DOE-STD-1020-2012, Natural Phenomena Hazards Analysis and Design Criteria for DOE Facilities
Functional areas: Natural Phenomena Hazards, Facility Structures, Systems, and Components (SSCs), Design Basis, Facility Safety
Provides criteria and guidance for the analysis and design of facility structures, systems, and components (SSCs) that are necessary to implement the requirements of DOE O 420.1C, Facility Safety, and to ensure that SSCs will be able to effectively perform their intended safety functions under the effects of natural phenomena hazards (NPHs).
Related To:
Natural Phenomena Hazards Analysis and Design Criteria for DOE FacilitiesPrivate
Version history and related documents
Superseded by
A newer version replaces this document.
Supersedes
Earlier documents this one replaced.
- DOE-STD-1020-2002Natural Phenomena Hazards Design and Evaluation Criteria for Department of Energy Facilities (Oct 03, 2012)
- DOE-STD-1021-93 Chg Notice 1Natural Phenomena Hazards Performance Categorization Guidelines for Structures, Systems, and Components (Oct 03, 2012)
- DOE-STD-1022-94 Chg Notice 1Natural Phenomena Hazards Site Characterization Criteria (Oct 03, 2012)
- DOE-STD-1023-95 Chg Notice 1Natural Phenomena Hazards Assessment Criteria (Oct 03, 2012)
Related documents
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
DISTRIBUTION STATEMENT. Approved for public release; distribution is unlimited.
DOE-STD-1020-2012
December 2012
_________________
Supersedes
DOE-STD-1020-2002
DOE STANDARD
Natural Phenomena Hazards Analysis and
Design Criteria for DOE Facilities
U.S. Department of Energy AREA NPHZ
Washington, D.C. 20585
NOT MEASUREMENT
SENSITIVE
DOE-STD-1020-2012
This document is available on the
Department of Energy Technical Standards Program Web page at
http://www.hss.doe.gov/nuclearsafety/ns/techstds/
DOE-STD-1020-2012
i
Foreword
Department of Energy (DOE) Standard (STD)-1020-2012, Natural Phenomena Hazards
Analysis and Design Criteria for DOE Facilities, provides criteria and guidance for the
analysis and design of facility structures, systems, and components (SSCs) that are
necessary to implement the requirements of DOE Order (O) 420.1C, Facility Safety, and to
ensure that the SSCs will be able to effectively perform their intended safety functions under
the effects of natural phenomena hazards (NPHs). This Standard also provides criteria and
guidance for the use of industry building codes and voluntary consensus standards in the
NPH analysis and design of SSCs in DOE facilities. In particular, it provides criteria and
guidance for:
Establishing the performance requirements for SSCs in terms of parameters that
define failure of their safety functions (e.g., design basis flood water level relative to
the location of an SSC that is vulnerable to inundation, the state of SSC deformation
under various NPH loads, limit states under dynamic loads , etc.), and grading the
SSCs into more than one NPH design category, based on the consequences of SSC
failure when subjected to NPH events;
Calculating NPH demands on SSCs resulting from NPH events in terms of parameters
that define failure of their safety functions; and
Designing (or, for existing facilities, design evaluation) SSCs to ensure their ability to
maintain required functionality when subjected to demands of NPH events.
The focus of this Standard is on the analysis and design of new facilities. For existing
facilities, evaluations of NPH capabilities should have already been performed utilizing the
previous version of this and other related NPH standards. This Standard also provides
criteria and guidance for major modifications to existing hazard category 1, 2, and 3 nuclear
facilities, and for 10-year NPH reassessments, which could potentially trigger design reviews
of existing facilities if significant increases in NPH design loads or risks are identified.
Prior to this revision of DOE-STD-1020, DOE used the following DOE guide (G) and
standards to support implementation of the NPH requirements:
DOE G 420.1-2, Guide for the Mitigation of Natural Phenomena Hazards for DOE
Nuclear and Non-Nuclear Facilities;
DOE-STD-1020-2002, Natural Phenomena Hazards Design and Evaluation Criteria for
Department of Energy Facilities;
DOE-STD-1021-93 (Reaffirmed in 2002), Natural Phenomena Hazards Performance
Categorization Guidelines for Structures, Systems, and Components;
DOE-STD-1022-94 (Reaffirmed in 2002), Natural Phenomena Hazards Site
Characterization Criteria; and
DOE-STD-1023-95 (Reaffirmed in 2002), Natural Phenomena Hazards Assessment
Criteria.
DOE-STD-1020-2012
ii
Because of the recent development and issuance of several voluntary consensus standards
by the nuclear industry professional organizations that address DOE NPH analysis and
design needs, three of the listed standards have been superseded and the DOE NPH Guide
has been cancelled with some information re-located to this new DOE-STD-1020-2012, as
discussed below:
Section 2
DOE G 420.1-2: This guide is cancelled. Most of the guidance was no longer needed
and any remaining applicable guidance was incorporated into this revision of DOE-
STD-1020.
DOE-STD-1021-93: This standard is superseded. The seismic categorization
provisions of DOE-STD-1021 are replaced by American National Standards Institute
(ANSI)/American Nuclear Society (ANS)-2.26-2004 (R2010), Categorization of Nuclear
Facility Structures, Systems, and Components for Seismic Design, and this revision of
DOE-STD-1020. The wind, precipitation (inclusive of rain, snow, and ice), and flood
hazard mitigation provisions are replaced by new criteria and guidance provided in this
revision of DOE-STD-1020.
DOE-STD-1022-94: This standard is superseded. The seismic site characterization
provisions of DOE-STD-1022 are replaced by ANSI/ANS-2.27-2008, Criteria for
Investigation of Nuclear Facility Sites for Seismic Hazard Assessment, as specified in
this revision of DOE-STD-1020. The wind and flood site characterization provisions
are also provided in this revision.
DOE-STD-1023-95: This standard is superseded. The seismic hazard assessment
provisions of DOE-STD-1023-95 are replaced by ANSI/ANS-2.29-2008, Probabilistic
Seismic Hazards Analysis, as specified in this revision of DOE-STD-1020. The wind
and flood hazards assessment provisions are also provided in this revision.
The superseded standards will still be available for reference and use at existing facilities
and can be found at the archived standards section of the DOE Technical Standards
Program website.
In addition, this revision of DOE-STD-1020 provides supplemental criteria and guidance
relative to seismic hazards (beyond and/or supporting that provided in the industry
standards) and new criteria and guidance for analysis and design of SSCs for lightning,
precipitation, and volcanic eruption events.
Throughout this Standard, the word “shall" denotes actions that are required to comply with
this Standard. The word "should" is used to indicate recommended practices. The use of
"may" with reference to application of a procedure or method, indicates that the use of the
procedure or method is optional.
DOE-STD-1020-2012
iii
TABLE OF CONTENTS
Foreword .................................................................................................................................... i
1.0. Introduction .................................................................................................................... 1
1.1. Purpose ....................................................................................................................... 1
1.2. Background ................................................................................................................. 1
1.3. Applicability and Scope ................................................................................................ 2
1.4. Overview and Organization ......................................................................................... 3
2.0. General Criteria and Guidance for NPH Design ........................................................... 5
2.1. Facilities Other than Hazard Category 1, 2, and 3 Nuclear Facilities ............................ 5
2.2. Hazard Categories 1, 2, and 3 Nuclear Facilities ......................................................... 6
2.3. General Criteria and Guidance for Defining Failure Condition...................................... 6
Section 3
3.0. Criteria and Guidelines for Seismic Design................................................................ 10
3.1. Seismic Design Categorization and Limit States ........................................................ 10
3.2. Selection of Design Basis Earthquake (DBE) Return Period to Approximately
Meet Target Performance Goal ................................................................................. 10
3.3. Site Characterization ................................................................................................. 11
3.4. Probabilistic Seismic Hazard Analysis ....................................................................... 12
3.5. Building and Equipment Response Analysis to Determine Seismic Demand ............. 13
3.6. Building and Equipment Capacity Evaluation ............................................................. 13
4.0. Criteria and Guidelines for Wind, Tornado, and Hurricane Design .......................... 15
4.1. SSC Categorization for Wind Design ......................................................................... 15
4.2. Site Characterization for Wind-Related Hazard Design .............................................. 16
4.3. Probabilistic Wind Hazard Assessment and Determination of Wind Design
Parameters ................................................................................................................ 19
4.4. SSC Design and Evaluation to Mitigate Wind-Related Hazards ................................. 22
5.0. Criteria and Guidelines for Flood, Seiche and Tsunami Design ............................... 25
5.1. SSC Categorization for Flood Design ........................................................................ 25
5.2. Site Characterization for Flood Design ...................................................................... 26
5.3. Determination of Flood Design Parameters for Flood-Related Hazards ..................... 28
5.4. Probabilistic Flood Hazard Assessment and Determination of Flood Design
Parameters ................................................................................................................ 34
5.5. SSC Design and Evaluation to Mitigate Flood-Related Hazards ................................ 39
6.0. Criteria and Guidelines for Lightning Design ............................................................. 50
6.1. SSC Categorization for Lightning Hazards ................................................................. 50
6.2. Designing SSCs for Lightning Protection ................................................................... 50
7.0. Criteria and Guidelines for Precipitation Design........................................................ 51
7.1. SSC Categorization for Precipitation Design .............................................................. 51
DOE-STD-1020-2012
iv
7.2. Site Characterization for Precipitation Design ............................................................ 52
7.3. Determination of Precipitation Design Parameters ..................................................... 53
7.4. Probabilistic Precipitation Hazard Assessment and Determination of Precipitation
Design Parameters .................................................................................................... 54
7.5. SSC Design and Evaluation to Mitigate Precipitation-Related Hazards ..................... 55
8.0. Criteria and Guidelines for Volcanic Eruption Design ............................................... 60
Section 4
8.1. Applicable Sites ......................................................................................................... 60
8.2. Volcanic Hazard Assessment .................................................................................... 60
8.3. Characterization of Volcanic Hazards ........................................................................ 60
8.4. Design Considerations for Volcanic Hazards ............................................................. 62
8.5. Additional Reading .................................................................................................... 64
9.0. Evaluation and Modification of SSCs in Existing Facilities ....................................... 65
9.1. NPH Design and Evaluation of Existing Facilities for Major Modifications .................. 65
9.2. Periodic Review and Update of NPH Assessments ................................................... 65
9.3. Facility Condition Assessments ................................................................................. 66
9.4. Guidelines for NPH Evaluation of SSCs in Existing Facilities ..................................... 69
10.0. Quality Assurance and Peer Review ........................................................................... 73
11.0. References .................................................................................................................... 74
Appendix A. Glossary ........................................................................................................... A-1
Appendix B. Abbreviations and Acronyms ......................................................................... B-1
Table of Figures and Tables
Table 3-1: Response Modification Coefficients for Seismic Design of SDC-1 and SDC-2
SSCs ....................................................................................................................11
Table 4-1: Mean Return Periods for Design Basis Wind Speeds for WDC-3, WDC-4, and
WDC-5 SSCs ........................................................................................................21
Table 5-1: Flood-Related Hazards ........................................................................................29
Table 5-2A: Return Period for Design Basis Flood Level (DBFL) for Various Flood Design
Categories ............................................................................................................35
Table 5-2B: Return Period (Years) for Design Basis Flood Structural Loads ............................35
Table 5-3: Design Basis Flood Event Combinations ..............................................................41
Figure 5-1: Flood Evaluation Process .....................................................................................46
Table 7-1: Return Period (Years) for Design Precipitation Flooding Caused by Precipitation
Runoff ...................................................................................................................55
Table 7-2: Return Period (Years) for Design Precipitation Structural Loads ..........................55
DOE-STD-1020-2012
1
1.0 Introduction
1.1. Purpose
Section 5
This Department of Energy (DOE) Standard (STD)-1020-2012, Natural Phenomena Hazards
Analysis and Design Criteria for DOE Facilities, provides criteria and guidance for the
analysis and design of facility structures, systems, and components (SSCs) that are
necessary to implement the requirements of DOE Order (O) 420.1C, Facility Safety, and to
ensure that the SSCs will be able to effectively perform their intended safety functions under
the effects of natural phenomena hazards (NPHs). This Standard also provides criteria and
guidance for the use of industry building codes and voluntary consensus standards in the
NPH analysis and design of SSCs in DOE facilities.
1.2. Background
Earlier versions of this Standard have directly provided NPH analysis and design methods,
requirements and criteria to satisfy DOE NPH requirements. However, since the passage of
the 1995 National Technology Transfer and Advancement Act that encourages the use of
industry building codes and voluntary consensus standards, DOE has actively participated
with standards development organizations, (e.g., the American Nuclear Society (ANS), the
American Society of Civil Engineers (ASCE), the Structural Engineering Institute (SEI)), to
develop the following five voluntary consensus standards associated with the seismic and
extreme winds design of nuclear facilities:
American National Standards Institute (ANSI)/ANS-2.26-2004, Categorization of
Nuclear Facility Structures, Systems, and Components;
ANSI/ANS-2.27-2008, Criteria for Investigation of Nuclear Facility Sites for Seismic
Hazard Assessment;
ANSI/ANS-2.29-2008, Probabilistic Seismic Hazards Analysis;
ANSI/ANS-2.3-2011, Estimating Tornado, Hurricane, and Extreme Straight-Line Wind
Characteristics at Nuclear Facilities; and,
ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components
in Nuclear Facilities.
The first four of these voluntary consensus standards were adopted by DOE, with some
modifications, as stated in DOE-STD-1189-2008, Integration of Safety into the Design
Process, for seismic design of new facilities and major modifications of existing facilities,
thereby replacing the seismic portions of:
DOE-STD-1020-2002, Natural Phenomena Hazards Design and Evaluation Criteria
for Department of Energy Facilities;
DOE-STD-1021-93, Natural Phenomena Hazards Performance Categorization
Guidelines for Structures, Systems and Components;
DOE-STD-1022-94, Natural Phenomena Hazards Site Characterization Criteria; and
DOE-STD-1020-2012
2
DOE-STD-1023-95, Natural Phenomena Hazards Assessment Criteria.
The use of criteria and guidance in DOE-STD-1020-2002, DOE-STD-1021-93, DOE-STD-
1022-94 and DOE-STD-1023-95 for NPHs other than seismic was continued, in large part,
with the criteria and guidance being consolidated, updated, and incorporated into this
revision of DOE-STD-1020.
This revision of DOE-STD-1020 adopts the seismic voluntary consensus standards to make
it consistent with the approach taken in DOE-STD-1189-2008 and consolidates, updates,
and incorporates criteria and guidance for other NPHs that was included in the DOE NPH
standards (i.e., DOE-STD-1020-2002, DOE-STD-1021-93, DOE-STD-1022-94, and DOE-
STD-1023-95). These four standards are superseded by this revision of DOE-STD-1020
and the voluntary consensus standards that it is adopting, but will still be available for
reference and use at existing facilities and can be found at the archived standards section of
the DOE Technical Standards Program website. Further, information in Appendices B
through E of DOE-STD-1020-2002, which is not included in this revision of DOE-STD-1020,
provides background on the previous NPH criteria and design that can be useful when
evaluating current designs and understanding general NPH design philosophies. The
Department is evaluating an update of this information and incorporation into a separate
handbook.
Section 6
1.3. Applicability and Scope
This Standard has the same applicability as Chapter IV of Attachment 2 in DOE O 420.1C,
i.e., it is applicable to all government-owned and government-leased nuclear and non-
nuclear facilities and sites.
The provisions of this Standard apply only to new facilities and major modifications, unless
triggered by periodic NPH assessment and upgrade requirements.
This Standard addresses the following NPHs: earthquakes, extreme winds (inclusive of
tornado, hurricane, and extreme straight line winds), floods, lightning, precipitation (inclusive
of snow, rain, and ice), and volcanic eruptions. Wildland fires that may result from certain
NPHs are not addressed in this Standard; rather, they are addressed in DOE-STD-1066-
2012, Fire Protection.
Several other NPHs may require analysis and design consideration at certain sites, although
no guidance for hazard analysis or design for these phenomena is provided in this Standard.
These phenomena include drought, fog, frost, extreme temperatures, landslides,
subsidence, surface collapse, uplift, and waterspouts. DOE and facility operators should
discuss which, if any, of these phenomena need consideration, based on both site and
facility characteristics.
Several documents have been referenced in this Standard, both for establishing or
augmenting requirements and to provide guidance. Even though only the current versions
of these documents have been cited in this Standard, the use of the applicable provisions in
the latest version of a cited reference is preferable, but not mandatory, provided that the use
of such a later version is consistent with other provisions of this Standard. Also, when an
SSC is designed by mixing the provisions from two versions of a cited reference, the
resulting design shall not be less conservative than that resulting from the application of the
latest version alone.
DOE-STD-1020-2012
3
1.4. Overview and Organization
The NPH analysis and design process involves the following steps:
Step 1: Siting new facilities to avoid active geologic faults, areas of instability
subject to landslides, and areas of likely soil liquefaction. Also, unless impractical
from cost and strategic considerations, facilities shall not be located below the design
basis flood level (DBFL) determined from a probabilistic flood hazard analysis.
Special attention shall be given to sites potentially subject to flooding from upstream
dams or reservoirs, including seismically induced failures.1
Step 2: Establishing the performance requirements for SSCs in terms of parameters
that define failure of their safety functions (e.g., flood water level relative to the
location of a SSC that is vulnerable to inundation, the state of SSC deformation
under various NPH loads, limit states (LS) under seismic loads, etc.), that can be
determined from the NPH design category (NDC) which is based upon the
consequences of SSC failure when subjected to NPH events.
Step 3: Calculating NPH demands on SSCs resulting from NPH events in terms of
parameters that define failure of their safety functions.
Step 4: Designing (or, for existing facilities, design evaluation) SSCs to ensure their
ability to maintain required functionality when subjected to demands of NPH events.
Section 2 of this Standard provides generic NPH criteria and guidance for Step 2, above, for
establishing the NPH performance requirements for SSCs. Additional criteria and guidance
for Step 2 specific to an NPH type are provided in Sections 3 through 8. These sections
also provide criteria and guidance for calculating NPH demands (i.e., Step 3) and for SSC
design (i.e., Step 4) for each of the NPH types, specifically:
Section 7
Section 3 addresses Seismic Hazards;
Section 4 addresses Wind, Tornado, and Hurricane Hazards;
Section 5 addresses Flood, Seiche and Tsunami Hazards;
Section 6 addresses Lightning Hazards;
Section 7 addresses Precipitation Hazards (i.e., snow, rain, ice, or their
combination); and
Section 8 addresses Volcanic Eruption Hazards.
The remainder of the standard provides general criteria and guidance applicable to all NPH types.
Section 9 presents criteria and guidance for modifications of existing facilities
and for periodic evaluation of NPH assessments;
1 Active geological faults are those demonstrating multiple movements within the last approximately 500,000 years, or at least one
movement within the last approximately 50,000 years.
DOE-STD-1020-2012
4
Section 10 provides criteria and guidance for ensuring quality assurance and
peer reviews;
Section 11 provides references; and,
Appendices A and B provide glossary and acronyms, respectively.
DOE-STD-1020-2012
5
2.0 General Criteria and Guidance for NPH Design
Criteria for NPH design of an SSC are dependent on the NDC of the SSC. This section
provides criteria and guidance for selecting NDCs that are appropriate for SSCs from the
consideration of their failure consequences to workers and the public. This section also
provides criteria and guidance for defining NPH-related SSC failure.
This Standard is written primarily for NPH design of hazard category 1, 2, and 3 nuclear
facilities, the criteria and guidance for which are given in Section 2.2, Section 2.1 provides
criteria and guidance that are applicable for all other facilities (see Section 1.3 for a list of
facilities to which this Standard is applicable).
2.1. Facilities Other than Hazard Category 1, 2, and 3 Nuclear Facilities
2.1.1 For facility risk categorization and design of SSCs subjected to seismic, wind, flood, and
precipitation (snow, ice, and rain) loads, the criteria and guidelines given in ASCE/SEI 7-
10, Minimum Design Loads for Buildings and Other Structures, shall be used. For these
facilities, lightning protection shall be in accordance with the National Fire Protection
Association (NFPA) 780-2011, Standard for the Installation of Lightning Protection
Systems. Annex L of NFPA 780-2011 provides guidance to determine if a lightning
protection system is required. For facilities in which a Faraday cage is selected, Chapter
X of DOE-STD-1212-2012, Explosives Safety, provides guidance on installation,
inspection, and maintenance. Electrical distribution lines, utility connections, piping, and
fencing should be protected from current surges by surge protective devices, bonding
and grounding. Consideration should be given to providing lightning protection to bus
shelters, guard shacks and other structures where personnel may seek shelter. Also, it
is recommended that sites within 400 kilometers of a Quaternary volcanic vent (such as
the Idaho National Laboratory, the Los Alamos National Laboratory and the Hanford site)
consider using Section 8 of this Standard to calculate potential ash loads on roofs and to
determine the applicable design load combinations.
Section 8
2.1.2 Facilities containing explosives, or those that can be affected by detonation (inadvertent
or planned) of explosives, are required by the Code of Federal Regulations (C.F.R.) in
10 C.F.R. 851, Worker Safety and Health Program, to use Chapters VI and X of the
DOE-STD-1212-2012, Explosives Safety, in addition to the requirements given in
Sections 2.1.1 and 2.1.4 of this Standard. Special care may be needed in detailing
frangible (blowout panels) to meet both criteria. Additional care is recommended for the
design and securing of industrial, laboratory equipment (with more than de minimus
quantities of explosives) and shelving for explosives storage in seismically prone areas
to preclude impact to explosives due to shelving collapse, or explosives ejection, or
falling.
2.1.3 NPH design of facilities with biological hazards should be based on an NDC level and LS
that are consistent with their safety and containment criteria.
2.1.4 To comply with Public Law 102-614 and Executive Order 12941, Seismic Safety of
Existing Federally Owned or Leased Buildings, the guidelines provided in the
Interagency Committee on Seismic Safety in Construction’s (ICSSC) RP-8, Standards of
Seismic Safety for Existing Federally Owned and Leased Buildings, shall be used to:
determine when a seismic evaluation and retrofitting of an existing non-
nuclear facility will be necessary; and
DOE-STD-1020-2012
6
establish the evaluation and mitigation requirements. Additional
guidelines are provided in ICSSC RP-5, ICSSC Guidance on
Implementing Executive Order 12941 on Seismic Safety of Existing
Federally Owned or Leased Buildings.
2.1.5 For facilities with significant chemical or toxicological hazards, the design should
consider the guidance and criteria in Section 2.3.9, or equivalent.
2.2 Hazard Categories 1, 2, and 3 Nuclear Facilities
2.2.1 Background and Overview. ANSI/ANS-2.26-2004, Categorization of Nuclear Facility
Structures, Systems, and Components for Seismic Design, provides a process for
determining a seismic design category (SDC) and LS that establishes performance
expectations for SSCs when subjected to seismic (i.e., earthquake-related) hazards. LS
defines the maximum deformation level that the SSC may undergo under seismic loads
and still perform its intended safety function. SSCs are graded into five SDCs based on
the consequences of SSC failure or the SSC reaching its LS. It is important to note that
the term LS defines SSC failure from seismic loads only, and in this Standard, this term
is not applicable to other NPHs. Deformation-related failures resulting from other, non-
seismic NPHs are defined by the design codes and criteria that are used to design the
SSCs. For NPH design of SSCs in nuclear facilities, subject to the additional and
superseding criteria and guidelines provided in this Standard, the intent is to use the
radiological hazards evaluation and NPH design categorization process provided in
ANSI/ANS-2.26-2004, supplemented by DOE-STD-3009-94, Preparation Guide for U.S.
Department of Energy Nonreactor Nuclear Facilities Documented Safety Analysis and
DOE-STD-1189-2008. Thus, for various NPHs, the SSCs will be categorized into the
following NDC:
For seismic hazards: SDCs 1 through 5 (i.e., SDC-1 through SDC-5);
For extreme wind, tornado, and hurricane hazards: wind design categories
(WDCs) 1 through 5 (i.e., WDC-1 through WDC-5);
For flood, seiche, and tsunami, hazards: flood design categories (FDCs) 1
through 5 (i.e., FDC-1 through FDC-5);
Section 9
For extreme precipitation hazards: precipitation design categories (PDCs) 1
through 5 (i.e., PDC-1 through PDC-5; and
For volcanic eruption hazards: volcanic design categories (VDC) 1 through 5
(i.e., VDC-1 through VDC-5).
The remainder of Section 2 provides general criteria and guidance for NPH design
categorization and for defining SSC failure conditions. Additional details are
provided in each NPH-specific section of this Standard (i.e., Sections 3 through 8).
2.2.2 General Criteria and Guidance for Establishing Various NPH Design Categories
2.2.2.1 For hazard category 1, 2, and 3 nuclear facilities, the NDCs for safety (i.e., safety
class and safety significant) SSCs shall be determined based on analysis of the
severity of unmitigated consequences using the categorization methodology given
in Appendix A of DOE-STD-1189-2008.
DOE-STD-1020-2012
7
2.2.2.2 The NDC of an SSC establishes the target performance goal for the SSC, (same as
those specified in ANSI/ANS-2.26-2004 and ASCE 43-05, Seismic Design Criteria
for Structures, Systems and Components in Nuclear Facilities, for seismic hazards),
and the return period of the NPH event given in this Standard to which the SSC will
need to be designed. For existing facilities, the NDC establishes the return period
of the NPH event to which the SSC design will need to be evaluated.
2.2.2.3 The Performance Goal (defined in ANSI/ANS-2.26-2004 in terms of annualized
failure probability) and the Return Period of the design or evaluation basis NPH of
an SSC, are based on the significance of the SSC for protection of workers and the
public. For example, for seismic design of SSCs important for the protection of the
public against high radiation doses, the return period for the design basis
earthquake (DBE) will be much longer (i.e., the peak ground acceleration will be
high) than that for SSCs whose failure does not result in any significant off-site
consequences to the public.
2.2.2.4 Consistent with ANSI/ANS-2.26-2004, SSCs shall be given a NDC (i.e., design
category 1 through 5) for seismic, wind, flood, precipitation, and volcanic eruption
(e.g., ashfall) NPHs. For lightning protection, since available data on the level or
the size of lightning events and their return periods are not adequate, SSCs have
been placed only into two groups: one for SSCs that may not perform their safety
functions when subjected to a lightning event, and, therefore, requires lightning
protection; and the other for SSCs that do not require lightning protection.
2.2.2.5 In applying the categorization criteria given in Appendix A of DOE-STD-1189, no
higher designations than NPH category 3 design requirements are necessary for
co-located worker protection because, in addition to design features, site training
and site emergency procedures provide for adequate protection for workers. Only
in the case of an in-facility worker who needs to remain in the facility for safe
shutdown or other safety-related purposes, should NDC 3 be considered for SSCs
required for the protection of that worker.
2.3 General Criteria and Guidance for Defining Failure Condition
2.3.1 For different SSCs, the “failure condition” (i.e., condition where the SSC cannot be
relied upon to perform its safety function) will depend upon the safety function being
performed. An SSC failure condition shall be defined using an approach consistent
with ANSI/ANS-2.26-2004 for NPHs, and the guidelines given in this Standard.
Section 10
2.3.2 For seismic hazard evaluations, consistent with ANSI/ANS-2.26-2004, the failure of
an SSC shall be defined in terms of its LS or permissible deformation limit from
safety function considerations. For other NPHs, dynamic loads, which consider
deformation-related SSC failure, the definition of failure shall be consistent with the
design codes being used. For example, for wind-related missile hazard design, the
SSC failure definition shall be consistent, as specified in this Standard, with that
provided in applicable standards such as American Concrete Institute (ACI)-349-06,
Code Requirements for Nuclear Safety-Related Concrete Structures and
Commentary, Appendix F, and ANSI/ American Institute of Steel Construction (AISC)
N690-06, Specification for Safety-Related Steel Structures for Nuclear Facilities,
Section NB-3. However, the hazards consequence evaluation process and
radiological dose criteria by which SDCs are determined in ANSI/ANS-2.26-2004 are
also applicable for selecting design categories for NPHs other than seismic.
DOE-STD-1020-2012
8
2.3.3 For wind-related hazards evaluations in Section 4 of this Standard, except for
evaluating tornado or wind-borne missile impacts, and for other NPH evaluations in
Sections 5 through 8 of this Standard, an SSC failure shall be defined, as specified in
this Standard, in terms of load combinations, permissible stress, strain, or
deformation given, as applicable, in ASCE/SEI 7-10, ACI-349-06 (for NDC 3, 4, and 5
only), or ANSI/AISC N690 (for NDC 3, 4, and 5 only), the provisions of which shall be
used in designing the SSCs.
2.3.4 The computed stress, strain, or deformation in the SSC, when subjected to NPHs,
shall not exceed the threshold value of any of these parameters at which the SSC
fails to perform its safety function. For example, even if the maximum stress and
strain in an SSC, when subjected to an NPH event, are within the permissible stress
and strain criteria, the SSC deformation shall not exceed the deformation limit at
which the SSC cannot perform its safety function, or the deformation limit at which
the SSC can compromise the safety function of another SSC.
2.3.5 When subjected to certain NPHs, all SSCs may be susceptible to failure, not only
because of excessive stress, strain, or deformation, but also due to other modes of
failure (as examples: inundation during a flood; electrical malfunction, such as short-
circuiting and connection failure; and explosion due to tornado atmospheric pressure
change). These failure modes shall also be considered in the hazard evaluation.
2.3.6 In designing an SDC-3, SDC-4, or SDC-5 building structure for a new facility that has
a direct confinement safety function, the LS is determined by the design analysis.
Section 11
2.3.7 For criticality prevention, DOE O 420.1C requires that criticality safety evaluations show
that entire processes involving fissionable materials remain subcritical under normal and
credible abnormal events, including these initiated by design basis events. Credible
design basis NPH events for the purposes of criticality process analysis are those
equivalent to NDC-3. The criticality process analysis will identify applicable SSCs relied
upon to ensure subcriticality during credible abnormal conditions. NPH Design Category
and limit states are assigned depending upon the required safety function. For the
purposes of applying ANSI/ANS-2.26-2004 as interpreted by DOE-STD-1189-2008,
criticality hazards are treated like any other radiological hazard with the following
exception: the SSCs whose safety function establishes single contingency for NPH shall
be designed to a NPH Design Category NDC-3 and appropriate limit states (i.e., SSCs
whose NPH-initiated failure alone can lead directly to a criticality accident shall be
designed to NDC-3 with deformation limits established to prevent the criticality
accident). If a process cannot be shown to meet the ANSI/ANS-8.1-1998, Nuclear
Criticality Safety I Operations with Fissionable Materials Outside Reactors,
recommendation for double contingency for NPH events because of NPH induced SSC
failure, DOE O 420.1C requires an explanation in the DOE approved Criticality Safety
Program for not implementing a recommendation in the applicable ANSI/ANS-8
Standards.
2.3.8 To ensure that proper failure criteria are developed (e.g., for seismic design of an
SSC, the LS selected for determining the permissible maximum stress, strain,
deformation, or displacement is consistent with the safety function(s) of the SSC, as
determined from hazard and accident analyses), the following professionals should
work together and evaluate the functional requirements of the SSC and its
subcomponents in relation to all of their potential failure modes:
Safety Analyst who is responsible for hazard and accident analyses;
DOE-STD-1020-2012
9
NPH Design Engineer who is responsible for NPH design and for
coordinating the selection of SSC LS or failure deformation level and SSC
NPH design category; and
Equipment Expert who is responsible for the mechanical and electrical
design of the equipment.
2.3.9 Additional Guidance for Hazard Category 1, 2, and 3 Nuclear Facilities with Chemical
Hazards. Federal Regulation 10 C.F.R. 830, Nuclear Safety Management, and DOE
O 420.1C both require evaluation of chemical and toxicological hazards in the design
of hazard category 1, 2, and 3 nuclear facilities and protection against these hazards.
The NDC for SSCs that provide protection from chemical or toxicological hazards
shall be determined based on the unmitigated consequences of SSC failure from an
NPH event. The methodology for this categorization should be consistent with DOE-
STD-1189-2008 and direction from the responsible program office. The higher of the
NDCs determined from the application of radiation dose criteria of Section 2.2.2 and
the criteria for chemical dose should be used. The LS should be chosen to be
consistent with safety and containment criteria.
DOE-STD-1020-2012
10
3.0 Criteria and Guidelines for Seismic Design
This section provides criteria and guidance for analysis and design of SSCs for mitigating
seismic hazards.
3.1. Seismic Design Categorization and Limit States
Section 12
3.1.1 The guidelines and criteria for design categorization and LS of SSCs subjected to
seismic hazards shall be the same as those in ANSI/ANS-2.26-2004, except that
consequence evaluation criteria shall be as defined in Table 2-1 of this Standard
(i.e., categorization guidance, in terms of unmitigated dose consequences, given in
Table 2-1 shall take precedence over those in Table A.3 of ANSI/ANS-2.26-2004).
3.1.2 For seismic design purposes, SDC-1 SSCs having LS A shall be considered
equivalent to Risk Category II of ASCE/SEI 7-10, and SDC-2 SSCs having LS B shall
be considered equivalent to Risk Category IV of ASCE/SEI 7-10.
3.1.3 SDC-1 and SDC-2 SSCs having safety functions requiring other LS, shall be
designed following ASCE/SEI 7-10 provisions for Risk Category II and Risk Category
IV, respectively, except as shown in Table 3-1 of this Standard, which replaces the
table in Appendix A.1 of DOE-STD-1189-2008. In Table 3-1, the R values given in
ASCE/SEI 7-10 have been modified to account for the difference between the limit
states achieved by ASCE/SEI 7-10 and the LS A, B, C, and D defined in ANSI/ANS
2.26-2004 and ASCE/SEI 43-05. Following ASCE/SEI 7-10, the term “Occupancy
Category” used in ASCE/SEI 7-05 and in the table in Appendix A.1 of DOE-STD-
1189-2008 has been substituted with the term “Risk Category.”
3.2. Selection of Design Basis Earthquake (DBE) Return Period to
Approximately Meet Target Performance Goal
3.2.1 For SDC-3 through SDC-5 SSCs, DBE return periods given in ANSI/ANS-2.26-2004
and ASCE/SEI 43-05, and appropriate Design Factors in ASCE/SEI 43-05, shall be
used to determine the seismic ground motion applicable for the facility site.
3.2.2 For SDC-1 and SDC-2 SSCs, the DBE return period on which the seismic provisions
of ASCE/SEI 7-10 are based shall be used.
DOE-STD-1020-2012
11
Table 3-1:
Response Modification Coefficients for Seismic Design of SDC-1 and SDC-2 SSCs
SDC
Limit State
A B C D
1 ASCE/SEI 7-10,
Use Risk Category
II,
I = 1.0
R a =R
(1)
ASCE/SEI 7-10,
Use Risk
Category II,
I = 1.0
R a = R/1.25
R ≥ 1.2
ASCE/SEI 7-10,
Use Risk
Category II,
I = 1.0
R a = R/1.5
R a ≥ 1.2
ASCE/SEI 7-10,
Use Risk
Category II,
I = 1.0
R a ≥ 1.0
2 N/A ASCE/SEI 7-10,
Use Risk
Category IV,
I = 1.5
R a = R
ASCE/SEI 7-10,
Use Risk
Category IV,
I = 1.5
R a = R/1.2
R a ≥ 1.2
ASCE/SEI 7-10,
Use Risk
Category IV,
I = 1.5
R a ≥ 1.0
Table notes:
(1)
R = Response Modification Coefficient given in ASCE/SEI 7-10. Ra = Actual (reduced ) Response
Modification Coefficient to be used in the design substituting R values given in ASCE/SEI 7 -10 to
account for the difference between the limit states achieved by ASCE/SEI 7-10 and the LS A, B, C,
and D, as defined in ANSI/ANS-2.26-2004 and ASCE/SEI 43-05. ASCE/SEI 43-05, in Table C1-1,
recognizes that Seismic Use Group (SG) I, SG II, and SG III of ASCE/SEI 7-02 (i.e., Risk
Categories II, III, and IV, respectively, in ASCE/SEI 7-10) are equivalent to SDC-1 LS-A; SDC-1 LS-
B; and SDC-2 LS-B, respectively. Also, it recognizes that SG III of ASCE/SEI 7-02 (i.e., Risk
Category IV in ASCE 7-2010) is equivalent to SDC-1 LS-C. Thus, the ratio between LS A and B
and between B and C are approximately 1.25 and 1.2, respectively. The Ra values given above are
based on these ratios.
3.3. Site Characterization
Section 13
3.3.1 For SDC-3 through SDC-5 SSCs, site characterization for determining the data
necessary for performing a site-specific probabilistic seismic hazard assessment
(PSHA), and evaluating surface fault rupture hazards and seismic-induced ground
failure hazards, shall be performed following the requirements given in ANSI/ANS-
2.27-2008. In addition, the following criteria shall be satisfied:
Table 1 of ANSI/ANS-2.27-2008 states that for SDC-3, SDC-4, and SDC-5
design response spectra, earthquake sources contributing > 5 percent to the
hazard at a site shall be characterized. For DOE purposes, earthquake
sources contributing >1 percent to the hazard shall be characterized.
Table 1 of ANSI/ANS-2.27-2008 column two is labeled “Maximum
Considered Earthquake Spectral Response Acceleration,” providing a range
of spectral response accelerations for low, moderate and high seismic
environments. For DOE purposes, and for consistency with terminology in
ASCE/SEI 43-05, this column heading shall be read to mean, “Spectral
response acceleration at 1 E-4 annual probability of exceedance.”
Section 4.4 of ANSI/ANS-2.27-2008 is titled “Characterization for Site
Response Analysis.” When applying this section to DOE facilities, the
DOE-STD-1020-2012
12
contents of ANSI/ANS-2.29-2008 Section 5.4, “Site Response Assessment,”
shall also be applied.
3.3.2 For SDC-1 and SDC-2 SSCs, site characterization shall be performed in accordance
with ASCE/SEI 7-10 to obtain the data necessary for site classification, and for
determining site soil properties necessary for designing the SSCs. If applicable, site
characterization activities shall also include the collection of data necessary to
perform soil-structure interaction and the development of site-specific ground motion.
3.4 Probabilistic Seismic Hazard Analysis
3.4.1 For facilities having SDC-3 through SDC-5 SSCs, provisions of ANSI/ANS-2.29-2008
shall be used for performing site-specific PSHAs, with the following exceptions:
In specifying a lower-bound magnitude as required by Section 5.1.1 of
ANSI/ANS-2.29-2008, “Lower-bound Magnitude,” the guidance in Electric
Power Research Institute Technical Report 1012965, Use of CAV in
Determining Effects of Small Magnitude Earthquakes on Seismic Hazard
Analyses, may be useful. This guidance may be used if site-specific
sensitivity analyses demonstrate that site hazard at return periods of interest
is not unduly reduced. In no case shall a lower bound be higher than a 5.5
magnitude; and
If any of the provisions given in Section 5.4 of ANSI/ANS-2.29-2008, Site
Response Assessment, is in conflict with any provision given in Section 2.3
of ASCE/SEI 43-05, the provision given in ASCE/SEI 43-05 shall be used.
For integrating site response into PSHAs, additional guidance can be
obtained from U.S. Nuclear Regulatory Commission (NRC) Regulatory Guide
1.208, Performance-Based Approach to Define the Site-Specific Earthquake
Ground Motion, and NRC’s NUREG/CR-6728, Technical Basis for Revision
of Regulatory Guidance on Design Ground Motions: Hazard- and Risk-
consistent Ground Motion Spectra Guidelines.
3.4.2 For use in foundation input motions of embedded structures, it is necessary to define
the Uniform Hazard Spectrum (UHS) both at bedrock and ground surface outcrop. In
addition, to have compatible foundation motions to the UHS, a suite of representative
(equally likely) soil profiles should be provided by the PSHA.
Section 14
3.4.3 For facilities having only SDC-1 and SDC-2 SSCs, it is not necessary to perform a
PSHA for determining a site-specific ground motion. However, if a site-specific
ground motion is used, or if it is required, the provisions of Sections 11.4.7 and 21 of
ASCE/SEI 7-10 shall be used; or a PSHA shall be performed in accordance with
ANSI/ANS-2.29-2008 to determine the site-specific ground motion.
DOE-STD-1020-2012
13
3.5 Building and Equipment Response Analysis to Determine Seismic Demand
3.5.1 For SDC-3 through SDC-5 SSCs, provisions of ASCE/SEI 43-05 and ASCE 4-98,
Seismic Analysis of Safety-Related Nuclear Structures, shall be used for determining
seismic demands, based on the following considerations and exceptions:
3.5.1.1 Design Basis Seismic Ground Motion. For a new facility, the method of
determining the design basis seismic ground motion shall be developed by
considering the current state-of-the-art methods, including, but not limited to:
the requirements of Section 2 of ASCE/SEI 43-05;
seismic input requirements given in Section 2 of ASCE 4-98, but only to
the extent these are consistent with the requirements of Section 2 of
ASCE/SEI 43-05; and
NRC Regulatory Guide 1.208.
3.5.1.2 Seismic Soil-Structure Interaction. The requirements of Section 3.3 of ASCE 4-
98 shall be followed, except that the wave incoherence provision, given in
Section 3.3.1.10 of ASCE 4-98, shall not be used.
3.5.1.3 Dynamic Response Analyses and Generation of In-Structure Response Spectra.
Requirements given in ASCE 4-98 shall be used only to the extent these are
consistent with the requirements of ASCE/SEI 43-05.
3.5.1.4 For evaluation of seismic response, the mass and stiffness effects of
nonstructural elements of buildings or equipment, even though these elements
are not part of the lateral force resisting system, shall be considered.
3.5.2 The ASCE/SEI 7-10 provisions applicable for Risk Category II and Risk Category IV
SSCs shall be used for determining seismic demands of SDC-1 and SDC-2 SSCs.
However, the R values given in ASCE/SEI 7-10 shall be modified as shown in Table
3-1 of this Standard to account for the difference between the limit states achieved
by ASCE/SEI 7-10 and the LS A, B, C, and D defined in ANSI/ANS-2.26-2004 and
ASCE/SEI 43-05.
3.6 Building and Equipment Capacity Evaluation
3.6.1 For SDC-3 through SDC-5 SSCs, provisions of ASCE/SEI 43-05 shall be used for
determining SSC capacity to withstand the seismic demands combined with other
applicable concurrent loads.
3.6.2 For SDC-1 through SDC-2 SSCs, provisions of ASCE/SEI 7-10 shall be used for
determining SSC capacity to withstand the seismic demands combined with other
applicable loads.
3.6.3 To evaluate the adequacy of the SSC to withstand the seismic demands combined
with other applicable concurrent loads, the ratio of the total demand, D, to SSC
capacity, C, shall be computed to code requirements. The computed D/C value shall
not exceed unity.
DOE-STD-1020-2012
14
3.6.4 The following five fundamental principles shall be followed in developing a design to
minimize the adverse consequences of earthquake-related hazards. These are as
follows:
Provide a continuous and traceable load path from surface to foundation;
Ensure that all viable loads and load combinations are accounted for;
Provide redundant structures or structural elements that can redistribute loads
when one structural element is overloaded;
Section 15
Provide ductile elements and connections that can undergo deformations
beyond yield without sudden and catastrophic collapse; and
Anchor mechanical equipment on roofs to resist specified wind and missile
loads.
3.6.5 Nonstructural elements attached to the structure shall be designed in a manner that
allows for seismic deformations of the structure without excessive damage to the
structure.
3.6.6 Seismic qualification of equipment may be performed by testing and/or by using actual
earthquake experience or generic shake table test data subject to the criteria and
limitations given in ASCE 43-05 (see Section 8.3) and DOE/EH-0545.
3.6.7 In designing attachments for the distribution lines (e.g., piping, tubing, conduit, or
cables, etc.), sufficient flexibility should be provided between the distribution line
support nearest to the anchor point and the anchor point so that the distribution
system can withstand the postulated relative displacement during a design basis
seismic motion.
DOE-STD-1020-2012
15
4.0 Criteria and Guidelines for Wind, Tornado, and Hurricane Design
This section provides criteria and guidance for design and evaluation of SSCs for mitigating
extreme wind hazards (i.e., extreme straight-line winds, rapid atmospheric pressure
changes (APCs) from tornadoes, tornado missiles, hurricanes, and hurricane missiles). It
provides guidance and criteria for:
Determining a WDC of an SSC, based on the severity of SSC failure consequence
(Section 4.1);
Collecting wind speed data at DOE sites for which site-specific data related to straight-
line wind hazards, tornadoes, and hurricanes are required (Section 4.2);
Performing Probabilistic Wind Hazard Assessments (PWHAs) on the basis of which
design parameters related to the wind-related hazard can be determined (Section 4.3);
and,
Designing SSCs to mitigate the effects of wind-related hazards (Section 4.4).
If a new facility is to be constructed on a site with existing Wind Hazard Analyses, then the Wind
Hazard Analysis used for the new facility would need to conform to the requirements of this
standard.
WDC-1 and WDC-2 SSCs shall be designed for extreme wind hazards using the criteria
given in ASCE/SEI-7-10 for Risk Category II and Risk Category IV facilities, respectively.
Accordingly, unless specifically mentioned, the provisions given in Sections 4.2 through 4.5
of this Standard are only applicable to WDC-3, WDC-4, and WDC-5 SSCs. However, if
Federal Emergency Management Agency (FEMA) or International Code Council (ICC)
requirements are mandated by the local, city, county, or state regulatory agencies for
tornado and hurricane shelters, these also shall be used in conjunction with ASCE/SEI 7-10
requirements and the requirements provided in this Standard.
For sites with WDC-3, WDC-4, and WDC-5 SSCs, site-specific design parameters for wind-
related hazards (e.g., wind speed, missile characteristics) shall be determined, either using
the guidelines and criteria provided in this section, or following the guidelines and criteria
provided in ANSI/ANS 2.3-2011, as supplemented in this section. Alternatively, these
design parameters may be based on a site-specific PWHA, the development of which shall
follow the guidelines and criteria provided in Section 4.3.2 of this Standard.
4.1. SSC Categorization for Wind Design
The design categorization process and criteria given in ANSI/ANS-2.26-2004 for seismic
hazards shall also be used for wind design categorization as described below, and as
previously described in Section 2.
Section 16
4.1.1 Wind design categorization shall be based on the severity of unmitigated failure
consequences resulting from all wind-related hazards which include extreme straight-
line winds, hurricane winds, tornado winds, tornado APC, tornado-generated
missiles, hurricane-induced water surges and hurricane-generated missiles that are
applicable to the DOE site and facility.
4.1.2 The failure of the safety function of some SSCs, when subjected to a wind-related
hazard, can occur not only because of excessive rupture, instability, deformation or
DOE-STD-1020-2012
16
distortion failure modes, but also as a result of intrusion of wind-borne water into, or
onto, the SSC. Such wind-borne water intrusion-related failure modes (e.g., shorting
or malfunctioning of an electric circuit or of mechanical equipment), typically
associated with storm surge flooding caused by sustained high winds on large bodies
of water, shall be accounted for in determining SSC unmitigated failure
consequences in the selection of SSC WDC and related SSC design methods and
criteria. See Section 5.0 for flood, seiche and tsunami hazards and Section 7.0 for
precipitation hazards.
4.1.3 The failure of SSCs caused by rapid APCs from tornado passage shall also be
accounted for.
4.1.4 Barriers and other SSCs that are provided for wind or missile protection of SSCs with
safety functions, shall be placed in a WDC category equal to, or higher than, the
category of the SSC to be protected. These protective SSCs, or barriers, shall be
designed using stress, strain, or deformation limits appropriate for the protective
function and the failure mode of the barrier. For example, a barrier intended to
protect a WDC-3 SSC from a wind-borne missile impact may respond inelastically as
defined in ACI 349-06 Appendix F and ANSI N690-06 Section NB-3 and considering
empirical penetration formulas which demonstrate the target will not be perforated.
4.1.5 The site-specific wind-related hazard data collection and PWHA shall be based on
the highest WDC category of the SSCs at the site.
4.2. Site Characterization for Wind-Related Hazard Design
4.2.1 General Requirements
4.2.1.1 Unless the design basis wind-related hazard parameters are determined
following the guidelines and criteria given in Section 4.3.3, sites which have
facilities with WDC-3, WDC-4, or WDC-5 SSCs shall be characterized for all
wind-related hazards following the guidelines and criteria provided in this section
(i.e., Section 4.2).
4.2.1.2 The extent and the quality of meteorological data that needs to be collected to
characterize wind-related hazards shall meet the requirements of ASCE/SEI 7-
10 for determining the design basis for straight-line and hurricane wind speed
and the criteria of ANSI/ANS-2.3-2011 for tornado wind pressure loads, APC and
from tornado missiles.
4.2.1.3 Guidance on meteorological monitoring programs can be found in DOE O 458.1,
Radiation Protection of the Public and the Environment, and ANSI/ANS-3.11-
2010, Determining Meteorological Information at Nuclear Facility Sites .
4.2.1.4 For sites with WDC-3, WDC-4, and WDC-5 SSCs, if the design basis wind-
related hazard parameters are determined following the guidelines and criteria
given in Section 4.3.3, site wind hazard characterization shall be performed
following the guidelines and criteria provided in ANSI/ANS-2.3-2011.
4.2.1.5 Sites with only WDC-1 and/or WDC-2 SSCs shall be characterized following the
requirements of ASCE/SEI 7-10. For these sites, data necessary for defining the
ASCE/SEI 7-10 parameters needed to design the SSCs shall be collected.
Section 17
DOE-STD-1020-2012
17
4.2.2 Site Description
4.2.2.1 For sites using site-specific PWHAs (see Section 4.3), data and information on
the geographical location of the facility on the DOE site, that is necessary for
estimating the distance from its location to the potential wind-borne missile
sources, and sources of hazardous and radioactive materials that may adversely
affect the safety and health of the facility workers and the safety functions of
SSCs, shall be collected.
4.2.2.2 Data for defining the size and orientation of the major facilities at the site, if
necessary for determining probabilistic tornado wind speeds and for evaluating
tornado missile hazards (see Section 4.3), shall be collected.
4.2.2.3 A general location map to clearly define the boundary of the site and to show the
distances from the site to natural and anthropogenic features pertinent to being
affected by wind-related hazards (e.g., mountains, rivers, lakes, oceans,
streams, dams, levees) shall be developed.
4.2.2.4 A detailed mapping of topographic, hydrologic, and surface features, as
appropriate, for the particular site conditions, with scales and contours suitable
for wind-related hazard assessment, shall be performed.
4.2.3 Meteorological Data. The sources of atmospheric NPHs to be characterized shall
include extreme straight-line winds, hurricane winds, tornado winds and APCs caused
by tornadoes. Guidelines and criteria for collecting meteorological data to be used in a
site-specific PWHA are provided in the following subsections.
4.2.3.1 Regional Climatology Description and History
4.2.3.1.1 The general climate of the region shall be described with respect to the types
of topographic influences, general airflow patterns, temperature and humidity,
precipitation, and relationships between regional atmospheric conditions and
local meteorological conditions.
4.2.3.1.2 Regional extreme climatology history shall be reported with dates, event
descriptions, and related information on their effects.
4.2.3.1.3 This information can generally be located in the Annual Site Environmental
Report developed to meet DOE O 450.1A, Environmental Protection Program,
and requirements at each DOE site.
4.2.3.1.4 This information can also be located in Environmental Impact Statements that
have been prepared for the site or in Programmatic Environmental Impact
Statements in which the site is one of the possible locations for the new
mission.
4.2.3.2 Wind Data Collection. Wind data shall be collected to characterize three types
of wind-related hazards: 1) straight-line winds; 2) hurricane winds; and 3)
tornado winds. Data sets of historical extreme winds shall be obtained from
weather stations that are close enough to sites to spatially represent the site
conditions. If more than one station is available, they may be combined,
provided they represent the same conditions as those at the site. Specific
guidance on spatial representativeness can be located in ANSI/ANS-3.11-2010.
DOE-STD-1020-2012
18
Guidelines and criteria for site-specific characterization of each of these three
types of wind-related hazards are provided in the following three subsections.
4.2.3.2.1 Straight-Line Wind Data. Straight-line winds are non-rotating winds such as those
occurring in thunderstorms and during frontal passages. Wind data to determine
straight-line intensities shall be collected at locations near the site. On-site
meteorological data shall be collected, if available, per guidance in ANSI/ANS-
3.11-2010, DOE O 458.1, and in Chapter 4 of DOE/EH-0173T, Environmental
Regulatory Guide for Radiological Effluent Monitoring and Environmental
Surveillance, and meet the following six criteria:
Section 18
There shall be at least ten continuous years of annual extreme wind
speed records. However, if longer periods of record exist, the entire
period shall be used.
The elevations at which wind speeds are recorded shall be 10 meters
(33 feet) above ground. The measurement elevation of these wind
speeds, if not 10 meters (since wind speed varies with height in the
Planetary Boundary Layer), shall be identified and the recorded wind
speeds shall be corrected using acceptable logarithmic wind height
conversion methods.
The type of wind speed parameter recorded over time shall be
specified (e.g., fastest-mile, peak speed, 3-second gust speed, etc.).
The recorded wind speeds shall be obtained from anemometers
located in flat open terrain, if possible.
It is possible to utilize meteorological data from on-site stations for
which less than ten years of records exist, if there are a sufficient
number of historical records from nearby National Weather Service
(NWS) stations, within a similar topographic environment.
In the absence or lack of sufficient on-site wind record data, it is
possible to utilize data collected by federal, state, and local agencies
for stations close to the site (i.e., generally within 50 km) and located
in a same wind environment. It should be noted that stations close to,
but separated by mountainous ranges from the site, may not qualify.
4.2.3.2.2 Hurricane Wind and Barometric Pressure Data. Hurricane winds are rotating
winds covering a large geographical area, with spatial and temporal variability in
wind intensities. Hurricane-prone regions of the continental U.S. are located
along the coastal areas since hurricanes draw their energy from the oceans or
other large warm water bodies (e.g., Gulf of Mexico). For sites in hurricane-prone
areas and for which no up-to-date site-specific PWHA has been performed, the
meteorological data of past historical hurricanes within 400 km (250 miles) from
the site shall be collected, including:
Location of hurricane tracks, including information on longitude and
latitude, with landfall locations;
DOE-STD-1020-2012
19
Life-cycle hurricane intensity history, inclusive of Saffir-Simpson
scale;
Reported minimal central barometric pressure near the coast or at
point of landfall; and
Reported maximum translational and rotational wind speeds near the
coast or at point of landfall.
Sources of data on hurricanes are available from the National Hurricane
Center in Miami, FL, and the National Climatic Data Center (NCDC) in
Asheville, NC.
4.2.3.2.3 Tornado Wind and Tornado APC Data. Tornado winds are violently rotating winds
which can reach speeds in excess of 320 km/hr (200 mph). States in the South
Central U.S., especially Oklahoma, Kansas, and neighboring states, have the
greatest number of historically-recorded tornadoes. A secondary maximum of
tornadoes occur in the Southeastern United States. For sites in tornado-prone
areas and for which no up-to-date site-specific PWHA has been performed the
following data shall be collected for tornadoes striking within 500 km (310 miles)
from the DOE site or reservation:
Tornado track, including latitude and longitude;
Tornado intensity, using the Enhanced Fujita, or EF, scale;
Tornado length and width; and
Data and information necessary for characterizing potential tornado
wind-borne missiles (e.g., weight, size, and shape).
Section 19
Sources of data on tornadoes are available from the National Severe Storms
Forecast Center in Norman, OK; National Oceanic and Atmospheric
Administration; and the NCDC, Asheville, NC.
4.3. Probabilistic Wind Hazard Assessment and Determination of Wind Design
Parameters
4.3.1 General
4.3.1.1 For sites which have facilities with WDC-3, WDC-4, or WDC-5 SSCs, unless
ANSI/ANS-2.3-2011 provisions are used, a site-specific PWHA shall be
performed and the design basis wind-related hazard parameters shall be
determined using guidelines and criteria given in Section 4.3.2.
4.3.1.2 Sites for which ANSI/ANS-2.3-2011 provisions are used, the design basis wind-
related hazard parameters shall be determined using the guidelines and criteria
provided in Section 4.3.3.
DOE-STD-1020-2012
20
4.3.2 Sites Using Site-Specific PWHA. Wind-related hazard design parameters for WDC-3,
WDC-4, and WDC-5 SSCs at a DOE site or reservation shall be determined based on a
PWHA, using the guidelines and criteria provided below. The PWHA shall be based on
site-specific data related to wind-related hazards that have been collected in accordance
with Section 4.2. The following criteria shall be considered:
4.3.2.1 A PWHA shall be performed for each of the three types of wind-related hazards,
as appropriate: 1) extreme straight-line winds; 2) hurricane winds; and 3)
tornado winds.
4.3.2.2 Extreme straight-line winds are non-rotating winds caused by air mass
thunderstorms and frontal passages. However, both tornadoes and hurricanes
have translational and rotational wind components. The applicability and
potential for all three types of wind-related hazards shall be determined in the
PWHA considering the geographical location of the DOE site or reservation.
4.3.2.3 In addition to the extreme wind-related hazard assessment for tornadoes that
would provide design basis tornado wind speed, the tornado hazard assessment
has additional components that are specific to this type of meteorological
phenomenon. The design basis APC shall also be determined and shall
characterize potential site-specific tornado wind-borne missiles (including
weight, size, shape, and probable horizontal and vertical velocity), the latter
based on the design basis tornado wind speed corresponding to the WDC of the
SSC. In the absence of information on site-specific APC and tornado wind-
borne missiles, values recommended in Section 4.3.3 shall be used.
4.3.2.4 The PWHA results shall include a mean wind-related hazard curve (i.e., wind
speed at the site as a function of mean return period in years).
4.3.2.5 The method for developing a site-specific PWHA shall be consistent with the
prevailing industry practice and guidelines, including those in Section 3.4 of
ANSI/ANS-2.3-2011, and shall use the latest available occurrence data
considering the uncertainties therein. The site-specific PWHA shall be
performed by a panel consisting of at least three subject matter experts (SMEs).
The development of a site-specific PWHA shall be subjected to a peer review.
4.3.2.6 The PWHAs for extreme straight-line winds and hurricanes may be combined to
produce a single straight-line wind-related hazard curve by assuming that the
two types of winds are mutually-exclusive events. This is a very reasonable
assumption since the meteorological conditions causing them are very different
and their simultaneous occurrence is of very low probability (e.g., frontal
passages would likely steer hurricanes away from the site).
Section 20
4.3.2.7 The design basis extreme straight-line wind, tornado wind, and hurricane wind
shall be based on a mean return period as depicted in Table 4-1 and as
indicated in the ANSI/ANS-2.3-2011 wind region maps and tables.
4.3.2.8 The return periods for the tornado winds could be justified to be the same as the
extreme straight-line and hurricane wind speeds, but higher return periods have
been specified in Table 4-1 for the following reasons:
the traditional approach for specifying tornado criteria has been to
select high return periods, and a precedence for doing this was
DOE-STD-1020-2012
21
established in specifying tornado criteria for commercial nuclear power
plants;
the straight-line wind speeds are larger than the tornado wind speeds at
lower return periods; and
the use of higher return periods for tornadoes has been traditionally
justified because it provides additional protection against uncertainty
without placing undue hardship on the design.
Table 4-1:
Mean Return Periods for Design Basis Wind Speeds for WDC-3, WDC-4, and WDC-5
SSCs
WDC*
Design Basis Mean Return Period in Years
Extreme Straight-
Line Wind Hurricane Wind** Tornado Wind*
WDC-3 2,500
2,500 50,000
WDC-4 6,250 6,250 125,000
WDC-5 *** *** ***
* Tornado wind hazards need not be considered if the straight-line wind speeds are greater than
tornado wind speeds at the design basis return periods tabulated above; or see ANSI/ANS-2.3-
2011 for additional information.
** For hurricane-prone areas (i.e., near the Gulf of Mexico and Atlantic coast) only.
*** Extreme straight-line wind not evaluated. See NRC R.G. 1.76, Rev. 1, “Design Basis Tornado and
Tornado Missiles for Nuclear Power Plants”, 2007 for tornados and NRC R.G. 1.221, “Design Basis
Hurricane and Hurricane Missiles for Nuclear Power Plants,” October 2011 for hurricanes.
DOE-STD-1020-2012
22
4.3.3 Sites Using ANSI/ANS-2.3-2011. For sites using ANSI/ANS-2.3-2011, wind-related
hazard design parameters for WDC-3, WDC-4, and WDC-5 SSCs for a DOE site shall
be determined as specified below:
4.3.3.1 The extreme straight-line wind, tornado wind, and hurricane wind hazard curves,
as shown in Figures 3.1-2 through 3.1-4 and in Table 3.1-2 of ANSI/ANS-2.3-
2011, as applicable for the region which is graphically shown in Figure 3.1-1 of
ANSI/ANS-2.3-2011, shall be used to determine the design basis wind speeds.
4.3.3.2 The characteristics of tornado and hurricane-borne missiles, shown in Table 4-1
of ANSI/ANS-2.3-2011, shall be used.
4.3.3.3 SSCs that have the potential to be adversely affected by the tornado APC and
the impact of missiles resulting from the design basis tornado and hurricane
shall be evaluated using the APC values and the missile characteristics given in
Tables 3.2-1 and 4-1 of ANSI/ANS-2.3-2011.
4.4. SSC Design and Evaluation to Mitigate Wind-Related Hazards
4.4.1 General Design Criteria
4.4.1.1 Any SSC that may fail to perform its safety functions when subjected to water
intrusion or submergence, or wind-borne missiles resulting from wind-related
hazards, shall be protected, either by barriers designed to withstand the effects
of wind-related hazards, or by placing the SSCs in a location that precludes
missile impact, water intrusion, or submergence.
4.4.1.2 An SSC that may fail to perform its safety function because of structural
deformation when subject to the adverse effects of wind-related hazards shall be
designed based on the guidelines and criteria provided below.
Section 21
4.4.2 Design of WDC-3, WDC-4, and WDC-5 SSCs
4.4.2.1 WDC-3, WDC-4SSCs shall be designed in accordance with the criteria and
methodology contained in this Standard and in ANSI/ANS-2.3-2011, employing
the methodology given in ASCE/SEI 7-10 to withstand the applicable design
basis wind, and APC.
4.4.2.2 In designing the SSCs to withstand the design basis tornado winds, ASCE/SEI
7-10 methodology for determining straight-line wind loads shall be used, except
as specified below:
4.4.2.2.1 In calculating the design basis forces on SSCs corresponding to design basis
tornado wind speeds, the ASCE/SEI 7-10 provisions shall be used based on
the applicable exposure category.
However, if no data on exposure category is available, Exposure Category C can
be used, regardless of the actual terrain roughness.
For these cases, the Velocity Pressure Exposure Coefficient can also be
determined assuming Exposure Category C.
DOE-STD-1020-2012
23
4.4.2.2.2 For designing SSCs against extreme straight-line wind, hurricane wind, and
tornado wind loads, the following load combinations shall be used for the
extreme loads using strength design:
D + F + 0.8(L + Lr) + W
0.9D + F + W
0.9D + W
where,
D = dead load, F = loads due to normal flood, L = live load, Lr = roof live load, and
W = extreme straight-line wind, hurricane wind, or tornado windload, including
APC, as appropriate.
4.4.2.3 SSCs, or the barriers protecting safety-related SSCs, shall be designed to
withstand the impact of site-specific tornado and hurricane missiles, as
characterized in Table 4 of ANSI/ANS-2.3-2011.
4.4.2.3.1 WDC-3, WDC-4, and WDC-5 SSCs subjected to such missile impact shall be
designed by calculating the capacity using ASCE/SEI 7-10 criteria for
determining wind pressure loads, but appropriately considering the impaction
nature of the load, including the deformation characteristics of the missiles.
4.4.2.3.2 For design of barriers to protect such safety-related SSCs against tornado APC
or tornado and hurricane missile impact loads, a permissible state of
deformation of the barrier beyond yield may be used to calculate the barrier
capacity as defined in ACI-349-06 Appendix F or ANSI N690-06 Section NB-3.
For example, a concrete wall, acting as missile barrier to protect a fragile
safety-related piece of equipment, can be permitted to deform beyond its yield
limit. It may be possible to allow the occurrence of perforation or spalling if
such does not adversely affect the safety function of the equipment that is
being protected. Additional guidance can be obtained for barrier evaluation
from the following references:
Report of the ASCE Committee on Impactive and Impulsive Loads,
Volume V, Civil Engineering and Nuclear Power, American Society of
Civil Engineers, September, 1980;
Structural Analysis and Design of Nuclear Plant Facilities, Manuals and
reports on Engineering Practice, No. 58, American Society of Civil
Engineers,1980;
A Review of Procedures for the Analysis and Design of Concrete
Structures to Resist Missile Impact Effects by Robert Kennedy, Nuclear
Engineering and Design, Volume 37, North Holland Publishing
Company, 1976; and
Structures, Systems, and Components Evaluation Technical Support
Document for the DOE Standard, Accident Analysis for Aircraft Crash
into Hazardous Facilities. UCRL-ID-123577. Lawrence Livermore
DOE-STD-1020-2012
24
National Laboratory, 1996 (Technical Support Document to DOE-STD-
3014).
Section 22
4.4.2.4 If a structure is not intentionally sealed to maintain an internal negative pressure
for confinement of hazardous materials, and if openings greater than one square
foot per 1,000 cubic feet of volume are present, or if openings of this size can be
caused by missile perforation, the effects of internal pressure should be
considered according to the applicable methodology in ASCE/SEI 7-10.
4.4.2.5 If a structure is sealed, the APC associated with a tornado, as shown in Table
3.2-1 of ANSI/ANS-2.3-2011, shall be considered instead of internal pressures.
4.4.2.6 Since the maximum APC pressure occurs at the center of the tornado vortex
where the rotational wind speed is theoretically zero, a more severe loading
condition occurs at the radius of maximum tornado wind speed, which is a finite
distance from the vortex center. At the radius of maximum wind speed, the APC
may be one-half its maximum value. Accordingly, a critical tornado load
combination for a sealed building shall be one-half the maximum APC pressure
combined with the maximum tornado wind pressure, or one-half wind pressure
and maximum APC, whichever controls design.
4.4.2.7 A loading condition of APC alone can occur on the roof of a buried tank or sand
filter, if the roof is exposed at the ground surface. Since APC pressure always
acts outward, a rapid rate of pressure change, which can accompany a rapidly
translating tornado, shall be analyzed to ensure that it does not damage safety-
related ventilation systems.
4.4.3 Fundamental SSC Design Guidelines for Wind Loads. The following seven fundamental
principles shall be followed in developing a design to minimize the adverse
consequences of all types of wind-related hazards for all WDC levels. These are as
follows:
Provide a continuous and traceable load path from surface to foundation;
Ensure that all viable loads and load combinations are accounted for;
Provide redundant structures or structural elements that can redistribute
loads when one structural element is overloaded;
Provide ductile elements and connections that can undergo deformations
beyond yield without sudden and catastrophic collapse;
Provide missile-resistant walls and roof elements;
Anchor mechanical equipment on roofs to resist specified wind and missile
loads; and
Minimize or eliminate the potential for wind-borne missiles.
DOE-STD-1020-2012
25
5.0 Criteria and Guidelines for Flood, Seiche and Tsunami Design
This section provides guidance and criteria for design and evaluation of SSCs for mitigating
flood hazards (i.e., flood seiche, tsunami). It provides guidance for:
Determining an FDC of an SSC, based on the severity of SSC failure consequence.
(Section 5.1);
Performing a site flood characterization and characterizing site hydrology and
hydrological data (Section 5.2);
Determination of flood design parameters (Section 5.3);
Performing probabilistic flood hazard assessments (PFHAs) on the basis of which
design parameters are related to the flood hazard [i.e., design basis flood level
(DBFL)] (Section 5.4); and
Designing SSCs to mitigate the effects of flood-related hazards (Section 5.5).
If a new facility is to be constructed on a site with existing Flood Hazard Analyses, then the
Flood Hazard Analysis used for the new facility would need to conform to the requirements of
this Standard.
Hazards from localized flooding resulting from extreme precipitation (i.e., snow, rain, or ice) ,
and the design of site drainage systems to mitigate these hazards are addressed in Section 7.
Section 23
For facilities with only FDC-1 and FDC-2 SSCs, the provisions in Sections 5.2 and 5.3 shall be
mandatory only to the extent these are necessary to define DBFL in accordance with Section
5.4.1.2.
5.1. SSC Categorization for Flood Design
The design categorization process and criteria given in ANSI/ANS-2.26-2004 for seismic
hazards shall also be used for flood design categorization, as discussed below and as
previously discussed in Section 2 of this Standard.
5.1.1 Flood design categorization shall be based on the severity of unmitigated failure
consequences resulting from all flood-related and hydrology-related hazards (e.g.,
river flooding, dam failure, tsunami, landslide, etc.) applicable to the DOE site and
facility.
5.1.2 The failure of the safety function of some SSCs, when subjected to a flood-related
hazard, can occur, not only because of excessive deformation or distortion (e.g., for
added hydrostatic or hydrodynamic water pressure), but also as a result of
inundation of the SSC or intrusion of flood water into or onto the SSC. In selecting
an SSC FDC and SSC design methods and criteria, such inundation and water
intrusion-related failure modes (e.g., shorting or malfunctioning of an electric circuit
or mechanical equipment) shall also be considered in determining unmitigated SSC
failure consequences.
5.1.3 In addition to rupture, instability, deformation-related or distortion-related failure
modes of the SSCs, potential failure modes resulting from flood waters shall also be
considered in determining unmitigated failure consequences.
DOE-STD-1020-2012
26
5.1.4 For a facility in a flood-prone area which has SSCs of FDC-3 or higher, dikes,
barriers, and/or enclosures shall be built for providing flood protection to the SSCs.
These dikes, barriers, and enclosures shall be placed in an FDC equal to the
category of the SSC or SSCs to be protected.
5.1.5 These protective SSCs, or barriers, shall be designed using stress, strain,
deformation limit, or leak tightness criteria appropriate for the protective function and
the failure mode of the barrier. Section 5.5.4.1 provides design criteria for protective
SSCs.
5.1.6 The site-specific flood hazard-related data collection and PHFA shall be based on
the highest FDC category of the SSCs at the site.
5.1.7 The DBFL for a facility or a site shall be dependent on the highest category of the
SSCs in the facility or at the site.
5.1.8 For a large site with varying topography, the DBFL may vary from facility to facility.
5.2. Site Characterization for Flood Design
5.2.1 General Requirements. The description of general requirements shall, at a minimum,
include the following:
5.2.1.1 Off-site precipitation, which includes rain and snow, and hydrologic
characteristics of a site and its surroundings, shall be investigated in sufficient
scope and detail to obtain the data necessary for performing a PFHA.
5.2.1.2 Site data and information are necessary for identifying and evaluating potential
external accident initiators and for identifying and analyzing accident
consequences external to the facility (see DOE-STD-3009-94).
5.2.1.3 A topographic map shall show the character of surface drainage patterns and
the topographic elevation of the site, relative to nearby hydrologic features (e.g.,
rivers, streams, lakes, local surface drainage channels, ponds, springs, sinks) at
the site.
5.2.1.4 The size of the region to be investigated and the type of data pertinent to the
investigations shall be determined by the nature of the region surrounding the
proposed or existing site.
Section 24
5.2.1.5 Site characterization shall be carried out to obtain the data necessary for
performing a site-specific PFHA, and design and evaluation of SSCs in
accordance with this Standard.
5.2.1.6 The site flood characterization shall be carried out by a review of the pertinent
literature and field investigations, and shall follow the requirements given in the
following sections.
5.2.1.7 The site flood characterization shall be performed by SMEs recognized in the
industry and, preferably, having site-specific knowledge and experience. Data
and other relevant information obtained from prior investigations shal l be used,
supplemented by additional investigations at the specific location, as deemed
necessary by the SMEs.
DOE-STD-1020-2012
27
5.2.1.8 Guidelines and requirements for collecting flood-related hazard data that are
necessary for conducting site-specific PFHA are provided below.
5.2.2 Site Characterization for Precipitation. Sites, for which no up-to-date site-specific PFHA
has been performed in accordance with Section 5.3, shall develop monthly and annual
summaries, including averages and periodical extremes, of precipitation and equivalent
melted water contents at, or near, the site.
5.2.3 Characterization of Site Hydrology and Hydrological Data
5.2.3.1 For sites where no up-to-date site-specific PFHA has been performed in
accordance with Section 5.3, a site flood characterization shall be performed in
accordance with the guidelines and requirements given in Sections 5.3.1 through
5.3.13.
5.2.3.2 Data provided in flood insurance studies by FEMA, and site-specific hydrological
studies performed by DOE, including DOE-sponsored contractors, and other
governmental agencies [e.g., the U.S. Army Corps of Engineers (COE), the U.S.
Bureau of Reclamation, the U.S. Geological Survey (USGS), the Flood
Insurance Administration (FIA), the Department of Water Resources, Agricultural
Department, the NWS, the Tennessee Valley Authority (TVA), etc.] may be used.
5.2.4 General Guidelines and Requirements for Hydrological Data Collection
5.2.4.1 Data on location, size, shape, and other hydrologic characteristics of streams,
lakes, shore regions, and ground water environment influencing the site shall be
collected.
5.2.4.2 A quantitative description of existing and planned water control structures that
may influence the hydrologic conditions at the site shall be provided.
5.2.4.3 Hydrologic events that are potential sources of flooding for the site shall be
determined. Hydrologic hazards listed in Table 5-1 shall be considered and their
applicability of each hazard to the PFHA determined.
5.2.4.4 Hydrologic hazard data shall be collected to determine the flood sources and
shall be used to evaluate potential flood-related hazards at the site.
5.2.4.5 Data collection processes may be iterative, as follows:
Initial data requirements shall focus on the need to identify potential
sources of hydrologic flood-related hazards to the site.
For each specific hydrologic flood-related hazard, a summary of hazard
characteristics shall be provided.
The worst case flood-related hazard shall be summarized, and only the
worst case flood hazard needs to be summarized in detail.
The flood-related hazard summary shall include the proximity of the
potential source of flood hazard to the site and also include applicable
reasons why certain data sources are unlikely or they present negligible
consequences to the site.
DOE-STD-1020-2012
28
Section 25
5.2.4.6 For applicable hydrologic hazards, additional data shall be required to perform a
PFHA. Data sources shall include, but not be limited to:
Walkdown of site and vicinity;
Site-specific and regional topographic maps;
Aerial photographs of the site and vicinity;
Hydrologic data (i.e., stream gauge data);
Historical flood event reports;
FEMA flood insurance studies; and
Dam-break studies.
5.2.4.7 Sources of available data shall include past site-specific hydrologic studies by
DOE and DOE-sponsored contractors, studies performed by other government
agencies (e.g., the COE, the U.S. Bureau of Reclamation, the USGS, the FIA,
the Department of Water Resources, Agricultural Department, the NWS, the
TVA, etc.), universities, and national laboratories.
5.2.4.8 Local and regional flood history with potential causes of flooding under extreme
conditions shall be reported with date, level, peak discharge, and other relevant
information.
5.3. Determination of Flood Design Parameters for Flood-Related Hazards
Table 5-1 identifies 13 flood-related hazards and the natural and anthropogenic phenomena
causing them. The following 13 sections (Sections 5.3.1 through 5.3.13) provide criteria
needed to define site specific information for each flood-related hazard.
DOE-STD-1020-2012
29
Table 5-1:
Flood-Related Hazards
Flood-Related Hazard Natural and Anthropogenic Phenomena
River Flooding Precipitation, rapid sedimentation, volcano-induced
Dam, Levee or Dike Failure Earthquake, flood, static failure, upstream dam failure, landslide, volcano
Storm Surge Hurricane
Tsunami Earthquake
Seiche Earthquake, wind
Wave Tsunami, wind
Landslide Precipitation, volcano
Volcano-Created Flood Volcano
Flood Runoff Precipitation, ponding, inadequate drainage capacity
Change in Ground Water
Level
Precipitation, ponding, flooding, drought and over pumping
Mudflow Volcano, earthquake, precipitation
Water-Borne Debris Damage to upstream objects or landscape that produce debris
Subsidence-Induced Flooding Supercritical Fluid Extraction (SFE)
5.3.1 River Flooding
5.3.1.1 Each river in the regional area of the site that could impact the site shall be
identified and characterized with respect to its location and elevation relative to
the site and its facilities.
5.3.1.2 The boundaries of the region to be investigated for river flooding hazard
depends primarily on whether the rivers could cause floods large enough under
extreme conditions to contribute to flooding at the site. Regional investigations
shall be conducted for rivers relatively close to the site (i.e., rivers with flood
plain boundaries less than a few kilometers from the site).
5.3.1.3 For rivers that could be potential sources of site flooding, the potential for
flooding shall be characterized by collecting the following information:
Location and elevation of the rivers at the location nearest the site;
Historical records of stream flow data (i.e., maximum yearly peak
discharge and stage elevation) with recording location;
Maximum flood level that may be expected from a combination of the
most critical historical meteorological and hydrologic conditions;
Characterization of geometric and hydraulic properties of the channel
closest to the site. The geometric properties of the channel include
Manning's roughness coefficient and top-width elevation tables for
cross sections, and streambed slope; and
DOE-STD-1020-2012
30
Section 26
Presence of bridges or natural river flow constrictions that could cause
flooding due to ice or debris jams.
5.3.1.4 For rivers for which no peak discharge records are available, the following
information shall be gathered:
Characteristics of the watershed basins of the river; and
Properties of the drainage basins including topographic maps of the
basin and land cover maps.
5.3.2 Dam, Levee, or Dike Failure
5.3.2.1 Historical experiences and analytical studies indicate that floods associated with
a dam break can significantly exceed flood levels that occur due to natural
events. All dams upstream on rivers in the regional area of the site shall be
identified and the following characteristics summarized:
Name of dam;
Owner of dam;
Type of dam (e.g., earth fill, concrete, etc.);
Date of dam completion;
River name and location (e.g., river mile);
Total height of dam;
Capacity of dam; and
Closest distance from the river to the site.
5.3.2.2 For dams that could pose a threat to the site, should they fail, a detailed
collection of data shall be conducted.
5.3.2.3 Failures of dams that could pose a hydrologic hazard to the site include dams
close enough to the site with a relatively large storage capacity or distant dams
with a large storage capacity. The collection of data shall include existing dam
break studies or data necessary to perform dam break analyses.
5.3.2.4 For dams for which dam break studies have been conducted as part of dam
safety emergency management planning evaluations, results of these studies
shall be collected, including date of study, dam failure scenario (e.g., flood,
earthquake, static failure due to internal erosion), peak discharge and elevation
at closest point from the site.
5.3.2.5 For dams for which no dam break studies are available, or for which dam break
studies are unavailable for all the potential hazards (e.g., seismic, flood,
landslide, upstream dam failure), data shall be collected to conduct such studies.
DOE-STD-1020-2012
31
5.3.2.6 Data to be collected include that which is necessary to perform a river flooding
hazard analysis of the river reach upstream of the dam(s), seismic hazard
analysis, potential landslide hazard analysis of the embankment or the dam
itself, and dam break analysis. These data include:
Results of seismic hazard analysis;
Data necessary to perform upstream river flooding hazard analysis;
Data on dam and dam characteristics necessary to evaluate its
resistance to the seismic loads and overtopping, including:
Material properties of the dam and abutment; and
Characteristics of gates and other mechanical equipment which
could affect the dam performance.
Reservoir depth, length and storage elevation tables;
Manning's roughness coefficient, and top-width elevation tables for
downstream cross sections;
In the case of overtopping events, the depth of overtopping at which
failure occurs;
In the case of hydrologic events, an inflow hydrograph; and
Outflow characteristics for emergency spillway, outlets, and turbines.
5.3.3 Storm Surge
5.3.3.1 For sites located within regions that experience hurricanes or strong storm
squalls and which are located nearby large bodies of water, data on surges
associated with such storms shall be collected from available flood hazard
analyses.
5.3.3.2 For cases where no such data are available, data necessary to perform a joint
probability hurricane frequency hazard analysis shall be collected, along with
data on:
Section 27
Bathymetric characteristics of the coastline (i.e., depth tables);
Tide levels; and
Local topographic data between the site and large bodies of water.
5.3.4 Tsunami
5.3.4.1 Tsunamis are ocean waves generated by vertical sea-floor displacements
associated with large offshore earthquakes. Such earthquakes may be those
occurring close to a site or at great distances from a site.
DOE-STD-1020-2012
32
5.3.4.2 For sites located near an ocean, seismic data shall be collected to assess the
potential for off-shore earthquakes which could create a tsunami.
5.3.4.3 Data collected shall include historical records of tsunami occurrence in the site
region.
5.3.4.4 Should the potential for a tsunami exist, local topographic data between the site
and the ocean shall be collected and evaluated.
5.3.4.5 Paleontological data should be collected for sites containing facilities with SSCs
in FDC-4 or FDC-5 where no historical records of tsunamis are available at the
site.
5.3.5 Seiche
5.3.5.1 Seiches are undulations of the surface of a body of water such as a bay, lake, or
reservoir, set up by interaction of the water body with seismic forces and winds.
5.3.5.2 For sites located near large bodies of water, seismic and meteorological data
shall be collected to assess the potential of creating seiche effects. See Section
4.2.3 for guidance on meteorological data collection.
5.3.5.3 Should the potential for a seiche exist, local topographic data between the site
and large bodies of water shall be collected and evaluated.
5.3.6 Wave
5.3.6.1 For sites located near bodies of water and in regions exposed to extreme winds,
meteorological data shall be evaluated to assess the wave action. See Section
4.2.3 for guidance on meteorological data collection.
5.3.6.2 Should the potential for a wave hazard exist, water depths, fetch characteristics,
and local topographic data between the site and large bodies of water shall be
collected and evaluated.
5.3.7 Landslide
5.3.7.1 Land sliding into a river can dam the river and pose a flooding hazard upstream
within the impoundment area or downstream in the event of overtopping of the
dam.
5.3.7.2 Tectonic uplift can have a similar damming effect.
5.3.7.3 If the potential for a landslide hazard exists, relevant information associated with
this phenomenon shall be collected and evaluated.
5.3.8 Volcano-Created Flood
5.3.8.1 Volcanic eruption debris can create natural dams in narrow valleys which can
lead to potential flood hazards resulting from a volcano-created flood.
5.3.8.2 A volcanic eruption can also cause mudflows (see Section 5.3.11), rapid
sedimentation in river, and rapid snowmelt, thereby creating potential flood
DOE-STD-1020-2012
33
hazards. The stability of slopes whose failures may cause this hazard shall be
investigated.
5.3.8.3 For DOE sites in regions with potential volcanic activity (e.g., the states of Idaho
and Washington), topographic data shall be collected to indicate the most likely
locations of valley damming which could impact the site. See Section 8.0 with
respect to volcano hazards.
5.3.9 Flood Runoff
5.3.9.1 Intense precipitation or snow melt may create local ponding or overland flooding
when the soil infiltration capacity is exceeded. In addition, drainage capacity
may be exceeded creating additional flooding.
5.3.9.2 Local topographic characteristics of drainage areas, including depressions,
terrain slope, nature of soil vegetation or Manning's coefficients, and soil
infiltration indices, shall be collected.
Section 28
5.3.9.3 Precipitation and snowfall data shall be collected. See Section 4.2.3 for
guidance on meteorological data collection.
5.3.10 Change in Ground Water Level
5.3.10.1 Intense precipitation or snow melt and infiltration can cause ground water to rise
and eventually flood sites.
5.3.10.2 Over pumping, reduced recharge and droughts can cause significant declines in
ground water levels. This can lead to land subsidence and well failure.
5.3.10.3 For sites that use ground water for production, cooling, or human consumption,
or that may be subject to land subsidence, records shall be kept of ground water
level trends on a quarterly basis.
5.3.10.4 The water-level data shall be adequate to document any long-term safety or
environmental effects of ground water withdrawal.
5.3.10.5 For sites with shallow ground water tables, data on regional and local aquifers
and aquitards shall be collected, including formations and sources of the
aquifers, local well log records, and drainage capacity.
5.3.11 Mudflow
5.3.11.1 A mudflow is a rapid and fluid type of downhill mass wasting; a rapid movement
of a large mass of mud formed from loose soil and water. Mudflows can also
result from lahar and pyroclastic flows associated with volcanic eruptions (see
Section 5.3.8 and Section 8).
5.3.11.2 For sites located in areas where mudflows are possible (e.g., in valleys) relevant
information associated with this phenomenon shall be collected and evaluated.
http://en.wikipedia.org/wiki/Mass_wasting
http://en.wikipedia.org/wiki/Mud
http://en.wikipedia.org/wiki/Soil
http://en.wikipedia.org/wiki/Water
http://en.wikipedia.org/wiki/Volcanoes
DOE-STD-1020-2012
34
5.3.12 Water-Borne Debris
5.3.12.1 Water-borne debris can occur from tsunamis and other phenomena that occur
upstream of a site, causing damage to the SSCs from the force of the debris.
5.3.12.2 For sites located in areas where damage from water-borne debris is possible
(e.g., coastal, harbor, estuarine areas) relevant information associated with this
phenomenon shall be collected and evaluated.
5.3.13 Subsidence-Induced Flooding
5.3.13.1 Subsidence-induced flooding can result from anthropogenic SFE activities
(i.e., the process of separating one component - the extractant - from another -
the matrix - using supercritical fluids as the extracting solvent).
5.3.13.2 For sites located in areas where damage from subsidence-induced flooding from
SFE activities is possible (e.g., Sacramento Valley, Gulf Coast) relevant
information associated with this phenomenon shall be collected and evaluated.
5.4. Probabilistic Flood Hazard Assessment and Determination of Flood Design
Parameters
5.4.1 General Requirements
5.4.1.1 For sites and facilities with FDC-3, FDC-4, and FDC-5 SSCs, the results of the
PFHA for a given credible flooding source shall be presented in the form of a
flood-related hazard curve showing the relationship between flood level and the
design basis return period in years. The DBFL for a given SSC shall be the
highest flood level considering all the credible flooding sources for the site
corresponding to the design basis return period applicable for the FDC of the
SSC.
5.4.1.2 For sites and facilities with only FDC-1 and FDC-2 SSCs, the DBFL shall be
determined either on the basis of the requirements in International Building Code
(IBC) and ASCE/SEI 7-10, or following the applicable provisions of this
Standard. However, the DBFL shall not be lower than that determined on the
basis of IBC and ASCE/SEI 7-10 requirements.
Section 29
5.4.1.3 Return periods for determining DBFL for various FDCs of SSCs shall be as
provided in Table 5-2A. Design basis flood structural loads in SSCs shall be
based on return periods as provided in Table 5-2B. The reason the return
periods are higher in Table 5-2A is because these are applicable to those SSCs
that are assumed to fail unconditionally due to submergence or water intrusion.
For these SSCs, it is not possible to provide margin in the flood design of an
SSC for the flood levels from stream/river flooding (i.e., the SSCs are either
above the flood level or they are not). For these SSCs, the annual probability of
functional failure is the same as the annual probability of hazard occurrence.
But, structural components that do not fail unconditionally due to submergence
or water intrusion, when designed following design codes, because of built-in
structural design conservatism, the design basis annual probability of hazard
occurrence can be more (i.e., lower return period) to achieve the same target
annual probability of SSC functional failure. Therefore, the return periods in
DOE-STD-1020-2012
35
Table 5-2A shall be used to determine DBFL’s for establishing building
elevations, heights of protective barriers, heights of waterproofing, etc. The
lower return periods in Table 5-2B (the same as those for extreme wind loads)
shall be used to determine design basis flood loads on building structural walls,
protective barriers, etc.
5.4.1.4 For sites and facilities with FDC-3, FDC-4, and FDC-5 SSCs, a site-specific
PFHA shall be performed to develop a flood-related hazard curve to establish
the DBFL. Guidelines and criteria for such PFHAs are provided in Section 5.4.2.
5.4.1.5 Guidelines and criteria for establishing a DBFL for facilities with only FDC-1 and
FDC-2 SSCs are provided in the Section 5.4.3.
Table 5-2A:
Return Period for Design Basis Flood Level (DBFL) for Various Flood Design
Categories
SSC Category FDC-1 FDC-2 FDC-3 FDC-4 FDC-5
Return Period
(Years)
500 2,000 10,000 25,000 100,000
Table 5-2B:
Return Period (Years) for Design Basis Flood Structural Loads
SSC Category FDC-1 FDC-2 FDC-3 FDC-4 FDC-5
Return Period
(Years)
100 200 2,500 6,250 10,000
5.4.2 Determination of DBFL for Facilities with FDC-3, FDC-4, and FDC-5 SSCs. For sites
and facilities with FDC-3, FDC-4, and FDC-5 SSCs, a site-specific PFHA shall involve
the following two steps:
Perform a Flood Screening Analysis (FSA) to evaluate the magnitude of flood
hazards that may impact the SSCs under consideration. Guidelines and criteria
for an FSA are provided in Section 5.4.2.1; and
Perform a Comprehensive Flood Hazard Assessment (CFHA), if required,
based on the results and conclusions of the FSA. Guidelines and criteria for a
CFHA are provided in Section 5.4.2.2.
5.4.2.1 Flood Screening Analysis (FSA). The objective of an FSA is to determine if a
CFHA would be necessary for the site by conducting a preliminary PFHA. The
FSA shall include the following steps:
5.4.2.1.1 Collect and compile site-specific flood-related hazard related data, identify the
potential sources of flooding, if any, and perform a site characterization study
following the guidelines and criteria given in Section 5.2.
DOE-STD-1020-2012
36
The potential sources of flooding to be considered shall include, but not limited to,
the following:
River/stream flooding;
Dam, dike, or levee failure;
Local precipitation (i.e., rainfall, ice melt, and snow melt, see also
Section 7); and
Section 30
Storm surge, seiche, and tsunami.
If the return period for a potential flood source is larger than the design basis
return period applicable for the FDC in Table 5-2A, the source does not need to
be considered.
5.4.2.1.2 Determine whether the site can be considered a flood-dry site (i.e., whether the
facility SSCs in the site can be considered physically removed from the potential
sources of flooding so that the safety functions of the SSCs are clearly and
obviously unaffected by hazards from any of the potential flooding sources).
The flood dry-site determination shall be performed by a panel of experts
consisting of both flood hazards SMEs and safety evaluation SMEs.
For sites that cannot be clearly demonstrated to be a flood-dry site, perform a
preliminary PFHA following the guidelines given below, and determine if a CFHA
is necessary:
Compile, obtain and update a data base of peak discharges for
streams/rivers;
Estimate the probability of exceedance of selected peak discharge
levels with associated uncertainty. An acceptable methodology using
stream flow data, and including uncertainty estimates due to the
statistical model selected and limited flood data is provided in UCRL-
21069, Preliminary Flood Hazard Estimates for Screening Models for
Department of Energy Sites;
Determine the stage-discharge relationship (a relationship between
flow discharge and flood stage); and
Transform the probability-discharge frequency to stage frequency to
determine the probability of exceeding selected stage elevations
using the stage-discharge relationship.
5.4.2.2 Comprehensive Flood Hazard Assessment (CFHA). When the results of the
FSA and preliminary PHFA conclude that a CFHA is a necessary evaluation to
be conducted for the site, the CFHA shall be performed.
5.4.2.2.1 The CFHA shall be performed probabilistically, considering and propagating
the uncertainties in the parameters used to estimate the DBFL.
DOE-STD-1020-2012
37
5.4.2.2.2 A CFHA shall consider meteorological, hydrologic and hydraulic assessments
of the potential sources of flood hazards identified in the FSA and the
reliability of flood protection systems (e.g., dams, levees), if present.
5.4.2.2.3 CFHA considerations should include the following:
Estimation of rainfall and snowfall frequency in watersheds;
Overland flow assessment due to precipitation;
Hydrologic modeling of watershed responses using verified and
validated models;
Assessment of discharge (i.e., flow rates) and flood elevations using
detailed hydraulic modeling techniques;
Estimation of joint natural hazard events frequency (e.g., joint probability
analysis shall be performed to assess surge level frequencies;
Assessment of likelihood of upstream dams and levees failure where all
causes of dam failure shall be accounted for; and
Assessment of the uncertainty due to the limited data for estimating
model parameters, the modeling of physical processes, and the
interpretation of the available data.
5.4.2.2.4 A full-scope probabilistic approach to model river flooding shall include
temporal and spatial frequency estimates of the random meteorological
parameters that contribute to precipitation and runoff and an estimate of the
modeling uncertainty of the watersheds.
5.4.2.2.5 Three acceptable approaches are available to evaluate the frequency of
extreme flows and/or levels due to hydrologic events, as follows:
Stochastic methods;
Section 31
Probabilistic hydrologic modeling (e.g., Bayesian analysis, joint
probability methods, etc.); and
Paleohydrological analysis (i.e., evaluating ancient evidence using age-
dating techniques to deduce early extreme hydrologic events).
5.4.2.2.6 Causes of dam failure to be evaluated include:
Hydrologic, seismic, hydrostatic, operations-related error;
Random structural failure;
Upstream dams; and
Landslides.
DOE-STD-1020-2012
38
5.4.2.2.7 Dam failure-induced flood levels shall be determined by analyses using
validated dam break models.
5.4.2.2.8 Uncertainty for the dam break model analysis parameters (e.g., breach size,
time to failure, flood time arrival) shall be accounted for in the analysis.
5.4.2.2.9 A simplified dam failure analysis is acceptable if the analysis accounts for
uncertainty.
5.4.2.2.10 To ensure that the DBFL determined from a CFHA conservatively accounts
for a recurrence of the event causing the flooding, a review of the data on
historical floods that may have affected the site shall be performed.
5.4.2.2.11 Since the hydraulic characteristics of the basin could have changed since the
maximum historical flood, the flood level itself may not be able to form a direct
comparison to the DBFL. Accordingly, the amount of water produced, or the
rainfall intensity and distribution, shall be compared to the event leading to the
DBFL.
5.4.2.2.12 For FDC 3, FDC-4, and FDC-5 SSCs, the DBFL event shall be equal to, or
greater than, the maximum historical event in the basin.
5.4.3 Determination of DBFL for Facilities with FDC-1 and FDC-2 SSCs
5.4.3.1 For FDC-1 and FDC-2 SSCs at a site for which a site-specific CFHA has been
performed, the DBFL shall be determined using the site-specific flood-related
hazard curve.
5.4.3.2 The DBFL shall not be lower than that estimated by utilizing existing flood
insurance studies applicable to the site.
5.4.3.3 For FDC-2 SSCs at a site for which no site-specific CFHA has been performed,
the DBFL shall be determined based on an FSA following the steps described in
Section 5.4.2.1, and recognizing that the DBFL shall correspond to a return
period of 1,000 years.
5.4.3.4 For FDC-1 SSCs at a site for which no site-specific CFHA has been performed,
the DBFL shall be determined utilizing existing flood insurance studies
applicable to the site, but recognizing that the DBFL shall correspond to a return
period of 500 years.
5.4.4 Flood Event Combinations
5.4.4.1 For each potential flood source, the determination of DBFL shall consider the
event combination cases as shown in Table 5-3. The combination of the
potential flood sources shall be assumed to be perfectly correlated for the
purpose of developing flood hazard curves.
DOE-STD-1020-2012
39
5.5. SSC Design and Evaluation to Mitigate Flood-Related Hazards
5.5.1 General Flood Design Overview
5.5.1.1 This section presents the design guidelines and criteria for mitigating the flood-
related hazards that are identified, characterized, and assessed in Sections 5.3
and 5.4. This section also presents alternative design strategies for mitigating
flood hazards.
5.5.1.2 Guidance is also provided to evaluate SSCs in existing facilities that may not be
located above the DBFL determined in accordance with the provisions in Section
9.4.
5.5.1.3 The hazard annual probability levels in Tables 5-2A and 5-2B correspond to the
mean hazard.
5.5.1.4 Evaluation of the flood design basis for SSCs consists of the following
determinations and evaluations:
Section 32
Determination of the DBFL for each flood-related hazard, as defined by
the hazard annual probability of exceedance and applicable
combinations of flood hazards;
Development of a flood design strategy for the DBFL that satisfies the
design requirements (e.g., build above the DBFL, harden the facility,
etc.); and
Design of civil engineering systems (e.g., buildings, buried structures,
site drainage, retaining walls, dike slopes, etc.) to the applicable DBFL
and design requirements.
5.5.1.5 For FDC-3, FDC-4, and FDC-5 SSCs, design basis flood loads (Fa) resulting
from flood hazards for return periods shown in Tables 5-2A and 5-2B shall be
considered as an Extreme Load category, thus the following strength load
combinations shall be used:
D + 0.8(L + Lr) +W + Fa,
0.9D + W + Fa, and
0.9D + Fa,
Where,
D = dead load; S = snow load (normal); L = live load; W = wind load (normal);
Fa, = hydrostatic and hydrodynamic (including wave and impact) loads resulting
from the FDC-specific design basis flood hazard (DBFH). Note that, the Dynamic
Pressure Coefficient, Cp (for wave loads, see Section 5.4.4 of ASCE/SEI 7-10) and
Importance Coefficient, CI (for impact loads from debris, ice, etc., see Section 5.4.5
of ASCE/SEI 7-10) appropriate for the DBFH can be used, if considered applicable,
and these coefficients shall not be less those for ASCE/SEI 7-10 Risk Category IV
SSCs.
DOE-STD-1020-2012
40
5.5.1.6 The design of FDC-1, and FDC-2 SSCs, shall meet both of the following
requirements:
Fa resulting from flood hazards shall be based on requirements given in
Section 5.4.1.2, above; and
Fa for FDC-1 and FDC-2 SSCs resulting from flood hazards shall be
based on ASCE/SEI 7-10 requirements for Risk Category II and Risk
Category IV SSCs, respectively.
5.5.2 Design Basis Flood Level (DBFL)
5.5.2.1 As part of the PFHA that is performed for a site, the sources of flooding (e.g.,
rivers, lakes, local precipitation) and the individual flood hazards (e.g.,
hydrostatic forces, ice pressure, hydrodynamic loads) shall be identified.
5.5.2.2 A site or individual SSC may be impacted by multiple sources of flooding and
flood hazards (e.g., many sites shall have to consider the hazards associated
with river flooding).
5.5.2.3 All sites shall design a storm water management system to handle the runoff due
to local (i.e., on-site or near site) precipitation (see Section 7).
5.5.2.4 Events that contribute to the potential for river flooding (i.e., spring snowmelt,
upstream-dam failure, etc.) shall be considered as part of a PFHA. Accordingly,
at a site there may be multiple DBFLs that shall be considered.
5.5.2.5 For sites with the potential for river flooding, a DBFL shall be determined for
river flooding and for local precipitation which determines the design of the site
storm water management systems.
5.5.2.6 For sites located on rivers or streams, the meteorological and hydrologic events
that produce intense local precipitation are often distinct from those which
produce high river flows. In this instance, various aspects of the design for an
SSC shall be determined by different flood hazards. As a result, the term DBFL
is used in a general sense that applies to the multiple flood hazards that may be
included in the design basis.
5.5.2.7 The DBFL for an SSC for a flood hazard (e.g., river flooding, local precipitation)
is defined in terms of:
Section 33
Peak-hazard level (e.g., flow rate, depth of water) corresponding to the
mean hazard annual probability as shown in Table 5-3, including the
combination of flood hazards (e.g., river flooding and wind-wave action)
provided in Table 5-4; and
Corresponding loads associated with the DBFL peak-hazard level and
applicable load combinations (e.g., hydrostatic and/or hydrodynamic
forces, debris loads).
5.5.2.8 The first consideration shall be determined as part of the PFHA. Limited FHAs
for some DOE sites have been conducted and flood loads have been assessed
for the DBFL on an SSC-by-SSC basis.
DOE-STD-1020-2012
41
5.5.2.9 Table 5-3 defines the flood design basis events that shall be considered. The
events listed in Table 5-4 should be considered as part of the site PFHA (i.e., if a
river is a source of flooding, wind waves shall be considered).
5.5.2.10 The DBFL is determined by entering the flood-related hazard curve that includes
the combination of events provided in Table 5-3 (e.g., at a site located on an
ocean shore, the flood-related hazard curve shall include the effects of storm
surge, tides and wind-waves.
Table 5-3:
Design Basis Flood Event Combinations
Primary Hazard Case No. Event Combinations*
River Flooding 1 Peak flood elevation due to all flooding contributors with the
exception of upstream dam failure. Note: The hazard analysis for
river flooding should include all contributors to flooding, including
releases from upstream dams, ice jams, etc.
Flooding associated with upstream dam failure is included in the dam
failure category.
2 Wind-waves corresponding, as a minimum, to the 2-year wind acting
in the most favorable direction coincident with the peak flood (i.e.,
Case 1, above) or as determined in a probabilistic analysis that
considers the joint occurrence of river flooding and wind-generated
waves.
3 Ice or debris forces (i.e., static and dynamic) and Case 1.
4 Peak and ground water level and Case 1
Evaluate the potential for erosion, debris, etc. due to the primary
hazard.
Levee/Dam
Failure
1 Peak flood elevation due to all modes of levee or dam failure (e.g.,
overtopping, seismically – or landslide-induced structural failure,
upstream dam failure, failure due to ice or debris forces (i.e., static
and dynamic), etc.).
2 Wind-waves corresponding, as a minimum, to the 2-year wind acting
in the most favorable direction coincident with the peak flood (i.e.,
Case 1, above) or as determined in a probabilistic analysis that
considers the joint occurrence of river flooding and wind-generated
waves.
3 Evaluate the potential for erosion, debris, etc. due to the primary
hazard.
Should be evaluated as part of the hazard analysis if overtopping
and/or failure occur.
Extreme Local
Precipitation
1 Peak flood based on runoff analysis due to extreme precipitation (i.e.,
rain, snow melting, ice melting).
Flooding based on the site runoff analysis shall be used to evaluate
the site drainage system and flood loads on individual facilities (see
Section 7).
2 Ponding on the roof to a maximum depth corresponding to the level
of the secondary drainage system (see Section 7).
DOE-STD-1020-2012
42
Primary Hazard Case No. Event Combinations*
Storm Surge,
Seiche (due to
Hurricane,
Seiche, Squall
Lines, etc.)
1
Peak flood levels plus mean high tide levels
Tide effects corresponding to the mean high tide above the mean low
water (MLW) level, if not included in the hazard analysis.
2 Surge-associated waves and Case 1
Section 34
Wave action should include static and dynamic effects and potential
for erosion.
Tsunami 1 Tide effects corresponding to the mean high tide above the MLW
level, if not included in the hazard analysis.
* Events are added to the flood level produced by the primary hazard.
5.5.3 Flood Evaluation Process
5.5.3.1 The following describes the steps involved in the evaluation of SSCs. The
procedure is general and applies to new and existing facilities and it is oriented
toward the evaluation of individual SSCs.
5.5.3.2 Due to the nature of flood events (i.e., river flooding may inundate a large part of
a site and thus many SSCs simultaneously), it may be possible to perform an
evaluation for the entire site or a group of SSCs.
5.5.3.3 The flood evaluation process is illustrated in Figure 5-1. It is divided into the
consideration of regional flood hazards and local precipitation (see Section 7).
5.5.3.4 For new construction, the design practice is to construct the SSC above the
DBFL, thus avoiding the flood hazard and eliminating the consideration of flood
loads as part of the design.
5.5.3.5 The design of the site storm water management system and structural systems
(i.e., roofs) for local precipitation shall be adequate to prevent flooding that may
damage an SSC or interrupt operations (see Section 7).
5.5.3.6 To perform the flood evaluation for an SSC, the results of a flood screening
analysis or a PFHA shall be available. The steps in the flood-related hazard
evaluation process include the following:
a) Determine the SSC FDC;
b) Determine the DBFL for each type or source of flooding;
c) Assess the flood loads (e.g., hydrostatic and hydrodynamic loads) or
other effects (e.g., scour, erosion) on an SSC-by-SSC basis;
d) For a new facility, locate the SSCs that may malfunction if submerged
above the DBFL, if possible. If this cannot be done, proceed to the next
step;
DOE-STD-1020-2012
43
e) Develop a design strategy to mitigate flood hazards that impact the SSC.
Options include hardening the SSC and modifying the flood path to
provide for occupant safety and to secure vulnerable areas;
f) If the SSC is located below the DBFL level even if the SSC has been
hardened, procedures shall be provided to evacuate personnel if life
safety is in danger and to secure the SSC prior to the arrival of the flood;
g) Following the provisions given in Section 7, develop an initial site-
drainage system and roof-system drainage plan and structural design;
h) Following the provisions given in Section 7, perform a hydrologic analysis
for the site to evaluate the performance of the site storm water
management system considering roof drainage, anthropogenic, and
natural watercourses for the DBFL local precipitation for each SSC;
i) The site analysis shall determine the level of flooding, if any, at each
SSC. Guidelines for performing a hydrologic analysis are provided in
Subsection 5.2.3;
j) For SSCs where flooding occurs, assess whether the SSC performance
is satisfactory;
k) If the SSC performance is unsatisfactory, a modification of the site storm
water management system shall be required. Due to the different DBFLs
for different FDC SSCs, this step shall be performed for a number of flood
events;
l) Following provisions given in Section 7, evaluate the drainage and
structural design of roof systems for the DBFL local precipitation. The
structural design of the roof system shall satisfy design criteria for loads
due to ponding that result from clogged/blocked drains and snow and ice
loads. These were either developed during the design of existing
facilities or shall be those from applicable regulations;
Section 35
m) If the design criteria for the roof are exceeded (i.e., deflection, stress
allowables), the design shall be revised;
n) If the DBFL for an SSC due to local precipitation produces unacceptable
levels of flooding, design modifications shall be developed. The design
modifications shall provide for additional capacity (i.e., runoff capacity,
additional strength) to mitigate the damage level; and
o) For SSCs that are impacted by the DBFL, plans shall be developed to
provide for the life safety of personnel and to secure critical areas.
5.5.3.7 In principle, each SSC shall be designed in accordance with the requirements for
the applicable FDC. However, because floods have a common-cause impact on
SSCs that are in proximity to one another, the design basis for the most critical
SSC may govern the design for other SSCs or for the entire site. Accordingly, it
may be more realistic economically and functionally to develop a design strategy
that protects the most critical SSC and simultaneously that of other SSCs (i.e., it
DOE-STD-1020-2012
44
may be feasible to harden a site (e.g., construct a levee system), thus protecting
all SSCs).
5.5.3.8 Conversely, it may be impractical to develop a design strategy that protects the
entire site when SSC locations vary substantially (i.e., they are at significantly
different elevations or there are large spatial separations).
5.5.3.9 The possible structural or functional interaction between SSCs shall be
considered as part of the evaluation process. For example, if an SDC-5 SSC
requires emergency electric power to protect the SSC, structures that house
emergency generators and fuel shall be designed to the DBFL for FDC-5 SSC.
5.5.3.10 In general, a systematic review of a site for possible structural or functional
dependencies is required. As an aid to the review, the analyst can develop a
logic model that displays the functional and structural dependencies between
SSCs.
5.5.4 Flood Design Strategies
5.5.4.1 All SSCs that are vulnerable to failure due to water intrusion or submergence
from flood shall be constructed or placed above the DBFL. If an SSC that is
vulnerable to failure due to water intrusion or submergence cannot be placed
above DBFL due to cost or other practical considerations, it shall be protected
by engineered features that shall be designed to prevent water intrusion
resulting from a DBFL that corresponds to the FDC of the SSC that requires
protection. The design of the protective features shall be based on the
requirements in the NRC Standard Review Plan 2.4.10, Flooding Protection
Requirements, NRC Standard Review Plan 2.5.5, Stability of Slopes, NRC
Standard Review Plan 3.4.2, Analysis Procedures, NRC Regulatory Guide
1.102, Flood Protection for Nuclear Power Plants, and ANSI/ASCE 1-82, N-725
Guideline for Design and Analysis of Nuclear Safety Related Earth Structures .
All SSCs, including those that are not vulnerable to failure due to water intrusion
or submergence, shall be designed to withstand the hydrostatic and
hydrodynamic loads resulting from a design basis flood, including those resulting
from possible raised ground water level.
5.5.4.2 Flood hazards resulting from local precipitation that shall be considered in the
design of the site storm water management system, roof systems, etc. , are
addressed in Section 7.
5.5.4.3 Since it may not always be possible to construct all SSCs above the DBFL,
alternate design strategies shall be considered. The hierarchy of flood design
strategies is as follows:
Section 36
1) Situate the SSC above the DBFL;
2) Reduce the design basis flood hazard;
3) Harden the site or SSC to mitigate the effects of the DBFL such that the
SSC is protected; and
4) Establish plans to safely evacuate employees and secure areas with
hazardous, mission-dependent, or valuable materials.
DOE-STD-1020-2012
45
5.5.4.4 If an SSC is placed above the DBFL, it is considered to be readily protected from
flood hazards.
5.5.4.5 If an SSC is located below the DBFL, alternatives should be considered to
modify the magnitude of the flood or mitigate its effects such that the likelihood
of damage and interruption of operations is acceptably low.
5.5.4.6 Under certain circumstances the hazard that results from the design basis flood
can be modified to limit the magnitude of the hazard. Alternatives include the
construction of detention ponds that provide for the collection and controlled
release of runoff on-site, modification of stream channels, etc.
DOE-STD-1020-2012
46
Figure 5-1: Flood Evaluation Process
5.5.4.7 The strategy of hardening an SSC is secondary to siting facilities above the
DBFL level since some probability of damage does exist and SSC operations
may be interrupted. If it is determined that an SSC may be impacted by the
DBFL and thus shall be hardened, the designer shall determine the flood loads
associated with the DBFL.
Determine the SSC
Flood Design
Category
Hazard Annual
Probability
(Table 5-3)
Develop Initial Roof
and Site Drainage
Design
Determine Design
Basis Flood for All
Hazards
Revise Design (e.g.,
Increase Drainage
Capacity, Roof
Strength)
Hazard Analysis
-Hazard curve
- Combined events
(Table 5-3 and 5-4)
Evaluate the
Site/SSCs Design
for DBFL
Is Site SSC
Located
Above
DBFL?
Does
Damage
Exceed
Design
Criteria?
Select Alternative
Design Strategy
Harden SSC or Site
Are Design
Criteria
Met?
OK
OKOK
Regional Flood Hazard Local Precipitation (See Section 7)
Yes No
YesNo
No
DOE-STD-1020-2012
47
5.5.4.8 The design of flood mitigation systems (i.e., exterior walls, flood-proof doors,
etc.) shall be conducted in accordance with the requirements specified in
Section 5.5.4.1.
5.5.5 Flood-Related Hazard Design Criteria. Unlike design strategies for seismic-related and
wind-related hazards, it is not always possible to provide margin in the flood design of an
SSC that is vulnerable to failure due to water intrusion or submergence. For example,
the simple fact that a site is inundated, even if structural damage does not occur, causes
significant disruption (e.g., down time during the flood, clean-up, etc.). This is often
unacceptable in terms of the economic impact and disruption of the mission-dependent
function of the site. Accordingly, such SSCs shall be kept above the DBFL to ensure
that its safety functions are not interrupted. If mitigation systems, such as watertight
doors, sealants, etc., are used, they should be designed in accordance with Section
5.5.4.1.
5.5.5.1 Design of FDC-1 SSCs
5.5.5.1.1 FDC-1 SSCs shall be designed using criteria given in ASCE/SEI 7-10 for Risk
Category II, except that the DBFL shall be based on the return periods as
given in Tables 5-2A and 5-2B of this Standard. Event combinations that shall
be considered are listed in Table 5-3.
5.5.5.1.2 The occupants’ safety shall be ensured. Also, adequate time for warning shall
be available to ensure that building occupants can be evacuated (i.e., 1 to 2
hours).
Section 37
5.5.5.1.3 If the building is located above the DBFL, structural and occupant safety
requirements are met.
5.5.5.1.4 Where a structure cannot be constructed above the DBFL level, an acceptable
design can be achieved by:
Reducing the design basis flood hazard or providing flood protection for
the site or for the specific structure, such that severe structural damage
does not occur; and
Developing procedures in order to provide adequate warning and
evacuation capability to provide for the safety of building occupants.
5.5.5.2 Design of FDC-2 SSCs
5.5.5.2.1 FDC-2 SSCs shall be designed using criteria given in ASCE/SEI 7-10 for Risk
Category IV, except that the DBFL shall be based on the return periods as
given in Tables 5-2A and 5-2B. Event combinations that shall be considered
are listed in Table 5-3.
5.5.5.2.2 For SSCs that cannot be located above the DBFL, an acceptable design can
be achieved by the same measures described for FDC-1.
5.5.5.2.3 Procedures shall be developed to provide for occupant safety and to mitigate
the damage to mission-dependent SSCs. These procedures may include
installation of temporary flood barriers, removal of equipment to protected
areas, anchoring vulnerable items, or installing sumps or emergency pumps.
DOE-STD-1020-2012
48
5.5.5.3 Design of FDC-3 SSCs
5.5.5.3.1 FDC-3 SSCs shall be designed using the NRC requirements identified in
Section 5.5.4.1, except that the DBFL shall be based on the return periods
given in Tables 5-2A and 5-2B. Event combinations that shall be considered
are listed in Table 5-3.
5.5.5.3.2 If the design objective is continued function of the facility, including
confinement of hazardous materials and occupant safety, FDC-3 SSCs shall
be located above the DBFL, if possible, as enumerated in Section 5.5.4.1
above.
5.5.5.3.3 If SSCs in this category cannot be constructed above the DBFL level, a design
shall be developed that provides continued facility operation. The strategy
shall mitigate the flood (i.e., reducing the flood hazards, hardening the facility,
building a levee to prevent flood encroachment) to an extent that facility
operations can continue.
5.5.5.3.4 For SSCs that may be impacted by the DBFL, plans shall be developed to
evacuate non-essential personnel, secure hazardous materials, prepare the
facility for possible extreme flooding and loss of power, and provide supplies
for personnel who may have an extended stay on-site.
5.5.5.3.5 Procedures shall be coordinated with the results of the flood hazard analysis,
which provides input on the time variation of flooding, type of hazards to be
expected and their duration.
5.5.5.3.6 The use of plans is not an alternative to hardening a facility to provide
adequate confinement unless all hazardous materials can be completely
removed from the site.
5.5.5.4 Design of FDC-4 SSCs
5.5.5.4.1 FDC-4 SSCs shall be designed using the NRC requirements identified in
Section 5.5.4.1, except that the DBFL shall be based on the return periods
given in Tables 5-2A and 5-2B. Event combinations that shall be considered
are listed in Table 5-3.
5.5.5.4.2 Other design requirements for FDC-4 SSCs are the same as those for FDC-3.
5.5.5.5 Design of FDC-5 SSCs. FDC-5 SSCs shall be designed using the NRC
requirements for commercial nuclear power plants.
5.5.6 Flood Design Practice for SSCs below the DBFL Elevation
5.5.6.1 For SSCs located below the DBFL elevation, mitigation measures shall be
designed such that the SSCs meet the structural requirements given in Section
5.5.4.1.
Section 38
5.5.6.2 In practice, a combination of structural and non-structural measures (i.e., flood
warning and planning) can be used to achieve the performance objectives.
DOE-STD-1020-2012
49
5.5.6.3 To evaluate the effects of flood hazards, corresponding forces on structures shall
be evaluated considering the event combinations given in Table 5-3.
5.5.7 Flood Protection. For SSCs that may be exposed to flood hazards (i.e., are located
below the DBFL), a number of design alternatives are available. Depending on the flood
hazards that an SSC shall withstand, various hardening systems may be considered.
These include:
Structural barriers (e.g., exterior building walls, floodwalls, watertight doors);
Wet or dry flood proofing (e.g., waterproofing exterior walls, watertight doors);
Levees, dikes, seawalls, revetments; and,
Diversion dams and retention basins.
The design of structural systems (i.e., exterior building walls) shall be developed in
accordance with the requirements in Section 5.5.4.1.
DOE-STD-1020-2012
50
6.0 Criteria and Guidelines for Lightning Design
6.1. SSC Categorization for Lightning Hazards
For designing new facilities, while performing the safety and hazard evaluation, the results
of which would be used to determine the seismic and other NDC of SSCs (see Section 2),
lightning hazards shall also be considered, and the SSCs that would need lightning
protection to ensure their safety function shall be identified and listed. The Design Basis of
these SSCs shall include the requirement for lightning protection.
In addition to providing lightning protection to the above-identified SSCs, in lightning prone
areas, consideration should be given to providing lightning protection for bus shelters,
stations, or other structures where personnel may seek shelter from the weather. Annex L
of NFPA 780-2011 provides guidance in making this determination.
6.2. Designing SSCs for Lightning Protection
6.2.1 SSCs identified in Section 6.1, above, shall be designed to preclude adverse
consequences from lightning hazards, and/or shall be protected in accordance with
NFPA 780-2011. Other risks to SSCs from lightning may be current surges through
electrical distribution lines, utility connections, piping and fencing that can be
protected by surge protective devices, bonding, and grounding.
6.2.2 When lightning protection is required for an SSC, a lightning protection system shall
be installed and maintained in accordance with NFPA 780-2011. When a Faraday
Shield is employed, the lightning protection system shall be installed and maintained
in accordance with DOE-STD-1212-2012.
DOE-STD-1020-2012
51
7.0 Criteria and Guidelines for Precipitation Design
This section provides criteria and guidelines for design and evaluation of SSCs for mitigating
precipitation due to rainfall, snow, and ice. It provides guidance for:
Determining the PDC of an SSC based on the severity of SSC failure consequence
(Section 7.1);
Performing a site precipitation characterization and characterizing the hydrological
and meteorological data (Section 7.2);
Determination of precipitation design parameters (Section 7.3);
Performing Probabilistic Precipitation Hazard Assessments (PPHAs) on the basis
of which design parameters are related to the precipitation hazard (Section 7.4);
and
Designing SSCs to mitigate the effects of precipitation hazards (Section 7.5).
Section 39
If a new facility is to be constructed on a site with existing Precipitation Hazard Analyses, then
the Precipitation Hazard Analysis used for the new facility would need to conform to the
requirements of this Standard.
The precipitation due to rainfall, snow, and ice can result in local si te flooding due to site
runoff from the precipitation, can result in hydrostatic and hydrodynamic pressures on dikes
or barriers used to protect SSCs from the runoff flooding, and can result in roof loadings on
the site structures. The site flooding due to runoff of the precipitation should be integrated
with the flood hazards studies discussed in Section 5.0.
7.1. SSC Categorization for Precipitation Design
The design categorization process and criteria given in ANSI/ANS-2.26-2004 for seismic
hazards shall also be used for precipitation design categorization as discussed below and
as previously discussed in Section 2.
7.1.1 Precipitation design categorization shall be based on the severity of unmitigated
failure consequences resulting from all precipitation-related hazards (e.g., rainfall or
snowfall site runoff, roof ponding, etc.) applicable to the DOE site and facility.
7.1.2 The failure of the safety function of some SSCs, when subjected to a precipitation-
related hazard, can occur not only because of excessive deformation or distortion
(e.g., roof loading), but also as a result of inundation of the SSC or intrusion of
precipitation water runoff into or onto the SSC. In selecting an SSC PDC and SSC
design methods and criteria, such inundation and water intrusion-related failure
modes (e.g., shorting or malfunctioning of an electric circuit or equipment) shall also
be considered in determining unmitigated SSC failure consequences.
7.1.3 Barriers, enclosures, dikes, and other SSCs, that are provided for precipi tation
protection of SSCs, with safety functions, shall be placed in a PDC equal to the SSC
to be protected.
DOE-STD-1020-2012
52
7.1.4 These protective SSCs, or barriers, shall be designed using stress, strain,
deformation limit, or leak tightness criteria appropriate for the protective function and
the failure mode of the barrier following the requirements in Section 5.5.4.1.
7.1.5 For a large site with varying topography, the precipitation runoff levels may vary from
facility to facility.
7.2. Site Characterization for Precipitation Design
7.2.1 General Requirements. The description of general requirements shall, at a minimum,
include the following:
7.2.1.1 Precipitation, hydrologic characteristics, and meteorological characteristics of a
site and its surroundings shall be investigated in sufficient scope and detail to
obtain the data necessary for performing a PPHA.
7.2.1.2 The size of the region to be investigated and the type of data pertinent to the
investigations shall be determined by the nature of the region surrounding the
proposed or existing site.
7.2.1.3 Site characterization shall be carried out to obtain the data necessary for
performing a site-specific PPHA, and design and evaluation of SSCs in
accordance with this Standard.
7.2.1.4 The characterization of the site precipitation shall be carried out by a review of
the pertinent literature and field investigations, and shall follow the requirements
given in the following sections.
Section 40
7.2.1.5 The characterization of the site precipitation shall be performed by SMEs
recognized in the industry and preferably having site-specific knowledge and
experience. Data and other relevant information obtained from prior
investigations shall be used, supplemented by additional investigations at the
specific location, as deemed necessary by the SMEs.
7.2.2 Site Characterization for Precipitation
7.2.2.1 Sites for which no up-to-date site-specific PPHA has been performed shall
develop monthly and annual summaries, including averages and periodical
extremes, of precipitation and equivalent melted water contents at or near the
site.
7.2.2.2 For sites where no up-to-date site-specific PPHA has been performed,
characterization of local site flooding from precipitation runoff shall be performed
in accordance with the guidelines and requirements given in Sections 7.3.1.
7.2.2.3 Precipitation data provided in flood insurance studies by FEMA, and site-specific
hydrological studies performed by DOE, including DOE-sponsored contractors,
and other governmental agencies (e.g., the COE, the U.S. Bureau of
Reclamation, the USGS, the FIA, the Department of Water Resources, the
Agricultural Department, the NWS, the TVA, etc.) may be used.
DOE-STD-1020-2012
53
7.2.2.4 Data on location, size, shape, and other hydrologic characteristics of streams,
lakes, shore regions, and ground water environment influencing the site shall be
collected.
7.2.2.5 A quantitative description of existing and planned water control structures that
may influence the hydrologic conditions at the site shall be provided.
7.2.2.6 Meteorological events that are potential sources of precipitation for the site shall
be determined.
7.2.2.7 Topographic data, storm drainage data, and building location data for the site
shall be collected and reviewed to determine the applicable watershed areas to
be used for evaluating the runoff flooding that can occur on the site.
7.2.2.8 New safety-related structures shall not be built in areas where flooding from site
precipitation can occur unless flood mitigation measures are provided.
7.3. Determination of Precipitation Design Parameters
The precipitation hazards are site flooding from precipitation and building roof loading from
rainfall, snow and ice. The following subsections provide guidance on determination of the
precipitation design parameters for each of the precipitation hazards.
7.3.1 Site Flooding Precipitation
7.3.1.1 Intense precipitation or snow melt may create local ponding or overland flooding
when the soil infiltration capacity is exceeded. In addition, drainage capacity
may be exceeded creating additional flooding.
7.3.1.2 Local topographic characteristics of drainage areas, including depressions,
terrain slope, nature of soil vegetation or Manning's coefficients, and soil
infiltration indices, shall be collected.
7.3.1.3 Site storm water drainage information and information on any site-located dams,
levees, dikes, etc. shall be collected.
7.3.1.4 Precipitation (rainfall, snow and ice) data shall be collected. See Section 4.2.3
for guidance on meteorological data collection.
7.3.1.5 Intense precipitation or snow melt and infiltration can cause ground water to rise
and eventually flood sites.
7.3.1.6 For sites with shallow ground water tables, data on regional and local aquifers
and aquitards shall be collected, including formations and sources of the
aquifers, local well log records, and drainage capacity.
Section 41
7.3.1.7 Site flood studies shall be integrated with the river/stream flood studies
discussed in Section 5.0.
DOE-STD-1020-2012
54
7.3.2 Building Roof Loading
7.3.2.1 Intense rainfall may create roof ponding when there are flat roofs with roof
parapets and the roof drainage system is blocked or its drainage capacity is
exceeded.
7.3.2.2 Building roof information (areas, slopes, parapets, roof drainage systems, roof
live load design information, etc.) shall be collected to determine roofs which
shall require evaluation.
7.4. Probabilistic Precipitation Hazard Assessment and Determination of
Precipitation Design Parameters
7.4.1 Determination of the Design Basis Precipitation Level for PDC-1 and PDC-2 SSCs.
For sites and facilities with only PDC-1 and PDC-2 SSCs, the design basis
precipitation level (DBPL) shall be determined on the basis of the requirements in
ASCE/SEI 7-10.
7.4.2 Determination of the Design Basis Precipitation Level for PDC-3, PDC-4, and PDC-5
SSCs
7.4.2.1 For sites and facilities with PDC-3, PDC-4, and PDC-5 SSCs, the results of the
PPHA shall be presented in the form of a precipitation-related hazard curve
(rainfall, snow, and ice) showing the relationship between precipitation level and
the design basis return period in years. For site flooding from precipitation, the
results should be presented in the form of a flood-related hazard curve showing
the relationship between the flood level and the design basis return period in
years.
7.4.2.2 Return periods for the design basis precipitation for various design categories of
SSCs shall be as provided in Table 7-1 or Table 7-2. Table 7-1 shall be used
when evaluating the flooding caused by runoff of the site precipitation. Table 7-2
shall be used when evaluating structures for the effects of loads resulting from
precipitation, i.e. roof loadings, loads on dikes/protective structures, etc ,. The
reason the return periods are higher in Table 7-1 is because it is not possible to
provide margin in the flood design of an SSC for the flood levels from site
precipitation runoff, i.e., the SSC is either above the flood level or not. For
example, the simple fact that a site is inundated (even if structural damage does
not occur), will cause significant disruption (e.g., down time during the flood,
clean-up, flooding of safety-related equipment). This is often unacceptable in
terms of consequences, economic impact, and disruption of the mission-
dependent function of the site. Under these circumstances, there is no margin,
as used in the structural sense that can be provided when a site or SSC is
inundated. For defining the structural loads resulting from precipitation, smaller
return periods shall be used, as defined in Table 7-2, because the design
process does provide margin in the structural design.
7.4.2.3 For winter precipitation loads (rain, snow, and/or ice), the NRC requirements in
NUREG-0800, Subsection 2.3.1, R-3, shall be used to determine the extreme
structural loads for PDC-3, PDC-4, and PDC-5 SSCs. The NRC requirements
state the extreme winter precipitation loads should be based on the weight of the
100-year snowpack at ground level, plus the weight of the 48-hour probable
DOE-STD-1020-2012
55
maximum winter precipitation (PMWP) at ground level for the month
corresponding to the selected snowpack. Depending on the location of the site,
the 48-hour PMWP may not necessarily be in the form of frozen participation.
Section 42
Table 7-1:
Return Period (Years) for Design Precipitation Flooding Caused by Precipitation Runoff
SSC Category PDC-3 PDC-4 PDC-5
Return Period (Years) 10,000 25,000 *
* Use return periods the same as those used by the NRC for commercial nuclear power plant design
Table 7-2:
Return Period (Years) for Design Precipitation Structural Loads
SSC Category PDC-3 PDC-4 PDC-5
Return Period (Years) 2,500 6,250 *
* Use return periods the same as those used by the NRC for commercial nuclear power plant design
7.5. SSC Design and Evaluation to Mitigate Precipitation-Related Hazards
7.5.1 General Precipitation Design Overview
7.5.1.1 This subsection presents the design guidelines and criteria for mitigating the
precipitation-related hazards, and also presents alternative design strategies for
mitigating precipitation hazards.
7.5.1.2 Guidance is also provided to evaluate SSCs in existing facilities that may not be
located above the DBFL.
7.5.1.3 Evaluation of the precipitation design basis for SSCs consists of the following
determinations and evaluations:
Determination of the DBPL for each precipitation-related hazard as
defined by the hazard return periods as applicable;
Evaluation of the site storm water management system (e.g., site runoff
and drainage, roof drainage);
Development of a precipitation design strategy for the DBPL that
satisfies the design requirements (e.g., build above the DBPL, harden
the facility, eliminate roof parapets, develop emergency operations
procedures); and
Design of civil engineering systems (e.g., buildings, buried structures,
site drainage, retaining walls, dike slopes) to the applicable DBPL and
design requirements.
DOE-STD-1020-2012
56
7.5.2 Precipitation Evaluation Process
7.5.2.1 The following describes the steps involved in the evaluation of SSCs. The
procedure is general and applies to new and existing facilities and it is oriented
toward the evaluation of individual SSCs.
7.5.2.2 For new construction, the preferred design practice is to construct the SSC
above the DBPL flood, and design the roofs for the DBPL loads. Live loads on
roofs are typically used to design roofs. This design live load may exceed the
DBPL loads, thus mitigating the DBPL loads. The magnitude of the design live
loads should be considered in determining the rigor of the PPHA that should be
done.
7.5.2.3 Evaluate or develop an initial site-drainage system and roof-system drainage
plan and structural design per applicable regulations.
7.5.2.4 Evaluate the drainage and structural design of roof systems for the DBFL local
precipitation. The structural design of the roof system shall satisfy design
criteria for loads due to ponding that result from clogged/blocked drains and
snow and ice loads.
7.5.2.5 If the design criteria for the roof are exceeded (i.e., deflection, stress
allowables), the design shall be revised.
7.5.2.6 If the DBPL for an SSC due to local precipitation produces unacceptable levels
of flooding, design modifications shall be developed or mitigation measures shall
be developed. The design modifications shall provide for additional capacity
(i.e., runoff capacity, additional strength) to mitigate the damage level.
7.5.2.7 For SSCs that are impacted by the DBPL, mitigation measures such as
emergency operation plans can be developed to ensure the life safety of
personnel and to secure critical areas.
7.5.3 Precipitation Design Strategies
Section 43
7.5.3.1 The basic design strategy for an SSC is to construct the SSC above the DBPL.
When this can be done, local site precipitation-related flood hazards do not have
to be considered in the design basis, except that possible raised ground water
level shall be considered.
7.5.3.2 Since it may not always be possible to construct a new SSC above the DBPL
level, alternate design strategies shall be considered. The following lists the
hierarchy of local site precipitation related flood design strategies:
Situate the SSC above the DBPL level;
Harden the site or SSC to mitigate the effects of the DBPL such that the
SSC is protected; and
Mitigate the hazards with emergency operation plans to safely evacuate
employees and secure areas with hazardous, mission-dependent, or
valuable materials.
DOE-STD-1020-2012
57
7.5.3.3 Under certain circumstances the hazard that results from the design basis
precipitation flood can be modified to limit the magnitude of the hazard.
Alternatives include the construction of detention ponds that provide for the
collection and controlled release of runoff on-site, modification of stream
channels, etc.
7.5.3.4 The strategy of hardening an SSC and providing emergency operation plans is
secondary to siting facilities above the DBPL level, since some probability of
damage does exist and SSC operations may be interrupted. If it is determined
that an SSC may be impacted by the DBPL and, thus shall be hardened, the
designer shall determine the flood loads associated with the DBPL.
7.5.3.5 The design of flood mitigation systems (i.e., exterior walls, flood-proof doors,
etc.) shall be conducted in accordance with the requirements specified in
Section 5.5.4.1.
7.5.3.6 The evaluation of the site storm water management system and roof design (i.e.,
drainage and structural capacity) differs somewhat from that for other flood
hazards.
All sites shall be designed for the effects of local precipitation; and
The adequacy of the site storm water management system is measured
in terms of the impact of local flooding on SSCs at the site. For
example, the initial design of the site storm water management system
may correspond to the 25-year rainfall 6-hour storm.
7.5.3.7 For PDC-3, PDC-4, and PDC-5 SSCs, the site storm water management system
design clearly will not meet the above criterion. However, at this point the only
conclusion that can be reached is that the system (i.e., storm sewers, etc.) will
be filled to capacity, and the resulting DBPL shall be determined without
consideration of the storm sewers.
7.5.3.8 The actual impact of the DBPL precipitation on the SSC shall be assessed by
conducting a hydrologic evaluation for the site that accounts for natural and
anthropogenic watercourses on site, roof drainage, etc. The analysis may
conclude that flooding is limited to streets and parking lots. If temporary flooding
in these areas does not significantly affect the operation and safety of the SSC,
it may be concluded that the design of the site-drainage system (i.e., for the 25-
year rainfall) is adequate.
7.5.3.9 Conversely, if flooding does result in significant damage that impairs the
operation or safety of SSCs, appropriate measures shall be taken to ensure the
safety function of the SSC. This may include increasing the capacity of the
drainage system, constructing detention ponds on site, or hardening an SSC
against the effects of flooding caused by local precipitation.
7.5.4 Precipitation-Related Design Criteria
Section 44
7.5.4.1 Design of PDC-1 and PDC-2 SSCs. PDC-1 and PDC-2 SSCs shall be designed
using criteria given in ASCE/SEI 7-10 for Risk Category II and Risk Category IV
respectively with the applicable Importance Factor.
DOE-STD-1020-2012
58
7.5.4.2 Design of PDC-3, PDC-4, and PDC-5 SSCs. PDC-3, PDC-4 and PDC-5 SSCs
shall be designed for the DBPL based on return periods as required in Table 7-1
and Table 7-2. The building structural system shall be capable of withstanding
the forces associated with the DBPL or appropriate mitigation actions taken to
address the DBPL.
7.5.4.2.1 The following load combinations shall be used for the DBPL flood extreme
participation loads on walls, dikes, protective structures, etc:
D + 0.8(L + Lr) + Wn + Fa
0.9D + Wn + Fa
0.9D + Fa
where D is the dead load
L is the live load
Lr is the roof live load
Wn is the normal wind
Fa is the extreme flood load on the walls, etc. considering the static,
hydrodynamic, and wave action as appropriate. The flood loads shall be
determined using the requirements in Section 5.5.4.1.
7.5.4.2.2 The following load combinations shall be used for the extreme participation
defined for the DBPL structural roof loads:
D + 0.8L + (Lr or R)
0.9D + (Lr or R)
D + 0.8L + (Lr or S)
0.9D + (Lr or S)
where D is the dead load
L is the live load
Lr is the roof live load
R is the extreme rainfall load on the roof
S is the snow (considering snow and combinations of snow, rain, and
ice) load on the roof
7.5.4.2.3 The use of emergency operation plans is not an alternative to hardening a
facility to provide adequate confinement unless all hazardous materials can be
completely removed from the site.
DOE-STD-1020-2012
59
7.5.5 Site Drainage and Roof Design Considerations
7.5.5.1 For new construction, the storm water-management system (i.e., street
drainage, storm sewers, open channels, roof drainage) can be designed
according to applicable procedures and design criteria specified applicable
regulations.
7.5.5.2 Applicable local regulations shall be considered in the design of the site storm
water management system. The minimum design level for the storm water
management system is the 25-year, 6-hour storm.
7.5.5.3 Once the site and facility drainage design has been developed, it should be
evaluated for the DBFL precipitation for each SSC.
7.5.5.4 The evaluation should consider the site-drainage area, natural and man-made
watercourses, roof drainage, etc. The analysis shall also determine the level
of flooding that could occur at each SSC.
7.5.5.5 The analyst may choose to evaluate the site storm water management system
for the highest category DBFL as a limiting case. If the results of this analysis
demonstrate that flooding does not compromise the site SSCs, it may be
concluded that the site storm water management system is adequate.
7.5.5.6 Local flooding in streets, parking lots, etc. may occur due to the DBFL
precipitation. This is acceptable if the effect of local flooding does not exceed
the design requirements. However, if flooding does have an unacceptable
impact, increased drainage capacity and/or flood protection shall be required.
7.5.5.7 Building roof design should provide adequate drainage in accordance with
applicable regulations.
7.5.5.8 Secondary drainage (i.e., overflow) should be provided at a higher level and
have a capacity at least that of the primary drain.
7.5.5.9 Limitations of water depth on a roof are specified by applicable local
regulations.
Section 45
7.5.5.10 The roof should be designed or evaluated to consider the maximum depth of
water that could accumulate if the primary drainage system is blocked.
7.5.5.11 Roof drainage systems should be designed according to applicable
regulations.
7.5.5.12 The drainage system should be verified as part of the site analysis for the
DBFL (discussed above). In the case of rainfall, a limiting check of the roof
system structural design should be made.
7.5.5.13 Ponding on the roof is assumed to occur to a maximum depth corresponding to
the level of the secondary drainage outlet system (i.e., assuming the primary
system has clogged). As part of this evaluation, the deflection of the roof due
to ponding shall be considered.
DOE-STD-1020-2012
60
8.0 Criteria and Guidelines for Volcanic Eruption Design
The primary design considerations relative to volcanic hazards are from volcanic ash, which
can deposit hundreds of kilometers downwind of an eruption. Designing facilities to
withstand the effects of more localized hazards such as lava flows, ballistic projections,
pyroclastic flows, mudflows, and ground deformation is rarely feasible. Such hazards
should be mitigated by siting facilities far enough from active volcanoes to eliminate these
hazards.
8.1. Applicable Sites
Volcanic eruptions may pose hazards to select DOE sites in the Western United States (e.g.,
Idaho National Laboratory, Hanford, and Los Alamos National Laboratory). Volcanic hazards
shall be assessed at DOE sites and facilities lying within 400 kilometers (approximately 250
miles) of a volcanic center that erupted within the Quaternary Period (i.e., 2.6 million years
before present). This section only applies to DOE facilities with envisioned life spans up to 100
years. This section does not apply to facilities such as geologic repositories with extended
performance periods.
8.2. Volcanic Hazard Assessment
Sites within 400 kilometers of a Quaternary volcanic vent shall perform a site volcanic
hazards assessment (VHA). Potential volcanic hazards to be assessed include:
Ashfall (tephra);
Lava flows;
Ballistic projections;
Pyroclastic flows;
Mudflows (lahars);
Low-level proximal seismic activity;
Ground deformation;
Tsunami (this is addressed separately in Section 5);
Atmospheric effects, such as lightning and downburst winds; and
Emissions of gasses that result in acid rains.
8.3. Characterization of Volcanic Hazards
8.3.1 Volcanic eruptions are classified on a volcanic explosivity index (VEI) ranging from 0
to 8, with 8 representing the most explosive, voluminous eruptions. Higher VEI
eruptions are less common than low VEI eruptions.
8.3.2 World-wide eruption data indicate that ashfall impacts from on nuclear facility SSCs
eruptions with a VEI of less than 6 will be negligible at distances beyond 400 km. At
DOE-STD-1020-2012
61
such distances, airborne particulates would likely have effects on a facility similar to
the effects of a dust storm, and roof loads from ash accumulation would be bounded
by other precipitation loads.
8.3.3 A VEI of 6 is selected as a benchmark since volcanic systems in the Western U.S.
are unlikely to produce eruptions at VEI 6 or above in the life span of a facility. Such
catastrophic eruptions generally occur only at highly active centers that would
demonstrate indicators of such potential decades in advance.
Section 46
8.3.4 For facilities within 400 km of a volcano with Quaternary activity, the volcanic
hazards shall be assessed with a graded approach, considering the distance from
the volcano(es) and the level of volcanic activity.
8.3.5 For facilities beyond 100 km from the closest Quaternary volcano, only the hazards
posed by ashfall and gases need be evaluated.
8.3.6 The hazard characterization for facilities between 100 km and 400 km from a
Quaternary volcano shall produce a map of all Quaternary volcanoes within 400 km,
including distances from the volcanoes to the site boundary. Information on the
eruption history of these volcanoes shall be assembled from available literature, such
as USGS publications, DOE contractor technical reports, and published geology
literature. This information shall include parameters such as eruption ages,
estimated volumes, eruption physical characteristics/explosivity, and extent of
ashfall, if known.
8.3.7 Ash deposits are highly erodible and, as such, poorly preserved in the geologic
record. Ashfall thicknesses and eruption volume data may be sparse and highly
uncertain. Most volcanoes and volcanic fields in the Western U.S. have been studied
to some degree in the past, and parameters, such as the most recent eruption age
and eruption characteristics, should be available for most all of them.
8.3.8 Eruption characteristics are much easier to assess than eruption volumes,
frequencies, and spatial extent.
8.3.9 Given the past research on Western U.S. volcanic centers, an adequate VHA for
DOE facilities should require minimal additional data collection. In cases where data
can be collected, at reasonable time and expense, that will significantly increase
understanding of the hazard posed by a volcano, such data collection is prudent. An
example would be a radiometric age on an identified, but undated Quaternary ash
deposit from a volcanic center within 400 km of a facility.
8.3.10 Well-characterized volcanoes outside the Western U.S. may serve as useful
analogues for additional data on ashfall parameters (i.e., distances and thicknesses),
assuming they demonstrate eruption characteristics similar to the volcanoes of
interest to DOE sites.
8.3.11 Volcanic eruption characterization is just the first step in a VHA. The wind conditions
shall also be characterized, as the wind will control the distribution pattern of an
ashfall. Meteorological data shall be assembled to characterize the prevailing winds
around the volcanoes of interest. Ideally, these data shall include probabilities by
azimuth sector at various altitudes. Information on eruption probabilities, eruption
characteristics, or volumes, and wind probabilities can be used to develop an annual
frequency of exceedance of ashfall with a given thickness, at a given distance from a
DOE-STD-1020-2012
62
volcano. Hoblitt and Scott (2011) provide an example of such a distribution for
DOE’s Hanford Site from the Cascade Range volcanoes.
8.3.12 In most cases, eruption data from relevant volcanoes will be too sparse to construct
a probabilistic distribution as Hoblitt and Scott (2011) do for Hanford. With less data,
a Monte Carlo simulation to capture the expected ranges of eruption frequency,
volume, and wind direction can be constructed to produce ashfall hazard curves (i.e.,
thickness versus probability of exceedance) for given locations surrounding a
volcano.
Section 47
8.3.13 If a facility has ventilation or other systems likely to be impacted by airborne ash, the
airborne ash concentration and duration of ashfall are important considerations. Any
existing data on eruption durations or ash cloud densities from volcanoes similar to
those of interest shall be assembled. In the absence of data, assume that the
maximum design ashfall thickness falls over a period of 12 hours. From these
values, as well as an assumption of average ash particle size and thus settling
velocity, an estimate of cloud density in grams of ash per cubic meter can be
obtained.
8.3.14 For facilities within 100 km of a Quaternary volcano, the hazards posed by lava
flows, pyroclastic flows, and mudflows, in addition to those by ashfall, shall be
addressed.
8.3.15 If local topography would prevent any of these hazards from impacting the facility,
this shall be documented and no further evaluation is required. If topography is not
an adequate barrier, geologic data describing the past extent of such features shall
be assembled and evaluated.
8.3.16 Geologic data are not likely to support a probabilistic assessment of these hazards.
An evaluation of the facility impact from the largest credible lava flows, pyroclastic
flows, and mudflows by a deterministic analysis shall be performed.
8.4. Design Considerations for Volcanic Hazards
8.4.1 The primary design considerations relative to volcanic hazards are structural loading
and ash impact on ventilation and other mechanical and electrical systems. To design
SSCs in a nuclear facility for volcanic eruption hazards, these shall be categorized
using the categorization process and the dose criteria given in Section 2 and Table
2-1. Accordingly, for nuclear facilities, unmitigated consequence of an SSC failure
resulting from volcanic eruptions shall be evaluated and compared to Table 2-1 dose
criteria to determine appropriate SSC VDC (i.e., VDC-1 through VDC-5). Target
performance goals (TPGs) for the five design categories can be selected to be the
same as those for seismic hazards given in Table 1-3 of ASCE/SEI 43-05.
8.4.2 Ash loads, if applicable for VDC-1 through VDC-5 nuclear SSCs, shall be based on
site-specific probabilistic volcanic eruption hazard studies using return periods that
are based on the TPGs (see Section 8.4.1, above) and estimated risk reduction
factors (RRFs), (see Section 8.4.3, below). The design and evaluations of VDC-3
through VDC-5 SSCs shall be performed using ACI-349-06 and ANSI N690-06
provisions with the following load combinations, in additions to the basic
combinations:
DOE-STD-1020-2012
63
D + 0.8L + (Lr or V)
0.9D + (Lr or V)
Where, D is the dead load
L is the live load
Lr is the roof live load
V is the ash load from volcanic eruptions
For VDC-1 and VDC-2, the load combinations in ASCE 7-10 shall be used
substituting the ash load, V, for the snow load, S, in the load combinations.
8.4.3 For structural design considerations, RRFs may be used to increase the annual
probability of hazard exceedance above the performance goals. An RRF is the ratio
of the design basis annual probability of hazard exceedance to the performance goal
annual probability of exceedance, and it represents conservatism employed in the
design or evaluation process. An example of employing RRFs for ashfall at the
Hanford Site appears in a 1996 report by Conrads, Volcanic Ashfall Loads for the
Hanford Site.
Section 48
8.4.4 Structural design shall consider ash density and the impact of precipitation combined
with an ashfall. Ash density estimates for volcanoes of interest are likely sparse.
Density of uncompacted ash generally decreases with distance from a volcano, and
a typical range is 0.5-1.3 g/cm3. Saturating volcanic ash with rainfall or melted snow
can increase density by 50-100 percent or more, on occasion exceeding a density of
2.0 g/cm3 as shown in a 2011 USGS document, Volcanic Ash: Effects & Mitigation
Strategies. Ash particle sizes are very effective for nucleating raindrops, so if an ash
cloud interacts with a precipitation front, heavy rainfall and ash saturation is likely.
Site meteorological data shall be considered in calculating the probability of ashfa ll
combining with rainfall, and an appropriate ash density derived.
8.4.5 Most likely non-structural impact of ashfall is on ventilation systems. Airborne ash
concentration estimates, which, as stated above, may be very imprecise, and a likely
eruption duration of 12 hours minimum shall be considered in ventilation system
design. Key considerations will be filter loading time, cooling coil fouling, ability to
keep critical systems in operation during filter change-out, and availability of spare
filters.
8.4.6 Impacts of ashfall and volcanic gases on other mechanical and electrical systems
shall also be evaluated.
8.4.7 Facility designs are unlikely to mitigate effects from the largest credible lava flows,
pyroclastic flows, and mudflows that might impact a facility within 100 km of a
volcanic eruption. However, these phenomena would most likely strike with some
advance warning. Therefore, facilities at risk shall develop administrative controls to
ensure safe process shutdown and personnel evacuation if the facility is endangered
by a volcanic eruption.
8.4.8 Secondary effects of these phenomena shall also be considered. For example, lava
flows can block rivers that can then flood, as discussed in Section 5.
DOE-STD-1020-2012
64
8.5. Additional Reading
In contrast to extensive work on seismic, wind, and flood hazards, little guidance has been
published on volcanic hazard characterization and mitigation at nuclear facilities. The
following documents may be beneficial.
8.5.1 A draft International Atomic Energy Agency (IAEA) safety guide, DS405, Volcanic
Hazards in Site Evaluation for Nuclear Installations, provides guidance on the
assessment of volcanic hazards at nuclear facilities world-wide.
8.5.2 Hill et al, Recommendations for Assessing Volcanic Hazards at Sites of Nuclear
Installations, in Volcanic and Tectonic Hazard Assessment for Nuclear Facilities,
provides an excellent overview on the topic, but as with the forthcoming IAEA safety
guide, it is most useful for facilities located outside the Western U.S., near much
more active volcanoes.
DOE-STD-1020-2012
65
9.0 Evaluation and Modification of SSCs in Existing Facilities
This section provides criteria and guidance for existing hazard categories 1, 2 and 3 nuclear
facilities with SSCs in NDC-3 or higher for:
NPH design and evaluation of SSCs in existing facilities for major modifications
(the term “major modification” is defined in DOE-STD-1189-2008);
Periodic review and update of NPH assessments;
Facility condition assessments; and
Potential evaluation and upgrading/modification of SSCs due to changes in the
NPH assessments.
Section 49
Criteria and guidance for evaluation of existing nuclear, radiological, and chemical hazard
facilities with SSCs in NPH Design Categories below NPH Design Category 3 is given in
Section 2.1.4
9.1. NPH Design and Evaluation of Existing Facilities for Major Modifications
For major modifications of existing facilities, the design of SSCs shall be based on the
methods and criteria given in this standard for new facilities with the following caveat. On a
case-by-case basis, analyses may be performed to evaluate the need to upgrade existing
SSCs (including interfacing SSCs) in accordance with these criteria. Sections 9.3 and 9.4
provide guidance on the conduct of such analyses. The analyses shall be submitted to the
DOE for approval, in the form of a report or a section in the project’s Safety Design Strategy
(see DOE-STD-1189), with recommendations and justification for the recommendations.
9.2. Periodic Review and Update of NPH Assessments
9.2.1 At a frequency not to exceed ten years, the following aspects of NPH assessments
shall be reviewed for changes that would warrant updating the assessments:
NPH data and data collection methods;
NPH modeling techniques, either generic or specific to the region of interest ;
and
NPH assessment methods.
9.2.2 Consistent with DOE 420.1C, a preliminary estimate of whether changes to data,
models, or methods are “significant” and warrant updating the assessments should
be performed and consider the following criteria:
Are the changes to data, models, or methods likely to cause a change in the
estimates of the major inputs to hazard calculations?
Given potential changes to the hazard inputs, by what magnitude might the
calculated hazard results change, and how might the results impact current
site design standards?
DOE-STD-1020-2012
66
9.2.3 The preliminary estimate of how hazard results might change from new inputs will
likely be imprecise. An expected significant increase in the hazard results would
clearly favor completion of a new assessment. However, even if hazard results are
not expected to change significantly, large changes to the input parameters may
warrant a new assessment to ensure the NPH assessment continues to have a
viable technical basis.
9.2.4 In the case of seismic hazard assessments, a determination of whether an existing
assessment remains adequate for future use should consider the criteria in Section
4.1 of ANSI/ANS-2.29-2008 for the suitability of existing studies. Additional guidance
on the bases for updating existing seismic assessments can be obtained from
NUREG-2117, Practical Implementation Guidelines for SSHAC Level 3 and 4 Hazard
Studies.
9.2.5 A decision on updating an NPH assessment should consider the intended application
of the assessment results. Such considerations include:
The number of facilities affected by the NPH assessment, and the hazards
posed by the facilities;
The life-cycle stages of the facilities affected by the NPH assessment;
Whether the assessment results will be used as design input for any future
facilities;
NUREG-2117, Chapter 6; and
NUREG-CR 6372, Recommendations for Probabilistic Seismic Hazard
Analysis: Guidance on Uncertainty and use of Experts , Appendices Vol. 2,
Appendix G.
9.2.6 If the review and evaluation of the changes warrants an update, the updated
assessment shall be performed following the criteria in this Standard for new
facilities.
Section 50
9.2.7 If the review and evaluation of the changes does not warrant an update, the review
and evaluation results shall be justified and documented.
9.3. Facility Condition Assessments
9.3.1 Facility condition assessments performed as a result of an updated NPH assessment
are required only for hazard category 1, 2, and 3 nuclear facilities. The following
subsections describe the decision process to proceed with a quantitative NPH
evaluation of affected SSCs, development of NPH mitigation plans, and collection of
data to support evaluations.
9.3.2 If an updated NPH assessment results in an NPH level that exceeds the level used
for the facility and/or SSCs in the current Documented Safety Analysis (DSA), an
assessment shall be performed to determine if the NPH design of facility and/or
SSCs may not meet the design criteria given in this Standard for new facilities. This
assessment should be performed by subject matter experts based on a review of the
DOE-STD-1020-2012
67
existing NPH design and evaluation basis documents and the results of the updated
NPH assessment, and should be peer reviewed.
9.3.3 If the peer-reviewed assessment concludes that the increase in the NPH level will not
result in the failure of SSC safety function, the assessment and the peer review
process and results shall be documented and submitted to DOE for review and for
determining additional actions or further evaluation, if any.
9.3.4 If the peer-reviewed assessment concludes that the increase in the NPH level may
result in the failure of the safety function of any SSC, a plan shall be established for a
quantitative NPH evaluation of the affected SSCs using the criteria and methods
given in this Standard for new facilities. The plan shall incorporate a schedule for
evaluation, taking into account programmatic mission considerations, and the safety
significance of the potential failure of the SSCs due to natural phenomena. The plan,
along with the assessment and peer review process and results, shall be
documented and submitted to DOE for review and for determining additional actions
or further evaluation. Note: If the assessment identifies an Unreviewed Safety
Question (USQ) or Potential Inadequate Safety Analysis (PISA), refer to DOE Guide
424.1-1B, Implementation Guide for Use in Addressing Unreviewed Safety Question
Requirements, for additional information.
9.3.5 An NPH mitigation plan shall be developed for the SSCs that are found to have NPH
design inadequacy, based on the above quantitative evaluation. This plan, to be
submitted to DOE for review, shall address how the inadequacies will be rectified
(physical retrofitting versus demonstration of adequacy using more refined analysis
methods), and should consider cost-versus-risk reduction of potential improvements;
possible time or funding constraints, and programmatic or facility mission. Also, it
should incorporate a prioritized schedule for upgrading the SSCs. If a structural
upgrade is required for any existing facility that can be performed quickly and
inexpensively, it should be implemented.
Section 51
9.3.6 Priorities should be established on the basis of the NDC (e.g., SDC, WDC, FDC,
PDC, VDC), cost of strengthening, and margin between as-is SSC capacity and the
capacity required by the criteria in this Standard. For SSCs which are within 10
percent of meeting the criteria in this Standard, the risk from non-compliance is likely
to be small and it may not be cost effective to strengthen the SSC in order to obtain a
small reduction in risk. As a result, as specified below, some relief from the criteria
in this Standard is permitted for evaluation of existing SSCs. It is permissible to
perform such evaluations using natural phenomena hazard exceedance probability of
twice the value (i.e., half the return period) specified for new design, provided that
the resulting reduction in the hazard level is less than, or equal to, 20 percent. This
amount of relief is within the tolerance of meeting the performance goals and is only
a minor adjustment of the corresponding NPH design and evaluation criteria. In
addition, it is consistent with the intent of the Federal Executive Order 12941
developed by the ICSSC. When upgrading becomes necessary, the design should
be based on the design criteria for new SSCs defined in this Standard.
9.3.7 For facilities with a remaining service life of five years or less, it may not be
necessary to upgrade the facility SSCs for NPH mitigation, unless the presence of
hazardous materials or other special conditions present an exceptionally high risk to
occupants or the public at large. The guidelines given in ICSSC RP-5 may be used
DOE-STD-1020-2012
68
for defining the “exceptionally high risk” facilities. For nuclear facilities, the
designation of “exceptionally high risk” facility should additionally be based on:
Hazard category of the facility;
The percent by which the revised design basis ground acceleration exceeds
that used in the original design;
The total number of safety significant and safety class SSCs that do not
meet the design requirements;
The dose that a co-located worker and a member of the public may likely
receive resulting from the NPH-related failure;
The number of co-located workers and members of the public that are likely
to be adversely affected; and
Strategic and economic importance of the facility.
9.3.8 The following data and information should be collected to support the evaluation of
the existing SSCs:
The safety basis documentation to identify and list individual safety SSCs in
the safety basis of the facility;
Identification of the safety function, functional requirements and NPH
performance criteria for each of the SSCs from the safety basis
documentation;
Construction or fabrication of as-built drawings and specifications of the
SSCs;
Data and information from site visits and walk-downs performed to verify
that the SSCs are built according to written plans and specifications;
Modifications not shown on the drawings or physical deteriorations;
Documents that establish an appropriate determination of material
properties to be used in the analyses; and
Data related to ductile design details that are necessary to evaluate the
appropriate inelastic energy absorption factor, Fμ, that can be used for
seismic re-evaluation.
Section 52
Using the above data and information, an evaluation of the SSCs should be
performed using the criteria given in this Standard. For the SSCs that do not meet
the criteria, a revised evaluation should be performed using median values of
material properties if median values were not used in the original design (the use of
median values of material properties should be obtained, which will allow an estimate
of the degree of conservatism in the design if other than median values were used in
the original design). Applicable industry practice should be followed in developing
sampling criteria to determine median values.
DOE-STD-1020-2012
69
9.4. Guidelines for NPH Evaluation of SSCs in Existing Facilities
Note: The sections below provide additional guidelines for different NPHs (e.g., seismic, wind,
flood and precipitation).
9.4.1 Seismic Evaluation. To comply with Public Law 102-614 and Executive Order 12941,
the guidelines provided in ICSSC RP-8, shall be used to: determine when a seismic
evaluation and retrofitting of existing nuclear facility will be necessary; and establish
the evaluation and mitigation requirements.
In addition, general guidelines for the seismic evaluation of existing facilities
presented in the following documents should also be considered:
Techniques for the Seismic Rehabilitation of Existing Buildings, FEMA 547,
2006;
Rehabilitation of Existing Buildings, ASCE/SEI 41-06, Structural Engineering
Institute of the American Society of Civil Engineers, 2006;
Standard for the Seismic Evaluation of Buildings, ASCE/SEI 31-03, Structural
Engineering Institute Of the American Society of Civil Engineers, 2003;
Seismic Evaluation Procedure for Equipment in U.S. Department of Energy
Facilities, DOE-EH-0545, 1997; and
Generic Implementation Procedure (GIP) for Seismic Verification of Nuclear
Plant Equipment, Revision 3A, Seismic Qualification Utility Group, 1997.
These documents, and the peer-reviewed consensus documents referenced therein,
should be used to develop a plan and criteria document for evaluating seismic
adequacy of existing facilities, as well as for specific guidelines on upgrading and
retrofitting until a revision or addendum to this section of this Standard is published
by DOE that provides specific guidelines as to seismic upgrading or retrofitting of
existing DOE facility SSCs. The plan should consider cost-versus-risk-reduction and
remaining facility life to prioritize detailed and refined seismic evaluation, and
upgrading of candidate facilities. High priority should be given to those SSCs
identified as weak links by the preliminary investigation and to SSCs that are most
important to personnel safety and operations with hazardous materials. Input from
safety personnel and/or accident analyses should be used as an aid in determining
safety priorities.
Once the as-is condition of a facility has been verified and deficiencies or weak links
have been identified, detailed seismic evaluation and/or upgrading of the facility
should be considered. Obvious deficiencies that can be readily improved should be
remedied as soon as possible. A realistic schedule to address all safety-related
deficiencies shall be developed.
Seismic evaluation for existing facilities would be similar to evaluations performed for
new designs except that a single as-is configuration is evaluated instead of several
configurations in an iterative manner (as is often required in the design process).
The evaluation of existing facilities for seismic hazards can result in a number of
options based on the evaluation results. If the existing facility can be shown to meet
the design and evaluation criteria presented in Section 3 and good seismic design
Section 53
DOE-STD-1020-2012
70
practice had been employed, the facility would be judged to be adequate for potential
seismic hazards to which it might be subjected. If the facility does not meet the
seismic evaluation criteria of Section 3, an analysis should be conducted to
determine appropriate action. Several alternatives may be considered:
If an existing SSC is close to meeting the criteria, a slight increase in the
annual risk to natural phenomena hazards can be allowed within the
tolerance of meeting the target performance goals (See Section 9.3). Note
that reduced criteria for seismic evaluation of existing SSCs is supported in
NISTIR 890-4062, Guidelines for Identification and Mitigation of Seismically
Hazardous Existing Federal Buildings and ICSSC RP-8 documents. As a
result, some relief in the criteria may be allowed by performing the
evaluation using higher hazard exceedance probability as permitted in
Section 9.3, above.
The SSC may be strengthened such that its seismic resistance capacity is
sufficiently increased to meet these seismic criteria. When upgrading is
required, it should be designed for the current design criteria.
The usage of the facility may be changed such that it falls within a less
hazardous performance category and, consequently, less stringent seismic
requirements.
It may be possible to conduct the aspects of the seismic evaluation in a
more rigorous manner that removes conservatism such that the SSC may
be shown to be adequate. Alternatively, a probabilistic assessment might
be undertaken in order to demonstrate that the performance goals can be
met.
9.4.2 Wind Hazard Evaluation. The following guidelines may be used for evaluating WDC-
1 through WDC-5 SSCs in an existing facility:
9.4.2.1 The key to the evaluation of existing SSCs is to identify potential failure modes
and to calculate the minimum wind speed that would cause the postulated
failure. A critical failure mechanism could be the failure of the main wind-force
resisting system of a structure, a breach of the structure envelope that allows
release of toxic materials to the environment, or a breach which results in wind
and water damage to the building contents. Also, in-situ strengths of existing
structures need to be adequately estimated when required.
9.4.2.2 Experience from wind storm damage investigations provides the best guidelines
for anticipating the potential performance of existing SSCs under wind loads.
Mehta et al, Procedures for Predicting Wind Damage to Buildings, provides a
methodology for estimating the performance of existing SSCs based on
identification of weak links in the building structure. The approach is directed
primarily to structures, but can be adapted to systems and components as well.
9.4.2.3 The methodology described in Mehta et al, Procedures for Predicting Wind
Damage to Buildings, involves two levels of evaluation:
Level I, essentially a screening process, should be performed before
proceeding to Level II, which is a detailed evaluation.
DOE-STD-1020-2012
71
The Level II process includes the following three steps:
Data collection;
Analysis of element failures; and,
Postulation of failure sequence.
9.4.3 Flood Hazard Evaluation. The following guidelines may be used for evaluating FDC-
1 through FDC-5 SSCs in an existing facility:
9.4.3.1 SSCs in existing facilities may be situated below the DBFL as defined in this
Standard. In this case, an evaluation shall be performed to determine the level
of external flooding, if any, that can be sustained, without negating the SSC
functional safety requirements.
Section 54
9.4.3.2 This level is referred to as the Critical Flood Elevation (CFE). If the CFE is
higher than the DBFL, no further evaluation will be necessary.
9.4.3.3 This situation may not be unique for existing facilities. For new facilities, it may
not be possible to situate all facilities above the DBFL, in which case other
design strategies shall be considered. For example, it may be possible to wet-
proof an SSC, thus allowing some level of flooding to occur.
9.4.3.4 For each SSC, there is a critical elevation, which, if exceeded, causes damage
or disruption such that design safety requirements are not satisfied. The CFE
may be located:
Below grade due to the structural flooding vulnerability of exterior walls or
instability due to uplift pressures on supporting or enclosing the safety
function of the structure;
At the elevation of utilities that support SSCs; or
At the actual base elevation of an SSC.
Typically, the first floor-elevation or a below-grade elevation (i.e., foundation
level) is assumed to be the critical elevation. However, based on a review of an
SSC, it may be determined that greater flood depths shall occur to cause safety
function failure (e.g., critical equipment or materials may be located above the
first floor). If the CFE for an SSC exceeds the DBFL, the design criteria is
satisfied. If the CFE does not exceed the DBFL, options shall be considered to
harden the SSC or relocate it.
9.4.4 Precipitation Hazard Evaluation. The following guidelines are provided for use in
evaluating PDC-1 through PDC-5 SSCs in an existing facility:
9.4.4.1 The precipitation evaluations of the SSCs may be performed using the same
criteria as for new facilities; and
9.4.4.2 For SSCs that are impacted by the precipitation evaluations, the following
mitigation measures can be considered:
DOE-STD-1020-2012
72
modifying roofs to minimize ponding on the roofs, such as removing roof
parapets, increasing the size and number of scupper openings in the roof
parapets;
providing protective shielding structures for critical SSCs to prevent water
intrusion from potential roof leaks;
relocating critical SSCs away from potential roof leaks;
providing protective dikes around the facility;
relocating critical SSCs to higher elevations in the facility to protect from
precipitation runoff;
modifying site grading or provide detention ponds to protect the facility;
and
implementing emergency operations plans to secure areas where critical
SSCs are located.
DOE-STD-1020-2012
73
10.0 Quality Assurance and Peer Review
The activities related to the design, construction, and evaluation of SSCs performed to meet
the criteria given in this Standard shall meet the applicable quality assurance requirements
of DOE O 414.1D, Quality Assurance, using a graded approach and an approved quality
assurance plan. In addition, for nuclear facilities, as defined in 10 C.F.R. § 830.3, Nuclear
Safety Management Rule, ASME NQA-1, Quality Assurance Requirements for Nuclear
Facility Applications, Part I and applicable requirements of Part II, shall be the preferred
consensus standard for developing the quality assurance plan. Additional quality
assurance and peer review requirements from ASCE/SEI 43-05 and ANSI/ANS 2.29
shall be implemented, as applicable, to supplement the requirements set forth above.
The peer review provisions given in ASCE/SEI 43-05 for seismic design and evaluation
shall also be used in the design and evaluation for other NPHs for design categories 3, 4
and 5.
Section 55
DOE-STD-1020-2012
74
References
Executive Orders
Executive Order 12941, Seismic Safety of Existing Federally Owned or Leased
Buildings, 1994
Code of Federal Regulations
U.S. Department of Energy, Nuclear Safety Management Rule, 10 C.F.R. § 830.3,
2001
DOE Directives
DOE O 414.1D, Quality Assurance, 2011
DOE O 420.1C, Facility Safety, 2012
DOE O 450.1A, Environmental Protection Program, 2003
DOE O 458.1, Change 2, Radiation Protection of the Public and the Environment,
2011
DOE M.440.1-1A, Explosives Safety, 2006
DOE G 420.1-2, Guide for the Mitigation of Natural Phenomena Hazards for DOE
Nuclear and Non-Nuclear Facilities, 2002
DOE G 424.1-1B, Implementation Guide for Use in Addressing Unreviewed Safety
Question Requirements, 2010
DOE Technical Standards
DOE-STD-1020-2002, Natural Phenomena Hazards Design and Evaluation Criteria
for Department of Energy Facilities, 2002
DOE-STD-1021-93 (Reaffirmed in 2002), Natural Phenomena Hazards Performance
Categorization Guidelines for Structures, Systems, and Components , 1993
DOE-STD-1022-94 (Reaffirmed in 2002), Natural Phenomena Hazards Site
Characterization Criteria, 1994
DOE-STD-1023-95 (Reaffirmed in 2002), Natural Phenomena Hazards Assessment
Criteria, 1995
DOE-STD-1066-2012, Fire Protection, 2012
DOE-STD-1189-2008, Integration of Safety into the Design Process, 2008
DOE-STD-1212-2012, Explosives Safety, 2012
DOE-STD-3009-94, Change Order 3, Preparation Guide for U.S. Department of
Energy Nonreactor Nuclear Facilities Documented Safety Analyses , 2006
DOE-STD-1020-2012
75
Other DOE Documents
DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring
and Environmental Surveillance, 2004
DOE/EH-0545, Seismic Evaluation Procedure for Equipment in U.S. Department of
Energy Facilities, 1997
Hossain, Quazi, et al, Technical Support Document for DOE-STD-3014-2006
(Accident Analysis for Aircraft Crash into Hazardous Facilities), Structures, Systems,
and Components Evaluation Technical Support Document, UCRL-ID-123577, 1996
McCann, M.W. and A.C. Boissonnade, Preliminary Flood Hazard Estimates for
Screening Models for Department of Energy Sites, Lawrence Livermore National
Laboratory, UCRL-21045, 1988
U.S. Nuclear Regulatory Commission Documents
NUREG-2117, Practical Implementation Guidelines for SSHAC Level 3 and 4 Hazard
Studies, 2012
NUREG/CR-6372, Recommendations for Probabilistic Seismic Hazard Analysis:
Guidance on Uncertainty and Use of Experts, 1997
NUREG/CR-6728, Technical Basis for Revision of Regulatory Guidance on Design
Ground Motions: Hazard- and Risk-consistent Ground Motion Spectra Guidelines,
2001
Regulatory Guide 1.76, Rev. 1, Design Basis Tornado and Tornado Missiles for
Nuclear Power Plants, 2007
Regulatory Guide 1.102, Flood Protection for Nuclear Power Plants, 1976
Regulatory Guide 1.208, Performance-Based Approach to Define the Site-Specific
Earthquake Ground Motion, 2007
Regulatory Guide 1.221, Design Basis Hurricane and Hurricane Missiles for Nuclear
Power Plants, 2011
Standard Review Plan, NUREG-0800, Section 2.4.10, Revision 3, Flooding
Protection Requirements, 2007
Standard Review Plan, NUREG-0800, Section 2.5.5, Revision 4, Stability of Slopes,
2010
Standard Review Plan, NUREG-0800, Section 3.4.2, Revision 3, Analysis
Procedures, 2007
DOE-STD-1020-2012
76
National Institute of Standards and Technology Documents
NISTIR 890-4062, ICSSC RP-3, Guidelines for Identification and Mitigation of
Seismically Hazardous Existing Federal Buildings, 1989
Section 56
NISTIR 5734, ICSSC RP-5, ICSSC Guidance on Implementing Executive Order
12941 on Seismic Safety of Existing Federally Owned or Leased Buildings , 1995
NIST GCR 11-917-12, ICSSC RP-8, Standards of Seismic Safety for Existing
Federally Owned and Leased Buildings, 2011
Other Government Documents
Federal Emergency Management Agency, FEMA 547, Techniques for the Seismic
Rehabilitation of Existing Buildings, 2006
Non-Government Standards
American National Standards Institute/American Institute of Steel Construction
ANSI/AISC N690-06, Specification for Safety-Related Steel Structures for Nuclear
Facilities, 2006
American National Standards Institute/American Nuclear Society
ANSI/ANS-2.26-2004 (R2010), Categorization of Nuclear Facility Structures,
Systems, and Components for Seismic Design, 2004
ANSI/ANS-2.27-2008, Criteria for Investigation of Nuclear Facility Sites for Seismic
Hazard Assessment, 2008
ANSI/ANS-2.29-2008, Probabilistic Seismic Hazards Analysis, 2008
ANSI/ANS-2.3-2011, Estimating Tornado, Hurricane, and Extreme Straight-Line Wind
Characteristics at Nuclear Facility Sites, 2011
ANSI/ANS-3.11-2010, Determining Meteorological Information at Nuclear Facility
Sites, 2010
ANSI/ANS-8.1-1998 (R2007), Nuclear Criticality Safety I Operations with Fissionable
Materials Outside Reactors, 1998
American Society of Civil Engineers
ANSI/ASCE 1-82, N-725, Guideline for Design and Analysis of Nuclear Safety
Related Earth Structures, 1982
ASCE 4-98, Seismic Analysis of Safety-Related Nuclear Structures, 1998
Report of the ASCE Committee on Impactive and Impulsive Loads, Volume V, Civil
Engineering and Nuclear Power, September, 1980
DOE-STD-1020-2012
77
Manuals and reports on Engineering Practice, No. 58, Structural Analysis and Design
of Nuclear Plant Facilities,1980
American Society of Mechanical Engineers
ASME NQA-1-2008 with the NQA-1a-2009 addenda, Quality Assurance
Requirements for Nuclear Facility Applications, 2009
National Fire Protection Association
NFPA 780-2011, Standard for the Installation of Lightning Protection Systems , 2011
Structural Engineering Institute of the American Society of Civil Engineers
ASCE/SEI 7-10, Minimum Design Loads for Buildings and Other Structures, 2010
ASCE/SEI 7-05, Minimum Design Loads for Buildings and Other Structures, 2005
ASCE/SEI 7-02, Minimum Design Loads for Buildings and Other Structures, 2002
ASCE/SEI 31-03, Standard for the Seismic Evaluation of Buildings, 2003
ASCE/SEI 41-06, Rehabilitation of Existing Buildings, 2006
ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems and Components
in Nuclear Facilities, 2005
Other
American Concrete Institute, ACI 349-06, Code Requirements for Nuclear Safety-
Related Concrete Structures and Commentary, 2006
Conrads, T.J., Volcano Ashfall Loads for the Hanford Site, Westinghouse Hanford
Company, WHC-SD-GN-ER-30038, Rev. 0, 1996
Electric Power Research Institute, Program on Technology Innovation, Technical
Report 1012965, Use of CAV in Determining Effects of Small Magnitude Earthquakes
on Seismic Hazard Analyses, Palo Alto, CA, 2005
Hill, B.E., Aspinall, W.P., Connor, C.B., Komorowski, J.-C., and Nakada, S.,
Recommendations for Assessing Volcanic Hazards at Sites of Nuclear Installat ions,
in Volcanic and Tectonic Hazard Assessment for Nuclear Facilities , C.B. Connor,
N.A. Chapman, and L.J. Connor, eds., Cambridge University Press, 638 p., 2009
Section 57
Hoblitt, R.P., and Scott, W.E., Estimate of Tephra Accumulation Probabilities for the
U.S. Department of Energy’s Hanford Site, Washington, U.S. Geological Survey
Open-File Report 2011-1064, 2011
International Atomic Energy Agency, Volcanic Hazards in Site Evaluation for Nuclear
Installations, Draft Specific Safety Guide DS 405, 2010
DOE-STD-1020-2012
78
Kennedy, Robert, A Review of Procedures for the Analysis and Design of Concrete
Structures to Resist Missile Impact Effects, Nuclear Engineering and Design,
Volume 37, North Holland Publishing Company, 1976
Mehta, K. C., McDonald, J. R., and Smith, D. A., Procedures for Predicting Wind
Damage to Buildings, Journal of the Structural Division, ASCE, Vol.107, No. ST 11,
2089-2096, 1981
Newhall, C.G., and Hoblitt, R.P., Constructing Event Trees for Volcanic Crises,
Bulletin of Volcanology, v. 64, pp. 3-20, 2002
Newhall, C.G., and Self, S., The Volcanic Explosivity (VEI): An Estimate of Explosive
Magnitude for Historical Volcanism, Journal of Geophysical Research, v.87, pp.
1231-1238, 1982
Seismic Qualification Utility Group, Generic Implementation Procedure (GIP) for
Seismic Verification of Nuclear Plant Equipment, Revision 3A, 1997
U.S. Geological Surve