use.
9.3.4.3. If a particular operation requires that no other operation be performed
concurrently in the same work area, this requirement shall be stated
clearly in the procedure.
9.4. Special or Experimental Procedures
9.4.1. In addition to the applicable requirements listed for Operating
Procedures, the following shall also be addressed:
9.4.1.1. Field operations (remote to normally occupied areas) shall include
procedures to verify prompt response of both fire and emergency
medical services.
9.4.1.2. Personnel involved with the operation shall be briefed or trained on any
unique aspects of the operation and emergency procedures.
9.4.2. When a special or experimental operation shall be conducted a number
of times, an Operating Procedure should be written and approved.
10. TRAINING
10.1. Explosives Safety Training
10.1.1. Personnel shall be properly trained before they are assigned to
explosives operations or operate any explosives transport vehicle.
DOE-STD-1212-2019
20
10.1.2. The training for explosives work serves to assist in conducting work
safely and developing safety awareness and shall verify that personnel:
• Develop and maintain a safe attitude towards work with explosives.
• Define and understand the potential hazards involved.
• Learn correct skills to perform tasks safely.
• Are prepared for unexpected hazardous conditions.
• Read and understand the appropriate operating procedures.
10.2. Training and Qualification Programs
10.2.1. Each Site's Training and Qualification Program shall address
Explosives Safety training.
10.2.2. An employee shall not be permitted to continue working with explosives
if the supervisor, with counsel from medical personnel, determines that
he or she is unable to perform the task safely. Possible reasons
include:
• Physical injury or illness.
• Disease.
• Mental or emotional disturbances.
10.3. Unexploded Ordnance (UXO) Qualification
10.3.1. Personnel in charge of UXO removal/disposal should be US citizens
and have successfully completed training at a US Military Explosives
Ordnance Disposal (EOD) school.
10.3.1.1. Personnel shall provide documentation of completed training and have
a minimum of 18 months operational EOD experience.
10.3.2. Personnel performing UXO removal or disposal shall have completed
training at a US Military EOD school or have equivalent training or
experience.
Section 19
10.3.3. All other personnel engaged in UXO operations shall be trained
thoroughly in applicable UXO recognition and Explosives Safety.
10.3.4. Personnel requiring access to areas known or suspected to contain
UXOs shall be required to complete UXO awareness training and
comply with any site-specific additional UXO area access requirements.
10.3.5. Sites containing UXOs shall establish site-specific UXO awareness
training.
DOE-STD-1212-2019
21
11. QUANTITY-DISTANCE
11.1. Explosives Safety Site Plan Submission and Approval
11.1.1. Contractor Facility Management shall verify that ESSPs are submitted
to the Head of DOE Field Element (DOE/NNSA Field/Operations/
Production Office) for review and approval.
11.1.2. Where there is an increase in risk, an ESSP shall be resubmitted and
approved prior to start of operations for the following conditions:
• There is an increase in explosive weight.
• The facility undergoes a major modification.
• The required Level-of-Protection changes.
11.1.3. Risk based explosives siting, as described in DDESB TP-14 is another
tool to address explosives QD determinations of equivalency of safety.
11.1.4. The site plan package shall contain the following:
11.1.4.1. A QD Chart containing the following:
• Each sited facility potential explosion site (PES) listing maximum net
explosives weight (NEW) for each applicable Hazard Division (HD).
• Actual and required distance to exposed sites (ES).
• QD criteria used for siting each PES - ES relationship.
11.1.4.2. Map(s) showing each PES, its clear zone, and all ESs within the clear
zone.
11.1.4.3. Personnel limits for the explosives facility.
11.1.4.4. Description(s) of explosives and non-explosives operations within the
clear zone.
11.1.4.5. Justification(s) for facilities not meeting current criteria for the operation
that address:
• Bringing the facility up to current standards is not feasible, and
• Operations present no significantly greater risk than that assumed
when the facility was originally constructed.
11.1.5. If the siting has any unique characteristics, explain what they are and
what criteria is being applied.
Note: If a facility is built to control blast effects and fragments, QD to
other facilities do not apply.
DOE-STD-1212-2019
22
11.1.6. A letter of transmittal shall accompany each site plan or group of site
plans. The letter shall contain the following:
11.1.6.1. Reason for submittal (preliminary or final siting of new facility, site
plan/plans for grandfathered facility/facilities, change in operation with
increased or decreased QD requirement).
11.1.6.2. Request for site plan approval.
11.1.6.3. For a grandfathered facility, note whether the facility meets current
criteria for the operation being conducted.
11.2. Quantity-Distance Criteria
11.2.1. QD criteria shall account for the types and severity of hazards each
explosive material presents, the construction and orientation of facilities
to which the criteria are applied, and the degree of protection desired
for personnel and facilities adjacent to the explosives operations.
Note: The United Nations (UN) hazard classification system defines the
types and severities of explosives hazards.
11.2.2. Hazard Divisions
11.2.2.1. Explosives shall be classified based on their reactions to specific
initiating influences.
11.2.2.2. Personnel shall use the UN hazard classification system for DOE
explosives classification, Table 11.1 lists the hazard divisions of Class
1.
Section 20
Table 11.1 Division of Class 1
HD
Designators Hazards
1.1 Mass detonating
1.2.1 Non-mass explosion, fragment producing with NEW for QD > 1.6 lbs
1.2.2 Non-mass explosion, fragment producing with NEW for QD ≤ 1.6 lbs
1.2.3 Non-mass explosion, fragment producing based on single package test only
No reaction greater than burning from the external fire test, bullet impact test
or slow cook-off test
1.3 Mass fire, minor blast or fragment
1.4 Moderate fire, no significant blast or fragment
1.5 Explosive substance, very insensitive (with a mass explosion hazard)
1.6 Explosive article, extremely insensitive
DOE-STD-1212-2019
23
11.2.2.3. Classification tests (described by TB 700-2) and additional tests (as
desired), including UN ST/SG/AC/10/1 and UN ST/SG/AC/10/11, shall
be used to assign energetic materials to the appropriate HD SCG
(Storage Compatibility Group). Supplemental tests may be used for
additional characterization when material properties or anticipated
material environments are expected to significantly influence the
explosives classification.
11.2.2.4. Although Department of Transportation (DOT) hazard classifications
require the use of the Bureau of Explosives' (BOE) Impact Apparatus to
determine impact sensitivity, other impact apparatus may be used,
providing:
• Test results for at least two reference explosives are compared to
results for the reference explosives on the BOE Impact Apparatus;
and
• A minimum of 10 trials each is run for the reference explosives and
the explosives being classified.
11.2.3. The principles and tables presented in DESR 6055.09 shall be used to
determine the total quantities of explosives in adjacent magazines,
operating buildings, or other explosive facilities that shall be applied to
QD tables, and inert storage locations.
Note 1: When the levels of protection required by this Technical
Standard differ from the requirements of DESR 6055.09, this Technical
Standard shall take precedence.
Note 2: The minimum separation distances required for the facilities are
based on the desired Level-of-Protection and total quantities of
explosives.
Note 3: The total quantity of explosives is determined by defining and
examining the maximum credible event (MCE). If an explosives event
occurs, the MCE is the largest credible amount of explosives that could
be involved (not necessarily the total quantity of explosives present).
Note 4: Requirements for onsite de minimis or residual quantities of
explosives can be found in Section 17.7.
11.2.4. Transport Vehicles
11.2.4.1. Explosives loaded vehicles in holding yards are considered
aboveground magazines for QD purposes. They shall be kept in
groups, and each group shall be limited to a maximum of 250,000 lbs
(113,398 kg) of high explosives (HE).
DOE-STD-1212-2019
24
11.2.4.2. When a classification yard, interchange yard, inspection station or
specified location is the site where explosives are interchanged
between the common carrier and facility transportation, QD provisions
do not apply provided that vehicles are moved expeditiously to a
suitable location.
11.2.5. Utilities Installations
11.2.5.1. Permanent DOE controlled underground utilities installations (excluding
building service lines) should be separated from explosives locations
containing HD 1.1 materials (see Table 11.2).
Table 11.2 QD Separation for Protection of Underground Service
Installations
Quantity of explosives (Maximum) Distance
Section 21
Lbs. (kg) Feet (Meters)
≤ 10,000 (4,535.9) 80 (26)
20,000 (9,071.8) 85 (28)
50,000 (22,679.6) 110 (36)
100,000 (45,359.2) 140 (46)
250,000 (113,398.1) 190 (62)
Note: If the potential donor building is designed to contain the effects of an explosion, the formula:
D=3.0 W1/3 can be used to determine separation distances for less than 20,000 lbs (9,071.8 kg).
11.2.5.2
Privately owned or operated utilities installations (aboveground and
underground) shall be separated from explosives locations by at least
public traffic route distances. Installations that include structures should
be separated from explosives facilities by inhabited building distance.
11.2.5.3. Certain auxiliary power facilities, transformer stations, etc., present fire
hazards to explosives facilities. Transformers and associated electrical
switching apparatus serving one explosives facility or complex that do
not present a fire hazard to the facility (i.e., dry type, "less flammable"
oil insulated) shall be located as specified in NFPA 70 and FMDS 5-
4/14-18.
11.2.5.4. Normal oil insulated transformers shall be located at least 50 ft from an
explosives facility or as specified in DESR 6055.09.
Note: See Section 36.3 for additional electrical supply system
requirements.
11.2.6. Storage Tanks for Petroleum and Hazardous Materials
DOE-STD-1212-2019
25
11.2.6.1. Storage tanks for petroleum and hazardous materials shall be sited
using Storage Tanks for Hazardous Materials criteria as specified in
DESR 6055.09.
Note 1: Above ground tanks containing 500 gallons or less of petroleum
that serve equipment (such as oil heaters or diesel generators) located
in or near explosives buildings shall be located a minimum of 50 ft from
explosives locations and comply with NFPA 30.
Note 2: Tanks located near intentional detonation areas should be
barricaded. Similar underground tanks complying with NFPA 30 do not
require separation from explosives facilities.
Note 3: In both cases (Note 1 and Note 2), the tanks shall be equipped
with an anti-siphoning device, unless siphoning is impossible.
11.2.7. Small Quantities of HD 1.1 Explosive Substances
11.2.7.1. Use Table 11.3 to determine distances for small quantities of explosive
substances.
Note: For many situations, it can be demonstrated that adequate
personnel protection is provided at distances considerably less than
those distances identified in DESR 6055.09.
Table 11.3 Minimum QD Requirements for Small Amounts of Explosive
Substances Having HD 1.1 Classification
NEW Inhabited Building
Distance
Public Traffic Route
Distance
Intraline
Distance
Less than 0.0066 lb 0 ft 0 ft 0 ft
(0.003 kg) (0 m) (0 m) (0 m)
0.0066 lb – 0.022 lb 16.40 ft 9.84 ft 6.56 ft
(0.003 kg – 0.01 kg) (5 m) (3 m) (2 m)
0.022 lb – 0.55 lb 49.21 ft 29.52 ft 16.40 ft
(0.01 kg – 0.25 kg) (15 m) (9 m) (5 m)
12. LEVEL-OF-PROTECTION CRITERIA
12.1. Required Level-of-Protection
12.1.1. The Level-of-Protection required for an explosives activity is based on
the hazard class (accident potential) of the explosives activity involved.
DOE-STD-1212-2019
26
12.1.2. Each bay (i.e., storage, handling, or processing building) that houses
an explosives activity shall have a Level-of-Protection based on the
hazard class determined for the activity.
12.1.3. Level-of-Protection may be provided by equipment design, structural
design, operation separation, or provision of operational shields.
12.2. Hazard Class 0
Section 22
12.2.1. Explosives operations involve the intentional initiation of explosives
materials or articles.
Note: Examples are explosives testing, firing activities associated with
training, and destruction of explosives by detonation.
12.2.2. Areas used to conduct Class 0 activities shall protect all personnel from
injury due to blast, fragments, and structural collapse of buildings. This
protection may be achieved by measures (or combination of measures)
to include control of fragments and overpressure by suppression,
containment, or distance (location) as follows:
12.2.2.1. No structural damage to any facility due to overpressure, fragments, or
debris.
12.2.2.2. No fragment or debris impact to operators.
12.2.2.3. Operator protection from any injurious thermal flux.
12.2.2.4. Overpressure, fragment, and debris impact to surrounding areas limited
to approved site plans and DESR 6055.09 for intentional detonation of
explosives criteria.
12.3. Hazard Class I
12.3.1. Explosives operations involve activities with a high accident potential
where: (1) energies approach the upper safety limits, (2) loss of control
of interfacing energy is likely to exceed safety limits, and (3) research
and development where safety implications have not been fully
characterized.
Note: Examples are screening, blending, pressing, extrusion, drilling of
holes, dry machining, machining explosives and metal in combination,
some environmental testing, new explosives development and
processes, explosives disposal by burning and some destructive
testing.
DOE-STD-1212-2019
27
12.3.2. Operations shall be conducted remotely because any personnel
exposure is unacceptable.
12.3.3. Bays for Class I activities shall comply with the requirements for Class
II bays, and, in addition, provide protection to prevent serious personal
injuries to personnel performing the activity and personnel in other
occupied areas. This protection can be achieved by controlling blast
and debris through suppression, containment, or establishing an
exclusion area with positive access control. Serious injury prevention is
satisfied when personnel are not exposed to:
12.3.3.1. Overpressures greater than 5 psi maximal effective pressure, which
should not exceed 2.3 psi peak positive incident pressure (2.3 psi is
specified in the DESR 6055.09 as required protection for all personnel
exposed to remote operations).
12.3.3.2. Structural collapse of a facility or building from overpressure or debris
impact. Structural collapse is a structural component’s failure as a
direct result of loss of structural integrity. This collapse does not result
in explosion propagation, fatalities, or severe personal injuries.
12.3.3.3. Hazardous fragment or debris having an impact energy greater than 11
ft lbs.
12.3.3.4. Thermal fluxes are limited to prevent the onset of second-degree burns.
This value is specified in DESR 6055.09, as required protection for all
personnel assigned to perform remote operations.
12.3.3.5. Transients shall be protected as specified in DESR 6055.09 using
“Accidental Ignition or Initiation of Explosives” criteria.
12.4. Hazard Class II
12.4.1. Explosives operations involve activities with moderate accident
potential due to the explosives type, condition of the explosives, or
nature of the operations. These activities involve energies that do or
may interface with the explosives are normally well within the safety
boundaries for the explosives involved, but where the loss of control of
these energies could approach the safety limits.
Section 23
Note: Examples are weighing, some wet machining, assembly and
disassembly, some environmental testing, and some packaging
operations.
12.4.2. Class II activities have an accident potential greater than Class III
activities, but personnel exposure in contact operations is acceptable.
DOE-STD-1212-2019
28
12.4.3. For Class II operations, access ramps and site roads are not
considered occupied areas.
12.4.4. Bays for Class II activities shall comply with the requirements for Class
III bays, and, in addition, provide protection to prevent fatalities and
severe personnel injuries in all occupied areas other than the bay of
occurrence. Prevention of fatalities and severe injuries is satisfied when
personnel in occupied areas other than the bay of occurrence are not
exposed to the following:
12.4.4.1. Overpressures greater than 15 psi maximal effective pressure. The
threshold pressure for eardrum rupture is 5 psi; one-half of the
threshold pressure for lung damage is 15 psi (see chapter I-11.1 of
UFC 3-340-02).
12.4.4.2. Structural collapse resulting from overpressure or debris impact.
Structural collapse is a structural component’s failure as a direct result
of a facility losing structural integrity. This collapse does not result in
explosives propagation, fatalities, or severe personnel injuries.
12.4.4.3. Hazardous fragments or debris generated in acceptor-occupied areas
having an impact energy of 58 ft-lbs or greater, (see chapter I-11.3 of
UFC 3-340-02).
12.5. Hazard Class III
12.5.1. Explosives operations involve activities with low accident potential.
Note: Examples are activities during storage and operations incidental
to storage or removal from storage.
12.5.2. Bays for Class III activities shall provide protection from explosion
propagation from bay to bay within buildings and between buildings that
are located at intraline or intermagazine distance.
12.5.3. If intermediate storage of explosives is within an operating building
containing Class II or Class I operations, the intermediate storage or
staging bay shall require Class II Level-of-Protection.
12.5.4. Minimum separation distances may be reduced when explosives bays
are designed to adequately contain the effects of an accident (blast
pressures and missiles).
DOE-STD-1212-2019
29
12.6. Hazard Class IV
12.6.1. Explosives operations involve activities with IHE or IHE subassemblies
where the probability of accidental initiation or transition from burning to
detonation is negligible.
Note: Examples are processing and storage activities with IHE and IHE
subassemblies.
12.6.2. The following explosives activities with IHE and IHE subassemblies
shall remain Class I:
• Pressing.
• Some machining (see Paragraph 24.2.4).
• Dry blending.
• Dry milling.
• Dry screening.
12.6.3. Bays for Class IV activities shall provide protection from fire hazards
effects.
12.6.3.1. This protection may be achieved by HD 1.3 aboveground magazine
distance separation or by a design that contains the effects of an
accident.
12.6.3.2. Because accidental detonation is not considered credible, Class IV
bays shall be sited and designed as acceptors rather than donors for
the effects of blast overpressure, structural collapse, and missiles
(hazardous fragments).
13. REMOTE OPERATIONS
13.1. Personnel Protection
13.1.1. Explosives operations that present a high accident potential as defined
in Paragraph 12.3.1 shall be performed remotely.
Section 24
13.1.2. Personnel involved in remote operations shall be provided the required
Level-of-Protection for the hazard class of the operation.
13.1.3. Transient personnel shall be provided protection in accordance with the
requirements in DESR 6055.09.
DOE-STD-1212-2019
30
13.2. Access and Equipment Controls
13.2.1. Administrative and/or engineered controls shall be used to prevent
entry into a hazardous location in which a remote operation is occurring
or to prevent the operation from proceeding when personnel enter.
13.2.1.1. Roads shall be blocked at a minimum public traffic route distance (K24)
or hazardous fragment distance from buildings where hazardous
(remote) operations are being performed, whichever is greater.
Note: Hazardous fragment distance may be satisfied by providing
equivalent protection.
13.2.1.2. Corridors leading to bays in which hazardous (remote) operations are
being performed shall be marked to warn of the danger with
established barriers.
13.2.1.3. When practical, visual methods should be used to monitor remote
operations to enable viewing of the operating area conditions before
entering. Audio monitoring and video recording should also be
considered.
13.2.1.4. Remote operating equipment should be interlocked to access doors for
each remote operation.
13.2.1.5. Lights or similar warning devices shall conspicuously identify locations
where remote operations are performed to indicate when remote
operations are under way.
14. LIMITS AND CONTROL
14.1. Explosives Limits
14.1.1. The quantity of explosives at an operating location shall be the
minimum necessary to carry out the operation safely and efficiently.
14.1.1.1. When practical, this quantity shall be subdivided and separated to
prevent propagation of detonation.
14.1.1.2. Supplies exceeding this minimum quantity shall be removed from the
operating area.
14.1.2. In no case shall the quantity of explosives permitted in an operating
building exceed the maximum permitted by QD criteria.
DOE-STD-1212-2019
31
14.1.3. QD criteria and requirements for application of these criteria are
presented in Chapter 11.
14.1.4. IHE limits for pressing, dry blending, dry milling, dry screening, and
certain machining operations (see Paragraph 24.2.4) should be the
same as those established for HE operations.
14.2. Personnel Limits
14.2.1. The number of personnel at an operating location shall be the minimum
consistent with safe and efficient operation.
14.2.2. Only jobs necessary to the performance of a hazardous explosives
operation should be performed in the same location as the hazardous
operation.
14.2.3. Only personnel needed for hazardous operations shall be allowed in
hazardous locations.
14.2.4. Personnel limits shall allow for necessary casuals.
14.2.5. Sufficient personnel shall be available to perform a hazardous
operation safely and to obtain help and aid the injured if an accident
occurs.
14.2.6. Contractor Facility Management shall specify explosives activities that
may be performed alone.
14.2.6.1. No person shall perform explosives work with a high risk of serious
injury alone.
14.2.6.2. Prompt and easy communications with other employees shall be
provided.
14.3. Limit Control
14.3.1. Posting and Recording
14.3.1.1. All rooms, bays, and buildings containing explosives shall have, posted
in a conspicuous place, a standardized posting stating the maximum
amount of explosives and the maximum number of workers and
casuals permitted in the controlled area at any one time.
Section 25
14.3.1.2. Maximum explosives and personnel limits for all buildings and bays for
each explosives area shall be documented and maintained on file.
DOE-STD-1212-2019
32
14.3.2. Limit Review and Approvals
14.3.2.1. Contractor Facility Management personnel with authority and
jurisdiction over an operating bay or building shall review explosives
and personnel limits for each location periodically and recommend
changes as required.
14.3.2.2. When the use of a location changes, personnel and explosives limits
shall be reviewed and limits reestablished as required.
14.3.2.3. Changes in explosives and personnel limits shall be reviewed and
approved in the same manner as operating procedures (see Chapter
9).
14.3.2.4. A procedure shall be established for the approval of temporary changes
in explosives and personnel limits for an operating location.
14.3.3. Personnel Controls
14.3.3.1. A system shall be established to control the presence of personnel
within explosives operating areas.
14.3.3.2. The movement of transients in the vicinity of an explosives operating
area should be controlled when their presence creates a congestion
problem or other safety concern.
14.3.4. Explosives Controls
14.3.4.1. A verifiable system shall be established to control the amount of
explosives present in an explosives facility.
15. PERSONAL PROTECTIVE EQUIPMENT
15.1. Clothing
15.1.1. Flame-retardant clothing may be desired for explosives operations with
the potential for flash fire.
15.1.1.1. The clothing shall not have cuffs.
15.1.1.2. The clothing should not have metallic fasteners.
15.1.2. Operating procedures shall include protective clothing requirements.
DOE-STD-1212-2019
33
15.1.3. Cotton or other antistatic outer and undergarments, including socks,
should be worn where generation of static electricity would create a
hazard.
15.2. Footwear
15.2.1. Personnel working in areas where electrostatic sensitive explosive
powders or materials are handled shall wear conductive, non-sparking
footwear.
Note: Exception: Personnel working on electrical or electronic
equipment shall not wear conductive footwear unless protected by
insulated mats, ground fault circuit interrupters (GFCI), etc.
15.2.2. When conductive footwear is worn, the conductivity shall be tested
immediately prior to each use.
15.2.3. Personnel working in areas where explosives contamination may be
present shall wear non sparking footwear or bootie shoe coverings.
15.3. Wristbands
15.3.1. When conductive wristbands are worn, the conductivity shall be tested
immediately prior to each use.
16. INSENSITIVE HIGH EXPLOSIVES QUALIFICATION
16.1. Revisions to Insensitive High Explosives (IHE) Test Description
and Criteria
16.1.1. Revisions to LLNL-TR-679331/LA-UR-15-29238, “IHE Material and IHE
Subassembly Qualification Test Description and Criteria” shall be
approved by the proponent organizations (Lawrence Livermore
National Laboratory, Los Alamos National Laboratory, Sandia National
Laboratory, and Pantex) and shall be reviewed for concurrence by the
DOE/NNSA Explosives Safety Committee. Once concurrence is
obtained, the Chair shall issue a letter of concurrence to the submitting
organization.
16.2. Insensitive High Explosive (IHE) Materials
16.2.1. In scales that are conservative to the relevant nuclear weapon
application, IHEs shall meet the following requirements:
Note: For more information refer to Attachment A of this chapter - IHE
QUALIFICATION BACKGROUND
DOE-STD-1212-2019
Section 26
34
16.2.1.1. Does not transition from deflagration to detonation (DDT).
16.2.1.2. Does not transition from shock to detonation (SDT).
• Under 3.5 GPa, 3 µs 1-dimensional shock insult at 25°C.
• Under 5.3 GPa, 0.5 µs 1-dimensional shock insult at 25°C.
• Under 1.5 GPa, 3 µs 1-dimensional shock insult when heated to
10°C below the cook-off temperature of the explosive.
16.2.1.3. Passes IHE criteria outlined in LLNL-TR-679331/LA-UR-15-29238,
"IHE Material and IHE Subassembly Qualification Test Description and
Criteria."
• Skid test
• Bullet test
16.2.2. The qualification and approval process described herein is limited to
DOE and nuclear weapons applications.
16.3. IHE Qualification Testing
16.3.1. Any explosive that is a candidate for classification as an IHE shall be
subjected to the DOE qualification tests listed in Table 16.1.
Note: This includes three tiers of tests. Test procedures are contained
in LLNL-TR-679331/LA-UR-15-29238.
Table 16.1 Required Testing to Qualify IHE Materials
Tier 1: Prerequisites Tier 2: IHE Material Qualification Tier 3: Demonstration Tests
Interim Hazard Classification DDT Test and SDT Test Skid Test and Bullet Test
16.3.2. Some or all of the test requirements of this section may be met by
analogy as indicated below:
16.3.2.1. The DOE/NNSA Explosives Safety Committee determines the
acceptability of analogy in lieu of test data.
16.3.2.2. Analogy submitted in lieu of test data shall include rationale.
16.3.2.3. Approved IHEs (listed in Table 16.2) with complete test data shall be
used for baseline comparison purposes.
16.3.3. The DOE/NNSA Explosives Safety Committee may request additional
information depending on circumstances surrounding the analogous
information submitted.
DOE-STD-1212-2019
35
16.3.4. A candidate IHE can be placed in one of the following analogy
categories to define required tests depending on the type and extent of
change in the candidate IHE relative to the baseline IHE and the
potential effects of these changes on specific initiation mechanisms
(shock, thermal, mechanical, impact):
16.3.4.1. If the analogy can be fully credited, no testing is required.
Note: For example; the candidate IHE involves the same energetic and
inert components as the approved baseline IHE, the only change being
a volume-percent decrease in the energetic component content.
16.3.4.2. If the analogy can be partially credited, partial testing is required.
Sufficient testing is required to verify that no chemical or physical
incompatibilities have been introduced that would de-stabilize the base
IHE.
Note 1: For example; the candidate IHE formulation modifies an inert
component of the approved baseline IHE.
Note 2: In this case, test data normally generated by the requesting
facility during their explosive development scale-up phasing process
may be submitted in lieu of the qualification tests of Table 16.1.
Note 3: During the development phase, the Contractor Explosives
Development Committee (EDC), or equivalent, may dictate restrictions
consistent with an IHE that are internal to their facility only.
16.3.4.3. If the analogy cannot be credited, full testing is required.
Note: For example; the candidate IHE involves the addition of an
untested (IHE tests) energetic component to the approved baseline
IHE.
16.4. IHE Qualification Process
16.4.1. IHE Materials qualified by previous methods shall remain qualified and
are listed in Table 16.2
Table 16.2 Approved IHEs
TATB
TATB/KEL-F (or equivalent) Formulations
Section 27
DOE-STD-1212-2019
36
16.4.2. The organization with the need for IHE determination ( hereafter shall
be referred to as the Requestor) shall perform or have performed the
appropriate tests in accordance with the requirements of LLNL-TR-
679331/LA-UR-15-29238, after coordinating need for material
qualification with the appropriate Headquarters (HQs) Program Office
(e.g., NA-11, NA-12, or NA-19).
16.4.3. The Requestor submits the test data, for the candidate explosive, to the
DOE/NNSA ESC Chair.
16.4.4. The DOE/NNSA ESC Chair assigns a Task Group for review and
recommendation of approval/disapproval of the candidate explosives
material.
16.4.5. If the request is not recommended for approval, the Task Group
documents the rationale and requirements that were not met and
provides this information to the DOE/NNSA ESC Chair who then
communicates with the Requester through the DOE/NNSA ESC Chair.
16.4.6. If the request is recommended for approval, the Task Group assembles
the test data and provides this information to the DOE/NNSA ESC
Chair with a recommendation to approve the candidate explosive.
16.4.7. The DOE/NNSA ESC Chair prepares a written recommendation on the
approval of the candidate explosive, and submits it along with the
supporting explosives package to the NNSA/NA-50 Associate
Administrator for Safety, Infrastructure, and Operations; the Explosives
Approval Authority (EAA) or designee.
16.4.8. The NNSA/NA-50 EAA approves or denies the candidate explosive for
qualification as an IHE, and provides written documentation of their
decision to the DOE/NNSA ESC Chair.
16.4.9. The DOE/NNSA ESC Chair provides documentation of the EAA's
decision to requestor, and if approved, the IHE is added to Table 16.2.
16.5. IHE Subassemblies Testing
16.5.1. IHE Subassemblies are composed of IHE hemispheres or spheres with
booster charges, with or without detonators that, as an assembly are so
insensitive that the probability of accidental initiation or transition from
burning to detonation is negligible, and therefore meet IHE criteria at a
system-relevant scale.
DOE-STD-1212-2019
37
16.5.2. Main charge materials that do not qualify as IHE materials in Section
16.3 may be used as main charges in an IHE Subassembly, provided
they meet IHE criteria at a smaller, system-relevant scale.
16.5.3. Any explosive Subassembly that is a candidate for classification as an
IHE Subassembly shall be subjected to DOE qualification tests as listed
in Table 16.3. These tests shall be planned with consideration of worst-
case scenarios. Testing approaches and methods are contained in
LLNL-TR- 679331 / LA-UR-15-29238. The qualification approach
evaluates each material in the assembly as follows:
16.5.4. Verify main charge is incapable of DDT and therefore meets IHE
criteria for a material.
16.5.4.1. Verify main charge meets IHE material criteria for SDT, as shown in
Table 16.1, Tier 2 and defined in LLNL-TR-679331/LA-UR-15-29238.
16.5.4.2. Verify detonator material is incapable of DDT in a scale conservative to
its relevant application.
Note: Electrical threat to detonator is not part of this qualification.
16.5.4.3. Verify booster is incapable of DDT in a scale conservative to its
relevant application.
Note: The test plan shall specify applicable testing for cased and/or
uncased configurations with or without detonators.
Table 16.3 DOE Qualification Tests for IHE Subassemblies*
Test Results
DDT No DDT in main charge, booster, and detonator materials tested at
Section 28
scales relevant to application, plus margin for conservatism.
SDT No SDT in main charge material per tests in Table 12.1 for both ambient
and heated materials.
Multiple Bullet Impact No detonation or violent reaction of main charge with a 3-round bullet
impact burst in worst-case configuration.
Skid Test No burning or violent reaction of main charge (as evidenced by visible
fireball) up to a specified height and test angle using Subassembly
configuration modified for impact in worst-case geometry.
*Tests are not required for subassemblies when main charge and booster charge explosives have
been qualified as IHE by tests in Table 16.1.
16.5.5. Some or all of these test requirements may be met by analogy as
indicated below:
DOE-STD-1212-2019
38
16.5.5.1. The DOE/NNSA Explosives Safety Committee determines the
acceptability of analogy in lieu of test data.
16.5.5.2. Analogy submitted in lieu of test data shall include rationale.
16.5.5.3. Approved IHE Subassemblies with complete test data shall be used for
baseline comparison purposes.
16.5.6. The DOE/NNSA Explosives Safety Committee may request additional
information depending on circumstances surrounding the analogous
information submitted.
16.5.7. A candidate IHE Subassembly can be placed in one of the following
analogy categories to define required tests depending on the type and
extent of change in the candidate IHE Subassembly relative to the
baseline IHE Subassembly and the potential effects of these changes
on specific initiation mechanisms (shock, thermal, mechanical, impact):
16.5.7.1. If the analogy can be fully credited, no testing is required.
Note: For example; materials and scales remain the same and only
minor changes that do not affect explosive characteristics.
16.5.7.2. If the analogy can be partially credited, partial testing is required.
Note: For example; minor changes to explosive materials or
components.
16.5.7.3. If the analogy cannot be credited, full testing is required.
Note: For example; a significant change to materials or configurations.
16.6. IHE Subassembly Qualification Process
16.6.1. IHE Subassemblies qualified by previous methods shall remain
qualified and are listed in Table 16.4.
16.6.2. The Requestor submits a test plan to the DOE/NNSA ESC Chair and
the test plan shall be coordinated with the appropriate DOE/NNSA site,
after coordinating need for subassembly qualification with the
appropriate HQs Program Office (e.g., NA-11, NA-12, or NA-19).
16.6.3. The DOE/NNSA ESC Chair assigns a Task Group for review and
approval/disapproval of the test plan.
DOE-STD-1212-2019
39
16.6.4. The ESC Task Group reviews the test plan for compliance with the IHE
subassembly requirements and provides input (if necessary), and
approves/denies the test plan. They then communicate their decision
to the DOE/NNSA ESC Chair.
16.6.5. The DOE/NNSA ESC Chair communicates the approval/disapproval to
the Requestor.
16.6.6. If the test plan is approved, the Requestor submits the test data, for the
candidate subassembly, to the DOE/NNSA ESC Chair.
16.6.7. The DOE/NNSA ESC Chair submits the test data to the Task Group for
review and recommendation of approval/disapproval of the candidate
subassembly.
16.6.8. If the request is not recommended for approval, the Task Group
documents the rationale and requirements that were not met and
provides to the Requestor through the DOE/NNSA ESC Chair.
Section 29
16.6.9. If the request is recommended for approval, the Task Group provides
the DOE/NNSA ESC Chair with recommendation to approve the
candidate subassembly.
16.6.10. The DOE/NNSA ESC Chair prepares a written recommendation on the
approval of the candidate subassembly, and submits it along with the
supporting subassembly package to the NNSA/NA-50 EAA.
16.6.11. The NNSA/NA-50 EAA approves or denies the candidate subassembly
for qualification as an IHE subassembly.
16.6.12. The EAA provides written documentation of their decision to the
DOE/NNSA ESC Chair.
16.6.13. If approved, the DOE/NNSA ESC Chair provides documentation of the
EAA's decision to requestor. If approved, the IHE Subassembly is
added to Table 16.4.
Note: Any redesign that dimensionally increases the booster size
requires resubmission of an experimental plan and additional testing as
another IHE Subassembly.
Table 16.4 Approved IHE Subassemblies
B61*3/4/6/7/8/10/11/12 W80* W81* B83*
W84 W87 W89
*Approval limited to boosters of the size tested or smaller.
DOE-STD-1212-2019
40
16.7. IHE Weapons
16.7.1. IHE weapons are those weapons listed in JNWPS TP-20-7, and are
exempt from storage and transportation limits when stored or
transported alone or in combination with each other.
Note: This classification is valid only if storage containers provide
adequate spacing between individual units. JNWPS TP-20-7 specifies
the spacing requirements for materials stored or transported out of
containers.
DOE-STD-1212-2019
41
Attachment A – IHE QUALIFICATION BACKGROUND
BACKGROUND
The DOE IHE definition differs from that of Department of Defense (DoD)/UN Extremely
Insensitive Substance (EIS) due to different risks and consequences associated with
nuclear weapons application. The critical difference in risk is the possibility of special
nuclear material (SNM) dispersal.
Detonation is the response that impacts nuclear safety. Inadvertent nuclear yield should
not be possible in modern weapons, so SNM dispersal is the critical nuclear safety
improvement that IHE enables. SNM dispersal requires shock from explosive in direct
contact, according to DOE-HDBK-3010-94 and NUREG/CR-6410. Absence of a
detonation greatly reduces the likelihood of dispersal. A shock from any High Explosive
violent reaction (HEVR) scenario, such as a violent deflagration, would be weak.
Prompt Shock-to-Detonation Transition (SDT) cannot be excluded under all conditions
because an IHE shall detonate to function as designed. The threshold should be clearly
defined because nuclear safety requires that we know the SDT characteristics of an
explosive. It is also important to confirm that the SDT characteristics are reasonably
consistent across the lifecycle temperature range. SDT insults are generated with a gas
gun which develops a sustained, 1D, shock pulse. These 1D shock pulses do not have a
system-relevant scale, so all IHE materials and subassemblies undergo the same test.
Deflagration-to-Detonation Transition (DDT) is the build-up of a burning reaction to a
detonation. Ignition is a complex phenomenon governed by many competing processes.
We assume ignition of a burning reaction in qualification testing since we cannot guarantee
that ignition shall never occur in the various relevant hazard scenarios. Whether the ignited
materials transition to a detonation is equally complex but is controlled by a few key
variables, including the strength of confinement, charge size, and the state of the
explosive. The DDT test is a large test with high confinement, and large margin. Deliberate
ignition verifies DDT is not possible in the material in any scale relevant to a nuclear
weapon. The inclusion of DDT testing eliminates the need for many standard ignition and
reaction violence tests like ODTX, Susan, Spigot, Friction, Bonfire, and Slow Cookoff.
Section 30
Unknown to Detonation Transition (XDT). In some hazard scenarios with detonable solid
rocket motors, initiation has been observed under conditions that are insufficient to
develop either an SDT or DDT initiation. This response mode is termed XDT, where “X”
stands for the unknown transition to detonation. It is believed that the XDT mechanism is
the result of a process that includes severe damage and break-up of a bare energetic
material in an unconfined space, expansion of this damaged material, and subsequent re-
compaction of damaged material to develop ignition or initiation. The process is known to
be highly complex and geometry dependent. There are no credible threats to nuclear
weapons that include a geometry that allows this process to progress. Also, the final stage
of both DDT and XDT is facilitated by the same underlying mechanism, shock initiation of
damaged explosives. If an HE passes a conservatively-designed DDT test, then we can be
DOE-STD-1212-2019
42
confident that XDT is not a possibility under similar stimulus and geometry. Therefore, a
test for XDT does not need to be included as a qualification test.
High explosive violent reaction (HEVR) is a commonly used term to describe an
unacceptable level of reaction. There is, however, no clear definition, either theoretically or
empirically, of HEVR. DOE Order 452.1E and the D&P Manual both refer to HEVR as
“ranging from a fast deflagration of the high explosive up to and including a detonation of
the high explosive”. There is no threshold for what might constitute a fast deflagration. In
other cases, including dispersal of material outside a facility perimeter, HEVR is essentially
being defined in terms of causing a secondary effect rather than in terms of the
phenomenon itself.
Without a clear or consistent definition, it is impossible to define one or more tests with
meaningful criteria to evaluate the candidate explosive for its propensity to undergo HEVR.
Hence the absence of that specific term in the definition of IHE. Historical IHE test
definitions similarly did not exclude the possibility of HEVR in an IHE.
We can make some observations on the implications of the new definition to the potential
for HEVR: the material properties that underlie DDT behavior also underlie HEVR
responses, including the propensity for thermal ignition, deflagration rate, and shock
sensitivity. Therefore, an explosive that meets the DDT criteria in the new definition is likely
to be relatively benign in any HEVR.
DEFINITIONS
Scales conservative to a relevant nuclear weapon application: The scale of a given
experiment is related to HE configuration in US nuclear weapons. This is related to the
main charge with a margin of conservatism. The scale is not the same as classified scaled
weapons experiments.
Scales conservative to its relevant application: The scale of a given experiment is related
to the HE configuration and confinement of the given application. For example, a booster
application has a shorter run length and lower confinement relative to a main charge.
REFERENCE DOCUMENTS
The following documents set forth some of the procedures to be referenced when planning
the IHE and IHE subassembly testing required by Table 16.1 and Table 16.3:
• TB 700-2
• MHSMP-84-22 Rev.1
• UN ST/SG/AC.10/11/Rev.1
• LLNL-TR-679331, LA-UR-15-29238, 2015
• DOE HDBK-3010
• NUREG-1320
• JNWPS TP-20-7
DOE-STD-1212-2019
43
17. LABORATORY OPERATIONS
17.1. Operational Requirements
Section 31
17.1.1. Laboratory personnel shall conduct work involving explosives materials
in accordance with approved operating procedures supported by
documented hazard analysis.
17.1.2. The quantity of explosives present in a laboratory shall be the minimum
required for the operations and should be at or below assigned limits.
17.1.3. Storage of explosives not in process is allowed provided the explosives
are secured when the laboratory is unoccupied.
17.1.4. Explosives shall be configured to preclude exceeding the maximum
credible event (MCE).
17.1.5. Open flames shall be prohibited in laboratories where explosives or
flammable solvent vapors are or may be present unless allowed by an
approved hazard analysis or procedure.
17.1.6. Disposal of explosives through laboratory drains shall be forbidden
unless the drain plumbing has no traps and is designed to handle
explosives (i.e., is provided with a sump or other device for the
collection of solids).
Note 1: Even if a drain is designed to handle explosives, deliberate
disposal of explosives in these drains should be avoided. These drains
should be used only to clean up explosives spills.
Note 2: Special care should be exercised to prevent entrance of
compounds into drains that may react with iron or rust to form sensitive
salts (e.g., picrates and picric acid).
17.1.7. Suitable guards shall be provided for all glass or fragile equipment
intended to withstand reduced or elevated pressure.
17.2. Blast Shields
17.2.1. If determined through a documented hazard analysis that a laboratory
operation presents a credible risk of explosives initiation, controls shall
be incorporated, such as the use of blast shields or performing the
operation remotely. Table 17.1 lists shields that have been tested and
found acceptable for the indicated quantities of explosive.
DOE-STD-1212-2019
44
17.2.2. If an experiment poses a metal-fragment hazard (as opposed to a
glass-fragment hazard) and the experiment cannot be conducted
remotely, the proposed shield should be tested and approved under
conditions simulating an explosion in the experimental setup but with at
least 125% of the anticipated explosive content.
17.2.3. The shield shall be anchored to the hood frame or bench top when it is
being used for protection against more than 0.16 oz (5 grams) of TNT
equivalent.
Note: Shields listed in Table 17.1 were not tested for metal-fragment
penetration (unless specifically indicated) and thus may not offer
effective protection when the explosive is closely confined in a
heavy-walled metal container (“heavy-walled” is defined here as wall
thickness to diameter ratio greater than 0.01).
17.2.4. Other blast shields may be approved for use after successfully passing
a test of 125% of the rated explosive charge.
17.2.5. For confined areas, a blast vent having less strength than the shield
should be provided.
17.2.6. When explosives operations require personnel to reach around a shield
to manipulate equipment, exposure shall be minimized.
DOE-STD-1212-2019
45
Table 17.1 Blast Shields for Laboratory Operations
Shield
Minimum
distance from
explosive
Explosives
limit
Leather gloves, jackets, or coats, and plastic face shields ---- 50 mg
3 mm tempered glass 8 cm 50 mg
7 mm Lucite/equivalent material 15 cm 2.5 g
20 mmLucite/equivalent material 15 cm 10 g
15 mm laminated resistant glass 20 cm 20 g
25.4 mm Lexan/Lexguard 30 cm 50 g
2 units each of 25.4 mm plate glass laminated with 12.4
mm polycarbonate with a 9.5 mm air gap between units
(glass sides facing the explosive)
Section 32
30 cm 50 g
(steel confined)
Note 1: Blast testing has shown that laminated tempered glass is superior to monolithic tempered glass,
and polycarbonate is superior to acrylic plastics, such as Lucite. Laminated tempered glass is
recommended instead of monolithic tempered glass and polycarbonate is recommended in lieu of acrylic.
Note 2: The shields are recommended to be of equal or greater thickness than those listed in the table.
Note 3: Proof testing is highly recommended.
Note 4: When designing and/or replacing a blast shield with a polycarbonate, it should be UV stabilized,
treated for abrasion resistance, and have met Mil Spec P-46144C.
Note 5: When designing or replacing a blast shield with laminated glass, it should be coated with a 0.1 mm
fragment-resistant film on the viewer’s side to minimize spalling.
Note 6: The shield, shield frame, and anchoring system shall be designed to resist maximum credible
overpressure and fragments.
17.3. Heating Operations
17.3.1. During synthesis, formulation, or experimental work, heat may be
applied to initiate or maintain reaction, to increase solubility, etc.
17.3.2. Heat shall be applied indirectly using steam, a water bath, oil bath, or
an approved laboratory electrical heating device such as a mantle.
17.3.3. Caution shall be exercised to verify that reactive material does not
come in direct contact with the heating elements.
17.3.4. If an experiment requires a blast shield, any heating device shall be
mounted so that temperature can be controlled from the operator side
of the shield.
17.3.5. If an experiment requires a blast shield, any heating device should be
mounted so it can be separated quickly from the reaction vessel without
operator exposure.
Note: During design of the experiment, consideration should be given
to providing emergency cooling for the reaction vessel or its contents.
DOE-STD-1212-2019
46
17.3.6. Heating systems that are operated unattended shall have dual controls,
an override shutoff, or some other protection against failure of the
primary heating control.
17.3.6.1. Heating of explosives with devices without these controls shall be
monitored at all times
Note: If the operator leaves for any reason, the heating device should
be turned off.
17.3.7. Requirements in paragraph 17.3.6. may not apply to systems capable
of totally containing the effects of an explosion.
17.3.8. Periodic checks should be made to verify that an experiment is
proceeding satisfactorily and that the apparatus is not boiling dry,
malfunctioning, etc.
17.3.9. In the case of remotely controlled operations, provisions shall be made
for observation using mirrors, television monitors, etc.
17.4. Laboratory Setups
17.4.1. Equipment and apparatus shall be clean, in good condition, and in
good working order.
17.4.2. All glassware and apparatus shall be inspected for cracks, defects, etc.,
before use.
17.4.3. Defective or damaged equipment shall be removed from service.
17.4.4. Setups shall be geometrically and structurally stable.
17.4.5. Work areas should be neat and uncluttered.
17.5. Low Concentration of Explosives in Solution
17.5.1. After explosives are in dilute solution (less than 25% explosives by
weight), the primary hazard shall be considered as that associated with
the solvent and not the explosive.
Note: Where supported by technical data and approved by the EDC, a
solvent/ explosives solution greater than 25% may also be similarly
classified.
Section 33
17.5.2. If the explosive recrystallizes or precipitates out of solution, safety
requirements for explosives shall apply.
DOE-STD-1212-2019
47
17.6. Explosives Sample Control
17.6.1. Samples shall be delivered to a laboratory only at specific designated
locations.
17.6.2. Each sample shall be properly identified and labeled.
17.6.3. Upon completion of required tests or analyses, the sample should be
removed from the laboratory.
17.6.4. A safety information sheet should accompany all samples of new
experimental explosive material submitted to a laboratory for analysis.
17.7. De minimis or Residual Quantities
17.7.1. Based on a total mass size less than the critical diameter, primary
explosives 1 mg or less and secondary explosives 10 mg or less are
considered non-detonable by abnormal stimuli or environment (see
Paragraph 6.2.1). Locations with explosives in these quantities are
therefore exempt from the following requirements.
• Electrical equipment requirements.
• Posting of fire symbol signs and placards.
• Quantity/distance requirements.
• Posting of explosives limits.
• Personnel Limits.
17.8. Laboratory Wiring and Equipment
17.8.1. Permanent wiring and equipment for existing laboratory areas are not
required to meet the requirements of Chapter 36.
17.8.2. Process equipment used for synthesis, heating, drying, mechanical
mixing, and blending shall be dual‐rated (Class I, Division 1 and Class
II, Division 1).
17.8.3. Weighing equipment shall be Class II, Division 1 or mechanical.
17.8.4. Synthesis, heating, drying, mechanical mixing, blending, and weighing
operations shall be isolated from non‐rated wiring, electrical equipment,
and instrumentation in a manner that prevents dust or vapors reaching
an ignition source.
17.8.5. When laboratory equipment cannot meet the requirements of
Paragraphs 17.8.2, 17.8.3, and 17.8.4, apply Paragraphs 36.4.3 and
36.4.4.
DOE-STD-1212-2019
48
18. INSPECTION
18.1. Inspections
18.1.1. Explosives shall be inspected to verify proper identification.
18.1.2. Incoming explosives raw materials shall be inspected for foreign bodies
that could cause operating or safety problems in processing operations.
18.1.3. Pressed explosive billets shall be inspected for foreign bodies, voids, or
cracks that could cause operating or safety problems in processing
operations.
18.1.4. Explosives pieces and assemblies shall have their physical parameters
measured where improper dimensions could cause safety problems in
processing operations.
18.2. Inspection Methods
18.2.1. The following are examples of acceptable inspection methods:
• Screening
• Visual inspection
• Magnetic separation
• Radiography
• Chemical analysis
• Physical dimension
18.3. Inspection Equipment Design and Operation
18.3.1. Pinch points shall be eliminated or steps taken to preclude explosives
contamination of pinch points.
18.3.2. Threaded fasteners or threads of measuring equipment shall be
protected from explosives contamination.
18.3.3. Care shall be taken to prevent parts of the measuring or handling
equipment from becoming loose and getting into the explosives.
18.3.4. Inspection fixtures shall be designed to secure the explosives piece or
assembly effectively to prevent toppling, rolling, or dropping during
measurement operations.
Note: This is especially critical if the explosives assembly is in motion
(e.g., spinning, vibrating) during measurement.
DOE-STD-1212-2019
49
19. EXPLOSIVES DEVELOPMENT AND FORMULATION SCALEUP
Section 34
19.1. Contractor Explosives Development Committee (EDC)
19.1.1. A committee shall be established at each DOE/NNSA facility engaged
in explosives development to be the approving authority for each phase
of an explosives development program.
19.1.2. This committee is referred to in this Technical Standard as the EDC,
but it may have a different name at each DOE/NNSA facility.
19.1.3. Individuals selected to serve on the EDC should have considerable
experience in explosives handling, processing, chemistry, sensitivity
and safety.
19.1.4. The EDC shall approve phase-by-phase, modified formulations and
sensitivity data as follows:
19.1.4.1. Shall review and approve data generated in each phase of a
development project that involves a new explosive or new explosive
formulation before the next phase begins.
19.1.4.2. Shall review and approve compositional modifications to previously
evaluated explosive formulations and may approve minor modifications
to the explosives formulation for a given phase of development without
requiring all of the developmental steps and tests.
19.1.4.3. May waive some developmental phase tests if comparable sensitivity
data for the subject material are available from another source.
19.2. Development Process
19.2.1. All DOE/NNSA explosives handling facilities shall establish an
administrative process that defines the basic steps for developing and
evaluating new explosives and explosive formulations.
19.2.2. The process shall require that each development effort proceed in
phases from small to large quantities. The quantities of materials that
may be handled in each phase shall be limited.
19.2.3. The EDC shall be responsible for establishing criteria for acceptable
explosive behavior in each test of each phase of the explosives
development process.
DOE-STD-1212-2019
50
19.2.4. The development process should consist of three phases plus
sensitivity and compatibility testing, when required. Guidelines for
establishing this procedure are contained in Table 19.1.
a. Quantities and recommended data apply to both new formulations and explosive ingredients.
b. The EDC may allow more than 500 g in Phase II where larger quantities are needed for some tests.
c. Compatibility of explosives and formulations with materials contacting the explosives in test and
production assemblies.
d. Before proceeding to Phase II if the composition of a formulation is modified so that the composition is
no longer within the limits specified by the EDC.
e. Before proceeding to Phase III if:
1. The formulation to be scaled up to Phase III differs from that tested in Phase I, or
2. The explosive or formulation prepared for Phase II development is produced by techniques
different from those used in Phase I.
f. Materials investigated in this phase should be produced by techniques similar to those that shall be
used to produce larger batches in a subsequent phase.
Table 19.1 Scaleup Process Guidelines for New Explosive and Formulations
Quantity of New Materiala Recommended
Dataa Data Desired Additional
Recommendations
Synthesis
Specified by the lab performing
the synthesis
Impact, friction,
spark, thermal
stability
Before using the new
ingredient in a
formulation
----
Formulation
Compatibility Testing: 2 g Thermal compatibility
of new ingredient
with other ingredients
of formulation
Before proceeding to
Phase I
Materials should be
processed remotely
Phase I
10 g Impact, friction,
Section 35
thermal stability
Before non-remote
processing and
handling in Phase I
or scaleup to
Phase II
Materials should be
processed remotely
before passing
sensitivity and
stability tests
Phase II
500 gb Compatibility c,
impact, friction,
spark, thermal
stability, thermal
characterization
before elevated
temperature pressing
d, e f
Phase III
Specified by EDC Compatibility,
high-speed
machining, drop, skid
Before Phase III
machining or
handling of billets
7 kg or greater
Composition of
formulation shall be
fixed
DOE-STD-1212-2019
51
19.3. Sensitivity Testing
19.3.1. Before mixing a new explosive with other materials, the sensitivity and
stability of the explosive should be determined and should comply with
the criteria set by the EDC. Recommended tests include the following:
• Drop-weight impact
• Friction
• Spark
• Thermal stability
Note: Thermal stability tests should include two or more of the
following:
• Differential thermal analysis or differential scanning calorimetry
• Thermal gravimetric analysis
• Gas evolution rate at elevated temperature (chemical reactivity test,
vacuum stability)
• Time-to-explosion analysis
19.4. Compatibility Testing
19.4.1. If a proposed formulation contains new ingredients (explosive or non-
explosive), the new ingredients should be tested for compatibility with
the other ingredients before preparing batches for Phase I testing.
19.4.2. Compatibility tests should include any of the stability tests listed under
Paragraph 19.3.1.
19.4.3. No more than 2g of the new formulation should be prepared, handled,
or stored before compatibility testing.
19.4.4. Formulations for compatibility testing should be processed remotely,
whenever possible.
19.5. Phase I—Preliminary Development
19.5.1. Whenever possible, material should be processed remotely.
19.5.2. The total quantity of material that may be processed, handled, or stored
at any one time in Phase I should not exceed 10g.
19.5.3. The new explosive or formulation should be subjected to sensitivity and
stability tests.
Note 1: As a minimum, drop-weight impact, friction, spark sensitivity,
and thermal stability tests should be performed.
DOE-STD-1212-2019
52
Note 2: Thermal stability testing need not be performed here if one or
more of the compatibility tests listed under Paragraph 19.3.1 have
already been conducted on the new formulation.
19.5.4. If the new explosive or formulation has acceptable sensitivity and
compatibility results, it may be scaled up to Phase II.
Note: The EDC may impose handling or processing restrictions or
precautions on the material if its performance in any of the above tests
is questionable.
19.5.5. After Phase I testing of a formulation is complete, the EDC shall define,
on the basis of the test results, what variations in composition are
permissible during Phase II development without retesting.
19.6. Phase II—Experimental Characterization and Development
19.6.1. The total quantity of materials processed or handled at any one time in
Phase II should not exceed 500g.
Note: No limit exists on the quantity that may be stored, other than the
storage facility limits for Group L explosives.
19.6.2. Materials investigated in Phase II should be produced by techniques
similar to those that shall be used to produce larger batches in a
subsequent scaleup phase.
19.6.3. A thermal characterization test and evaluation should be run before
pressing the new material at elevated temperature.
Section 36
19.6.4. The Phase I sensitivity and stability tests should be rerun in Phase II if
any of the following conditions apply:
19.6.4.1. The formulation to be scaled up to Phase III differs from that tested in
Phase I. In this case, testing should be completed before Phase III
scaleup.
19.6.4.2. The explosive or formulation prepared for Phase II development is
produced by techniques different than those used in Phase I.
Note: Testing should be completed before Phase III scaleup.
19.6.4.3. During Phase II, the composition of a formulation is modified to an
extent that the composition is no longer within the limits specified by the
EDC (see Paragraph 19.5.5). Testing should be completed before
proceeding with Phase II.
DOE-STD-1212-2019
53
19.6.4.4. The compatibility of explosives and formulations with materials
contacting the explosives in test and production devices shall be
evaluated before any such device is assembled.
Note: If compatibility testing is required, one or more of the tests listed
under Paragraph 19.3.1 should be recommended.
19.7. Phase III—Full-Scale Testing and Production Development
19.7.1. The maximum quantity of materials processed or handled in Phase III
shall be defined in the EDC grant of authorization to proceed with
Phase III.
Note: No limit is imposed for storage facilities except the limits imposed
by the QD tables.
19.7.2. All additional testing necessary to define storage compatibility grouping
should be completed before committing bulk quantities of the material
to storage (see Section 32.4).
19.7.3. During Phase III development, the composition of all formulations
should be fixed.
19.7.4. Any new explosive material that is to be contact machined shall be
subjected to a machining overtest.
Note: Reaction threshold should be determined if possible.
19.7.5. If billets of 7kg or greater are to be produced in Phase III, skid testing
should be performed and EDC criteria for this test should be met.
19.7.6. Paragraph 19.6.4 should also apply to Phase III development.
20. SYNTHESIS AND FORMULATION
20.1. Synthesis
20.1.1. Synthesis operations are conducted both on laboratory and pilot scales.
The EDC shall approve new operations and materials. In the
laboratory, the new material shall initially be prepared on a small scale
and characterized as to sensitivity, physical, and explosive properties.
Also, the laboratory shall develop processing techniques for the
material. If laboratory studies determine that the explosive is of
continuing interest, it may be advanced to the Pilot Plant where
processing techniques shall be refined and scaled up. The Pilot Plant
DOE-STD-1212-2019
54
shall produce sufficient material for larger scale physical, explosive,
and sensitivity characterizations.
20.1.2. Laboratory Scale Synthesis
20.1.2.1. Before initiation of work, the subject matter expert who is directing or
conducting the synthesis shall analyze each explosives or potential
explosives experiment for the type and magnitude of hazards. They
shall be responsible for planning the proper selection of conditions,
quantity of explosives, and safety devices to be employed.
20.1.2.2. Experiments should be designed to minimize the amount of explosives
involved and to use the mildest conditions that yields the desired
information.
20.1.2.3. New explosives materials shall be afforded extra protection against
impact, pinching, friction, pressure, sparks, contamination, and
deterioration.
Section 37
Note: If it is necessary to subject explosives to any of these conditions,
the operation shall be conducted remotely or adequate personnel
shielding shall be provided.
20.1.3. Pilot or Processing Scale Synthesis
20.1.3.1. Alarms should be provided for coolant flow to the reactor, for reaction
vessel agitation, and for reactor temperature. These alarms should be
energized whenever coolant supply or agitation is critical to prevent a
runaway reaction.
20.1.3.2. When agitation is critical, the reactor should be equipped with at least
two sources of power to maintain agitation in the event of failure. For
example, a reactor might employ an air or inert gas bubble tube as a
backup for a mechanical agitator.
20.1.3.3. The reaction vessel should be equipped with an emergency system
that automatically cools the vessel or opens or closes a vessel dump
valve as required by the process.
Note: Contact operations should be conducted with a means to activate
the emergency system manually.
20.1.3.4. An alarm or monitor should be provided for the critical exhaust
ventilation system to warn operating personnel if airflow rates drop
below a predetermined level.
DOE-STD-1212-2019
55
20.1.3.5. Emergency plans shall be established for the synthesis area, specifying
action to be taken in the event an alarm sounds.
20.1.3.6. Before operations begin, all equipment shall be set up and checked for
proper function.
20.1.3.7. Prior to use with any hazardous material, new or infrequently used
equipment shall be tested in a “dry run.”
20.1.3.8. Before starting any process operation, the transfer lines to be used
should be properly labeled and their function specified in the operating
procedure.
20.1.3.9. All control valves shall be correctly identified according to function.
20.1.3.10. Safety equipment and clothing shall be worn as defined in operating
procedures.
20.1.3.11. Explosives warning signs shall be conspicuously displayed on any
processing vessel in which explosive materials are to be left overnight.
20.1.3.12. All explosives synthesis process equipment shall be maintained
routinely.
20.1.3.13. Equipment with defects that could affect safe operations shall be
tagged to prevent its use until repairs are completed.
20.1.3.14. Transfer hoses and portable equipment not involved in the process
shall be removed from the work area and stored in their proper places.
20.1.3.15. Agitator blades on reactors and mixers shall be inspected regularly for
proper clearance to verify that there is no pinch point or metal to metal
contact.
20.1.3.16. Any vessel that can be sealed and that can operate above atmospheric
pressure shall be equipped with overpressure protection.
20.1.3.17. All closed vessels should be purged with inert gas before flammable
liquids are introduced.
20.1.3.18. Inert gas pressure should be used to transfer flammable liquids when
gravity flow or pumping is not practical.
DOE-STD-1212-2019
56
20.2. Formulation
20.2.1. Formulation operations considered in this section involve combining
compounds or mixtures when one or more of the ingredients are
explosive.
20.2.2. Explosives should be loaded into mixers, mills, and deaerators as an
operator attended, contact operation. However, the starting, operating,
and stopping of such equipment with explosives present shall be
accomplished remotely. As an exception, mixing type operations
involving a low-energy transfer may be allowed as a contact operation
(e.g., slurry coating and melt agitation).
Section 38
20.2.3. Equipment used for explosives formulation shall be checked for proper
operation before adding explosives.
20.2.4. Equipment shall be examined for proper clearances and for metal-to-
metal rubbing of moving parts with the potential to contact explosives.
20.2.5. Bearings should be sealed to preclude explosives contamination.
20.2.6. Fast action deluge systems shall be considered for equipment (e.g.,
mixers, mills, and deaerators) used for easily ignitable explosives
formulations.
20.2.7. Hot water, cold water, or steam may be applied to mixers and mills.
Heating fluid temperatures shall not exceed known safe operating
temperatures for the explosives involved. When roll milling, allowance
shall also be made for viscous shear heating of the explosives in
process. Heated systems shall comply with the requirements of
Paragraphs 21.3.1 and 21.3.4.
20.2.8. Mixing
20.2.8.1. Mixer seals and gaskets shall be checked on a regular schedule and
cleaned or replaced as required.
20.2.8.2. Checks should be made to verify that maximum particle sizes of
ingredients or hard agglomerates of proposed mixes are less than the
blade to blade or blade to bowl clearances.
20.2.8.3. Initial cleaning with solvents used for dissolving or suspending the
explosives residues shall be done remotely (except for melt mix or
slurry coating vessels).
DOE-STD-1212-2019
57
20.2.8.4. Explosive powders and plastic bonded explosives formulations should
be mixed wet in a contact operation. This can be accomplished if the
wet mixture cannot be initiated with energy sources available, the
viscosity is kept low, and the possibility of isolated portions of the mix
becoming dry is precluded.
20.2.9. Ball or Jar Milling
20.2.9.1. Balls that are porous or contain cavities shall not be permitted in mills
for grinding explosives.
20.2.9.2. Grinding media contaminated with explosives slurry shall be protected
from excessive impact when emptying of the mill.
20.2.9.3. After grinding, a careful inspection shall be made to verify that the
explosive is free of grinding media. Dispose of any explosives
contaminated with broken media.
20.2.9.4. After separating the explosive, the grinding media shall be thoroughly
cleaned and inspected before reuse or disposal.
20.2.10. Roll Milling
20.2.10.1. Positive stops should be installed on roll mills to prevent rolls from
rubbing against each other.
20.2.10.2. Before starting a milling operation on a roll mill, the contact of the
scraper blade with the roll should be adjusted to the minimum pressure
necessary to perform the operation.
20.2.10.3. Roll gaps should be set as wide as possible while still allowing
adequate working of the material. The minimum gap setting shall be 0.1
mm.
20.2.10.4. Roll rpm should be held at the minimum required to process the
material adequately.
20.2.10.5. All roll mills that should be contact operated (e.g., with nonexplosive
materials) shall be equipped with emergency stop devices (breaker bar
or chain) within easy reach of the operator.
DOE-STD-1212-2019
58
21. HEATING, DRYING, AND THERMAL CONDITIONING
21.1. Hazards of Heating Explosives
21.1.1. Elevated temperature may increase an explosive’s sensitivity to other
stimuli such as impact, shock, friction and static electricity.
Note: A runaway chemical reaction may occur at or above the
explosive’s critical temperature that can produce an explosion or fire.
Section 39
21.1.2. Elevated temperature of an explosive in a sealed container may cause
gas generation and pressure rupture of the containment even at
temperatures below the critical temperature.
21.1.3. Chemically incompatible or reactive materials, which may be present as
accidental contaminants, as components of the formulation, or in
external contact with the explosive, may intensify the preceding
dangers or cause them to occur at lower temperatures.
21.1.4. Non-uniform heating can cause excessively hot regions in the
explosives. Causes may include inadequate agitation of fluid
explosives, non-uniform heaters, and non-uniform heat conduction.
21.2. Critical Temperature and Thermal Analysis Methodology
21.2.1. Critical temperature is a system property that depends on a
combination of the explosive’s chemical decomposition reactions, its
mass and shape, heat transfer and other thermal characteristics of the
system, and the confinement or pressure of decomposition products,
especially gases. Several different methods of thermal analysis may be
used to determine or estimate the critical temperature. The process is
typically quite complex because of the complexity of normally occurring
chemical reactions.
21.2.2. For operational safety, a conservative estimate (i.e., lower limit) of the
critical temperature for a heating operation shall be made (uncertainties
of 18°F to 45°F (10°C to 25°C) being common).
Note: Analogy of one explosive or system to another similar system
with a reliable thermal analysis should be used to determine safe
heating temperatures and heating times (heating limits).
21.2.3. The differential thermal analysis (DTA), differential scanning calorimetry
(DSC), or other comparable techniques may be used to measure the
DOE-STD-1212-2019
59
temperature of the onset of an exothermic reaction in an explosive. The
test results may be used to rank the thermal stability of explosives and
as part of a thermal analysis. Because of the complexity of chemical
decomposition, however, the DTA/DSC exotherm has no systematic
relationship to the critical temperature and is unreliable for estimating
safe heating limits. Exotherm temperature is always considerably
above critical temperature and usually increases with the heating rate
of the test.
21.2.3.1. Where the DTA/DSC exotherm is specified as a standard for
temperature control, the test heating rate shall not exceed 18°F (10°C)
per minute.
21.2.3.2. DTA/DSC shall not be used as a sole means for establishing heating
limits.
21.2.4. Each facility shall conduct or obtain thermal analysis of any explosives
system before the explosive is heated in a contact operation or in
association with hazardous radioactive materials as described in
Section 29.4.
21.2.5. From this analysis, a heating limit for the explosives system shall be
established which the EDC shall approve.
21.2.5.1. All factors in Sections 21.1 and 21.2 shall be considered.
21.2.5.2. Any significant change in the geometry or an increase in mass should
be considered a new explosives system.
21.2.5.3. For a contact operation, the maximum temperature should be set at
least 18°F (10°C) below the critical temperature.
21.2.5.4. For heating explosives in association with hazardous radioactive
materials, the maximum temperature should be set at least 36°F (20°C)
below the critical temperature.
Section 40
21.2.5.5. Contractor Facility Management should approve heating to a
temperature greater than the above specifications if a documented
analysis of the explosive’s thermal characteristics indicates that an
acceptable time or temperature safety factor is still present for a
specific operation.
21.2.5.6. These operations shall be conducted remotely.
21.2.6. Heating controls for each operation shall be established and specified
in written operating procedures.
DOE-STD-1212-2019
60
21.2.6.1. Specified conditions should be set at the lowest temperatures and
heating times to do the job efficiently. Temperatures should not exceed
the heating limit for the explosives system.
21.2.6.2. Factors to consider when establishing heating controls include:
• The heating limit and accuracy of the estimated critical temperature.
• Accuracy of the temperature control equipment.
• The likelihood of incompatible chemical contamination and other
operational parameters.
21.3. Heating and Drying Equipment
21.3.1. Heat should be supplied by steam, hot water, friction air, electrically
heated transfer fluid, or electrical resistance elements.
21.3.2. Redundant, automatic heat controls shall limit temperatures.
21.3.3. Explosives heated using electrical resistance elements shall be
separated from electrical resistance elements to avoid any possible
contact.
21.3.4. In systems heated by steam only, the requirements for redundant,
automatic heat controls shall be satisfied if a pressure reducing valve,
pressure relief valve, and thermostatic valve on the system control the
steam pressure.
21.3.5. In electricity heated systems, a manual reset secondary over-
temperature system consisting of a controller, failsafe sensor, and an
interrupting device shall be provided to interrupt the heat supply source
if the primary system fails.
21.3.5.1. The secondary interrupter shall be separate from the primary
interrupter.
21.3.5.2. The upper limit of the primary controller is determined by the desired
operating temperature limit.
21.3.5.3. The secondary (override) controller is set at a higher temperature but
should not exceed the maximum temperature determined by the
heating limit specified for the explosives system as determined in
Paragraph 21.2.4.
21.3.6. Visual and/or audible alarms should be provided to alert operating
personnel to abnormal temperature conditions.
DOE-STD-1212-2019
61
21.3.6.1. The heating of explosives should be monitored at all times.
21.3.7. The air or gas used to condition exposed explosives shall not be
recirculated if directly heated by electrical resistance elements.
21.3.8. Drying or heating ovens should be vented to a safe location outdoors.
Water wash or filtration of the exhaust may be required.
21.3.8.1. If exhaust fans are used, they shall be interlocked with the heat source.
21.4. Heating and Drying Operations
21.4.1. Heating and drying shall be performed under the mildest set of
conditions to accomplish the task safely and efficiently.
21.4.2. A thermal analysis shall be made and a written procedure prepared
consistent with Section 21.2.
21.4.3. The operating procedure shall include controls on the mass and
geometry (thickness of the layer) of the material that may be heated.
21.4.4. Except as described in Paragraph 21.4.5, drying shall be achieved by
circulating a warm, dry gas—either air or inert—over or through the
material.
21.4.5. Small samples may be dried by placement in desiccators or by
subjecting them to vacuum.
Section 41
21.4.5.1. Vacuum drying of larger items should be preceded by drying at
atmospheric pressure to remove quantities of moisture or solvent
before vacuum is applied to remove the final traces of moisture or
solvent.
21.4.5.2. Explosives having a vapor pressure exceeding 0.013 Pa (1 x 104 mm
Hg) at the drying temperature shall not be subjected to vacuum drying.
21.4.5.3. A cold trap shall be used for vacuum drying where the vapor pressure
of the explosives is unknown.
21.4.6. A vapor air mixture within explosive concentration limits shall be
avoided.
21.4.6.1. Such a vapor air mixture can be controlled by providing sufficient
airflow to maintain a vapor concentration well below the lower
flammability limit or by using an inert atmosphere.
DOE-STD-1212-2019
62
21.4.6.2. For inert atmosphere, positive purge shall be used to preclude oxygen
leakage into the unit.
21.4.6.3. If vapor concentrations approaching a flammable level are anticipated,
they shall be monitored.
21.4.6.4. Airflow shall be controlled to prevent dusting.
21.4.7. When heating explosives whose vapor pressure may cause undesired
condensation of explosives on equipment parts, heating shall be
conducted in a manner to control condensation of the explosive
material.
21.4.7.1. This control should be accomplished by heating the exhaust system or
by circulating the air at a rate that shall keep the explosives
concentration below the level at which condensation could occur.
21.4.8. The proper operation of heater controls shall be verified on a regular
schedule established by Contractor Facility Management.
22. DRY SCREENING, BLENDING, AND MELTING
22.1. Dry Screening
22.1.1. Use of magnetic separators is often advisable to remove ferrous
materials that may have passed through the screens.
22.1.2. Operations using mechanical screens shall be performed remotely.
22.1.3. Screening small samples may be performed as a contact operation in
accordance with approved operating procedures.
22.1.4. Operating areas and equipment therein shall be cleaned frequently to
avoid accumulation of explosives dust.
22.1.5. Operations and equipment shall be set up to minimize and control dust
generation.
22.1.6. Equipment shall be designed and operations performed to avoid
subjecting explosive materials to pinching, friction, or impact.
22.1.7. Precautions shall be taken to prevent metals from rubbing together
when the screens vibrate.
22.1.8. Vibrating equipment shall be inspected frequently for developing cracks
subject to contamination by explosives.
DOE-STD-1212-2019
63
22.1.9. Equipment shall be electrically bonded and grounded. Resistance to
ground shall be 10 ohms or less and shall be inspected as established
by Contractor Facility Management.
22.1.10. Equipment used to transfer electrostatic sensitive explosives to or from
screens shall be conductive and electrically bonded to the screen
during transfer.
22.2. Blending
22.2.1. Dry blending of explosives shall be performed remotely.
22.2.2. Dry, hand blending of small samples may be performed as a contact
operation in accordance with approved operating procedures.
22.2.3. Equipment should be designed and operations performed to minimize
generation and dispersion of explosives dust.
22.2.4. Equipment shall be electrically bonded to provide a continuous path to
ground.
22.2.4.1. Resistance to ground shall be 10 ohms or less and shall be inspected
as established by Contractor Facility Management.
Section 42
22.2.5. Equipment used to transfer electrostatic sensitive explosives to or from
blenders shall be conductive and electrically bonded to the blender
during transfer.
22.3. Melting
22.3.1. The heat for melting explosives shall be supplied by saturated steam,
hot water, or another temperature controlled medium.
22.3.1.1. The steam pressure shall be controlled in accordance with Paragraph
21.3.4.
22.3.2. Temperatures for contact melting of TNT based explosives (except
those containing PETN (Pentaerythritol Tetranitrate), e.g., pentolite)
and keeping them molten shall not exceed 249.8°F (121°C).
22.3.2.1. The temperature limit for TNT explosives containing PETN shall be
228.2°F (109°C).
22.3.3. Alarms shall be provided on the melt temperature and on melt kettle
agitation when the operation is left unattended.
DOE-STD-1212-2019
64
22.3.3.1. Alarms shall sound if the temperature exceeds the specifications of
Paragraph 22.3.2 above, or if agitation ceases.
22.3.4. Provisions should be made for emergency emptying of melt kettles in
the event of temperature control problems or power failures.
22.3.5. Feeding of the melt kettle and the melting operation shall be controlled
or regulated to prevent the formation of large chunks of explosives.
22.3.6. Wherever possible, valves, piping, and threaded bolts and fasteners
should be eliminated from melted explosives handling systems.
22.3.7. Melt kettles shall be constructed with corrosion resistant materials.
22.3.7.1. Construction shall not contain blind holes, threads, or cracks in areas
exposed to melted explosives.
22.3.7.2. Welds shall be inspected and found free of cracks and porosity.
23. PRESSING AND EXTRUDING
23.1. Pressing
Note: Explosives pressing operations subject explosives to high
pressures to achieve a physical change. Pressing of explosives
formulations is done routinely to consolidate explosive materials into
configurations required for test assemblies or weapon systems. Two
common types of pressing operations commonly performed are
isostatic/hydrostatic and punch and die. The following requirements
apply to these types of pressing operations.
23.1.1. Explosives pressing operations shall be conducted remotely.
23.1.2. The correct functioning of press interlock systems shall be verified at
intervals established by Contractor Facility Management.
23.1.3. Pressing mandrels, punches, and dies used in explosives operations
shall be examined regularly during periods of use for evidence of
structural failure.
23.1.3.1. Suitable nondestructive test methods shall be used to perform the
examination.
DOE-STD-1212-2019
65
23.1.3.2. Contractor Facility Management shall establish intervals between
inspections for each tooling design before committing the tooling to
use.
23.1.3.3. The inspection interval and updating should be based on experience
with similar tooling designs and configurations.
23.1.4. All new or modified mandrels, punches, and dies shall be inspected
before their first use.
23.1.4.1. At least one pressing cycle shall be completed with mock explosives
before proceeding to explosives.
23.1.5. Pressure controllers and indicators shall be calibrated periodically to
verify accurate control and monitoring of pressing operations.
23.1.6. Press parts that contact explosive materials shall be cleaned
thoroughly to remove residual explosives before use with a different
explosive formulation.
23.1.7. Temperature control for heated presses and dies shall comply with the
requirements of Paragraphs 21.3.1 and 21.3.4.
Section 43
23.1.8. All pressing assemblies shall be designed or procedural controls
established to minimize or eliminate the extrusion of explosives
between two mating metal surfaces during the pressing operation.
23.1.9. Operations with explosive powders should be performed in a manner
that reduces the release of explosives dust and thereby reduces
operator exposure and general room contamination.
23.1.9.1. For operations involving large amounts of powders, local exhaust
ventilation with a dust collection system should be provided.
23.1.9.2. Respiratory protection to prevent inhalation of explosives dust may be
required when adequate ventilation is not available.
23.1.10. Isostatic/Hydrostatic Pressing
23.1.10.1. Before an elastomeric container or mandrel constructed of a new
material is introduced into a pressing operation (where it contacts
explosives), the material shall be evaluated for compatibility with the
explosives.
23.1.10.2. All pressing vessels shall be examined for evidence of cracking or other
signs of incipient structural failure at regular use intervals by suitable
DOE-STD-1212-2019
66
nondestructive test methods. Contractor Facility Management shall
establish examination intervals.
23.1.10.3. Before large scale pressings of new explosives or explosives
formulations, the materials shall be evaluated for thermal stability (see
scaleup procedures in Chapter 19).
Note 1: “New explosives or explosives formulations” refer to those that
are “new” to large scale pressing.
Note 2: Stability test results shall be used to assist in establishing safe
pressing conditions for the specific pressing size.
23.1.10.4. For isostatic pressing, procedural controls shall be established to
validate that:
• An acceptable vacuum can be obtained on the mandrel assembly to
prevent adiabatic heating during pressing; and
• Air is bled out of the press before pressurization.
23.1.10.5. Consideration should be given to the use of fire resistant hydraulic
fluids.
Note: New fluids shall be checked to verify compatibility with the
explosives used.
23.1.11. Punch and Die Pressing
23.1.11.1. All pressing punches and dies shall be inspected visually for damage,
deformation, and cleanliness before installation on a press.
Note: Any questionable condition shall be resolved before the pressing
proceeds to verify that the operation’s safety is not compromised.
23.1.11.2. All punches, dies, and press attachment fixtures shall be designed to
minimize the possibility of the punch being misaligned with the die
(resulting in gouging of a die surface during pressing).
Note: Press setup procedures shall provide for operator verification of
proper alignment before pressing.
23.1.11.3. The responsible user of a gauging section capable of performing the
necessary measurements shall control punches and dies.
Note: Punches and dies should be maintained in matched sets.
DOE-STD-1212-2019
67
23.1.11.4. A group other than the user shall check critical punch and die
dimensions before initial use and at suitable intervals thereafter.
Note: Suitable check intervals for each punch and die design should be
determined as in Paragraph 23.1.4.
23.2. Extruding
23.2.1. Extrusion operations shall be conducted remotely.
23.2.2. Contact extrusion should be performed only when extruding
nonexplosive or mock materials or when hand extruding small
quantities with no metal to metal contact.
23.2.3. Precautions shall be taken to prevent personnel from being injured by
the rupture of pressurized equipment.
Section 44
23.2.4. The explosive shall be protected against extrusion beyond the tooling
cavity.
23.2.5. Precautions shall be taken to prevent foreign material from entering the
explosives.
23.2.6. New designs and significant design changes in equipment, tooling or
components shall be tested by mock explosives extrusion before actual
explosives extrusion.
23.2.7. Pressure controllers and indicators shall be calibrated periodically to
validate that proper sealing and extrusion pressures are maintained.
23.2.8. Extrusion press parts shall be cleaned thoroughly of residual explosives
remaining from the previous operation before the press is loaded with a
different explosive formulation.
23.2.9. Hand loading of extrudable explosives is covered in Section 28.3.
24. MACHINING
24.1. Equipment Requirements
24.1.1. Interlocks shall be provided for wet machining operations to verify
coolant flow before machine operation.
24.1.1.1. The coolant flow shall be monitored and the equipment automatically
and safely shut down if loss of coolant flow is detected.
DOE-STD-1212-2019
68
24.1.1.2. The coolant interlocks shall be protected from tampering and
unauthorized disabling by physical means, or supervisory control.
24.1.2. The vacuum on vacuum chuck holding fixtures shall be monitored and
interlocked with the equipment for automatic shutdown of machining in
the event of vacuum loss.
24.1.3. Tool path controls (stops, limits, design patterns) shall be provided to
prevent the unplanned travel path of a tool or work piece.
24.1.4. Positive means or secondary verification shall control and limit
equipment speed and feed rates.
24.1.5. Pressure-relief devices should be installed on pneumatically or
hydraulically powered equipment to provide for safe operation.
24.1.6. Metal chip waste from machining operations should be kept separate
from explosives waste.
24.1.6.1. When this is not possible, mixed explosives and metal waste should be
completely segregated from unmixed waste and held for separate
disposal.
24.1.7. A cutting tool inspection and control program shall be established for
explosives machining operations.
24.1.8. Dull or damaged tools shall not be used.
24.1.9. Consideration shall be given to additional safety control devices (e.g.,
design patterns, safety templates, chip thickness sensors, tool pressure
sensors), depending on the type of machining operations, size of
explosives pieces, types of explosives, and other factors.
24.1.10. The “machining over-test” shall be considered a testing operation (see
Paragraph 24.4.13) and is exempt from equipment requirements.
24.2. Contact or Remote Operations
24.2.1. The following explosives may be contact machined if a compatible,
nontoxic, noncombustible coolant is used. Explosives not listed below
shall be machined remotely.
• Amatol
• Baratol
• Boracitol
• Explosive D
DOE-STD-1212-2019
69
• Octol with no more than 75% HMX (Cyclotetramethylene
Tetranitramine)
• Pentolite with no more than 50% PETN
• RDX/TNT compositions with no more than 75% RDX
(Cyclotrimethylene Trinitramine). These compositions include
Composition B, Composition B-3, and 75/25 Cyclotol
• TATB (Triamino Trinitrobenzene) and TATB compositions with an
inert plastic binder
• TNT
24.2.2. Explosive assemblies composed of any combination of explosives
listed in the Paragraph 24.2.1 and the following non-explosive materials
may be contact machined if a compatible, nontoxic, noncombustible
coolant is used.
• Foamed plastics
• Solid plastics
• Adhesives
• Amorphous graphite
• Calcium sulfate casting powder
• Explosives mockup
Section 45
24.2.3. If an assembly contains an explosive not listed in Paragraph 24.2.1 or a
nonexplosive material not listed in Paragraph 24.2.2, the assembly
shall be machined remotely.
24.2.4. On any explosive, with certain exceptions for TATB and TATB/KEL-F
(or equivalent) formulations and explosives machined by fluid jet (see
Paragraph 24.2.6), the following operations shall be performed
remotely:
• Drilling of holes smaller than 5cm in diameter (except for TATB and
TATB/KEL-F (or equivalent) formulations, where drilling of holes
smaller than 5 mm).
• Coring operations (except contact operations on those explosives
listed in Paragraph 24.2.1, when the requirements of Section 24.6
are met and a coolant is used).
• Machining of any metal/explosives interface.
• Machining TATB and TATB/KEL-F (or equivalent) formulations
subassemblies with HD 1.1 boosters installed.
• Machining of explosives in Phase II or earlier stage of scaleup (see
Chapter 19).
• Dry machining
Note: TATB and TATB/Kel-F (or equivalent) formulations booster
pellets may be contact machined provided a dust collection system is
used.
DOE-STD-1212-2019
70
24.2.5. Machining of primary explosives shall be avoided. Consider other
methods, such as forming or pressing to final dimensions, to achieve
the desired shape.
24.2.6. IHE, PBX 9404 (Plastic Bonded Explosive), and LX-10 may be contact
machined by high-pressure fluid jet.
24.2.6.1. The fluid jet system pressure shall not exceed 20,000psig.
24.2.6.2. The velocity of the fluid jet shall not exceed 520m/sec (theoretical).
24.2.6.3. The jet nozzle orifice diameter shall not exceed 0.01in.
24.2.6.4. The system machining fluid shall be water and shall not contain any
abrasives.
Note: See Chapter 25 for use of low-pressure fluids.
24.2.7. Concurrent contact machining operations in the same bay should not
be permitted. However, concurrent TATB and TATB/KEL-F (or
equivalent) formulations contact machining is permitted when other
explosives are not present.
24.2.8. Provisions shall be made to monitor remote machining operations
visually. Consideration should be given to video recording and audio
monitoring.
24.3. Setup and Preparation Prior to Machining
24.3.1. Before setting up the explosive work piece, the equipment shall be
checked for proper function and the absence of interference between
stationary and moving parts.
24.3.2. An inert shape (e.g., wax, Lexan (polycarbonate), or mock explosive)
should be used to test the equipment function of any operation using
new tooling or new part programs.
24.3.3. The explosive component to be machined shall be inspected by
radiography or other suitable nondestructive test methods for cracks,
voids, and high-density foreign objects.
24.3.4. The explosive component shall be checked for proper size.
DOE-STD-1212-2019
71
24.3.5. Caution shall be exercised during setup and adjustment to avoid
pinching, dropping, crushing, or otherwise applying abnormal forces to
explosives present.
24.3.6. Special care shall be given to mounting and centering a part on a
vacuum chuck.
24.3.7. Special attention shall be given to the proper functioning of the vacuum
system and its surface holding area.
24.3.8. Limits on machine speed, depth of cut, and feed rate shall be set
before the machine is activated.
24.3.9. Interlocks shall be functional before the machine is used to machine
explosives. They should be tested once per shift.
24.4. Operations Requirements
Section 46
24.4.1. The minimum tool speed necessary for safe and efficient operation
should be maintained. The following maximums shall apply:
• The relative velocity between the explosives surface and the cutting
tool shall not exceed 65m/min;
• Work pieces or cutting tools shall not be rotated at speeds
exceeding 525rpm; and
• The feed rate of the cutting tool or work piece shall not exceed 1mm
per revolution.
24.4.2. The work piece, fixture, cutting tools, equipment, floor, troughs, drains,
etc., should be cleaned frequently to prevent accumulation of explosive
wastes.
24.4.3. Approved measures should be taken to prevent rust and minimize
deterioration of precision surfaces.
24.4.4. All tools, equipment, fixtures, and parts should be cleaned before
removal from the work area for storage.
24.4.5. Coolant shall be used to aid in removing heat and cutting waste for
contact machining operations.
24.4.6. Coolant should be used for remote operations when practical.
24.4.7. Coolant should be used on explosives/inert assemblies.
24.4.8. When the explosives portion is included in the cut, coolant shall be
used for contact machining.
DOE-STD-1212-2019
72
24.4.9. Coolant is not required if the explosives portion of the assembly is
contained (no bare explosives) and is not included in the cut, or the
machining is conducted remotely.
24.4.10. Spray mist coolant may be used during machining of the
explosive-containing assemblies if the explosives portion is not
included in the cut.
24.4.11. All visible explosives shall be removed from the machine before
maintenance or repairs.
24.4.12. No safeguards or interlocks shall be removed or made inoperative,
except by authorized personnel.
24.4.13. Before submitting an explosive for contact machining approval, a
machining over-test shall be conducted to identify the machinability and
associated hazards.
24.4.13.1. Machining over-test should be performed in facilities set aside for this
purpose.
24.4.13.2. Machining over-test shall be conducted remotely.
24.4.13.3. Operations performed during sample preparation may include gaging
and assembly, but shall not include any contact cutting, scraping, or
other material-removing operations on explosives specimens.
24.5. Drilling
24.5.1. Drilling operations should be set up to maximize the ease of achieving
and maintaining proper alignment and to facilitate removal of
explosives chips, fines, and powder.
24.5.2. The fluting length on the drill bit shall exceed the depth of the hole to be
drilled by a minimum of 1.3cm or one-hole diameter, whichever is
greater.
24.5.3. The depth of a hole shall not be extended more than 1.5 times the hole
diameter (up to a maximum of 2cm) during a single insertion of the drill
into the material.
Note: After each insertion, it may be advisable to withdraw the drill
completely and remove loose explosives from the cavity and drill bit
before reinserting.
DOE-STD-1212-2019
73
24.5.4. Coolant flow (when used) shall be directed to the explosives/cutting
edge interface.
24.5.5. Drill bits larger than 0.25in (6mm) should have a coolant channel to the
tip of the drill.
Note: Bits 0.25in (6mm) or less in diameter do not need coolant
channels, but should limit the depth of each pass to no more than ½ the
diameter of the bit to verify that the coolant flow is capable of keeping
the hole clean.
24.5.6. Pulsating pressure types of coolant supplies are recommended for drills
of 0.25in (6 mm) diameter or less to remove drill fines.
Section 47
24.6. Coring
Note: A machining operation that removes material in the form of a
cylinder by cutting at the circumference to create a hole or recover the
material from the center of the cut.
24.6.1. Coolant flow (when used) shall be directed at the explosives/cutting
edge interface.
24.6.2. If the hole is not positioned to provide continuous breakout, the coring
shall be accomplished incrementally.
24.6.3. When done in increments, no more than 1.5 times the diameter of the
hole shall be cored at one time.
24.6.3.1. Before the maximum distance has been cored, the tool shall be totally
retracted from the hole and cleaned.
24.6.3.2. The hole shall be flushed with coolant.
24.7. Sawing
24.7.1. The feed rate of the saw blade or work piece shall not exceed
7.5cm/min.
24.7.2. For band saws, coolant flow should be directed onto the saw blade at
the cutting interface, guide rollers, and the drive wheel/saw blade
interface.
24.7.3. For circular saws, the coolant flow should be directed at the
explosives/cutting edge interface.
DOE-STD-1212-2019
74
25. LOW PRESSURE FLUIDS
25.1. Use of Low Pressure Fluids
25.1.1. Low pressure fluids may be handled in explosives contact operations to
aid in the following:
• Dissolution
• Rinsing
• Flushing, or
• Similar operations
25.1.2. The fluid system shall have a pressure relief device installed to prevent
system over pressurization.
25.1.3. Low pressure fluid operations may be used with those explosives
whose impact sensitivity is less than PETN.
Note: Such operations may be used on other explosives only after
analyzing the energies involved.
25.1.4. Solvents shall be compatible with the explosive material.
Note: Controls for their use shall be specified in operating procedures.
26. LASER ABLATION
26.1. Laser Ablation Operations
26.1.1. Laser ablation shall be conducted as a Hazard Class 1 Level-of-
Protection Activity.
26.1.2. During set-up, when personnel are exposed to the explosives hazard,
the ablation laser beam shall not be able to reach the explosives or
assembly containing explosives.
Note: Low-power alignment lasers may be used.
26.1.3. Before setting up the explosive work piece, the equipment shall be
checked for proper function and the absence of interference between
stationary and moving parts.
26.1.4. Caution shall be exercised during setup and adjustment to avoid
pinching, dropping, crushing, or otherwise applying abnormal forces to
explosives present.
DOE-STD-1212-2019
75
26.1.5. Interlocks shall be functional before the laser is used to ablate
explosives.
26.1.6. During laser ablation operations, the operator should be provided an
immediate means to block the laser beam from reaching the
explosives.
27. HAND CUTTING AND FINISHING
27.1. Hand-Cutting and Finishing Operations
27.1.1. Hand-cutting and finishing of explosive materials shall be performed
using the mildest energy input that accomplishes the task safely and
efficiently.
27.1.2. These activities may include:
• Cutting
• Trimming
• Coring
• Lapping (surface polishing)
27.1.3. The Contractor EDC shall review and approve the safety of
hand-cutting and finishing operations, which shall then be incorporated
into an operating procedure before starting the operation.
28. ASSEMBLY AND DISASSEMBLY
28.1. Tools
28.1.1. Hand tools and electrical and pneumatic tools that may subject the
explosives to abnormal frictional forces, pinching, or excessive
pressure, or cause significant deformation, shall not be used during
assembly or disassembly.
Section 48
Note: Tools may be used on nonexplosive components.
28.2. Assembly Operations
28.2.1. Operators need to be alert for mismated parts and misaligned
components during assembly operations.
28.2.2. Hard surfaces that contact explosives shall be precisely machined to
mate with the explosives, lined with cushioning material, or otherwise
configured to keep sharp corners or projections from being forced into
explosives.
DOE-STD-1212-2019
76
28.3. Loading Assemblies with Plastic or Extrudable Explosives
28.3.1. Contamination of these explosives with abrasive or foreign substances
shall be avoided.
28.3.2. The assembly shall be loaded with small increments of explosives and
may be tamped with suitable nonmetallic tools to eliminate air voids.
28.3.3. Plastic explosive compositions C-3 and C-4 may be softened by
warming to between 69.8°F (21°C) and 100.4°F (38°C) before working.
28.3.4. Extrudable explosives LX-13 and XTX should be kept as cool as
practical to prevent premature curing.
28.4. Disassembly Operations
28.4.1. Before beginning disassembly, the device’s condition shall be assessed
to determine if it can be safely handled.
28.4.2. Disassembly operations shall be planned before actual disassembly.
Possible problem areas caused by method of construction or physical
condition shall be considered.
28.4.3. Approved operating procedures shall be used for each unique
disassembly.
28.4.4. If disassembly would normally cause release of pressure or if a credible
hazard exists of pressure causing components to fly apart, before
beginning disassembly, pressurized units shall be thoroughly
depressurized.
28.4.5. If approved for use, compressed air shall be applied cautiously during
disassembly to avoid causing device components to fly apart.
28.4.5.1. This may require remote operation.
28.4.5.2. Use hydraulic pressure if possible.
28.5. Personnel Protection for Disassembly Operations
28.5.1. Operators and all other personnel shall be provided complete
protection from disassembly operations involving conditions known or
expected to require the use of abnormal force.
28.5.1.1. Such operations require either remote operation or the use of an
operational shield.
DOE-STD-1212-2019
77
28.5.2. When required, shielding shall be designed to protect personnel at
other operations or locations from blast and fragments arising from a
possible explosion.
28.5.3. When disassembly requires that the operator be protected by an
operational shield, disassembly shall be defined as complete
separation (threads or other connections) of component parts.
Note: For example, parts shall not be loosened or separated while the
operator is unprotected.
29. TESTING
29.1. Test Planning
29.1.1. All explosives testing involving the intentional initiation of explosives
materials or articles shall be considered Class 0 operations and shall
comply with the requirements of Chapter 12 of this Technical Standard.
29.1.2. Proposed testing programs shall undergo a hazard analysis based
upon the maximum credible event.
29.1.2.1. This shall be done with knowledge of the construction and operation of
all standard and nonstandard equipment to be used, as well as the type
of explosives involved.
29.1.3. Large-scale tests with the potential to propel fragments off DOE testing
locations shall receive a formal risk analysis of the worst-case
conditions for each test type.
29.1.3.1. Such analysis shall address the probability and potential severity of
hazards with respect to injury and property damage.
Section 49
29.2. Firing Areas
29.2.1. A secured firing area (danger zone) shall be established for each test to
protect personnel from hazardous blast overpressure, firebrands
(burning or hot fragment), fragments, or projectiles from an explosives
shot or gun firing.
29.2.1.1. The danger zone shall be determined by the application of the
principles outlined in DESR 6055.09.
29.2.2. Selected firing areas shall minimize the potential for secondary fires
and adverse effects to the environment.
DOE-STD-1212-2019
78
29.3. Checkout of Dynamic Engineering Test Equipment for Explosive
Assemblies
29.3.1. To minimize the possibility of an incident during dynamic testing of
explosive assemblies, load-bearing members of the test equipment or
explosive assembly should be proof-tested and examined if:
29.3.1.1. The test equipment is new or has undergone a design modification;
29.3.1.2. Existing test equipment is to be used under unusually severe test
conditions (i.e., conditions of velocity, vibration, pressure, load); or
29.3.1.3. A new or modified explosive assembly is to be tested that affects the
loading characteristics of the equipment.
29.3.2. Proof-testing of the explosive assembly or test equipment should be
conducted before running tests involving systems with explosives.
29.3.3. At a minimum, proof-testing should consist of the following sequence of
checkouts:
29.3.3.1. Check out load-bearing members (lifting devices, hold-down
mechanisms, fixtures, vehicle cases) to at least 125% of rated load
using simulated loads.
29.3.3.2. “Dry run” tests of actual systems with mock materials in place of
explosives and hazardous radioactive materials.
29.3.4. If a part failure occurs in either of the checkout tests in Paragraphs
29.3.3.1 or 29.3.3.2, tests involving explosives or radioactive material
shall not be run until additional checkout tests have demonstrated that
the cause of failure has been eliminated.
29.4. Testing of Explosives and Hazardous Radioactive Materials
29.4.1. Explosives and hazardous radioactive materials (e.g., plutonium,
enriched uranium) shall not be included in the same test or operation if
the test or operation is not contained and involves any of the following:
Note 1: Depleted uranium and natural thorium are not considered
hazardous radioactive materials for this purpose.
Note 2: Nuclear Explosive Operations, covered by DOE Order 452.2
are exempted from this requirement.
DOE-STD-1212-2019
79
29.4.1.1. Application of high-energy stimuli (e.g., high shock, impact, or friction
levels) to the explosive.
29.4.1.2. Heating the explosive to within 18°F (10°C) of the heating limit
determined for the explosive system without hazardous radioactive
materials consistent with Paragraph 21.2.4.
29.4.1.3. Intimate contact of incompatible material with the explosive as
determined by compatibility testing.
29.5. Heating of Explosives Test Specimens
29.5.1. Before heating an explosive, a thermal analysis shall be conducted and
a written procedure prepared consistent with Section 21.1.
29.5.2. For requirements on heating equipment see Section 21.3.
29.5.3. Contact operations on explosives specimens undergoing thermal
conditioning may be permitted if:
29.5.3.1. The specimen is not subjected to excessive friction, impact, or spark
stimuli during normal operations or during a credible accident scenario.
29.5.3.2. The explosive involved has satisfied appropriate scale-up sensitivity
and stability criteria (see Chapter 19) and has sufficient handling history
to reveal any special characteristics affecting safe use.
Section 50
29.5.4. If an explosives test specimen in a contact operation is discovered to
have exceeded the established heating limit for the explosive system,
the test shall be terminated and the specimen cooled to ambient
temperature.
Note: An operating procedure should be prepared and approved for the
required corrective action (i.e., disassembly or disposal).
29.6. Instrumentation
29.6.1. Instrumentation directly applied to explosives in a test specimen shall
be physically disconnected, isolated, or grounded before personnel
may enter the test cell.
29.6.1.1. Only instrumentation channels that contain devices that limit the current
below the level capable of initiating the explosive are exempt.
DOE-STD-1212-2019
80
29.6.2. Environmental control transducer leads, not attached to the test
specimen and permanently installed in an approved control system, do
not need to be grounded or disconnected.
29.7. Explosives Accumulation Limits
29.7.1. Explosives specimens shall not be permitted to accumulate in a test
cell beyond the quantity required to sustain the test.
29.7.1.1. For short-term testing (less than one day), specimens present shall not
exceed a 4-hr supply.
30. TEST FIRING
30.1. General Range Standards
30.1.1. Each DOE explosives test site shall establish procedures to verify that
personnel are not exposed to firebrands (burning or hot fragment),
fragments, or excessive blast overpressure from a test shot.
30.1.2. During test operations, personnel access to each test site shall be
controlled.
30.1.2.1. Unattended roadblocks, gates, or doors used to prevent personnel from
entering the danger zone during a test should be interlocked or locked
with specially controlled keys.
Note: In locations where interlocks or locks are not practicable,
appropriate barriers and signage may be applied.
30.1.3. Before test firing, all firing site personnel and visitors shall be
accounted for and in a safe place.
30.1.4. A visual inspection of the danger zone shall be performed immediately
before each test shot or series of shots as applicable, to verify that no
transients are present.
30.1.5. The danger zone shall be free of service personnel (e.g., telephone
repairmen, surveyors, road maintenance crews) during test operations.
30.1.6. The control point shall notify service personnel of the specific
requirements under which they may safely work in the area when
testing is not in progress.
30.1.7. The control point shall notify firing site personnel of the presence and
location of service personnel in their areas.
DOE-STD-1212-2019
81
30.1.8. Clearance for a test or test series shall be coordinated with all test sites
and other areas that could be affected.
30.1.9. A warning shall be provided to every affected area to warn personnel of
an impending test firing.
Note 1: This warning shall include standard audible signals.
Note 2: Detonation of very large explosive shots, numerous smaller
shots, or gun firings could exceed the DOE allowable limits for impulse
noise.
30.1.10. During test operations, all personnel assigned to the test area shall be
continuously alert for movement of personnel, vehicles, and aircraft.
30.1.11. Test firings often create hazardous conditions for aircraft operating in
the airspace near the danger zone. If this airspace is subject to air
traffic, precautions shall be taken to verify that the airspace is clear of
traffic at the time of firing.
Section 51
30.1.12. Each firing site shall establish personnel limits based on the number of
people actually needed to conduct an operation and the number of
casuals that should be present. The responsible person at the firing site
shall enforce these personnel limits.
30.1.13. Testing of explosives can result in personnel exposure to toxic
decomposition products such as carbon monoxide, hydrogen chloride,
hydrogen fluoride, hydrogen cyanide, and nitrogen oxides.
30.1.13.1. Allow the detonation cloud to disperse before leaving protective
bunkers.
Note: Fragment-danger-zone distances are normally adequate to allow
cloud dispersal and protect outside personnel from excessive
exposure.
30.1.14. For testing that can result in abnormally long hazardous conditions
following the test, the procedure shall require a suitable waiting period
before personnel leave their shelter or safe haven area.
30.2. Grass Fires
30.2.1. Before conducting a test shot at an outside firing pad, an evaluation
shall be made to determine the need to control grass fires that the test
may initiate.
DOE-STD-1212-2019
82
30.3. Test Setup
30.3.1. Test setup work should be done before receipt of explosives. When
possible the following activities should be performed:
30.3.1.1. Firing site safety devices (at both the bunker and remote from the firing
bunker) shall be checked as established by Contractor Facility
Management.
Note: Safety devices include warning lights, door and gate firing circuit
interlocks, emergency firing circuit cutoff switches, and grounding.
30.3.1.2. Firing pad and shot stand setup work that require power tools or other
potential spark-producing devices should be completed.
Note: Special precautions and procedures shall be developed and
implemented if power tools or other spark producing devices are
needed after explosives are delivered to the firing pad.
30.3.1.3. The firing pad shall be cleared of all unnecessary equipment.
30.3.1.4. When possible, all diagnostic equipment shall be set up, checked, and
tested in a “dry run.”
30.3.1.5. If a special structure is required, as much work as possible should be
accomplished on the structure, including assembly of all materials.
30.4. Pin Switches and Other Non-initiating Circuits
30.4.1. Whenever pin switches and other non-initiating circuits are checked
(such as for charging current or leakage) and are in contact with or in
close proximity to explosives, the check should be performed remotely.
30.4.2. Other non-initiating electrical circuits include strain gauges, pressure
transducers, thermocouples, etc., that may be affixed to or close to the
explosives within an assembly.
30.4.2.1. A continuity-only (resistance) check may be accomplished as a contact
operation with an electrical instrument approved for use with the
particular explosive device.
30.4.3. When low-firing-current actuators are involved, consider conducting
these tests remotely (see Section 37.4).
DOE-STD-1212-2019
83
30.5. Low-Energy Electro-explosive Devices
30.5.1. Procedures shall be established to verify that Radio Frequency (RF),
Frequency Modulation (FM), and television transmitters with sufficient
output energy to initiate an electro-explosive devices (EED) at the test
site are either restricted to a safe distance from the site or not operated.
30.5.2. Appropriate separation distances from Electromagnetic Radiation
(EMR) transmitters shall be determined per Paragraph 38.1.3.
Section 52
30.5.3. Low-firing-current igniters or detonators shall be kept separate from
explosives at all times, except during actual test charge assembly and
setup.
30.5.4. At all times, wiring systems for the explosive charge and any
low-firing-current initiators shall be kept insulated from all sources of
extraneous current unless the weapon components have an exposed
electrical ground by design.
30.5.5. Connections made using weapon wiring connectors or cables are
acceptable without further modification.
30.5.6. Shunts shall be left on low-energy initiators or lead wires until
connections are made.
30.5.7. Connections shall be taped or otherwise insulated.
30.5.8. Test units containing low-firing-current actuators or detonators shall be
clearly marked.
30.5.8.1. No contact operations involving electrical testing shall be permitted on
this type of unit unless an electrical meter for the specific application is
used.
30.6. Explosives Storage in Firing Areas
30.6.1. Explosives or ammunition storage at a firing area shall be located such
that ignition, explosion, or detonation is improbable if a fire, unplanned
explosion, or detonation occurs in the area.
30.6.2. Tests that require storage of explosives or ammunition at the firing site
beyond a day’s event shall conform to the requirements of Chapter 32.
30.7. Firing Leads
30.7.1. All detonator lead wires shall be electrically insulated.
DOE-STD-1212-2019
84
30.7.2. During setup on the firing point, firing leads or cables of low-energy
detonators for explosive assemblies shall be kept shorted.
30.8. Unattended Test Assemblies (during off-shift hours, when
necessary)
30.8.1. If explosives are present, appropriate safety warning signs shall be
displayed at all entrances to the firing pad.
30.8.2. Protective services and fire department personnel shall be notified of
the explosives location.
30.8.3. This location shall be in a controlled-access or secured area.
30.8.4. If low-energy detonators are present on the assembly, their leads or
cables shall be shorted.
30.9. Firing Control Circuit Criteria
30.9.1. The criteria in this section apply to electrical circuits used to initiate
EEDs used for test firing.
Note 1: These criteria apply regardless of whether the circuit is
energized using an internal or external power source.
Note 2: A Firing Circuit shall be treated as capable of firing without
warning as soon as it is coupled to an EED.
Note 3: A Firing Circuit that is connected to explosives shall not be
armed during contact operations.
30.9.2. Firing Control Circuits shall be documented, reviewed, and approved
for safety and operational control purposes.
30.9.2.1. Documentation shall include complete wiring diagrams, electrical
schematics, and cable function lists.
30.9.3. All Firing Control Circuits, including changes and modifications, shall be
reviewed for safety and compliance with Section 30.9, and approved by
Contractor Facility Management prior to use with explosives.
30.9.4. Firing Control Circuits not meeting the safety criteria of Section 30.9
may be used with explosives only if equivalent safety is provided as
determined by a documented analysis reviewed by the Contractor
DOE-STD-1212-2019
85
Explosives Safety AHJ, and approved by Contractor Facility
Management.
30.9.5. Firing Control Circuits shall include both an arm and a fire control.
30.9.5.1. For low-energy EEDs, the safe mode of the arming circuit shall interrupt
the firing circuit, short-circuit the EED terminals, and should ground the
EED terminals.
Section 53
Note: Manual shorting and grounding is permitted.
30.9.6. Each Firing Control Circuit shall include an interlock device which
prevents unauthorized or inadvertent energization of a firing circuit.
30.9.6.1. The interlock device shall be unique for its application.
30.9.6.2. If key-operated controls are used, they shall be designed to lock in the
safe (Off) position when the control key is removed.
30.9.6.3. Duplicate keys, safety plugs, or other interlock devices shall not be
permitted in any single test area.
30.9.6.4. During shot preparation, the key, safety plug, or other interlock device,
whichever is used, shall be in the control of the lead operator at all
times.
30.9.7. Each Firing Control Circuit shall be isolated from all other circuits so as
to prevent inadvertent energization by other circuits.
30.9.8. Firing Control Circuits shall be failsafe. Failure of any single component
shall not result in inadvertent initiation of the EED prior to arming.
30.9.9. Firing Control Circuits shall be marked clearly or otherwise distinctively
identified.
30.9.10. Developmental and/or Self-Contained Firing Circuits designed to initiate
EEDs shall meet the requirements of Section 30.9 before being used
with explosives.
30.10. Test Firing in Containment Apparatus (Tanks, Chambers, or
Vessels)
30.10.1. Explosives may be detonated in containment apparatus.
30.10.2. All containment components shall be capable of withstanding and
confining the effects of the explosion.
DOE-STD-1212-2019
86
30.10.3. When new firing containment apparatus are designed and put into
service, a safety factor to their operational explosives weight limit shall
be included during certification testing.
30.10.3.1. This over-test load should be based on a percentage of the operational
explosives weight limit.
Note: For example, a certification test should be performed with an
appropriate explosive material weighing at least 125% TNT equivalency
of the intended operating limit.
30.10.4. The firing circuit should be interlocked with the containment apparatus
access door latch.
30.10.5. Qualified engineering personnel shall periodically inspect the
containment apparatus to verify that its structural integrity is maintained
after repeated detonations.
30.10.6. Test firing is often conducted inside large containment apparatus that
allow personnel entry but provide a confined working space and limited
egress.
30.10.6.1. The operating procedure shall include requirements for ventilating and
evaluating the containment apparatus’ atmosphere before personnel
entry.
30.11. Gun Firings
30.11.1. The gun shall be rigidly mounted so that the impact area is defined and
controlled.
30.11.2. The target shall have an adequate backstop.
30.11.3. Provision should be made to remotely move the gun, remotely remove
the propellant charge, or remove the explosives from the line of fire if
the gun misfires, unless the hazardous effects of an accidental
detonation of the explosive target is contained or effectively shielded
from personnel.
30.11.4. Provisions shall be made to collect and remove undetonated explosives
from the chamber or area.
30.11.5. Work, adjustment, or observation shall not be permitted on a gun while
a live round is in the firing chamber. The only exception is to check
azimuth and elevation.
DOE-STD-1212-2019
87
30.11.6. Precautions shall be taken to protect personnel or equipment against
Section 54
hazards resulting from errors in assembly or preparation of equipment
and ammunition. In particular, the following areas shall be checked:
• Fluid level of hydraulic recoil mechanisms.
• Function of the firing mechanisms.
• Absence of obstructions in the bore.
30.11.7. Firing mechanisms, particularly electric firing mechanisms, shall be
tested before use to verify that merely inserting a round or closing of
the breech does not result in firing.
30.11.8. Test weapons other than manually-fired small arms should be equipped
for remote control of the safety and for remote cocking.
Note: The safety shall not be advanced to the fire position and the
weapon shall not be cocked until all personnel are in a safe location.
30.11.9. When using hydrogen gas to fire a light gas gun, the operation shall be
remote while hydrogen is present in the gun pressure tanks or in the
gun barrel and catch tank after firing.
30.11.9.1. The hydrogen shall be purged from the entire system with inert gas and
the atmosphere checked before personnel are allowed to reenter the
gun bay.
30.12. Drop Testing
30.12.1. After an explosives drop test, personnel shall wait a minimum of 5
minutes before leaving the control bunker to inspect the test pad.
30.12.1.1. If smoke or flame is observed at the drop test area, entry shall not be
permitted until at least 30 minutes after all visual signs have
disappeared.
30.13. Post-firing Controls
30.13.1. If the firing appears to be normal, test personnel shall remain in the
protective shelter for a suitable waiting period.
30.13.1.1. The test procedure shall specify the waiting period, which shall be
sufficient to verify adequate dissipation of smoke and dust.
Note: In some cases, developing and analyzing the diagnostic film for
misfires may be helpful.
DOE-STD-1212-2019
88
30.13.2. During the waiting period, all power to the firing units shall be turned off
or disconnected.
30.13.2.1. Whenever possible, detonator cables should be disconnected from the
firing units and shunted and grounded, and the firing unit capacitor
grounded.
30.13.3. After the waiting period, one qualified person (or more, when required
by a documented hazard analysis) shall physically inspect the firing pad
to determine the results of the shot before other personnel leave the
shelter.
30.13.3.1. When a partial detonation or a test misfire occurs or is suspected, the
firing area shall be inspected for unreacted explosives (see Chapter
31).
30.13.3.2. If the inspection confirms that safe conditions exist, the lead person
shall signal “all clear.”
30.13.4. Recovered explosives from a destructive test shall be placed in an
explosives storage magazine as Storage Compatibility Group L unless
a documented analysis determines that the explosives do not present a
special risk.
30.14. Contamination of Firing Areas
30.14.1. A contamination zone for each firing area shall be established and
permanently documented.
30.14.2. Personnel access to explosives-contaminated areas shall be controlled.
Note: Unless determined unnecessary, through documented analysis
reviewed by the Contractor Explosives Safety AHJ and approved by
Contractor Facility Management.
30.14.3. Service personnel shall not work in the area without the permission of
testing-area management and only when supervised by a
management-approved person.
Note: Unless determined unnecessary, through documented analysis
reviewed by the Contractor Explosives Safety AHJ and approved by
Contractor Facility Management.
Section 55
DOE-STD-1212-2019
89
31. TEST FAILURES AND MISFIRES
31.1. Explosives Misfire
31.1.1. If no audible detonation is heard after once pulsing the firing circuit, the
firing circuitry and detonators may be checked for continuity. These
checks shall be accomplished from within the control bunker or from a
protected location. If the firing circuits and detonators appear operative,
additional attempts to fire may be made.
31.1.2. If the shot still does not fire, the following precautions shall be taken:
31.1.2.1. Disconnect and de-energize all electrical power sources connected to
the shot.
31.1.2.2. Verify that all personnel in the danger zone are aware of the misfire and
that they shall remain under cover until released.
31.1.2.3. Before personnel are permitted to leave the cover of the bunker, a pre-
established waiting period shall be observed.
Note: A minimum 30 minute waiting period is advised.
31.1.2.4. A carefully prepared review of the situation should be initiated in
consultation with another knowledgeable person.
31.1.2.5. After an agreement has been reached and before other personnel are
permitted to leave the cover of the bunker, one qualified person should
carefully approach and examine the setup to verify that it is safe.
31.2. Misfire of a Remotely Fired Gun
31.2.1. When a misfire occurs, several more attempts to fire the gun may be
made. If subsequent attempts are also unsuccessful, the following
precautions should be taken:
31.2.1.1. Disconnect all electrical circuitry to the gun so the firing system cannot
be energized.
31.2.1.2. Before approaching a light-gas-driven gun, verify that it is in a safe
condition by venting all pressure in the gun breech.
31.2.1.3. To reduce the risk of a gas explosion if the driving gas is flammable,
the gun breech shall be purged with inert gas after venting.
DOE-STD-1212-2019
90
31.2.1.4. A minimum waiting period of 10 minutes shall be observed before
permitting personnel to approach to the gun.
31.2.1.5. When approaching the gun, if there is any indication that powder is
burning, personnel shall return to a safe area and observe an additional
waiting period of at least 20 minutes.
31.2.1.6. The gun shall not be approached within the known recoil distance
behind the breech or from the front. Approach to and work on the gun
shall be from the sides.
31.2.1.7. For separate loading guns (i.e., propellant charge is loaded separate
from projectiles), the propellant igniter shall be disconnected from the
firing mechanism and removed from the gun before any other gun
operations.
31.2.1.8. If possible, the powder chamber of the gun shall be checked for the
presence of pressure and vented to the atmosphere before opening the
chamber.
31.2.2. If an unforeseen failure situation arises (e.g., the explosive projectile is
stuck in the bore), an emergency procedure shall be prepared and
followed to resolve the situation.
32. EXPLOSIVES STORAGE
32.1. Storage Magazine Facilities
32.1.1. Permanent Facilities and Portable Magazines
32.1.1.1. New permanent explosives facilities shall comply with UFC 3-340-02,
Unified Facilities Criteria.
Note