DOE-STD-1034-93 Chg Notice 1, Guide to Good Practices for Timely Orders to Operators
Functional areas: Timely Orders, Administrative Instructions, Communication, Written Guidance
This Guide to Good Practices is written to enhance understanding of, and provide direction for, Timely Order to Operators, Chapter XV of DOE O 5480.19, Conduct of Operations Requirements for DOE Facilities. Reaffirmed 2001
Canceled By:
DOE-HDBK-1226-2019, Conduct of Operations Implementation on Mar 06, 2019
Version history and related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
TS
NOT MEASUREMENT
SENSITIVE
DOE-STD-1034-93
March 1993
CHANGE NOTICE NO. 1
December 1998
DOE STANDARD
GUIDE TO GOOD PRACTICES FOR
TIMELY ORDERS TO OPERATORS
U.S. Department of Energy AREA MISC
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
This document has been reproduced from the best available copy.
Available to DOE and DOE contractors from ES&H Technical
Information Services, U.S. Department of Energy, (800) 473-4375,
fax: (301) 903-9823.
Available to the public from the U.S. Department of Commerce,
Technology Administration, National Technical Information Service,
Springfield, VA 22161; (703) 605-6000.
Change Notice No. 1 DOE-STD-1034-93
December 1998
Guide to Good Practices for Timely Orders to Operators
Page / Section Change
p. 10 / Section 4.3 The references to DOE Order 1324.2A and DOE
Order 1324.5B were updated to reference DOE
Guide 1324.5B.
p. 11 / Supplemental Resources The references to DOE Order 1324.2A and DOE
Order 1324.5B were removed. The reference to
DOE Guide 1324.5B was added.
Concluding Material The Preparing Activity was updated to EH-31.
Change Notice No. 1 DOE-STD-1034-93
December 1998
INTENTIONALLY BLANK
DOE-STD-1034-93
FOREWORD
The purpose of this Guide to Good Practices is to provide Department of Energy (DOE)
contractors with information that can be used to validate and/or modify existing programs relative
to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to
enhance the guidelines set forth in DOE Order 5480.19, "Conduct of Operations Requirements
for DOE Facilities."
KEYWORDS
Daily Orders
Long-Term Orders
Operator Orders Book
iii
DOE-STD-1034-93
INTENTIONALLY BLANK
iv
DOE-STD-1034-93
TABLE OF CONTENTS
FOREWORD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii
DEFINITIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . vii
1. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
2. OBJECTIVE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
3. DISCUSSION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
4. GOOD PRACTICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.1 Content and Format . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.1.1 Content . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4.1.2 Format . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4.2 Issuing, Segregating, and Reviewing Operator Orders . . . . . . . . . . . . . . . . . . . . . 8
4.2.1 Issuing Operator Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4.2.2 Segregating Operator Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4.2.3 Reviewing Operator Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4.3 Removal of Operator Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Section 2
SUPPLEMENTAL RESOURCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
APPENDIX A
EXAMPLE OPERATOR ORDERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
v
DOE-STD-1034-93
INTENTIONALLY BLANK
vi
DOE-STD-1034-93
DEFINITIONS
Cognizant Manager The individual having authority and responsibility for
control of a facility, process, experiment, or other project.
Daily Orders Orders whose information is relevant to that day's (or two
days) operations.
Long-Term Orders Orders whose information is relevant to several days,
weeks, or months operations.
Non-routine Operations Special, short-term, or one-of-a-kind activities that are not
performed as part of a normal routine.
Operator Orders Book A binder or logbook containing the current operator
orders.
vii
DOE-STD-1034-93
INTENTIONALLY BLANK
viii
DOE-STD-1034-93
GUIDE TO GOOD PRACTICES FOR
TIMELY ORDERS TO OPERATORS
1. INTRODUCTION
This Guide to Good Practices is written to enhance understanding of, and provide direction
for, Timely Orders to Operators, Chapter XV of Department of Energy (DOE) Order
5480.19, "Conduct of Operations Requirements for DOE Facilities." The practices in this
guide should be considered when planning or reviewing Timely Orders to Operators
programs. Contractors are advised to adopt procedures that meet the intent of DOE
Order 5480.19.
"Timely Orders to Operators" is an element of an effective Conduct of Operations program.
The complexity and array of activities performed in DOE facilities dictate the necessity for
timely orders to operators to promote safe and efficient operations.
1
DOE-STD-1034-93
INTENTIONALLY BLANK
2
DOE-STD-1034-93
2. OBJECTIVE
The objective and criteria are derived from DOE Order 5480.19. They are intended to aid
each facility in meeting the intent of the order.
A program is in place for operations management to communicate, in writing, short-term
information and administrative instructions to personnel in a timely fashion.
Criteria:
a. Operator orders are clearly written, dated, and maintained in an accessible location.
b. Operator orders are issued by the cognizant manager to communicate pertinent and
relevant information to personnel.
c. Operator orders are segregated into daily and long-term orders.
d. Appropriate personnel periodically review operator orders and document their review.
e. Operator orders that are no longer applicable or are outdated are removed or cancelled
by the cognizant manager.
3
DOE-STD-1034-93
INTENTIONALLY BLANK
4
DOE-STD-1034-93
3. DISCUSSION
Management often finds it necessary to provide written guidance and direction to employees,
such as outlining activities during periods of maintenance or providing notice of an immediate
document review located in the required reading file. This guidance needs to be provided in
a formal and timely manner. Operator orders are designed to provide a means for
management to communicate guidance and short-term information to personnel. They may
be used whenever it is necessary to disseminate information to personnel concerning special
operations, administrative details, or environmental, safety, and health issues, but should
never be used to replace or change facility procedures.
Establishing an administrative policy or procedure which specifically addresses the
requirements for content, format, issuing, segregating, reviewing, and removal of timely
Section 3
orders will ensure the process is standardized throughout the facility. Such a policy should
provide managers and supervisors an effective means to communicate appropriate guidance
and information in a timely manner. Other means of routinely communicating guidance to
employees are addressed in DOE Order 5480.19, Chapter XIV, "Required Reading"; Chapter
XVI, "Operations Procedures"; and Chapter XVII, "Operator Aid Postings."
5
DOE-STD-1034-93
INTENTIONALLY BLANK
6
DOE-STD-1034-93
4. GOOD PRACTICES
A Timely Orders to Operators program that uses the following guidance will enhance the
safety and reliability of operations at any DOE facility.
4.1 Content and Format
4.1.1 Content
Operator orders should be issued whenever it is necessary to communicate
short-term information related to the conduct of facility business. They may
be used in either shift or daily work environments, but specifically when there
is a need to provide direction or information to work-force personnel in the
absence of cognizant management. Examples of the types of information to
include in operator orders are:
• Notification of work priorities
• Special operations
• Non-routine tests
• Data collection programs
• Upcoming events and audits
• Announcements of administrative items, policies, procedure changes, or
specific activities
7
DOE-STD-1034-93
• Notice of documents requiring immediate review in the Required Reading
File.
The information in operator orders should not conflict with or change
procedures; however they may be used to notify personnel of a procedure
change or revision, or issuance of a new procedure. DOE Order 5480.19,
Chapter XVI, "Operations Procedures" provides guidelines for the
development, approval, revision, and use of procedures.
4.1.2 Format
Operator orders should be clearly written and dated. They should include the
length of time the order is to be applicable or a cancellation date. Provisions
should be made to document review by appropriate personnel. Examples of
daily and long-term orders are shown in Appendix A.
4.2 Issuing, Segregating, and Reviewing Operator Orders
4.2.1 Issuing Operator Orders
The cognizant manager is responsible for issuing operator orders to personnel.
Orders should be issued as necessary and updated on a daily basis. The orders
should be issued as either daily orders or long-term orders. Daily orders
contain information such as the announcement of a procedure change or
direction for a non-routine process. They usually contain action items which
will take place: on the remaining portion of the day, the following day, or
weekends and holidays. Daily orders may be renewed by the cognizant
manager when necessary. Long-term orders contain information such as a
time-line of work activities during a maintenance period. When long-term
orders are issued, a notice should be placed in the daily orders.
8
DOE-STD-1034-93
4.2.2 Segregating Operator Orders
The orders should be placed in an operator orders book. This book should be
maintained in a designated location for easy access. The operator orders book
should be divided into two sections: daily orders and long-term orders. Daily
orders include those that should be completed within one or two days. Long
term orders include orders that may take several days or longer to complete.
As a general rule, orders in effect for an extensive period of time should be
incorporated into a procedure or company policy.
Section 4
4.2.3 Reviewing Operator Orders
Daily orders should be reviewed by the appropriate individuals early in the
work period prior to starting or resuming any affected activity (e.g., at shift
change). This review should be documented by signature or initials. Long
term orders should be reviewed periodically or when changes occur. It is a
good practice to have supervisors review daily and long-term orders during
daily briefings to ensure that the information in the order is disseminated to all
personnel. For guidance on shift briefings, refer to DOE Order 5480.19,
Chapter XII, "Operations Turnover."
The cognizant manager should be notified when action items are complete.
When operator orders are postponed or delayed, the cognizant manager should
be notified.
4.3 Removal of Operator Orders
The cognizant manager should review the operator orders book periodically to
ensure that it only contains current orders. A good management practice is to
review the book monthly. Operator orders that are no longer applicable should be
9
DOE-STD-1034-93
removed or cancelled. These orders may need to be retained for reference. For
guidance on the retention of documents, refer to DOE-G-1324.5B, "Guide for
DOE Records Management."
10
http:DOE-G-1324.5B
DOE-STD-1034-93
SUPPLEMENTAL RESOURCES
The following sources provide additional information pertaining to topics discussed in this Guide
to Good Practices:
DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities, Chapter XII,
"Operations Turnover."
DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities, Chapter XIV,
"Required Reading."
DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities, Chapter XVI,
"Operations Procedures."
DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities, Chapter XVII,
"Operator Aid Postings."
DOE-G-1324.5B, Guide for DOE Records Management.
11
http:DOE-G-1324.5B
DOE-STD-1034-93
INTENTIONALLY BLANK
12
DOE-STD-1034-93
APPENDIX A
EXAMPLE OPERATOR ORDERS
A-1
DOE-STD-1034-93
INTENTIONALLY BLANK
A-2
DOE-STD-1034-93
EXAMPLE DAILY ORDER
Initial/date after Review:
Allen /
To: All Supervisors Johnson /
From: Area Manager Jones /
Duration: Jan. 17, 1992 at 5:00 pm to Pratt /
Jan. 18, 1992 at 5:00 pm Smith /
Turner /
Daily Orders
1. A copy of a new procedure has been placed in the Required Reading File: OP-EV-0082,
Pumping Out Evaporation Pit, 101-C. Ensure all applicable personnel have reviewed this
procedure prior to performing the evolution or shift completion.
2. JONES - Lock out No. 1 air compressor in 101-1A per lockout order OP-92-531 for
overhaul to be ready to work 1/18/92 at 7:30 am.
3. A shipment of low level waste (LLW) is expected during second shift. After receipt,
begin characterization of waste for emplacement. Contact the Operations Manager if
shipment has not arrived by 6:30 pm.
4. Review long-term orders. A new order outlining the work activities for the upcoming
maintenance period is in effect.
General Information:
1. See attached 1/13/92 Safety Committee meeting minutes. Post in Briefing Room and
Lunchroom.
A-3
DOE-STD-1034-93
Quality
Attention to Detail. We must pay attention to detail during our monitoring of equipment. This
often means going beyond simply taking the data. It means being inquisitive, looking for
problems before they arise, and observing all indications. By paying attention to detail, we can
Section 5
significantly reduce the number of potential problems.
A-4
DOE-STD-1034-93
EXAMPLE LONG-TERM ORDER
Initial/date after Review:
Allen /
To: All Supervisors Johnson /
From: Area Manager Jones /
Date: January 17, 1992 Pratt /
Smith /
Turner /
Cancellation Date: 2/15/92
Long-Term Orders
1. The first quarter maintenance period begins 1/20/92 and is scheduled to end on 2/14/92.
Review the attached work schedule. Daily briefings will be held at the beginning of each
work period throughout the maintenance period. The daily briefings will be held in Bldg.
101 conference room. All work groups involved in the maintenance must attend. At 7:00
am each day, all supervisors will meet in Bldg. 101 conference room and submit a written
status report.
2. Transuranic (TRU) waste is no longer being accepted due to current state litigation
proceedings. If a TRU waste shipment arrives DO NOT RECEIPT THE SHIPMENT,
CONTACT THE OPERATIONS MANAGER IMMEDIATELY.
3. See revised training schedule for January (attached). Post in Bldg. 101 and distribute
copies to all personnel. All personnel should know when they are scheduled and should
attend as scheduled.
4. Continue measuring conductivity of potable water (PW) as requested by Engineering.
These measurements will be used for determining the best instrument to measure
conductivity in the PW system. Our effort now will help us in the future by having reliable
instruments!
A-5
DOE-STD-1034-93
INTENTIONALLY BLANK
A-6
DOE-STD-1034-93
CONCLUDING MATERIAL
Review Activities: Preparing Activity:
DOE DOE-EH-31
DP
EH Project Number:
EM
ER MISC-0006
NE
NS
Untitled
Change Notice No. 1 DOE-STD-1034-93 December 1998
GUIDE TO GOOD PRACTICES FOR. TIMELY ORDERS TO OPERATORS.
1. INTRODUCTION
2. OBJECTIVE
3. DISCUSSION
4. GOOD PRACTICES
4.1 Content and Format
4.1.1 Content
4.1.2 Format
4.2 Issuing, Segregating, and Reviewing Operator Orders
4.2.1 Issuing Operator Orders
4.2.2 Segregating Operator Orders
4.2.3 Reviewing Operator Orders
4.3 Removal of Operator Orders
SUPPLEMENTAL RESOURCES