DOE-STD-1063-2021, DOE Standard Facility Representatives (Invoked)
Defines the duties, responsibilities and qualifications for U.S. Department of Energy (DOE) Facility Representatives (FRs), based on facility hazard classification; risks to workers, the public, and the environment; and the operational activity level. Provides the guidance necessary to ensure that DOE’s hazardous nuclear and non-nuclear facilities have sufficient staffing of technically qualified FRs to provide day-to-day oversight of contractor operations.
Related To:
Version history and related documents
Supersedes
Earlier documents this one replaced.
- DOE-STD-1063-2017Facility Representatives (Dec 10, 2021)
Related documents
- DOE-STD-1027-2018 Chg Notice 1Hazard Categorization of DOE Nuclear Facilities
- DOE-STD-1146-2017General Technical Base Qualification Standard
- DOE-STD-1151-2019Facility Representative Functional Area Qualification Standard
- DOE-STD-3009-2014Preparation of Nonreactor Nuclear Facility Documented Safety Analysis (Invoked)
- DOE-STD-1063 FAQ Staffing Analysis
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
NOT MEASUREMENT
SENSITIVE
DOE-STD-1063-2021
December 2021
Superseding
DOE-STD-1063-2017
DOE STANDARD
FACILITY REPRESENTATIVES
U.S. Department of Energy
Washington, D.C. 20585
DOE-STD-1063-2021
Available on the Department of Energy
Technical Standards Program Web site at
https://www.standards.doe.gov/
DOE-STD-1063-2021
i
FOREWORD
1. This Department of Energy (DOE) standard is approved for use by all DOE/National
Nuclear Security Administration (NNSA) Components.
2. The revision to this DOE standard was developed by a working group consisting of
headquarters and field participants. Beneficial comments (recommendations, additions,
and deletions), as well as any pertinent data that may be of use in improving this
document, should be emailed to nuclearsafety@hq.doe.gov or sent to:
Office of Nuclear Safety (AU-30)
Office of Environment, Health, Safety and Security
U.S. Department of Energy
19901 Germantown Road
Germantown, MD 20874
Additional information on the DOE Facility Representative Program is available on the
DOE Facility Representative Powerpedia page at:
https://powerpedia.energy.gov/wiki/Facility_Representative_Program
3. DOE technical standards, such as this standard, do not establish requirements.
However, all or part of the provisions in a DOE standard can become requirements if
they are explicitly stated to be requirements in a DOE requirements document, or if the
organization makes a commitment to meet a standard in a contract or in an
implementation plan or program plan required by a DOE requirements document.
4. Throughout this standard, the word "shall" is used to denote actions that must be
performed if the objectives of this standard are to be met. If the provisions in this
standard are made requirements through one of the two ways discussed above, then the
"shall" statements would become requirements. It is not appropriate to consider that any
"should" statements would automatically be converted to "shall" statements, as this
action would violate the consensus process used to approve this standard.
5. Throughout this standard, any DOE Directive or Standard referenced refers to the latest
version of that DOE Directive or Standard.
mailto:nuclearsafety@hq.doe.gov
https://powerpedia.energy.gov/wiki/Facility_Representative_Program
DOE-STD-1063-2021
ii
DOE-STD-1063-2021
iii
CONTENTS
PAGE
1.0 SCOPE ........................................................................................................................... 1
1.1 Scope ....................................................................................................................... 1
1.2 Purpose of Program ............................................................................................... 1
1.3 Purpose of Standard .............................................................................................. 1
1.4 Applicability ............................................................................................................ 1
2.0 REFERENCES ............................................................................................................... 3
2.1 Government and Industry Documents. ................................................................. 3
2.1.1 DOE Directives [Policies (P), Orders (O), Guides (G)]. ..................................... 3
2.1.2 DOE Standards. ............................................................................................... 3
2.1.3 Other. ............................................................................................................... 3
Section 2
3.0 DEFINITIONS ................................................................................................................. 4
4.0 DUTIES, RESPONSIBILITIES, AND AUTHORITIES OF FACILITY
REPRESENTATIVES AND OTHER KEY PERSONNEL................................................ 9
4.1 Duties, Responsibilities, and Authorities of Facility Representatives ................ 9
4.1.1 Operational Awareness .................................................................................... 9
4.1.2 Communication ................................................................................................ 9
4.1.3 Availability ........................................................................................................ 9
4.1.4 Independence .................................................................................................. 9
4.1.5 Scope of Reviews ............................................................................................ 9
4.1.6 Oversight Routine ...........................................................................................10
4.1.7 Stop Work Authority ........................................................................................10
4.1.8 Relationship of Facility Representative with DOE Managers ...........................10
4.1.9 Relationship of Facility Representative with Other DOE Oversight
Personnel ........................................................................................................10
4.1.10 Relationship of Facility Representative with Operating Contractor ..................10
4.2. Duties, Responsibilities, and Authorities of Other Key Personnel ....................12
4.2.1 Deputy Secretary. ...........................................................................................12
4.2.2 Associate Under Secretary for Environment, Health, Safety and Security. ......12
4.2.3 Cognizant Secretarial Officers. ........................................................................13
4.2.4 Field Element Managers. ................................................................................13
4.2.5 Facility Representative Program Sponsors. ....................................................14
4.2.6 Office of Enterprise Assessments. ..................................................................14
5. FACILITY REPRESENTATIVE PROGRAM REQUIREMENTS ....................................15
5.1 Facility Coverage and Staffing ..............................................................................15
5.2 Facility Assessment Plans and Reports ..............................................................16
5.3 Unencumbered Access .........................................................................................16
DOE-STD-1063-2021
iv
Section 3
5.4 Training and Qualification .....................................................................................16
5.4.1 Formal Training ...............................................................................................17
5.4.2 Continued Training ..........................................................................................17
5.4.3 Qualification Standard .....................................................................................17
5.4.4 Final Qualification Activities .............................................................................17
5.4.5 Competency Equivalencies .............................................................................17
5.4.6 Core Qualification ...........................................................................................17
5.4.7 Interim Qualification ........................................................................................17
5.4.8 Full Qualification .............................................................................................18
5.4.9 Qualification on Additional Facilities after Full Qualification .............................18
5.4.10 Proficiency ......................................................................................................18
5.4.11 Maintaining Qualification .................................................................................18
5.4.12 Examinations ..................................................................................................19
5.5. Recruitment, Selection, Retention, and Advancement Considerations .............22
5.5.1 Retention and Advancement ...........................................................................22
5.6 Facility Representative Program Performance Assessment and Feedback .....23
5.6.1 Performance Indicators ...................................................................................23
5.6.2 Field Element Self-Assessments .....................................................................23
5.6.3 Nuclear and Facility Safety Programs Workshop ............................................23
Appendix A. Facility Representative DOE-Wide Performance Indicators .................... A-1
Appendix B. Facility Representative Program Assessment Guide ............................... B-1
Appendix C. Process to Determine Facility Representative Staffing ............................ C-1
Appendix D. Evaluated Facility Walkthrough ................................................................. D-1
TABLES
Table 1: Facility Representative Qualification ...........................................................................21
Table A-1: Example Report – Red Run Site ........................................................................... A-2
Table A-2: Quarterly Reporting Requirements – How to Determine ....................................... A-3
Table A-3: Additional Guidance on Computing Facility Representative Percentage of
Oversight Time ..................................................................................................... A-4
Table C-1: Determination of Facility Representative Coverage .............................................. C-2
Table C-2: Recommended Base Coverage Level .................................................................. C-5
Table C-3: Recommended Base FTE Level ........................................................................... C-6
Section 4
Evaluated Facility Walkthrough Documentation Form (Example) ............................................ D-5
DOE-STD-1063-2021
v
Acronyms
CFR Code of Federal Regulations
CSO Cognizant Secretarial Officer
DOE U.S. Department of Energy
DSA Documented Safety Analysis
ES&H Environment, Safety, and Health
FEM Field Element Manager
FR Facility Representative
FTE Full Time Equivalent
HQ Headquarters
ISM Integrated Safety Management
NMMP Nuclear Maintenance Management Program
NNSA National Nuclear Security Administration
O Order
P Policy
PI Performance Indicator
QS Qualification Standard
RPP Radiation Protection Program
SSC Structures, Systems, and Components
STD Standard
TIM Technical Information Memorandum
TQP Technical Qualification Program
TSR Technical Safety Requirements
DOE-STD-1063-2021
vi
DOE-STD-1063-2021
1
1.0 SCOPE
1.1 Scope. This Standard (STD), DOE-STD-1063, Facility Representatives, defines the
duties, responsibilities and qualifications for U.S. Department of Energy (DOE) Facility
Representatives (FRs), based on facility hazard classification; risks to workers, the
public, and the environment; and the operational activity level. This standard provides
the guidance necessary to ensure that DOE’s hazardous nuclear and non-nuclear
facilities have sufficient staffing of technically qualified FRs to provide day-to-day
oversight of contractor operations. Field Element Managers (FEMs) should incorporate
the information contained in this standard, as well as any additional facility-specific
requirements, such as radiological training, into site-specific implementation procedures
for DOE FRs.
1.2 Purpose of Program. The purpose of the DOE FR Program is to ensure that competent
DOE staff personnel are assigned to oversee the day-to-day contractor operations at
DOE’s hazardous nuclear and non-nuclear facilities. Oversight performed by FRs
provides DOE Line Managers with accurate, objective information on the effectiveness
of contractor work performance and practices, including implementation of the integrated
safety management (ISM) system. The DOE’s experience has shown that, when
personnel are dedicated to this function, the information they provide can be used
proactively to ensure that work is completed in a safe and efficient manner.
1.3 Purpose of Standard. DOE Order (O) 422.1, Conduct of Operations, states that field
organizations must assign DOE FRs to oversee conduct of operations in accordance
with DOE-STD-1063-202X, Facility Representatives. Furthermore, DOE O 426.1B,
Department of Energy Federal Technical Capabilities, states that designation of final
qualification for FRs must include satisfactory completion of final qualification activities
identified in this Standard. The purpose of this Standard is to help ensure that DOE FRs
are selected based on consistently high standards and from the best-qualified
candidates available, that they receive the training required for them to function
effectively, and that their expected duties, responsibilities, and authorities are well
understood and accurately documented. To this end, this guidance provides the
following practical information:
a. The duties, responsibilities, and authorities expected of an FR and other
personnel relative to the FR Program;
b. An approach for use in determining the required facility coverage;
c. The training and qualifications expected of an FR; and
d. Elements necessary for successful FR Programs.
Section 5
1.4 Applicability. This standard is intended for use by all DOE components in establishing
and maintaining FR programs at DOE-owned, contractor-operated facilities. DOE
DOE-STD-1063-2021
2
managers of government-owned, government-operated facilities may apply this
guidance to facilities operated exclusively by DOE Federal employees. FEMs and
Cognizant Secretarial Officers (CSOs) may develop additional requirements and/or
guidance regarding FR programs under their cognizance.
DOE-STD-1063-2021
3
2.0 REFERENCES
2.1 Government and Industry Documents.
2.1.1 DOE Directives [Policies (P), Orders (O), Guides (G)].
• DOE O 226.1B, Implementation of Department of Energy Oversight Policy
• DOE O 232.2A, Occurrence Reporting and Processing of Operations Information
• DOE O 360.1C, Federal Employee Training
• DOE O 422.1, Conduct of Operations
• DOE O 426.1B, Department of Energy Federal Technical Capabilities
• DOE O 430.1C, Real Property Asset Management
2.1.2 DOE Standards.
• DOE-STD-1027, Hazard Categorization of DOE Nuclear Facilities
• DOE-STD-1146, General Technical Base Qualification Standard
• DOE-STD-1151, Facility Representative Functional Area Qualification Standard
• DOE-STD-3009, Preparation of Nonreactor Nuclear Facility Documented Safety
Analysis
2.1.3 Other.
• 10 Code of Federal Regulations (CFR) Part 830, Nuclear Safety Management
• 10 CFR Part 851, Worker Safety and Health Program
• 29 CFR Part 1910, Occupational Safety and Health Standards
• 40 CFR Part 68, Chemical Accident Prevention Provisions
• 40 CFR Part 355, Emergency Planning and Notification
DOE-STD-1063-2021
4
3.0 DEFINITIONS
For the purpose of this standard, the following terms are defined:
Activity Level. The term “activity level” in DOE encompasses the work activities of any facility or
organization, from building infrastructure to scientific research and nuclear facilities. Examples
include, but are not limited to, operating science and technology machines, operating
equipment, construction, decontamination and decommissioning, dismantlement, environmental
characterization and monitoring activities, waste handling, research and development,
maintenance, and laboratory analysis activities.
Cognizant Secretarial Officers. The Secretarial Officers responsible for accomplishing work in a
safe and environmentally sound manner at DOE-owned or DOE-leased sites and facilities [other
than Headquarters (HQ)]. Cognizant Secretarial Officers (CSOs) are Secretarial Officers with
line accountability for a laboratory or a bounded set of facilities. The CSOs provide direction to
line organizations in DOE HQ and the field regarding safety management processes and
systems. Although the ultimate responsibility for safety rests with the Secretary, the CSOs are
responsible for providing direction to the line organizations in their assigned areas and they are
accountable for the appropriate and successful implementation of DOE policies and
requirements through their line organizations.
Core Qualification. The portion of the qualification program designed to cover the DOE-wide,
generic subjects on which all FRs are expected to be knowledgeable. This includes DOE-STD-
1146, DOE General Technical Base Qualification Standard and DOE-STD-1151, Facility
Representative Functional Area Qualification Standard.
Contractor. [10 CFR Part 851, Worker Safety and Health Program] Any entity, including
affiliated entities, such as a parent corporation, under contract with DOE, or a subcontractor at
any tier, that has responsibilities for performing work at a DOE site in furtherance of a DOE
mission.
Section 6
Currency. An individual is knowledgeable of current requirements, facility status, facility
activities, processes and procedures as applicable to their Technical Qualification Program
(TQP) position. Currency is maintained through continuing training on facility changes,
including activities, processes, and Documented Safety Analysis/ Technical Safety
Requirements (DSA/TSR) revisions as determined by the FR supervisor.
Department or DOE. The U.S. Department of Energy.
DOE Oversight. (DOE O 226.1B, Department of Energy Oversight Policy) Encompasses
activities performed by DOE organizations to determine whether Federal and contractor
programs and management systems, including assurance and oversight systems, are
performing effectively and/or complying with DOE requirements. Oversight programs include
operational awareness activities, onsite reviews, assessments, self-assessments, performance
DOE-STD-1063-2021
5
evaluations, and other activities that involve evaluation of contractor organizations and Federal
organizations that manage or operate DOE sites, facilities, or operations.
Documented Safety Analysis. (10 CFR Part 830, Nuclear Safety Management) A documented
analysis of the extent to which a nuclear facility can be operated safely with respect to workers,
the public, and the environment, including a description of the conditions, safe boundaries, and
hazard controls that provide the basis for ensuring safety.
Equivalency. The attainment of a required technical competency through prior training or
experience. To grant an equivalency the prior training and /or experience is evaluated by a
designated equivalency reviewer (qualification official) to determine if it demonstrates attainment
of the related technical competency.
Evaluated Facility Walkthrough. A type of final qualification activity where a designated
individual or group of individuals observes an FR candidate performing their duties and
responsibilities in their assigned facilities. The evaluated facility walkthrough also includes an
oral evaluation component where the FR candidate is asked questions regarding procedures,
safety implications, safety systems, and other topics to determine whether they have obtained a
sufficient level of competency to independently perform their assigned duties and
responsibilities (See Appendix D).
Facility. (DOE O 430.1B, Real Property Asset Management) Land, buildings, and other
structures, their functional systems and equipment, and other fixed systems and equipment
installed therein, including site development features outside the plant, such as landscaping,
roads, walks, parking areas, outside lighting and communication systems, central utility plants,
utilities supply and distribution systems, and other physical plant features.
Facility Representative. An individual assigned responsibility by the FEM (or designee) for
monitoring the safe and efficient performance of the site/facility and its operations. This
individual is the primary point of contact with the contractor for operational and safety oversight
and is responsible to the site’s/facility’s DOE Line Manager.
Facility Representative Coverage. The degree of attention an FR is expected to devote to an
assigned site/facility. Coverage is usually expressed in terms of the amount of time, including
back shift and weekend time, the FR is expected to routinely spend observing operations in the
facility.
Section 7
Field Element or Organization. A non-Headquarters DOE organization that is geographically
distinct. Field elements can be site offices, support offices, operations offices, field offices,
regional offices, or offices located at environmental restoration, construction, or termination
sites.
Field Element Manager. The DOE employee having overall responsibility for a field element.
Hazard. (10 CFR Part 830) A source of danger (i.e., material, energy source, or operation) with
the potential to cause illness, injury, or death to personnel or damage to a facility or to the
DOE-STD-1063-2021
6
environment (without regard to the likelihood or credibility of accident scenarios or consequence
mitigation).
Hazard Categories. The consequences of unmitigated releases of radioactive material are
evaluated as required by 10 CFR Part 830 and classified by the following Hazard Categories:
Category 1 – The hazard analysis shows the potential for significant off-site
consequences;
Category 2 – The hazard analysis shows the potential for significant on-site
consequences;
Category 3 – The hazard analysis shows the potential for only significant localized
consequences; and
Below Category 3 – Only consequences less than those that provide a basis for
categorization as a hazard category 1, 2, or 3 nuclear facility.
DOE-STD-1027, Hazard Categorization of DOE Nuclear Facilities contains additional
information on methods and criteria for determination of Hazard Categories.
Hazard Classes. For the purpose of staffing FRs, non-nuclear facilities are categorized as high,
moderate, or low hazards based on the following:
High – hazards with a potential for on-site and off-site impacts to large numbers of
persons or for major impacts to the environment;
Moderate – hazards that present considerable potential on-site impacts to people or the
environment, but at most only minor offsite impacts; and
Low – hazards that present minor on-site and negligible off-site impacts to people and
the environment.
Hazardous Material. (DOE-STD-3009, Preparation of Nonreactor Nuclear Facility Safety
Analysis) Any solid, liquid, or gaseous material that is toxic, explosive, flammable, corrosive, or
otherwise could adversely affect the health and safety of the public or the workers or harm the
environment.
Interim Qualification. Core qualified and any facility/site specific requirements/competencies as
determined by the FEM that must be met prior to a FR being assigned to provide limited
coverage for a site/facility for which they are not fully qualified.
Line Organization. The unbroken chain of command that extends from the Secretary through
the Deputy Secretary (Chief Operating Officer), to the Secretarial Officers who set program
policy and plans and develop assigned programs, and to the Program and FEMs who are
responsible for execution of these programs. Environment, Safety, and Health (ES&H) are
DOE-STD-1063-2021
7
integral parts of each program. Accordingly, responsibility for ES&H functions resides with the
line organizations.
Occurrence Report. (DOE O 232.2A, Occurrence Reporting and Processing of Operations
Information) A documented evaluation of an event or condition that is prepared in sufficient
detail to enable the reader to assess its significance, consequences, or implications, and to
evaluate the actions being proposed or employed to correct the condition or to avoid recurrence.
Section 8
Operational Awareness. Operational awareness refers to those activities taken by DOE line
personnel to maintain cognizance of overall site/facility or activity status, major changes
planned, and overall safety posture. Activities include routine day-to-day monitoring of work
performance through site/facility tours/walkthroughs, work observation, document reviews,
meeting attendance and participation, and ongoing interaction with contractor workers, support
staff, and management.
Oral Board. A formal oral evaluation conducted by a group of designated individuals. The
organization-specific TQP implementing procedures specify specific membership and
qualifications of oral board members, expectations for oral board questions and answers, and
criteria for passing the oral board or requiring any remediation.
Oral Checkout. An examination of a trainee’s understanding relative to a specific system or
process that constitutes only a portion of the trainee’s prospective job.
Oral Examination. An examination of a trainee’s knowledge during which a trainee answers oral
questions related to a knowledge requirement for the applicable learning objectives, tasks, or
qualification standard.
Other Hazardous Facilities. Other hazardous facilities identified by the FEM that could pose a
significant risk to the public, workers, or the environment, or are crucial mission facilities that
require FR oversight. Consideration could include poor operational or safety performance,
special needs, and significant public concern.
Proficiency. The demonstrated ability to perform duties related to a person’s current position
based on an initial qualification and regular, documented performance of those duties.
Proficiency is maintained by performance of FR duties for at least 40 hours per calendar quarter
(in one or more facilities) as required by Table 1 of this Standard.
Qualification. The process of verifying attainment of required technical competencies for
performing the FR role at a specific site/facility. This process includes verification of attainment
of required technical performance competencies in DOE-STD -1151, verification of attainment of
required site/facility specific technical competencies identified by the Field Element, and
satisfactory completion of final qualification activities identified in this Standard.
Qualifying Official. A designated individual who meets to requirements of DOE O 426.1B and is
authorized to verify attainment of specific competencies in technical qualification standards.
DOE-STD-1063-2021
8
Risk. (DOE-STD-3009) The quantitative or qualitative expression of possible loss that
considers both the likelihood that an event will occur and the consequences of that event.
Walkthrough. A tour through a site/facility to maintain operational awareness.
DOE-STD-1063-2021
9
4.0 DUTIES, RESPONSIBILITIES, AND AUTHORITIES OF FACILITY
REPRESENTATIVES AND OTHER KEY PERSONNEL
4.1 Duties, Responsibilities, and Authorities of Facility Representatives. The following
paragraphs describe the duties, responsibilities, and authorities of FRs. FEMs shall
tailor these and additional duties and responsibilities for FRs to reflect the specific
requirements of the site, the facility, the operational activities, and the involved
organizations.
Section 9
4.1.1 Operational Awareness. An FR shall be thoroughly familiar with their assigned
site/facility, operating procedures, site/facility safety bases, operating organizational
structure, and key process control personnel. The FR shall be aware of major work in
progress and in planning. The FR shall know which personnel are controlling the work,
the hazards and hazard controls associated with the work, what procedures are to be
used, and whether training and qualification requirements have been established and
are being met. FRs shall verify that work activities are being performed safely and
efficiently based on periodic observations and spot-check reviews of frequency
commensurate with the hazard and complexity of the work. This knowledge is primarily
acquired by walking through the facility, discussions with contractor personnel,
observation of work in progress, review of facility records and documentation, and
attendance at appropriate planning and management meetings of the operating
contractor. FRs should spend a significant amount of their time in their assigned
facilities observing operations and assessing operating conditions, consistent with the
goals in Appendix A, Facility Representative DOE-Wide Performance Indicators.
4.1.2 Communication. The FR shall maintain frequent communication with contractor
personnel and field element supervision. The FR shall ensure that DOE Line
Management is cognizant of current site/facility conditions.
4.1.3 Availability. The FR shall be available to respond to site/facility events and serve as the
DOE presence for special operations. The FR shall be readily available to operating
contractor personnel to facilitate the notification of occurrences and any safety or
operational concerns.
4.1.4 Independence. An FR should be in a position to provide information to DOE Line
Management independent of programmatic responsibilities. Therefore, FEMs should not
make FRs responsible for preparing budgets or schedules for assigned site/facilities. In
cases where separating programmatic responsibilities is impractical, the FEM or
designee should approve all assignments of programmatic responsibilities to FRs.
4.1.5 Scope of Reviews. The FR shall observe, evaluate, and report on the effectiveness of
the operating contractor in multiple areas important to safe, efficient operations, such as
conduct of operations requirements, operational performance, ISM, quality assurance,
management controls, emergency response readiness activities, and assurance of
worker health and safety. In facilities where nuclear safeguards and security are a
DOE-STD-1063-2021
10
concern, FRs may evaluate security issues as they relate to safe operations.
Additionally, the FR should evaluate the overall effectiveness of the operating contractor
in implementing corrective actions.
4.1.6 Oversight Routine. FRs should vary their day-to-day presence in assigned site/facilities
to show a degree of unpredictability and spontaneity based on the FR’s judgment
regarding what is appropriate to observe and assess. Although FRs conduct beneficial
oversight by walking through assigned facilities with contractor facility managers, certain
benefits are lost when FR presence is 100 percent predictable and always with facility
managers.
4.1.7 Stop Work Authority. The FR shall “Stop Work” in the following instances, or in
accordance with the requirements/guidance provided by the FEM:
Section 10
a. Conditions exist that pose an imminent danger1 to the health and safety of
workers or the public;
b. Conditions exist that, if allowed to continue, could adversely affect the safe
operation of, or could cause serious damage to, equipment or the facility; or
c. Conditions exist that, if allowed to continue, could result in the release, from the
facility to the environment, of radiological or chemical effluents that exceed
regulatory limits.
4.1.8 Relationship of Facility Representative with DOE Managers. FRs should periodically
meet with DOE managers and senior managers within the field element to provide
information related to the assigned facilities. If safety or operational concerns are not
resolved by the contractor to the satisfaction of the FR, the FR should elevate the
concerns to DOE Management. If DOE Management is not responsive to FR safety or
operational concerns, the FR should elevate the concerns using processes such as the
Differing Professional Opinion Process or the Employee Concerns Process.
4.1.9 Relationship of Facility Representative with Other DOE Oversight Personnel. FRs shall
follow their local procedures regarding their relationship with other DOE oversight
personnel.
4.1.10 Relationship of Facility Representative with Operating Contractor. FRs occupy a unique
position in the transmission of information between DOE and its contractors. FRs should
be able to communicate effectively with all levels of the contractor organization. They
should be familiar with the contractor chain of command for facility operations. The FR
should always strive to work constructively and effectively with contractor personnel to
meet the shared goals of safe and efficient facility operations, in accordance with
1. Any condition or practice such that a hazard exists that could reasonably be expected to cause death or serious
physical harm to employees (permanent or prolonged impairment of the body or temporary disablement or requiring
hospitalization), unless immediate actions are taken to mitigate the effects of the hazard and/or remove employees
from the hazard.
DOE-STD-1063-2021
11
relevant DOE and contractual expectations. FRs should represent DOE to the
contractor and ensure that the contractor carries out DOE operational safety policies in a
manner consistent with DOE expectations, relevant contract requirements, and the
contractor’s Integrated Safety Management System description. In defining the
relationship between an FR and contractor, the following points are emphasized:
a. The FR functions as a part of the DOE Line Management and exercises authority
consistent with the requirements/guidance established by the field element.
b. The FR is the primary point of contact for the contractor to notify DOE of
reportable occurrences as required by DOE O 232.2A.
c. The contractor is responsible for the safe and efficient operation of the
site/facility. The contractor is accountable to DOE to perform its operations in a
manner that ensures the safety and health of personnel and protection of the
environment. No FR activity or inactivity can diminish the contractor’s
responsibility.
d. The FR is responsible for determining that the contractor is operating the
site/facility in a safe and efficient manner, consistent with the established safety
expectations and requirements. FRs fulfill this responsibility by assessing the
contractor’s performance, evaluating contractor safe configuration and/or
corrective actions in response to identified abnormal conditions and/or
deficiencies, and via discussions with contractor personnel. FEMs should
identify processes or procedures within the field element for FRs to use to track
identified issues or discrepancies to satisfactory closure.
Section 11
e. Although the FR identifies deficiencies, the ultimate responsibility for identifying
and correcting deficiencies rests with the operating contractor. FEMs should
ensure that the contractor does not rely solely on the FR to identify deficiencies.
f. Minor events or problems may indicate more general problems in the contractor’s
organization, management, personnel abilities, or practices. Therefore, attention
to detail in the identification, tracking, trending, collective significance evaluation,
and correction of minor problems can result in significant improvements in the
contractor’s performance. When corrective actions are called for, DOE
managers should initiate formal action with the operating contractor. Additionally,
the FR should also provide input to formal mechanisms such as confirmation of
actions or orders, if necessary.
g. The FR shall adhere to defined rules of conduct, or protocol, while performing
assigned duties. Formal protocols should be established to include the following:
1. The FR should avoid interrupting site/facility personnel in their work. The
FR should perform their observations/evaluations in an unobtrusive
manner and wait for opportune times to question site/facility operators.
DOE-STD-1063-2021
12
Site/facility personnel carry responsibility for safety, and a diversion from
their duties could adversely affect personnel, site/facility, and
environmental safety along with site/facility operations.
2. The FR should maintain frequent contact with the appropriate contractor
management. When an FR observes something that raises a safety
concern, they shall promptly discuss their concerns with the site/facility
management. If the contractor response is deemed unsatisfactory, the
FR should discuss the concern with DOE Management for appropriate
action.
3. The FR should use established chains of command for all requests for
action, except when exercising “Stop Work” authority.
4. The FR shall keep a record of their activities and observations in
accordance with local procedures. The FR should periodically review
their records to determine if a systemic or recurring problem exists with
contractor activities. This record is subject to review in audits or
appraisals and may be used by the FEM as a source of information for
the contractor evaluation process.
4.2 Duties, Responsibilities, and Authorities of Other Key Personnel. Duties,
responsibilities, and authorities of other key personnel with respect to the FR program
are described below and in DOE O 226.1B, DOE O 232.2A, DOE O 422.1, and DOE O
426.1B, and associated lower-tier functions and responsibilities documents.
4.2.1 Deputy Secretary.
a. Establish DOE policy on FRs.
b. Resolve any cross-organizational disputes regarding FRs.
c. Ensure the Associate Under Secretary for Environment, Health, Safety and
Security and CSOs take actions necessary to consistently meet program goals.
4.2.2 Associate Under Secretary for Environment, Health, Safety and Security.
a. Guide DOE-wide program implementation and continuous improvement.
b. Monitor DOE-wide implementation performance and disseminate information to
senior DOE and National Nuclear Security Administration (NNSA) managers to
promote improved performance.
c. Sponsor an annual workshop to share lessons learned and promote continued
effectiveness of the FR program.
DOE-STD-1063-2021
13
d. Participate in periodic assessments of site FR programs.
e. Maintain the DOE FR Powerpedia page.
Section 12
f. Host periodic FR Steering Committee meetings.
g. Designate a Headquarters FR Program Manager to perform one or more of the
above functions.
4.2.3 Cognizant Secretarial Officers.
a. Guide program implementation and continuous improvement at assigned field
elements.
b. Evaluate overall effectiveness of FR programs at assigned field elements,
including on-site assessment and shadowing, performance indicator information
sufficiency, and program self-assessments and associated corrective actions
adequacy.
c. Ensure adequate allocation and use of resources for FR programs at assigned
field elements.
d. Assign a Headquarters Program Lead to participate in FR Steering Committee
discussions, and assist with the above functions.
4.2.4 Field Element Managers.
a. Determine facility coverage needs and make assignments of qualified FRs to
maintain day-to-day oversight of applicable site/facilities activities, using
Appendix C, Process to Determine Facility Representative Staffing.
b. Select, train, and qualify FRs so that they are capable of performing their
assigned duties.
c. Clearly define the functions, responsibilities and authorities of the FRs in formal
protocol, and ensure that affected DOE and contractor managers understand the
role of the FRs and provide the necessary access and support.
d. Ensure that operating contractors apprise FRs of planning, scheduling,
maintenance, operations review, and safety review meetings, contractor-provided
training and contractor employee training and qualification boards and facilitate
their attendance.
e. Periodically evaluate the effectiveness of the field element’s FR program and
pursue changes to improve overall performance and effectiveness, using
Appendix A, and Appendix B, Facility Representative Program Assessment
Guide.
DOE-STD-1063-2021
14
f. Provide developmental opportunities for FRs. Examples of such opportunities
could include short-duration details to other organizations or specialized training.
g. Assign an FR Program Sponsor from among the field element’s senior managers
to guide and direct implementation within the field element.
h. Establish the authority of the FR to represent DOE Line Management to the
contractor regarding operational safety issues except where this would change
scope, cost, or schedule.
i. Interact frequently with FRs and ensure DOE managers take appropriate action
to resolve identified operational and safety issues.
j. Ensure that FRs have the authority to “Stop Work” in the facility. The FEM shall
ensure that contractors and subcontractors are aware that FRs have this
authority and that this authority covers all facility-related work performed by the
contractor and subcontractor.
4.2.5 Facility Representative Program Sponsors.
a. Serve as a management advocate for FRs within the field element to resolve
programmatic issues.
b. Ensure FEM defined functions, responsibilities and authorities are effectively
executed.
c. Ensure that training materials, qualification cards, qualification standards, and
examinations are developed and maintained.
d. Ensure that DOE line/program managers are effectively using FR oversight
results.
e. Participate in FR Steering Committee activities.
f. May appoint or secure the appointment of a Site FR Program Manager, Team
Leader, or Supervisor to manage day-to-day implementation issues for the field
element and participate in FR Steering Committee discussions.
4.2.6 Office of Enterprise Assessments.
Section 13
a. The Office of Enterprise Assessments, through the National Training Center, is
responsible for developing and maintaining initial training to support attainment of
the technical competencies in DOE-STD -1151.
DOE-STD-1063-2021
15
5. FACILITY REPRESENTATIVE PROGRAM REQUIREMENTS
5.1 Facility Coverage and Staffing. FEMs, or their designee, shall evaluate each hazardous
facility to determine an appropriate level of FR coverage. Appendix C provides a
detailed process to determine appropriate facility coverage and assignment and is the
methodology to be used.
a. FEMs shall assign one or more full-time FRs to each nuclear hazard category 1
facility, unless the FEM and CSO agree that less coverage is necessary. For
nuclear hazard category 2 or 3 site/facilities, radiological facilities, and hazardous
non-nuclear facilities, Field Element Managers may assign a qualified FR to two
or more facilities unless the FEM or Cognizant Secretarial Office determine that
such a site/facility warrants full-time coverage by one or more FRs. When
assigning a sufficient number of facilities to occupy a person full time is
impractical, the Field Element Manager may assign the duties of an FR to be
performed part time as a collateral function.
b. An FR’s primary duty of providing DOE an on-site presence is very important and
must not be diminished. FEMs should make assignments so that FRs spend a
significant portion of their time in their assigned site/facility(s). Location of FR
offices near or within the facility of primary responsibility is preferable. FEMs
should make assignments so that administrative work does not prevent FRs from
performing their primary function of monitoring the performance of the site/facility
and its operations as described in Section 5.2.
c. To the degree that FRs are transferred or otherwise lost from the program, FEMs
should take necessary steps to ensure that departing FRs are replaced in a
timely manner. The goal of the FEM should be to recruit and hire technically
capable personnel to fill FR vacancies in an expeditious manner. Recognizing
the lengthy average time for a new FR candidate to achieve full qualifications
(i.e., approximately 18 months), FEMs should strive to recruit experienced
candidates from technically rigorous programs, both from within DOE and from
external sources, to minimize time in qualification. Such potential sources
include DOE Safety System Oversight personnel, DOE Subject Matter Expert
personnel, and personnel from directly related fields such as naval nuclear
power, commercial nuclear power, radioactive waste management, nuclear
weapons, nuclear research, industrial safety, chemical safety, or accelerator
facility programs. Section 5.6 contains additional guidance.
d. As part of the overall staffing strategy, FEMs should also consider making use of
existing DOE and NNSA technical intern programs to provide a source of
prospective FR candidates, especially for sites that have experienced historically
high attrition rates.
DOE-STD-1063-2021
16
e. FEMs shall review staffing plans and assignments of FRs at least annually to
ensure that coverage assignments and responsibilities are appropriate to the
hazards and level of activity involved. Additionally, FEMs shall reevaluate each
hazardous facility on a biennial basis to determine an appropriate level of FR
coverage.
Section 14
f. FEMs may also establish provisions for changing coverage. For example, as the
degree of hazard, complexity, or other governing factors is increased, the FEMs
may decrease the number of processes, facilities, buildings or areas covered by
a single FR. FEMs may use special coverage assignments for a facility that
operates only intermittently. Also, FEMs should consider periodically rotating
FRs to different facilities to maintain objective oversight, broaden FRs’
experience bases, and provide flexibility for backup coverage during periods
when FRs are absent.
h. FEMs shall ensure that adequate facility coverage is maintained by qualified FRs
during any period the assigned FR has extended absence.
5.2 Facility Assessment Plans and Reports. FEMs shall develop facility assessment plans
consistent with the requirements in DOE O 226.1B. Assessment plans may review
compliance with the safety directives and standards listed in DOE O 226.1B. FEMs shall
ensure that reporting does not become an onerous task that unduly limits the oversight
activities of the FR. In order to facilitate a direct communication link with senior
contractor management, the FR should meet with senior contractor managers on a
periodic basis to discuss the results of and contractor responses to FR oversight
activities, forthcoming activities, and assessments and to discuss trends and systemic
issues and overall site/facility health.
5.3 Unencumbered Access. FEMs shall ensure that FRs have independent, direct, and
immediate access to contractor personnel, facilities, and records, as necessary and
allowable, to carry out their assigned responsibilities. Unencumbered access does not
preclude an FR maintaining the proper clearances or from following industrial safety,
emergency action, radiation protection, safeguards and security, or operational
requirements and controls of the facility. FRs shall adhere to these requirements and
controls when discharging their duties.
5.4 Training and Qualification. The FEM shall develop the overall qualification program in
accordance with DOE O 426.1B, DOE O 360.1C, Federal Employee Training, and any
additional elements defined in this standard. This program shall include the formal and
on-the-job training elements specific to the assigned site/facilities. FR supervisors
should ensure that site/facility training materials, qualification cards, qualification
standards, and examinations are periodically updated to reflect changing facility
conditions (e.g., DSA/TSR changes, Structures, Systems, and Components (SSC)
modifications, significant mission activity changes, changes in contractor
processes/procedures impacting the safe and efficient performance of site/facility
DOE-STD-1063-2021
17
operations) and new or updated DOE directives, standards, or regulations. The steps
involved in the various levels of qualifications are described below and in Table 1:
Facility Representative Qualification.
5.4.1 Formal Training. FEMs shall ensure that FRs receive the training necessary for the
position.
Section 15
5.4.2 Continuing Training. FEMs shall ensure that FRs participate in a continuing training
program to maintain qualifications as required by DOE O 426.1B. Recommendations
for continuing training related to the core FR competencies are included in Appendix C
of DOE-STD-1151. The FEM shall ensure that FRs are also provided continuing training
to make sure that they are aware of an understand significant site/facility/activity
changes such as safety basis and activity level hazard control changes, changes in
contractor processes/procedures with the potential to impact the safe and effective
execution of site/facility operations, and to provide a mechanism for sharing lessons
learned across the site and DOE complex. Continuing training should also be provided
to help FRs stay abreast of changing technologies, enhance skills, improve performance
and proficiency, and review new requirements.
5.4.3 Qualification Standard. FEMs shall establish the site/facility specific technical
competencies that FRs must attain and document these in a local qualification standard
(QS). The FR site/facility specific QS may be a separate stand-alone qualification
standard or it may be incorporated into the organization specific qualification standard
required in DOE O 426.1B. The site/facility specific QS must be assigned using the
eTQP system. The competencies in the QS are attained by the FR candidate and
verified by a designated QO in the same manner as all other QSs in the TQP, such as
GTB Parts A and B and the FR FAQS, DOE STD-1151.
5.4.4 Final Qualification Activities. FEMs shall ensure that FRs complete the final
qualification activities identified in Table 1 prior to designating final qualification.
5.4.5 Competency Equivalencies. Equivalencies for competencies identified in assigned
Qualifications Standards are evaluated and approved by designated equivalency
reviewers (qualification officials) per the requirements of DOE O 426.1B. The
documentation of the approved equivalency is maintained in the eTQP system.
5.4.6 Core Qualification. Core qualification requirements are presented in Table 1. Having
one qualification card that covers both core and site/facility-specific requirements is
acceptable.
5.4.7 Interim Qualification. In addition to the requirements listed in Table 1, DOE FEMs shall
establish and document the process and the specific requirements to be met prior to an
FR candidate being assigned to provide limited coverage in a facility for which he or she
is not fully qualified. FEMs shall formally define and document the duties and authorities
that may be assigned to an Interim Qualified FR. FEMs should minimize the time FRs
DOE-STD-1063-2021
18
spend under Interim Qualification. FEMs should also determine and document the
compensatory measures to be implemented during periods while no fully qualified FR is
assigned to a given facility. In addition, some FEMs may designate FRs, as described in
Section 5.5, Designated Facility Representatives, at the completion of interim
qualifications.
5.4.8 Full Qualification. Full qualification occurs when all core and facility-specific qualification
requirements have been completed. Designated management within the field element
shall review and confirm satisfactory completion of the training and qualification
requirements. Qualification is granted by the FEM or designee.
Section 16
5.4.9 Qualification on Additional Facilities After Full Qualification. Upon assignment of fully
qualified FRs to a different or additional facility or site, FEMs or their designees should
identify any additional qualification requirements that are necessary for an FR to
complete for that facility or site.
5.4.10 Proficiency. FEMs shall formally define proficiency requirements.2 These requirements
shall include actions required to maintain proficiency and those required to regain
proficiency following periods of inactivity as an FR, and the length of time which initiates
a need for proficiency training. For example, if an FR is no longer assigned to a facility
but wishes to maintain proficiency, the FR should periodically participate, either in the
normal role or as an observer, in in-plant drills. The process to regain proficiency after
inactivity as an FR is shown in Table 1. DOE FEMs shall document the actions required
to regain proficiency following periods of inactivity as an FR, which shall as a minimum
include the following information.
a. Demonstration of knowledge of any facility modifications since the FR last served in that
capacity.
b. Demonstration of knowledge of revisions to the Documented Safety Analysis and
Technical Safety Requirements since the FR last served in that capacity.
c. Demonstration of knowledge of mission changes in the facility since the FR last served
in that capacity.
d. Demonstration of knowledge of changes to the contractor organization, processes, and
procedures since the FR last served in that capacity.
5.4.11 Maintaining Qualification. FEMs shall ensure that the incumbent FR maintains the
knowledge and skills necessary to properly perform FR duties at the assigned facilities.
For the purpose of maintaining qualification, FEMs shall implement one of the options
below.
2 FR Programs which select Option B: Continuous Qualification must ensure that FRs perform FR duties at a
minimum of 40 hours per calendar quarter at the facilities which they are qualified to maintain proficiency.
DOE-STD-1063-2021
19
a. Periodic Requalification. FRs shall requalify at a minimum of every five years. The FEM
shall establish processes or procedures to ensure that FRs do not exceed the five-year
time limit for requalification. At the time of requalification, the FR will be currently fully
qualified and meet proficiency requirements at the assigned facility or facilities, and will
exhibit satisfactory performance as documented by past performance appraisals. FEMs
shall document the requalification process, which shall as a minimum include the items
listed in Table 1. Certification of requalification shall be granted by the DOE FEM or
designee.
b. Continuous Qualification. FRs shall maintain their qualification at the assigned facility on
a continuous basis. The FEMs shall establish processes or procedures to ensure that
continuous qualification is met and that FRs exhibit satisfactory performance as
documented by past performance appraisals. Additional requirements to maintain
continuous qualification are listed in Table 1.
5.4.12 Examinations. The FEM, or designee, shall develop formal procedures for the
administration of facility evaluated walkthrough examinations, written examinations, oral
examinations, and failure of written or oral examinations. Additional information on
examinations is available on the DOE FR Powerpedia Page.
Section 17
a. Evaluated Facility Walkthrough. FEMs shall establish requirements for an Evaluated
Facility Walkthrough of assigned facilities in the FR qualification process for
demonstrating to a qualifying official practical skills and knowledge of selected key
elements, including safety systems, structures, and components of the facility.
Additional guidance can be found in Appendix D.
b. Written Examinations. During Full Qualification, the FEM or designee shall administer a
written examination to the FR candidate as listed in Table 1. The examination should
include only subjects on the FR core and facility-specific qual cards. The minimum
passing grade shall be 80%.
c. Oral Examinations. Oral examinations (e.g., oral check-outs) may be used in FR
qualification as shown in Table 1. Oral Boards, which are only required for FR
candidates undergoing their initial Full Qualification, are described below.
d. Oral Board. For an FR to achieve initial Full Qualification, the FEM or designee shall
convene and administer an Oral Board of the FR candidate. The FEM or designee shall
determine the composition of the Board. Board members should ask critical questions
intended to integrate qualification learning objectives. Additionally, the Board members
may ask follow-up questions to help the Board determine how the candidates “think on
their feet.” FEMs or designees should develop formal guidance for the Oral Board; this
guidance includes: standards for qualification, use of technical advisors by the Board,
questioning procedures or protocol, pass/fail criteria, voting authorization and
procedures, and the Board deliberation and documentation process. The Board may
DOE-STD-1063-2021
20
conduct the Oral Board as a group or individually. The Board should document explicitly
any questions and answers that result in an Oral Board failure.
e. Failure of Written or Oral Examinations. FEMs or their designees may require FR
candidates who fail a written or oral examination to undertake a special study program
designed to strengthen each area of weakness revealed in the examination. FEMs or
their designees may direct candidate reexaminations, with concentration in the identified
weak areas. FEMs should consider reassigning FR candidates who repeatedly fail
examinations to a non-FR position. In rendering a final decision on reassignment, the
FEM should consider any extenuating circumstances.
DOE-STD-1063-2021
21
Table 1: Facility Representative Qualification
Qualification
Process
DOE-STD-
1146,
General
Technical
Base
Qualification
Standard
DOE-STD-
1151,
FR Functional
Area
Qualification
Standard
Site-/Facility-
Specific
Competencies
Examination Type and
Additional
Requirements
Core Qualification
[Note 1] X X N/A • Written Exam [Note 2]
Interim Qualification X X
FEM determines the competencies and
examination requirements so that an FR
could provide interim coverage in a facility
for which he/she is not fully qualified.
Initial Full
Qualification X X X
• Written Exam [Note2]
• Evaluated Facility
Walkthrough
• Oral Board [Note 3]
Qualification on
Additional Facilities
after Full
Qualification
Would be core qualified. X
• Evaluated Facility
Walkthrough and/or
• Written Exam and/or
• Oral Checkout
[Note 4]
To Regain
Proficiency after
Inactivity as an FR
As determined by the Field
Element:
Items added and areas of theory
or fundamentals.
Changes to system, process, and
facility documentation.
X
• Evaluated Facility
Walkthrough and/or
Section 18
• Written Exam and/or
• Oral Checkout
[Note 4]
Maintaining
Qualification:
Periodic
Requalification
As determined by the Supervisor:
1. Items added, and areas of theory or
fundamentals;
2. Changes to system, process, and facility
documentation.
• Evaluated Facility
Walkthrough and/or
• Written Exams and/or
• Oral Checkout
[Note 4]
Maintaining
Qualification:
Continuous
Qualification
As determined by each local DOE site office,
currency as an FR should be verified on a biennial
basis [Note 5].
Documentation of currency can be tailored by each
site office as appropriate to suit its needs [Note 6].
Maintain continuous
proficiency by performing
FR duties 40 hours per
calendar quarter [Note 7].
Notes:
1. Core qualification needs to be conducted only once.
2. The written exam for core qualification may be combined with full qualification written exam.
3. An Oral Board only needs to be conducted for an FR’s initial full qualification. At their
discretion, an FEM may require an oral board for a previous qualified FR transferring from
DOE-STD-1063-2021
22
another site Additional Information for Oral Boards are included on the DOE FR Powerpedia
Page.
4. Additional information for oral check-outs are included on the DOE FR Powerpedia Page. At
the Supervisor’s discretion, the Oral Checkout may be combined with the Evaluated Facility
Walkthrough.
5. The following items should be considered in determining currency as an FR:
a. Knowledge of up-to-date applicable DOE directives (e.g. Rules, Orders, Guides,
Standards, Manuals, Handbooks, etc.);
b. Knowledge of up-to-date facility documentation (e.g. DSAs, TSRs, TIM, NMMP, RPP,
etc.);
c. Knowledge of up-to-date Local Site Office SOPs or DOE Program Office procedures;
d. Knowledge of up-to-date relevant lessons learned across the DOE complex;
e. Continued professional training within applicable ES&H discipline (e.g. nuclear safety,
accelerator safety, etc.);
f. Completion of required local site ES&H training;
6. Consideration should be given to demonstrating currency through documenting, in a checklist
format, a combination of required reading; computer based training; attendance at classroom
training; and/or evidence of participation in the criteria listed.
7. If an FR fails to maintain proficiency by performing FR duties 40 hours per calendar quarter,
proficiency must be regained by completing the requirements in Table 1, “To Regain
Proficiency after Inactivity as an FR”.
5.5 Recruitment, Selection, Retention, and Advancement Considerations. As qualified FRs
gain experience, they become a valuable resource of DOE. FEMs should take
necessary steps to ensure that FR positions are career enhancing and remain desirable
to FR candidates. This includes incentives to maintain qualification and encouragement
of skills enhancement through continuing training, graduate study, and professional
certifications. In addition, FEMs should provide opportunities for FRs to develop
management skills. This experience and training can make FRs with solid technical and
management skills into prime candidates for positions of higher responsibility both in the
field and at DOE Headquarters. FEMs should identify these developmental experiences
and training opportunities in the personnel development plans for their organizations,
and in FRs’ Individual Development Plans. DOE O 426.1B provides various
mechanisms that can be used to retain these valuable resources.
Section 19
5.5.1 Retention and Advancement. Several mechanisms may be available to assist field
elements in the retention of high-quality personnel necessary for their program. FEMs
should seek to understand reasons for unusually high FR attrition rates and counter
those reasons using appropriate mechanisms. These mechanisms may include:
a. Recognition and real-time management acknowledgement;
b. Mentoring from senior DOE and Facility Managers;
DOE-STD-1063-2021
23
c. Educational reimbursement incentives;
d. Quality Step Increases based on experience and performance;
e. Higher Pay Grade or Band based on higher facility hazard category;
f. Higher Pay Grade or Band based on scope of facility assignments;
g. Higher Pay Grade or Band for FR Program Managers, Supervisors, Work Leads,
and Team Leads;
h. Promotions based on knowledge and experience;
i. Reimbursement incentives for obtaining and maintaining professional
certifications; and
j. Use of government vehicles for transportation between Site Headquarters and
assigned facilities.
5.6 Facility Representative Program Performance Assessment and Feedback. FEMs shall
periodically evaluate and adjust their FR programs as necessary to ensure a high and
continuously improving level of performance. Methods to be used include the following:
5.6.1 Performance Indicators (PIs). Carefully chosen PIs can provide valuable measures of
the effectiveness of FR programs. DOE-wide Performance Indicators that address
staffing and qualification levels and fulfilling FR roles, along with their reporting
requirements are included in Appendix A. Field elements may provide additional site-
specific performance indicators. The DOE FR Program Manager shall use these PIs to
evaluate DOE-wide program performance and compile a DOE-wide performance
indicator (PI) report for dissemination to applicable field elements and program offices.
The DOE FR Program Manager will post the reports to the DOE FR Powerpedia page.
5.6.2 Field Element Self-Assessments. FEMs shall ensure that their FR Programs are
evaluated periodically (not to exceed three years) relative to the requirements of this
standard. FEMs shall provide the results of these self-assessments to the responsible
Program Office at DOE Headquarters, with a copy to the DOE FR Program Manager.
When possible, FEMs or designees should invite FRs and/or FR management from
other sites to participate in these self-assessments. Guidance for the performance of
these assessments is provided in Appendix B, “Facility Representative Program
Assessment Guide.”
5.6.3 Nuclear and Facility Safety Programs Workshop. FEMs should encourage as many
FRs, FR Managers, and FR support personnel as possible to attend the annual
Workshops to share information with other sites and identify potential improvements for
use in their own FR and Safety Management programs.
DOE-STD-1063-2021
24
DOE-STD-1063-2021
A-1
Appendix A. Facility Representative DOE-Wide Performance Indicators
Scope: Carefully chosen Performance Indicators (PIs) can provide valuable measures of the
effectiveness of FR Programs. These PIs are DOE-wide and will be used by FEMs and DOE-
HQ personnel to evaluate program effectiveness with regards to staffing and qualification levels
and fulfilling the FR role. Other PIs may be useful at local and HQ levels to determine the need
for local program changes, depending on circumstances that may be unique to a site. DOE-
wide FR PIs are relatively few in number, easy to measure and report, applicable to all FR
Programs, and resistant to misinterpretation.
Section 20
General Points:
1. The Performance Indicators listed in A-1 shall be used DOE-wide as a minimum. Field
elements may use additional, local PIs that suit their own needs.
2. PIs for DOE-wide use measure FR staffing, FR qualification, and fulfilling the FR role.
3. PIs that measure contractor performance have been avoided as measures of FR
program effectiveness.
4. PIs shall be reported quarterly by FEMs to their Headquarters Program Lead, with a
copy sent to the DOE FR Program Manager. At the close of a given quarter, one month
is allocated to assemble PI reports, which are then due on the first working day of the
months of February, May, August, and November.
5. The Performance Indicators methods of determination and goals are provided in Tables
A-2 and A-3.
DOE-STD-1063-2021
A-2
A-1. Quarterly Reporting Elements – What to Report
FR Programs shall report the following DOE-Wide Performance Indicators each Quarter:
• Analysis full time equivalent (FTE): The number of FR FTEs needed per the DOE-STD-
1063 Staffing Analysis (Appendix C);
• Approved FTE: The number of FR FTEs approved for the Program to staff;
• Actual Staff: The number of FRs staffed during the reporting period;
• % Staffed: Calculated as described in Table A-2;
• Gains/Losses: Both the number of FR gains and losses during the reporting period.
Programs must report the reason for each gain and loss. Definitions are provided in
Table A-2;
• No. of FRs Core Qualified: The number of FRs that were core qualified at the end of the
reporting period. See Section 3 for the definition of core qualification;
• No. of FRs Fully Qualified: The number of FRs that were fully qualified at the end of the
reporting period;
• % Fully Qualified: Calculated as described in Table A-2; and
• % Oversight Time: Calculated as described in Tables A-2 and A-3.
The Performance Indicators should be reported in table format. An example is provided below
in Table A-1, and a table template is provided on the DOE FR Powerpedia page at
https://powerpedia.energy.gov/wiki/FacilityRepresentativeProgram.
Table A-1: Example Report – Red Run Site
Performance Indicators for First Quarter CY2016
(January 2016 through March 2016)
Submitted May 2, 2016
Site Analysis
FTE
Approved
FTE
Actual
Staff
%
Staffed
Gains/
Loses1
No. of
FRs Core
Qualified
No. of
FRs
Fully
Qualified
%
Fully
Qualified
%
Oversight
Time
RR 10 9 8 80 +1, -1 7 5 50 75
Notes:
1. Red Run Site hired one FR and lost one FR due to retirement during this reporting period.
https://powerpedia.energy.gov/wiki/FacilityRepresentativeProgram
DOE-STD-1063-2021
A-3
Table A-2: Quarterly Reporting Requirements – How to Determine
Indicator Name How to Determine Goal
Staffing level (%) Number of FR positions filled
Divided by
Number of FR positions per Appendix C
100% of
[#FRs]
Gains/Losses Number of FRs starting or leaving the program this
quarter. Provide reason for attrition using the options
below.
Gains:
• Industry: Hired from the private industry.
• Government: Hired from another government
agency.
• Lateral: Hired from a DOE non-FR position
• Transfer: Hired from another FR position.
• Developmental: Hired from DOE technical intern
program.
Losses:
• Transfer: Takes an FR job at different site.
• Promotion: Takes non-FR position at higher GS or
ES level or a supervisory position.
• Lateral: Takes non-FR position at same pay grade.
• Retirement: Leaves DOE for retirement.
• Resignation: Leaves DOE other than retirement.
Section 21
N/A
% of FRs Fully
Qualified
Number of Fully Qualified FRs
Divided by
Number of FR positions per Appendix C
Greater than
80%
% Oversight Time Total number of work hours this quarter (Note 1) minus
the hours worked performing Non-FR duties (Note 2)
Divided by
Number of work hours in the quarter (Typically 520)
Greater than
65%
Notes:
1. Total number of work hours this quarter equals the total number of hours per calendar quarter
(typically 520) plus any overtime worked minus any leave taken (annual, sick, holiday, or other).
2. Activities that count as time performing FR Duties are included in Column 1 of Table A-3 while
activities that should be considered Non-FR Duties are included in Column 2 of Table A-3.
DOE-STD-1063-2021
A-4
Table A-3: Additional Guidance on Computing Facility Representative Percentage of
Oversight Time
COLUMN 1
Activities that Count as Time Spent Performing FR Duties
Goal: Greater than 65%
COLUMN 2
Activities That Should Not
Be Counted in Numerator
Plant walkthroughs/walkdowns Emergency Operations Center
assignments
Training (mandatory
refresher, etc.) not related to
an FR’s abilities to perform
oversight. Surveillances Performing facility review activities
(e.g., ISMS verification, ORR, RA)
in a facility at the Facility Rep’s site
Assessments of the contractor Researching requirements
Observing & participating in
critiques
Occurrence report reviews
Verifying completion of
corrective actions in the field or
with the contractor
Issues tracking and trending
Observing operator activities
and maintenance actions
Supporting facility-related
programmatic needs and special
projects
Reviewing contractor
documents and procedures at
the job site
Reviewing DSAs, SERs, ABs, and
other safety documentation at desk
Non facility-related special
projects
Facility grounds and property
tours
Reviewing contractor documents
and procedures at desk
Administrative/Collateral
duties
Completing facility condition
assessments
Attending facility meetings Non oversight commute time
Commute time between facilities
or driving tours within facility and
between oversight activities
Communications involving issues
requiring DOE oversight
Meetings not related to the
FR’s facilities/duties
Attending contractor pre-job
briefings or other facility activity
briefings
Discussions of actions required for
addressing issues
Plan of the day/Plan of the week
meetings
Training and qualification related to
an FR’s abilities to perform
oversight
Shift turnovers Briefing Management on facility
issues
Response to facility/lab events Providing feedback to the
contractor
Observing or participating in
facility drills or lab exercises
PAAA corrective action validations
DOE-STD-1063-2021
B-1
Appendix B. Facility Representative Program Assessment Guide
The DOE has implemented its FR Program and is looking to continuously improve the
program’s effectiveness DOE-wide. An effective FR Program has many elements, as described
in this Standard. These elements are intended to yield a program that provides DOE facilities
with well-trained FRs who spend appropriate amounts of time in their facilities and can work
effectively with their contractor management counterparts. The program, to be effective, needs
the functional support of management. To maintain the continued support of DOE
management, the FR program needs to demonstrate its continued performance and
effectiveness, which is to be assessed periodically using this guide. Any assessment of an FR
Program should determine the extent to which management expectations and the objectives
below are being met and provide recommendations on improving the program’s effectiveness.
Section 22
Objectives:
1. Well-trained, qualified FRs.
2. Adequate coverage for DOE facilities.
3. FRs provide effective oversight of facilities.
4. Adequate functional support from the Field Element Management.
5. Performance assessment and feedback program in place.
NOTE: At the discretion of Field Element management, additional Objectives can be assessed.
Purpose:
The purpose of this guide is to provide the DOE with a consistent set of guidelines to assess the
effectiveness of FR Programs. A template that should be used to perform the FR Program
assessment is provided starting on page B-3 and is available at
https://powerpedia.energy.gov/wiki/Facility_Representative_Program. The template includes
the appropriate Criteria, Review and Approach Document and Report format.
Scope:
This guide is provided for use by DOE HQ and Field Elements to assess the effectiveness of
their FR Programs as described in DOE STD-1063.
References:
The following references should be used in conjunction with this guide:
• DOE-STD-1146, General Technical Base Qualification Standard
• DOE-STD-1151, Facility Representative Functional Area Qualification Standard
DOE-STD-1063-2021
B-2
• Applicable Field Element site - and facility-specific qualification standards
• Applicable Field Element site - and facility-specific program implementing documents
• Applicable Field Element FR Program Performance Indicators
DOE-STD-1063-2021
B-3
FACILITY REPRESENTATIVE PROGRAM TEMPLATE
Facility Representative Program
Assessment for
DOE Site or Field Office Title
(Report Date)
U.S. Department of Energy, Office or Site (DOE-XXX)
DOE-STD-1063-2021
B-4
DOE-STD-1063-2021
B-5
DOE (state the organization
title):
Facility
Representative
Program Assessment
Dates of Assessment:
Report Date:
Part 1 – FACILITY REPRESENTATIVE PROGRAM ASSESSMENT PLAN OF ACTION (POA)
Scope:
The U.S. Department of Energy (DOE) continues to assess and improve its Facility Representative
(FR) Program at sites with hazardous facilities. Field Element Managers (FEMs) are required in DOE-
STD-1063-2021, Facility Representatives, to periodically (not to exceed three years) evaluate their FR
Programs relative to the Standard.
An effective FR Program contains many elements, which are described in DOE-STD-1063-2021.
These elements are intended to implement a program which provides DOE facilities with well-trained
FRs that spend appropriate amounts of time in their facilities and can work effectively with their
contractor management counterparts.
Purpose and Objectives.
This self-assessment was performed to provide assistance to the DOE-XX Manager in systematically
assessing the current status of the DOE- XX FR Program. The focus of the self-assessment was
evaluation of the DOE- XX FR Program performance level for the following objectives:
1. The Facility Representative training and qualification program that is in place results in well-trained,
qualified Facility Representatives.
2. The Facility Representative Program provides adequate coverage for DOE facilities.
3. Facility Representatives provide effective oversight of facilities.
4. Management provides adequate functional support for Facility Representatives.
5. An adequate performance assessment and feedback program is in place to assess the effective
implementation of the Facility Representative Program.
NOTE: At the discretion of Field Element management, additional Objectives can be assessed. If
additional items are to be assessed, they must be listed above in addition to the five required
Objectives
Section 23
Proposed Team Leader
Team Member
Team Member
Team Member
DOE-STD-1063-2021
B-6
Part 2 – Facility Representative Assessment Implementation Plan (IP) and Report
CRITERIA
FR-1 The Facility Representative training and qualification program that is in
place results in well-trained, qualified Facility Representatives.
a) Training records demonstrate that:
• Qualified FRs completed all qualification requirements as specified in
DOE-STD-1146, DOE General Technical Base Qualification Standard,
DOE-STD-1151, Facility Representative Functional Area Qualification
Standard, and local directives;
• The examination process demonstrates that the FR has the proper level
of knowledge of all qualification areas and facilities including technical
understanding of facility processes, judgment and decision-making
abilities, and ability to communicate expectations to the contractor;
• FRs are qualified by the FEMs or designee(s); and
• Appropriate action is taken for personnel failing to qualify within the time
allowed.
b) The continuing training program is documented and meets the needs
of the FRs by ensuring that:
• FRs maintain awareness of significant new hazards, activities, facility
modifications and/or operating practices at their assigned facility(s);
• Lessons learned from facilities, the site and across the complex are
shared;
• FRs stay abreast of changing technologies;
• FR skills are enhanced;
• FR performance and proficiency is improved;
• New requirements are reviewed; and
• Maintenance of FR qualifications is supported.
c) A process is defined and used effectively to maintain qualification(s).
d) A process is defined and used effectively to ensure that qualified FRs
maintain or regain proficiency.
Review and Approach
a) Review FR training documentation (e.g. training implementation
documents, training plans, job task analysis, training needs analysis,
qualification and/or certification records, training completion records,
etc.) and verify that the FRs are properly qualified and the continuing
training program is effective in meeting FR program needs.
b) Review the applicable documentation that defines the maintenance of
FR qualifications and determine the effectiveness of the process.
c) Review the applicable documentation that defines the FR proficiency
process and determine the effectiveness of the process.
d) As needed, interview the FR Program Sponsor, FR Program Manager,
FR supervisors, FRs, and Field Element management to evaluate their
understanding of the current FR training program and qualification
process(es).
Criteria Met:
YES
PARTIAL
NO
DOE-STD-1063-2021
B-7
Evaluation:
The review should include sufficient discussion to justify the conclusion drawn – may
be a few lines or a full page – whatever is necessary. Include Documents reviewed,
personnel interviewed and activities observed if appropriate. A simple SAT/UNSAT is
not sufficient.
1. Documents reviewed.
Consider reviewing the following types of documents: Program directive(s) and
procedure(s), Performance Indicators (DOE-wide and locally generated), Qualification
tracking data, Performance Assessments including the FR Program Self-Assessment,
Training records (including continuing training), Qualification records, FR logs, FR
reports, Management tracking system for FR reported issues, Written and Oral
examination question banks, Significant Occurrence Reports, etc.)
2. Personnel interviewed (use job titles).
Section 24
3. Activities observed.
The observation of activities can provide indication of: Level of FR facility knowledge,
actual practices of the facility, interactions with DOE and contractor personnel, log-
keeping and reporting practices, corrective action verification, etc.
Discussion:
Criteria met/partially met/not met with x Findings, x Observations and x
Noteworthy Practices - or - no deficiencies noted.
Reviewers:
Last Name
DOE-STD-1063-2021
B-8
FR-2 The Facility Representative Program provides adequate coverage for DOE
facilities.
a) A current FR staffing analysis has been performed in accordance with
the Facility Representative Standard and FRs are staffed to the
indicated level including:
• A sufficient numbers of FR candidates are undergoing
qualification to fill known or projected FR vacancies; and
• If FR vacancies exist, appropriate action(s) are being taken
to address the vacancies.
b) Performance Indicator data is used to provide indication of the FR
program status. Tracking and trending is performed and used to drive
program improvements
c) FRs metrics demonstrate adequate time spent performing Operational
Awareness activities; and
d) A process is defined and established to ensure that adequate facility
coverage is maintained by qualified FRs during periods of absence.
Review and Approach
a) Review the applicable documentation (e.g. most recent FR staffing
analysis, staffing plans, performance metrics, applicable office
documents, assessments, etc.) to determine if the FR Program is
appropriately staffed to provide adequate coverage and oversight of
DOE facilities and/or activities.
b) As needed, interview the FR Program Sponsor, FR Program Manager,
FR supervisors, FRs, and Field Element management to evaluate their
understanding of the current FR staffing and if effective coverage of
DOE facilities and/or activities is being accomplished.
c) Observe selected FR activities and records to evaluate the
effectiveness of FR coverage and oversight of assigned DOE facilities
and/or activities.
Criteria Met:
YES
PARTIAL
NO
Evaluation:
The review should include sufficient discussion to justify the conclusion drawn - may
be a few lines or a full page - whatever is necessary. Include documents reviewed,
personnel interviewed and activities observed if appropriate. A simple SAT/UNSAT is
not sufficient.
1. Documents reviewed:
(Consider reviewing the following types of documents: Program directive(s) and
procedure(s), Performance Indicators (DOE-wide and locally generated), Qualification
tracking data, Performance Assessments including the FR Program Self-Assessment,
Training records (including continuing training), Qualification records, FR logs, FR
reports, Management tracking system for FR reported issues, Written and Oral
examination question banks, Significant Occurrence Reports, etc.)
2. Personnel interviewed (use job titles):
3. Activities observed:
Reviewers:
Last Name
DOE-STD-1063-2021
B-9
The observation of activities can provide indication of: Level of FR facility knowledge,
actual practices of the facility, interactions with DOE and contractor personnel, log-
keeping and reporting practices, corrective action verification, etc.
Discussion:
Criteria met/partially met/not met with x Findings, x Observations and x
Noteworthy Practices - or - no deficiencies noted.
DOE-STD-1063-2021
B-10
FR-3 Facility Representatives provide effective oversight of facilities.
a) FR unencumbered access and “Stop Work” authority in their assigned
Section 25
facilities has been effectively implemented and used appropriately.
b) FR review of occurrence reports are accomplished as specified in DOE
O 232.2A, Occurrence Reporting and Processing of Operations
Information.
c) A formal process is documented and is effective in ensuring FR
availability and response to facility events.
d) FRs activities (e.g. operational awareness activities, facility
assessments, audits, surveillances, etc.) are adequately documented,
completed as scheduled and provides an evaluation of the overall
effectiveness of the operating contractor.
e) The process for reporting issues (formally and informally) to the
contractor and DOE management are defined, effective and ensures
consistency between the information captured and that reported.
f) Processes have been established that promote effective FR
communications and interaction with DOE Line Management, other
oversight personnel, and with contractors to provide information
related to their assigned facilities.
g) Verify the effectiveness of the FRs by observing selected qualified
personnel who are monitoring training, operations, or maintenance
evolutions.
Review and Approach
a) Review the applicable documentation that implements Stop Work
Authority and unencumbered access to FRs. Determine if these
processes are effectively implemented.
b) Determine if FRs have exercised “stop work” authority. If stop work
authority was exercised, interview the personnel involved and
determine if the action was appropriate and effective.
c) Determine if there were any occasions when it was appropriate for FRs
to exercise “Stop Work” authority, but it was not used. If instances are
identified, determine why it was not used.
d) Review a representative sample of final occurrence reports and verify
that the DOE 232.2A required reviews were completed within the
required periodicity, that the root cause(s) were identified and
appropriate corrective action(s) were identified.
e) Review the applicable documentation that specifies expectations for
FR availability and response to facility events and determine if it is
effectively implemented.
f) Review applicable FR documentation (e.g. operational awareness
activities, assessments, surveillances, audits, etc.) and determine if
they effectively demonstrate that assigned activities were completed
as scheduled, adequately document the activity and evaluate the
overall effectiveness of the contractor.
g) Review the applicable documentation that specifies how issues are
reported and determine if the process is effective.
h) Review the processes in place to facilitate communications between
the FRs, Field Element management and contractor management and
determine if they are effective.
Criteria Met:
YES
PARTIAL
NO
DOE-STD-1063-2021
B-11
i) Interview FR Program Sponsor, FR Program Manager, FR
supervisors, FRs, Field Element management, Contractor
management, Technical Expertise support (e.g. Radiological Controls,
Training, Industrial Safety, Quality Assurance, etc.) to evaluate the
effectiveness of the FR oversight for their assigned facility(s) and/or
activities.
j) Observe selected FR activities and evaluate the experience and
knowledge of Operations personnel, including line management
personnel, who will operate and control the facility(s)/activity(s).
Section 26
Evaluation:
The review should include sufficient discussion to justify the conclusion drawn – may
be a few lines or a full page – whatever is necessary. Include Documents reviewed,
personnel interviewed and activities observed if appropriate. A simple SAT/UNSAT is
not sufficient.
1. Documents reviewed.
Consider reviewing the following types of documents: Program directive(s) and
procedure(s), Performance Indicators (DOE-wide and locally generated), Qualification
tracking data, Performance Assessments including the FR Program Self-Assessment,
Training records (including continuing training), Qualification records, FR logs, FR
reports, Management tracking system for FR reported issues, Written and Oral
examination question banks, Significant Occurrence Reports, etc.
2. Personnel interviewed (use job titles).
3. Activities observed.
The observation of activities can provide indication of: Level of FR facility knowledge,
actual practices of the facility, interactions with DOE and contractor personnel, log-
keeping and reporting practices, corrective action verification, etc.
Discussion:
Criteria met/partially met/not met with x Findings, x Observations and x
Noteworthy Practices - or - no deficiencies noted.
Reviewers:
Last Name
DOE-STD-1063-2021
B-12
FR-4 Management provides adequate functional support for Facility
Representatives.
a) The reasons for any FR attrition are known (e.g. promotions, laterals,
downsizing, etc.) and steps have been taken to counter excessive
attrition.
b) Field element management ensures that FR positions are career
enhancing.
c) The process for addressing differing professional opinions is
documented and effective.
Review and Approach
a) Review any applicable FR attrition documentation and determine if the
reason(s) for attrition are understood, and effective steps have been
taken to address excessive attrition.
b) Interview Field Element management, FR Program Sponsor, FR
Program Manager and FR Supervisor(s) concerning methods that are
used to ensure FR positions are career enhancing. Determine if the
methods are effective.
c) Review the applicable documents that implement the differing
professional opinion process and determine if the process is
implemented effectively.
d) Determine if any FRs have used the differing professional opinion
process. It the process was used, interview the personnel involved
and determine the effectiveness of the differing professional opinion
process.
Criteria Met:
YES
PARTIAL
NO
Evaluation:
The review should include sufficient discussion to justify the conclusion drawn – may
be a few lines or a full page – whatever is necessary. Include Documents reviewed,
personnel interviewed and activities observed if appropriate. A simple SAT/UNSAT is
not sufficient.
1. Documents reviewed.
Consider reviewing the following types of documents: Program directive(s) and
procedure(s), Performance Indicators (DOE-wide and locally generated), Qualification
tracking data, Performance Assessments including the FR Program Self-Assessment,
Training records (including continuing training), Qualification records, FR logs, FR
reports, Management tracking system for FR reported issues, Written and Oral
examination question banks, Significant Occurrence Reports, etc.
2. Personnel interviewed (use job titles).
Discussion:
Criteria met/partially met/not met with x Findings, x Observations and x
Noteworthy Practices - or - no deficiencies noted.
Reviewers:
Last Name
DOE-STD-1063-2021
Section 27
B-13
FR-5 An adequate performance assessment and feedback program is in place to
assess the effective implementation of the Facility Representative Program.
a) The field element periodically conducts self-assessments of the entire
FR program.
b) The FEM has pursued improvements to the FR program resulting from
self-assessments of the program.
Review and Approach
a) Review applicable documentation (e.g. self-assessment reports,
assessment reports, feedback reports, corrective action database,
etc.) to determine if self-assessments have been performed, have
resulted in FR Program improvements and have included peer
reviews.
b) Interview the FR Program Sponsor, FR Program Manager, FR
Supervisors, FRs, and Field Element management to assess their
knowledge of self-assessment results and of any process
improvements that have resulted from the self-assessment program.
Criteria Met:
YES
PARTIAL
NO
Evaluation:
The Review should include sufficient discussion to justify the conclusion drawn – may
be a few lines or a full page – whatever is necessary. Include Documents reviewed,
personnel interviewed and activities observed if appropriate. A simple SAT/UNSAT is
not sufficient.
1. Documents reviewed.
(Consider reviewing the following types of documents: Program directive(s) and
procedure(s), Performance Indicators (DOE-wide and locally generated), Qualification
tracking data, Performance Assessments including the FR Program Self-Assessment,
Training records (including continuing training), Qualification records, FR logs, FR
reports, Management tracking system for FR reported issues, Written and Oral
examination question banks, Significant Occurrence Reports, etc.)
2. Personnel interviewed (use job titles).
Discussion:
Criteria met/partially met/not met with x Findings, x Observations and x
Noteworthy Practices - or - no deficiencies noted.
Reviewers:
Last Name
DOE-STD-1063-2021
B-14
List any additional items to be assessed as directed by Field Element management)
FR-XX List any additional items to be assessed as directed by Field Element
management
NOTE: This section may be copied and pasted to the assessment report
as often as needed to cover any additional self-assessment requirements
as directed by Field Element management. If no additional self-
assessment items are directed by Field Element management, delete this
section from the final report
Review and Approach
a) Review applicable documentation (e.g. self-assessment reports,
assessment reports, feedback reports, corrective action database,
etc.) to determine if self-assessments have been performed, have
resulted in FR Program improvements and have included peer
reviews.
b) Interview the FR Program Sponsor, FR Program Manager, FR
Supervisors, FRs, and Field Element management to assess their
knowledge of self-assessment results and of any process
improvements that have resulted from the self-assessment program.
Criteria Met:
YES
PARTIAL
NO
Evaluation:
(The Review should include sufficient discussion to justify the conclusion drawn – may
be a few lines or a full page – whatever is necessary. Include Documents reviewed,
personnel interviewed and activities observed if appropriate. A simple SAT/UNSAT is
not sufficient.)
1. Documents reviewed.
Consider reviewing the following types of documents: Program directive(s) and
procedure(s), Performance Indicators (DOE-wide and locally generated), Qualification
tracking data, Performance Assessments including the FR Program Self-Assessment,
Training records (including continuing training), Qualification records, FR logs, FR
reports, Management tracking system for FR reported issues, Written and Oral
examination question banks, Significant Occurrence Reports, etc.
Section 28
2. Personnel interviewed (use job titles).
Discussion:
Criteria met/partially met/not met with x Findings, x Observations and x
Noteworthy Practices - or - no deficiencies noted.
Reviewers:
Last Name
DOE-STD-1063-2021
B-15
Facility Representative Program Assessment Implementation Plan Approval
Signature Printed/Typed Name, Position
Team Leader*
* Upon completion of the Implementation Plan, the Team Leader will enter this report into applicable
database and should forward this report to the appropriate DOE line management personnel for
information.
DOE-STD-1063-2021
B-16
Part 3 – Facility Representative Program Assessment Report
The completed Assessment, Part 2 constitutes the body of the FR Program Assessment Report.
Assessment Findings, Lessons Learned, and a Conclusion follows:
Facility Representative Program Assessment Findings
All Findings must be entered into the applicable database for appropriate issues management and
corrective action tracking. The findings are summarized below. Tracking, Corrective Action Planning and
Execution, Closure, and Verification of Closure are conducted in accordance with the applicable DOE
Office procedures/processes.
Tracking # Summary of Finding
Provide a summary of the finding in sufficient detail to provide a
reader with an understanding as to how the finding relates to the
objective of the FR Program reviewed.
Lessons Learned
All Lessons Learned must be entered into the applicable Lessons Learned database. The Lessons
Learned are summarized below.
Tracking # Summary of Lessons Learned
List any Lessons Learned about either the Assessment Process,
interface with the Facility or other information that will improve the
FR Program and/or Assessment process.
Conclusion
Based on the completion of this Assessment and the results documented in the preceding Part 2 the
team concludes – provide a brief summary of the conclusion as to whether or not the objective of the
FR Program was met. Indicate the number of Findings written.
Facility Representative Program Assessment Report Approval
Signature/Date Printed/Typed Name, Position
Team Leader
Team Member
Team Member
* Upon completion of the Report, the Team Leader will ensure that this report is entered into the
applicable database and should forward this report to the responsible FEM and appropriate DOE FR
Program personnel for information.
DOE-STD-1063-2021
B-17
Assessment Team Biographies
Include a short biography (a short summary paragraph that demonstrates competence commensurate
with the responsibility) of the Team Leader and Team Members. The biography must summarize how
each team member met the following requirements:
1. technical knowledge of the area assigned for evaluation, including experience working in the
technical area;
2. knowledge of performance-based assessment processes and methods; and
3. knowledge of facility, activity, or operation-specific information.
Assessment Team Independence
Include a short statement that demonstrates that the Team Leader and each Team Member is
independent and did not review any activity for which they are directly responsible.
I, (insert Team Leader Name), have verified that each member of the Assessment Team did not review
any work and/or activity for which they are directly responsible.
Signature/Date Printed/Typed Name
Team Leader
Dissenting Professional Opinion(s)
If there is a dissenting professional opinion, capture the facts and resolution in this space. If there is no
dissenting professional opinions, then state so in this space.
Section 29
DOE-STD-1063-2021
C-1
Appendix C. Process to Determine Facility Representative Staffing
Overview:
The steps below describe an analytical process to determine FR staffing for all hazardous
facilities at a site. This method provides a technical approach to determine the appropriate
amount of FR oversight necessary for a facility given its hazard level, operational activity and
complexity, and programmatic importance. This staffing approach is also designed to provide
DOE with a common human capital strategy approach such that the DOE can objectively
analyze, allocate, budget, and justify FR resources throughout the DOE Complex.
Methodology:
The following elements shall be included in each site analysis:
1. An analysis of facilities based on hazards or risks present to the public, worker, and/or
environment;
2. A method for determining FR coverage (e.g., continual, frequent, occasional, etc.) based
on facility categorization and adjusted for other factors identified in this Appendix such
as facility size, operations complexity, hazards and risks, etc.;
3. A determination of FR Full Time Equivalent (FTE) requirements based on coverage
assigned and adjusted to address factors considered in Step 2 above; and
4. A determination of actual staffing based on FR FTE requirements adjusted to account for
actual staff time available to support the FR function when competing activities such as
collateral duties, leave, training, etc. are considered.
Process:
The process for conducting an FR staffing analysis involves generating and analyzing the data
necessary to complete Table C-1: Determination of FR Coverage.
Column A lists the name of the facility or group of facilities.
Column B lists the Facility Hazard Categorization, which is predetermined for
Categorized (Nuclear, Biosafety, and some Chemical) facilities, and is determined for
non-categorized by completing a worksheet.
Column C lists the Facility Activity Level.
Column D lists a Base FR Facility Coverage Level.
Column E lists Base FR FTE Level.
DOE-STD-1063-2021
C-2
Column F lists Adjusted FR FTE Coverage Level based on facility operational and
programmatic conditions and situations.
Column G lists the Percentage of Time FR is Available to Provide Coverage utilizing
historical FR Performance Indicator data.
Column H lists the Final FR FTE Coverage Level for each facility or group of facilities,
which is obtained by dividing the Adjusted FR FTE Coverage Level by the Percentage of
Time FR is Available to Provide Coverage.
Total FR FTEs Required is determined by summing the facility values listed in Column H.
Total FR FTEs Onboard is listed to provide a reference for determining if sufficient FR FTEs are
currently available.
Table C-1: Determination of Facility Representative Coverage
(Facility X, Y, and Z provided as examples)
Column
A
Column
B
Column
C
Column
D
Column
E
Column
F
Column
G
Column
H
Facility or
Groups of
Facilities
Facility
Hazard
Categorization
Facility
Activity
Level
Base FR
Facility
Coverage
Level
Base FR
FTE Level
Adjusted
FR FTE
Coverage
Level
Percentage
of Time FR
is Available
to Provide
Coverage
Final FR
FTE
Coverage
Level
Nuclear
Facility X
Nuclear
HazCat 2 High Frequent 0.50 – 1.00 1.50 0.73 2.05
Biosafety
Facility Y
Biosafety Level
3 Medium Intermittent 0.25 – 0.50 0.25 0.73 0.34
Other
Hazardous
Facility Z
Other
Hazardous
High
Medium Intermittent 0.25 – 0.50 0.50 0.73 0.68
Total FR FTEs Required 3.07
Section 30
Total FR FTEs Onboard 2.0
Explanation of Difference Hiring action in progress to add 1 FR
DOE-STD-1063-2021
C-3
Procedure for Completing Table C-1: Determination of Facility Representative Coverage
1. Column A – Facility or Groups of Facilities
Determine all hazardous facilities, or groups of hazardous facilities, and list them in
Column A.
2. Column B – Facility Hazard Categorization
Determine the Facility Hazard Categorization and list that categorization in Column B.
For Nuclear Hazard, Biological Hazard, and Chemical Hazard facilities, enter the
categorization determined by regulatory requirements.
a. Nuclear hazard categorization is from DOE-STD-1027. The staffing analysis
shall include at least one FR for a hazard category 1 nuclear facility.
b. Biological hazard levels are defined in Biosafety in Microbiological and
Biomedical Laboratories, U.S. Department of Health and Human Services
Centers for Disease Control and Prevention and National Institutes of Health
Fifth Edition, May 2009.
c. Chemical hazard classes are established by OSHA and EPA. Regulated Toxic
and Regulated Flammable Substances and their Threshold Quantities are listed
in 40 CFR Part 68.130, Chemical Accident Prevention Provisions. Extremely
Hazardous Substances and Threshold Planning Quantities are listed in
Appendices A and B of 40 CFR Part 355, Emergency Planning and Notification.
Process Safety Management chemicals are listed in Appendix A of 29 CFR
Section 1910.119, Occupational Safety and Health Standards, “Process Safety
Management of Highly Hazardous Chemicals.”
The FEM identifies Other Hazardous Facilities that could pose a significant risk to
the public, workers, or the environment, or are crucial mission facilities that
require FR oversight. Consideration could include poor operational or safety
performance, special needs, and significant public concern.
For Other Hazardous Facilities, complete the following worksheet. Evaluate
each hazard at each facility based on the relative magnitude of the hazard to the
public, workers, and the environment. The evaluation should include the
complete spectrum of hazards in the facility that could expose members of the
public, onsite co-located workers, facility workers and the environment to
hazardous materials or energy. The highest resulting hazard associated with the
facility is the overall Facility Hazard Categorization for Table C-1, Column B.
DOE-STD-1063-2021
C-4
The ranking system used in this process is:
• High Hazard – 3 – Potential for major impact to the public, workers, or the
environment;
• Moderate Hazard – 2 – Potential for moderate impact to the public, workers,
or the environment; and
• Low Hazard – 1 – Potential for minor impact to the public, workers, or the
environment.
(Facility Z is provided as an example)
Worksheet for Determining the Facility Hazard Categorization for Other Hazardous Facilities
Biological Hazard
Chem. Fire Electrical/
Laser Cryogens High
Pressure
Hoisting
and
Rigging
Explosive Other
Facility or
Group of
Facilities
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Pu
bl
ic
W
or
ke
r
En
vi
ro
nm
en
t
Facility
Hazard
Categorization
Section 31
Facility Z 1 2 1 1 3 2 1 1 2 1 3 High
3. Column C – Facility Activity Level
Determine the Facility Activity Level and list the result in Column C. The activity level
definitions are:
• High Activity Level – Facilities that daily to weekly involve activities with one or more
hazards.
• Medium Activity Level – Facilities that weekly to monthly involve activities with one or
more hazards.
• Low Activity Level – Facilities that monthly to quarterly involve activities with one or
more hazards.
4. Column D – Base FR Facility Coverage Level
Determine the recommended Base Coverage Level using the guide in Table C-2 and list
in Column D.
DOE-STD-1063-2021
C-5
Table C-2: Recommended Base Coverage Level
Nuclear
Hazard
Category
Biosafety
Level
Chemical Hazard
Classification
Other
Hazardous
Facilities
Facility Activity Level
High Medium Low
Hazard
Category 1
Biosafety
Level 4 Continual Frequent Intermittent
Hazard
Category 2
Biosafety
Level 3
Facilities with regulated
hazardous material requiring
a Risk Management Plan
AND
The potential for ERPG-2
levels or TEEL-2 for off-site
High
Hazard Frequent Intermittent Occasional
Hazard
Category3
Biosafety
Level 2
Facilities with regulated
hazardous material requiring
a Risk Management Plan
OR
The potential for ERPG-2
levels or TEEL-2 for
collocated worker (100M)
Moderate
Hazard Intermittent Occasional Seldom
Radiological
Inventories of flammable
materials and reactive
compounds exceeding
threshold quantities in 29
CFR 1910.119
Low
Hazard Occasional Seldom
The coverage levels are:
• Continual – The FR is present daily. This coverage may require the complete attention
of one or more individuals and may require backshift, weekend, or 24-hour coverage. If
the normally-assigned FR is gone for one week or longer, the FEM should name a
temporary replacement and establish an appropriate coverage schedule.
• Frequent – The FR is present approximately half of the time (i.e., about 2-4 days per
week). One person can cover multiple facilities. If the normally-assigned FR is gone for
two weeks or longer, the FEM should name a temporary replacement and establish an
appropriate coverage schedule.
• Intermittent – The FR is present at least one day per week. One person can cover
several such facilities.
• Occasional – The FR visits the facility 12-24 days a year.
• Seldom – The FR visits the facility 6-12 days a year.
DOE-STD-1063-2021
C-6
5. Column E – Base FR FTE Level
Determine the recommended Base FTE Level using the Table C-3 guide and list in Column E.
Table C-3. Recommended Base FTE Level
Base FR Coverage Level Base FR FTE Level
Continual > 1.00 FTE
Frequent 0.50 – 1.00 FTE
Intermittent 0.25 – 0.50 FTE
Occasional 0.10 – 0.25 FTE
Seldom < 0.10 FTE
6. Column F – Adjusted FR FTE Coverage Level
Following establishment of the Base FR FTE Level for each facility, the FEM may further adjust
the level of coverage. This adjustment should take into consideration factors such as those
listed below, and be based on the FEM’s judgment of the contractor’s operational performance
and the priority for providing FR oversight. FR coverage for “Other Hazardous Facilities” with a
“Low” hazard category is optional.
• Complexity of the facility and facility operations and facility operations involving multiple
shifts
• Status of operational rigor; history of Contractor performance for similar activities
• History of significant events/incidents at the facility
Section 32
• Facility size, age, and material condition
• Programmatic importance and risk associated with successful accomplishment of
mission
• Potential for DOE or public interest
• Anticipated changes in the operational status of facility
• Facility configuration changes (like test facilities, for example)
• Availability of other DOE technical oversight
Determine the Adjusted FTE Coverage Level and list in Column F.
DOE-STD-1063-2021
C-7
7. Column G – Percentage of Time FR is Available to Provide Coverage
Utilizing Quarterly FR Performance Indicator data for the last four calendar quarters, determine
the average percentage of time FRs spent performing Contractor oversight (DOE goal is 65%),
and list that value in Column G.
8. Column H – Final FR FTE Coverage Level
Calculate Final FR FTE Coverage for each hazardous facility by dividing the Adjusted FR FTE
Coverage Level in Column F by the Percentage of Time Available to Provide FR Coverage in
Column G. Enter the result in Column H.
9. Total Number of FR FTEs Required
Sum the values in Column H, Final FR FTE Coverage Level, to obtain the Total Number FR
FTEs Required, and place that total in the space provided.
10. Total FR FTEs Onboard
Enter the number of FR FTEs currently available to perform oversight at the facilities or groups
of facilities included in the analysis.
11. Explanation of Difference
Provide a brief explanation of what action is planned to resolve any difference between Total FR
FTEs Required and the Total FR FTEs Onboard.
DOE-STD-1063-2021
C-8
DOE-STD-1063-2021
D-1
Appendix D. Evaluated Facility Walkthrough
1.0 Background: An Evaluated Facility Walkthrough is a type of final qualification practical
examination where a designated individual or group of individuals observes a FR candidate
performing their duties and responsibilities in their assigned facilities. The Evaluated Facility
Walkthrough includes a qualifying official observing an FR candidate performing a facility
walkthrough and also includes an oral evaluation component (i.e. during the walkthrough) where
the FR candidate is asked questions regarding procedures, safety implications, safety systems,
and other topics to determine whether they have obtained a sufficient level of competency to
independently perform their assigned duties and responsibilities.
The Evaluated Facility Walkthrough verifies the adequacy of the FR candidate's technical
knowledge in the actual facility for which they will be responsible. This examination is part of the
FR qualification process that follows successful completion of the written examination but
precedes the final oral board examination. It ensures that the candidate has gained the
necessary level of knowledge; and that the candidate can satisfactorily represent the interests of
DOE; monitor contractor performance; and ensure implementation of significant environmental,
safety, and health requirements. The Evaluated Facility Walkthrough is evaluated by an
examiner (e.g. FR Program Manager (FRPM), Operations Manager, qualified FR) assigned by
DOE Management (i.e. responsible for qualifying FRs) and may include an evaluation team.
2.0 Purpose: The purpose of this Appendix is to document guidance for the methodology and
process of conducting an Evaluated Facility Walkthrough for the qualification of an FR.
3.0 Methodology
Section 33
The general methodology for completion of the Evaluated Facility Walkthrough includes the
Field Element Management (i.e. the DOE Management responsible for the respective FR
program) appointing an examiner that will conduct the Evaluated Facility Walkthrough;
Identifying questions to be asked during the walkthrough; Documenting the questions on an
evaluation form; Evaluating the conduct of the walkthrough; Documenting and Grading the
walkthrough followed by feedback to the FR candidate. These steps are outlined in more detail
below.
3.1 The DOE Manager responsible for qualification of FRs should identify a DOE
Examiner(s) (e.g. Facility Rep Program Manager (FRPM), ESH Supervisor, Operations
Supervisor, etc.) that is responsible for evaluating the Facility Walkthrough. The DOE
Manager may appoint an Evaluation Team; however, the evaluation team should be kept
small to ensure adequate dialogue/evaluation and minimal impact on ongoing facility
operations. Consideration should be given to including a qualified FR on the Evaluation
Team.
3.2 The Evaluation Team should draft questions to be asked of the FR candidate during the
walkthrough. The content of the questions should be tailored according to the areas
listed below.
DOE-STD-1063-2021
D-2
• Weak functional areas identified on the written test;
• Hazards (e.g. form/quantity of radiological or fissile material in facility) and credited
controls existing in the facility (e.g. SACs, LCOs, SLs, etc.);
• Facility System Components including credited SS and SC SSCs;
• General Technical Knowledge;
• Emergency Preparedness;
• Safety Management Programs (Maintenance, Conduct of Operations, Training,
Radiation Safety, Fire Protection Program, Criticality Safety, etc.);
• Scenario Based questions (e.g. What happens if…). Examples of scenario-
based questions include the following:
o You walk up to a fire door and notice a crack in the window of a fire door that
is part of a 2 hour fire barrier. What would you do and what would you expect
the contactor to do?
o You are with a technician who is performing morning rounds and walk
through a 2 hour fire door and notice that the door does not close on its own
behind. What do you do?
o You are walking through a waste storage facility and notice that a drum is
bulging. What do you do?
o You are walking through a facility and notice that the radiation survey map is
several months old and contact information includes a HP that recently
separated from the lab several weeks ago.
o You are walking through the facility and notice that several operator aids do
not have a number identifier/approval signature/ or date. The Operator Log
shows that monthly audits have been performed on a monthly basis. What
do you do?
The questions, criteria for passing each question, and results (i.e. pass or fail) should be
documented on an Evaluated Facility Walkthrough Documentation Form (See example
below).
3.3 The FR Candidate should schedule and conduct the walkthrough of the facility with the
Evaluation Team while describing items such as the following: mission of the facility;
hazard category, hazards and credited SSCs, support equipment; program work;
aspects of radiological safety; industrial safety; Safety Management programs; open
DOE-STD-1063-2021
D-3
work permits in the facility; aspects of maintaining operational awareness (routine
meetings, walkthroughs, surveillances, interactions with facility management); etc.
Section 34
3.3.1 During the conduct of the walkthrough, the Evaluation Team should ask the
predetermined questions that are documented on the Evaluated Facility Walkthrough
Documentation Form to evaluate the FR candidate’s knowledge. The results of the
walkdown should be documented by the examiners on the same form. All primary
questions in an area should be listed along with an evaluation of each response
(Satisfactory or Unsatisfactory). Any follow-up or secondary questions that show a
weakness should be recorded with an explanation as to the nature of the weakness.
3.3.2 Following completion of the Evaluated Facility Walkthrough and after the Evaluation
Team completes evaluation of the FR candidate, they should discuss overall and area
grades and document the results on the Evaluated Facility Walkthrough Documentation
Form. If any examiner assigns the candidate an overall grade of “Unsatisfactory,” the
consolidated overall grade should be “Unsatisfactory.” The overall grade should be
documented on the Evaluated Facility Walkthrough Documentation Form and signed by
all examiners.
3.4 Following the grading of the exam, the results should be discussed with the FR candidate.
If there are areas that are unsatisfactory, remedial training should be conducted followed
by an abbreviated Evaluated Facility Walkthrough to test on deficient areas.
3.5 Successful completion of the Evaluated Facility Walkthrough should be documented in
accordance with Site TQP requirements.
DOE-STD-1063-2021
D-4
DOE-STD-1063-2021
D-5
EVALUATED FACILITY WALKTHROUGH DOCUMENTATION FORM (EXAMPLE)
CANDIDATE: DATE:
POSITION or FACILITY for QUALIFICATION:
AREA #1:
Facility SC/SS SSCs
Primary Question 1:
(Correct Response)
Primary Question 2:
AREA GRADE (Satisfactory/Unsatisfactory):
AREA #2
General Technical
Primary Question 1:
(Correct Response)
Primary Question 2:
AREA GRADE (Satisfactory/Unsatisfactory):
DOE-STD-1063-2021
D-6
WALKDOWN DOCUMENTATION FORM - continued
CANDIDATE: DATE:
POSITION or FACILITY for QUALIFICATION:
AREA #3:
Functional Area Specific
Primary Question 1:
(Correct Response)
Primary Question 2:
AREA GRADE (Satisfactory/Unsatisfactory):
AREA #4
Emergency Response
Primary Question 1:
(Correct Response)
Primary Question 2:
AREA GRADE (Satisfactory/Unsatisfactory):
DOE-STD-1063-2021
D-7
WALKDOWN DOCUMENTATION FORM - continued
CANDIDATE: DATE:
POSITION or FACILITY for QUALIFICATION:
AREA #5:
Environment Safety and Health (ES&H)
Primary Question 1:
(Correct Response)
Primary Question 2:
AREA GRADE (Satisfactory/Unsatisfactory):
AREA #6
Title of Area:
Primary Question 1:
(Correct Response)
Primary Question 2:
AREA GRADE (Satisfactory/Unsatisfactory):
DOE-STD-1063-2021
D-8
WALKDOWN DOCUMENTATION FORM - continued
CANDIDATE: DATE:
POSITION or FACILITY for QUALIFICATION:
AREA #7:
Title of Area:
Primary Question 1:
(Correct Response)
Primary Question 2:
AREA GRADE (Satisfactory/Unsatisfactory):
OVERALL GRADE (Satisfactory/Unsatisfactory):
Remediation Plan Required? Yes / No
Continuation page(s) attached? Yes / No
Date:
Date:
Examiner’s Signature and Title
Date:
Examiner’s Signature and Title
Date:
Examiner’s Signature and Title
Date:
Candidate’s Signature and Title
FOREWORD
CONTENTS
Acronyms
1.0 SCOPE
2.0 REFERENCES
2.1 Government and Industry Documents.
2.1.1 DOE Directives [Policies (P), Orders (O), Guides (G)].
2.1.2 DOE Standards.
2.1.3 Other.
Section 35
3.0 DEFINITIONS
4.0 DUTIES, RESPONSIBILITIES, AND AUTHORITIES OF FACILITY REPRESENTATIVES AND OTHER KEY PERSONNEL
4.2.1 Deputy Secretary.
4.2.2 Associate Under Secretary for Environment, Health, Safety and Security.
4.2.3 Cognizant Secretarial Officers.
4.2.4 Field Element Managers.
4.2.5 Facility Representative Program Sponsors.
4.2.6 Office of Enterprise Assessments.
5. FACILITY REPRESENTATIVE PROGRAM REQUIREMENTS
Appendix A. Facility Representative DOE-Wide Performance Indicators
Appendix B. Facility Representative Program Assessment Guide
Appendix C. Process to Determine Facility Representative Staffing
Appendix D. Evaluated Facility Walkthrough
Table 1: Facility Representative Qualification
Appendix A. Facility Representative DOE-Wide Performance Indicators
A-1. Quarterly Reporting Elements – What to Report
Table A-1: Example Report – Red Run Site
Table A-2: Quarterly Reporting Requirements – How to Determine
Table A-3: Additional Guidance on Computing Facility Representative Percentage of Oversight Time
Appendix B. Facility Representative Program Assessment Guide
FACILITY REPRESENTATIVE PROGRAM TEMPLATE
Part 1 – FACILITY REPRESENTATIVE PROGRAM ASSESSMENT PLAN OF ACTION (POA)
Part 2 – Facility Representative Assessment Implementation Plan (IP) and Report
Part 3 – Facility Representative Program Assessment Report
Appendix C. Process to Determine Facility Representative Staffing
Appendix D. Evaluated Facility Walkthrough