DOE-STD-1083-95, Requesting and Granting Exemptions to Nuclear Safety Rules
Functional areas: Requesting Exemptions, Granting Exemptions, Rules, Nuclear Safety
DOE may grant temporary or permanent exemptions to its nuclear safety rules provided that the provisions of 10 CFR Part 820, Subpart E, "Exemption Relief," are met. The provisions of 10 CFR Part 820 state that the Secretarial Officer (as described in Section 3.5, below) shall utilize any procedures deemed necessary and appropriate to comply with the exemption responsibilities. This standard establishes an acceptable procedure to be used to request and grant exemptions to DOE nuclear safety rules in accordance with 10 CFR Part 820.
Unknown Block text
Version history and related documents
Superseded by
A newer version replaces this document.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
TS
NOT MEASUREMENT
SENSITIVE
DOE-STD-1083-95
February 1995
DOE STANDARD
REQUESTING AND GRANTING
EXEMPTIONS TO NUCLEAR SAFETY RULES
U.S. Department of Energy AREA SAFT
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
WELCOME
This Portable Document Format (PDF) file contains bookmarks, thumbnails, and hyperlinks to help you navigate through the document. All items listed on the contents page are linked to the corresponding sections. In addition, if you click on a section heading while you are reading the text, you will return to the contents page. Click on the DOE seal below to move to the contents page.
This document has been reproduced directly from the best available copy.
Available to DOE and DOE contractors from the Office of Scientific and
Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401.
Available to the public from the U.S. Department of Commerce, Technology
Administration, National Technical Information Service, Springfield, VA 22161;
(703) 487-4650.
Order No. DE95007451
DOE-STD-1083-95
iii
FOREWORD
1. This Department of Energy (DOE) standard has been prepared by the Office of
Environment, Safety and Health with the assistance of Hank George of Synergy Consultants and
Steve Hosford of Phoenix Consultants. In addition, representatives of DOE Program Offices and
Operations and Field Offices, as well as DOE Management and Operating contractors, contributed
substantially to the development of this standard. This standard provides an acceptable process
for requesting and granting exemptions to DOE nuclear safety rules. It does not provide the
authorization for granting exemptions. Authorization for granting exemptions to nuclear safety
rules is provided through Title 10 of the Code of Federal Regulations Part 820 (10 CFR Part 820),
Subpart E, "Exemption Relief."
2. Beneficial comments (recommendations, additions, and deletions) and any pertinent
data that may improve this document should be sent to the Office of Nuclear Safety Policy and
Standards (EH-60), U.S. Department of Energy, Washington, D.C. 20585, by letter or by using the
self-addressed Standardization Document Improvement Proposal (DOE F 1300.3) appearing in
Attachment 1 to this document.
3. The provisions of 10 CFR Part 820.63 allow DOE to determine the procedures to be
used to comply with the responsibilities regarding exemption relief from DOE nuclear safety rules.
The procedure in this standard defines an acceptable method for meeting these responsibilities. If
any conflicts are identified between this standard and the provisions of 10 CFR Part 820, the
provisions of 10 CFR Part 820 apply. This standard does not supersede or replace any
requirement specified in any DOE Rule, Order, Notice, Immediate Action Directive, or Manual
(requirements documents). The Office of Nuclear Safety Policy and Standards in the Office of
Environment, Safety and Health should be made aware of conflicts between this standard and
requirements documents so that any necessary modifications can be made to the standard.
DOE-STD-1083-95
iv
4. DOE technical standards such as this technical standard do not establish requirements.
However, all or part of the provisions in a technical standard can become requirements under the
following circumstances:
(1) they are explicitly stated to be requirements in a DOE requirements document; or
Section 2
(2) the organization makes a commitment to meet a standard in a contract or in a plan or
program required by a DOE requirements document.
Throughout this standard, the word "shall" is used to denote actions which must be performed if
this standard is to be met. If the provisions in this technical standard are made requirements
through one of the two ways discussed above, then the "shall" statements would become
requirements.
5. The term "Operations Office" is used throughout this document. Where it is used, the
term "Field Office" shall be substituted where appropriate.
DOE-STD-1083-95
v
TABLE OF CONTENTS
SECTIONS PAGE
1. SCOPE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2. APPLICABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3. EXEMPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3.1 Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
3.2 Request for Exemption . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3.3 Operations Office Manager Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
3.4 Evaluations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3.5 Evaluations of Exemptions from Radiological Protection Requirements . . . . . . . . . . . . 6
3.6 Approval Authorization. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3.7 Approvals and Rejections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3.8 Delegation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3.9 Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4. EXEMPTIONS TO ESTABLISH IMPLEMENTATION PLANS . . . . . . . . . . . . . . . . . . . . . . . . . . 8
5. APPEAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
5.1 Appeal by the Contractor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
5.2 Notice of Review . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
6. FINAL ORDER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
7. SUBJECT TERM (KEY WORD) LISTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
DOE-STD-1083-95
vi
INTENTIONALLY BLANK
DOE-STD-1083-95
1
1. SCOPE
DOE may grant temporary or permanent exemptions to its nuclear safety rules provided that the
provisions of 10 CFR Part 820, Subpart E, "Exemption Relief," are met. The provisions of 10 CFR
Part 820 state that the Secretarial Officer (as described in Section 3.5, below) shall utilize any
procedures deemed necessary and appropriate to comply with the exemption responsibilities. This
Section 3
standard establishes an acceptable procedure to be used to request and grant exemptions to DOE
nuclear safety rules in accordance with 10 CFR Part 820.
2. APPLICABILITY
This standard is intended for use by all DOE elements and their contractors when requesting or
granting exemptions to the following rules and their subparts:
10 CFR PART 830, "NUCLEAR SAFETY MANAGEMENT"
10 CFR PART 834, "RADIATION PROTECTION OF THE PUBLIC AND THE
ENVIRONMENT" (proposed), and
10 CFR PART 835, "OCCUPATIONAL RADIATION PROTECTION"
or any other rule in 10 CFR which DOE has adopted and determined to be related to nuclear
safety.
3. EXEMPTIONS
3.1 Criteria. 10 CFR Part 820.62 states the criteria which must be met in order for DOE to
grant an exemption to the nuclear safety rules. These criteria are repeated below.
The criteria for granting an exemption to a DOE nuclear safety requirement are determinations that
the exemption:
DOE-STD-1083-95
2
(a) Would be authorized by law;
(b) Would not present an undue risk to public health and safety, the environment,
or facility workers;
(c) Would be consistent with safe operation of a DOE nuclear facility; and
(d) Involves special circumstances, including the following:
(1) Application of the requirement in the particular circumstances
conflicts with other requirements; or
(2) Application of the requirement in the particular circumstances
would not serve or is not necessary to achieve its underlying
purpose, or would result in resource impacts which are not
justified by the safety improvements; or
(3) Application of the requirement would result in a situation
significantly different than that contemplated when the
requirement was adopted, or that is significantly different from
that encountered by others similarly situated; or
(4) The exemption would result in benefit to human health and
safety that compensates for any detriment that may result from
the grant of the exemption; or
(5) Circumstances exist which would justify temporary relief from
application of the requirement while taking good faith action to
achieve compliance; or
DOE-STD-1083-95
3
(6) There is present any other material circumstance not
considered when the requirement was adopted for which it
would be in the public interest to grant an exemption.
Exemptions shall be processed and approved in the manner discussed in this standard.
3.2 Request for Exemption. The contractor shall submit the request for an exemption with
supporting justification to the Operations Office Manager.
The request and the supporting justification shall:
(a) identify the requirements or parts of requirements from which exemptions are being
requested;
(b) identify if the exemption being requested is temporary or permanent;
(c) identify the specific activities that would be necessary to implement the requirement
for which the exemption is being requested;
(d) state and provide supporting justification that the exemption:
(1) is authorized by law,
(2) would not present an undue risk to the public health and safety, the
environment, or facility workers, and
(3) is consistent with the safe operation of a DOE nuclear facility;
(e) discuss the special circumstances which warrant the exemption (see 10 CFR Part
820.62 and above);
DOE-STD-1083-95
4
(f) provide justification that there will be no significant increase in risk to the public,
facility workers, or the environment that would result from granting the exemption
Section 4
versus implementing the requirement;
(g) discuss any proposed alternatives or mitigating actions taken to provide protection
from the hazard covered by the requirement;
(h) state what benefit is realized by not meeting the requirement from which the
exemption is requested;
(i) identify any urgent circumstances warranting the necessity for a temporary relief, as
well as when compliance will be achieved, if temporary relief is requested; and
(j) include any additional information which is not requested above, but is helpful to
understand the request and support its approval.
The exemption request shall also identify and justify the date (if any) by which the exemption
decision must be made to prevent or minimize impacts on safety, operations, or missions.
Consistent with the National Environmental Policy Act (NEPA) and the Department of Energy
NEPA Implementing Procedures (10 CFR Part 1021), if the requested exemption will have a
significant environmental impact which has not been previously considered in a NEPA analysis, the
exemption request shall address those impacts.
It is anticipated that contractors will discuss the possibility of filing an exemption request with
representatives of the Operations Office and the Program Office prior to filing the request in order
to gain a preliminary view of the likelihood of the request being granted and the necessary
supporting material. Such discussions are encouraged as a means to improve the efficient use of
resources.
3.3 Operations Office Manager Responsibilities. The Operations Office Manager shall
assess the decision date requested by the contractor and either concur with the date or provide an
DOE-STD-1083-95
5
alternate date with the basis. The Operations Office Manager shall ensure that the request for
exemption along with the Operations Office assessment of the requested decision date is
transmitted to the Secretarial Officer responsible for the activity for which the exemption is being
requested (Cognizant Secretarial Officer) within 4 days of receipt of the request. The Operations
Office Manager shall also ensure that a copy of the request is transmitted to the Assistant
Secretary of Environment, Safety and Health if the request relates to an exemption from
radiological protection provisions (10 CFR Part 834 or 835).
The Operations Office shall also provide the Program Office with its recommendation and support
on the approval of the exemption request on a schedule to be mutually agreed.
3.4 Evaluations. The approving Secretarial Officer (see section 3.5) is responsible for
evaluating the request for an exemption. Any exemption decision shall be documented in a letter
to the requesting contractor setting forth the reasons for granting or denying the requested
exemption. For any exemption which is approved, the documentation shall also include the basis
for determining that the criteria of 10 CFR Part 820, Subpart E, have been met.
Exemptions shall be evaluated in accordance the Department of Energy NEPA Implementing
Procedures (10 CFR Part 1021) whenever they will have a significant environmental impact that
has not been previously considered in a NEPA analysis.
Because contractors are required to comply with the nuclear safety rules, failure to decide
exemption requests in a timely manner could result in negative mission impacts, unnecessary
shutdowns, and/or additional costs. Therefore, the approving Secretarial Officer shall ensure that
Section 5
exemptions are evaluated and decided in a timely manner. Exemption decisions shall be issued
within 180 days except where special circumstances warrant a delay in the decision. In these
cases, the approving Secretarial Officer shall provide the reason for the delay and the projected
decision date in writing to the requesting contractor, the Operations Office Manager, and the
Cognizant Secretarial Officer within 180 days of the request for exemption.
3.5 Evaluations of Exemptions from Radiological Protection Requirements Because
exemptions from the radiological protection requirements of 10 CFR Part 834 and 835 require
DOE-STD-1083-95
6
approval by the Assistant Secretary of Environment, Safety and Health, those exemptions shall be
processed as follows:
(1) the exemption request shall be reviewed by the Program Office responsible for the
activity in coordination with the Operations Office;
(2) once the review is complete and within 90 days of the receipt of the exemption
request, the Cognizant Secretarial Officer shall forward a recommendation for
approval or disapproval, and the basis therefor, to the Assistant Secretary for
Environment, Safety and Health;
(3) the Assistant Secretary for Environment, Safety and Health may choose to accept
the evaluation of the Program Office or perform a separate evaluation;
(4) the Assistant Secretary of Environment Safety and Health shall document the
exemption decision in a letter to the requesting contractor with a copy to the
Cognizant Secretarial Officer and the Operations Office Manager.
3.6 Approval Authorization. 10 CFR Part 820.61, "Secretarial Officer," states, in part, that
the Secretarial Officer who is primarily responsible for the activity to which a nuclear safety
requirement relates may grant an exemption from that requirement, provided that the Secretarial
Officer responsible for environment, safety and health matters shall exercise this authority with
respect to provisions relating to radiological protection of workers, the public and the environment.
Consequently, exemptions to rules relating to radiological protection (10 CFR PART 835,
"OCCUPATIONAL RADIATION PROTECTION" or 10 CFR PART 834, "RADIATION
PROTECTION OF THE PUBLIC AND THE ENVIRONMENT" [proposed]) shall be approved by the
Assistant Secretary for Environment, Safety and Health. The Cognizant Secretarial Officer
responsible for the activity or facility to which the requirement is being applied shall approve
exemptions to nuclear safety rules other than those relating to radiological protection.
Activities which involve multiple Cognizant Secretarial Officers require approval (or concurrence in
the case of exemptions to radiological protection) of all of the affected Cognizant Secretarial
DOE-STD-1083-95
7
Officers. In such cases, the approvals and concurrences shall be coordinated by the Manager of
the Operations Office.
3.7 Approvals and Rejections. The approving Secretarial Officer may approve or reject a
request for an exemption or return it to the contractor with written directions on how to change it to
make it acceptable. Alternatively, the approving Secretarial Officer may modify the request in
consultation with the contractor and approve a modified exemption. In such cases, the change
shall be fully documented and justified in the approval letter. In addition, an exemption may
contain appropriate terms and conditions as discussed in 10 CFR Part 820.64, "Terms and
Section 6
Conditions." Those provisions include, but are not limited to provisions which:
(a) limit its duration;
(b) require alternative action;
(c) require partial compliance; or
(d) establish a schedule for full or partial compliance.
Exemptions which are granted for a limited duration are temporary exemptions.
In the event that DOE rejects a request for exemption, it is incumbent upon DOE to (1) ensure that
sufficient funding has been or will be provided for the contractor to perform reasonable actions to
comply with the requirements or (2) direct the contractor to cease or curtail operations so that
compliance can be achieved within current funding.
3.8 Delegation. 10 CFR Part 820.61 states that the authority to grant an exemption may
not be delegated.
3.9 Documentation. In accordance with the requirements of 10 CFR Part 820.63,
"Procedures," the approving Secretarial Officer shall submit copies of all exemption decisions to
the Office of the Docketing Clerk in the Office of Environment, Safety and Health. The Office of the
DOE-STD-1083-95
8
Docketing Clerk shall maintain a comprehensive docket for exemption decisions. The approving
Secretarial Officer shall also ensure that the requesting organization receives a copy of the
decision within 48 hours after filing the decision.
4. EXEMPTIONS TO ESTABLISH IMPLEMENTATION PLANS
The provisions of 10 CFR Part 820.65 are as follows:
With respect to a DOE Nuclear Safety Requirement for which there is no regulatory
provision for an implementation plan or schedule, an exemption may be granted to
establish an implementation plan which reasonably demonstrates that full
compliance with the requirement will be achieved within two years of the effective
date of the requirement without a determination of special circumstances under
Paragraph 820.62(d).
The majority of nuclear safety rules (final and proposed) specify that compliance is to be achieved
in accordance with a schedule either specified in the rule or in a plan or program required by the
rule (referred to as "implementation plans" in 10 CFR Part 820.65). Both of these provisions
permit "phased-in" implementation of the requirements. However, a few of the nuclear safety rules
contain requirements which are to be fully implemented by the effective date of the rule. DOE
believes these requirements are already substantially implemented through contractual
requirements. It is recognized that a few contractors may not be in full compliance with these rules
when they are issued and may need up to two years to achieve full compliance. Consequently, for
those nuclear safety rules which do not contain a provision for phased-in compliance through
either a specified schedule or an implementation plan, 10 CFR Part 820.65 permits DOE to
approve an exemption to establish a schedule for achieving compliance for up to two years from
the effective date of the rule without a determination of special circumstance (see 10 CFR Part
820.62.d for special circumstances).
For any exemption granted under the provisions of 10 CFR Part 820.65, the contractor must
demonstrate and DOE must agree that: (1) the exemption is authorized by law, (2) there will be no
undue risk to human health or safety or the environment as a result of granting the exemption, and
(3) the exemption would be consistent with the safe operation of the facility.
DOE-STD-1083-95
9
10 CFR Part 820.65 does not apply to nuclear safety rules which contain provisions for phased-in
Section 7
compliance through either a future schedule or an implementation plan. The implementation plan
referred to in the rule includes plans and programs such as the Radiation Protection Program
specified in 10 CFR Part 835 which will contain schedules for achieving compliance with the rule.
Consequently, the provisions of 10 CFR Part 820.65 will not apply to the majority of the rules.
Paragraph 10 CFR Part 820.65 does not address the inclusion of exemption requests in
implementation plans. That issue is discussed in DOE Standard 1082-94, "Preparation, Review,
and Approval of Implementation Plans."
5. APPEAL
5.1 Appeal by the Contractor. 10 CFR Part 820.66, "Appeal," specifies that within fifteen
(15) working days of filing an exemption decision by the Secretarial Officer, the person requesting
the exemption (contractor) may file a Request to Review with the Secretary, or the Secretary may
file a Notice of Review. The Request to Review shall specifically state why the exemption
determination is claimed to be erroneous, the grounds of the request, and the relief requested.
5.2 Notice of Review. If the contractor submits a Request to Review to the Secretary, the
Secretary will determine if a review of the decision is to be conducted. If a review is to be
performed, the Secretary will issue a Notice of Review. The Secretary may accept the decision of
the Secretarial Officer who approved or rejected the exemption request, change the decision, or
modify the decision by issuing a Final Order.
DOE-STD-1083-95
10
6. FINAL ORDER
10 CFR Part 820.67, "Final Order," states if no filing is made under Section 820.66 (i.e, a Request
to Review), an exemption decision becomes a Final Order fifteen (15) days after it is filed by a
Secretarial Officer with the Office of the Docketing Clerk. If a Request to Review is filed within
fifteen days of filing the exemption decision, then the exemption decision would become a Final
Order 45 days after it is filed by a Secretarial Officer, unless the Secretary stays the effective date
or issues a Final Order that modifies the decision.
7. SUBJECT TERM (KEY WORD) LISTING
The following list of subject terms (key words) is provided so that this document may be found
during retrieval searches.
appeal
compliance
enforcement
exemption
final order
implementation plan
Notice of Review
nuclear safety requirement
regulation
relief
rule
special circumstances
temporary exemption
DOE-STD-1083-95
CONCLUDING MATERIAL
Review Activities:
DOE HQ FIELD OFFICES AREA OFFICES
DP AL Amarillo
EH CH Brookhaven
EM ETEC Dayton
ER FERNALD Golden
FE ID Kansas City
HR NV
NE Oakland LABORATORIES
NN OR
PO RL ANL
PR RF BNL
RW SR INEL
Power Authorities LBL
BPA METC
WAPA PNL
LANL
LLNL
PPNL
Sandia
SSCL
SLAC
Preparing Activity:
DOE EH-62
Project Number:
SAFT 0016
FOREWORD
TABLE OF CONTENTS
1. SCOPE
2. APPLICABILITY
3. EXEMPTIONS
3.1 Criteria.
3.2 Request for Exemption.
3.3 Operations Office Manager Responsibilities.
3.4 Evaluations.
3.5 Evaluations of Exemptions from Radiological Protection Requirements
3.6 Approval Authorization.
3.7 Approvals and Rejections.
3.8 Delegation.
3.9 Documentation.
4. EXEMPTIONS TO ESTABLISH IMPLEMENTATION PLANS
5. APPEAL
5.1 Appeal by the Contractor.
5.2 Notice of Review.
6. FINAL ORDER
7. SUBJECT TERM (KEY WORD) LISTING
CONCLUDING MATERIAL