Section 1
DOE-STD-1064-94
June 1994
DOE STANDARD
GUIDELINE TO GOOD PRACTICES FOR
SEASONAL FACILITY PRESERVATION AT
DOE NUCLEAR FACILITIES
U.S. Department of Energy
Washington, D.C. 20585
AREA MNTY
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
WELCOME
This Portable Document Format (PDF) file contains bookmarks, thumbnails, and hyperlinks to help you navigate through the document. All items listed in the Contents are linked to the corresponding sections. In addition, if you click on a section heading while you are reading the text, you will return to the Contents. Click on the DOE seal below to move to the Contents page.
This document has been reproduced directly from the best available copy.
Available to DOE and DOE contractors from the Office of Scientific and
Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (615) 576-8401.
Available to the public from the U.S. Department of Commerce, Technology
Administration, National Technical Information Service, Springfield VA 22161;
(703) 487-4650.
Order No. DE94014954
DOE-STD-1064-94
FOREWORD
The Guideline to Good Practices for Seasonal Facility Preservation at DOE
Nuclear Facilities provides contractor maintenance organizations with information
which may be used for the development and implementation of a seasonal facility
preservation plan developed for maintenance organizations at DOE (Department of
Energy) nuclear facilities. This document is intended to be an example guideline for
the implementation of DOE Order 4330.4A, Maintenance Management Program,
Chapter II, Element 19.1, Seasonal Facility Preservation Requirements. DOE
contractors should not feel obligated to adopt all parts of this guide. Rather, they
should use the information contained herein as a guide for establishing processes
applicable to their facility.
i i i
DOE-STD-1064-94
DOE-STD-1064-94
FOREWORD . . . . . . . .
1. INTRODUCTION
1.1 Purpose . . .
1.2 Background .
1.3 Application .
2. DEFINITIONS . .
2.1 Acronyms . .
3.
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
. . . . . . . . .
2.2 Hurricane Watch: . . . . .
2.3 Hurricane Warning: . . . .
2.4 Tornado Watch: . . . . . .
2.5 Tornado Warning: . . . . .
CONTENTS
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
SEASONAL FACILITY PRESERVATION . . . .
3.1
3.2
3.3
3.4
Discussion . . . . . . . . . . . . . . . . . . . . . . . . .
Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Responsibilities . . . . . . . . . . . . . . . . . . . . .
3.3.1 Owner/Operators . . . . . . . . . . . . .
3.3.2 Building Managers . . . . . . . . . . . .
3.3.3 Maintenance Supervisors . . . . . . . .
Seasonal Facility Preservation Plan . . . . . .
3.4.1
3.4.2
3.4.3
3.4.4
3.4.5
APPENDIX A
APPENDIX B
Cold Weather Preparation . . . . . . .
Flash Floods . . . . . . . . . . . . . . . . .
Hurricane Watches and Warnings .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
Section 2
. . . . . . .
. . . . . . .
. . . . . . .
. . . . . . .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
Tornado Watches and Warnings (High Winds)
Extreme Hot/Dry Weather . . . . . . . . . . . . . .
EXAMPLE COLD WEATHER CHECKLIST
SEASONAL FACILITY PRESERVATION
SAMPLE LESSON PLAN . . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . .
. . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . .
iii
1
1
1
1
2
2
2
2
2
2
3
3
3
4
4
5
6
7
8
10
10
10
11
. . . . . . . . . . . . .
. . . . . . . . . . . . . .
A - 1
B - 1
v
DOE-STD-1064-94
v i
DOE-STD-1064-94
1. INTRODUCTION
1.1 Purpose
This guide is intended to assist facility maintenance organizations in the review
of existing methods and in the development of new methods for establishing a
maintenance Seasonal Facility Preservation program. It is expected that each DOE
facility may use approaches or methods different from those defined in this guide.
The specific guidelines that follow reflect generally accepted industry practices.
Therefore, deviation from any particular guideline would not, in itself, indicate a
problem. If substantive differences exist between the intent of this guideline and
actual practice, management should evaluate current practice to determine the need
to include/exclude proposed features. A change in maintenance practice would be
appropriate if a performance weakness were determined to exist. The development,
documentation, and implementation of other features that further enhance these
guidelines for specific applications are encouraged.
Additional information pertinent to the implementation of this guideline may
be found in DOE-STD-1072-93, “Guidelines to Good Practices for Facility Condition
Inspections at DOE Nuclear Facilities. ”
Appendix B (Sample Lesson Plan) is provided for use by facility trainers who
provide training regarding this element of DOE Order 4330.4A, “Maintenance
Management Program.”
1.2 Background
The information in this guide was developed from commercial and DOE
sources. Each facility should select any details applicable, add any additional
knowledge or experience that is applicable, and then develop and implement facility-
specific methods for establishing applicable maintenance processes. Facilities which
use existing documented methods should review this guide to identify any details
which may enhance their existing process.
1.3 Application
The content of this guide is generally applicable to all DOE nuclear facilities.
Portions of the methods outlined may not be applicable to all facilities, because
maintenance organizations, disciplines, titles, and responsibilities may vary among
DOE nuclear facilities. Facility maintenance personnel should (1) verify the
adequacy of or (2) improve existing methods by adapting this guide to their specific
facility and individual maintenance disciplines.
Section 3
1
2 . 1
2 . 2
2 . 3
2 . 4
2 . 5
DOE-STD-1064-94
2. DEFINITIONS
Acronyms
DOE: Department of Energy
MJR’s: Maintenance Job Requests
PM: Preventive Maintenance
Hurricane Watch: Alerts an area of a possible hurricane within the next
several days. It is observed and detected by abnormal wind
low pressure areas moving toward a fixed area.
Hurricane Warning: Issued when winds are expected to be
mph within the next 24 hours. There may be heavy rain or
combination of these.
disturbances and/or
greater than 74
high water, or a
Tornado Watch: Meteorological conditions are favorable for the formation of
a tornado. These watches are usually for a period of time not exceeding 4
hours.
Tornado Warning: Issued when a tornado has been sighted in the area.
2
DOE-STD-1064-94
3. SEASONAL FACILITY PRESERVATION
3.1 Discussion
The fundamental objective of an effective seasonal facility preservation plan should
be to ensure continued safe facility operations. This objective requires that appropriate
controls be established for inspections and self-assessments of seasonal facility
preservation plans to ensure correction of deficiencies or preparation of other
compensatory measures to protect DOE nuclear facilities.
The plan should clearly define responsibilities, accountabilities, and interfaces for
each functional organization supporting each step in the plan. A seasonal facility
preservation plan, as a minimum, should include the following elements:
● Cold weather preparation including freezing conditions, hail, snow, and ice
● Flash floods
● Hurricane watches and warnings
● Tornado watches and warnings (High Winds)
● Extreme hot/dry weather
NOTE: Plant status at the time a severe weather condition exist should dictate actions
required to place the plant in a state of readiness for seasonal facility
preservation.
Building Managers should consider seasonal related problems as priority and take
immediate corrective action to minimize damage.
Appendix A may be used as an example checklist for Cold Weather conditions.
3.2 Scope
This guideline applies to seasonal facility preservation plan activities involving
maintenance organizations throughout.
3
DOE-STD-1064-94
3.3 Responsibilities
3.3.1 Owner/Operators are responsible for:
3.3.1.1
3.3.1.2
3.3.1.3
3.3.1.4
3.3.1.5
3.3.1.6
3.3.1.7
3.3.1.8
3.3.1.9
the regular evaluation of seasonal facility preservation plan activities
involving maintenance organizations to determine and implement
enhancement/improvement opportunities in a timely manner;
making decisions to temporarily curtail operations (safe shutdown) of a
facility identified as having a high probability for sustaining damage
when subjected to unusually severe weather conditions;
identifying personnel to be evacuated during severe weather conditions
and ensuring any such evacuation is carried out in accordance with
approved emergency procedures;
ensuring that adequate seasonal weather protection plans are validated,
verified, approved, and implemented.
assuring predetermined operational changes are executed to protect
equipment and facilities assigned as their area of responsibility
involving modification of equipment set-ups or shut down/start-up of
equipment as required to ensure protection from potential damage and
to minimize loads on power distribution lines;
operation of all primary heating, ventilating and air conditioning
building equipment which may affect ambient temperatures in any
facility susceptible to seasonal damage. Secondary equipment such as
unit heaters and desk heaters may be operated by others.
Section 4
ensuring preventive maintenance (PM) is current for emergency diesel
generators, uninterruptible power supplies, and plant battery banks to
ensure operability when severe weather conditions are expected;
inspecting for damage and initiating repairs during and/or
severe weather conditions;
secure operations for safe shutdown of critical systems.
following
4
DOE-STD-1064-94
3.3.2 Building Managers are responsible for:
3.3.2.1
3.3.2.2
3.3.2.3
3.3.2.4
3.3.2.5
3.3.2.6
3.3.2.7
3.3.2.8
examining all facilities and equipment assigned to their area of
responsibility on a seasonal basis. This may be included in the Facility
Condition Inspection process in accordance with DOE-STD-1072-93,
“Guideline to Good Practices for Facility Condition Inspections at DOE
Nuclear Facilities.”
identifying facilities having a high probability for sustaining damage
when subjected to unusually severe weather conditions;
monitoring their assigned facilities for protection and assuring any
necessary on-site actions are taken and/or correct personnel are
notified to protect equipment and facilities assigned to their area of
responsibility;
monitoring conditions in climate sensitive areas during normal daytime
operations;
identifying deficiencies requiring repair or modification in order to
mitigate/prevent problems;
verifying routine actions are taken annually prior to seasonal hazards to
provide protection for their assigned areas of responsibility;
initiating necessary damage inspections and applicable repairs following
severe weather conditions;
identifying and submitting corrective actions on deficiencies requiring
repair or modification to systems/equipment in order to prevent
“seasonal hazard” problems and to ensure that, in extreme (high/low)
temperature conditions, proper operation of equipment is maintained
within their assigned areas of responsibility.
5
DOE-STD-1064-94
3.3.3 Maintenance Supervisors are responsible for:
3.3.3.1
3.3.3.2
3.3.3.3
3.3.3.4
3.3.3.5
3.3.3.6
3.3.3.7
scheduling craft activities to correct previously identified deficiencies
that may lead to seasonal hazard problems, which prevent proper
system/equipment operation in extreme (high/low) temperature
conditions;
maintaining a “crew call-in list” for maintenance crews to respond to
specific seasonal hazard related problems;
for accomplishing scheduled Preventive Maintenance (PM) job
requests, repairs and/or modifications to correct deficiencies that may
lead to seasonal hazard problems, which prevent proper
system/equipment operation in extreme (high/low) temperature
conditions;
inspecting the on-going job sites for loose materials and debris which
may become missiles in a strong wind and secure them to the
maximum extent possible;
ensuring freestanding materials or objects in staging/laydown areas have
been tied and anchored or moved inside buildings to the maximum
extent practical;
ensuring adequate foul weather gear, tools, and equipment are
available for use in the applicable seasonal hazard;
regularly evaluating emergency diesel generators, uninterruptable
power supplies, and plant battery banks to ensure operability when
severe weather conditions are expected.
6
DOE-STD-1064-94
3.4 Seasonal Facility Preservation Plan
Section 5
Plans should be developed, implemented and documented to prevent equipment and
building damage at DOE facilities, due to the seasonal weather conditions listed in
Section 3.1. A task team should be established to provide for the development and
implementation of policies, goals, and objectives for severe weather protection plans.
Buildings and equipment with the potential for damage due to seasonal weather should
be identified and a risk assessment based on the graded approach should be conducted.
The plan should include contingencies for the critical facilities or equipment which are
likely to sustain damage when seasonal weather conditions are expected. The plan
should ensure that, in all cases, the preparatory actions and requirements imposed to
provide seasonal weather protection, particularly those taken to restrict safety system
functions, are reviewed by facility operations and safety personnel prior to
implementation to ensure that the facility is maintained in a safe condition to protect the
health
As
●
●
●
●
●
●
●
and safety of the public.
a minimum, this plan should include:
A checklist for Building Managers to ensure the implementation of actions prior
to seasonal weather to provide protection for their assigned areas of
responsibility.
Identification of items requiring major modifications or redesign to
mitigate/prevent equipment damage. For items which may not be changed prior
to the upcoming seasonal weather condition, interim actions should be taken to
prevent equipment damage.
Specific responsibilities for the operations staff and Building Managers for
monitoring the temperatures in facilities’ on and off shifts, including weekends
and holidays.
Alerting of personnel and providing increased surveillance in periods of extreme,
unusual, or extended seasonal weather conditions. Maintenance personnel should
be on call to respond to such events.
Adequate foul weather gear, tools, and equipment are available for use for
emergency and operations personnel.
The recalibration of exposed instrument loops when instrument lines or
transmitters are subjected to severe seasonal weather conditions.
A review of the status of safety related equipment during seasonal weather
conditions and ensure inoperable equipment is available for return to service, if
possible.
7
●
●
●
●
●
●
●
●
●
●
3.4.1
DOE-STD-1064-94
A review of surveillance schedules and considerations given to performing
surveillances early if possible or delaying them until after the seasonal weather
condition passes if permitted to minimize equipment out of service.
Inspection of outside areas for loose materials and debris, which may become
missiles in a strong wind, and securing to the maximum extent possible.
The availability of adequate lumber and other supplies for wind protection or
damage control.
Verification of operability
Identification of plant veh
and availability of communications equipment.
cles needed for emergency use and ensure vehicles
have a full tank of fuel and are in good repair.
The availability of equipment for making emergency repairs.
Ensuring materials susceptible to severe weather damage are properly stored and
protected.
Ensuring the protection of accumulation site waste containers and bulk chemicals
from potential damage as a result of seasonal hazards.
Ensuring all building doors and windows can be properly secured.
Section 6
Provisions are made to remove seasonal weather protection features after the
weather season is over with appropriate verification and documentation of return
to normal service through the facilities configuration management system. (An
example related to cold weather is given in Appendix A.)
Cold Weather Preparation
In addition to the list of items in Section 3.4 above, the following should be
included to minimize equipment and building damage due to cold weather
conditions, temperatures < than 35° F, including freeze protection, hail, snow,
and ice.
● Identification of areas where portable heating may be required and attaining
portable heating equipment, approved by the fire protection engineering
group.
● Monitoring the conditions surrounding fire protection sprinkler systems to
ensure a temperature of above 40° F is maintained.
8
DOE-STD-1064-94
Ensuring air intakes, windows, doors and any other access which may result in
abnormal inflow of cold air into an area susceptible to freeze damage are
secured.
Heating systems are cleaned, serviced, and functionally tested.
Antifreeze used in cooling systems is checked and replaced as necessary.
Heating system power and temperature controls are protected against
inadvertent deactivation.
Systems requiring or deserving special protection due to hazards or costs
associated with freeze damage have temperature alarms and/or automatic
backup heat sources.
Facility personnel should inspect, test, and stage portable auxiliary heaters and
have identified sources to obtain more, if needed. Personnel should be trained
in the safe use of portable heaters.
The main water supply cutoffs for each critical facility is
readily accessible to emergency personnel responding
incident.
Outside storage pads and unheated storage areas are
there are no materials susceptible to freeze damage.
to
identified, tested, and
a freeze/thaw
inspected to ensure that
Implementation of snow and ice removal activities.
Employees are aware of the need to identify and report any suspected
problem with heating or other cold weather protection equipment (i.e., non-
insulated water or process pipes, steam trace heaters valved off, electrical
trace heaters turned off or burned out, broken windows, holes in exterior
walls, etc.).
The removal of freeze protection equipment from service during the seasonal
freeze period should be carefully evaluated.
Wet-pipe sprinkler systems are reviewed for areas susceptible to freezing, and
appropriate actions planned, such as provisions for auxiliary heat; draining and
posting a fire watch; etc.
The availability and use of salt, sand, and “ice-chaser” as needed.
Outside areas are inspected to ensure that gutters and downspouts are
provided where there is a potential for ice buildup that may restrict egress.
9
DOE-STD-1064-94
3.4.2 Flash Floods
In addition to the list of items in Section 3.4 above, the following should be
included to minimize equipment and building damage due to flash flooding.
● Doors and windows closed,
● The use of tarp over vulnerable items,
● Ensuring storm drains are kept clear of debris,
● The use of sandbags and dikes,
● Raising water vulnerable items above the expected water line, and
● Ensure all vehicles are parked/moved to high ground as necessary.
3.4.3 Hurricane Watches and Warnings
In addition to the list of items in Section 3.4 above, and Section 3.4.2, Flash
Floods, the items listed below should be included to minimize equipment and
building damage due to a hurricane.
Section 7
● Ensure windows have been boarded up or taped as necessary during a
hurricane watch;
● Safe shutdown of vulnerable equipment;
● Emergency evacuation policies and routes.
3.4.4 Tornado Watches and Warnings (High Winds)
In addition to the list of items in Section 3.4 above and Section 3.4.2, Flash
Floods, the following should be included to minimize equipment and building
damage due to a tornado.
● Safe shutdown of vulnerable equipment; and
● Emergency evacuation policies and routes.
1 0
DOE-STD-1064-94
3.4.5 Extreme Hot/Dry Weather
In addition to the guidelines listed in Section 3.4 above, the following should be
included to minimize equipment and building damage due to extreme hot/dry
weather.
● Safe shutdown of vulnerable equipment;
● Restrict operations which involve heat (welding, burning, sparks, etc.);
● Restrict fire hazards (smoking, etc.);
● Ensure an ample supply of portable fire extinguishers are available;
● Ensure the fire protection personnel are alerted; and
● Verify all exits are kept clear.
11
DOE-STD-1064-94
1 2
DOE-STD-1064-94
APPENDIX A
EXAMPLE COLD WEATHER CHECKLIST
A - 1
DOE-STD-1064-94
Building
Managers
Maintenance
Department
Facility
Manager
Building
Managers
Maintenance
Department
APPENDIX A
COLD WEATHER CHECKLIST
SEPTEMBER
Increase surveillance of assigned facilities to identify areas having a high
probability for sustaining freeze damage. Generate Standing Work
Orders or MJR’s for corrective action.
Increase surveillance of facilities to identify areas having a high
probability for sustaining weather related damage. Generate MJR’s for
corrective action.
Check status of winter and foul weather gear, tools, and equipment for
personnel required to work outdoors.
Plan and schedule final outages on main steam system(s).
Coordinate semi-annual boiler inspections.
Plan and schedule seasonal facility preservation MJR’s and PM job
request.
OCTOBER
Annual reminder to the plant of seasonal facility preservation
precautions.
Coordinate with Maintenance Managers to assure timely scheduling and
completion of seasonal facility preservation related MJR’s.
Complete semi-annual boiler inspections.
Complete maintenance activities requiring outages of main steam
system.
Request extended work week for the shops involved in seasonal facility
preservation maintenance activities, if required.
Ensure a “crew call-in list” is available for maintenance crews to respond
to cold weather related problems.
Complete execution of cold weather related MJR’s and PM job request.
A - 2
DOE-STD-1064-94
Building
Managers
Maintenance
Department
Building
Managers
Maintenance
Department
APPENDIX A
COLD WEATHER CHECKLIST
MARCH
Increase surveillance of assigned facilities in anticipation of the Spring
season. Generate Standing Work Orders and/or MJR’s for corrective
action.
Plan, schedule, and begin execution of Standing Work Orders and/or
MJR’s relating to the Spring season.
Schedule PM job request related to the Spring season.
APRIL
Coordinate with the Maintenance Department to schedule and execute
freeze protection/prevention Standing Work Orders and/or MJR’s which
require close down or turn around work during the warm weather
season.
Plan, schedule, and execute freeze protection/prevention Standing Work
Orders and/or MJR’s which require close down or turn around work
during the warm weather season.
Continue execution of MJR’s and PM relating to Spring/Summer
Operations.
Section 8
A - 3
DOE-STD-1064-94
A - 4
DOE-STD-1064-94
APPENDIX B
SEASONAL FACILITY PRESERVATION
SAMPLE LESSON PLAN
APPENDIX B
B - 1
DOE-STD-1064-94
SEASONAL FACILITY PRESERVATION
SAMPLE LESSON PLAN
LESSON PLAN
1. The instructor should be familiar with the following background information:
a. The primary purpose of seasonal facility preservation should be to ensure safe,
reliable plant operations by minimizing damage sustained due to unusually
severe weather conditions.
b. One successful approach to seasonal facility preservation is to establish a plan
which includes periodic inspections, corrective actions for identified
deficiencies, and follow-ups to ensure deficiency correction.
c. The involvement of facility maintenance personnel in periodic inspections and
walk-downs of plant equipment and areas should help ensure a well-maintained
seasonal facility preservation plan.
2. To teach this lesson, the following training housekeeping items are required:
a. Location for the training,
b. Approximately 30 minute time period for the training,
c. Notification of selected employees, and
d. A copy of the seasonal facility preservation plan.
3. This lesson has the following trainee enabling objective:
Explain the purpose of a seasonal facility preservation plan.
B - 2
DOE-STD-1064-94
4. A facility-wide seasonal facility preservation plan is an effective means to identify and
correct deficiencies related to severe weather conditions.
a. Considerations for this type of plan include the following:
●
●
●
●
●
●
●
all personnel should have a clear understanding of the plan,
all owner/operators and supervisors should participate in the seasonal
facility preservation inspections,
inspection areas should be assigned in conjunction with facility condition
inspection plans, to cover the entire facility, including out-of-the-way
locations,
identified deficiencies should be corrected in a timely manner,
unauthorized modifications do not exist,
identification and monitoring of facilities having a high probability for
sustaining damage when subjected to unusually severe weather
conditions, and
inspection of the job sites for loose materials and debris which may
become missiles in a strong wind and removal of them to the maximum
extent possible.
b. In addition to an inspection, all site personnel should be responsible for the
prompt identification, correction, or documentation of seasonal facility
preservation deficiencies during the normal course of their duties.
5. Discuss with the trainees the facility’s seasonal facility preservation plan.
B - 3
DOE-STD-1064-94
Review Activity:
DOE
FM
DP
EH
EM
ER
NE
NS
RW
Area Offices
Amarillo
Brookhaven
Fernald
Kansas City
Kirtlant
Princeton
Facilities
ANL
KC AlliedSignal
NBL
LBL
LANL
LLNL
ORAU
PANTEX M&H
PNL
PPPL
RF-EG&G
SNL
NV REECo.
NV EG&G
OR OSTI
WHC
ID-EG&G
RF
SLAC
WSRC
CONCLUDING MATERIAL
Field Offices
AL
CH
ID
NV
OR
RL
SR
OAK
RF
Preparing Activity:
DOE-EH-63
Project Number:
MNTY-0018
FOREWORD
CONTENTS
1. INTRODUCTION
1.1 Purpose
1.2 Background
1.3 Application
2. DEFINITIONS
2 .1 Acronyms
2 .2 Hurricane Watch
2.3 Hurricane Warning
2.4 Tornado Watch
2.5 Tornado Warning
3. SEASONAL FACILITY PRESERVATION
3.1 Discussion
3.2 Scope
3.3 Responsibilities
3.3.1 Owner/Operators
3.3.2 Building Managers
3.3.3 Maintenance Supervisors
3.4 Seasonal Facility Preservation Plan
3.4.1 Cold Weather Preparation
3.4.2 Flash Floods
3.4.3 Hurricane Watches and Warnings
3.4.4 Tornado Watches and Warnings (High Winds)
3.4.5 Extreme Hot/Dry Weather
APPENDIX A