DOE-STD-1104-2009, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Documents
Functional areas: Nuclear Facility Safety, Design Basis Documents
Safety and health assurance may be increased by standardizing the process of reviewing and approving the SDS, CSDRs, PSDRs, PDSAs, DSAs, and TSRs. Although complete standardization of the process (e.g., standardized review plan) requires substantial commitments and is complicated by the diversity of facility operations throughout the DOE complex, certain benefits are gained by standardizing fundamental elements of the review and approval process.
Unknown Block text
Superseded By:
Version history and related documents
Superseded by
A newer version replaces this document.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
NOT MEASUREMENT
SENSITIVE
DOE-STD-1104-2009
May 2009
Superseding
DOE-STD-1104-96
DOE STANDARD
REVIEW AND APPROVAL OF NUCLEAR
FACILITY SAFETY BASIS AND SAFETY
DESIGN BASIS DOCUMENTS
U.S. Department of Energy AREA SAFT
Washington, DC 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
DOE-STD-1104-2009
ii
Available on the Department of Energy Technical Standards web page at
http://www.hss.energy.gov/nuclearsafety/ns/techstds/
DOE-STD-1104-2009
iii
CONTENTS
FOREWORD .................................................................................................................................. v
INTRODUCTION .......................................................................................................................... 1
APPLICABILITY AND SCOPE.................................................................................................... 1
1.0 MANAGEMENT AND COORDINATION OF SAFETY BASES........................................ 3
1.1 Responsibilities and Authorities .......................................................................................... 3
1.2 Planning ............................................................................................................................... 4
1.3 Interactions........................................................................................................................... 5
1.4 Issue Origination and Resolution ......................................................................................... 6
2.0 APPROVAL BASES FOR DOCUMENTED SAFETY ANALYSES ................................... 9
2.1 Base Information.................................................................................................................. 9
2.2 Hazard and Accident Analyses .......................................................................................... 11
2.3 Safety Structures, Systems, and Components.................................................................... 12
2.4 Specific Administrative Controls....................................................................................... 12
2.5 Derivation of Technical Safety Requirements................................................................... 12
2.6 Safety Management Program Characteristics.................................................................... 13
2.7 Conditions of Approval...................................................................................................... 14
3.0 APPROVAL BASIS FOR TECHNICAL SAFETY REQUIREMENTS.............................. 16
3.1 Management and Coordination.......................................................................................... 16
3.2 Approval Bases .................................................................................................................. 16
3.2.1 Hazards Analysis ........................................................................................................ 16
3.2.2 Safety SSC .................................................................................................................. 17
3.2.3 Specific Administrative Controls................................................................................ 17
3.2.4 Other Important Defense-In-Depth SSCs ................................................................... 17
3.2.5 Safety Management Programs .................................................................................... 17
Section 2
4.0 SAFETY EVALUATION REPORTS................................................................................... 18
4.1 Title Page ........................................................................................................................... 20
4.2 Signature Page ................................................................................................................... 20
4.3 Executive Summary ........................................................................................................... 20
4.4 Review Process .................................................................................................................. 21
4.5 Base Information................................................................................................................ 21
4.6 Hazard and Accident Analyses .......................................................................................... 21
4.7 Safety Structures, Systems, and Components.................................................................... 22
4.9 Derivation of Technical Safety Requirements................................................................... 22
4.10 Safety Management Program Characteristics.................................................................. 23
DOE-STD-1104-2009
iv
4.11 Technical Safety Requirements ....................................................................................... 23
4.12 Conditions of Approval.................................................................................................... 23
4.13 Records ............................................................................................................................ 24
5.0 SAFETY DESIGN BASIS DOCUMENTS .......................................................................... 25
5.1 Safety Design Strategy, Review Teams, and Approvals ................................................... 25
5.2 Review Bases for Conceptual Safety Design Reports ....................................................... 27
5.3 Review Bases for Preliminary Safety Design Reports ...................................................... 29
5.4 Approval Bases for Preliminary Documented Safety Analyses ........................................ 31
5.5 Safety Validation Reports .................................................................................................. 34
5.5.1 General Discussion ..................................................................................................... 34
5.5.2 Content and Format..................................................................................................... 34
DOE-STD-1104-2009
v
FOREWORD
1. This Department of Energy (DOE) Standard is approved for use or reference by DOE,
including the National Nuclear Security Administration (NNSA) and its contractors.
2. Title 10 of the Code of Federal Regulations (CFR) Part 830 Final Rule, Nuclear Safety
Management, issued January 10, 2001, establishes requirements for nuclear facility
Preliminary Documented Safety Analyses (PDSA), Documented Safety Analyses (DSA),
and Technical Safety Requirements (TSR) or TSR-equivalent documents for
environmental restoration activities. DOE Order (O) 413.3A, Change 1, Program and
Project Management for the Acquisition of Capital Assets, or successor document,
establishes the requirements for safety design basis documents and invokes the use of
DOE- Standard (STD)-1189-2008, Integration of Safety into the Design Process, for
these documents.
Section 3
3. This Standard was prepared to be consistent with 10 CFR Part 830 and its
implementation Guides and should be used in conjunction with the Rule and its
implementing guidance for safety basis documents. It was also prepared to be consistent
with DOE O 413.3A, Change 1, and DOE-STD-1189-2008 and should be used in
conjunction with those documents, the Rule, and their implementing guidance for safety
design basis documents.
4. This revision of the Standard expands the scope of the previous revision to address the
review and approval of all the safety basis documents developed per DOE-STD-1189-
2008. The previous version only addressed the review and approval of Documented
Safety Analyses (DSAs) and Technical Safety Requirements (TSRs). Rather than
restructuring the entire Standard, information on the review and approval of DSAs and
TSRs was kept in the first two chapters even though other safety basis documents would
be developed and reviewed prior to the development of DSAs and TSRs. This
organization may be revisited in future after experience is gained with the new aspects of
the Standard.
5. Comments (e.g., recommendations, additions, and deletions) and any pertinent data that
may be of use in improving this document should be sent by letter to:
Office of Nuclear Safety Policy and Assistance (HS-21)
U.S. Department of Energy
19901 Germantown Road
Germantown, MD 20874
Phone: (301) 903-1408
Facsimile: (301) 903-6172
DOE-STD-1104-2009
vi
INTENTIONALLY BLANK
DOE-STD-1104-2009
vii
GUIDING PRINCIPLES
The following guiding principles pertain to the application and provisions of this Standard:
1. The documents (i.e., DOE Orders, Manuals, Guides, and Standards, Nuclear Regulatory
Commission Regulatory Guides and regulations) listed in Table 2 of Appendix A to
10 CFR Part 830, Subpart B, provide approved methodologies for meeting the DSA
requirements of 10 CFR Part 830. These documents are commonly referred to as “safe
harbors.” Developed consistent with, and as a companion to these documents, this
Standard does not generally reiterate the provisions of these documents but may cite
specific requirements from these documents, as convenient for the user of this Standard.
2. If a contractor uses a method other than a safe harbor method from Table 2 of
Appendix A of 10 CFR Part 830, per 10 CFR 830.204, the contractor must obtain DOE
approval of the method before developing the DSA. Likewise, if a contractor uses a safe
harbor method to develop the DSA, but does not follow the method completely, per
10 CFR 830.204, the contractor must request DOE approval of the method with the
specific deviations noted. Requirements and responsibilities for the use of alternative
methods or specific deviations from the safe harbor methods are contained in DOE
Manual (M) 411.1-1C, Safety Management Functions, Responsibilities and Authorities
Manual, and DOE O 410.1, Central Technical Authorities Responsibilities Regarding
Nuclear Safety Requirements.
3. DOE O 413.3A, Change 1, assigns the authority to designate a Safety Basis Approval
Authority (SBAA) with the authority to review and approve safety basis and safety
design basis documents to the Program Secretarial Officer (PSO). DOE M 411.1-1C1
defines provisions for delegation of authorities. In accordance with DOE M 411.1-1C,
the PSO may establish a new SBAA, but does not relinquish the ultimate responsibility
for ensuring adequate performance of that approval authority. In carrying out assigned
responsibilities, the approval authority, if not the PSO, is at all times accountable to
the PSO.
Section 4
4. Independent review of the safety design basis and safety bases documents facilitates
achieving defensible approval. Since both the preparation and the review and approval
of these documents may fall under the purview of the SBAA, independent review is
achieved by designating a review team leader with the responsibility and authority to
conduct independent assessments. The review team leader is independent of any
responsibility for preparation of the documents under review. The review team members
are also independent of any responsibility for preparation of the documents. See Guiding
Principle 6 for further information.
1A December 27, 2005, Deputy Secretary memorandum on safety delegations provides further instruction on safety
delegation and remains in effect until M 411.1-1C is revised or rescinded.
DOE-STD-1104-2009
viii
5. The SBAA is the single point of contact between DOE and the facility contractor for all
areas of review and approval of DSAs and TSRs. In this capacity, the SBAA serves as
the focal point through which DOE interfaces with the facility contractor and from which
directions to the facility contractor originate. This is accomplished through the review
team leader and in conjunction with official contractor interfaces and the DOE
contracting officer.
6. DOE is responsible for both the operation and the regulation (e.g., review and approval of
DSAs and TSRs) of the facilities for which these documents are required. This dual role
places fundamental limits on the ability of DOE to completely segregate the processes of
preparation and review of these documents. For example, the Field Element Manager
(FEM) typically has responsibility for both the operation of the facility and the review
and approval of the DSA and TSRs. However, in order to be as objective as possible in
the review process, most of the reviewers of these documents should not be responsible
for the design or operation of the facility, including the preparation of the safety design
basis and safety bases documents. It is expected that these reviews will be conducted,
to the extent practicable, by individuals and organizations separate from the document
preparation. This Standard encourages interface between the two processes to develop
familiarity with the facility’s safety basis, to respond to requests from the preparer for
early identification and resolution of potential issues, and to establish the scope of
subsequent review and the extent of approval documentation required.
7. DOE strives for an effective, streamlined review and approval process for safety design
basis and safety basis documents while still achieving an acceptable level of safety
assurance. This Standard advocates proper planning for a review and encourages an
integrated review process where all parties with vested interest in a facility safety basis
coordinate throughout the review and approval process.
8. DOE manages review issues requiring resolution for approval in that reviewers establish
and document the safety significance of issues prior to submittal for possible resolution.
Guidance is provided to focus facility contractor’s resolution of those issues determined
to be necessary for adequately establishing and documenting the facility safety basis.
9. This Standard provides guidelines for reviewing the DSA through assessment of the
major subject areas of a safety analysis as defined by the following DSA approval bases:
Section 5
a. Base information;
b. Hazard and accident analyses;
c. Safety structures, systems, and components (SSCs);
d. Specific administrative controls (SACs);
e. Derivation of TSRs; and
f. Safety management program characteristics.
DOE-STD-1104-2009
ix
10. This Standard also provides guidelines for reviewing the TSRs. Determining the
adequacy of the TSRs generally entails a disciplined analysis and tracing of commitments
to hazard controls in a DSA through appropriate provisions that implement these controls
in a TSR document.
11. The Safety Evaluation Report (SER) is primarily a management document that provides
the SBAA the basis for the extent and detail of the review of the PDSA, DSA, and TSRs
and the bases for any conditions of approval. This Standard endorses the concept that the
contents of an SER are concise summary statements and that little benefit is gained from
the wholesale repetition of elements already contained in a PDSA, DSA, or TSR or from
reproducing original analysis that, if deemed critical, is performed as part of the review
process.
12. SERs document the bases for approving revisions of DSAs/TSRs, including annual
updates. Those revisions determined to not involve an Unreviewed Safety Question
(USQ) in accordance with 10 CFR 830.203, Unreviewed Safety Question Process, may
be reviewed and approved for accuracy and completeness by DOE subsequent to
implementation of the changes by the facility contractor. This review and approval is of
the incorporation of the information concerning the facility changes into the DSA, not for
the change to the facility itself, as this was determined not to be needed because the
change did not involve a USQ.
13. The safety design basis documents addressed in this Standard are the Safety Design
Strategy (SDS), the Conceptual Safety Design Report (CSDR), the Preliminary Safety
Design Report (PSDR), and the PDSA. These documents are provided for DOE review
and approval during the design of the facility or the major modification to facilitate
communication and mutual understanding of the ongoing design efforts. Contractors are
not required to submit these documents for all modifications. The provisions of 10 CFR
830.206, Preliminary Documented Safety Analysis, require a PDSA for new hazard
category 1, 2, and 3 nuclear facilities and major modifications. DOE-STD-1189-2008,
Section 8.1.3, Determining a Major Modification, including the Major Modification
Evaluation Criteria in Table 8.1, provides information on determining if a modification is
a “major modification” requiring a PDSA. The discussion on the SDS in
DOE-STD-1189-2008, Section 2.3, discusses the relationship between a revised hazard
analysis and a determination that a change represents a major modification. This
Standard does not address the criteria for determining if safety design basis documents
are needed. Rather, it provides guidance on the review process for the CSDR, the PSDR,
and the PDSA when they are submitted to DOE. The purpose of the review of the safety
design basis documents is (1) to ensure that safety is integrated into the design as early as
possible, and (2) to ensure the safety design is sufficient to proceed to the next phase of
design or construction. Such activities are intended to preclude the need for expensive
modifications to the design and/or construction at a later date when changes are more
costly.
14. The reviews of the CSDR and of the PSDR are documented in the Conceptual Safety
Validation Report (CSVR) and the Preliminary Safety Validation Report (PSVR).
Section 6
DOE-STD-1104-2009
x
Similar to the SER, Safety Validation Reports (SVR) should be concise summary
statements of the bases for review of the CSDR and the PSDR, including any
recommended actions.
15. Approval of the safety design basis documents signifies that the safety design is sufficient
to proceed the next phase of design or construction. These activities are also intended to
preclude the need for expensive modifications to the design and/or construction at a later
date when changes are more costly.
16. Approval of the DSA signifies that DOE has reasonable assurance that the nuclear
facility can be operated safely and in a manner that adequately protects workers, the
public, and the environment.
DOE-STD-1104-2009
1
INTRODUCTION
Safety and health assurance may be increased by standardizing the process of reviewing and
approving the SDS, CSDRs, PSDRs, PDSAs, DSAs, and TSRs. Although complete
standardization of the process (e.g., standardized review plan) requires substantial commitments
and is complicated by the diversity of facility operations throughout the DOE complex, certain
benefits are gained by standardizing fundamental elements of the review and approval process.
This Standard describes a framework and criteria for reviewing safety basis documents that will
support DOE approval of the documents as required by 10 CFR 830 Subpart B and
DOE-STD-1189-2008 (as invoked by DOE Order 413.3A, Chg 1) including preparation of SERs
and SVRs for nuclear facilities. This Standard utilizes the verb “must” to specify requirements
in associated rules or DOE Orders or critical actions in performing the safety basis document
reviews. This Standard does not add any new requirements for DOE or its contractors. The verb
“should” is utilized to identify an effective approach for performing these reviews.
APPLICABILITY AND SCOPE
Guidance provided in this Standard is applicable to the review and approval of the SDS, CSDRs,
PSDRs, PDSAs, DSAs, and TSRs, and revisions thereto, including required updates for DSAs
and TSRs (i.e., 10 CFR Part 830 annual updates) for existing nuclear facilities. Therefore, this
Standard is appropriate for Hazard Category 1, 2, or 3 facilities (classified in accordance with
DOE-STD-1027-92 Change Notice No. 1, Hazard Categorization and Accident Analysis
Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports) that
document their safety basis in accordance with 10 CFR Part 830. For new facilities and major
modifications, the review and approval processes for the SDS, CSDR, PSDR, and PDSA2 are
focused on the adequacy of the proposed design for safety to support proceeding to the next
phase of design or construction. The review and approval of the DSA and TSRs are focused on
safety of the as-built facility.
The body of this Standard focuses on management of the review and approval process, provides
guidelines for establishing the basis of approval, and recommends a format and content for SERs
and SVRs. Specific review guidelines that are technical in nature are more appropriately
addressed individually by subject matter and require more detailed guidance and discussion.
Therefore, the text provides general guidelines as opposed to a comprehensive list of technical
safety criteria (e.g., Standard Review Plan [SRP]). Thus, this Standard does not constitute an
SRP in the same context as the SRP employed by the Nuclear Regulatory Commission.
Section 7
This Standard is applicable to government-owned, government-operated facilities in which
DOE performs the function of the facility contractor, as well as government-owned, contractor-
operated facilities.
This revision of the Standard expands the scope of the previous revision to address the review
and approval of all the safety basis documents developed per DOE-STD-1189-2008. The
2 For major modifications, in accordance with DOE-STD-1189-2008, the SDS will address whether there is a need
for a CSDR and/or a PSDR.
DOE-STD-1104-2009
2
previous version only addressed the review and approval of DSAs and TSRs. Rather than
restructuring the entire Standard, information on the review and approval of DSAs and TSRs was
kept in the first two chapters even though other safety basis documents would be developed and
reviewed prior to the development of DSAs and TSRs. This organization may be revisited in the
future after experience is gained with the new aspects of the Standard.
DOE-STD-1104-2009
3
1.0 MANAGEMENT AND COORDINATION OF SAFETY BASES
1.1 Responsibilities and Authorities
Responsibilities and authorities relating to the review and approval of safety basis and safety
design basis documents are defined in requirement documents (e.g., Rules, Orders, Manuals,
etc.), but are cited in this Standard for the convenience of the user and to provide clarifying
guidance.
Appendix A of 10 CFR Part 830 states that “The DOE Management Official for a DOE nuclear
facility (i.e., the Assistant Secretary, the Assistant Administrator, or the Office Director who is
primarily responsible for the management of the facility) has primary responsibility within DOE
for ensuring that the safety basis for the facility is adequate and complies with the safety basis
requirements of Part 830.” It further states that “The DOE Management Official is responsible
for ensuring the timely and proper (1) review of all safety basis documents submitted to DOE
and (2) preparation of a safety evaluation report concerning the safety basis for a facility.”
DOE O 413.3A, Chg 1, assigns the authority to designate an SBAA with the authority to review
and approve safety basis and safety design basis documents to the PSO. By assigning
responsibilities for the review and approval of the DSA to another individual, the DOE
Management Official for the facility establishes that individual as the new approval authority.
Assigning responsibilities carries concurrent delegation of authority recognized by the line
management and those responsible for monitoring and auditing implementation of the Rule.
Refer to Guiding Principle 2 in this Standard for responsibilities for approval of the use of
a methodology other than the “safe harbor” methodologies listed in Table 2 of Appendix A of
10 CFR Part 830.
The SBAA is responsible for providing a defensible review and approval of the DSA. Achieving
defensible review and approval is facilitated by an independent review process. Since both the
preparation of the DSA and its review and approval typically fall within the purview of the
SBAA, the SBAA assigns a review team leader the responsibility for performing the independent
review. In making this assignment, the SBAA ensures that the review team leader maintains
sufficient independence of the line organization responsible for DSA preparation (i.e., no
responsibility for preparation of the DSA under review) and possesses the technical competence
relevant to the DSA of concern. The details of independently reviewing the DSA, up to and
including recommending approval to the SBAA, are managed by the review team leader.
Section 8
The SBAA has responsibility as the single point of contact between DOE and the facility
contractor for all matters regarding review of the DSA. This responsibility is typically assigned
to the review team leader, but the SBAA remains the final authority on any points requiring
arbitration. The single point of contact is the focal point through which DOE and the facility
contractor interface and from which directions to the facility contractor originate. Requests for
any material on the DSA, determination of the significance of identified issues on such material,
and direction to the facility contractor for resolution of issues are approved by the single point of
contact. As appropriate, transmittal of official communications and directions involving
significant work effort by the facility contractor are coordinated with the Contracting Officer.
Line management personnel and representatives of organizations responsible for monitoring and
DOE-STD-1104-2009
4
auditing implementation of 10 CFR Part 830 coordinate their activities through the single point
of contact as well.
The SBAA has the specific responsibility of ensuring that the review and approval process
represents all DOE entities with vested interest in the facility under review and considers
commitments made to agencies outside DOE. Agencies external to DOE, however, have no
standing under the Orders/Rules structure for approval. Identifying safety issues and their
resolution may involve negotiations between concerned organizations. Issues raised by any
vested interest should be given proper consideration to enhance safety assurance.
On behalf of the SBAA, the review team leader coordinates the day-to-day aspects of managing
the review and approval process for the DSA. General responsibilities in this capacity include
the following:
• Serving as the focal point for interface between DOE and the facility contractor
for review matters;
• Developing a DSA review plan, including review milestones developed in
consultation with the facility contractor;
• Establishing and managing the review team;
• Supervising the overall review process, including planning and scheduling
changes;
• Coordinating, scheduling, and arbitrating issue resolution; and
• Preparing an SER.
The SBAA has the responsibility for ensuring adequate performance of the review team leader in
fulfilling assigned responsibilities.
1.2 Planning
A review plan defines the extent and details of the review process deemed necessary for each
DSA. Well before submittal of the DSA for approval, plans should be developed in coordination
with the facility contractor where support of the contractor will be required (e.g., briefings on the
DSA, facility walkthroughs, and issue resolution). The review plan can be very brief for the
least hazardous or the least complex facility DSAs and is generally not necessary for the review
of revisions and annual updates of DSAs. The plan should be approved by the SBAA with a
copy forwarded to the facility contractor for its information. Basic components of a review plan
include the following:
• Scope and objectives of the review and their bases, including technical-, mission-,
and/or project-related influences impacting the extent and detail of the review;
• Methodology of the review, including basic task identification, objectives, and
criteria by which the review is to be conducted;
• Resources required for the review;
DOE-STD-1104-2009
5
Section 9
• Process and requirements for providing orientation for the reviewers (e.g.,
briefings, training on review plan and review criteria, facility walkthroughs);
• Means of coordinating the review (e.g., periodic monitoring of individual tasks,
documentation of review efforts, formats for issue submittal and responses,
tracking of issues and their resolutions, and record keeping);
• Required SER reviews and signoffs;
• Schedule for the review, including key milestones for the review process (e.g.,
dates of facility walkthroughs, briefings, and/or meetings, calendar time allotted
for issue submittal and issue resolution, SER reviews, and final SER approval).
The review plan is developed from a general understanding of the overall facility safety basis
derived from existing safety basis documentation (e.g., Basis for Interim Operations), familiarity
with the facility, and DOE experiences with similar facilities. Typical considerations include
facility hazard category, complexity of operations, dominant accident concerns, apparent or
known operational and/or design vulnerabilities, hazard controls, safety impact of software
failures, existing mission or program influences (e.g., mission-related considerations and
objectives), and time constraints for the review and approval. Careful consideration should be
given to developing the review plan and any subsequent updating of the plan due to major
changes in the DSA development schedule, provisions, or approach to its review. Many
elements considered in planning the review will be summarized as part of the SER to document
the basis and the extent and detail of the review. Documentation establishing the basis and
conduct of the review is maintained for subsequent demonstration that the review process was
complete and adequate.
An important part of planning is selecting the individuals who comprise the review team.
Members of the review team are typically selected based on technical qualifications, experience,
familiarity with the subject matter, independence from preparation of the DSA, understanding of
DOE’s safety assurance strategy (e.g., nuclear safety requirements), and availability. The review
team requires a core team with expertise in process hazards analysis and accident analysis. The
core of the review effort is assessing the hazard and accident analyses in the DSA because they
are the primary sources of original material with which the remainder of the DSA is aligned.
Other personnel with diverse experience in safety and health, facility operations, safety systems,
and safety software are not necessarily members of the core team, but collectively provide
support as needed for a thorough assessment of the facility safety basis. The extent of support
necessary is generally reflected by the hazard and complexity level of the activities being
examined. Personnel resources may be augmented with available personnel from DOE
Headquarters or unaffiliated Field/Operations Offices. To support a comprehensive and
integrated review, the review team should include representatives from any party responsible for
the review of the DSA and may also include representatives of parties responsible for oversight
of the review and approval to monitor the review process.
1.3 Interactions
DOE has certain fundamental limits on its ability to completely separate the DSA preparation
DOE-STD-1104-2009
6
Section 10
and review processes because it is responsible for both the operation and regulation of the
facilities for which DSAs are prepared, reviewed, and approved. Therefore, reviews are not
expected to be conducted completely segregated from preparation of the DSA. Some degree of
interaction between the preparation and review processes is useful in streamlining the review and
approval. This interaction provides the means by which DOE keeps abreast of issues that arise
during development of the DSA and by which DOE responds to requests from the DSA preparer
to assist in resolving fundamental conceptual issues. It is through such interaction that DOE is
afforded the opportunity to commence research on potential issues in preparation for the official
review.
It is important to maintain a balance in the interaction of the review and preparation processes.
Requests for material outside the provisions of the review plan are made solely by the review
team leader. Reviewers do not directly request draft material from the preparers. Informal
direction of preparation by reviewers is unacceptable. Tendencies exist for facility contractors
to view any comments or direction offered by reviewers as a firm prerequisite for approval. The
actual preparation of and changes to a DSA are the responsibilities of the preparers, not the
review team or its members. Therefore, comments or advice affecting DSA preparation should
result from unequivocal solicitation by the preparer. Even so, the review team leader, as
authorized by the SBAA, is the only authority for originating any official intervention driving
the content and details of a DSA. Any intervention is officially communicated by DOE to the
facility contractor after ensuring that it is crucial to the development of the facility safety basis
and originates from a sound technical foundation (i.e., undergone technically qualified
independent review).
Even then, intervention generally takes the form of guidance or recommendation and is well
documented for subsequent reference by the reviewers during the review.
1.4 Issue Origination and Resolution
Traditionally, in reviewing DSAs, both line management personnel and representatives of other
organizations generate a large number of comments, many of which were not commensurate
with a consistent concept of the DSA and its purpose. The preparer of the DSA has often borne
the sole burden of resolving all such comments, while reviewers have not been held accountable
for justifying comments. This often resulted in forced integration of contradictory comments or
comments contrary to a particular approach or structure for the DSA. To prevent such
occurrences, the SBAA, through the review team leader, maintains authority to determine what
issues are significant and are transmitted to the preparer for formal (i.e., a documented, traceable,
written record) resolution. For this reason, the “burden of proof” lies with reviewers to justify
the safety significance of an issue through substantiation of its impact on the safety basis if left
unresolved. Each “significant issue” submitted should be accompanied by justification for its
significance. The review team leader, and subsequently the SBAA, should rely upon these
justifications in determining the relevance of all issues.
A significant issue identifies a problem or concern that affects the utility or validity of the safety
basis documentation. Such issues are generally those involving (1) hazardous material or energy
release with significant consequences to the public, worker, or environment that will otherwise
Section 11
DOE-STD-1104-2009
7
be left without coverage in the DSA; (2) technical errors that invalidate major conclusions
relevant to the safety basis; or (3) failure to cover topical material required by DOE regulations,
directives, and guidance on DSAs. DSAs prepared in accordance with 10 CFR Part 830 use the
graded approach in documenting the facility safety basis. The absence of information in a DSA
is not a potential issue unless that absence adversely impacts the adequacy of the facility safety
basis documentation. For example, DOE-STD-3009-94, Change Notice No. 3, Preparation
Guide for U.S. Department of Energy Nonreactor Nuclear Facility Safety Analysis, states that
standard industrial hazards are not generically covered in the DSA. But an issue requiring that
a standard industrial hazard be included in a DSA would be justified if a clear case can be made
that there is a potential contributor to a significant release of hazardous material involving that
hazard. If thorough justification of the significance of an issue is not provided and supported,
then the review team leader is not obligated to transmit the issue to the DSA preparer as
significant and requiring resolution. Such judgments may be appealed to the approving
authority. DOE M 442.1-1, Differing Professional Opinions Manual for Technical Issues
Involving Environment, Safety and Health, can be used to resolve any professional disagreements
that cannot be resolved locally.
While only significant issues require formal resolution, the review team leader will typically
transmit all issues to the preparer that will improve overall preparation of the DSA. The preparer
may resolve these issues to the extent they enhance the final product without formal response. In
the process outlined by this Standard, the objective is not to document a large number of issues,
but to contribute to improving the DSA to meet the mission established by 10 CFR Part 830 and
the intent of amplifying guidance (i.e., to provide assurance that the DSA appropriately
establishes the safety basis of the facility).
For issues transmitted to the preparer as significant, the preparer should formally prepare
resolutions and submit them to the review team leader. The review team leader transmits
proposed resolutions to reviewers originating the issues, who should notify the review team
leader if a resolution is considered unsatisfactory. All responses are transmitted through the
review team leader, who schedules and arbitrates the process of resolution. The review team
leader may consider proposed resolutions satisfactory in the absence of timely responses or
adequate justification of unacceptability by the issue originator. As a matter of course, the
review team leader should ensure that the preparer is formally notified of acceptable and
unacceptable resolutions proposed for significant issues.
Reviewers or the preparer of the DSA may appeal the disposition of an issue by the review team
leader to the SBAA. The SBAA determines the final disposition of issues as it is the ultimate
responsibility of the SBAA to achieve a defensible position for the final product (i.e., determine
when resolution is adequate). Neither a reviewer nor the preparer has veto power over ultimate
resolution or disposition of an issue, and neither need be satisfied with the final resolution. The
review team leader ensures that final disposition of significant issues is documented (i.e., with
a traceable, written record), including minority opinions and dissenting views.
Section 12
As stated in 10 CFR 830.202, contractors must incorporate in the safety basis any changes,
conditions, or hazard controls directed by DOE. The regulation also states that the SER must
document the basis for approval of the safety basis for the facility including any conditions of
DOE-STD-1104-2009
8
approval. Documenting directed changes and conditions of approval in the SER provides a way
to address inadequacies in the safety basis that are not significant enough to warrant rejection of
the safety basis but which need to be addressed. Section 2.7 provides guidance on what
constitutes an appropriate condition of approval for DSAs. Section 4.12 presents guidance on
information to be documented in the SER for each condition of approval.
To ensure adequate tracking and closure of conditions of approval, the DOE site office staff
must:
• Verify that contractors have a documented process for:
o tracking conditions of approval to closure (including any required compensatory
measures),
o verifying satisfactory closure of the condition of approval,
o notifying DOE when a condition of approval has been satisfied, and
o managing any conditions of approval until they are closed.
• Ensure that when a condition of approval is satisfied, the basis for closure is documented
in the next update of the DSA, and the closure of the condition of approval is noted in
the DOE approval of that update of the DSA; and
• Periodically assess the closure progress and status of conditions of approval, as well as
the contractor tracking process for them.
TSRs identify the limits, controls, and related actions that establish the specific parameters and
requisite actions for the safe operation of a nuclear facility/activity/process. Consistent with
10 CFR 830.202, the SER may direct changes or impose additional hazard controls to be applied
to the TSRs before operation, but it is not appropriate to specify temporary conditions to be
applied to TSRs. These directed changes must be incorporated into the approved TSRs prior to
operation under the approved safety basis.
DOE-STD-1104-2009
9
2.0 APPROVAL BASES FOR DOCUMENTED SAFETY ANALYSES
DOE evaluates the DSA by considering the extent to which the DSA (1) adequately addresses
the criteria set forth in 10 CFR 830.202 and 10 CFR 830.204, and (2) satisfies the provisions of
the methodology used to prepare the DSA. DSA review and approval focuses on the adequacy
of the following approval bases:
• Base information;
• Planned improvements;
• Hazard and accident analyses;
• Safety Structures, Systems, and Components (SSC);
• Defense-in-depth and worker protection controls;
• Specific Administrative Controls (SAC);
• Derivation of TSRs; and
• Safety management program characteristics and attributes.
Once technical justification exists to support conclusions that the DSA adequately describes
how the facility is satisfactory with respect to the approval bases, the DSA may generally be
considered adequate. These approval bases also form the foundation for documenting DSA
approval in an SER.
For new facilities and major modifications, the DSA evolves from the PDSA with the addition
of the final analysis of operational hazards and any upset conditions that were not considered
previously. The DSA also documents any changes that were necessary during the construction
phase. The review of the DSA and TSRs includes verifying that the commitments in the PDSA
have been met.
2.1 Base Information
Section 13
Base information is the first of the approval bases that should be reviewed and encompasses
elements of DSA preparation, completeness, and general content. Base information is reviewed
for sufficiency to allow assessment of the other approval bases that rely on this information. The
review for sufficiency can range from a simple screening effort to more detailed discussions,
depending on the complexity of the DSA.
Insufficient or incomplete base information in a DSA may prevent further review of the DSA.
Reviewers should require resolution of major discrepancies in base information (e.g., incomplete
site characteristics) before evaluation of the more specific aspects (e.g., hazard and accident
analyses) of the safety basis proceeds. It is for this reason that the SER need only provide a brief
statement as to the adequacy of base information.
For example, for DSAs adhering to the DOE-STD-3009-94, Change Notice No. 3, format, the
review of base information primarily determines the sufficiency of the information provided in
the Executive Summary, Site Characteristics (Chapter 1), Facility Description (Chapter 2), and,
DOE-STD-1104-2009
10
to some extent, material generic to all DSA chapters (e.g., statutes, Rules, Orders, and principal
health and safety criteria). Determining the adequacy of base information generally entails being
able to conclude that the DSA contains sufficient documentation and basis to arrive at the
following conclusions:
• The facility contractor development and approval processes (e.g., personnel
involvement in developing the DSA, management cognizance and acceptance,
internal reviews) demonstrate sufficient commitment to establish the facility
safety basis.
• The facility mission(s) and scope of operations (i.e., the scope of work to be
performed) for which safety basis approval is being sought are clearly stated and
reflected in the type and scope of operations analyzed in the DSA. For example,
a DSA documenting the safety basis of a spent fuel storage facility whose mission
includes size reduction of spent fuel elements would be unacceptable if the DSA
omitted safety analysis of size-reduction operations.
• A description of the facility’s life-cycle stage, mission(s), scope of operations, and
the design of safety SSCs3 is presented, including explanation of the impact on the
facility safety basis.
• Clear bases for and provisions of exemptions, consent agreements, and open
issues are presented.
• Description of the site, facility, and operational processes provide a
knowledgeable reviewer sufficient background material to understand the major
elements of the safety analysis.
• Correlation is established between actual facility arrangements and operations
with those stated in the DSA. This may be accomplished successfully through
reference to facility walkthroughs during DSA preparation. Walkthroughs may
also be warranted during DSA review to provide some level of assurance that the
actual physical arrangement of a facility corresponds to that documented in the
DSA. For example, a walkthrough may be considered for a facility and/or
operation that was modified in the time frame between when DSA development
was started and completed. This is not intended to imply the review team must
perform detailed verifications of facility configuration. The objective is to allow
the review team to conclude that the basic descriptions provided are
fundamentally up-to-date and correct.
Section 14
3 Safety SSCs are defined in 10 CFR 830.3 as the combination of safety class SSCs and safety significant SSCs.
DOE-STD-1104-2009
11
2.2 Hazard and Accident Analyses
Another of the DSA approval bases is hazard and accident analyses that form the foundation
upon which the remaining approval bases (i.e., safety SSCs, SACs, derivation of TSRs, and
safety management program characteristics) rely. Determining the adequacy of hazard and
accident analyses generally entails being able to conclude that the DSA contains sufficient
documentation and basis to arrive at the following conclusions:
• The hazard analysis includes hazard identification that specifies or estimates the
hazards relevant for DSA consideration (i.e., both natural and man-made hazards
associated with the work and the facility) in terms of type, quantity, and form and
also includes properly performed facility hazard categorization.
• The final hazard category for the facility is determined consistent with
DOE-STD-1027-92, Change Notice No. 1. Any differences between the final
hazard category and the initial hazard category are explained.
• The hazard analysis includes a hazard evaluation that covers the activities
for which approval is sought, is consistent in approach with safe harbor
methodologies, identifies preventive and mitigative features for the spectrum of
events examined, and identifies dominant accident scenarios through ranking.
• The hazard analysis evaluates normal, abnormal, and accident conditions,
including consideration of natural and man-made external events, identification
of energy sources or processes that might contribute to the generation or
uncontrolled release of radioactive and other hazardous materials, and
consideration of the need for analysis of accidents that may be beyond the
design basis of the facility.
• The hazard analysis results are clearly characterized in terms of public safety,
defense in depth, worker safety, and environmental protection as part of the safety
basis of the facility. The logic behind assessing the results in terms of safety
significant SSCs, SACs, and designation of TSRs is understandable and internally
consistent.
• Subsequent accident analysis clearly substantiates the findings and delineations
of hazard analysis for the subset of events examined and confirms their potential
consequences. Safety class and safety significant SSCs, SACs and associated
TSRs have been identified for preventing and/or mitigating events potentially
exceeding evaluation guidelines.
The goal of the review is to ensure that the safety basis is comprehensive relative to hazards
presented and is based on a consistent, substantiated logic. As a minimum, reviewers should
utilize the safe harbor methodology used in developing the DSA (e.g., DOE-STD-3009, Chg 3),
DOE-STD-1189, and DOE’s DSA guide (DOE G 421.1-2, Implementation Guide for Use in
Developing Documented Safety Analyses to Meet Subpart B of 10 CFR 830) as a reference to
DOE-STD-1104-2009
12
support their review. In addition, the review of the hazard analysis should include the entire
analysis and not just the summary of the analysis that might be included in the DSA.
2.3 Safety Structures, Systems, and Components
The next DSA approval basis is safety SSCs. Identification of safety SSCs is a product of the
hazard and accident analyses. Determining the adequacy of safety SSCs generally entails being
able to conclude that the DSA contains sufficient documentation and basis to arrive at the
following conclusions:
Section 15
• The safety SSCs identified and described are consistent with the logic presented
in the hazard and accident analyses.
• Safety functions for safety SSCs are defined with clarity and are consistent with
the bases derived in the hazard and accident analyses.
• The boundaries of safety SSCs are clearly defined, including the support systems.
• Functional requirements and system evaluations are derived from the safety
functions and provide evidence that the safety functions can be performed when
called upon.
• System Evaluation is performed to assure functional requirements are met.
• Control of safety SSCs relevant to TSR development is clearly defined.
2.4 Specific Administrative Controls
As stated in DOE-STD-1186-2004, Specific Administrative Controls, SACs are administrative
controls that are selected to prevent and/or mitigate specific accident scenarios and which have
safety importance equivalent to engineered controls that would normally be classified as safety
SSCs. Engineered controls (safety SSCs) are preferred over SACs for these functions; thus,
SACs should only be selected if engineered controls cannot be identified to serve these functions
or are not practical. The approval basis for SACs is the same as for safety SSCs. Specific
expectations for SACs are delineated in DOE-STD-1186-2004.
2.5 Derivation of Technical Safety Requirements
Derivation of TSRs is the next of the DSA approval bases. Hazard controls are derived to
eliminate, limit, or mitigate hazards. The controls generally are safety SSCs, SACs, or
commitments to safety management programs, which are ultimately included in TSRs.
Identification of TSRs results from the most significant preventative and mitigative features
identified in the hazard and accident analyses and from the designation of safety SSCs and
SACs. Determining the adequacy of the derivation of TSRs generally entails being able to
conclude that the DSA contains sufficient documentation and bases to arrive at the following
conclusions:
DOE-STD-1104-2009
13
• TSRs are identified to ensure adequate protection of workers, the public, and the
environment.
• The bases for deriving TSRs are identified and described in the hazard and
accident analyses, safety SSC, and SAC chapters and are consistent with the logic
and assumptions presented in the analyses.
• The bases for deriving safety limits, limiting control settings, limiting conditions
for operation, surveillance requirements, and administrative controls are provided
as appropriate.
• The process for maintaining the TSRs current at all times and for controlling their
use is defined.
2.6 Safety Management Program Characteristics
Safety management program characteristics are the last of the DSA approval bases and
encompass the elements of institutional programs and facility management that are necessary to
ensure safe operations based on assumptions made in the hazard and accident analyses. While
these elements must be addressed in the DSA, generic descriptions of these institutional
programs should not be duplicated in the DSA if they can be referenced in Integrated Safety
Management System documents or site-wide manuals. These institutional programs include
(where applicable) quality assurance, procedures, maintenance, personnel training, conduct of
operations, emergency preparedness, fire protection, waste management, radiation protection,
and criticality safety. Identification of safety management program characteristics and credited
attributes is a product of hazard and accident analyses, designation of safety SSCs and SACs,
and derivation of TSRs. Determining the adequacy of safety management program
characteristics generally entails being able to conclude that the DSA contains sufficient
documentation and basis to arrive at the following conclusions:
Section 16
• The major programs needed to provide programmatic safety management are
identified.
• Basic provisions of identified programs are noted, and references to facility or site
program documentation are provided.
The review of safety management programs is normally performed at the site-wide level and
a reference to the site-wide review is sufficient to support the DSA review. The acceptance of
safety management program characteristics does not constitute acceptance of the adequacy of
program compliance with DOE directives. Acceptance can be accomplished only by a detailed
compliance review of each of the programs, which is beyond the scope of a DSA. Detailed
reviews of the adequacy of safety management programs only need to be performed for safety
management programs that are specific to the facility.
DOE-STD-1104-2009
14
2.7 Conditions of Approval
Conditions of approval should be used to document any changes, conditions, or hazard controls
directed by DOE. Purely editorial issues (e.g., punctuation, misspelling) that do not change the
meaning or technical content of the statement should not be handled through conditions of
approval. Conditions of approval should not be used to approve DSAs with fundamental flaws.
Large numbers of conditions of approval for a single DSA may indicate that the DSA is
fundamentally flawed and should prompt a review of which issues should be corrected prior to
approval of the DSA. DOE should not approve conditions of approval for extended periods of
time. A defined closure date or milestone must be identified in the condition of approval. If a
condition is intended to be applied for an extended period of time, the DSA should reflect that
condition as part of the analysis. Conditions of approval may identify compensatory measures
that are required for temporary periods until the conditions of approval are closed.
The following criteria constitute a basis for rejection of the DSA and should not be addressed
through conditions of approval:
• There is insufficient information to document the conclusion that there is reasonable
assurance of adequate protection of the worker, the public, and the environment.
• The DSA does not meet the regulatory requirements of 10 CFR Part 830 and does not
have an approved exemption in accordance with 10 CFR Part 820, Subpart E.
• Significant issues were identified during the acceptance review that would prevent
conducting a successful technical review.
• The base information contained in the DSA is insufficient to describe the activities,
processes, or systems to enable the hazard analyst to identify a complete set of hazards
for the covered facility/activity/program.
• The hazard analysis is incomplete (e.g., there are missing hazards; the response is
incomplete, unavailable, or misapplied).
• The accident analysis is incomplete (e.g., a scenario does not bound the hazard from the
hazard analysis; there are incorrect calculations supporting the accident analysis
conclusions).
Conditions of approval cannot be used to allow the facility/activity/program to be outside of the
approved safety basis or to be inconsistent with law or other requirements.
Examples of situations where conditions of approval would be appropriate for DSAs are as
follows:
• Use of a fire watch where a fire barrier is needed per the safety analysis, but it has not
yet been installed; and
DOE-STD-1104-2009
15
Section 17
• Use of personal protective equipment (e.g., respiratory protection) to mitigate any
exposure to workers doing glovebox repackaging operations for a defined period until
a design correction identified in the DSA can be completed.
Fundamentally, the DSA must demonstrate that proposed activities have been thoroughly
described and analyzed and that the hazards have been adequately identified. The DSA must
establish the linkage between the individual hazards identified and the final control set that
addresses each hazard. The functions of the controls that are relied upon for safety must be
clearly documented and demonstrated to be adequate for the bounded hazards that they are
intended to address. The selected controls must be documented as capable of providing the
credited safety functions and appropriately captured in the TSRs. The DSA, TSRs, SER, and
conditions of approval should provide an acceptable safety envelope for the
facility/activity/program. While individual instances of a shortcoming in one of these areas, such
as the need for an additional control, may be addressed in a condition of approval, a fundamental
weakness in the processes used to perform the hazard analysis and accident analysis would
render the DSA unacceptable.
DOE-STD-1104-2009
16
3.0 APPROVAL BASIS FOR TECHNICAL SAFETY REQUIREMENTS
3.1 Management and Coordination
DOE reviews of TSRs are generally conducted in coordination with DSA reviews and by many
of the same team members. This provides an economy of effort because team members, by
virtue of their familiarity with the DSA, have an understanding of the commitments made in the
DSA that need to be reflected in the TSR. The discussions in Section 1 of this Standard relative
to management and coordination of DSA reviews are equally applicable to the TSR review
process. The management plan should address both DSA and TSR reviews. Because the TSRs
must implement commitments made in the DSA, approvals and implementation of both the DSA
and TSRs must be coordinated.
3.2 Approval Bases
The approval bases for the TSR document are the TSR provisions. These TSR provisions may
be design features, safety limits, operating limits (i.e., limiting control settings and limiting
conditions of operation), surveillance requirements, or administrative controls (primarily
commitments to implement safety management programs according to the facility-specific
characteristics described in the DSA). The approval bases for a TSR document include
a disciplined analysis and tracing of commitments to hazard controls through appropriate
provisions that implement these controls in a TSR document. In some cases the specific
treatment of safety controls in the TSR is committed to in the DSA; in other cases, it is
a judgment call as to the appropriate TSR treatment. Determining the adequacy of the TSR
provisions generally entails being able to conclude that:
• Hazard controls discussed in the DSA are faithfully translated into TSR
provisions; and
• TSR provisions are appropriate and consistent with the DSA.
The sources of information in a DSA regarding these provisions are the hazards analysis
(including description of hazard controls); the description of safety SSCs; the classification of
these SSCs as safety class, safety significant, or other important defense-in-depth SSCs; the
description of the functional requirements for the safety SSCs; the description and functional
requirements for SACs; the derivation of TSRs; and the descriptions of the safety management
programs.
Section 18
3.2.1 Hazards Analysis
A hazards analysis will include a disciplined analysis of all hazards within the scope of the DSA,
including a listing of applicable preventative and mitigative hazard controls. These controls may
include safety SSCs, design features, SACs, and provisions of various safety management
programs. These controls should be regarded as DSA commitments. They should be traced
through DSA documentation to specific TSR provisions.
DOE-STD-1104-2009
17
3.2.2 Safety SSC
Safety SSCs must be described in sufficient detail in a DSA so that their functional requirements
are defined and the bases for TSR requirements are derived. These safety SSCs will be either
active or passive. If passive, they should also be considered for designation as “Design
Features” in the TSR. These are features of facility design that may not be changed without
DOE review and approval. A crosscheck between DSA-identified important design features and
the Design Features section of the TSR should be conducted to ensure consistency. If active,
safety class SSCs will usually have a safety limit and a limiting control setting associated with
them, as well as a surveillance requirement. An active safety significant SSC may have
a limiting condition of operation and surveillance requirement and/or specific provisions of
a maintenance management program associated with it. In any case, safety SSCs must be
addressed specifically in TSR provisions. Technical bases for limiting control settings and
surveillance requirements in the Bases appendix of the TSR should be reviewed for adequacy.
All of these provisions are directed at ensuring that the safety function of the SSC will be
protected.
3.2.3 Specific Administrative Controls
When SACs are used, they must be controlled through the TSR. DOE-STD-1186 specifies the
methodologies that are acceptable to use for SACs. The first involves using the conventions for
limiting conditions for operation and associated surveillance requirements. The second method
available to incorporate SACs into a TSR document is to identify the specific requirement/action
in a special section in the Administrative Control section of the TSR. This format may be
appropriate when it is essential that the SAC be performed every time and without any delay
when called upon (e.g., hoisting limits for nuclear explosives, material-at-risk limits, or expected
responses during criticality safety infractions not covered by a limiting conditions for operation)
or when definitive program requirements for specific activities can be established.
3.2.4 Other Important Defense-In-Depth SSCs
As discussed in Section 2.7, DOE line management can identify conditions of approval in the
SER for the DSA. The conditions of approval may include the identification of additional
important defense-in-depth items and administrative controls. Furthermore, although not
preferred, DOE may require additional important defense-in-depth items and administrative
controls, independent of safety analysis. If important defense-in-depth items and administrative
controls are identified, the review team should ensure that TSRs have been developed to provide
assurance of the identified safety function as appropriate.
3.2.5 Safety Management Programs
Section 19
Hazards analyses may invoke particular aspects of safety management programs, such as
emergency preparedness, criticality safety, procedures, and training. Any particular provisions
of these programs unique to the facility should have been described in the DSA. The
administrative controls section of the TSR should include commitments to implement those
programs identified in the DSA as important to the facility safety basis.
DOE-STD-1104-2009
18
4.0 SAFETY EVALUATION REPORTS
The review process results in the generation of an SER integral to the facility’s authorization
basis. The SER for a given facility or operation documents (1) the conduct of an appropriate
review of the PDSA, DSA, or TSRs; and (2) the bases for approving these documents and any
conditions of approval. Approval signifies that DOE has accepted these documents as
appropriately documenting the safety basis of a facility and as serving as the basis for operational
controls (e.g., TSRs or programmatic control) necessary to maintain an acceptable operating
envelope.
TSR
DSA Safety Evaluation
Report (SER)
PDSA
Then document
the evaluation in
a …
If it is a…
The SER is developed specifically to document acceptance of the PDSA, DSA, and TSRs.
Therefore, significant issues concerning these documents are typically resolved and incorporated
in the PDSA, DSA, and TSRs before the final SER is prepared. An analysis that was not
performed during preparation of the PDSA, DSA, and TSRs, but is determined to be required to
complete the review is also documented independently of the SER. Only statements pertinent to
accepting the facility basis are included in the SER. In accomplishing this, informed judgment
and discretion are used to focus the SER on facts that clearly reflect the actual conditions of the
facility safety basis. The SER does not need to repeat in wholesale fashion material contained in
the PDSA, DSA, and TSRs
The SER is intended to provide an overall summary of the methodology, assumptions, bases,
conclusions, and commitments in the PDSA, DSA, and TSRs rather than a total reanalysis (i.e.,
independent verification and validation) of those activities addressed in these documents.
During the review process, selected limited independent verification and validation can be
performed; for example, in cases where (1) there may be significant questions about the validity
of the original analysis, (2) where the risks are significant, and/or (3) the analysis is critical to the
overall conclusions in the DSA and TSRs. However, significant discrepancies should be resolved
as part of the development effort for the DSA and TSRs and, if deemed appropriate, only briefly
documented in the SER. The resolution of such significant discrepancies should not be deferred
to conditions of approval. The SER clearly states any conditions of approval that impose
additional commitments to which facility management must adhere beyond those already
documented in the DSA and TSRs. In general, conditions that could be incorporated into the
body of these documents are so incorporated during the review process as prompted by issue
DOE-STD-1104-2009
19
resolution (as opposed to being addressed in the SER and potentially invalidating portions of the
DSA and TSRs). See Section 2.7 and Section 4.12 for additional discussion of conditions of
approval.
Section 20
Approval statements addressing specific areas of the safety basis are augmented with brief
summaries of the most significant facility-specific points in those areas to provide a basic context
to understand what is being approved. In stating the adequacy of the approval bases, it may also
prove advantageous and/or warranted for the SER to discuss areas of concern or issues with
significant ramifications for facility operations. Generally, these issues will have been resolved
and any inquiries into them will have been completed during the review process. Any discussion
of issues in the SER should be on a summary level and directed towards clarifying some specific
aspect of approval or demonstrating understanding of some aspect of the facility safety basis.
In the case of DSAs and TSRs, if the SER imposes a condition of approval (e.g., additional
compensatory measures, alterations of stated commitments) on the facility safety basis
documented in the DSA and TSRs, then the SER necessarily modifies that facility safety basis.
In such cases, conditions cited in the SER become part of the facility safety basis. Therefore,
a facility safety basis is composed of an approved DSA and TSRs, modified as necessary by the
SER to reflect DOE-imposed conditions of approval. The SER or memorandum stating the
conditions is subsequently appended to the DSA and TSRs. Specification of conditions in the
SER not currently in place in these documents should identify an expected schedule for
completion. The SER for a PDSA may also direct changes to the PDSA as well as add
conditions of approval, although this should be done only when absolutely necessary. The
purpose of the PDSA and its revisions is to keep DOE engaged in the design activities of the
project and aware of any significant changes to the design as they occur to ensure DOE is in
agreement with current and proposed design activities.
Revisions of DSAs and TSRs, including DSA annual updates, undergo review and approval by
DOE. Review and approval of revisions are a matter of endorsing the incorporation of changes
in the safety basis since the last approval rather than performing a new assessment of the
previously approved safety basis documents. Modifications to the facility operations not
encompassed by the safety basis as documented in a DSA and TSRs invoke the USQ process.
Therefore, revisions are generally administrative and/or editorial in nature in that they
incorporate final disposition of USQs, conditions of approval stated in the existing SER, and/or
minor changes that clarify the safety basis documentation. For this reason, administrative and
editorial revisions determined not to involve a USQ can be performed by the facility contractor
at any time without prior DOE approval. It is recommended that the facility contractor provide
a copy of the revision, with a discussion of the changes, to the SBAA within 30 days of
implementing the changes for subsequent DOE review and approval. Review and approval of
revisions of DSAs and TSRs do not typically warrant a significant new effort (e.g., detailed
review plan, formal review team) and may be as simple as merely indicating the latest revision
numbers for simple administrative and/or editorial changes.
SERs document the bases for approving revisions, including annual updates of DSAs and TSRs.
An SER for a revision typically does not provide the complete basis of approval for that DSA
and TSRs and only provides the basis of approving changes in the provisions resulting from
the revision. Therefore, SERs for revisions are appended to the SER, documenting the last
Section 21
DOE-STD-1104-2009
20
comprehensive determination of the basis of approval of the DSA and TSRs. Collectively, an
SER and its appendices provide the complete basis of approval for any given DSA and TSRs.
An SER without appendices is generated upon the next comprehensive determination and
documentation of the basis of approval for that DSA and TSRs or at the discretion of the SBAA.
The remainder of this chapter provides the recommended format and content for an SER. The
SER addresses only those issues that are germane to documenting the basis of acceptance of the
PDSA or the DSA and TSRs; therefore, the SER is subject to the graded approach. Summaries
of material already contained in a PDSA or a DSA and TSRs should be brief but sufficient to
provide a knowledgeable reader a basic understanding of the basis of approving these
documents.
4.1 Title Page
The title page provides the unique identifier information for the PDSA, DSA, and TSRs and the
SER. Minimum information consists of the following: (1) SER title, revision number, and date
issued; (2) title, revision number, and date issued for the PDSA or DSA and TSRs; (3) facility
name and identification number, if any; (4) site; and (5) DOE contractor’s name and appropriate
contract number.
4.2 Signature Page
The signature page provides the identification and signature of the SBAA, and the approval date
of the PDSA or DSA and TSRs. Other signatures may be provided at the discretion of the
SBAA.
4.3 Executive Summary
This section presents summary information regarding the basis of approval of the PDSA or the
DSA and TSRs. The introduction contains the following information, which is briefly
summarized: (1) clear identification of the facility for which approval is being granted and its
hazard category; (2) statement of the facility mission and scope of operations encompassed by
the facility mission; (3) summary of the major facility hazards and dominant accident scenarios;
(4) discussion of pertinent exemptions and/or consent agreements impacting the approval;
(5) discussions of major mission- and project-related influences impacting the decision to
authorize operation; and (6) any conditions of approval and/or open issues raised with regard to
the approval bases, including schedules for completion (if applicable). The executive summary
concludes with a statement on the acceptability of the PDSA or the DSA and TSRs indicating
that these documents have undergone an appropriate review and:
• For the PDSA, that it provides a reasonable basis for the preliminary conclusion that the
nuclear facility can be operated safely based on the following: (1) the nuclear safety
design criteria in DOE O 420.1B have been satisfied; (2) a safety analysis meeting DOE
O 420.1B and DOE-STD-1189-2008 requirements to support the design has been
performed; and (3) an initial listing is provided of the safety management programs that
must be developed to address operational safety considerations.
DOE-STD-1104-2009
21
• For the DSA and TSRs, that the facility safety basis as documented is acceptable with
stated conditions of approval, if any.
4.4 Review Process
Section 22
This section provides a brief description of the review process the PDSA or the DSA and TSRs
have undergone and its basis. Because there is no generic level of review effort required, this
section is more the historical top-level documentation of the review process and the rationale for
level of effort and detail. Typical information summarized includes the following: (1) basic
premises of review, particularly those representing some consensus with the preparer of the
PDSA or the DSA or TSRs; (2) summation of the review effort; (3) key participants in the
review process; and (4) scope of special efforts, if any (e.g., selected independent calculations,
walkthroughs). Discussion should be brief, but still sufficient to provide an understanding of the
thoroughness of the review process and its basis. This section does not provide a documented
record of the details of the review (e.g., issue resolution files).
4.5 Base Information
This section documents the bases of approving the adequacy of base information, including any
conditions of approval imposed. A statement of adequacy is generally focused and brief. This
may entail nothing more than a paragraph stating that the PDSA or the DSA and TSRs contain
sufficient background and fundamental information to support the review of the more technical
aspects of the documents (i.e., review of the remaining approval bases). The majority of any
inadequacies in the base information will require revision to the DSA or the TSRs prior to SER
preparation or may be sufficiently minor that they can be resolved in a future revision of the
DSA or TSRs.
In addition to bases of acceptance, this SER section provides a brief synopsis of major site,
facility, and operational process features. This information is intended for the sole purpose of
providing a minimal, facility-specific context for SER bases of approval such that an elementary
understanding of the operational envelope can be gleaned from the SER. The SER does not,
however, attempt to repeat detailed safety basis information contained in the PDSA, DSA, or
TSRs.
4.6 Hazard and Accident Analyses
This section documents the bases for approving the hazard and accident analyses, including any
conditions of approval imposed. Such documentation focuses on the completeness of the
analysis and the consistency of the logic used throughout the analysis process.
In addition to bases of acceptance, this SER section provides (1) a brief synopsis of hazards
identified; (2) fundamental aspects of defense in depth, worker safety, and environmental
protection; (3) dominant accident potentials; and (4) accident consequences relative to the
DOE-STD-3009-94, Change Notice No. 3, Evaluation Guideline. The purpose of summarizing
DOE-STD-1104-2009
22
this information is not to recapture detailed information already present in the PDSA, DSA, or
TSRs. The summary provides the reader with an elementary understanding of the major facility
hazards. In summarizing this information, the SER does not repeat the details of the DSA
assumptions or calculations. The SER may, however, discuss essential aspects of important
issues resolved during the review process.
4.7 Safety Structures, Systems, and Components
This section documents the bases for approving the designation of safety SSCs and their
associated safety functions, functional requirements, system evaluations, and potential TSR
coverage, including any conditions of approval imposed. Focus is on the consistency of the logic
developed in hazard and accident analyses being carried through to the identification of safety
SSCs and the definitions and descriptions provided for these SSCs.
Section 23
In addition to bases of acceptance, this SER section provides a brief synopsis of safety SSCs and
their safety functions as determined in the hazard and accident analyses. The purpose of
summarizing this information is not to recapture detailed information already presented in the
PDSA or DSA. The summary provides a reader with an elementary understanding of the safety
SSCs and the bases of their designation in hazard and accident analyses. The SER may,
however, discuss essential aspects of important issues resolved during the review process.
4.8 Specific Administrative Controls
This section documents the bases for approving the SACs, as well as their associated safety
functions, functional requirements, system evaluations, and potential TSR coverage, including
any conditions of approval imposed. The basis for acceptance of SACs is the same as that for
safety SSCs, except that the discussion in the safety analysis for SACs should justify the use of
SACs over engineered features (i.e., safety SSCs). It is not expected that SACs will be
developed in detail at final design (for the PDSA). However the safety function of SACs must
be clearly defined so that the decision to use an SAC rather than a safety SSC can be evaluated.
Expectations regarding SACs are defined in DOE-STD-1186-2004 and expectations for the
discussion of SACs in the PDSA are discussed in Appendix I of DOE-STD-1189-2008.
4.9 Derivation of Technical Safety Requirements
This section documents the bases for approving the derivation of TSRs, including any conditions
of approval imposed. Such documentation focuses on the consistency of the logic developed in
the hazard and accident analyses, safety SSC, and SAC chapters being carried through to the
derivation of TSRs. The TSRs required by 10 CFR 830.205 are not specified in a DSA, which is
only required to provide the basis of their derivation.
In addition to bases of acceptance, the SER section provides a brief synopsis of the derivation of
TSRs as a function of the hazard and accident analyses. This information is intended for the sole
purpose of providing minimal, facility-specific context for SER bases of approval, such that an
elementary understanding of the operational envelope can be gleaned from the SER. The SER
does not, however, attempt to repeat detailed information contained in the DSA.
DOE-STD-1104-2009
23
4.10 Safety Management Program Characteristics
This section documents the bases of approving safety management program characteristics,
including any conditions of approval imposed. These bases do not relate to compliance with
regulatory requirements, but to identification of the basic capability and awareness of
fundamental provisions needed for maintaining the adequacy of the facility safety basis. This
approval simply documents that the basic elements of the institutional safety management
programs depended on for ensuring facility safety basis are adequate and that these elements can
and will be implemented. A list of these programs briefly noting their general significance to
defense in depth, worker safety, and/or dominant accident scenarios is provided, but no summary
of the information from each programmatic chapter is needed. The PDSA may have little or no
detail provided for the safety management programs, which may rely heavily on separately
developed documents. Consequently, this section of the SER for the PDSA may be little more
than recognition of the need for such programs in the DSA.
Section 24
4.11 Technical Safety Requirements
This section documents the basis of approving the TSRs. It should be verified that all the
commitments for safety controls that are made in the DSA are carried through to TSR provisions.
Judgment needs to be exercised in the specifics of the form of TSR treatment (e.g., limiting
condition of operations or administrative controls). The technical bases for these judgments
should be documented as part of the review and summarized in this section of the SER.
The SER for the PDSA should address the review of the bases for TSRs in the PDSA consistent
with the hazard and accident analyses, as well as a summary table for the TSRs. The TSR safety
limits, limiting control settings, limiting conditions of operation, surveillance requirements,
administrative controls, and design features should be listed in the PDSA consistent with the
hazard and accident analyses.
4.12 Conditions of Approval
Conditions of approval should be written in such a manner that the conditions required to be met
and the actions required to be implemented are clearly articulated. Durations, implementation
periods, and/or completion dates should also be specified so that it is clear when compliance with
the condition of approval is expected to occur. The reason for including any conditions of
approval should be clearly stated in the SER, as well as the basis for the conclusion that
continued operation under the condition of approval is acceptable and consistent with adequate
protection of workers and the public.
Whenever a compensatory measure is needed to ensure appropriate safety levels are maintained
while a temporary condition of approval is in effect, that compensatory measure should be
clearly articulated in the SER and it becomes part of the facility safety basis.
DOE-STD-1104-2009
24
4.13 Records
This section provides references to the essential records, documentation, and information
generated throughout the review process. This may include reference to records of the
following: (1) the review plan and schedule; (2) minutes of review meetings, including meeting
with the facility contractor; (3) dates and the results of facility walkthroughs; (4) submittal of
issues and their disposition; (5) documentation generated in resolution of issues; and
(6) documentation regarding commitments made by the facility contractor for approval of the
PDSA, DSA and TSRs. References should be complete and accurate enough to locate necessary
information during future revision and review activities, if needed.
DOE-STD-1104-2009
25
5.0 SAFETY DESIGN BASIS DOCUMENTS
The interactive process between safety analysis and design should begin as early as possible so
that safety is effectively integrated into the design process. This is consistent with the Integrated
Safety Management System process. The following sections address the review of documents
that support the safety-in-design concepts defined in greater detail in DOE-STD-1189-2008.
Familiarity with DOE-STD-1189-2008 is essential to properly apply this Standard
(DOE-STD-1104). In particular, this Standard provides expectations for the review of the SDS,
CSDR, the PSDR and the PDSA. These documents (referred to in this Standard as safety design
basis documents) are progressive documents for the design phases of a project that lead to the
development of the DSA and the TSR. Review and approval of these documents during the
design phases ensure communication between DOE and its contractors regarding facility design,
as well as ensuring that safety design is incorporated early in the design process. The
relationship of these documents and the order of their development are as follows:
Section 25
1. The SDS provides a roadmap for strategizing how important safety issues will be
addressed in the design and in the tailoring in the development of key safety
documentation.
2. The CSDR summarizes the hazards analysis efforts and safety-in-design decisions
incorporated into the conceptual design, along with any identified project risks associated
with the selected strategies.
3. The PSDR updates the information in the CSDR, adding design detail.
4. The PDSA demonstrates the adequacy of the design from the safety prospective to
support construction of the facility.
5. The DSA evolves from the PDSA and reflects the as-built design.
6. The TSR is developed, based upon the DSA.
5.1 Safety Design Strategy, Review Teams, and Approvals
DOE O 413.3A, Chg 1 (or successor document) defines the roles and responsibilities for DOE in
managing a project, including who assigns the responsibility for reviewing and approving safety
design basis documents submitted to DOE. When a new project enters the conceptual design
phase, DOE-STD-1189-2008 calls for the development of an SDS as one of the first safety
documents to be generated. The SDS is discussed in Section 2.3 of DOE-STD-1189-2008, and
the expectations for the SDS are defined in Appendix E of DOE-STD-1189-2008.
The DOE expectations for safety-in-design developed during the preconceptual phase evolve
into the SDS during the conceptual phase. The SDS is updated in the preliminary and final
design phases. As the initial project safety management integration tool, the SDS provides the
preliminary information to gauge the scope of significant hazards and the general strategy for
DOE-STD-1104-2009
26
addressing those hazards. In addition, for projects that do not follow the traditional project cycle,
the SDS provides a vehicle to describe how requirements for safety documentation will be
tailored to that particular project approach while satisfying DOE O 413.3A, Chg 1 (or successor
document). DOE-STD-1189-2008 anticipates that the final safety basis documents for the
facility being constructed or modified will be based on the format and content of DOE-STD-
3009-94, Change Notice No. 3. If a different methodology will be applied to these documents,
the SDS should identify that methodology and define the resulting changes to the format of the
safety design basis and safety basis documents.
The SDS, at the conceptual design phase, is prepared by the Safety Design Integration Team
(SDIT)4 (or the contractor safety lead in the absence of an SDIT) from the DOE expectations for
the execution of safety activities during design. The SDS is approved by DOE SBAA and the
Federal Project Director, with the advice of the Chief of Nuclear Safety or the Chief of Defense
Nuclear Safety, as appropriate. As stated earlier, DOE O 413.3A, Chg 1, assigns the authority to
designate the SBAA to the PSO for the project.
Updates to the SDS should be focused on the major safety decisions that influence project cost
(e.g., seismic design criteria, confinement ventilation, safety functional classification, and safety
and design strategies). Interim SDS updates provide a means by which all parties are kept
informed of important changes due to safety in design evolution between Critical Decision
points.
Section 26
As the name suggests, the SDS lays out the strategy for the safety design of the project; hence,
it defines the framework of a number of the project safety documents to be approved by DOE,
including the CSDR, the PSDR, the PDSA, the DSA, and the TSRs. The SDS, CSDR, the
PSDR, the PDSA, the DSA, and the TSRs are approved by the SBAA. In reviewing an SDS, the
reviewer should evaluate whether the topics described in DOE-STD-1189, Appendix E, have
been addressed and provide an adequate basis to proceed with design efforts.
DOE should appoint a senior staff person qualified to lead a safety basis review team (SBRT) for
those documents that require DOE approval. The SBRT is expected to review the SDS and other
safety design basis documents submitted for DOE approval and to prepare the CSVR for the
CSDR, the PSVR for the PSDR and the SER for the PDSA. The SBRT lead should maintain
communication with the Federal Integrated Project Team (IPT)5 and the SDIT as the design
progresses to ensure that the IPT is kept up to date with respect to safety design. The SBRT
should attend design review meetings and review and comment on the SDS; however, it should
be careful to remain independent of the development of the CSDR, PSDR, and PDSA to ensure
independence in the review of those documents.
As discussed earlier, the safety basis design documents are progressive documents drawing from
the analyses and information in the previous document and evolving with the design of the
facility. Consequently it is important staff to the SBRT with members who can stay with the
4 See DOE-STD-1189-2008 or successor document for additional information on the SDIT.
5 See DOE O 413.3A, Chg 1, and DOE-STD-1189-2008 or successor documents for requirements and additional
information on the IPT.
DOE-STD-1104-2009
27
review process as it progresses. Having long-term team members adds efficiency to the team
effort as they carry the history of the safety design bases documents with them. Over time, some
team members may change due to attrition, promotions, the need to add individuals to the review
team to include specific technical skills, or the decision to drop certain individuals whose skills
are no longer needed. However, it is most important that there is continuity of the SBRT team
leader, so that individual should be chosen with this in mind.
The conceptual design phase of a project presents a key opportunity for the safety analysis to
influence the design. Because many important preliminary analyses and safety design decisions
are decided during this period, it is important for the SBRT to be actively involved in the review
process. The SBRT lead should identify and assign Subject Matter Experts (SMEs) in the review
of safety-in-design issues as they are identified. These SMEs should become members of the
SBRT. The team lead should make use of all available resources. For example, Defense
Nuclear Facilities Safety Board (DNFSB) reviews of the project (or other projects) may identify
design issues that should be addressed early in the design process (some of which may be
captured in staff reports posted on the DNFSB website).
5.2 Review Bases for Conceptual Safety Design Reports
Section 27
DOE O 413.3A, Chg 1, requires a CSDR as a part of the approval package for the Critical
Decision-1 (CD-1) phase of a project. DOE-STD-1189-2008 provides details on DOE’s
expectations for the CSDR. In particular, DOE-STD-1189-2008, Appendix H, provides a format
and content guide for the CSDR. The CSDR must reflect the project configuration at conceptual
design; however, the design at this phase is not fully defined and the CSDR may (1) propose
more than one possible approach to some aspects of the design and (2) identify some areas that
will need more research and development at later stages. Consequently, a comprehensive safety
assessment at the conceptual design stage is not expected. Further, the CSDR may be the first
opportunity for the reviewer to see and review the SDS.
Although some of the decisions and selections may be preliminary at this phase of design, the
CSDR reviewer must confirm that the following are adequate and sufficiently conservative to
proceed from the conceptual design phase to the preliminary design phase:
• Selected hazard categorization (hazard category-1, -2 or -3) of the facility;
• Preliminary identification of the facility Design Basis Accidents (DBAs);
• Assessment of the need for safety class and safety-significant facility-level safety
controls based on the analysis of the DBAs;
• Preliminary assessment of the appropriate seismic design criteria for the facility; and
• Positions taken with respect to compliance with the safety design criteria of
DOE O 420.1B, Facility Safety, or any alternate criteria proposed.
DOE-STD-1104-2009
28
The reviewer should refer to DOE-STD-1189-2008, Appendix H, for detailed guidelines on the
expected contents for a CSDR. These contents may vary somewhat based on the individual
project, as documented in the SDS.
As part of the review of the CSDR, the reviewer must:
1. Assess whether the identified facility level DBAs appear to be a complete set;
2. Determine if the safety function classifications from Appendices A and B of
DOE-STD-1189-2008 were appropriately applied, including natural phenomena hazards
(NPH) classifications, such as seismic design category;
3. Assess the adequacy of the preliminary hazard analysis against the expectations in
Section 4.2 of DOE-STD-1189-2008;
4. Evaluate the basis of the chosen confinement strategy if a confinement strategy other than
active ventilation was adopted (e.g., passive confinement); in general, an active safety
class or safety- significant confinement system is preferred for hazard category 1 and 2
nuclear facilities unless otherwise indicated by the safety analyses;
5. Review the risk and opportunity assessment6 to confirm that the technical uncertainties
related to safety are identified;
6. Confirm that the current safety design basis is reasonably conservative and the risk of
significant redesign related to major or costly changes in safety controls is minimized or
properly documented in the CSDR and addressed as discussed in items 7 and 8;
7. Confirm that the CSDR contains a summary of the risks and opportunities associated
with the safety design basis strategies;
8. Confirm that the CSDR identifies risk handling strategies that bound each identified risk;
9. Confirm that the hazard analysis is complete to the degree appropriate for the stage of
development;
10. Confirm that the process in DOE-STD-1189-2008, as tailored in the SDS, was used for
the selection of safety controls at the facility level;
Section 28
11. Evaluate the decisions made with respect to the safety classification of the safety controls
and associated functions;
12. Ensure that any safety issues that require further study are identified in the CSDR;
6 See DOE-STD-1189-2008, Appendix F, for information on expectation for the risk and opportunity assessment.
DOE-STD-1104-2009
29
13. Confirm that the safety design aspects of the project are acceptable such that the project
is ready to move to the preliminary design phase; and
14. Evaluate the CSDR to ensure that the hazard controls were selected consistent with the
principles of the hierarchy of hazard controls7:
• passive engineering features,
• active engineering features,
• administrative controls, and
• personal protective equipment.
DOE documents the results of the review of the CSDR in a CSVR for approval by the SBAA.
In accordance with DOE O 413.3A, Chg 1, approval of the CSVR is a prerequisite to CD-1;
therefore, the Federal Project Director concurs on the CSVR. Detailed expectations for the
preparation of an SVR are provided in Section 5.5.
5.3 Review Bases for Preliminary Safety Design Reports
The PSDR evolves from and expands upon the CSDR adding design detail from the preliminary
design phase of a project. The PSDR is a part of the approval package for the CD-2 phase of
a project. DOE-STD-1189-2008 provides details on DOE’s expectations for the PSDR. In
particular, Appendix I of DOE-STD-1189-2008 provides a format and content guide for the
PSDR and the PDSA. As stated in Section 5.1, DOE-STD-1189-2008 anticipates that the final
safety basis documents for the facility being constructed or modified will be based on the format
and content of DOE-STD-3009-94, Change Notice No. 3. If a different methodology will be
applied to these documents, the SDS should identify that methodology and define the resulting
changes to the format of the safety design basis and safety basis documents. The format and
content expectations should be tailored to the design and safety analysis maturity at the
preliminary design phase.
The reviewer should refer to DOE-STD-1189-2008, Appendix I, for detailed guidelines on the
expected contents for a PSDR. The contents may vary somewhat based on the individual project
as documented in the SDS.
The reviewer of the PSDR must also confirm that it adequately addresses the following safety
design basis aspects for the preliminary design phase:
1. The nuclear facility design requirements of DOE O 420.1B;
2. A viable design solution (e.g., safety SSCs) to provide the safety functions assessed to be
necessary by the hazard analysis, as follows:
a. The unmitigated accident consequence assessment properly indicates the required
functional classification (i.e., safety class versus safety significant) and seismic
7 See Guiding Principle 2 in DOE-STD-1189-2008.
DOE-STD-1104-2009
30
and other NPH design requirements (i.e., the proper seismic design criteria for
seismic design and performance criteria for other NPH design).
b. The analysis of DBAs identifies the functional requirements that the safety SSCs
and SACs must perform and the conditions (e.g., normal and accident) under
which these functions must be performed.
c. The safety systems can meet the functional requirements and any unique
technology development that may be needed has been identified.
3. Appropriate supplemental design criteria (DOE G 420.1-1, Chapter 5 and
DOE-STD-1186) as specified for safety SSCs and SACs, as follows:
Section 29
a. General requirements for safety class and safety significant SSCs and for SACs
are specified (e.g., conservative design features, design against single-point
failure, environmental qualification, safe failure modes, as appropriate).
b. Based on the functional classification and the safety SSC design function,
appropriate codes and standards are specified and tailored, as needed, or alternate
codes and standards are identified and justified.
4. Descriptions of the technical studies needed to complete the safety design.
5. Safety design risks and risk mitigation strategies for the final design phase.
The PSDR must demonstrate the adequacy of the hazard analyses and the selection and
classification of the safety controls, including consideration of the application of the principles
associated with the hierarchy of controls.8 The information in the PSDR should be sufficient to
conclude, that if the commitments made in the PSDR and design documents are met, the result
should be a final design and a constructed facility that could be approved for operation without
significant modifications. The detail in the PSDR should be more complete than the information
provided in the CSDR, even though the design may not be complete. The reviewer should
confirm that the PSDR identifies (1) viable engineered safety solutions that address the
recognized hazards and (2) an acceptable set of safety design requirements to address the
hazards.
The PSDR should identify any SSCs that are intended to become design features in operational
TSRs.
It is not necessary that the full details of consensus design codes and standards be listed in the
PSDR. These details should be in the documents available for the design reviews and should be
fully scrutinized during design reviews by safety personnel participating in those reviews.
8 See DOE-STD-1189-2008, Guiding Principle 2.
DOE-STD-1104-2009
31
If a format and content other than that defined in Appendix I of DOE-STD-1189-2008 are used
to develop the PSDR, the reviewer should verify that the PSDR follows the expectations defined
in the SDS.
DOE documents the review of the PSDR in a Preliminary SVR (PSVR) for approval by the
SBAA. In accordance with DOE O 413.3A, Chg 1, approval of the PSVR is a prerequisite to
CD-2; therefore, the Federal Project Director concurs on the PSVR. Detailed expectations for
the preparation of an SVR for the PSDR are provided in Section 5.5 of this Standard.
5.4 Approval Bases for Preliminary Documented Safety Analyses
Title 10 CFR 830.206 requires a PDSA for new facilities and major modifications initiated after
December 11, 2000, and it defines the PDSA as follows:
Preliminary documented safety analysis means documentation prepared in connection
with the design and construction of a new DOE nuclear facility or a major modification
to a DOE nuclear facility that provides a reasonable basis for the preliminary conclusion
that the nuclear facility can be operated safely through the consideration of factors
such as:
(1) The nuclear safety design criteria to be satisfied;
(2) A safety analysis that derives aspects of design that are necessary to satisfy the
nuclear safety design criteria; and
(3) An initial listing of the safety management programs that must be developed to
address operational safety considerations.
Section 30
One purpose of the PDSA is to ensure that DOE and the contractor agree that safety has been
adequately integrated into the design before the construction phases of new hazard category 1, 2,
or 3 nuclear facilities or a major modification to such facilities. The 10 CFR 830.206 Rule
requires that DOE approve the nuclear safety design criteria used to prepare the PDSA unless the
contractor uses the design criteria in DOE O 420.1B. The PDSA is revised as needed to reflect
design changes. When a PDSA is required, it must be approved by DOE before the contractor
can procure materials or components or begin construction, unless DOE provides relief under the
provisions of the Rule9.
The PDSA evolves from the PSDR and follows the same format and content expectations as
the PSDR, as defined in Appendix I of DOE-STD-1189-2008. As stated in Section 5.1,
DOE-STD-1189-2008 anticipates that the final safety basis documents for the facility being
constructed or modified will be based on the format and content of DOE-STD-3009-94, Change
Notice No. 3. If a different methodology will be applied to these documents, the SDS should
identify that methodology and define the resulting changes to the format of the safety design
9 Guidance on this relief process is provided in DOE G 421.1-2 and the relief process is documented in
10 CFR Part 820, Subpart E.
DOE-STD-1104-2009
32
basis and safety basis documents. The format and content expectations are tailored to the design
and safety analysis maturity at the final design stage.
The PDSA must identify any changes that were made to the decisions and commitments in the
PDSR. Furthermore, while the CSDR should include a facility-level hazards analysis and the
PSDR should include a process-level hazards analysis, the PDSA is expected to address
activity-level hazards and hazard controls and evaluate facility/process hazards. This should be
confirmed during the review of the PDSA.
The PDSA is typically submitted for approval during the Final Design Phase of a project. The
review of the PDSA should confirm that the PDSA addresses the following safety design basis
information for the Final Design Phase:
1. Completion of the design safety analysis demonstrating the adequacy of the design from
the safety perspective. The PDSA does not need to show the progression of the design
that led to the final choices, only the final choices and the justification for their adequacy.
2. Demonstration that the safety design requirements specified at the end of the preliminary
design have been met.
3. Mature hazards and accident analysis consistent with DOE-STD-1189-2008, Section 4.4.
4. Description of the final design of the facility with respect to safety SSCs and safety
design features.
5. Identification of safety SSCs, SACs, and other hazard controls and clear definition of
their performance requirements.
6. Description of the safety controls selected to address the identified hazards and accidents
and justification of their adequacy, as well as how they provide defense in depth, if
warranted, based on mitigated accident frequency and on control reliability.
7. Initial list of safety management programs.
8. Description of how the selected controls adequately prevent and/or mitigate accidents and
how they provide defense in depth, if warranted, based on mitigated accident frequency
and on control reliability. 10
9. Description of how the nuclear safety design criteria of DOE O 420.1B have been
satisfied by the design.
Section 31
10. Resolution of any technical issues that required performance of research or other data
collection to finalize the design.11
10 This analysis should provide adequate understanding of the baseline mitigated consequences for the facility. The
description should define the safety control effectiveness in the context of the potential accidents and provide the
baseline safety analysis for the evaluation of changes as the facility DSA is developed for the transition to operation.
11 The technical issue(s) giving rise to the need for research or other data collection must be identified in the project
DOE-STD-1104-2009
33
11. Documentation of preliminary approaches to startup and operations management.
If format and content other than that defined in Appendix I of DOE–STD-1189-2008 are used
to develop the PDSA, the reviewer should verify that the PDSA follows the expectations
defined in the SDS. The expectations for integration of safety in design criteria defined in
DOE-STD-1189-2008 still apply. In any event, the PDSA should be developed to support the
development of a DSA that complies with the requirements of 10 CFR Part 830 to avoid
problems during the review of the DSA.
Prior to operations, the PDSA will evolve to a final DSA that reflects the facility as actually
constructed. DOE does not expect PDSAs for activities that do not involve significant
construction, such as environmental restoration activities, decontamination and decommissioning
activities, specific nuclear explosives operations, or transition surveillance and maintenance
activities.
DOE documents the review and approval of the PDSA in an SER. The format and content
expectations of the SER are described in Section 4 of this Standard. DOE reviewers for PDSAs
should be mindful that the PDSA is based on the available knowledge of equipment to be
procured after the PDSA is approved, particularly if early approval of the PDSA is requested to
facilitate early construction and procurement. In such cases there may be a need for additional
research and final data collection before the final safety analysis can be performed. Therefore,
it is recommended that the DOE reviewer for the PDSA prepare the SER for the review and
approval of the PDSA based on one of the following findings/evaluations:
• Proposed design item/system/activity is completely reviewed and found acceptable
(subject to any DOE-imposed changes); or
• Proposed design item/system/activity is based on preliminary information and is
accepted based on commitments to fully meet specific safety criteria in the final DSA
(e.g., separation, redundancy, maintainability access).
While it is most desirable for the reviewers to be able to make the first finding listed above, the
design may not be sufficiently mature to reach that conclusion. Consequently, if the second
finding is chosen, the PDSA will need to be revised and resubmitted for approval consistent with
the changes made to the design as it progresses, until such time as it is superseded by a final
DSA. In either case, significant changes to the design after PDSA approval may require that the
PDSA be revised and resubmitted for approval in accordance with DOE-STD-1189, Section 6.4.
DOE documents the review of the PDSA in an SER for approval by the SBAA. In accordance
with DOE O 413.3A, Chg 1, approval of the PDSA is a prerequisite to CD-3; therefore the
Federal Project Director concurs on the PDSA. Detailed expectations for the preparation of an
SER for the PDSA are provided in Chapter 4 of this Standard.
Section 32
Risk and Opportunity Assessment, including the plan and rationale for resolution of the issue(s). (See
DOE-STD-1189, Section 3.2, and Appendix F.) DOE reviewers must evaluate the risk and opportunity evaluation
to ensure that it is robust in identifying unknowns and potential technical issues related to the results of the hazard
analysis; specifically, the selection of hazard controls.
DOE-STD-1104-2009
34
5.5 Safety Validation Reports
5.5.1 General Discussion
The SVR format is used to document the review of the early safety design basis submittal;
namely, the CSDR and the PSDR. The SVR for the CSDR is the Conceptual SVR or CSVR; the
SVR for the PSDR is the Preliminary SVR or the PSVR. Some of the fundamental information
related to the project and documented in the SVR, such as the site and mission information, may
be used later in the SERs used to document the reviews of the PDSA, DSA, and TSRs.
However, the information provided in the early safety design basis documents reviewed in the
SVR is by definition more preliminary than the later safety basis documents. The main purpose
of the review of these early documents is to identify and raise any concerns with the design early
in the process when changes are less expensive to make and to ensure that the safety design is
sufficient to proceed to the next phase of design or construction. Ideally, the SVR will confirm
that DOE agrees with the design concepts at these early phases. The following section provides
guidance on the content and format for the SVR in reviewing the CSDR and the PSDR:
PSDR
Safety Validation
Report (SVR)
CSDR
Then document
the evaluation in
a …
If it is a…
5.5.2 Content and Format
5.5.2.1 Title Page
The title page for the SVR is similar to the title page for the SER. It provides the unique
identifier information for the CSDR or the PDSR, as applicable, and for the SVR. Minimum
information consists of the following:
(1) SVR title, revision number, and date issued;
(2) Title, revision number, and date issued for the CSDR or the PDSR as applicable;
(3) Facility name and identification number, if any;
(4) Site; and
(5) Name of the prime contractor for the facility and the contract number.
DOE-STD-1104-2009
35
5.5.2.2 Signature Page
The signature page provides the identification and signature of the SBAA and the date of the
approval of the CSDR or the PDSR. Other signatures, such as the Federal Project Director, may
be included on this page.
5.5.2.3 Executive Summary
This section presents summary information regarding the basis of the review of the CSDR or the
PDSR. The introduction or briefly summarizes the following:
(1) Facility for which review is being conducted;
(2) Facility hazard category;
(3) NPH design criteria;
(4) Facility mission and scope of operations;
(5) Issues affecting the ability for the project to proceed;
(6) Conditions for proceeding to the next stage of design;
(7) Open issues raised in the SVR;
(8) Significant risks or opportunities identified in the document reviewed; and
(9) Significant outstanding studies or reviews identified in the document reviewed and the
expected schedules.
The Executive Summary concludes with a statement on the acceptability of the CSDR or the
PDSR indicating that these documents have undergone an appropriate review and the design
information is sufficient to continue the design process; or the design information is sufficient to
proceed, but with any specified conditions; or with a statement that the project should not
proceed to the next phase until specified actions are completed.
Section 33
5.5.2.4 Review Process
This section should provide a brief description of the process used to review the CSDR or the
PDSR and provides the rationale for level of effort and detail. Typical information summarized
includes:
(1) Key participants in the review process;
(2) How the review was done (e.g., verification of information, independent calculations,
reading the report and comparing it to other documentation); and
(3) Scope of the review (e.g., selected independent calculations and design reviews
attended).
DOE-STD-1104-2009
36
Discussion should be brief, but still sufficient to provide an understanding of the thoroughness
of the review process and its basis. This section does not provide a documented record of the
details of the review (e.g., issue resolution files).
5.5.2.5 Recommendation to Proceed
This section documents the bases for review of the CSDR or the PSDR and the recommendations
to proceed with the design and construction. The statement on the adequacy is generally focused
and brief. This may entail nothing more than a paragraph stating that the CSDR or the PDSR
contains sufficient background and fundamental information to support the progress of the
design effort and contains no open issues or design flaws that would warrant holding or reversing
the design progress. This does not mean that there are no inadequacies as the design is still
immature, but rather that the reviewer believes these inadequacies will be resolved in the normal
design process and the resolutions documented in the next design document (PDSR for the
preliminary design phase and PDSA for the final design phase). If they are significant, the
inadequacies should be documented in the SVR for the follow-up in later reviews, including
methods and schedules for resolving them as soon as practicable.
5.5.2.6 Site and Facility Information
This SVR section may provide a brief synopsis of major site, facility, and operational process
features. This information is intended for the sole purpose of providing a minimal, facility-
specific context for SVR bases of approval, such that an elementary understanding of the
consideration of safety in the design process can be understood. The SVR does not, however,
attempt to repeat detailed information contained in the CSDR or PSDR. This information may
be used later to support the basis section of the SER for the PDSA or later documents. This
section of the SVR is not essential and can be omitted if it is not needed to support the document.
5.5.2.7 Hazard Analysis
For the CSVR (Conceptual Design Phase), this section must document how the hazard and
accident analyses are consistent with DOE-STD-1189-2008, Section 4.2, and follow the format
of Appendix H of that Standard or the format that is defined and approved in the SDS.
For the PSVR (Preliminary Design Phase), this section must document how the hazard and
accident analyses are consistent with DOE-STD-1189-2008, Section 4.3 and follow the format
of Appendix I of that Standard or the format that is defined and approved in the SDS.
5.5.2.8 Hazard Categorization
This section must identify the designated nuclear facility hazard category level (hazard
category 1, 2 or 3) and assess whether the designated level is appropriate. This section must be
used to address any issues related to any uncertainties in the nuclear facility hazard category
level and the potential costs and opportunities if the level is revised at a later date.
DOE-STD-1104-2009
Section 34
37
5.5.2.9 Safety Structures, Systems and Components
This section must address the identified safety SSCs in the CSDR or the PSDR, their bases and
their functions, and any issues related to the identified set.
5.5.2.10 Specific Administrative Controls
This section must address any identified SACs in the CSDR or the PSDR, their bases and their
functions, and any issues related to the identified set. It is not expected that the SACs will be
developed in detail for the PSDR and they may not be identified at all for the CSDR, as SACs
are limited to any outstanding issues.
5.5.2.11 Hazard Controls
This section must address any issues with the hazard controls identified in the CSDR or PSDR.
5.5.2.12 Design Codes and Standards
This section must provide the basis for approval of the design codes and standard(s) identified in
the CSDR or PSDR, including any exceptions to the design codes and standards listed in
DOE O 420.1B, DOE G 420.1-1, and DOE G 420.1-2. This section does not constitute an
exemption to the requirements of DOE O 420.1B, which must be requested separately if needed.
5.5.2.13 Safety Design Criteria
This section should assess any crosswalk in the CSDR or PSDR to the design criteria in DOE
O 420.1B. If the contractor used design criteria other than that documented in DOE O 420.1B,
this section must document the evaluation of the alternate criteria and assess the acceptability of
those criteria.
5.5.2.14 Conditions for Proceeding to the Next Stage of Design
This section must document any conditions for proceeding to the next stage of design. The
section must also document any recommendation that the project is not ready to proceed to the
next phase of design. This section may also indicate whether SBAA (or the SBRT) has any
fundamental problems with the developing design. Such problems should be elevated in a timely
manner. The early identification and communication of fundamental problems is one of the key
reasons for this incremental review of the design. Resolution of these issues at an early stage
will reduce the cost to correct these problems at a later date, so it is important for the reviewer to
make such issues known.
5.5.2.15 Conclusion
This section must summarize the significant issues in the review and document whether the
CSDR or the PSDR is acceptable.
DOE-STD-1104-2009
38
Acronyms
CD Critical Decision
CFR Code of Federal Regulations
CSDR Conceptual Safety Design Report
CSVR Conceptual Safety Validation Report
DBA Design Basis Accident
DOE Department of Energy
DNFSB Defense Nuclear Facilities Safety Board
DSA Documented Safety Analysis
FEM Field Element Manager
G Guide
IPT Integrated Project Team
M Manual
NNSA National Nuclear Security Administration
NPH Natural Phenomena Hazard
O Order
PDSA Preliminary Documented Safety Analysis
PSDR Preliminary Safety Design Report
PSO Program Secretarial Officer
PSVR Preliminary Safety Validation Report
SAC Specific Administrative Control
SBAA Safety Basis Approval Authority
SBRT Safety Basis Review Team
SDIT Safety Design Integration Team
SDS Safety Design Strategy
SER Safety Evaluation Report
SME Subject Matter Expert
SRP Safety Review Plan
SSC Structures, Systems, and Components
STD Standard
DOE-STD-1104-2009
39
SVR Safety Validation Report
TSR Technical Safety Requirements
USQ Unreviewed Safety Questions
DOE-STD-1104-2009
Concluding Page 1
CONCLUDING MATERIAL
Review Activities Preparing Activity
DOE HS-21
DOE Headquarters
CTA-ESE & Science
CTA-NNSA
EE
EM
FE
GC
IM
ME
NA
NE
PO
RW
SC
DOE Field
BHSO
BPA
Carlsbad FO
CTA- ESE
CTA-NNSA
Chicago Ops Office
Fernald
GFO
GJPO
Idaho SO
KAO
LSO
LASO
Mound
NNSA Service Center
NETL
NETL-PGH
Nevada SO
ORO-EM
Oak Ridge Ops Office
Pantex SO
Portsmouth/Paducah
Princeton SO
RL
Sandia SO
SR-NNSA
SRO
WAPA
WVDP
Y-12 SO
Contractors
Battelle/PNNL
WIPP
Fluor Hanford
WSRC
Bechtel Nevada
LANL
LLNL
WSI-NV
Pantex
Sandia Natl Lab
Y-12
INL-ICP-EM
INL-NE
Ames Lab
Argonne Nat Lab
BJC-OR
BNL
CH-Ames Group
Fermi Nat Lab
ORP
ORAU
PPPL
SLAC
TJNL
Project Number
SAFT-0114