DOE-STD-1120-2016, Preparation of Documented Safety Analysis for Decommissioning and Environmental Restoration Activities
Functional areas: Documented Safety Analysis, Decommissioning
This DOE Standards describes a methodology for preparing a Documented Safety Analysis (DSA) for decommissioning of hazard category (HC) 1, 2, or 3 nuclear facilities, as well as HC-2 or HC-3 environmental restoration (ER) activities that involve work not done within a permanent structure or the decommissioning of a facility with only low-level residual fixed radioactivity.
Supersedes:
Version history and related documents
Supersedes
Earlier documents this one replaced.
- DOE-STD-1120-2005 Volume 1Integration of Environment, of Environment, Safety, and Health Into Facility Disposition Activities, Volume 1 - Documented Safety Analysis for Decommissioning and Environmental Restoration Projects (Mar 15, 2016)
- DOE-STD-1120-2005 Volume 2Integration of Environment, Safety, and Health Into Facility Disposition Activities, Volume 2 - Appendices (Mar 15, 2016)
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
NOT MEASUREMENT
SENSITIVE
DOE-STD-1120-2016
March 2016
DOE STANDARD
PREPARATION OF DOCUMENTED SAFETY
ANALYSIS FOR DECOMMISSIONING AND
ENVIRONMENTAL RESTORATION
ACTIVITIES
U.S. Department of Energy AREA SAFT
Washington, DC 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
DOE-STD-1120-2016
ii
FOREWORD
1. This Department of Energy (DOE) Standard (STD) has been approved to be used by DOE,
including the National Nuclear Security Administration, and their contractors.
2. Beneficial comments (recommendations, additions, and deletions), as well as any pertinent
data that may be of use in improving this document, should be addressed to:
Office of Nuclear Safety (AU-30)
Office of Environment, Health, Safety and Security
U.S. Department of Energy
19901 Germantown Road
Germantown, MD 20874
Phone: (301) 903-2996
Facsimile: (301) 903-6172
3. Title 10 of the Code of Federal Regulations (C.F.R.) Part 830, Nuclear Safety Management,
Subpart B, Safety Basis Requirements, establishes requirements for the documented safety
analyses (DSA) for nuclear facilities. This Standard provides an acceptable methodology for
meeting the 10 C.F.R. Part 830 requirements for the preparation of DSAs prepared for
decommissioning or environmental restoration activities as described in Table 2 of the
regulation.
4. This Standard is a significant revision of DOE-STD-1120-2005, Integration of Environment,
Safety, and Health into Facility Disposition Activities, and a successor document to DOE-STD-
1120-98, Integration of Environment, Safety, and Health into Facility Disposition Activities.
The principal purpose of the revision is to clearly identify actions necessary for satisfying this
methodology for DSA preparation. The revision also updates this DSA methodology to reflect
experience, lessons learned, and the changes in DOE-STD-3009-2014, Preparation of
Nonreactor Nuclear Facility Documented Safety Analysis.
5. Throughout this Standard, the word “shall” denotes actions that are required to satisfy this
Standard. The word “should” is used to indicate recommended practices. The use of “may”
with reference to application of a procedure or method indicates that the use of the procedure
or method is optional. To use this Standard as an acceptable methodology for meeting 10
C.F.R. Part 830 requirements for preparing DSAs, all applicable “shall” statements need to be
met.
6. The goal of this revised Standard is to provide clearer criteria and guidance to support effective
and consistent DSAs based upon lessons learned in implementing DOE-STD-1120-2005.
DOE-STD-1120-2016
iii
CONTENTS
FOREWORD .................................................................................................................................. ii
DEFINITIONS ............................................................................................................................... iv
ACRONYMS ............................................................................................................................... viii
1.0 INTRODUCTION ............................................................................................................... 1
Section 2
1.1 Purpose ............................................................................................................................. 1
1.2 Applicability ..................................................................................................................... 1
1.3 Use of this DSA Preparation Methodology ...................................................................... 2
1.4 Application of the Graded Approach Principles .............................................................. 3
1.5 Overview of the Changes in this Revision ....................................................................... 4
1.6 Overview of the Standard ................................................................................................. 4
2.0 HAZARD CATEGORIZATION ......................................................................................... 4
2.1 Final Hazard Categorization............................................................................................. 5
2.2 Inactive Waste Sites ......................................................................................................... 6
3.0 DSA DEVELOPMENT REQUIREMENTS ....................................................................... 7
3.1 Hazard Identification and Evaluation ............................................................................... 8
3.2 Accident Analysis .......................................................................................................... 10
3.3 Hazard Controls Selection .............................................................................................. 12
3.4 DSA Format and Content ............................................................................................... 15
3.5 Disposition Plans ............................................................................................................ 16
4.0 REFERENCES .................................................................................................................. 17
APPENDIX A: GUIDANCE FOR DECOMMISSIONING ACTIVITIES .............................. A-1
A.1 Facility Description ...................................................................................................... A-1
A.2 Hazard and Accident Analysis and Control Selection ................................................. A-3
A.3 Safety Structures, Systems and Components ............................................................... A-7
A.4 Derivation of Technical Safety Requirements ............................................................. A-9
A.5 Safety Management Programs ................................................................................... A-10
APPENDIX B: GUIDANCE FOR ENVIRONMENTAL RESTORATION ACTIVITIES ..... B-1
B.1 Facility Description ...................................................................................................... B-1
B.2 Hazard and Accident Analysis and Control Selection ................................................. B-3
B.3 Safety Systems, Structures and Components ............................................................... B-5
DOE-STD-1120-2016
iv
DEFINITIONS
The definitions presented below are provided for understanding and consistency among the
various safe harbor methodologies. The origins of the definitions are indicated by references
shown in square brackets [ ]. If no reference is listed, the definition originates in this Standard.
Section 3
Accident analysis. The process of deriving a set of formalized design/evaluation basis
accidents from the hazard evaluation and determining their consequences. Accident analysis
results are used to identify the need to designate safety class and safety significant controls.
[DOE-STD-3009-2014]
Beyond Design/Evaluation Basis Accident (BDBA/BEBA). An accident that exceeds the
severity of the design/evaluation basis accident. [DOE-STD-3009-2014]
Deactivation. The process of placing a facility in a stable and known condition, including the
removal of hazardous and radioactive materials. [10 C.F.R. Part 830, Subpart B, Appendix A,
Table 3]
Decommissioning. Those actions taking place after deactivation of a nuclear facility to retire it
from service, and includes surveillance and maintenance, decontamination, and/or
dismantlement. [10 C.F.R. Part 830, Subpart B, Appendix A, Table 3]
Decontamination. The removal or reduction of residual radioactive and hazardous materials by
mechanical, chemical, or other techniques to a stated objective or end condition. [10 C.F.R. Part
830, Subpart B, Appendix A, Table 3]
Design Basis. The set of requirements that bound the design of structures, systems, and
components within the facility. Some, but not necessarily all, aspects of the design basis are
important to safety. [DOE-STD-3009-2014]
Design Basis Accidents (DBAs). Accidents explicitly considered as part of the facility design
for a new facility (or major modifications) for the purpose of establishing functional and
performance requirements for safety class and/or safety significant controls. [DOE-STD-3009-
2014]
Disposition. Those activities that follow completion of program missions, including, but not
limited to, preparation for reuse, surveillance, maintenance, deactivation, decommissioning, and
long-term stewardship. [DOE O 430.1B, Attachment 3]
Documented Safety Analysis (DSA). A documented analysis of the extent to which a nuclear
facility can be operated safely with respect to workers, the public, and the environment,
DOE-STD-1120-2016
v
including a description of the conditions, safe boundaries, and hazard controls that provide the
basis for ensuring safety [10 C.F.R. § 830.3]
Environmental Restoration Activities. The process by which contaminated sites and facilities
are identified and characterized and by which existing contamination is contained, or removed
and disposed. [10 C.F.R. Part 830, Subpart B, Appendix A, Table 3]
Evaluation basis accidents (EBAs). When an adequate set of design basis accidents does not
exist, the representative and unique accidents evaluated in the accident analysis for the purposes
of determining the need for safety class and safety significant controls in an existing facility
where design basis accidents were not used for this purpose. [DOE-STD-3009-2014]
Evaluation guideline (EG). The criterion for the dose of ionizing radiation that the safety
analysis evaluates against. The EG is established for the purpose of identifying the need for and
evaluating safety class controls. [DOE-STD-3009-2014]
Graded Approach. The process of ensuring that the level of analysis, documentation, and
actions used to comply with a requirement in this Standard is commensurate with:
• The relative importance to safety, safeguards, and security;
• The magnitude of any hazards involved;
• The life cycle stage of a facility;
• The programmatic mission of a facility;
• The particular characteristics of a facility;
• The relative importance of radiological and non-radiological hazards; and
• Any other relevant factor.
Section 4
[10 C.F.R. § 830.3]
Hazard. A source of danger (i.e., material, energy source, or operation) with the potential to
cause illness, injury, or death to a person or damage to a facility or to the environment (without
regard to the likelihood or credibility of accident scenarios or consequence mitigation).
[10 C.F.R. § 830.3]
Hazard Analysis. The identification of materials, systems, processes, and plant characteristics
that can produce undesirable consequences (hazard identification), followed by the assessment of
hazardous situations associated with a process or activity (hazard evaluation). Qualitative
techniques are usually employed to pinpoint weaknesses in design or operation of the facility that
could lead to accidents. The hazard evaluation includes an examination of the complete
spectrum of potential accidents that could expose members of the public, onsite workers, facility
workers, and the environment to radioactive and other hazardous materials. [DOE-STD-3009-
2014]
DOE-STD-1120-2016
vi
Hazard Categorization. Evaluation of the consequences of unmitigated radiological releases to
categorize facilities in accordance with the requirements of 10 C.F.R. Part 830. Note: 10 C.F.R.
Part 830 requires categorization consistent with DOE-STD-1027-92, Hazard Categorization and
Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis
Reports. [DOE-STD-3009-2014]
Hazard Controls. Measures to eliminate, limit, or mitigate hazards to workers, the public, or
environment, including: (1) physical design, structural, and engineering features; (2) safety
structures, systems, and components; (3) safety management programs; (4) technical safety
requirements; and (5) other controls necessary to provide adequate protection from hazards.
[10 C.F.R. § 830.3] Note: “hazard controls” include “specific administrative controls.”
Interim Operations. Activities conducted during a nuclear facility’s life cycle phase that
involves: (1) limited operational life; (2) deactivation; or (3) transition surveillance and
maintenance.
Life Cycle. The life of an asset from planning through acquisition, maintenance, operation,
remediation, disposition, long-term stewardship, and disposal. [DOE O 430.1B, Attachment 3]
Long-Term Stewardship. The physical controls, institutions, information and other
mechanisms needed to ensure protection of people and the environment at sites where DOE has
completed or plans to complete cleanup (e.g., landfill closures, remedial actions, removal
actions, and facility stabilization). This concept includes land-use controls, monitoring,
maintenance, and information management. [DOE O 430.1B, Attachment 3]
Nuclear Facility. A reactor or a nonreactor nuclear facility where an activity is conducted for or
on behalf of DOE and includes any related area, structure, facility, or activity to the extent
necessary to ensure proper implementation of the requirements established by this Part. [10
C.F.R. § 830.3]
Safety Basis. The documented safety analysis and hazard controls that provide reasonable
assurance that a DOE nuclear facility can be operated safely in a manner that adequately protects
workers, the public, and the environment. [10 C.F.R. § 830.3]
Safety Class Structures, Systems, and Components (SC SSCs). Structures, systems, or
components, including portions of process systems, whose preventive or mitigative function is
necessary to limit radioactive hazardous material exposure to the public, as determined from
safety analyses. [10 C.F.R. § 830.3]
Section 5
DOE-STD-1120-2016
vii
Safety Significant Structures, Systems, and Components (SS SSCs). Structures, systems, and
components which are not designated as safety class SSCs but whose preventive or mitigative
function is a major contributor to defense-in-depth and/or worker safety as determined from
safety analyses. [10 C.F.R. § 830.3]
Safety Structures, Systems, and Components (safety SSCs). Both safety class structures,
systems, and components, and safety significant structures, systems, and components.
[10 C.F.R. § 830.3]
Specific Administrative Control. An administrative control that is: 1) identified in a DSA as
a control needed to prevent or mitigate an accident scenario, and 2) has a safety function that
would be safety significant or safety class if the function were provided by a structure, system,
or component. [DOE-STD-1186-2004]
Technical Safety Requirements (TSRs). The limits, controls, and related actions that establish
the specific parameters and requisite actions for the safe operation of a nuclear facility and
include, as appropriate for the work and the hazards identified in the DSA for the facility: safety
limits, operating limits, surveillance requirements, administrative and management controls, use
and application provisions, and design features, as well as a bases appendix. [10 C.F.R. § 830.3]
Transfer of Facilities. Transferring programmatic and financial responsibility of land and/or
facilities from one program office to another. [DOE O 430.1B, Attachment 3]
Transition Surveillance and Maintenance Activities. Activities conducted when a facility is
not operating or during deactivation, decontamination, and decommissioning operations when
surveillance and maintenance are the predominant activities being conducted at the facility.
These activities are necessary for satisfactory containment of hazardous materials and protection
of workers, the public, and the environment. These activities include providing periodic
inspections, maintenance of structures, systems, and components, and actions to prevent the
alteration of hazardous materials to an unsafe state. [10 C.F.R. Part 830, Subpart B, Appendix A,
Table 3]
Note: Transition surveillance and maintenance activities may occur at any of the following
transitions between life cycle phases: (1) transition from operations to deactivation or
decommissioning; (2) transition from deactivation to decommissioning; and (3) transition
from decommissioning to environmental restoration.
DOE-STD-1120-2016
viii
ACRONYMS
CERCLA Comprehensive Environmental Response, Conservation, and Liability Act
C.F.R. Code of Federal Regulations
DOE Department of Energy
DSA Documented Safety Analysis
EG Evaluation Guideline
EPA Environmental Protection Agency
ER Environmental Restoration
HA Hazard Analysis
HC Hazard Category
HAZWOPER Hazardous Waste Operations and Emergency Response
IWS Inactive Waste Site
NCS Nuclear Criticality Safety
NDA Non-Destructive Assay
NPH Natural Phenomena Hazards
O Order
RCRA Resource Conservation and Recovery Act
SAC Specific Administrative Control
S&H Safety and Health
SC Safety Class
SMP Safety Management Program
SS Safety Significant
SSC Structure, System, and Component
STD Standard
TED Total Effective Dose
TSR Technical Safety Requirement
USQ Unreviewed Safety Question
DOE-STD-1120-2016
1
1.0 INTRODUCTION
1.1 Purpose
Section 6
This Department of Energy (DOE) Standard (STD), DOE-STD-1120-2016, describes a
methodology for preparing a Documented Safety Analysis (DSA) for decommissioning
of hazard category (HC) 1, 2, or 3 nuclear facilities, as well as HC-2 or HC-3
environmental restoration (ER) activities that involve work not done within a permanent
structure or the decommissioning of a facility with only low-level residual fixed
radioactivity.
1.2 Applicability
The Code of Federal Regulations (C.F.R.) in 10 C.F.R. Part 830, Nuclear Safety
Management, Subpart B, Safety Basis Requirements, Section 830.204(a) requires that
“[T]he contractor responsible for a hazard category 1, 2, or 3 DOE nuclear facility must
obtain approval from DOE for the methodology used to prepare the documented safety
analysis for the facility unless the contractor uses a methodology set forth in Table 2 of
Appendix A to this Part.” As described in Appendix A, Table 2 of this regulation,
contractors may prepare a DSA for decommissioning a DOE nuclear facility or for an
environmental restoration activity by using the method described in DOE-STD-1120-98,
Integration of Environment, Safety, and Health into Facility Disposition Activities, or
successor document, and the provisions of 29 C.F.R. Part 1910.120 or 29 C.F.R. Part
1926.65, Hazardous Waste Operations and Emergency Response (HAZWOPER). In
addition, the table also requires decommissioning projects involving more than “low level
residual fixed radioactivity” to derive hazard controls based on the Safety and Health
Programs, Work Plans, Health and Safety Plans and Emergency Response Plans.
This Standard does not apply to facility life-cycles that are subject to the safe harbor provisions of
DOE-STD-3009-2014, Preparation Guide for U.S. Department of Energy Nonreactor Nuclear
Facility Safety Analysis Reports, or DOE-STD-3011-2016, Preparation of Documented Safety
Analysis for Interim Operations at DOE Nuclear Facilities (i.e., deactivation including material
stabilization campaigns such as processing of reactive liquids and any long-term surveillance and
maintenance).
As a DOE nuclear facility transitions from operations through the decommissioning process, the
facility undergoes many life cycle changes and the safety basis is required to be maintained
whenever the hazard category is 1, 2, or 3. The following sequential phases are described for this
transition:
DOE-STD-1120-2016
2
1. Deactivation. The process of placing a facility in a stable and known condition including
the removal of hazardous and radioactive materials to ensure adequate protection of the
worker, public health and safety, and the environment, thereby limiting the long-term
cost of surveillance and maintenance. Actions include the removal of fuel, draining
and/or de-energizing nonessential systems, removal of stored radioactive and hazardous
materials, and related actions. Deactivation may not include all decontamination
necessary for the dismantlement and demolition phase of decommissioning, e.g.,
removal of contamination remaining in the fixed structures and equipment after
deactivation.
2. Decommissioning. Takes place after deactivation and includes surveillance and
maintenance, decontamination and/or dismantlement. These actions are taken at the end
of the life of a facility to retire it from service with adequate regard for the health and
safety of workers and the public and for the protection of the environment. The ultimate
goal of decommissioning is unrestricted release or restricted use of the site.
Section 7
3. Decontamination. The removal or reduction of residual chemical, biological, or
radiological contaminants and hazardous materials by mechanical, chemical or other
techniques to achieve a stated objective or end condition.
4. Demolition. Destruction and removal of physical facilities or systems.
This Standard may be used for facilities conducting activities as described in Steps 2-4 above, as
well as ER activities not conducted in a permanent structure. Although activities may involve
changes to existing structures, decommissioning and ER projects do not typically apply safety
basis documentation requirements of DOE-STD-1189, Integration of Safety into the Design
Process, unless they involve new design and construction and are determined to be a major
modification of the facility.
1.3 Use of this DSA Preparation Methodology
The methodology provided in this Standard is intended to be compliant with 10 C.F.R. Part 830,
Subpart B. DSAs prepared for decommissioning or ER activities should use the latest revision of
the Standard, not previous versions, as they have been revised to provide clearer criteria and
guidance to support effective and consistent DSAs based upon lessons learned from
implementation. If a DOE contractor chooses to use this DOE-STD-1120 revision for updating
an existing DSA, then the applicable sections of this Standard are required to be implemented
completely; unless DOE approves use of an alternate methodology due to the deviations from
this Standard. For all safe harbor approaches, DSAs are required to be compliant with the general
requirement of 10 C.F.R. § 830.204, Documented Safety Analysis, which requires: (1) a facility
and work description; (2) a systematic identification of natural and man-made hazards associated
with the facility; (3) an evaluation of normal, abnormal and accident conditions; (4) a derivation
of hazard controls; and (5) a description of safety management program characteristics, including
criticality safety.
DOE-STD-1120-2016
3
This Standard provides a safe harbor methodology to develop DSAs in compliance
with10 C.F.R. Part 830, Subpart B, for decommissioning and ER activities. Many (but
not all) of the requirements for compliance with this Standard are drawn from DOE-STD-
3009-2014, which also provides detailed guidance on interpreting these requirements.
Rather than extend the length of this Standard by reprinting that guidance, the user of this
Standard should refer to DOE-STD-3009-2014, as necessary, for effective and acceptable
methods for hazards and accident analysis (e.g., standard industrial hazard screening,
unmitigated analysis, dispersion and consequence analysis).
Title 10 C.F.R. Part 851, Worker Safety and Health Program, specifically focuses on provisions
for developing a Safety and Health (S&H) Program and a site-specific health and safety plan,
which incorporates HAZWOPER requirements (29 C.F.R. Part 1910.120 or 29 C.F.R. Part
1926.65). HAZWOPER applies to all worker hazards, including physical hazards posed by
decommissioning or ER work (e.g., use of heavy equipment, excavations, confined space entry,
and hot work). Some of these worker hazards, such as chemical hazards and unique hazards that
can affect multiple workers, are within the scope of the DSA. Although HAZWOPER is
specified in Table 2 of Appendix A to 10 C.F.R. Part 830, Subpart B for ER or decommissioning
projects, it is not within the scope of the DSA to establish controls related to the common
industrial hazards that make up a large portion of basic Occupational Safety and Health
Administration regulatory compliance. Therefore, in the context of Subpart B requirements of
Part 830, the HAZWOPER program is taken to be an important safety management program that
is identified, described, and maintained within a HC-1, 2, or 3 facility’s safety basis.
Section 8
1.4 Application of the Graded Approach Principles
Section 830.7 of 10 C.F.R. Part 830 prescribes the use of a graded approach for the effort
expended in safety analysis and the level of detail presented in the associated documentation.
The graded approach, applied to initial DSA preparation and subsequent updates, is intended to
produce an effective and efficient safety analysis and a DSA that is sufficient to assure DOE that
a facility has acceptable safety provisions, without providing unnecessary information. As
described in 10 C.F.R. § 830.3, the graded approach adjusts the magnitude of the preparation
effort to the characteristics of the subject facility based on:
• The relative importance to safety, safeguards, and security;
• The magnitude of any hazard involved;
• The life cycle stage of a facility;
• The programmatic mission of a facility;
• The particular characteristics of a facility;
• The relative importance of radiological and non-radiological hazards; and
• Any other relevant factor (e.g., short operational life).
DOE-STD-1120-2016
4
The application of the graded approach may allow for much simpler analysis and documentation
for some facilities. However, the DSA is still required to provide a systematic evaluation of
hazards and an appropriate set of controls commensurate with the results of the hazard
evaluation.
1.5 Overview of the Changes in this Revision
This revision of DOE-STD-1120-2005, Integration of Environment, Safety, and Health Into
Facility Disposition Activities, and successor document to DOE STD-1120-98, Integration of
Environment, Safety, and Health Into Facility Disposition Activities, updates the Standards’
provisions to reflect experience and lessons learned from implementation. This revision also
reflects pertinent changes to other key DOE documents, such as DOE Order (O) 420.lC, Facility
Safety, and DOE-STD-3009-2014 which have been revised since this Standard was last issued.
DOE contractors may choose to use this revision to update a facility’s DSA. If a DOE contractor
chooses to use this revision of DOE-STD-1120 to update an existing DSA, then the applicable
sections of this Standard are required to be implemented completely, unless DOE approval for
use of an alternate methodology is obtained [See 10 C.F.R. § 830.204(a)]. This revision clearly
identifies which of its provisions are mandatory for use of this Standard in order to meet the
requirements of 10 C.F.R. § 830.204.
1.6 Overview of the Standard
Section 2 provides the general approach for hazard categorization for decommissioning and ER.
Section 3 provides specific requirements for implementing this Standard. Section 4 provides
references. Appendix A provides additional guidance for decommissioning of a nuclear facility.
Appendix B provides additional guidance for ER activities. Appendix C provides additional
guidance for implementation of DSA.
2.0 HAZARD CATEGORIZATION
This section provides initial and final hazard categorization requirements and guidance that are
applicable for decommissioning and ER projects. 10 C.F.R. § 830.202, Safety basis, requires
that “(b) In establishing the safety basis for a hazard category 1, 2, or 3 DOE nuclear facility, the
contractor responsible for the facility must: . . . (3) Categorize the facility consistent with DOE-
STD-1027-92 ("Hazard Categorization and Accident Analysis Techniques for compliance with
DOE Order 5480.23, Nuclear Safety Analysis Reports," Change Notice 1, September 1997)”.
DOE-STD-1027-92 describes an initial and final hazard categorization process that is necessary
to determine applicability of Part 830, Subpart B requirements. This process has particular
relevance to decommissioning and ER. The decommissioning phase of a nuclear facility
operational life cycle takes place after much of the facility inventory has been removed. ER
activities typically involve buried waste that is not readily dispersible; such conditions may be
Section 9
DOE-STD-1120-2016
5
appropriate for downgrading facilities below Hazard Category 3 (HC-3) using the initial and
final hazard categorization process described in DOE-STD-1027-92.
The initial hazard categorization is based strictly on the total radionuclide inventory as compared
with the threshold quantities of DOE-STD-1027-92, as well as consideration of criticality mass
limits for fissile materials (i.e., per the asterisk to Table A.1 of the standard). Estimating the total
radionuclide inventory may be challenging for decommissioning and ER projects because of
poor quality records and/or lack of process knowledge needed to accurately determine material
inventory quantities. Characterization methods that are typical to the environmental cleanup
projects should be employed to improve process knowledge such as employee interviews,
intrusive sampling, and non-destructive assay (NDA) techniques of soil, surface and
groundwater, and contaminated equipment and structures. These methods are appropriate for
hazard categorization provided they are sufficiently bounding. For example, NDA techniques
should fully account for instrument error and intrusive sampling plans should reflect the potential
for radioactive material to be distributed unevenly.
Some DOE facilities or restoration projects may initially be categorized as a HC-2 or HC-3
based on DOE-STD-1027-92, but subsequently, based on the results of a facility-specific hazard
analysis (HA) and final categorization (performed in accordance with the provisions of DOE-
STD-1027-92), the facility may be determined by the contractor to be a “Below Hazard Category
3” (or radiological) nuclear facility.
2.1 Final Hazard Categorization
Nuclear Safety Technical Position, NSTP-2002-2, Methodology for Final Hazard Categorization
of Nuclear Facilities from Category 3 to Radiological, describes an acceptable methodology that
may be used as guidance for how a HC-3 facility can be demonstrated to be below HC-3 in final
hazard categorization, consistent with DOE-STD-1027-92. The HC-3 threshold values may be
revised based on the physical and chemical form and available dispersive energy sources, if the
credible release fractions can be shown to be significantly different than the values used in the
Environmental Protection Agency (EPA), Technical Background Document to Support Final
Rulemaking Pursuant to Section 102 of the Comprehensive Environmental Response,
Compensation, and Liability Act: Radionuclides. A facility or activity may be downgraded
below HC-3 if inventory is below threshold quantities as modified by these factors (i.e.,
physical/chemical form of material and available energy sources). Though unlikely; the
conditions, parameters, and assumptions that form the basis for the initial hazard category of the
facility also need to be evaluated to determine whether the hazard categorization could be
increased.
ER activities typically involve radioactive or hazardous materials (i.e., hazardous substances,
wastes or other constituents) that may be distributed unevenly over a large area. The cumulative
DOE-STD-1120-2016
6
Section 10
total of material inventory will often exceed HC-3 threshold quantities because of the large area
being considered. However, waste materials or contamination is buried in the ground at many of
these sites and not subject to dispersive forces until exhumed. Additionally, exhumed material
may not be readily dispersible due to physical form or the method of extraction. It may also be
possible to demonstrate through segmentation that certain intrusive ER activities can not
physically exhume sufficient quantities of material at risk to trigger HC-3 threshold values based
on a final hazard categorization (material is dispersed, mixed with soils). For intrusive ER
activities, segmentation arguments used in final hazard categorizations should consider and
account for planned staging or storage of exhumed material that could collocate significant
inventory that could be acted upon by a common accident-initiating energy source. It may be a
simple matter to qualitatively demonstrate in a final hazard categorization that non-intrusive ER
activities (e.g., soil capping) pose no dispersive energy sources.
Facilities that are being decommissioned may also have valid arguments for facility hazard
categorization downgrades in cases where remaining materials are in the form of surface
contamination that is fixed or embedded and non-dispersible based on the planned scope of
decommissioning activities. However, potential holdup of radionuclide inventory with process
piping or ventilation systems should not be overlooked as potentially significant contributors to
inventory quantities.
For facilities that have an initial hazard categorization at or above HC-3, the DSA basis and
assumptions are required to demonstrate compliance with Part 830, Subpart B. Consistent with
the intent of DOE-STD-1027-92, hazard categorization information shall include: (1) the
bounding radionuclide inventories at a facility; (2) discussion of any assumptions used in
calculating inventories; and (3) a defensible HA associated with a final hazard categorization.
Final hazard categorizations that result in a determination of “below Hazard Category 3” based
on a HA will require DOE approval in accordance with final hazard categorization
determinations described in DOE-STD-1104-2014, Review and Approval of Nuclear Facility
Safety Basis and Safety Design Basis Documents, but may be developed and submitted separate
from a DSA that may have otherwise been required.
2.2 Inactive Waste Sites
Inactive waste sites (IWS) are a special category of facilities that involve radioactive material
buried in a soil matrix and not planned to be exhumed for an extended period of time. These
facilities are simplistic in nature, and share similar safety features, operational characteristics,
and hazard potential. Following the methodology of DOE-STD-1027-92, a final hazard
categorization determination has been established that concludes these facilities may be
DOE-STD-1120-2016
7
downgraded below HC-31. This determination may be used for facilities meeting the following
definitions and criteria:
a) An IWS shall be covered with soil or other engineered barrier as required by Resource
Conservation and Recovery Act (RCRA) and/or Comprehensive Environmental
Response, Conservation, and Liability Act (CERCLA) requirements and subject to
physical access control as required by HAZWOPER and 10 C.F.R. Part 835,
Occupational Radiation Protection. Hazardous or radioactive material may be in a
general soil matrix as a result of liquid discharge or spill, legacy burial grounds, or in
areas that contain contaminated equipment, pipes, or other items disposed of at the waste
site. Physical features (i.e., soil overburden or engineered cap) shall preclude the
introduction of an energy source capable of dispersing the radioactive material.
Section 11
b) The following items shall not be permitted within an IWS:
• Above-ground structures or containers with radioactive inventory,
• Below-grade facilities/structures with human access or active provision of services
(e.g., electricity, ventilation, steam), including tanks,
• Any intrusive activity at the waste site (e.g., waste sampling, waste acceptance or
retrieval),
• Above-ground remediation activities (e.g., pump and treat facilities),
• Evaporation ponds or sludges,
• Waste sites that could contain fissile material such that there is a potential for a
criticality hazard because of water intrusion or material rearrangement,
• Waste sites that could contain explosives, or chemicals that might react with
sufficient energy to cause a significant release,
• Unvented tanks, unless demonstrated that there is no potential to exceed tank bursting
limits from overpressurization.
The final hazard categorizations will result in a determination of “below Hazard Category 3” and
will require DOE approval in accordance with final hazard categorization determinations
described in DOE-STD-1104-2014. Verification that the IWS requirements have been met shall
be included in this final hazard categorization determination.
3.0 DSA DEVELOPMENT REQUIREMENTS
Although all elements of the DSA preparation are important, three elements—hazard
analysis, accident analysis, and hazard control selection—are fundamental, because they
1 See DOE-STD-1120-2005, Vol. 2, Appendix D, Inactive Waste Site Criteria, for additional background.
DOE-STD-1120-2016
8
determine the hazard controls needed to provide protection for workers, the public, and
the environment. This section provides detailed criteria and guidance for performing
these three elements. Hazard analysis and accident analysis are performed to identify
specific controls and improvements that feed back into overall safety management.
Consequence and likelihood estimates obtained from this process also form the bases for
selecting the level of detail and control needed in key elements of specific safety
management programs, using a graded approach. The result is documentation of the
safety basis that emphasizes the hazard controls needed to maintain safe operation of a
facility.
3.1 Hazard Identification and Evaluation
The initial analytical effort for all facilities is a hazard analysis that systematically identifies and
evaluates facility hazards, potential accidents, and controls. The hazard evaluation focuses on
evaluating the complete spectrum of hazards and accidents. This largely qualitative effort forms
the basis for the entire safety analysis, including the identification of worker hazard controls and
the subset of accidents to be analyzed. Note: DOE’s 10 C.F.R. Part 835 and 10 C.F.R. Part 851
also require DOE contractors to conduct hazard identification and evaluation which may aid
analysts in DSA development.
3.1.1 The methodology used for hazard identification shall ensure comprehensive identification
of the hazards associated with the full scope of facility processes, associated operations, such as
handling of fissionable materials and hazardous waste, and work activities covered by the DSA.
The methodology shall include characterization of hazardous materials (radiological and non-
radiological) and energy sources, in terms of quantity, form, and location. Commercial industry
practices for hazard identification, such as those described in the Center for Chemical Process
Safety’s Guidelines for Hazard Evaluation Procedures (Third Edition, Wiley/American Institute
of Chemical Engineers, 2008), may be used.
Section 12
3.1.2 Bounding inventory values of radiological or hazardous materials shall be used,
consistent with the maximum quantities of material that are stored and used in facility processes.
Inventory data may be obtained from flowsheets, vessel sizes, contamination analyses, maximum
historical inventories, and similar sources. Other possible sources of information supporting
hazard identification include fire hazard analyses, health and safety plans, job safety analyses,
and occurrence reporting histories, and safety basis documents from other sites with pertinent
activities or histories.
3.1.3 The hazard evaluation shall provide (a) an assessment of the facility hazards associated
with the full scope of planned operations covered by the DSA and (b) the identification of
controls that can prevent or mitigate these hazards or hazardous conditions. The hazard
evaluation shall analyze normal operations (e.g., startup, facility activities, shutdown, and testing
DOE-STD-1120-2016
9
and maintenance configurations) as well as abnormal and accident conditions. In addition to the
process-related hazards identified during the hazard identification process, the hazard evaluation
shall also address natural phenomena and man-made external events that can affect the facility.
3.1.4 As part of the hazard evaluation, an unmitigated hazard scenario shall be evaluated for
each initiating event by assuming the absence of preventive and mitigative controls. Initial
conditions may be necessary to define the unmitigated evaluation; further guidance is provided
in Section A.3 of Appendix A of DOE-STD-3009-2014. The consequences and the likelihood of
the unmitigated hazard scenario shall be estimated (using qualitative and/or semi-quantitative
techniques) to address potential effects on facility workers2, co-located workers, and the public
(maximally-exposed offsite individuals [MOIs]), consistent with the likelihoods and
consequence levels described in Tables 1 and 2 of DOE-STD-3009-2014.
3.1.5 Consequence determinations used for co-located workers in the hazard evaluation shall
be supported by an adequate technical basis such as scoping calculations. Alternately, the
quantitative evaluation of co-located worker consequences used to compare to DOE-STD-3009-
2014 Table 1 thresholds may be performed in the accident analysis and reported in the DSA.
3.1.6 Risk ranking/binning may be used to support the selection of Design Basis Accidents
(DBAs)/ Evaluation Basis Accidents (EBAs) and hazard controls3. If risk ranking/binning is
used, the consequence and likelihood thresholds in DOE-STD-3009-2014 Tables 1 and 2 shall be
used.
3.1.7 For each of the unmitigated hazard scenarios, the controls (structures, systems, and
components [SSCs], administrative and/or programmatic) that can prevent or mitigate the hazard
scenario shall be identified. A mitigated hazard evaluation shall be performed to determine the
effectiveness of safety significant (SS)4 controls (following the preferred hierarchy as described
in Section 3.3 of this Standard) by estimating hazard scenario likelihood with preventive controls
and consequences with mitigative controls.
3.1.8 The analysis should include SS controls for hazard scenarios having high estimated
chemical consequences to the public, or high radiological or chemical consequences to workers
(i.e., as defined by Table 1 of DOE-STD-3009-2014). This information, along with safety
Section 13
2 See DOE-STD-3009-2014, Section 3.1.3.1, for information regarding qualitative evaluation of facility worker
consequences.
3 See DOE-STD-3009-2014 Appendix A, Section A.4 for information on risk ranking/binning.
4 Since unmitigated high or moderate radiological consequences to the public could challenge the Evaluation
Guideline and are required by Section 3.2 to be evaluated as Design Basis Accidents, or as representative or
unique Evaluation Basis Accidents, a mitigated analysis for the public is optional for the DSA hazard evaluation.
DOE-STD-1120-2016
10
functions for these controls, shall be included in the hazard evaluation, unless determined as part
of the accident analysis (see Section 3.2).
3.1.9 An inadvertent criticality accident represents a special case for hazard evaluation. The
criticality safety program requirements5 are derived from the hazard analysis process established
in the American National Standards Institute/American Nuclear Society (ANSI/ANS)-8 series of
national standards, which require a documented criticality safety evaluation demonstrating that
operations with fissionable material remain subcritical under both normal and credible abnormal
conditions (see Appendix A, Section A.5 of DOE-STD-3009-2014 for details). In addition, the
DSA hazard evaluation shall include:
• Events where consequences (from the criticality itself or subsequent impact to hazardous
material) exceed the high radiological consequence thresholds for either the co-located
workers or the MOI in Table 1 unless it has been determined that an unmitigated
criticality accident is not credible; and,
• Situations where an active engineered control(s) is required by the Nuclear Criticality
Safety (NCS) analysis to ensure subcriticality.
3.1.10 If the NCS program requires a criticality accident alarm system, then the criticality
accident alarm system shall be discussed in the hazard evaluation and carried forward to
evaluation in accordance with Section 3.3 of this Standard.
3.2 Accident Analysis
Accident analysis entails the formal characterization of a limited subset of accidents, referred to
as Design Basis Accidents (DBAs)/Evaluation Basis Accidents (EBAs)6 and the determination
of consequences and hazard controls associated with these events. Accident analysis is not
necessary for facilities with unmitigated offsite consequences that do not have the potential to
challenge the evaluation guideline (EG). Scoping calculations performed during hazard
evaluation may be used to show that accident analysis is not needed.
For the purpose of identifying safety class (SC) SSCs, estimated consequences to the MOI are
compared to the EG. For identification of SS SSCs, an evaluation of co-located worker
consequences and offsite chemical consequences is performed as part of either: (1) the hazard
evaluation as described in Sections 3.1 of this Standard or (2) the accident analysis addressed in
5 Criticality safety program requirements are established in DOE O 420.1C. This Order states that DOE-STD-
3007-2007, Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor
Nuclear Facilities, is the required method for performing criticality safety evaluations, unless DOE approves an
alternate method.
6 DOE-STD-3009-2014 Appendix A, Section A.6 discusses the concept of EBAs.
DOE-STD-1120-2016
11
Section 14
this section and compared to the applicable quantitative and qualitative criteria in Section 3.3 for
the various categories of affected persons. The need for SS controls to protect the facility worker
is determined by the qualitative hazard evaluation discussed in Section 3.1.3.1 of DOE-STD-
3009-2014.
3.2.1 EBAs are derived from the spectrum of hazard scenarios developed in the hazard
evaluation. Two types of EBAs shall be defined for further analysis: representative and unique.
Representative EBAs bound a number of accidents with a similar control set (e.g., the worst fire,
for a number of similar fires). At least one bounding accident from each of the major types
determined from the hazard evaluation that have the potential to challenge the EG (fire,
explosion, spill, etc.) shall be selected. Unique EBAs are those events that may be bounded by
other events but have their own unique control set or other hazard/accident characteristics.
3.2.2 Representative EBAs shall be defined such that:
• The control(s) applicable to the EBA are similar and will perform the same function as
the controls of the represented hazard scenarios; and
• The accident environment associated with the EBA envelopes the environment expected
from the represented hazard scenarios.
3.2.3 Both the hazard evaluation and the accident analysis require an unmitigated analysis of
the consequences and likelihood of accidents (note: the term “accident” as used in this subsection
also includes “hazard scenarios”). An unmitigated consequence analysis shall be performed for
plausible operational accident scenarios7, natural phenomena hazards events, and external events.
3.2.4 The unmitigated source term should characterize both the release fractions and the
energies driving the release in accordance with the physical realities of the accident phenomena
at a given facility, activity, or operation. As a result, some additional assumptions may be
necessary in order to define a meaningful accident scenario8, and such assumptions may also
affect the magnitude of the resultant consequences. An assumption that an SSC exists does not
automatically require SC or SS designation. However, assumptions shall be protected at a level
commensurate with their importance.
3.2.5 A mitigated analysis shall be performed to determine the effectiveness of SS and SC
controls to protect co-located workers and the public. This analysis should be the same as the
unmitigated analysis except that accident likelihood is estimated with preventive controls
available, and consequences are estimated with mitigative controls available.
7 See DOE-STD-3009-2014, Section 3.2.1 for further discussion of plausible accidents.
8 Section 3.2.2 of DOE-STD-3009-2014 provides additional guidance for unmitigated analysis assumptions of
plausible accident scenarios.
DOE-STD-1120-2016
12
3.2.6 Where preventive controls are credited as SS or SC, the DSA shall evaluate the
effectiveness of the controls to either eliminate the hazard or terminate the accident and prevent a
release of radioactive or other hazardous materials. If hazard elimination or accident termination
cannot be accomplished, the effectiveness of the credited controls is evaluated in terms of the
overall reduction in the likelihood of the accident.
Section 15
3.2.7 A mitigated consequence analysis is required if the credited preventive controls do not
eliminate the hazard or terminate the accident. This analysis shall demonstrate how SC
mitigative SSC(s) and/or specific administrative controls (SACs) reduce consequences below the
EG and how SC (if identified) and SS mitigative SSCs and/or SACs reduce co-located worker
consequences below 100 rem Total Effective Dose (TED) (i.e., as representative of the co-
located worker). In circumstances where no viable control strategy exists in an existing facility
to prevent or mitigate the consequence of one or more of the accident scenarios from exceeding
the EG, the DSA shall provide the information as described in DOE-STD-3009-2014, Section
3.3.1, Safety Class Controls.
3.2.8 Calculations shall be made based on technically-justified input parameters9 and
underlying assumptions such that the overall consequence calculation is conservative.
Conservatism is assured by the selection of bounding accident scenarios, the use of a
conservative analysis methodology, and the selection of source term and input parameters that
are consistent with that methodology.
3.2.9 A χ/Q value of 3.5 x 10-3 sec/m3 shall be used for ground-level radiological or chemical
release evaluation at the 100 meter receptor location, unless an alternate onsite χ/Q value is
justified. This value may not be appropriate for certain unique situations, such as operations not
conducted within a physical structure10. When an alternate value is used, the DSA shall provide
a technical basis supporting the need for the alternate value and the value selected.
3.3 Hazard Controls Selection
If a SC or SS control is found necessary, all preventive and mitigative controls associated with
the sequence of failures that result in a given release scenario are candidates for consideration.
Preventive or mitigative controls are selected using a judgment-based process considering a
hierarchy of controls that gives preference to passive engineered safety features over active ones;
9 Section 3.2.4 of DOE-STD-3009-2014 provides detailed discussion on the derivation and selection of accident
analysis source term and input parameters.
10 Operating Experience Level 3, Atmospheric Dispersion Parameter (χ/Q) for Calculation of Collocated Worker
Dose, dated April 2015, and associated technical report, NSRD-2015-TD01, Technical Report for Calculations of
Atmospheric Dispersion at Onsite Locations for Department of Energy Nuclear Facilities, conclude that the
default χ/Q value may not be appropriate for releases from small facilities (i.e., those with dimensions less than 10
m tall by 36 m wide).
http://energy.gov/ehss/downloads/operating-experience-level-3-atmospheric-dispersion-parameter-xq-calculation-co
http://energy.gov/ehss/downloads/operating-experience-level-3-atmospheric-dispersion-parameter-xq-calculation-co
http://energy.gov/ehss/downloads/nsrd-2015-td01-technical-report-calculations-atmospheric-dispersion-onsite-locations
http://energy.gov/ehss/downloads/nsrd-2015-td01-technical-report-calculations-atmospheric-dispersion-onsite-locations
DOE-STD-1120-2016
13
engineered safety features over administrative controls or SACs; and preventive over mitigative
controls.
3.3.1 When the hierarchy of controls is not used for situations requiring SC/SS controls (e.g., a
SAC is selected over an available SSC), the DSA shall provide a technical basis that supports the
controls selected.
Section 16
Following efforts to minimize hazardous materials, this control selection strategy translates into
the following hierarchy of controls11, listed from most preferred to least preferred:
(1) SSCs that are preventive and passive
(2) SSCs that are preventive and active
(3) SSCs that are mitigative and passive
(4) SSCs that are mitigative and active
(5) Administrative controls that are preventive
(6) Administrative controls that are mitigative
3.3.2 In some cases, safety-SSCs rely upon supporting SSCs to perform their intended safety
function. For new facilities, Attachment 3 of DOE O 420.1C requires that support SSCs be
designed as SC or SS SSCs if their failures prevent safety-SSCs or specific administrative
controls from performing their safety functions. For existing facilities, support SSCs shall be
designated at the same classification (SC or SS) as the safety controls they support, or else
compensatory measures shall be established to assure that the supported safety-SSC can perform
its safety function when called upon. SSCs whose failure would result in losing the ability to
complete an action required by a SAC are similarly identified and designated as SC or SS based
on the SAC safety function, or justification provided if not so designated.
3.3.3 If the unmitigated release consequence for a DBA/EBA exceeds the EG, SC controls
shall be applied to prevent the accident or mitigate the consequences to below the EG. If
unmitigated off-site doses between 5 rem and 25 rem are calculated (i.e., challenging the EG),
SC controls should be considered, and the rationale should be described for decisions on whether
or not to classify controls as SC.
3.3.4 SS control designation shall be made on the basis of: (1) major contribution to defense-
in-depth; (2) protection of the public from release of hazardous chemicals; (3) protection of co-
located workers from hazardous chemicals and radioactive materials; and, (4) protection of
facility workers from fatality, serious injury, or significant radiological or chemical exposure.
11 An exception to this hierarchy is for confinement of radioactive materials. See Section A.8 in DOE-STD-3009-
2014.
DOE-STD-1120-2016
14
3.3.5 SS designation of controls for protection of the public from chemical releases shall be
based on a peak 15 minute time-weighted average air concentration, measured at the receptor
location that exceeds Protective Action Criteria (PAC) level 2.
3.3.6 For radiation hazards, a conservatively calculated unmitigated dose of 100 rem TED to a
receptor located at 100 meters from the point of release shall be used as the threshold for
designation of SS controls. The methodology used to determine consequences shall be
consistent with that described in Section 3.2. SS designation for protection of co-located
workers from chemical releases shall be based on a peak 15 minute time-weighted average air
concentration at the receptor location that exceeds PAC-3.
3.3.7 Safety management programs provide an important part of the overall strategy for
protecting facility workers. However, SS controls (SSCs or SACs) shall be selected for cases
where a fatality, serious injury, or significant radiological or chemical exposure to a facility
worker may occur. The term “serious injury” refers to an injury requiring medical treatment for
immediately life-threatening or permanently disabling injury such as the loss of an eye or limb.
SS controls are not designated solely to address standard industrial hazards (see Section 3.1.3.1
and Appendix A.1 of DOE-STD-3009-2014). Examples of conditions that warrant consideration
of SS designation include:
Section 17
• High concentrations of radioactive or chemically toxic materials in areas where a facility
worker could be present;
• Explosions or over-pressurizations within process equipment or confinement/containment
structures or vessels, where serious injury or death to a facility worker may result from
the fragmentation of structures or vessels; and
• Unique hazards that could result in asphyxiation or significant chemical/thermal burns.
3.3.8 The Criticality Safety Program ensures that operations remain subcritical under normal
and credible abnormal conditions. NCS controls derived in accordance with the DOE-approved
NCS Program are required to be implemented in accordance with 10 C.F.R. Part 830, Subpart A,
Quality Assurance Requirements, commensurate with the importance of the safety functions
performed. Explicit criticality controls required as a result of hazard evaluation criteria
established in Section 3.1 shall be documented in the DSA and classified in accordance with
requirements of this Section.
3.3.9 If hazard controls are anticipated to be removed or downgraded during the interim
operations, step-out criteria shall be documented in the DSA. Unmitigated source terms and
consequences should be considered, and supported by the hazard analysis, and accident
analysis if necessary, for points in time in which anticipated step-out criteria will apply. The
following criteria should be used when determining if it is appropriate to retire a control from
the safety basis:
DOE-STD-1120-2016
15
• Hazardous condition being controlled is no longer present.
• Hazardous substance’s physical form has changed to a less dispersible form.
• Hazardous substance quantities are no longer present or have been reduced to the point
where the consequences of releases are no longer a concern.
3.4 DSA Format and Content
Criteria and guidance for the format and content of each of the chapters in the DSA are provided
in this section. The DSA format and content shall address the DSA sections and subsections
described below (Sections that are distinct to either decommissioning or ER projects are noted in
parenthesis). The DSA may include addenda for short-term evolutions (e.g., activities that may
be conducted only once) provided the addenda meet the requirements of this Standard.
• DSA [Executive Summary]
• DSA [Chapter 1: Introduction]
o Rationale for DSA Methodology
• DSA [Chapter 2: Facility Description]
o Facility and Work Description (Decommissioning)
o Restoration Project and Site Description (ER)
o Site Location
o Systems, Structures, and Components (Decommissioning)
o Operational History (Decommissioning)
o Site History (ER)
o Decommissioning Activities and Techniques (Decommissioning)
o Restoration Project Activities and Techniques (ER)
• DSA [Chapter 3: Hazard and Accident Analysis and Control Selection]
o Hazard Evaluation and Safety Significant Control Selection
o Hazard Categorization
o Accident Analysis and Safety Class Control Selection
o Beyond Design/Evaluation Basis Accident Consideration
• DSA [Chapter 4: Safety Structures, Systems and Components]
o Safety Class Systems, Structures, and Components
Safety Function, Functional Requirements, System Evaluation, and TSR
Requirements
o Safety Significant Systems, Structures, and Components
Safety Function, Functional Requirements, System Evaluation, and TSR
Requirements
o Specific Administrative Controls
Safety Function, Functional Requirements, SAC Evaluation, and TSR
Requirements
Section 18
DOE-STD-1120-2016
16
• DSA [Chapter 5: Derivation of Technical Safety Requirements]
o TSR Coverage
o Derivation of Facility Modes
o TSR Derivation
o Design Features
• DSA [Chapter 6: Prevention of Inadvertent Criticality]
o Criticality Safety Program
• DSA [Chapter 7: Safety Management Programs]
o Radiation Protection
o Fire Protection
o Maintenance
o Procedures
o Training
o Conduct of Operations
o Quality Assurance
o Emergency Preparedness
o Waste Management
Appendices A and B provide guidance that is explicit to decommissioning and ER activities and
should be considered when developing each DSA chapter.
3.5 Disposition Plans
The guidance provided in this Standard addresses only the preparation of a DSA for
decommissioning and ER activities. In the development of a DSA, it is helpful to understand the
process for developing a disposition plan that the DSA will support. It also important that the
DSA and disposition plan be consistent in term of the scope of planned decommissioning
activities. DOE O 430.1B, Real Property Asset Management (which superseded DOE O 430.1A,
Life-Cycle Asset Management) requires the development of a disposition plan along with
specifics of what the disposition plan needs to cover. The use of the terms “disposition” and
“disposition plan,” refers to activities that follow completion of the facility’s mission including,
but not limited to, surveillance and maintenance, the deactivation and decommissioning phases,
and long-term stewardship. Guidance that is relevant to the decommissioning phase is provided
in DOE G 430.1-4, Decommissioning Implementation Guide, dated 9-2-99.
DOE-STD-1120-2016
17
4.0 REFERENCES
[1] 10 C.F.R. Part 830, Nuclear Safety Management
[2] 10 C.F.R. Part 835, Occupational Radiation Protection
[3] 10 C.F.R. Part 851, Worker Safety and Health Program
[4] 29 C.F.R. Part 1910, Occupational Safety and Health Standards
[5] 29 C.F.R. Part 1926, Safety and Health Regulations for Construction
[6] 40 C.F.R. Part 68, Chemical Accident Prevention Provisions
[7] DOE O 414.1D, Quality Assurance, April 2011
[8] DOE O 420.1C, Chg. 1, Facility Safety, February 2015
[9] DOE O 430.1B, Chg. 1, Real Property Asset Management, February 2008
[10] DOE O 440.1B, Chg. 2, Worker Protection Program for DOE (Including the National
Nuclear Security Administration) Federal Employees, March 2013
[11] DOE G 430.1-2, Implementation Guide for Surveillance and Maintenance during Facility
Transition and Disposition, dated 9-29-99
[12] DOE G 430.1-3, Deactivation Implementation Guide, dated 9-29-99
[13] DOE G 430.1-4, Decommissioning Implementation Guide, dated 9-2-99
[14] DOE G 430.1-5, Transition Implementation Guide, dated 4-24-01
[15] DOE G 440.1‐1B, Chg. 1, Worker Safety and Health Program for DOE (including the
National Nuclear Security Administration) Federal and Contractor Employees, March
2013
[16] DOE-STD-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria for
DOE Facilities, December 2012
[17] DOE-STD-1027-92, Chg. 1, Hazard Categorization and Accident Analysis Techniques for
Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports, September
1997DOE-STD-1104-2014, Review and Approval of Nuclear Facility Safety Basis and
Safety Design Basis Documents, December 2014
[18] DOE-STD-1120-2005, Integration of Environment, Safety and Health into Facility
Disposition Activities, Volumes 1 and 2, April 2005
[19] DOE-STD-1186-2004, Specific Administrative Controls, August 2004
Section 19
[20] DOE-STD-1189-2008, Integration of Safety into the Design Process, March 2008
[21] DOE-STD-3007-2007, Guidelines for Preparing Criticality Safety Evaluations at
Department of Energy Nonreactor Nuclear Facilities, February 2007
http://www.ecfr.gov/cgi-bin/text-idx?SID=a30696673e0c7c5091301f1fd49a469c&mc=true&tpl=/ecfrbrowse/Title10/10cfr830_main_02.tpl
http://www.ecfr.gov/cgi-bin/text-idx?SID=a30696673e0c7c5091301f1fd49a469c&mc=true&tpl=/ecfrbrowse/Title10/10cfr835_main_02.tpl
http://www.ecfr.gov/cgi-bin/text-idx?SID=a30696673e0c7c5091301f1fd49a469c&mc=true&tpl=/ecfrbrowse/Title10/10cfr851_main_02.tpl
http://www.ecfr.gov/cgi-bin/text-idx?SID=a30696673e0c7c5091301f1fd49a469c&mc=true&tpl=/ecfrbrowse/Title29/29cfr1910b_main_02.tpl
http://www.ecfr.gov/cgi-bin/text-idx?SID=a30696673e0c7c5091301f1fd49a469c&mc=true&tpl=/ecfrbrowse/Title29/29cfr1926_main_02.tpl
http://www.ecfr.gov/cgi-bin/text-idx?SID=a30696673e0c7c5091301f1fd49a469c&mc=true&tpl=/ecfrbrowse/Title40/40cfr68_main_02.tpl
https://www.directives.doe.gov/directives-documents/400-series/0414.1-BOrder-d-admchg1
https://www.directives.doe.gov/directives-documents/400-series/0420.1-BOrder-C-chg1
https://www.directives.doe.gov/directives-documents/400-series/0430.01-BOrder-b-chg2
https://www.directives.doe.gov/directives-documents/400-series/0440.1-BOrder-b-chg2
https://www.directives.doe.gov/directives-documents/400-series/0430.1-EGuide-2
https://www.directives.doe.gov/directives-documents/400-series/0430.1-EGuide-3
https://www.directives.doe.gov/directives-documents/400-series/0430.1-EGuide-4
https://www.directives.doe.gov/directives-documents/400-series/0430.1-EGuide-5
https://www.directives.doe.gov/directives-documents/400-series/0440.1-EGuide-1B-admchg1
http://energy.gov/ehss/downloads/doe-std-1020-2012
http://energy.gov/ehss/downloads/doe-std-1027-92
http://energy.gov/ehss/downloads/doe-std-1120-2005
http://energy.gov/ehss/downloads/doe-std-1186-2004
http://energy.gov/ehss/downloads/doe-std-1189-2008
http://energy.gov/ehss/downloads/doe-std-3007-2007
DOE-STD-1120-2016
18
[22] DOE-STD-3009-94, Change Notice NO.3, Preparation Guide for U.S. Department of
Energy Nonreactor Nuclear Facility Documented Safety Analyses, March 2006
[23] DOE-STD-3009-2014, Preparation of Nonreactor Nuclear Facility Documented Safety
Analysis, November 2014
[24] DOE-STD-3011-2016, Preparation of Documented Safety Analysis for Interim Operations
at DOE Nuclear Facilities, January 2016
[25] DOE-STD-3014-2006, Accident Analysis for Aircraft Crash into Hazardous Facilities,
May 2006
[26] DOE-HDBK-1163-2003, Integration of Multiple Hazard Analysis Requirements and
Activities, October 2003
[27] Nuclear Safety Technical Position, NSTP-2002-2, Methodology for Final Hazard
Categorization of Nuclear Facilities from Category 3 to Radiological, November 2002
[28] Technical Background Document to Support Final Rulemaking Pursuant to Section 102 of
the Comprehensive Environmental Response, Compensation, and Liability Act:
Radionuclides, U.S. Environmental Protection Agency, February 1989
[29] Guidelines for Hazard Evaluation Procedures, Center for Chemical Process Safety, Third
Edition, Wiley/American Institute of Chemical Engineers, 2008
[30] Memorandum from Roberson, Hazard Categorization of EM Inactive Waste Sites as Less
Than Hazard Category 3, September 17, 2002
[31] Operating Experience Level 3, Atmospheric Dispersion Parameter (χ/Q) for Calculation of
Collocated Worker Dose, April 2015
Section 20
[32] NSRD-2015-TD01, Technical Report for Calculations of Atmospheric Dispersion at Onsite
Locations for Department of Energy Nuclear Facilities, April 2015
http://energy.gov/ehss/downloads/doe-std-3009-94
http://energy.gov/ehss/downloads/doe-std-3009-2014
http://energy.gov/ehss/downloads/doe-std-3011-2016
http://energy.gov/ehss/downloads/doe-std-3014-2006
http://energy.gov/ehss/downloads/doe-hdbk-1163-2003
http://energy.gov/ehss/downloads/technical-position-nstp-2002-2
http://energy.gov/ehss/downloads/operating-experience-level-3-atmospheric-dispersion-parameter-xq-calculation-co
http://energy.gov/ehss/downloads/nsrd-2015-td01-technical-report-calculations-atmospheric-dispersion-onsite-locations
DOE-STD-1120-2016
A-1
APPENDIX A: GUIDANCE FOR DECOMMISSIONING ACTIVITIES
As described in Table 2 of Appendix A to 10 C.F.R. Part 830, Subpart B, contractors may
prepare a DSA for facilities being decommissioned by using the method described in DOE-STD-
1120-98, or successor document, and the provisions of 29 C.F.R. Part 1910.120 or 29 C.F.R. Part
1926.65, Hazardous Waste Operations and Emergency Response (HAZWOPER) without
obtaining DOE approval for use of that methodology. Derivation of controls is also necessary
for facility decommissioning projects that involve more than “low level residual fixed
radioactivity.”
As explained in Section 1.3 of this Standard, the DSA is not expected to address the full scope of
standard industrial hazards and controls typically covered by 10 C.F.R. Part 851 and
HAZWOPER. An acceptable DSA format and content that meets the requirements of 10 C.F.R.
§ 830.204 and the provisions described in Table 2 of Appendix A to 10 C.F.R. Part 830, Subpart
B is described according to the sections given below. While these topics may be described in a
HAZWOPER health and safety plan, it is recommended that information be presented in a
separately prepared DSA, providing a clearer distinction of facility safety basis information that
is subject to the Unreviewed Safety Question (USQ) process.
Decommissioning projects that have only low level residual fixed radioactivity are not expected
to have the potential for accidents involving significant radiological consequences. This is
reflected in 10 C.F.R. § 830.205(c), which states that Technical Safety Requirements (TSRs) are
not required for this type of activity. The DSA format for this type of decommissioning activity
may exclude topics related to accident analysis, safety SSCs and TSR derivation, unless such
controls are warranted because of significant consequences.
A.1 Facility Description
A.1.1 Faci l i ty and Work Description
A description of the facility and the decommissioning work activities should be presented to the
extent needed to facilitate an understanding of the HA. Some of this information will be
available in DSAs prepared during previous operational phases of the facility. It is important
that this section of the DSA be consistent with information presented in Decommissioning Plans.
DOE O 430.1B, Real Property Asset Management, requires a project plan for each distinct phase
of facility disposition (i.e., Deactivation Plan, S&M Plan, and Decommissioning Plan) prior to
the execution of work. The purpose of these plans is to describe the work that will be performed
and the methods that will be used to accomplish it. An obvious characteristic of a
decommissioning project is that the facility state changes progressively as work proceeds. For
this reason, it is important that the facility state to which a DSA applies is clearly defined and
Section 21
DOE-STD-1120-2016
A-2
articulated in the DSA, and that the scope of planned activities is consistent with the
Decommissioning Plan.
A Decommissioning Plan defines such matters as decommissioning strategy, sequence of
decommissioning tasks and the scope of work at each phase, as these are the key inputs that the
safety analyst needs from the project so that representative analyses can be carried out. It is also
important that the Decommissioning Plan and the DSA be consistent, so any changes to work
plans as defined in the Decommissioning Plan may be considered for potential impacts to the
DSA.
A.1.2 Site Location
The location of the facility and its relationship to nearby structures is important data for
understanding potential on or off-site impacts from decommissioning operations. Nearby
facilities, structures and buildings in which there may be persons or equipment that could be
affected by events occurring during the decommissioning project, and their physical relationship
to the facility being decommissioned, should be listed. The locations of potentially affected
members of the public near the site should also be given. Transportation routes for equipment
and materials, both off-site and within the site, should also be described.
Analytical data that is used for atmospheric dispersion of airborne releases including
meteorological data and distances and directions to potential receptors may be simplified within
the DSA commensurate with the level of rigor necessary in the hazard and accident analysis.
A.1.3 Systems, Structures and Components Description
A description of SSCs which are being decommissioned, including a description of buried
structures that will be remediated should be presented. This information should include the
existing configuration and interdependencies of SSCs, and in particular any degradation or other
changes that may have occurred relative to the original design. A description of new or
temporary SSCs which may be needed to prevent or contain the spread of radioactive or
hazardous materials during decommissioning should also be provided.
Interdependencies among SSCs should be described to the extent they will be affected by the
decommissioning, and to the extent necessary to facilitate an adequate understanding of the HA.
Equipment being dismantled may be structurally linked to safety SSCs that are not planned for
retirement until a subsequent phase of decommissioning. The means by which integrity of the
remaining structures will be assured should be described.
To the extent possible at the time of DSA preparation, it is important that SSC changes
anticipated during the course of the decommissioning project be described in the DSA to reduce
DOE-STD-1120-2016
A-3
the potential activities that would need to be separately evaluated in accordance with the USQ
process. Additionally, the timing of SSC changes within the overall project work scope should
be stated to support proposed rationales for retiring hazard controls.
A.1.4 Operational History
Information from the operational history of the facility, which is important in understanding the
hazards and state of SSCs should be described. Information on previous modifications to the
design that may have an impact on the safety of decommissioning should be presented.
Operational information about previous facility processes and the location of radioactive
contamination, both as a result of normal operation and resulting from incidents or accidents,
should be also presented.
Section 22
A.1.5 Decommissioning Activit ies and Techniques
Since the decommissioning activities themselves, by their nature, can be a source of accident
initiators, decommissioning equipment and processes should be described to the extent necessary
to support the HA and control selection. This description should include the major phases of
decommissioning including the removal of remaining hazardous material inventory; the removal
of fixed contamination from surfaces and equipment; dismantling of systems and equipment;
demolition of major structures or other defined end-states for the facility. Where sequencing of
these activities is important, this information should also be presented.
Decommissioning techniques that are planned should also be described. The requirements for
power, cooling water, and other external supplies to the equipment used to carry out these
techniques should be documented. Hazardous chemicals, heat or ignition sources, combustible
or flammable materials, or other types of hazards that could be introduced in the facility as a
result of the chosen decommissioning techniques should be described. The expected quantities
and location of radioactive, hazardous and mixed wastes expected to be generated during the
decommissioning process should be described. Any temporary storage of generated or packaged
waste should also be described. These activities may require additional hazard analyses and
controls, as well as special permitting.
A.2 Hazard and Accident Analysis and Control Selection
Overall, this section of the DSA should present the methodology used to identify and evaluate
hazards, as well as the results of these efforts. The hazard and accident analysis approaches
described in Sections 3.1 and 3.2 of DOE-STD-3009-2014 should be applied to
decommissioning operations, with additional clarifications noted in the following subsections
below.
DOE-STD-1120-2016
A-4
A.2.1 Methodology
A.2.1.1 Hazard Identification
This subsection of the DSA should identify the method used by analysts to identify hazardous
material inventories and energy sources that could initiate or contribute to a potential release of
hazardous substances, hazardous waste or radiological materials. The dynamic nature of
decommissioning and potential for unknown hazards requires a thorough identification of
hazards. Consideration should be given to the remaining hazardous materials (e.g. material
quantity, form, and location) and energy sources that exist or will be introduced as a result of
decommissioning activities. New fire ignition sources or flammable materials, as well as the
potential accumulation of combustible wastes are all hazards that can be introduced or worsened
because of decommissioning activities. Hazards related to the physical state and degradation of
SSCs should also be identified. As an example, the scabbling of degraded concrete structures
could decrease structural stability and increase the risk of failing a material confinement barrier.
Hazardous material inventory and facility design information (e.g., drawings, design criteria,
instrumentation diagrams) may be unavailable or in poor condition at some existing facilities
being decommissioned. This will necessitate the use of “process knowledge” and/or intrusive or
non-intrusive characterization, depending on the level of hazards information needed to support a
defensible analysis. The following activities should be conducted and described in the DSA to
support a thorough identification of hazards:
Section 23
• Assess existing facility status and hazards information by collecting and reviewing
facility operating records and existing safety analysis information for previous phases of
facility operation (e.g., DSAs, Safety Analysis Reports, Fire Hazards Analysis).
• Interview past and present employees, to the extent available, regarding facility operating
history (e.g., location of hazardous materials and previous spills or releases).
• Assess existing facility conditions and identify inherent hazards by performing a facility
walkdown using a multidisciplined team that includes appropriate subject matter experts.
• Review of applicable lessons learned reports and DOE Occurrence Reporting and
Processing System database events for the facility, as well as for similar facilities.
The need for intrusive characterization activities (e.g., sampling and analysis) should be
determined based on the collection and evaluation of facility information, the remaining level of
uncertainty regarding existing hazardous substances (i.e., radiological materials, hazardous
chemicals, or hazardous wastes), and the existing facility condition. Consider characterization
activities if there is insufficient knowledge of hazards to understand the hazardous substance
types, quantities, forms, potential exposures, and locations.
DOE-STD-1120-2016
A-5
Hazard identification data, and its subsequent use in the facility hazard categorization and
analysis, may rely on various characterization results provided that data is sufficiently bounding.
For example, non-destructive examination techniques should fully account for instrument error
when used to estimate material inventory and intrusive sampling plans should reflect the
potential for radioactive material to be distributed unevenly.
A.2.1.2 Hazard Evaluation
The hazard evaluation should be consistent with the types and anticipated progression of
decommissioning activities. For example, if dispersible radioactive materials are scheduled to be
removed prior to initiation of dismantling activities involving plasma torches, then associated fire
hazards may present a potential accident initiator until radioactive materials are removed from the
building or system. Thus, hazard and accident analysis information should be consistent with the
anticipated types and sequences of decommissioning activities discussed in Chapter 2 of the
DSA.
A.2.2 Hazard Analysis Results
The results of hazard identification and evaluation efforts should be presented in this section of
the DSA. In general, existing DSAs that were prepared for a previous phase of a facility’s life
cycle are a good source of hazard identification and evaluation information. Analysts should
consider this information for applicability to decommissioning. Fire hazards analyzed for
previous operational phases can be increased during decommissioning because of intrusive
activities and from equipment, chemicals and techniques introduced during the decommissioning
project. This may increase worker hazards and require more robust fire protection measures than
needed during a facility’s operational phase.
Hazards such as natural phenomena will have similar applicability during decommissioning and
should be retained for analysis. Hazard and accident analysis information from previous facility
operations is appropriate for inclusion into decommissioning DSAs (NOTE: Decommissioning
may introduce new hazards and energy sources).
Section 24
The facility-level HA supports the safety basis for decommissioning operations and provides an
envelope against which day-to-day work planning and associated task level analysis are
measured. Consistent with DOE-STD-3009, the level of analysis is driven by the simplicity of
operations and hazard potential. Qualitative analysis will typically suffice for the majority of
decommissioning projects, because operations have been deactivated and hazardous material
inventory has been reduced.
A decommissioning HA should consider the type of decommissioning activities, as well as work
techniques and sequencing of activities to be employed. The HA should also be forward looking
DOE-STD-1120-2016
A-6
to capture the expected decommissioning activities and anticipated facility changes. This
includes anticipated changes in control designation as the project proceeds. Retiring safety SSCs
or eliminating SACs should be at the appropriate point when material inventory or hazardous
conditions no longer exist. The HA should support these decisions.
There may be cases when hazardous material inventories could be made more dispersible during
decommissioning, thereby requiring new and/or temporary safety SSCs not originally identified
during the initiation of decommissioning. An example of this is the decontamination of a piece
of equipment (e.g., glovebox or furnace) at a facility located close to a site boundary with fixed
Pu-238 contamination. During the decontamination activities, the system may be breached and
mechanical means may be used to remove or reduce the contamination to levels that allow for
disposal of the equipment. Such decontamination activities may result in the potential increase
of dispersible material that could be released, even potentially challenging the Evaluation
Guideline (EG) of DOE-STD-3009-2014. Therefore, designating temporary ventilation as safety
SSC may be necessary until the hazard is no longer present.
Facilities entering into a decommissioning phase typically have performed an evaluation of
natural phenomena hazards (NPH) based on a previous 10 C.F.R. Part 830, Subpart B, compliant
DSA. These evaluations can be utilized in the decommissioning DSA unless significant
structural or equipment modifications are planned that invalidate the conclusions in the previous
DSA (e.g., seismic response is affected by reduction in structural load capacity). Additionally,
decommissioning may introduce activities that were not addressed in the previous DSA. The
impact of any new activities on the existing NPH evaluation should also be considered when
determining if the existing evaluation is adequate for decommissioning operations. Where such
an evaluation does not exist or is less than adequate, conservative assumptions can be made in
the decommissioning DSA without the need for further NPH analysis.
Any NPH evaluation performed in support of decommissioning should be inclusive of all
applicable natural phenomena to allow DOE to understand potential consequences to workers,
the public, and environment. Typically, very qualitative evaluations will be sufficient, given that
facilities undergoing decommissioning have a short remaining life when compared to the
facility’s operational phase, and material at risk is being constantly reduced with a resultant
reduction in consequences from postulated NPH accident events. For instance, in a seismic
scenario, a worst case assumption that the building will collapse may be made in lieu of detailed
seismic response calculations. In this case, the consequences of the building collapse may be
acceptable to DOE, provided appropriate controls such as emergency plans/procedures are
clearly understood and referenced in the DSA. The facility undergoing decommissioning will
still be required to meet 29 C.F.R. Part 1926 to protect life safety during work activities that
require habitation of the facility, but will not be required to meet the performance criteria
indicated by DOE-STD-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria
Section 25
DOE-STD-1120-2016
A-7
for DOE Facilities.
Other external low probability, high consequence events (e.g., aircraft crash) may be treated
similar to NPH events as described above (i.e., use of previous analysis, qualitative evaluation,
etc.). Some external events may present a higher probability of occurrence during
decommissioning such as external vehicle impacts as a result of heavy equipment, or increased
waste transportation activities.
During decommissioning activities within a facility, administrative processes and safety
management programs normally are of utmost importance for protecting workers from hazards.
However, there are times when active and passive safety SSCs are necessary until certain
hazards are eliminated. An example of such an SSC would be the criticality accident alarm
system at facilities that still have fissile material present in sufficient quantities that a criticality
hazard exists.
A priority should be placed on expediently reducing the hazards and risks to the point where
safety SSCs are no longer required. Consideration should also be given to establishing post-
NPH event procedures that ensure the Safety SSC is still capable of performing its’ safety
function following NPH events that may be of lesser magnitude and higher frequency than
DBAs.
A.2.3 Accident Analysis
The vast majority of decommissioning projects are not expected to require detailed analysis and
quantification of accidents, given the magnitude of remaining radionuclide inventory and
associated consequences (i.e., typically well below the Evaluation Guideline). However, for
those HC2 facilities undergoing decommissioning that have potential scenarios with
consequences that could challenge or exceed the EG, an accident analysis is required with
explicit calculations for both the source term and consequences sections in accordance with
Section 3.2 of this Standard (and DOE-STD-3009-2014, as necessary). Unmitigated source
terms and consequences should also be considered for points in time in which anticipated step-
out conditions will apply. These step-out conditions could involve changes in material forms
that are likely to be present during the decommissioning activity. This can then serve as the
bases for the change in safety control designation or elimination of controls.
A.3 Safety Structures, Systems and Components
A summary of the controls that require TSR coverage based on the hazard/accident analysis
results is required to be presented according to the type of control being established (safety SSC,
SAC, or safety management program). Controls should be linked to specific hazards and
accidents identified in the DSA and considerate of the spectrum of activities anticipated during
DOE-STD-1120-2016
A-8
the entire decommissioning project. Specific administrative controls should be established, as
necessary, in accordance with DOE-STD-1186, Specific Administrative Controls.
Section 26
The control hierarchy presented in Section 3.3.1 should be followed for decommissioning (as
appropriate based on deconstruction activities), which gives priority to engineered safety features
over administrative controls, and preventive over mitigative controls. In some cases,
decommissioning activities may benefit from the use of temporary SSCs because existing
systems may not be reliable or the nature of decommissioning may involve some physical
alterations of the existing systems. The use of functional criteria may be appropriate, rather than
providing detailed design requirements and system descriptions for specific SSCs. This will
facilitate accomplishment of the safety function using either a permanent or temporary SSC
where necessary to support certain decommissioning actions. For example, a concrete vault (i.e.,
design feature) that provides shielding to workers from radiation may require penetrations during
decommissioning to remove equipment. Temporary shielding may be used during these
operations and still provide adequate worker protection in accordance with 10 C.F.R. Part 835.
As another example, active ventilation may only require protection of the differential pressure
and filter efficiency parameters. The number of fans required to provide the requisite pressure
differential will change as individual glovebox loads are removed. In this case, the TSR targets
the function, maintaining differential pressure, rather than specifying the number of fans and
interlocks.
There will be some balancing required to determine when engineered controls can be replaced or
supplemented by administrative controls. For example, a fire suppression system that has not
been maintained per code may not have sufficient reliability and therefore may not be an
adequate safety basis control without considerable upgrades to the system. It may be appropriate
to replace or supplement this control with certain administrative controls such as combustible
material limits or ignition source controls. These decisions should consider factors such as
system availability and reliability and the effectiveness of selected administrative controls. The
final control strategy should maintain a level of defense in depth such that no single layer is
relied on to prevent or mitigate significant hazards that warrant safety controls.
By the very nature of decommissioning, facility equipment and systems will be removed. It is
expected that there will be less reliance on safety systems and other TSR controls as the project
progresses and as hazardous substances are reduced. For example, the operational limits
imposed on a SSC to prevent a release of hazardous substance are no longer valid if the material
has been removed. Care should be taken to ensure that hazard controls are not retired
prematurely or that administrative controls are selected in lieu of available, functioning
engineered safety features.
Trigger points, or the criteria that allow step-out of a control should be supported by the HA and
DOE-STD-1120-2016
A-9
described in the DSA. The criteria in Section 3.3.9 should be used when determining if it is
appropriate to retire a control from the safety basis.
Stepping out of a control does not necessarily mean that the control may be de-energized, as it
still may be needed to satisfy life safety or emergency response requirements. It simply means
that a control may be retired from the safety basis without formally revising the DSA and TSR
and re-submitting for DOE approval. The use of this process should include pre-negotiated step-
out criteria that are reviewed and approved by DOE during the DSA/TSR review process.
Section 27
Once step-out criteria are satisfied, contractor verification of the condition and DOE notification
is necessary to allow the contractor to retire the control. When using this approach, the TSR
should: (1) use explicit TSR definitions that define terms and conditions used in retiring
controls; (2) incorporate step-out conditions into Limiting Conditions of Operation applicability
statements; (3) provide administrative controls that formalize the process for stepping out of a
control, as well as further safety measures necessary once a control is retired; and (4) provide
TSR Bases that support the established points for stepping out of controls.
There may be unanticipated situations in which a retired facility safety control is needed to
perform its past safety function. For example, if unknown dispersible radiological materials are
discovered during the course of a decommissioning activity, it may be necessary to reactivate the
building ventilation system to provide a confinement function. In these cases, the operability,
maintainability, reliability, and availability of the reactivated control should be verified prior to
placing the control back into service.
A.4 Derivation of Technical Safety Requirements
The derivation of controls within the DSA should be consistent with expectations provided in
Section 4 of DOE-STD-3009-2014 for Chapter 5 of a DSA. This applies to the entire suite of
TSR controls, including specific administrative controls. This information may be integrated
together with the presentation and description of controls as described in the DSA. For example,
the derivational basis for specific administrative controls may consist of brief logic statements
that can be presented in tabular form alongside the listing of such controls.
Where specific administrative controls are selected in lieu or support of an engineered feature,
the derivational basis should justify why administrative controls by themselves or in combination
with other systems provide adequate protection against the accident consequences. For example,
certain administrative controls such as combustible material limits or ignition source controls
may be necessary to supplement an existing fire sprinkler system that is unreliable. In this case,
derivation of the administrative control should include discussion of the specific reliability issues
associated with the sprinkler system and justify how the selected administrative controls ensure
adequate protection against fire hazards.
DOE-STD-1120-2016
A-10
A.5 Safety Management Programs
A listing of safety management programs (SMPs) and any references to site-wide programs and
facility-specific characteristics may be presented in summary or table form, consistent with
provisions in DOE-STD-3009-2014. SMPs that are required to be considered based on
applicability are provided in items 5 and 6 of 10 C.F.R. § 830.204 (b). At a minimum, Table 2 in
Appendix A of 10 C.F.R. Part 830, Subpart B, requires that facility decommissioning address
emergency preparedness, if the listed safe harbor is used for DSA development without obtaining
DOE approval for use of an alternate methodology. Similarly, decommissioning activities with
only low-level residual fixed radioactivity would typically address at least emergency
preparedness, conduct of operations, training and qualification, and maintenance management.
DOE-STD-1120-2016
B-1
APPENDIX B: GUIDANCE FOR ENVIRONMENTAL RESTORATION
ACTIVITIES
Section 28
Environmental restoration activities that are not performed within permanent structures are
subject to the requirements of 10 C.F.R. Part 830, Subpart B. It is anticipated that many of these
activities, especially non-intrusive ER, may not present significant nuclear or chemical risks to
workers or members of the public. Chapter 3 of this Standard is applicable to the small subset of
ER projects that require a DSA, based on the results of a final hazard categorization performed in
accordance DOE-STD-1027-92 and provisions described in Chapter 2 of this Standard.
As described in 10 C.F.R. Part 830, Subpart B, Appendix A, Table 2, contractors may prepare a
DSA by using the method described in DOE-STD-1120-98, or successor document, and the
provisions of 29 C.F.R. Part 1910.120 or 29 C.F.R. Part 1926.65, Hazardous Waste Operations
and Emergency Response (HAZWOPER).
As explained in Section 1.3 of this Standard, the DSA is not expected to address the full scope of
standard industrial hazards and controls typically covered by 10 C.F.R. Part 851 and
HAZWOPER. An acceptable DSA format and content that meets the requirements of 10 C.F.R.
§ 830.204 and the provisions described in Table 2 of Appendix A to 10 C.F.R. Part 830, Subpart
B, is provide in Section 3.4 of this Standard. While these topics may be described in a
HAZWOPER health and safety plan, Section 3.4 requires that information be presented in a
separately prepared DSA, providing a clearer distinction of facility safety basis information that
is subject the Unreviewed Safety Question process.
B.1 Facility Description
B.1.1 Restoration Project and Site Description
Background information on the ER site and planned restoration-related activities should be
presented to the extent necessary to facilitate an understanding of the HA. It is important that
this section of the DSA be consistent with the scope of planned activities as agreed upon with
federal and authorized State environmental regulators.
B.1.2 Site Location
The location of the facility and its relationship to nearby structures is important data for
understanding potential on-site or off-site impacts from ER operations. Nearby facilities,
structures and buildings in which there may be persons or equipment that could be affected by
events occurring during the ER project, and their physical relationship to the facility being
decommissioned, should be listed. The locations of potentially affected members of the public
near the site should also be given. Transportation routes for equipment and materials, both off-
DOE-STD-1120-2016
B-2
site and within the site, should also be described.
Analytical data that is used for atmospheric dispersion of airborne releases including
meteorological data and distances and directions to potential receptors may be simplified within
the DSA commensurate with the level of rigor necessary in the hazard and accident analysis.
B.1.3 Site History
Background information should be presented on activities that led to the condition requiring
restoration. Previous waste disposal activities should be described in terms of the types and
quantities of radioactive and hazardous materials and methods used for treatment and disposal
(i.e., container burial, seepage ponds, direct injection). Other details that are important to the
analysis include the estimated condition of any waste containers being exhumed, design details
of disposal trenches or wells that were used, characterization and sampling activities performed
and the resulting estimated contamination levels that are expected.
Section 29
B.1.4 Restoration Project Activit ies and Techniques
The scope of the restoration activity should be presented in sufficient detail that is commensurate
with the expected hazards and complexity of the project. The description should include the
regulatory driver for restoration, planned characterization activities, primary operational phases
that comprise the project, any work sequencing requirements and parallel work activities, and the
anticipated final state upon completion of the restoration activity. Temporary or permanent
SSCs that are part of the project should also be presented.
Restoration techniques should also be described, including the requirements for power, cooling
water and other external supplies to the equipment used to carry out activities. Soil restoration
techniques generally fall into one of four categories:
• Soil Capping and Ground Penetrations to Support Monitoring Activities – installation of
soil capping and/or minor intrusive activity into the waste matrix for monitoring the
effectiveness of an environmental cap, e.g., ground water wells, piezometer well
installation, or some other means of environmental effectiveness measurement.
• Waste Stabilization (e.g., grout injection) in soil – waste matrix stabilization where the
form of the matrix is modified to a less dispersible form through the addition of grout or
similar stabilizing material
• Waste Exhumation and Elimination (retrieval and shipment to a different location for
processing, treatment, storage and/or final disposal) – eliminates the retrieved waste from
the restoration site inventory.
DOE-STD-1120-2016
B-3
• Ground or Surface Water Restoration (collection and/or treatment of contaminated soil,
surface and ground water)-activities and processes that clean-up existing contaminants
from industrial or waste management sources or minimize the spread of contaminants
resulting from releases of hazardous waste, hazardous constituents, or radiological
contaminants to surface and/or ground water, and soils.
There is also the possibility to have combinations of these restoration approaches, which can add
to the complexity of the activity.
B.2 Hazard and Accident Analysis and Control Selection
Overall, this section of the DSA should present the methodology used to identify and evaluate
hazards, as well as the results of these efforts. The hazard and accident analysis approach
presented in DOE-STD-3009-2014, Chapter 3, should be applied to ER projects with additional
clarifications provided in the following subsections below.
B.2.1 Hazard Identif ication
This subsection of the DSA should identify the methods used by analysts to identify hazardous
material inventories and energy sources that could initiate or contribute to accidents impacting
workers, the public or environment. Identifying the hazards is an output from the work/scope
description. The identified hazards will be used in the Hazard Categorization and also in the
Hazard Evaluation that develops the hazard controls applicable to the project. Hazard
constituents include radionuclides, chemical substances (hazardous, toxic, reactive or flammable
elements, compounds, and or mixtures), and energy sources (chemical, mass/motion, fire ignition
sources radiant, thermal, radiation/radiolysis, etc.). Consideration of fire hazards should include
intrinsic hazards associated with remaining hazardous or radioactive inventory, as well as those
introduced by equipment and techniques used in the process. Hazardous constituents and
sources need to be identified early in the safety basis process. Depending on the availability of
process and/or historical data and the confidence in that data, there may need to be an early phase
of investigation/sampling to develop a hazard inventory/energy listing that will bound and
represent all activities to be conducted in the various phases of the restoration.
Section 30
Hazardous material inventory data may be unavailable or incomplete for many restoration
projects. This will necessitate intrusive or non-intrusive characterization, depending on the level
of hazards information available to support a defensible analysis. The need for intrusive
characterization activities (e.g., sampling and analysis) should be determined based on the
collection and evaluation of facility information, the remaining level of uncertainty regarding
existing hazardous substances (i.e., radiological materials, hazardous chemicals, or hazardous
wastes), and the existing facility condition. Consider characterization activities if there is
insufficient knowledge of hazards to understand the hazardous substance types, quantities, forms,
DOE-STD-1120-2016
B-4
potential exposures, and locations.
B.2.2 Hazard Analysis
The results of the hazard and accident analysis should present the accident events and initiators
considered, estimated frequencies, unmitigated consequences and preventive/mitigative controls
that are considered and credited. DOE-STD-3009-2014 provides example approaches for
tabulating and presenting this information.
Generally, the controls needed for ER activities can be derived from qualitative hazard
evaluation techniques such as what-if analysis or hazard checklists. The hazard evaluation
provides the input and basis to support control selection. HA results should be documented in a
hazard evaluation table that qualitatively shows the candidate controls as well as those
specifically credited. This complete listing of candidate and credited controls helps clarify what
was considered in the hazard evaluation.
NPH and man-made external hazards are required to be considered in accordance with 10 C.F.R.
Part 830, Subpart B. Seismic hazards will not typically present a significant concern for
restoration projects, unless buildings and structures are involved in processing or storing
hazardous materials. Therefore, an evaluation of the impacts from seismic hazards may be a
simple matter. Other NPH such as high winds, floods and lightning can be problematic for some
ER projects which may not have protective barriers or facilities (i.e., open trenches with non-
containerized combustible wastes). These events should be considered in the HA, as applicable.
Certain man-made external events can also be problematic for ER projects due to factors such as
a high frequency of waste transports. For example, an external vehicle impact and subsequent
fire associated with staged or stored waste drums generated during ER should be evaluated.
Aircraft crashes may also be considered in accordance with DOE-STD-3014, Accident Analysis
for Aircraft Crash into Hazardous Facilities, which has applicability to HC-1 or HC-2 facilities,
as well as those projects where hazardous chemical inventory exceeds thresholds of 29 C.F.R.
Part 1910.119 or 40 C.F.R. Part 68, Chemical Accident Prevention Provisions.
The presentation of hazard and accident analysis information should be consistent with the types
and anticipated progression of ER activities. Hazards from typical restoration activities that
should be considered include:
• Setup and mobilization needs to consider siting and accumulation of combustibles
(fueling operations for equipment) or other fire hazards that could have an impact on
subsequent phases of restoration.
• Equipment operation may cause subsidence or compaction that creates a shift in
DOE-STD-1120-2016
B-5
Section 31
packaged wastes (if present).
• Monitoring well installation may create a pathway for release or re-distribution of
packaged wastes (e.g., penetration of waste package and redistribution of reactive
chemical to create an exothermic condition).
• Trenching activities for diversion of surface water runoff could introduce a new pathway
for impacting or relocating the waste matrix.
• Exhumation (digging) operations could introduce dispersible energy for buried wastes or
soil contamination.
• Combustible fluids from operating, maintaining, or refueling equipment in proximity to
exposed wastes, as well as fire hazards from equipment itself, could introduce fire
hazards.
• Packaging, repackaging, overpacking and waste staging/stacking could create potential for
spills, accumulation/concentration of reactive materials or hazardous substances, waste or
constituents, or re-distribution of fissile materials.
• Movement/loading of waste materials introduces potential for vehicle accidents.
• Inventories or high energy sources added by the restoration activity (e.g., any process
chemicals, packing or fill material, or quantities of combustibles).
B.2.3 Accident Analysis
The vast majority of ER projects are not expected to require detailed analysis and quantification
of accidents given the expected magnitude of radionuclide inventory and associated
consequences (i.e., well below the EG). However, for HC-2 facilities that have potential
scenarios with consequences that could challenge or exceed the EG, the accident analysis needs
to present explicit calculations for both the source term and consequences sections (i.e., in
accordance with Sections 3.2 of this Standard and DOE-STD-3009-2014, as necessary).
Unmitigated source terms and consequences should also be considered for points in time in
which anticipated step-out criteria will apply. These step-out criteria could be decreased
hazardous materials inventories and/or changes in material forms that are likely to be present
during the restoration activity. This can then serve as the bases for the change in safety control
designation or elimination of controls.
B.3 Safety Systems, Structures and Components
As provided in 10 C.F.R. § 830.205(c), “A contractor for an environmental restoration activity
may follow [HAZWOPER provisions] to develop the appropriate hazard controls (rather than the
provisions for technical safety requirements in paragraph (a) of [10 C.F.R. § 830.205]), provided
the activity involves either: (1) Work not done within a permanent structure, or (2) The
DOE-STD-1120-2016
B-6
decommissioning of a facility with only low-level residual fixed radioactivity.”12 This is
consistent with the philosophy that ER activities are typically not expected to involve hazards
that will necessitate active safety SSCs and associated TSRs. Although TSRs are not required,
general requirements described in 10 C.F.R. § 830.204(b)(4) are still required to be met. This
requires that hazard controls be derived, that adequacy of controls be demonstrated and that a
process be defined for maintaining hazard controls current. Therefore, the focus of the “hazards
control” section of the DSA should be on SSCs and SACs that prevent or mitigate a release of
radionuclides or hazardous chemicals (see DOE-STD-3009-2014 and DOE-STD-1186-2004 for
additional details). Safety management programs that are generally relied on for worker
protection should also be presented.
Section 32
It is expected that there will be less reliance on facility design and administrative features as the
project progresses and as hazardous substances are removed. For example, the operational limits
imposed on a SSC to prevent a release of hazardous substance are no longer valid if the material
has been removed. Care should be taken to ensure that hazard controls are not retired
prematurely or that administrative controls are not selected in lieu of available, functioning
engineered safety features.
Trigger points, or the criteria that allow step-out of a control should be supported by the HA and
described in the DSA. The criteria in Section 3.3.9 should be used when determining if it is
appropriate to retire a control from the safety basis.
A DOE pre-approved process for “stepping out of controls” allows the contractor to retire a
control without formally revising the DSA and re-submitting for DOE approval. This process
requires the use of pre-negotiated step-out criteria that are reviewed and approved by DOE
during the DSA review process. Stepping-out of a control does not necessarily mean that the
control may be de-energized, as it still may be needed to satisfy life safety or emergency
response requirements. It simply means that a control be retired from the safety basis.
Once the criteria are satisfied, only contractor verification that the condition is met, and that
DOE is notified, is necessary to allow the contractor to retire the control. When using this
approach, the DSA should use explicit terms and conditions that define the conditions and
process for retiring controls, and provide administrative controls that describe the process for
stepping out of a control, as well as further safety measures if necessary, once a control is retired
(e.g., increased fire watch or lower combustible limits).
12 TSRs and associated derivation within the DSA should be considered for the unlikely case where environmental
restoration projects require active SSCs to provide for significant worker safety or protection of the public.
FOREWORD
DEFINITIONS
ACRONYMS
1.0 INTRODUCTION
1.1 Purpose
1.2 Applicability
1.3 Use of this DSA Preparation Methodology
1.4 Application of the Graded Approach Principles
1.5 Overview of the Changes in this Revision
1.6 Overview of the Standard
2.0 HAZARD CATEGORIZATION
2.1 Final Hazard Categorization
2.2 Inactive Waste Sites
3.0 DSA DEVELOPMENT REQUIREMENTS
3.1 Hazard Identification and Evaluation
3.2 Accident Analysis
3.3 Hazard Controls Selection
3.4 DSA Format and Content
3.5 Disposition Plans
4.0 REFERENCES
APPENDIX A: GUIDANCE FOR DECOMMISSIONING ACTIVITIES
A.1 Facility Description
A.1.1 Facility and Work Description
A.1.2 Site Location
A.1.3 Systems, Structures and Components Description
A.1.4 Operational History
A.1.5 Decommissioning Activities and Techniques
A.2 Hazard and Accident Analysis and Control Selection
A.2.1 Methodology
A.2.2 Hazard Analysis Results
A.2.3 Accident Analysis
A.3 Safety Structures, Systems and Components
A.4 Derivation of Technical Safety Requirements
A.5 Safety Management Programs
APPENDIX B: GUIDANCE for ENVIRONMENTAL RESTORATION ACTIVITIES
B.1 Facility Description
B.1.1 Restoration Project and Site Description
B.1.2 Site Location
B.1.3 Site History
B.1.4 Restoration Project Activities and Techniques
B.2 Hazard and Accident Analysis and Control Selection
B.2.1 Hazard Identification
B.2.2 Hazard Analysis
B.2.3 Accident Analysis
B.3 Safety Systems, Structures and Components