Section 1
TS
NOT MEASUREMENT
SENSITIVE
DOE-STD-1043-93
June 1993
CHANGE NOTICE NO. 1
December 1998
DOE STANDARD
GUIDE TO GOOD PRACTICES
FOR OPERATOR AID POSTINGS
U.S. Department of Energy AREA MISC
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
This document has been reproduced from the best available copy.
Available to DOE and DOE contractors from ES&H Technical Information
Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823.
Available to the public from the U.S. Department of Commerce, Technology
Administration, National Technical Information Service, Springfield, VA 22161;
(703) 605-6000.
Change Notice No. 1 DOE-STD-1043-93
December 1998
Guide to Good Practices for Operator Aid Postings
Page / Section Change
Concluding Material The Preparing Activity was changed from NE-73
to EH-31.
Change Notice No. 1 DOE-STD-1043-93
December 1998
INTENTIONALLY BLANK
DOE-STD-1043-93
FOREWORD
The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors
with information that can be used to validate and/or modify existing programs relative to Conduct
of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the
guidelines set forth in DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities.
KEYWORDS
Operator Aid
Posted Procedure
Posted Information
iii
DOE-STD-1043-93
INTENTIONALLY BLANK
iv
DOE-STD-1043-93
TABLE OF CONTENTS
FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii
DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii
1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2. OBJECTIVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3. DISCUSSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4. GOOD PRACTICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.1 Operator Aid Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.2 Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4.3 Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4.4 Placement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
4.5 Use of Operator Aids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
4.6 Review of Operator Aids . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
SUPPLEMENTAL RESOURCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
APPENDIX A
SAMPLE OPERATOR AID APPROVAL/AUDIT SHEET . . . . . . . . . . . . . . . . . . . . . . . . . A-1
APPENDIX B
SAMPLE OPERATOR AIDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . B-1
APPENDIX C
SAMPLE OPERATOR AID INDEX SHEETS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1
Section 2
v
DOE-STD-1043-93
INTENTIONALLY BLANK
vi
DOE-STD-1043-93
DEFINITIONS
Operations The business activity of the facility and assigned personnel,
e.g., controlling process equipment, producing/assembling
components, performing tests, conducting experiments,
processing information, etc.
Operations Supervisor The individual having authority and responsibility for
operational control of a facility, process, experiment, or
other project.
Operator A qualified person assigned specific responsibilities related
to the operation of facility process systems and equipment.
Operator Aids
(Operator Aid Postings)
Approved, posted information used to assist personnel in
performing a task [e.g., copies of procedures (portion or
pages thereof), system drawings, information tags, curves,
graphs, prints].
vii
DOE-STD-1043-93
INTENTIONALLY BLANK
viii
DOE-STD-1043-93
GUIDE TO GOOD PRACTICES FOR
OPERATOR AID POSTINGS
1. INTRODUCTION
This Guide to Good Practices is written to enhance understanding of, and provide direction for,
Operator Aid Postings, Chapter XVII of Department of Energy (DOE) Order 5480.19, Conduct
of Operations Requirements for DOE Facilities. The practices in this guide should be
considered when planning or reviewing operator aid postings. Contractors are advised to adopt
procedures that meet the intent of DOE Order 5480.19.
"Operator Aid Postings" is an element of an effective Conduct of Operations program. The
complexity and array of activities performed in DOE facilities dictate the necessity for
controlling posted information to promote safe and efficient operations.
1
DOE-STD-1043-93
INTENTIONALLY BLANK
2
DOE-STD-1043-93
2. OBJECTIVE
The objective and criteria are derived from DOE Order 5480.19. They are intended to aid
each facility in meeting the intent of the order.
An operator aid program is in place to ensure that operator aids are current, correct, and useful.
Criteria:
a. Personnel follow guidelines for developing operator aids.
b. Operator aids are approved prior to being posted.
c. A list of approved operator aids, along with a reference copy of each operator aid, is
maintained.
d. Placement of operator aids adequately supports their intended use and does not obscure
instrumentation or controls.
e. Operator aids are a convenience to the individual using them.
f. Operator aids are periodically reviewed for currency and relevance.
3
DOE-STD-1043-93
INTENTIONALLY BLANK
4
DOE-STD-1043-93
3. DISCUSSION
Operator aid postings (operator aids) provide information for personnel to use during the
performance of tasks. This information may be in the form of a system drawing, copy of a
procedure, information tag or sheet, curve, chart, or graph. Posted copies of procedures or
portions of procedures that are used as operator aids may be useful when the performance of a
task makes it impractical to refer to a procedure in a manual (e.g., task requires the use of both
hands). Operator aids may help the operator identify problems that might be encountered during
performance of a task, or they may present a simple diagram of equipment, systems, or areas
(e.g., piping diagrams, electrical schematics). Other examples of operator aids include:
C A list of approved facility communication terms, abbreviations, and emergency numbers
posted by communication equipment,
C A graph of flow versus pump speed for a variable speed pump hanging beside the pump
speed control switch,
Section 3
C A simple diagram of control knobs, valves, and switches for infrequently used equipment,
C Specifications for a particular step in a task. (For example, pH minimum and maximum
values and elemental concentrations for disposing of fluids posted by the drain. This one
may be particularly useful since specifications for different fluids can be found in many
different manuals.)
Operator aids must reflect the most current information and they must not conflict with any
procedures or requirements. Using operator aids containing outdated or incorrect information
may cause harm to personnel or damage to the equipment, system, area, or facility. Also, if
operator aids are developed for other than normal operations, (e.g., for temporary systems, for
abnormal system configurations, for emergency situations) it is a good practice to clearly identify
the circumstances under which they apply.
Developing useful operator aids may require intensive research and forethought. The
information presented in the operator aid must be factual, and organized in a manner usable for
all intended users. A thoroughly developed operator aid will ensure that the approver and
reviewers better understand its need and usefulness. During the development process, reviews
by applicable technical personnel may be helpful to ensure clarity.
5
DOE-STD-1043-93
An initial review and approval process verifies that the information contained in an operator aid
is accurate and useful. This process officially authorizes its use. Periodic reviews will help
ensure that the information is kept up-to-date and will verify the continued usefulness of the
operator aid. It is important to remove obsolete, conflicting, or non-useful operator aids as
quickly as possible to eliminate personnel confusion when performing tasks.
Documentation of operator aids is essential to their control. Maintaining a centrally located file
of all operator aids will enhance the periodic review process. This file will help personnel
quickly review and take action to correct, update, or remove obsolete operator aids as necessary.
Listing reference documents used in the development process facilitates finding and updating
operator aids when reference information changes.
Placing an operator aid in a conspicuous place that will allow the user to access controls or
instrumentation is essential to posting. If the operator aid blocks instruments or controls, it will
be more of a hinderance than a help. Affixing operator aids to the desired location using an
attachment device suitable to the posting surface and the environment will ensure that the
operator aid remains posted. An operator aid will be of little use if it comes loose and falls from
its desired location.
The operator is one of the most important elements in ensuring the success of the operator aid
program. Using only approved and current operator aids will help ensure the operator aid
promotes safe and efficient operation. Operators must identify and report unapproved or
incorrect operator aids at their work stations. This will ensure that the operator aids remain a
useful tool in conducting business safely at their facility.
6
DOE-STD-1043-93
4. GOOD PRACTICES
This good practice provides instruction on how to administer and control an effective operator
aids program, including operator aid development, approval, documentation, posting, use, and
review. Each of these six steps are important to ensure that only useful operator aids are posted,
and that they remain updated during their use.
Section 4
Operator aids should be developed to provide the user with information that might otherwise be
overlooked. The need for an operator aid should be concurred with prior to expending
resources in its development. Operator aids may be developed to supplement procedures, but
should not be developed to alter (e.g., correct or update) procedures. Only procedure changes
and revisions should be used to alter procedures. For more information on procedures refer to
DOE Order 5480.19, Chapter XVI, "Operations Procedures."
Operator aids must not be developed for personnel and equipment safety situations where danger
or caution tags should be used. The facility lockout and tagout procedure should address the
correct mechanism(s) for protecting personnel and equipment. For information on lockouts and
tagouts, refer to DOE Order 5480.19, Chapter IX, "Lockouts and Tagouts."
Operator aids should not be developed for use as equipment and piping labels. Guidance
concerning labeling should be provided in the facility's equipment and piping labeling program.
For information pertaining to labeling, refer to DOE Order 5480.19, Conduct of Operations
Requirements for DOE Facilities, Chapter XVIII, "Equipment and Piping Labeling."
4.1 Operator Aid Development
Facility personnel should be encouraged to develop needed operator aids. Therefore, all
personnel, including support personnel, should be aware of the operator aid development
process. Prior to developing an operator aid, personnel should be trained on the
development process. As a minimum, this training should cover the importance of
controlling posted information and the procedure or guidelines for developing an operator
aid. Information control topics such as why it is important to use only approved operator
aids, how to tell if an operator aid is approved, what to do if it is not approved, and how
to verify that an operator aid is current should be addressed.
When developing operator aids, personnel should use the most current information. This
may require communicating with personnel in the facility's document control organization
to ensure that the most current revisions of reference documents (e.g., procedures,
7
DOE-STD-1043-93
drawings, technical manuals) are being used. To ensure the operator aid is correct, the
developer should communicate with other users, competent technical authorities (e.g.,
system, facility, or safety engineers), and the cognizant supervisor.
An operator aid submitted for approval should contain the reference information that the
approver will need to ensure that the operator aid is necessary and correct (e.g., document
names, numbers and revision numbers, technical personnel phone numbers). Including this
information with the operator aid will minimize the time required for approval. To ensure
that the proper information accompanies each operator aid that is submitted, an operator
aid approval sheet, which contains spaces for this information, could be used. Appendix
A contains a sample operator aid approval sheet.
If operator aids are developed for other than normal operations, they should clearly identify
their intended purpose. For example, if an operator aid is developed for a temporary
system, it may contain the title "Temporary System Operator Aid" or may be developed
using a different color paper. If an operator aid is only to be used for a limited time or in
certain situations the operator aid should contain this information also (e.g., "This operator
aid for use only during Mode 1 operation."). Including this information should help reduce
the human interface problems associated with operator aids.
Section 5
Operator aids should be prepared in a professional manner (refer to Appendix B). Operator
aids submitted for approval should be identical, or as close as possible to the size, format,
material and quality of the proposed operator aid. This will allow the approver to see how
the operator aid will appear, before it is approved. To assist in preparing the operator aid,
facility support personnel (e.g., technical writers, graphic artists) may need to be contacted,
especially if the operator aid contains complex figures or drawings.
4.2 Approval
After an operator aid is developed, it must be approved before posting. At a minimum, the
operations supervisor or cognizant manager should approve the operator aid. Support
organization personnel wanting to have an operator aid posted should submit the proposed
information to the operations supervisor for approval.
The person responsible for approving the operator aid (the approver) should verify that it
is necessary. This verification will limit the number of operator aids posted in the facility.
8
DOE-STD-1043-93
If an administrative mechanism (e.g., label, tagout, procedure change) should be used, the
operator aid should not be approved.
The next step is to verify that the operator aid is correct. Part of this verification should
ensure that the operator aid does not contradict or alter procedures. The documents and
technical authorities referenced for the submitted operator aid should be consulted to verify
correctness. Using an operator aid approval sheet should enhance this process since all of
the information is listed in one convenient location.
If the approver verifies that the operator aid is necessary and correct, the approver should
sign and date the operator aid to signify that it is approved. Once approved, the operator
aid should be documented and routed for posting. If the operator aid is not approved, it
should be returned to the developer with an explanation concerning its disapproval and
requirements for resubmittal and final approval.
4.3 Documentation
All approved operator aids should be documented. At a minimum, a listing of all approved
operator aids should be maintained, along with a reference copy of each operator aid. The
reference copies should be used to replace operator aids found to be damaged or missing.
If an operator aid approval sheet is used, it should be kept with the copy of the operator aid.
All operator aid documentation should be kept in a specified location (e.g., control area,
operation supervisor's office, project manager's office, other appropriate location).
The listing of all approved operator aids, also called an index, serves as a record for
all operator aids posted in the facility. This index should contain the operator aid's
control number, title, reference documents, posted location, approval signature and
date, and removal signature and date. If an operator aid approval sheet, which
contains this information, is used, the index would not need to duplicate all of the
information. Appendix C contains a sample operator aid index sheet for both cases.
To assist in tracking operator aids, each operator aid should be assigned a unique
control number. One method of assigning control numbers is to use a sequential serial
number. As an example, operator aid control number 92-02 would indicate the second
operator aid issued for the year 1992.
A system, such as a binder, should be used to maintain the operator aid information.
This binder may include a copy of the operator aid development procedure or
Section 6
9
DOE-STD-1043-93
guidelines, the operator aid index, and a reference copy of all operator aids. If an
operator aid approval sheet is used, it should be filed in the binder with its associated
operator aid.
4.4 Placement
Approved operator aids should be placed (posted) in proximity to the area of expected
use. They should not obscure instruments (e.g., meters, gauges, indicating lights) or
interfere with controls.
An operator aid should be firmly attached at the specified location. The attachment
method should be compatible with the environment. A form of attachment should be
used such that when the operator aid is no longer needed, it can be readily removed.
The posted operator aid should be protected from the environment. If an operator aid
is located in an area where it might become wet, oil-stained, or otherwise unusable, it
should be laminated, placed in a clear plastic pouch, or made of material that will
withstand the environment. Using a paper copy of the operator aid placed in a clear
plastic pouch is a suitable, inexpensive method.
4.5 Use of Operator Aids
Operator aids should be viewed as a convenience to the individual using them, not a
requirement. Although copies of procedures or portions of procedures can be used as
operator aids, the requirement is to follow the procedure. The operator aid makes it
easier for the operator to follow the procedure, because the procedure is conveniently
posted. The decision to use the posted procedure or the procedure in the manual
should be left to the operator.
All personnel should be trained on the need for controlling posted information. This
training should cover why it is important to use only approved operator aids, how to
tell if an operator aid is approved, what to do if it is not approved, and how to verify
that an operator aid is current.
When an operator aid is used, the user should verify that it is approved. If the posted
information is not approved, the person should not use it and should notify the
supervisor. A decision should be made whether to submit the operator aid for
10
DOE-STD-1043-93
approval or remove it. If the operator aid is unusable because of wear or dirt, the
operator should obtain a new copy of the operator aid. When the need for an operator
aid no longer exists, an operator or the developer/organization originating the operator
aid should notify the appropriate supervisor and ensure that the operator aid is
disposed of in accordance with facility policies and procedures.
4.6 Review of Operator Aids
Posted operator aids should be reviewed periodically to ensure that they are still
correct, necessary, and don't supersede or conflict with controlled procedures or
information. A person or persons should be assigned the responsibility for auditing the
operator aid index to ensure that only currently posted aids are recorded on the index.
This person should verify that each operator aid listed in the operator aid index is still
posted and necessary. This determination should be made through discussion with the
affected operators. If it is still necessary, the auditor should verify the location is the
same as that recorded on the operator aid index sheet or the operator aid approval
sheet and that each operator aid is legible and in good condition. No unapproved pen-
and-ink changes should exist. The auditor should also verify that the information
contained in the operator aid is current and applicable. If the operator aid is still
needed but is missing, a new copy should be posted. If the operator aid is no longer
needed, the reference copy should be removed from the operator aid binder and the
operator aid should be deleted from the index (i.e., the removal signature and date
block of the index should be completed).
Section 7
Since operator aids may be copies of graphs, curves, or procedures, the information
is subject to change as the reference documents are revised. Therefore, the reference
documents should be periodically checked for the latest revision numbers. If a revision
to an operator aid's reference document has changed information on the operator aid,
the operator aid should be updated. One way to ensure that revisions are incorporated
into operator aids is to notify the appropriate document control personnel of those
operator aids that are derived from controlled (parent) documents. This would
effectively place the appropriate person(s) on the document control system distribution
list for the specified parent documents. When a revision is made to one of these
controlled documents, document control would notify the appropriate control area of
the affected operator aid(s). The appropriate review person would then determine if
operator aid changes were necessary.
11
DOE-STD-1043-93
Besides a formal periodic review of all operator aids, personnel should be instructed
to review operator aids at their work stations to ensure they are approved and correct.
This may be done during routine work station tours, or as a separate inspection. If
unapproved operator aids are found, they should be reviewed and submitted for proper
approval, or removed if determined to be unnecessary.
12
DOE-STD-1043-93
SUPPLEMENTAL RESOURCES
The following sources provide additional information pertaining to topics discussed in this Guide to
Good Practices:
DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities, Chapter IX,
"Lockouts and Tagouts."
DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities, Chapter XVI,
"Operations Procedures."
DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities, Chapter XVIII,
"Equipment and Piping Labeling."
13
DOE-STD-1043-93
INTENTIONALLY BLANK
14
DOE-STD-1043-93
APPENDIX A
SAMPLE OPERATOR AID APPROVAL/AUDIT SHEET
A-1
DOE-STD-1043-93
INTENTIONALLY BLANK
A-2
DOE-STD-1043-93
OPERATOR AID APPROVAL/AUDIT SHEET
Operator Aid Control No.:
Operator Aid Name:
Description:
Reason for Posting:
Posting Location:
Reference Documents:
Developer:
Department:
Reviewers:
Rev. No.:
Rev. No.:
Rev. No.:
Date:
Approval Signature: Date:
Audited:
Date Initial Date Initial Date Initial Date Initial
A-3
DOE-STD-1043-93
Notes:
Operator Aid Control No. The next sequential number for operator aid issuance.
Description A description of the operator aid (e.g., chart, graph, procedure
inset).
Reason for Posting An explanation of the need for the operator aid.
Posting Location The desired location for posting the operator aid.
Reference Documents Any documents that were used to obtain the operator aid
information (e.g., procedures, technical manuals, reports, prints,
drawings). If the document has a revision, the revision number
should be listed.
Developer The name and position of the person developing/requesting the
operator aid.
Department The department (e.g., Operations, Maintenance) of the developer.
Reviewers The names and positions of all additional technical personnel
involved in the initial development and approval process.
Approval Signature The approvers signature, position, and date signed signifying the
operator aid is necessary and correct, and approved for posting.
Audited When an operator aid is audited the auditor dates and initials the
next open line signifying the operator aid is still necessary and
correct.
Section 8
A-4
DOE-STD-1043-93
APPENDIX B
SAMPLE OPERATOR AIDS
B-1
DOE-STD-1043-93
INTENTIONALLY BLANK
B-2
DOE-STD-1043-93
OPERATOR AIDS
Prepared by: Date:
Approved by: Date:
Number:
B-3
DOE-STD-1043-93
LUBE OIL TANK SIGHTGLASS LEVEL CONVERSION CHART
Since the sightglass on the lube tank to the emergency Diesel Generator is incremented in inches
and our fuel oil consumption reports are in gallons, the following chart should be used to convert
level in the lube oil tank to gallons.
INCHES GALLONS Prepared by: Date:
Approved by: Date:
20 104.0 Number:
19 98.1
18 92.0
17 85.9
16 79.7
15 73.4
14 67.2
13 61.0
12 54.9
11 48.8
10 42.9
9 37.1
8 31.4
7 26.1
6 20.9
5 16.1
4 11.6
3 7.6
2 4.2
1 1.5
B-4
CIRCULATING WATER SYSTEM
EAST CONDENSER
WEST CONDENSER
FROM
INTAKE
STRUCTURE
MOV-5313
P-40A
MOV-5311 z
MOV-5305
MOV-5306
MIXING BASIN
MOV-5312
PREPARED BY:1{&$- DATE 5/3/92
APPROVED BY: .06 H•-. ,,,_ DATE 5/4/92
NUMBER: 92-76
A B
MOV-5326A MOV-5326B
(DILUTION TO MIXING BASIN) (CT SLOWDOWNS)
D
O
E
-ST
D
-1043-93
B
-5
DOE-STD-1043-93
INTENTIONALLY BLANK
B-6
DOE-STD-1043-93
APPENDIX C
SAMPLE OPERATOR AID INDEX SHEETS
C-1
DOE-STD-1043-93
INTENTIONALLY BLANK
C-2
D
O
E
-ST
D
-1043-93
OPERATOR AID INDEX SHEET USED WITHOUT AN OPERATOR AID APPROVAL SHEET
Operator Aid
Control Number Title of Operator Aid Reference Documents Posted Location
Approval
Signature/Date
Removal
Signature/Date
C
-3
D
O
E
-ST
D
-1043-93
OPERATOR AID INDEX SHEET USED WITH OPERATOR AID APPROVAL SHEET
Operator Aid Control
Number
Title of Operator Aid Approval
Signature/Date
Removal
Signature/Date
C
-4
DOE-STD-1043-93
CONCLUDING MATERIAL
Review Activities: Preparing Activity:
DOE DOE-EH-31
DP
EH Project Number:
EM
ER MISC-0018
NE
NS
FOREWORD.
KEYWORDS
DEFINITIONS.
GUIDE TO GOOD PRACTICES FOR. OPERATOR AID POSTINGS.
1. INTRODUCTION
2. OBJECTIVE
3. DISCUSSION.
4. GOOD PRACTICES.
4.1 Operator Aid Development
4.2 Approval
4.3 Documentation
4.4 Placement
4.5 Use of Operator Aids
4.6 Review of Operator Aids
SUPPLEMENTAL RESOURCES.
APPENDIX A. SAMPLE OPERATOR AID APPROVAL/AUDIT SHEET.
OPERATOR AID APPROVAL/AUDIT SHEET
APPENDIX B. SAMPLE OPERATOR AIDS.
OPERATOR AIDS.
LUBE OIL TANK SIGHTGLASS LEVEL CONVERSION CHART.
APPENDIX C. SAMPLE OPERATOR AID INDEX SHEETS.
OPERATOR AID INDEX SHEET USED WITHOUT AN OPERATOR AID APPROVAL SHEET
OPERATOR AID INDEX SHEET USED WITH OPERATOR AID APPROVAL SHEET
CONCLUDING MATERIAL