DOE-HDBK-3012-96, Guide to Good Practices for Operational Readiness Reviews (ORR) Team Leader's Guide
Functional areas: Operational Readiness, Plan of Action
This guidance section provides instructions, explanations and examples for the performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the Team Leader (TL), Team Members (TM) and Review Coordinator (RC) are outlined. An appendix contains sample forms and correspondence which are typically used to initiate and perform the ORR. Although this document was written specifically for use by DOE ORR Team Leaders, its use may also be beneficial to contractor ORR Team Leaders. The handbook is also useful for Team Leaders of Readiness Assessments conducted in accordance with requirements of DOE O 425.1. Lessons learned, which are promulgated with this handbook, will benefit any line manager, particularly those preparing a facility or process for startup or restart. Superseded by DOE-HDBK-3012-2003.
Unknown Block text
Superseded By:
Version history and related documents
Superseded by
A newer version replaces this document.
Document text
Text extracted from the attached file. Refer to the original document for the authoritative version.
Section 1
TS
INCH-POUND
DOE-HDBK-3012-96
June 1996
SUPERSEDING
DOE-HDBK-3012-94
September 1994
DOE HANDBOOK
GUIDE TO GOOD PRACTICES FOR
OPERATIONAL READINESS REVIEWS
(ORR)
TEAM LEADER'S GUIDE
U.S. Department of Energy AREA MISC
Washington, D.C. 20585
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
WELCOME
This Portable Document Format (PDF) file contains bookmarks, thumbnails, and hyperlinks to help you navigate through the document. All items listed in the Contents are linked to the corresponding sections. In addition, if you click on a section heading while you are reading the text, you will return to the Contents. Click on the DOE seal below to move to the Contents page.
This document has been reproduced directly from the best available copy.
Available to DOE and DOE contractors from the Office of Scientific and
Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401.
Available to the public from the U.S. Department of Commerce, Technology
Administration, National Technical Information Service, Springfield, VA 22161;
(703) 487-4650.
Order No. DE96009471
DOE-HDBK-3012-96
iii
FOREWORD
This Department of Energy handbook, Guide to Good Practices for Conducting Operational
Readiness Reviews (ORR) Team Leader's Guide, is approved for use by all DOE Components
and their contractors.
Beneficial comments (recommendations, additions, deletions) and any pertinent data that may
improve this document should be sent to: Defense Programs, Office of Engineering, Operations,
Security and Transition Support by letter or by using the self-addressed Document Improvement
Proposal (DOE F 1300.3) appearing at the end of this document.
DOE-HDBK-3012-96
iv
INTENTIONALLY BLANK
DOE-HDBK-3012-96
v
TABLE OF CONTENTS
PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
PRIOR TO PREVISIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Initial Duties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Team Selection Duties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Scheduling/Coordination Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Data Packets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Team Member Preparation for both Previsit and ORR . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
PREVISIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Initial Team Meeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
PREPARING FOR THE ORR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Team Leader Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Finalize the ORR Implementation Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Establish ORR Length . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Review Coordinator Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Section 2
ORR DUTIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Opening Meeting at Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Team Meetings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Final Team Meeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Close-out Meeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
POST ORR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Final Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Finding Closure and Team Follow-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
LESSONS LEARNED FROM PREVIOUS ORR/RAs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Achieving Readiness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Items to Note Before Proceeding With a DOE ORR . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Administration of the Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Conduct of Drills and Other Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Logistics and Support . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Team Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Developing the Implementation Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Defining the Scope and Graded Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Post ORR Corrective Actions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Miscellaneous Lessons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Generic Lessons Learn Which Apply to The Design, Construction, Operation, and
Decommissioning of DOE Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
DOE-HDBK-3012-96
vi
INTENTIONALLY BLANK
DOE-HDBK-3012-96
vii
APPENDICES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
KEY POINTS TO DISCUSS DURING INITIAL
CONTACT WITH SITE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX 1-1
SITE CONTACT MEMORANDUM . . . . . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX 2-1
LOGISTICS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX 3-1
PRELIMINARY SCHEDULE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX 4-1
PREVISIT SCHEDULE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX 5-1
CHECKLIST FOR ORR TEAM INFORMATION PACKAGES . . . . . . . . APPENDIX 6-1
DETAILED SCHEDULE FOR ORR TEAM . . . . . . . . . . . . . . . . . . . . . . APPENDIX 7-1
TRANSMITTAL LETTER FOR DATA PACKAGES . . . . . . . . . . . . . . . APPENDIX 8-2
TEAM MEMBER DELIVERABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . APPENDIX 9-1
INSTRUCTIONS FOR COMPLETING ORR FORMS . . . . . . . . . . . . . . APPENDIX 10-1
PRESTART AND POST-START DETERMINATION CRITERIA
FOR OPERATIONAL READINESS REVIEWS . . . . . . . . . . . . . . . . . . APPENDIX 11-1
Section 3
DOE-HDBK-3012-96
viii
INTENTIONALLY BLANK
DOE-HDBK-3012-96
1
TEAM LEADER, TEAM MEMBER, & REVIEW COORDINATOR ORR DUTIES AND
RESPONSIBILITIES
PURPOSE: This guidance section provides instructions, explanations and examples for the
performance of all phases of an Operational Readiness Review (ORR). Details pertinent to the
Team Leader (TL), Team Members (TM) and Review Coordinator (RC) are outlined. An
appendix contains sample forms and correspondence which are typically used to initiate and
perform the ORR. Although this document was written specifically for use by DOE ORR Team
Leaders, its use may also be beneficial to contractor ORR Team Leaders. The handbook is also
useful for Team Leaders of Readiness Assessments conducted in accordance with requirements of
DOE O 425.1. Lessons learned, which are promulgated with this handbook, will benefit any line
manager, particularly those preparing a facility or process for startup or restart.
PRIOR TO PREVISIT ORR DUTIES
TL Initial Duties: After the projected start date is established, the TL should perform the
following:
1. Comply with commitments made in the approved Plan of Action.
2. Contact the identified points of contact to discuss details about the upcoming ORR
and negotiate prospective dates for the previsit and ORR.
3. Send a letter, as soon as possible after the above negotiations, formalizing the
notification of the ORR to site points of contact (see Appendices 2, 3, 4, and 5).
4. Advise the Review Coordinator of dates and agenda for the previsit.
5. Initiate the process of selecting team members to support the ORR as soon as
possible.
TL Team Selection Duties: The importance of this task cannot be overemphasized. No
other task has such a direct impact on the overall quality of the ORR. The TL selects and
organizes the previsit and ORR teams. Additional guidance on team selection can be
found in sections 5.4.2 and 5.4.3 of the ORR Standard, DOE-STD-3006-95. Guidelines
for completing the process follow:
1. Candidates may be obtained from any independent sources within DOE or from
contractors not directly responsible for the oversight or operation of the facility
under review. Previous TLs are valuable resources in reviewing the past
performance of team members. The areas to be reviewed at a minimum are:
Operations, Maintenance, Training, Safety Envelope Verification, Engineering
Support, Environmental Safety and Health, Emergency Preparedness, Radiation
Protection, Occupational Health and Industrial Safety, Management, Fire
Protection, and Quality Assurance. Other areas reviewed can include, if
appropriate, configuration management, criticality safety, and DOE management.
Team members must have technical experience in their area of review.
DOE-HDBK-3012-96
2
TL 2. Remember that team members must not only have technical experience relevant to
their assignment, but also must have assessment experience and be familiar with
the facility/process in question. Typically, familiarization with the facility/process
is gained during the previsit. In determining the number of team members,
experience indicates more members for less time is the best option.
3. Determine whether any conflict of interest, actual or perceived, exists for any
candidate or source of candidates. If so, those candidates must be rejected from
further consideration. A real conflict of interest (COI) would exist for a contractor
who has, previous to the ORR, provided direct support to a facility in an area which
will be reviewed during the ORR. For example, DOE has used mentors at some
facilities to assist in improving the conduct of operations at the facility. It would be
inappropriate for this contractor to be a part of the ORR team.
Section 4
A perceived COI could exist when a contractor has provided indirect support to the
facility or was an employee of the facility at some other point in their career. An
example of indirect support could be participation on a review team evaluating
facility safety basis documentation. The second case is self explanatory. These
cases are more subjective, but the TL should be sensitive to them and avoid them if
possible.
4. No individual directly involved in the management or operation of a facility can
participate as a team member in his/her area of responsibility at the facility.
5. With regard to selecting administrative staff for the ORR, it must be noted that the
administration of the forms and summaries is a prodigious task. It has been found
that one person (the ORR Review Coordinator) should be dedicated to
administering the forms, e.g., logging in and tracking. This task is very time
consuming once forms begin being turned in and increases as the ORR progresses.
In addition, at least one other person with a word processor should be dedicated to
editing the forms. Consideration should be given to bringing in supplemental editing
staff toward the close of the ORR. It should also be recognized that a significant
amount of copying will need to be accomplished at the close of the ORR.
6. Concurrent with the above tasks, work with the site point-of-contact to obtain
counterparts. A counterpart is an individual designated by the site to assist in
coordinating the ORR team's inspection activities. Each ORR team member should
have a counterpart for each functional area under evaluation.
DOE-HDBK-3012-96
3
7. As soon as team members and counterparts have been selected, disseminate a list
showing counterparts' telephone, facsimile numbers, and e:mail address, if available,
to team members. The list is important for informing team members of their
selection and their counterpart, which allows for early contact and preparation.
Scheduling/Coordination Responsibilities
RC • After team selection is made, obtain social security number, date of birth, address,
phone number, fax number, type of clearance, and funding information for all team
members.
• Assist the TL with developing team member/counterpart chart.
• Prepare ORR notification letter and enclosures for the TL (Appendix 2).
• Make a contact list for the previsit ORR team. The list should include site contact
names, phone numbers, fax numbers, hotel information, site security office number,
per diem rates. (Some of this information will be provided to the by the TL).
• Send draft ORR Implementation Plan and CRADs to ORR previsit team members
for their review.
• Reserve a block of rooms for ORR previsit team members who will travel form
outside the area. Send the hotel a team list, if required.
ADDITIONAL GUIDANCE FOR PREPARING FOR BOTH PREVISIT AND ORR
These duties involve the preparation of the data packets, travel, and other logistics. The TL should
manage the performance of the following items.
TL • Data Packets: Data packets are used to provide team members with information
and documents that enable them to better prepare for the previsit and ORR.
• Working with the RC, assemble and distribute data packets to team members. The
normal makeup of the data packet is provided in Appendix 6. Mail data packets
early to ensure that team members have their packets at least two weeks prior to the
previsit.
Section 5
• Other Logistics: Verify compliance with the request for logistic support that was
sent (Appendix 3) with the letter of confirmation.
RC • Inform team members, usually these instructions are included in the data packet, to
call the hotel and confirm their reservation and to guarantee it with a credit card.
DOE-HDBK-3012-96
4
RC • Make security clearance arrangements for the ORR previsit. Complete DOE F
5631.20 (277's), Request for Visit or Access Approval forms for previsit team.
Discuss access requirements with the site point-of-contact before the previsit to
determine which Sigmas are needed. Discuss security procedures for any uncleared
team members.
• Make sure the team has maps of the site and how to get to the site and hotel from
the airport. Maps should be requested from the site.
• Make contact with site coordinator to introduce and discuss logistical questions.
Discuss sigma/security requirements for cleared and uncleared team members and if
there are any special procedures to bring in equipment, such as laptop computers, or
supplies such as computer disks.
• Verify that all team members' clearance information and all necessary forms for
access to the site have been forwarded to the site. Verify that this has occurred at
least one week prior to the previsit.
• Complete the necessary forms for access to the site for all team members and
forward the data to the site.
• Verify that all reference material needed by the team from HQ has been provided
to team members four to five days before the team's arrival for the previsit and
ORR.
Team Member Preparation for both Previsit and ORR
TM • Each team member should receive and review their data packet. The data packet
provides team members with information on the site, their assignments, including
deliverables, and responsibilities of the team member.
• Each team member is to contact the Hotel to confirm their reservation and
guarantee it with a credit card.
• Each contractor is responsible for providing clearance information to the RC.
Provide the following clearance information:
1. team members' name
2. social security number
3. date of birth
4. organization/company name
5. the type of clearance held.
DOE-HDBK-3012-96
The Health unit in the A-wing basement in GTN can provide medical exams for fitting respirators to1
federal employees only. Contractors will need to arrange for this on their own.
5
TM • If special training or fittings are required, such as respirator fitting, for access to
certain facilities, arrange to have any pre-conditions completed before arrival for the
previsit. For example, respirator fitting requires a medical exam before the fit
test can be administered . Other special training could include Radworker II and1
Hazardous Waste Operations Training. The TL will inform all team members of any
special requirements.
• Team members are to contact their counterpart during the preparation phase to
obtain information they feel is necessary or to arrange for additional
documentation to be readily available onsite. However, keep these requests to a
minimum.
• The site appointed counterpart is a crucial element to the ORR inspection. They
should be in constant communication with the team member during the review and
will provide the best source of site specific information and access available to the
subteams.
Section 6
PREVISIT: The previsit is a fact finding and familiarization visit conducted by as many team
members as possible. A comprehensive previsit lays the foundation for a thorough and efficient
ORR and normally satisfies the requirement for team members to be familiar with the
facility/process. The following are items to consider for completion during the previsit.
TL • Brief site management on the mission, the methodology, and the scope of the ORR,
as well as the logistical support required from the site.
• Arrange for the Operations Office/Area Office and/or contractor management to
brief the team on safety, security, the organization, processes and operations of the
facility. Specifics of the startup (e.g., initial shut-down, restart following upgrade,
restart following a safety shut-down) should be included in the briefing.
• Complete final review and editing of the CRADs. Have TMs provide their proposed
CRAD changes prior to the end of the previsit.
• Attend a walkthrough at the facility/process and observe any current operations to
acquaint team members with the facility and processes in question.
TL • Attend any special training or fitting, such as respirator training and fitting, which
might be necessary to allow for access to the facility during the ORR. Verify that all
DOE-HDBK-3012-96
For example, respirator fitting requires a medical exam before the fit test can be administered. The2
Health Unit, in the A-wing basement of Germantown, provides these exams to federal employees only.
6
team members have met any pre-conditions prior to their arrival at the site .2
• Develop a preliminary listing of Shift Evolutions and Interviews and provide it to the
site so they can plan and schedule events and personnel availability. Each team
member should provide input prior to completion of the previsit. Efforts should be
made to coordinate the interviews among team members to minimize the impact on
site personnel.
• Schedule a counterpart meeting. Each team member should have
acquaintedhim/herself with their counterpart and developed their inspection
requirements during the preparation phase.
• Arrange for any documents designated as required reading for team members to be
available to team members. Scheduling periods of free time during the previsit to
allow this to be accomplished is valuable, particularly if any of the required reading
is classified.
• Investigate other or additional hotel accommodations for the ORR if necessary.
TM • Review the ORR Implementation Plan including the Criteria and Review Approach
Documents (CRADs). Ideally, each team member should have received an advance
copy of the plan to enable a thorough preview of their assigned objectives and
criteria.
• Team members should arrive at the site as scheduled, having met any prerequisites
for site access which were provided by the TL.
• During the previsit, Team Members will:
a. Receive briefings by the Operations Office/Area Office and/or contractor
management on safety, security, the organization, processes, and operations of
the facility as well as, specific information concerning the nature of the restart or
startup.
b. Walkthrough the facility or process area to observe any current operations to
acquaint team members with the facility and processes in question.
TM c. Complete any special training or fitting, such as respirator training and fitting,
DOE-HDBK-3012-96
7
Section 7
which might be necessary to allow for access to the facility during the ORR.
d. Develop their Evolution and Interview List(s) to be provided to the site so they
can plan and schedule events and personnel availability.
e. Meet with their counterpart and develop a methodology for completing their
assigned criteria.
f. Expect and plan to be in regular communication with the site-appointed
counterparts as they will provide the best source of site specific information and
access available to the team member.
g. Complete any required reading of documents that cannot be accomplished
readily elsewhere, e.g. classified documents.
h. Provide proposed CRAD changes to the TL before the end of the previsit for
inclusion in the Implementation Plan.
Initial Team Meeting: The following specific items are suggested for discussion.
TL • Define the ORR team's relationship with the site. The ORR is conducted to verify
the site's readiness to safely conduct operations.
• Emphasize that the ORR inspection is an arduous and time consuming process for
which team members are expected to provide their complete and undivided
attention.
• Establish that the TL is responsible for all aspects of the inspection.
• Define the expected schedule for the ORR, including the time frame for submission
of all deliverables (see Appendix 9).
• Explain the need for and use of the various forms:
- Assessment Forms (Form 1s) are used to document the methods and actions taken
in the criteria evaluation process. Additional guidance is provided in Appendix 4 of
the ORR Standard and Appendix 10 of this document.
- Deficiency Forms (Form 2s) are used to document the findings uncovered during
the criteria evaluation process. Findings are to be documented (i.e., a Form 2
drafted) as soon as there is reasonable evidence to substantiate a finding. This
allows the TL to present site management a daily briefing of emerging issues and
allows the site to better facilitate the finding validation process. Additional guidance
is provided in Appendix 4 of the ORR Standard and Appendix 10 of this document.
TL • Provide administrative information such as area phone numbers, dining locations,
DOE-HDBK-3012-96
8
etc., at this meeting.
• Advise team members to keep the TL abreast of all concerns and new developments
as they arise to minimize confusion and mis-communication as information is
collected.
• Advise team members that participation in any site activity by the team members
(e.g., special tours) not directly related to the review must be cleared by the TL. All
discussions with site management outside the assigned CRADs should also be
cleared through the TL.
• Insist that all complaints, concerns, suggestions, and information be passed through
the TL as soon as possible. Identify problems with counterparts to the TL.
• Advise team members not to meet with external regulatory or oversight agencies,
such as state environmental protection agencies, without the permission of the TL.
Exceptions must be approved in advance with the TL who must notify the Area
and/or the Site Office Manager.
• Advise team members to strictly adhere to the need-to-know criteria in dealing with
classified shapes, components, data or processes. Team members should
immediately identify any difference of opinion which arises with the site on access to
information.
Section 8
• Explain that no contractor business development will take place onsite. Any such
activity will result in removal from the ORR. This does not mean that a contractor
must refrain from giving out a business card, if asked. It does mean they are not
permitted to solicit business from site personnel.
• Explain the format to be used for completing the final report and how the team
members' input will be integrated into the report.
PREPARING FOR THE ORR
Team Leader Responsibilities
TL • Finalize the ORR Implementation Plan: The Implementation Plan should be
finalized immediately following or even during the previsit, if possible. Further
information concerning development of the Implementation Plan is contained in
section 5.9.2 and Appendices 1 through 4 of the ORR Standard.
DOE-HDBK-3012-96
9
TL • Prior to release by the TL, the plan should be forwarded to the Office of
Environment, Safety and Health (EH) and the Defense Nuclear Facility Safety
Board (DNFSB), if applicable, for review and comment, as discussed in section
5.3.2 of the ORR Standard. It is important to remember that although neither EH
nor DNFSB approval of the Implementation Plan is required, it is appropriate to
allow adequate time for their review and comments. The TL should make a good
faith effort to resolve all comments.
• Establish ORR Length: In developing the ORR schedule, several factors need to be
considered, among them the complexity of the facility/process being reviewed, the
number of team members available, and the number of interviews and evolutions to
be conducted. Experience has shown that even limited scope ORRs need a
minimum of a week for field work. Several days are then needed to analyze the
data, conduct follow-up, and develop coherent and informative conclusions, as well
as to complete the extensive administrative requirements prior to leaving the site.
Two weeks as a general guideline has been a challenging but achievable goal.
Review Coordinator Responsibilities
RC • After ORR dates are confirmed, reserve a block of rooms and send rooming list to
the hotel with names and check-in/check-out dates, if required. Make the
reservation under the DOE ORR team. Make arrangements for a meeting room at
the hotel for the initial team meeting, if necessary.
• Prepare security clearance forms for all team members. Complete form DOE F
5631.20 (formerly 277) Request for Visit or Access Approval for team. 277's are
not completed for uncleared team members.
• Provide the site point-of-contact with a list of names and social security numbers in
order for them to track clearance status. Ensure the site security office has received
a copy of this list either from site point-of-contact or by directly faxing them a copy.
• Assist in preparing data packets for team members (see Appendix 6). The following
information is provided by the RC:
a. the hotel meeting room number, if applicable;
b. where and when to get badges;
c. badge office hours;
d. special arrangements for any uncleared team members or personal computers;
DOE-HDBK-3012-96
10
RC e. what to do in case a team member gets delayed and can't be at the right place at
the right time;
f. if any special training is required;
g. where the onsite team room is located;
• Provide the following:
- blank forms with the reviewer's objectives and criteria filled in, and provide the
Section 9
same information on a diskette;
- Maps;
- Detailed schedule, (Appendix 7);
- Team member assignment and counterpart matrix;
- Team member deliverables, (Appendix 9);
- DOE O 425.1 and Standard DOE-STD-3006-95; and
- Sample format for Forms (Appendix 10), if the TL chooses to use this format.
• Make arrangements to mail data packets to team members. Packages should be
delivered to team members at least two weeks before the beginning of the ORR.
• Keep the site point-of-contact informed of any team member/schedule changes by
updating and faxing the team member assignment chart. Make sure latest date is on
the chart.
• Keep all team members informed of the status of progress and potential or actual
changes in ORR start dates.
• Prepare package to mail to hotel. The package should include any
information/documents the TL and DOE-HQ team members need for the ORR and
the standard formats/examples such as latest team member assignments, latest
agendas and schedules; computer disk with all ORR information; blank Form 1s and
Form 2s; previous ORR closeout summary examples; and the template for the word
processing software to be used. Mail the package to the hotel. The package should
arrive at the hotel before the team arrives.
ORR DUTIES
The ORR begins with the arrival of the team at the hotel or site.
TL • Ensure all team members have completed all access requirements of the site.
• The TL normally meets every morning with site managers to brief them on the issues
raised by the previous day's review activities. The TL presents the site with draft
Form 2s detailing the findings uncovered during the previous day's inspections. This
greatly enhances site/team communication and allows the site to better facilitate the
DOE-HDBK-3012-96
11
validation process.
TL • Hold daily team meetings, usually held in the afternoon, to discuss emerging issues.
- Functional Area Leaders, if assigned, or team members brief the TL on the issues
uncovered during the day (this is not intended to be a travelogue of the day's
events). Issues deemed sufficiently substantive by the TL will be drafted onto
Form 2s.
- Some duplication of effort is to be expected and it can often lead to beneficial
cross-talk and fuller understanding of the issues.
- Issues raised may be assigned to a different functional area or subteam if it is felt
that better coverage will result.
- Any disputes between functional areas or subteams that occur are resolved by the
TL.
• Additional guidance for the conduct of the ORR can be found in section 5.4.6 of the
ORR Standard.
Opening Meeting at Site: This meeting is the "kickoff" meeting for the commencement of the
ORR. Items to consider for completion during this meeting include:
TL • Make introductions.
• Allow for a series of briefs by the site explaining the site's management and
organization, its functions, operations and interfaces.
• Brief the audience on the ORR process and the ORR schedule.
• Brief site audience and team on the rules for interaction between team members
and site personnel. The team will not act as safety monitors nor direct operations,
etc.
Team Meetings: Items Which Should be Reiterated Throughout the Inspection:
TL • Encourage the identification of any unclear issues. They still need to be identified so
that others may consider them at a later date.
• Re-emphasize that team members should focus on that portion of the organization
directly responsible for their area. Contact outside their area, specifically including
interviews with senior site management, must be discussed in advance with the TL.
Section 10
DOE-HDBK-3012-96
12
Team Meetings (continued)
TL • Insist on validation of facts. ORR teams validate facts they collect on a continuous
basis. The Area or Site Office and the counterparts are the primary points of
contact for validating facts.
• It is also important to try and gauge the response of site management to the
conclusions that are drawn from the validated facts.
• Maintain a running record of the important issues brought out at each nightly
meeting.
• The technical editor or review coordinator will review all Forms and summaries.
Team members are encouraged to use the technical editor's assistance. If
appropriate, all forms will be reviewed by a derivation classifier.
TM • Team members are responsible for providing the TL a draft Form 2 for each finding
by 0800 the next morning. This allows the TL time to review all Form 2s prior to
the daily site briefing.
• Validation of facts is a must. The Area or Site Office and the counterparts are the
primary points of contact for validating facts. If facts have not been validated,
don't use them. If you have validated facts, know with whom or by what
reference, you validated and be sure that they know and that they have the authority
to validate.
• Assessment Forms (Form 1s) are used to document the methods and actions taken
in the criteria evaluation process. Team members are encouraged to update their
Form 1s daily to ensure complete record keeping of all inspection activities. The TL
may choose to require each team member provide daily draft Form 1s for his/her
review. Additional guidance is provided in Appendix 4 of the ORR Standard, and
Appendix 10 of this document.
• Deficiency Forms (Form 2s) are used to document the findings identified during the
criteria evaluation process. When issues are unclear, they still need to be identified
so that others may consider them at a later date. If you begin to have suspicions
about something, report the concern and let the site follow it up. Avoid delaying the
drafting of a Form 2 until there is overwhelming evidence as this may excessively
delay the validation and correction processes. Additional guidance is provided in
Appendix 4 of the ORR Standard and Appendix 10 of this document.
During the ORR, the RC works closely with the TL providing administrative and logistical support.
RC • Hand out latest team member assignments and agendas/schedules and any guidance
DOE-HDBK-3012-96
13
on writing Forms and summaries (see Appendix 10).
• Provide administrative and logistical support to team members.
• Get to know the site, i.e., locations of library, copy center, fax machine, supplies.
• Find out about site-specific security procedures, i.e., do team member notes need to
be reviewed for classification? If so, where?
• Check all computers and printers to make sure they are working properly. Arrange
for repairs or replacement if necessary.
• Load Form 1 and 2 files onto all computers.
• Provide sample Functional Area Summaries to each functional area leader. This
helps ensure the inputs for the final report are consistent in content and format.
• Attend team meetings and manage the Form 1 and Form 2 tracking system(s). A
suggested procedure to manage the forms is as follows: (1) get a hard copy with
diskette from each inspector or subgroup team leader; (2) the form(s) are logged in;
(3) a copy should go to the TL as soon as possible and a copy is placed in the
logbook; (4) after the TL reviews and comments on the form and it has been edited
by the technical editor, the form is returned to the inspector for revision or
signature; and (5) revisions and editing are then accomplished between the inspector
and the technical editor with the TL reviewing only the final edited and signed
version submitted by the inspector.
Section 11
Final Team Meeting: This is the last opportunity to work directly with team members and clarify
any questions that have persisted throughout the ORR. Final Form 1s and Form 2s are due prior to
this meeting as is a draft summary evaluation of the assigned objectives for inclusion in the final
report. This is the last opportunity to discover and address dissenting opinions and conflicts prior
to presenting the ORR results to the site. Any such issues must be addressed at this time to avoid
any confusion at the Close-out meeting.
TL • In preparation for the Close-out Meeting announce and discuss the following items:
a. The closeout meeting will be kept short.
b. Attendance will not be limited. Anyone interested may attend.
c. All findings are subject to the approval of the TL and the Senior Advisers, if
applicable.
• Discuss the final report schedule and deliverables.
TL • All findings should be discussed at this meeting. A consensus must be reached by
DOE-HDBK-3012-96
14
the team on each findings' categorization as prestart, post-start, observation, or, if
appropriate, deleted. Discussing all findings at this meeting will help bring the team
to a unified position on the general status of the facility or process being reviewed.
TM • All Form 1s and Form 2s should have been submitted to the TL. They must be
signed-off by the TL.
• Summary evaluations should also have been completed and submitted to and
signed-off by TL prior to this meeting.
• Be prepared to justify all findings.
Close-out Meeting: The close-out meeting is the forum by which the TL informs the site
management of the major issues identified during the ORR. There should be absolutely no
surprises at this meeting as counterparts and site staff should have been kept well apprised of all
issues during the conduct of the ORR.
TL • Prepare a discussion based on the Form 1s, Form 2s, and conclusions drawn by the
ORR team.
RC • Assist the TL in preparing the close-out briefing.
• Make arrangements for the site to mail information that was brought with the ORR
team or collected during the review to the team members. This package should be
sent on the day of the close-out meeting.
• Make copies of Form 1s and 2s for dissemination to site management.
TM • All team members will remain near the close-out meeting and be prepared to answer
questions regarding their findings should the TL need their support.
POST ORR: Final Report
TL • The Senior Advisers, if applicable, must review and concur with the final report
before it is issued.
• Consistent with the number of findings, the final report should be issued within two
weeks of the end of the inspection. The TL is the issuer of the ORR report.
TL • The Final Report should be sent to the restart authority with copies to the
applicable program office, operations and/or area office, EH, and the DNFSB if
applicable.
DOE-HDBK-3012-96
15
• Each TM should sign the final report indication his/her concurrence with the
conclusions of the ORR in his/her area of responsibility or review.
• If a TM has a dissenting opinion, refer to DOE-STD-3006-95, Planning and
Conduct of Operational Readiness Reviews, for guidance.
• Detailed guidance for the preparation of the final report is contained in sections 5.5
and 5.9.3 of the ORR Standard.
• Ensure that all ORR files that may be needed in the future are maintained in one
location as determined by the DOE line management for the site.
Section 12
• The completion of the ORR, and the finalizing of the report do not signify the end of
the ORR process. Several actions may require the participation of the TL including
briefings, interpretations and possible defense of findings, review of action plans,
and review of finding closure plans. Additional guidance can be found in section 5.7
of the ORR Standard.
Finding Closure and Team Follow-up:
TM • Team members may be called upon to assist the TL in several ways including
briefings, finding interpretation, review of action plans, or review of finding closure.
The TL will notify team members when such assistance will be needed. Section 5.7
of the ORR Standard provides additional discussion concerning post-ORR activities.
RC • Draft thank-you letters to site for TLs signature.
• Collect, condense, index, and file pertinent ORR information to include:
a. all correspondence related to the ORR;
b. all final Form 1s and Form 2s signed by the inspector and TL;
c. the Evolution and Interview List and schedule;
d. the approved Plan of Action;
e. the approved Implementation Plan; and
f. the approved Final Report with all signatures from the team members and TL;
g. facility basis documentation.
DOE-HDBK-3012-96
16
LESSONS LEARNED FROM PREVIOUS ORR/RAs
The following items were learned from conducting previous ORRs and Readiness Assessments
(RAs) from which both line managers and reviewers could benefit.
ACHIEVING READINESS:
The successful completion of any ORR will be strongly influenced by the degree to which readiness
to start program work has been achieved prior to the start of the ORR. While it is the responsibility
of line management to achieve a condition of readiness, experience indicates that the ORR Team
Leader (TL) can influence the success of the process to gain readiness during his/her preparations
for the ORR. In many cases, the potential for the particular problem to occur will become evident
during previsits or other ORR preparations. The following lessons learned reflect areas in which
the ORR TL and Team Members (TM) may improve the success of the ORR.
Experience shows that prerequisites should provide significant detail and be fully
measurable in order to permit line management to track each prerequisite to completion.
The ORR/RA standard stresses the fact that the prerequisites should be tied to the core
requirements, which are what will be evaluated in the readiness determination. So, ensure
that the ORR Prerequisites specified in the Plan of Action support achieving readiness.
A thorough Management Self-Assessment to assist line management in verifying that
readiness has been achieved is an important final step in preparing for the ORR. The ORR
Implementation Plan should reflect an intention to review the results of the management
self-assessment.
Inadequate, incomplete, or undefined incorporation of the safety basis documentation into
procedures and policies has frequently resulted in delays in starting an ORR or in significant
findings during the ORR. This is frequently caused by late development and approval of the
safety basis documentation. Line management may not fully grasp the time and effort
necessary to develop and implement all of the "flow down" procedures and surveillances
necessary to put the requirements of the approved safety documentation into practice.
Ensure full implementation of the safety basis.
Section 13
Inadequate or incomplete evidence files or other verifiable documentation which
demonstrates that the prerequisite conditions have been met may result in an inability to
verify readiness has been achieved. The implementation plan should clearly indicate the
intentions to review these evidence files.
A responsible representative of the line management team must be prepared to demonstrate
to the ORR TM that the conditions required to be met prerequisite to resumption, have
actually been met. In most cases, this individual will be the counterpart who is assigned to
work with the individual ORR TM. The counterparts should be identified and utilized
during the previsit.
DOE-HDBK-3012-96
17
Lack of understanding by assigned counterparts of their responsibility to support the ORR
TM. The counterpart must present the information and documentation requested. The
counterpart must accept responsibility for gaining information and resolving questions. The
counterparts should be fully dedicated to a single ORR TM for the duration of the ORR
field work. This expectation should be clearly defined during the previsit.
Lack of experience on the part of line management as to the expectations of the ORR team
in the areas of drills and evolutions expected to occur during the ORR will lead to difficulty
in completing established objectives. The TL and TM must devote considerable attention to
communicating expectations to responsible line management at the facility level.
Inadequate validation and verification of operational or maintenance/surveillance
procedures which are newly prepared or recently modified will result in readiness not being
achieved when the ORR starts. The adequacy and maturity of these procedures should be
evaluated during the previsit. If problems are apparent, they should be identified to senior
management at the end of the previsit.
Lack of formal, structured preparation by DOE line management of the personnel,
programs, and documentation to be evaluated during the ORR will delay completion of
required activities. DOE line management should be encouraged to conduct a Management
Self-Assessment to ensure that prerequisite conditions for which they are responsible have
been met. Potential problems in this area should be apparent during the pre-visit and if
noted, pointed out to senior DOE management at that time.
Note: It will usually be apparent to the observant team leader during the previsits and other ORR
preparations when the problems with achieving readiness will become a problem during the ORR.
Although the ORR TL will not be able to deal with the problems directly, his identification of the
problems to the appropriate DOE or contractor line manager should be considered.
ITEMS TO NOTE BEFORE PROCEEDING WITH A DOE ORR:
Thoroughly review the ORR Plan of Action (POA) which, among other things, defines the
scope of the ORR and lists the prerequisites for the ORR. The success of the ORR will be
enhanced if the POA provides specific detail as to the scope of each core requirement, and
defines the prerequisites in sufficient detail. Prerequisites should be specific and define
measurable conditions. If the ORR TL is identified prior to final approval of the POA, he
should be included in the POA review and approval process and should ensure that the POA
contains adequate detail to support a successful ORR. The POA should be approved as
early as possible in the startup/restart process.
Section 14
Gain familiarity with the facility and the project programs prior to the start of the ORR.
Site access training, facility walkthroughs, and document reviews are essential for team
DOE-HDBK-3012-96
18
members to gain the necessary familiarity with the project prior to the kickoff of the ORR.
Unescorted and unrestricted access to the facility is essential to effectively complete the
review. This will require some investment of time and money in the preparation process.
Get agreement, during development of the ORR plans, between the facility contractor and
the Department of Energy on the details of the operations that are available for
demonstration. Coldruns, partial simulations, and full walkthroughs are options, but an
effort must be made to achieve a demonstration as close as possible to actual operations as
allowed by the current restrictions of the shutdown.
Obtain and review the documented results of the contractor ORR/RA, including corrective
action plans and evidence files documenting corrective action taken. Copies of corrective
action documentation need to be readily available to the DOE ORR/RA team. Corrective
action closure packages should be prepared in accordance with DOE-STD-3006-95,
Section 5.7.3.
Give consideration to requiring the contractor to deliver a completed set of surveillance
procedures and authorization basis documents to the team leader as a prerequisite to the
ORR/RA.
Ensure that records, plans, and other documentation requested by the ORR/RA team are
readily available, preferably in a central location. A review, several days in advance of the
ORR/RA should be used to verify that what was requested is really there. In addition, this
will reinforce the importance of the information requests by the individual team members.
ADMINISTRATION OF THE RESULTS:
Conduct a training session prior to the ORR/RA or no later than the beginning of the review
process to communicate the expectations and deliverables required of the team. Format,
content, and style (how to use and fill out) of Forms 1 (Assessment Forms), of Forms 2
(Deficiency Forms), and functional area summaries should be discussed to eliminate a
compounding of the administrative load as the review progresses. Acceptable samples of
these deliverables should be provided to all the team members prior to the start of the
review. This guide provides explicit instructions on the use of the forms, and the team
leader can use this to provide training to the team. The technical editor or the RC should be
equally aware of the requirements and could conduct the training.
Provide draft Form 2s to site personnel as soon as an issue starts to be identified. Be sure
that it is understood that the forms are draft documents (and should be marked as such) to
avoid legal or public record exposure issues. Providing these forms to the site provides
them an opportunity to produce further information that may clarify the issue and creates an
air of openness that will contribute favorably to the review.
DOE-HDBK-3012-96
19
CONDUCT OF DRILLS AND OTHER OPERATIONS
Specify requirements for Emergency Preparedness or facility drills prior to the start of the
ORR/RA. Detailed guidance on drill expectations, e.g. type of drill, desired preconditions,
scenario requirements, etc., should be provided to the facility prior to the ORR/RA.
Ensure that site personnel understand fully the conditions which are desired to be simulated
during each drill and performance demonstration. All documentation such as Radiological
Work Permits, Work Procedures, etc., must reflect the simulated condition.
Section 15
Define, during the preparation phase, the role, authority and responsibilities of the ORR
Team when it is monitoring the conduct of an emergency exercise or drill. The ORR Team
must not disrupt the flow of the exercise. The ORR team is evaluating both the facility and
the emergency preparedness training organization and drill control. These roles, authority
and responsibilities require definition and must be fully understood by the facility managers.
Evaluate whether the contractor ORR/RA ensures the integration of equipment operability,
procedure viability, and training of the operators in a performance-based methodology.
Additionally, a detailed plan for the progression from completion of the ORR/RA to startup
should be verified if a significant difference exists between the operations that can be
demonstrated and normal operations.
LOGISTICS AND SUPPORT
Communicate logistical needs and requirements to the site well in advance of the review.
For example,
- Specify what documents need to be available to the team and that these documents
need to be in a central location for easy access by the team during the review.
- Specify that computers need to be up-to-date models. Printers and copying
machines, with adequate supplies of paper, toner, etc. need to be dedicated to the
team for the duration of the review.
- Request administrative support personnel (typist with WordPerfect, or selected
software, experience if at all possible), as they are especially helpful when preparing
the final pieces of documentation for the final report.
- In cases where the review involves classified facilities/operations, schedule
derivative classifiers to come to the work area and review the draft documentation
at the end of the day during the last week of the review.
- Request sufficient office space and computers to support, at a minimum, each
functional area sub-group. Working in one large room is difficult since many
discussions take place among site, review team, and field office groups.
DOE-HDBK-3012-96
20
-. Investigate whether laptops can be brought on-site. This is usually not an option
when the review involves classified material. Some form of property accountability
pass may be required by the site.
Establish clear formal and informal communications between the facility and the review
team as early as possible. Define the "rules of the road." This will improve the
effectiveness and efficiency of the ORR/RA. Explain the open, "filters off" nature of the
daily team meetings, and that other briefings can be held with management. While
important, the number and the length of these meetings should be minimized to allow the
members of the review team to do their job.
TEAM ISSUES
Emphasize that team members are dedicated for the duration of the review. If a team
member completes their review before the end of the ORR/RA, and is authorized to leave,
their complete Forms 1 and 2 must be signed-off (approved) by the TL before they leave
the site. If a summary is due from the team member, the summary must be accepted by the
TL prior to the team member leaving the site.
Emphasize to team members the need to familiarize themselves with the Implementation
Plan and the facility/process under review before the ORR/RA. This should be
accomplished through the team members' qualification process, which should establish the
minimum requirements for facility familiarity, prior to the review. Additionally, the TL is
responsible in the team selection to ensure that the team members have the required
technical expertise (education/experience) to perform a valid review of the functional area
assigned. This should also be documented through the selection and acceptance process.
Section 16
Ensure that team members fully understand the scope of the ORR/RA and the time frame in
which it must occur. In some cases, time management decisions and sampling plans will be
important to successful completion of the ORR/RA within the required schedule.
Ensure counterparts have been assigned to each team member or functional area group.
Early identification (usually during the pre-visit) of documents needed, interviews expected,
evolutions and drills requested is helpful to both the team member and the counterpart.
Counterparts need to understand they should be prepared to present the information
required. Team members need to be respectful of their counterpart time constraints and
schedule as few after-hours meetings or interviews as possible.
Capture issues and observations in writing as soon as possible. Forms 2 should be prepared
shortly after an issue is identified. Forms 1 should be prepared shortly thereafter to capture
the full extent of the finding. This will enhance the flow of communication throughout the
review and contribute to openness on the part of both the team and the facility.
DOE-HDBK-3012-96
21
DEVELOPING THE IMPLEMENTATION PLAN
Ensure the objectives and criteria clearly encompass all aspects of the Core Objectives
required in the approved Plan of Action (POA). Generally, this will be all core objectives in
an ORR and some subset of the total for an RA. The ORR standard breaks the twenty
Core Requirements into 36 objectives which translate easily into functional areas.
Experience has shown this methodology to be successful. Additionally, the "geographic"
scope of the ORR/RA must be considered. The POA should specify the bounds of the
facility, systems, and personnel involved in the activity under review and the approaches for
the objectives and criteria should reflect these boundaries.
Confirm that the criteria review and approach documents (CRADs) are written with a
clear understanding of the facility systems and processes under review. A generic CRAD
should be tailored during the pre-visit to successfully complete a through and critical review.
Without this understanding and modification of the CRADs, the review effort will suffer.
Fully involve the team early in the process for training and implementation plan
development. Early dialogue with the facility to gain understanding of the activity in
progress and the contractor activities in progress is particularly useful. The implementation
plan used by the contractor and DOE should parallel in numerous
respects.
Give the POA and the Implementation Plan to oversight groups (EH, DNFSB, State
Agencies as required) as soon as possible. Early review and input from all stakeholders will
reduce last minute perturbations.
Determine the "mode" of the facility in reference to Standards Requirements Information
Documents (S/RIDs), Necessary and Sufficient, Rule-making, the DOE Order system and
other initiatives related to order compliance. Conduct the review appropriately with respect
to the mechanism selected by the facility. DOE O 425.1 requires a statement of order
compliance with respect to DOE Orders or S/RIDs. Statements to this effect should be
included in the final report in addition to the overall evaluation of the compliance posture
required.
DEFINING THE SCOPE AND GRADED APPROACH
Define the scope of the DOE ORR consistent with that of the contractor ORR.
Differences between the two result in difficulties in performing the DOE ORR. DOE O
Section 17
425.1 provides a structure for such consistency. Differences will occur in the evaluation of the
core requirements specifically related to DOE management, which are necessarily absent from the
contractor review.
DOE-HDBK-3012-96
22
Go beyond the defined scope in a case where an ongoing program that supports the
process or facility under review but which is outside the scope of the review, presents
potential problems. If the team is to make a judgement as to the ability for operations to be
conducted safely and it requires investigation at the interface of the process/facility with the
supporting program, then going beyond the defined scope is proper.
Define the graded approach as it applies to each CRAD as specifically as possible.
POST ORR CORRECTIVE ACTIONS
Although the ORR/RA follow-up corrective actions are not the responsibility of the TL, line
management may ask for input and advice as to the necessary action(s) to correct the issues
identified during the ORR/RA. Experience has shown that the value and effectiveness of the
ORR/RA can be significantly decreased by ineffective corrective actions to resolve the issues
identified during the ORR/RAs. The TL, through interest in the effectiveness of the overall
ORR/RA process, retains an interest in the post ORR/RA corrective actions. In general, the
following items need attention:
Facility management sometimes starts taking immediate action to correct the symptoms
identified by the ORR/RA team without adequate attention to understanding the root cause
and programmatic basis of the issue. As a result, the corrective action may be incomplete,
shallow, and short lived.
DOE line management review of the status of the contractor ORR/RA corrective actions
should require corrective action closure packages for the contractor ORR/RA which meet
the requirements of DOE-STD-3006-95, section 5.7.3. In that way, the contractor may
more effectively evaluate their own corrective actions before reporting readiness to
proceed to DOE.
When DOE line management forwards the DOE ORR/RA to the responsible contractor,
the actions expected as to the contractor's corrective action should be clearly stated.
Unclear or unstated expectations result in false starts and failure of the responsible
contractor to meet DOE's expectations. This in turn has resulted in delays and incomplete
actions following several ORR/RAs.
In those cases where issues have been identified as the responsibility of a DOE field
organization, DOE-HQ should formally communicate corrective action expectations to the
responsible field organization. The expectations should include corrective action plans and
closure packages.
DOE-HDBK-3012-96
23
MISCELLANEOUS LESSONS
Engage a technical editor, if at all possible, during the second week of the review. The
final report left at the close-out briefing, although a draft, is the site or facility's first
encounter with the full results of the review and as such warrants a technical editing. This
person should stay until all Forms 1, Forms 2, and summaries have been approved, the
executive summary edited, and the final report formatted, collated, and printed. The
introductory material (cover sheet, background, scope, etc.) can be written before the
review is started, thus reducing the workload during the review and allowing the team to
concentrate on issues at hand.
Do not assign any CRADs to the TL, however technically qualified.
Section 18
Identify an assistant TL. Having an assistant TL can greatly improve efficiency in the
conduct of the ORR/RA. An assistant TL is particularly beneficial during the labor
intensive ORR preparation phase.
Select an RC with previous experience in the ORR/RA process, as this function is essential
in the assimilation of the data provided by the team members. Without accuracy and
timeliness in this function, conclusions are subject to question.
Select the TL carefully. The TL should be senior to the team members. He or she should
not be a peer or a co-worker of the team members. Selection of the appropriate TL is
important in that the TL must exercise some degree of control over the team.
Evaluate OJT, drills, and other training evaluation against the established guidance in DOE
Orders, standards, guides, and handbooks. This helps eliminate the subjective aspects of
the review. Additionally, this intention should be communicated to the contractor for the
conduct of the contractor ORR/RA.
GENERIC LESSONS LEARN WHICH APPLY TO THE DESIGN, CONSTRUCTION,
OPERATION, AND DECOMMISSIONING OF DOE FACILITIES
During startup of new facilities, numerous cases have been observed in which the
surveillance requirement supporting the safety basis could not be completed, or if
completed did not properly verify the safety basis requirement. Surveillance procedures
should be completed, validated, and executed as part of the startup program, prior to the
implementation of the supported Technical Safety Requirements (TSRs). Actually
executing the surveillance will reveal such problems as: test points which are not installed;
test points which are inaccessible; and other interfering interlocks or functions. These
problems have occurred repeatedly in previous ORR/RAs.
Additionally, determination must be made that the surveillance actually tests the function or
DOE-HDBK-3012-96
24
protective action upon which the safety basis depends. Previous ORR/RAs have revealed
numerous occasions in which surveillances have been conducted and through either invalid
acceptance criteria or a misunderstanding of the as-built configuration, the surveillance did
not test the required functions.
DOE-HDBK-3012-96
25
APPENDICES
STANDARD FORMS AND LETTERS
Appendix 1: Key Points to Discuss during Initial Contact with Site
Appendix 2: Site Contact Memorandum
Appendix 3: Logistics
Appendix 4: ORR Preliminary Schedule
Appendix 5: Previsit Schedule
Appendix 6: Checklist for ORR Team Information Packages
Appendix 7: Detailed Schedule for ORR Team
Appendix 8: Transmittal letter for data packages to team members
Appendix 9: Team Member Deliverables
Appendix 10: Instructions and Samples for Completing ORR Forms
Appendix 11: Prestart and Post-start Determination Criteria
DOE-HDBK-3012-96
26
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 1-1
APPENDIX 1
KEY POINTS TO DISCUSS DURING INITIAL CONTACT WITH SITE
Refer to the Plan of Action, and:
1. Contact DOE Headquarters' Line Management Director of Facility.
Facility
Director's Name
Telephone Number
2. Identify yourself as the Team Leader for the ORR.
3. Discuss the tentative review schedule.
Previsit dates: to
ORR dates: to
4. Explain overview of review process (if requested).
Previsit and Preparation
- Site Visit: 2-3 day for site and facility familiarization, walkthrough, and presentation to
site of inspection process.
- Information needed from site: (list to be provided)
Section 19
- Counterparts: Site expected to provide list of counterpart(s) for each area.
Onsite Review Period
- Purpose: Identify findings and observations for the safe startup of facility process(es).
- General: Up to 30 team members, approximately a two week period, though with a
graded approach, as few as 10-15 team members may be needed for one week.
- Logistic Support: Conference room, work space, computers, phones, fax, etc. (list to be
provided).
5. Request point-of-contact at site to support review and to receive formal correspondence.
Name: _______________________________________________
Telephone number:____________________________________
6. Leave your telephone number and advise site contact that written confirmation will follow.
DOE-HDBK-3012-96
APPENDIX 1-2
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 2-1
APPENDIX 2
SITE CONTACT MEMORANDUM
Refer to the Plan of Action.
Operations Office or Area Office Manager
Operational Readiness Review of [Facility] .
An Operational Readiness Review (ORR) of [Facility] will be performed. [Site point-of-
contact] has been identified as the lead Department of Energy contact at the site. [Team Leader]
will lead the review team.
Enclosed are a preliminary schedule for the overall review and a detailed schedule for the onsite
portion, an agenda for the pre-review visit, a list of support required for the onsite portion of the
review, a list of site documents required to prepare the team for the review, and an ORR summary
document. Please forward one copy of each requested document to [Team Leader] by [Date] .
Please contact [Team Leader] (phone #) if you wish to discuss these items or any other aspect of
the review.
Your assistance is greatly appreciated.
Team Leader
Attachments
cc w/Attachments:
Manager, Area Office
Program Office Director
Facility Manager
_______________________________________
*Attachments
ORR Logistics (Appendix 3)
ORR Review Schedule (Appendix 4)
ORR Previsit Schedule (Appendix 5)
DOE-HDBK-3012-96
APPENDIX 2-2
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 3-1
APPENDIX 3
OPERATIONAL READINESS REVIEW LOGISTICS
The following list suggests items the TL should consider. It should be personalized by the TL for
each ORR. These items should be discussed and agreed upon during the previsit.
1. The team will require work space for approximately [#] people to review documents,
conduct interviews, prepare reports, and conduct meetings.
2. Work spaces should be equipped with several IBM compatible PCs and laser printers. A
current version of WordPerfect (or other preferred software) should be installed on each
system. One copy of a familiar graphics program should be available on one of the team
support staff's computers.
3. Work spaces should have phones with contractor and DOE phone books.
4. The team will require ready access to photocopy machines.
5. The team will require ready access to a facsimile machine.
6. A list of support personnel or a single contact to repair equipment, receive phone messages,
and aid in logistical problems should be available at the start of the review.
7. Adequate visitor parking should be available for team members.
8. The team may require ready access to a classifier and a classified document repository.
Section 20
9. The team will require ready access to the following documents in a convenient, centralized
location at the site: (Note: the following are examples of documents that the TL can request to
have available during the ORR). The TL may require the team members to review these
documents to accomplish qualification for site familiarity, thus they may be required during the
previsit. The TL should communicate these desires to the site as soon as possible.
- DOE Orders and mandatory standards (DOE 5480.4).
- General facility schematics.
- List of Facility Representatives and Facility Managers (per DOE 5000.3).
- Hierarchy of documents: Top-level policy and site wide procedures down to operating
instructions.
- Current listing of titles, numbers, and revisions of manuals/procedures.
- Implementation plans submitted to Headquarters for DOE Orders. These would include all of
the Orders specified in DOE 5480, DOE 5500-series Orders, DOE 4330.4, and DOE 5700.6.
- Any exemption, exception, deviations, variances, or waivers requested for ES&H Orders.
- DOE and Contractor ES&H oversight plans/programs, and self-assessment program manuals.
- All DOE Field/Area Office and Contractor self-assessment reports for the past 12 months.
* Contractor and DOE organization charts with management/supervisor names.
DOE-HDBK-3012-96
APPENDIX 3-2
* Functional description for environmental, safety, and health (ES&H) organizations (NQA-1).
* General site map.
- Contractor ORR and/or Management Self Assessment reports.
- The Tiger Team/TSA Action Plan(s) and the most recent Status Report for the Tiger Team
Assessment.
- A list of functional review reports issued within the last 12 months by DOE- [ Field Office]
regarding [Site] (DOE 5482.1).
- All DNFSB, EH, NS, IG, EPA, OSHA reports issued within the last 12 months.
- The most recent contractor triennial management review (required per DOE 5480.5) of the
internal safety review system.
- Site Development Plan (ref. 4300.1).
- Annual Site Environmental Reports; the most recent, even if in draft form, and the preceding
year (ref. 5400.1 Ch. II).
- Environmental Monitoring Plan and it's associated Meteorological Information/Monitoring
Program (ref. 5400.1 Ch. IV).
- Spill Prevention, Control and Countermeasures Contingency Plans (if applicable).
- Inventory of hazardous chemicals (those above Threshold Planning Quantities per SARA Title
III) by room, area, or building, as appropriate to planning walkthroughs. (Remove portions
that are classified).
- SARA Title III Tier One and Two reports.
- Most recent site-wide EIS and/or EA.
- National Emission Standards for Hazardous Air Pollutants (NESHAP) report (if applicable).
- All Type A accident investigations reports for the last two years.
- OSHA 200 log from past two years.
- Site Radiation Control Manual and associated implementation plan.
- DOE and Contractor Quality Assurance Program Manual.
- List of Quality Assurance plans and implementation procedures.
- DOE and Contractor Conduct of Operations Manual.
- List of Conduct of Operations plans and implementation procedures.
- Operator training program documentation.
- List of ES&H policies and procedures of the Field Office and Contractor.
- Contractor's ES&H Manual.
* List of applicable Technical Safety Requirements.
* Applicable Safety Analysis Report(s).
- Site-specific Explosives Safety Manual (if applicable).
- Explosives Safety Policy Statements (if applicable).
- Explosives Handling, Storage, and Disposal facility Design Bases/SARs (if applicable).
- Site Fire Protection Manual.
- Site Pre-fire Plans.
- All Fire Department Procedures.
- Fire Protection staff organization charts and job descriptions.
- Staffing plans and any analyses relating to staffing for the past 12 months.
- Applicable DOE Order Compliance Documents and Compliance Schedule Agreements.
- Site Emergency Plans
Section 21
DOE-HDBK-3012-96
APPENDIX 4-1
APPENDIX 4
OPERATIONAL READINESS REVIEW
PRELIMINARY SCHEDULE
Activity Date(s) Previsit
Onsite Review
Close-out Meeting
Report Preparation
Issue Report
HQ Briefing
Note: The above dates are tentative. The team intends to conclude identified activities within the
allotted windows on the schedule, but adjustments may be made to accommodate particular issues that
may require more or less attention.
DOE-HDBK-3012-96
APPENDIX 4-2
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 5-1
APPENDIX 5
PREVISIT SCHEDULE
NAME OF FACILITY
Activity Date Participants
Site Access Month, Day, Year Full ORR Team
Previsit Start Month, Day, Year Full ORR Team
Orientation Site Management
Meeting Full ORR Team(1)
Month, Day, Year* (a.m.)
ORR TL Presentation Site Management(2) Month, Day, Year* (a.m.)
Full ORR Team
Counterpart Meeting Site Counterparts(3) Month, Day, Year* (p.m.)
Full ORR Team
Site/Facility Training and Full ORR Team
Processing(4)
Month, Day, Year* (p.m.)
Facility/Process Walkthrough Full ORR TeamMonth, Day, Year*
Previsit End Month, Day, Year Full ORR Team
*Site to specify times and locations.
Orientation Meeting - The goal is to receive from the site an overview of the site activities in progress and(1)
any special operating guidance required for the ORR team members. Include in the presentation, all safety
and security briefs to ensure ready access, overviews of the organizational structure, document hierarchy,
assessment activities, occurrence reporting and tracking, training organization, lessons learned programs,
and any other desired elements (approximate Time: 2 hours).
TL ORR Presentation - The TL will make a short presentation on the ORR scope and process to the site(2)
(approximate Time: 30 minutes).
Counterpart Meeting - Each ORR team member or functional area is assigned a site counterpart. This(3)
meeting provides an introduction of the site counterparts to the Team (approximate Time: 1-2 hours).
Site/Facility Training and Processing - The goal is to receive from the site the training and processing(4)
(e.g., respirator training and fitting) so as to permit all team members ready access to the site/facility during
the ORR.
DOE-HDBK-3012-96
APPENDIX 5-2
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 6-1
APPENDIX 6
CHECKLIST FOR ORR TEAM INFORMATION PACKAGES
DESCRIPTION APPENDIX No.
Transmittal letter. Appendix 8
Maps from airport to hotel/site. Provided by site.
Schedules for ORR team. Appendices 4, 5, and 7
DOE ORR Plan of Action. Provided by TL
DOE ORR Implementation Plan. Provided by TL
Site organization charts. Provided by site.
Team member assignment and counterpart matrix. Provided by RC
ORR Order (425.1) and Standard Provided by RC
(DOE-STD-3006-95)
Contractor ORR Report. Provided by TL
Site DOE Validation Report Provided by TL
Other Required Reading Documents Provided by TL
Team Member Deliverables List Appendix 9
Blank Form 1s and 2s on diskette (note: the objective and criteria Provided by RC
should be filled in on the forms)
DOE-HDBK-3012-96
APPENDIX 6-2
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 7-1
APPENDIX 7
DETAILED SCHEDULE FOR ORR TEAM
[Month, Day, Year] Travel to .
Optional: You may pick up your badge at .
[Month, Day, Year] Team meeting at the site (Room , a.m./p.m.)
[Month, Day, Year] Start ORR.
[Month, Day, Year] Tentative date for Close-out meeting.
Section 22
[Month, Day, Year] Travel from .
DOE-HDBK-3012-96
APPENDIX 7-2
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 8-1
APPENDIX 8
TRANSMITTAL LETTER FOR DATA PACKAGES TO TEAM MEMBERS
DATE:
NOTE TO: [Name of Site/Facility] Operational Readiness Review Team Members
FROM: NAME , DOE ORR Review Coordinator
SUBJECT: Operational Readiness Review at [site] .
Attached is the detailed schedule for the Operational Readiness Review (ORR) at [site] .
Your badge will be ready for pick up at the Badge Office which is located . You will need
access authorization for Sigmas . The badge office is open from a.m. to p.m.
The site is providing a team room located in for our use throughout the entire review period.
Attached are the functional area assignments; the review methodology for ORR team members; a [site]
organization chart; team member duties and responsibilities; required reading assignments, list of
deliverables, and the assigned Criteria and Review Approach Documents (CRADs).
If you have any questions or if I can be of further assistance, please call me (301-903- ).
DOE-HDBK-3012-96
APPENDIX 8-2
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 9-1
APPENDIX 9
TEAM MEMBER DELIVERABLES
- Qualification Summary: due before or during the previsit.
- Security clearance data: due as required by the Review Coordinator.
- Comments on Criteria and Review Approach Documents: due before or during the previsit.
- Evolution and Interview list: input due to TL prior to the end of the previsit.
- Form 1 for each CRAD Objective assigned: due for signature before the final team meeting of the ORR.
May consider daily draft. TL may require a current draft for review at any time.
- Form 2 for each deficiency identified: due in draft form by 0800 the morning after the deficiency is
identified and due in final form before the final team meeting of the ORR.
- Final Report Summary: due in draft form before the final team meeting of the ORR and signed-off by
the TL before leaving the site.
- Final Report, including Form 1s, 2s, and functional area Summaries, reviewed, signed by the team
member and TL by the end of the ORR. Any dissenting opinions must be prepared and submitted by the
end of the ORR.
- Lessons Learned for inclusion in the report and in later versions of this handbook.
DOE-HDBK-3012-96
APPENDIX 9-2
INTENTIONALLY BLANK
DOE-HDBK-3012-96
APPENDIX 10-1
APPENDIX 10
INSTRUCTIONS FOR COMPLETING ORR FORMS
ORR ASSESSMENT FORM 1
OBJECTIVE: CRITERIA: CRITERION MET
DATE: 6/ 4/96
YES NO
OBJECTIVE: (2 spaces) Copy the Objective from the Implementation Plan.
Criterion: (2 spaces) Copy the criterion as written in the Implementation Plan.
Records Reviewed:
o(F4) Cite a specific document (number, title, rev.)
o(F4) Cite next document, etc.
Interviews Conducted:
o(F4) Use title, do not use name (use site identifer, as site will respond)
Shift Performance Evolution:
o(F4) Provide description of activity observed. Use N/A if not applicable
Discussion of Results:
Record Review: (2 spaces) Discuss the record review or write None, if not applicable.
Interviews: (2 spaces) Discuss the interviews or None if not conducted.
Shift Performance: (2 spaces) Discuss the shift performance observed or write None, if not applicable.
Section 23
Conclusion:(2 spaces) Tie together discussion of key points resulting in your conclusion. State whether the
criterion was met.
Issue(s):
o(F4) Write a brief, full sentence description of each issue. This should be an exact match of the title on
the Form 2. Cite all Form 2s associated with this criteria. If no Form 2s were generated under this criteria,
write NONE.
DOE-HDBK-3012-96
APPENDIX 10-2
APPENDIX 10
SAMPLE ORR ASSESSMENT FORM 1
FUNCTIONAL OBJECTIVE EP.2, Rev. 2 CRITERIA MET
AREA: EP DATE: June 4, 1996
PAGE NO. 2 YES NO X
OBJECTIVE: A baseline compliance status review of DOE Orders 5500.1B, 5500.2B, 5500.3A has been
performed. Noncompliance items have been addressed.
Criteria
All noncompliance issues are adequately addressed by DOE approved compliance schedule approvals
(CSA) or exemptions. The CSAs include an adequate technical basis and schedule for attaining compliance.
(DP-AP-202)
Compensatory measures that are specified in the CSAs are adequately implemented. (DP-AP-202)
Approach
Record Review: Review order compliance packages for the listed orders, including all applicable CSAs and
exemptions.
Interviews: For orders that are not fully implemented, interview management personnel to ensure they are
aware of this noncompliance and action necessary to fully implement the order requirements.
Shift Performance: Where appropriate, observe the implementation of any specified compensatory
measures within the facility to determine their effectiveness.
Records Reviewed:
• 5500.1B-STCS-93-016
• 5500.1B-CSA-94-123, Rev.1
• 5500.2B-CSA-93-072
• 5500.3A-CSA-93-005
• 5500.3A-CSA-93-006
• 5500.3A-CSA-93-024
• 5500.3A-CSA-93-001, Rev. 2
• 5500.7B-STCS-93-010
• 5500.7B-STCS-93-015
• 5500.3A-CSA-93-007A
• 5500.3A-CSA-94-127
DOE-HDBK-3012-96
APPENDIX 10-3
Interviews Conducted:
• Emergency Services Manager NMPD/Reactors
• Manager of Emergency Services Technical
• Administrative Assistant to Operations Management
• Lead Emergency Preparedness Coordinator
• DOE Area Representative EP
• Emergency Management Preparedness Coordinator
• Emergency Management Preparedness Coordinator
• Shift Advisor on loan to Emergency Planning
• Administrative Assistant to Operations Management
Shift Performance Evolution: Facility DOE-HQ-ORE Drill
Discussion of Results:
Records Reviewed: The Emergency Preparedness Program for the Facility (the original used the name of
the facility) was reviewed to ensure that the emergency plan and implementing procedures and instructions
for the Facility, and applicable portions of the site plan, complied with or have Compliance Schedules
Approvals (CSAs) for DOE 5500 Series Orders. The following DOE 5500 Series Order Compliance
Packet CSAs were reviewed:
XXX-DOE-5500.3A-CSA-93-007A; Personnel accountability was demonstrated for the facility personnel
during the Emergency Preparedness Drill X-F Facility DOE-HQ-ORE Evaluated Drill [ . . . "must be
preformed in 30 minutes not to exceed 45 minutes" . . . 5500.3A.11.c.(6)(c)]. The Facility has implemented
personnel accountability in procedure "Personnel Accountability" [EPIP-XXXX-203 Rev. 2] using a newly
established manual badge system.
Section 24
Another issue of this CSA, is personnel accountability for Outside Facilities, XXX-F, XXX-F, and the area
which uses a supervisor accountability system . The supervisory accountability system is not consistently
proceduralized for the facility. In addition, neither the manual badge system nor the supervisor
accountability system have been found reliable for personnel working on the roof. A facility compensatory
measure is visitors and personnel are required to respond to direction from the AEC. Also, personnel
working on the roof are required to notify the Control Room when entering and exiting. A facility
procedure addressing the above points will ensure a consistent approach to Area accountability.
Offsite Response Interfaces: Offsite Response Interface is the responsibility of the Site Emergency
Preparedness Organization, it is not an issue for Emergency Preparedness Organization. XXX-DOE-
5500.2B-CSA-93-072 for Consolidated Emergency Response Facility is a site not and a facility issue.
DOE-HDBK-3012-96
APPENDIX 10-4
Notification: XXX Area and the Site ERO has adequate communication networks.
Medical Support: The area has adequate medical support.
Recovery and Reentry: Adequate procedures exist for Reentry [Emergency Exposure Guidelines, EPIP-
XXXX-202 Rev. 2; Personnel Accountability, EPIP-XXXX-203 Rev. 2; Emergency Response Team
Dispatch, EPIP-XXXX-201, Rev. 2] and Recovery [Recovery, EPIP-XXXX-206 Rev.2] Operations at the
facility.
Public Information: Public Information is the responsibility of the Site Emergency Preparedness
Organization, it is not an issue for this facility's ERO.
Training: XXX is not in full compliance with systematic and performance based training requirement
[5500.3A.11.c(11)(b)(1)]. CSA, XXX-DOE-5500.3A-CSA-94-127, schedules compliance with this
requirement 9/30/95.
Interviews: All interview comments are included in the Records Review section.
Shift Performance: XXX Facility DOE-HQ-ORE Drills (see TR.3 for comments).
Conclusion: All XXXX non-compliance issues have Compliance Schedule Approval agreements. Facility
CSAs for hazards assessment, Emergency Action Levels (EALs), and EPZ have expired and are addressed
in a finding. The compensatory measures for the CSAs provide an adequate level of protection for the
health and safety of workers and the public due to their conservative nature.
The criteria for this objective have not been met.
Issue(s):
• Compliance Schedules Approvals (XXX-DOE-5500.3A-CAS-93-005, 006,024) committed to complete
a facility Interim Hazards Assessment leading to a compliant (EAL) procedure has not been completed
on schedule (EP.2-1). (Pre-start)
Inspector: __________________ Approved:_____________________
Team Member Team Leader
DOE-HDBK-3012-96
APPENDIX 10-5
INSTRUCTIONS FOR COMPLETING
ORR DEFICIENCY FORM 2
Objective: Criterion: Finding______ Prestart____ Issue No.:
Observ.______ Post-Start____ Date: 6/ 4/96
ISSUE: (2 spaces) Write a brief, full sentence, description of the issue. Reference the
corresponding Form 1. Use the present tense.
REQUIREMENT: (2 spaces) Write the requirement, from a rule, DOE order, mandatory
standard, or site requirements document. Reference locations are provided in the CRAD.
REFERENCE(S): (2 spaces) Be specific. Include section and paragraph, if possible, of all
references that support the conclusion that existing conditions are deficient. This must match the
requirement(s) stated above.
Section 25
DISCUSSION: (2 spaces) Describe the issue. The discussion should be self-explanatory and
support the conclusion. Use the present tense. Cite specific example(s) for a generic issue.
CONCLUSION: (2 spaces) State whether it is a pre-start or a post-start finding. The ORR
Implementation Plan should provide evaluation guidelines.
Inspector: Approved:
Team Leader
DOE-HDBK-3012-96
APPENDIX 10-6
ORR DEFICIENCY FORM 2 SAMPLE
Functional Objective Finding X Pre-Start X Issue No.: EP.2-1
Area: EP No.: 2 Observe. Post-Start Date: 8/24/94
ISSUE: XXX Area Compliance Schedules Approvals (XXX-DOE-5500.3A-CAS-93-005,
006,024) committed to complete a facility Interim Hazards Assessment leading to a compliant
Emergency Action Level (EAL) procedure has not been completed on schedule (August 22,
1994).
REQUIREMENT: EALs are require by DOE Order 5500.3A, 11.be)[2] and
5500.3A,11.c(3)[2] ". . ., the specific criteria used to recognize and categorize events, must be
developed for the spectrum of potential Operational Emergencies identified by the hazards
assessment."
REFERENCE(S): XXX-DOE-5500.3A-CAS-93-005; XXX-DOE-5500.3A-CAS-93-006;
XXX-DOE-5500.3A-CAS-93-024; XXX-940093 memorandum, X-Area USQ Resolution
Matrix.
DISCUSSION: Compliance Schedule Approval (CSA) agreements were approved for required
upgrades to the Emergency Preparedness Program. Due to a variety of circumstances, the EAL
procedure was not developed in conformance with the agreed to schedule. The CSA
compensatory actions remain in place while a new CSA is evaluated. Reportedly, XXXX
(CONTRACTOR) has proposed a new schedule for compliance with an end date of 10/31/94.
CONCLUSION: This order compliance issue should be evaluated and a new schedule accepted
by DOE. Pending resolution of this matter, the agreed upon compensatory measures should
continue. Resolution of this matter prior to restart is considered appropriate due to the
significance of the topic and the need for Headquarters agreement on the delay in achieving
compliance.
Inspector:____________________ Approved:_____________________
Team Member Team Leader
DOE-HDBK-3012-96
APPENDIX 11-1
APPENDIX 11
PRESTART AND POST-START DETERMINATION CRITERIA FOR OPERATIONAL
READINESS REVIEWS
The following checklist may be used by the TL and the ORR TMs to evaluate if an issue must be
corrected prior to startup.
A. Initial Screening
1. Does this issue involve a safety system?
2. Does this issue involve processes, functions or components identified in the Technical Safety
Requirements, Operational Safety Requirements or nuclear safety control procedures?
3. Does this issue involve potential adverse environmental impact exceeding regulatory or site
specific release limits?
4. Does this issue impact non-safety processes, functions or components which could adversely
impact safety related processes, functions or components?
5. Is this issue non-compliant with WSRC or DOE-SR approved startup documents?
6. Does this issue indicate a lack of adequate procedures or administrative systems?
7. Does this issue indicate operational or administrative non-compliance with procedures or
policy?
8. Has this issue occurred with a frequency that indicates past corrective actions have been
lacking or ineffective?
9. Does this issue require operator training not specified in existing facility training
requirements?
10. Does the issue involve a previously unknown risk to worker or public safety and health or
a previously unknown threat of environmental insult or release?
Section 26
If the response to any of the above is yes, further evaluation in accordance with the issue
impact criteria below is required.
B. Issue Impact
1. Does the loss of operability of the item prevent safe shutdown, or cause the loss of essential
monitoring?
DOE-HDBK-3012-96
APPENDIX 11-2
2. Does the loss of operability of the item require operator action in less than ten (10) minutes to
prevent or mitigate the consequences of events described in the Safety Analysis?
3. Does the loss of operability of the item cause operation outside the TSR/OSRs or Safety
Analysis?
4. Does the loss of operability of the item result in a reduction of the margin of safety as
described in the Safety Analysis?
5. Does the issue indicate a lack of control which can have a near term impact on the operability
or functionality of safety related systems?
6. Does the issue involve a violation or potential violation of worker safety or environmental
protection regulatory requirements which poses a significant danger to workers, the public, or
of environmental insult or release?
If the response to any of the above questions is yes, the item should be considered a startup
item.
DOE-HDBK-3012-96
CONCLUDING MATERIAL
Review Activity: Preparing Activity:
DOE-DP-45
DOE Field Offices
DP-21/23/25/31/33 AL
EH-11/30/63 CH Project Number:
EM-23 ID MISC-OO32
NE-44 NV
ER-8.1 OR
SR
RF
National Laboratories
INEL
Area Offices
Amarillo Area Office
Kirtland Area Office
FOREWORD