DOE-STD-1055-93, Guideline to Good Practices for Maintenance Management Involvement at DOE Nuclear Facilities
Functional areas: Good Practices, Maintenance Management, Nuclear Facilities
This guide is intended to assist facility maintenance management in the review of existing and in developing new maintenance management programs.
Unknown Block text
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
NOT MEASUREMENT NOT MEASUREMENT
SENSITIVESENSITIVE
DOE-STD-1055-93
March 1993
DOE STANDARD
GUIDELINE TO GOOD PRACTICES FOR
MAINTENANCE MANAGEMENT
INVOLVEMENT AT DOE NUCLEAR
FACILITIES
U.S. Department of Energy AREA MNTY
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
WELCOME TO PDF
This Portable Document Format (PDF) file contains bookmarks, thumbnails, and hyperlinks to help you navigate through this document. All items listed in the Contents are linked to the corresponding sections. In addition, if you click on a section heading while you are reading the text, you will return to the Contents. Click on the DOE Seal below to move to the Contents page.
This document has been reproduced directly from the best available copy.
Available to DOE and DOE contractors from the Office of Scientific and
Technical Information, P.O. Box 62, Oak Ridge, TN 37831.
Available to the public from the National Technical Information Service, U.S.
Department of Commerce, 5285 Port Royal Rd., Springfield, VA 22161.
Order No. DE93013953
DOE-STD-1055-93
FOREWORD
The purpose of the Guideline to Good Practices for Maintenance Management
Involvement at DOE Nuclear Facilities is to provide contractor maintenance organizations
with information that may be used to verify adequacy of and/or modify existing maintenance
management programs, or to develop new programs. This document is intended to be an
example guideline for the implementation of DOE Order 4330.4A, Maintenance Management
Program, Chapter II, Elements 14 and 16. DOE contractors should not feel obligated to adopt
all parts of this guide. Rather, they should use the information contained herein as a guide
for developing maintenance management programs that are applicable to their facility.
iii
DOE-STD-1055-93
CONTENTS
FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1 Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.2 Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
1.3 Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
2. MAINTENANCE MANAGEMENT INVOLVEMENT . . . . . . . . . . . . . . . . . . . . . . . 3
2.1 Discussion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 Guidelines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.2.1 Manager Involvement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.2.2 Performance Indicators, Goals, and
Objectives Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2.2.3 Problem Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2.2.4 Feedback . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2.2.5 Program Reviews. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
APPENDIX A MAINTENANCE MANAGEMENT
INVOLVEMENT SAMPLE LESSON PLAN . . . . . . . . . . . . . . . . . A - 1
Section 2
v
DOE-STD-1055-93
1. INTRODUCTION
1.1 Purpose
This guide is intended to assist facility maintenance management in the review of existing
and in developing new maintenance management programs. It is expected that each DOE
facility may use different approaches or methods than those defined in this guide.
Explanation of the intent of this guide is provided in the Discussion section, and the specific
guidelines that follow reflect generally accepted industry practices. Therefore, deviation from
any particular guideline would not, in itself, indicate a problem. If substantive differences
exist between the intent of the Guideline and actual practice, management should evaluate
current practice to determine the need to include/exclude proposed features. A change to
maintenance practice would be appropriate if a performance weakness was determined to
exist. Development, documentation, and implementation of other features which further
enhance these guidelines for specific applications, is encouraged.
This guide describes key features of programs that support maintenance management.
Their implementation should enhance safe, reliable, and efficient maintenance operations.
Included in these key features is guidance for the following management functions:
a) Management Involvement
b) Performance Indicators, Goals, and Objectives Results
c) Problem Analysis
d) Feedback
e) Program Reviews
The Discussion Section, of this guideline, concisely describes actions which support the
development of a maintenance management program and includes a brief explanation of it's
relevance. The Guidelines section provides typical industry guidance relative to each of the
four features listed above. In some cases, example situations accompany the guidelines.
These examples have been provided only as an aid in clear understanding of the guidelines
and should not be construed as the only method for meeting the intent of the guidelines.
Persons wishing to obtain an overview of this document need only read the Introduction
and Discussion section.
1
DOE-STD-1055-93
Additional information pertinent to the implementation of this guideline may be found in
the following DOE Guidelines:
1) DOE-STD-1004-92 "Root Cause A nalysis Guidance Document."
2) DOE STD-XXXX-XX "Guidelines to Good Practices for Maintenance Organization and
A dministration at DOE Nuclear Facilities."
3) DOE-STD-XXXX-XX "Guidelines to Good Practices for Maintenance History at DOE
Nuclear Facilities."
4) DOE-NE-STD-XXXX-XX "Guidelines to Good Practices for Planning, Scheduling, and
Coordination of Maintenance A ctivities at DOE Nuclear Facilities."
5) DOE-STD-XXXX-XX "W riter's Guide for Technical Procedures."
6) DOE-STD-XXXX-XX "Guidelines to Good Practices for Types of Maintenance at DOE
Nuclear Facilities."
7) DOE-STD-XXXX-XX "Guidelines to Good Practices for Control of Maintenance
A ctivities at DOE Nuclear Facilities."
Appendix A is provided for use by facility trainers who intend to provide training
regarding this element.
1.2 Background
The information in this guide was developed from commercial and DOE sources. Each
facility should select those details that are applicable, add any unlisted knowledge or
experience that are applicable, and develop and implement facility-specific maintenance
management programs. Facilities that have existing maintenance management programs
should review this guide to identify details that may enhance their existing programs.
1.3 Application
Section 3
The content of this guide is generally applicable to all DOE nuclear facilities. Portions of
the programs outlined may not be applicable to all facilities because maintenance
organizations, disciplines, titles, and responsibilities may vary among DOE nuclear facilities.
Facility maintenance personnel may verify the adequacy or improve existing maintenance
management programs by adapting this guide to their specific facility and individual
maintenance disciplines.
2
DOE-STD-1055-93
2. MAINTENANCE MANAGEMENT INVOLVEMENT
2.1 Discussion
Maintenance managers should demonstrate their commitment to excellence through direct
involvement in activities which encourage a high level of individual performance.
Management should set an example which supports the first-line supervisors by taking the
lead in direct observation of craft activities in the field.
This high profile by management during frequent non-scheduled individual tours of work
areas both on- and off-shift provides:
· First-hand observation of actual conditions
· An opportunity to communicate expected performance standards through appropriate and
timely recognition/feedback directly to individuals regarding either positive or negative
observations
· An opportunity to seek involvement in and to establish ownership of approved actions at
the level closest to and directly involved in performance improvement
· Incentive for individuals at all levels to take pride in their accomplishments
· Motivation for first-line supervisors and craftspersons to accept responsibility for the early
detection of opportunities for improvement
· The means for timely escalation of significant problems/concerns to the level of
management having resolution authority
In addition to first-hand observations, maintenance managers ensure effective
knowledge-based decisions using factual information derived from and substantiated by a
variety of sources, including:
· Key performance indicator trend review
· Critical self-assessments
· Exception reports
· Problem and corrective action status tracking
· Lessons Learned and Alert System reviews
· Daily and weekly review of staff activities
· Customer feedback
· Craftsperson input
· Historical data
· Regulatory (ESH) requirements
Follow-up actions assure all levels that management is interested in and acts upon
individual input.
3
DOE-STD-1055-93
A work sampling program should be used to establish and update baseline effectiveness
values and to assess the impact of imposed constraints and limitations such as radiation
contamination control and historical repair time versus engineered time standards to provide
for productivity improvements.
Maintenance workmanship standards used to gauge and ensure an appropriate level of
performance are those consensus standards associated with specific maintenance activities
such as:
· National Electric Code
· Asbestos Abatement Standards
· OSHA regulations
· National Standards for Calibration and Certification
· Garage (vehicle) repair/service standards
· Warranty/guarantee stipulations
· FCC telecommunications regulations
· Davis-Bacon Act
· Waste Stream Management
· ALARA Contamination Control
· Plant housekeeping standards
· Environmental regulations
A Real-Property Cost Collection System (using a series of blanket work orders for each
building) may be used to assist in identifying cost drivers associated with Plant buildings and
structures.
Programmatic maintenance support should be identified by accounting work orders
associated with specific programmatic activity.
Section 4
Current cost drivers which usurp maintenance resources normally allocated to facility
maintenance and production/process equipment tasks include:
· Safety Class Items
· OSHA and environmental compliance
· Various upgrades
4
DOE-STD-1055-93
2.2 Guidelines
2.2.1 Manager Involvement
Managers should include time for non-scheduled walk-throughs of facility work areas
as a regular management activity. These walk-throughs should be directed at
improving dialogue with workers at all levels of the maintenance organization.
Implementation of this method should be an on-going process. Maintenance
management should establish the percentage of time that first-line supervisors are
expected to spend supervising field work and providing value-added involvement in
crew activities (an industry average is approximately fifty percent). Facility and
work-site tours should be conducted randomly for management visibility to and contact
with weekend, and second and third shift workers. These tours may also be
selectively and judiciously accomplished based on concerns resulting from program
reviews or other feedback. The results of management walk-through observations and
contacts should be documented and communicated to affected organizations and
individuals and followed to logical conclusion. Managers should demonstrate to all
employees their commitment to excellence in all areas of maintenance.
2.2.2 Performance Indicators, Goals, and Objectives Results
Accomplishments toward established performance indicators, goals and objectives
should be developed, trended, and reported to provide feedback to those affected.
DOE Guidelines to Good Practices for Maintenance Organization and A dministration
at DOE Nuclear Facilities discusses the development of performance indicators, goals,
and objectives for maintenance.
A well-structured formal Total Quality Management Program should be developed
within the Maintenance organization. Various councils, task analysis teams,
engineering, and technical support groups should continually review:
· Significant program elements to determine and recommend opportunities for
maintenance program improvement
· Critical work in progress
· System and procedure applicability
· Real-time and history data
· Root cause resolution
· Activity intervals and acceptance criteria
· Acquire and apply value-added new technology
· Project status
· Non-Facility maintenance personnel performance
· Site planning
5
DOE-STD-1055-93
These groups should meet regularly with management to:
· Review and report progress
· Maintain management visibility and awareness
· Ensure management support for proposed actions
· Obtain management approvals
Meetings with affected individuals/groups, should be conducted on a regular schedule
to provide for sharing information through interrogative/interactive participation.
Reported accomplishments should be tracked and regularly evaluated for trends (both
positive and negative) which provide timely visibility and opportunity for informed
knowledge-based management decisions leading to continued improvement. Trends
(both positive and negative) should be analyzed for root cause determination (see
DOE-NE-STD-1004-92, "Root Cause A nalysis Guidance Document"). Action plans to
correct deficiencies and reverse negative trends should be implemented, when
appropriate. Positive indicators should be evaluated for stability, reliability, and the
potential for broader application.
2.2.3 Problem Analysis
Section 5
Root cause analysis of unplanned, recurring, and persistent maintenance problems,
incidents, and outages which impact safe and reliable operations, although historically
performed has only recently adopted formal methodologies to systematically and
clearly lead to their effective resolution. Root cause is seldom a single factor.
Individuals at all levels should be trained in the use of one or more of a variety of
formal problem analysis and solving methodologies, including:
· Kepnor-Tregoe
· Job Hazard Analysis
· Function Analysis
· Total Quality Management - Performance Improvement Process
· Reliability, Availability, and Maintainability Analysis
· Single Failure Analysis
· Root Cause Analysis
· Facility Safety Analysis and Review Phases
· Risk Assessment (Failure Modes and Effects)
· Value Engineering
6
DOE-STD-1055-93
The interaction and effects of one or more of the following factors should be
considered:
· Design
· Drawings
· Procedures
· Training
· Qualification verification
· Tools
· Attitude
· Supervision
· Human error
· Management control
· Communication
When the nature of specific concerns warrants (based upon uniqueness, warranty,
complexity, time-constraints, state-of-the-art technology, special skills/equipment/tools,
etc.) outside expertise may need to be contracted to ensure the appropriate focus.
Root cause categories should be established to:
· Facilitate future analyses
· Correlate proven corrective actions
· Focus management action to the critical few
These methods result in value-added and knowledge-based correction plans which
should be followed to validated resolution, documented in the maintenance history
files, and applicable information should be shared as lessons learned for broad-based
benefit from local actions.
7
DOE-STD-1055-93
2.2.3.1 Information Collection
Problems should be coded and clearly defined to permit status tracking.
In addition to maintenance history files, information pertinent to the most
recent occurrence is valuable during problem analysis and may be obtained
from:
· Maintenance Job Requests
· Shop floor activity logs
· Strip-chart and other recording devices
· Operator statements (facts and symptoms)
· Troubleshooting results
· Craftsperson statements
· Industry experience
Information and data gathered from the most recent occurrence should be
recorded as maintenance history.
2.2.3.2 Information Analysis, Cause Determination, and Corrective Action
The responsibility and authority for performing the analysis, cause
determination and corrective action recommendations should be clearly
defined.
Owner/operators and other involved/informed individuals should be
members of a problem analysis teams.
The problem analysis methodology suitable for the type problem, formality
warranted, and application of the information available should be used.
All information should be evaluated to establish a list of most probable or
associated causes (care should be taken to go beyond simply addressing
symptoms).
Each probable cause should be analyzed until the combination of factors
which, when corrected, should prevent recurrence of the problem is
determined. That combination of factors is the actual root cause.
8
DOE-STD-1055-93
The criteria for acceptable root cause resolution are:
· Implementation should prevent recurrence of the problem
· The proposed action is feasible
· Implementation should not adversely impact safety, reliability, or
Section 6
operational goals
· The proposed action results in long-term improvement
· Generic applicability
A plan defining the acceptable root cause corrective action should be:
· Developed
· Documented
· Approved by applicable managers
· Implemented
· Tracked to validated completion
Analyses and corrective action plans should include generic applicability to:
· Similar items
· Training and qualification programs
· Documentation revision
· Maintenance activities
· Tool availability
2.2.3.3 Corrective Action Followup
Following validated problem resolution, postmaintenance testing should be
performed to ensure all critical parameters are within tolerance and the
owner/operator considers the item acceptable for return to normal service.
2.2.3.4 Generic Followup
Management should be responsible for ensuring that generic applicability of
validated resolutions are communicated through the lessons learned
validator system.
Generic applicability within the plant should be tracked until validated
completion.
9
DOE-STD-1055-93
2.2.4 Feedback
Management should actively solicit and encourage constructive feedback from all
affected individuals and organizations including line, staff, support (craftspersons,
planners, engineers, and etc.), and customers regarding performance concerns and
opportunities for improvement at all levels of the maintenance organization. A written
and verbal means for interested individuals to identify concerns and to suggest actions
for resolving deficiencies should be provided. Feedback should be evaluated and
actions implemented which result in improved maintenance services. The individual
identifying the concern or suggestion should receive feedback with a timely response
from management which:
· Demonstrates management's interest in the input
· Explains the rationale for either no action or alternate action
· Indicates status of suggested action
Concerns which involve a broad area of responsibilities should be addressed by project
teams consisting of representatives from all affected crafts and organizations. These
project teams should be given the necessary time to provide effective action.
2.2.5 Program Reviews
Each element which forms the Maintenance Program should be assessed periodically
by appropriate individuals and organizations to ensure:
· Applicability
· Effectiveness
· Improvement milestones implemented during the last assessment are reflected
therein
A Maintenance Standing Order process may be used to establish a self-assessing
surveillance program to verify compliance with program needs.
Standing Orders on surveillance:
· Assigns surveillance responsibilities and accountability
· Specifies the number and interval of surveillances
· Requires the implementation of written checklists when performing surveillances
· Requires documentation and reporting
· Requires follow-up on findings through validated resolution
10
DOE-STD-1055-93
Deficient areas should be assigned to accountable individuals for action planning and
follow-up.
Conditions and needs which affect the capability to perform should be regularly
reported and evaluated regarding:
· Work force (functions, crews, individuals)
· Equipment
· Systems
· Facilities
· Scheduling
· Coordination
· Tools/materials/equipment availability
Documented root causes defined during evaluations should form the basis for program
improvements.
Section 7
Training should be a continuing process to provide assurance that maintenance
personnel are knowledgeable of applicable plant physical and procedural modifications,
changes to regulatory requirements, and lessons learned from industry and in-house
operating experience that may affect job performance. Refer to DOE-NE-STD-1003-
91 "Guide to Good Practice for Training and Qualif ication of Maintenance Personnel"
for more detail information concerning training.
Training includes numerous areas, for example:
· Skills (all levels)
· Performance Based Training (PBT)
· On-The-Job (OTJ)
· Certification/Qualification
· Health, Safety, Environmental Accountability (HSEA)
· Administrative
· Refresher
11
DOE-STD-1055-93
Maintenance management should be directly involved in the training program:
· Needs identification
· Development
· Planning/Facilities
· Documentation
· Adjustment
· Scheduling
· Approval
· Evaluation
· Reinforcement through personal actions
New and revised technical and regulatory needs should be continuously monitored to
ensure adequate and timely training program:
· Development
· Scheduling
· Adjustment/emphasis
· Coverage
Changes to the training program should be based upon:
· Management recommendation
· Trainee feedback
· Performance deficiencies where skills inadequacy is determined as the root cause
Procurement policy and practices should be regularly assessed for overall effectiveness
using documented actual experience information regarding:
· Usage versus inventory levels
· Delayed/deferred maintenance related to: Service factor (out-of-stock);
Non-conforming or defective items; Handling, storage, shelf-life problems;
Inaccurate inventory records; Incorrect or delayed delivery
· System errors; Incorrect, Incomplete, Illegible, Wrong form/format, Unauthorized
approval
12
DOE-STD-1055-93
The responsibility and accountability should be established and documented for quality
record:
· Transmittal
· Distribution
· Retention
· Maintenance
· Disposition
· New document addition
Responsible maintenance managers should specify what constitutes quality records and
regularly assess their status to ensure:
· They are legible, identifiable, retrievable
· Damage, deterioration, and loss are controlled
· Addition, retention, and disposition schedules are enforced
13
DOE-STD-1055-93
APPENDIX A
MAINTENANCE MANAGEMENT INVOLVEMENT
SAMPLE LESSON PLAN
A - 1
DOE-STD-1055-93
MAINTENANCE MANAGEMENT INVOLVEMENT
SAMPLE LESSON PLAN
LESSON PLAN
1. The instructor should be familiar with the following background information:
a. To ensure safety and excellence of all facility operations, managers and supervisors
should be technically informed and personally familiar with the operating conditions at
the site.
b. It is important that maintenance management establish the percentage of time that first
line supervisors are expected to spend supervising field activities. Additionally,
unnecessary paperwork, excessive meetings, and other administrative activities that
keep supervisors out of the field should be reduced.
c. An analysis program should be established to investigate unplanned events or
occurrences of a recurring nature that indicate corrective actions have not been
effective in eliminating the root cause.
d. A root cause is defined as the most basic reason or collection of reasons for an
unplanned event which if corrected will prevent recurrence of that event.
Section 8
e. Correcting the causes of both equipment and human error problems may result in
improved facility reliability by decreasing the probability of recurrence of that
problem.
f. Maintenance performance indicators should be trended and tracked for program
improvements.
g. Managers should periodically review and assess various elements of the site
maintenance program. An evaluation of each maintenance program element should be
conducted at least once every other year.
2. To teach this lesson, the following training housekeeping items are required:
a. Location for the training,
b. Approximately 30 minute time period for the training,
A - 3
DOE-STD-1055-93
c. Notification of selected employees, and
d. A copy of the facility or corporate policy relating to management responsibility for site
operations.
3. This lesson has the following trainee enabling objective:
a. Explain management's role in facility operations.
b. Explain a maintenance problem analysis program, and
c. Define the criteria for identifying a root cause.
4. Some important aspects in management role in overall facility operations include the
following:
a. To ensure safety of facility operations, managers and supervisors should be technically
informed and personally familiar with the operating conditions at the site or facility.
This does not mean managers should know every operational detail, but it does imply
a knowledge level that allows them to speak the language of the technology and
understand its basic workings.
b. A problem analysis program is a system designed to help correct the causes of both
equipment and human error problems. This may improve the reliability of the site by
decreasing the probability of recurrence. Some thoughts on this type of program
include:
1) Examples of proven and accepted techniques for analyzing for root cause include
the following:
· event and causal charting (system utilizing a block diagram to depict cause and
effect),
· barrier analysis (questioning process used to determine what programmatic
system or "barrier" may have prevented the problem),
· walk-through task analysis (step-by-step reenactment to determine the failure
mode,
· change analysis (looks at the problem from the standpoint of what was
expected and what actually happened), and
· interviewing (a verbal, intuitive investigation process).
A - 4
DOE-STD-1055-93
2) An acceptable root cause should meet three criteria:
· its correction should prevent recurrence of the unplanned occurrence,
· its correction should be feasible, and
· its correction should not adversely impact safety, reliability, or operational
goals.
3) The most important aspect of an analysis program is to fix the problem and not
merely conduct an academic, analytical thought exercise. Therefore, after the root
cause has been determined, corrective actions should be initiated to correct the
deficiency and prevent recurrence. Follow-up should be incorporated into the
corrective action to ensure the "fix" is appropriate and the problem does not recur.
c. Management should periodically review and assess various elements of the site
maintenance program. An evaluation or self-assessment of each maintenance program
element, as defined in 4330.4A, should be conducted at least once every other year.
This evaluation should include inputs from maintenance managers and supervisors, and
from other groups such as operations, technical staffs, and corporate departments.
Additionally, performance based observations of actual field maintenance should be
performed to examine problem areas in implementation of maintenance program
elements. Examples of program elements to consider include the following:
Section 9
· assessment of the work control system,
· assessment of facility equipment and worker conduct of maintenance practices,
· assessment of maintenance training,
· assessment of spare parts and material procurement activities,
· assessment of the use and control of measuring and test equipment, and
· assessment of supervisory effectiveness.
5. Discuss with the trainees the facility policies on management involvement and
responsibilities.
A - 5
DOE-STD-1055-93
CONCLUDING MATERIAL
Review Activities: Preparing Activity:
DOE Field Offices DOE-NE-73
AD AL
DP CH Project Number:
EH ID
EM NV MNTY-0010
ER OR
NP RL
NS SR
RW SF
Area Offices
Amarillo
Brookhaven
Kansas City
Kirtland
Princeton
Facilities
ANL
BNL
LBL
PNL
PPPL
SNL
NV REECo.
NV EG&G
OR OSTI
WHC
EG&G
RF
SLAC
WSRC
FOREWORD
CONTENTS
1. INTRODUCTION
1.1 Purpose
1.2 Background
1.3 Application
2. MAINTENANCE MANAGEMENT INVOLVEMENT
2.1 Discussion
2.2 Guidelines
2.2.1 Manager Involvement
2.2.2 Performance Indicators, Goals, and Objectives Results
2.2.3 Problem Analysis
2.2.4 Feedback
2.2.5 Program Reviews
APPENDIX A : MAINTENANCE MANAGEMENT INVOLVEMENT SAMPLE LESSON PLAN