Section 1
DOE-HDBK-1221-2024
DOE HANDBOOK
Suspect/Counterfeit Items Resource Handbook
U.S. Department of Energy Washington, D.C. 20585
NOT MEASUREMENT
SENSITIVE
DOE-HDBK-1221-2024
i
This page intentionally left blank.
DOE-HDBK-1221-2024
ii
Foreword
This Department of Energy (DOE) Handbook assists the DOE enterprise in preventing suspect/counterfeit
items (S/CI) from entering the supply chain. Specifically, it provides examples and information that may
be used to prevent, detect, document, report, and control these types of items. Internal and external
resources have been referenced for additional information.
The Handbook is available for use by all DOE elements and their contractors.
This Handbook does not establish new requirements, and any existing requirements are explicitly
referenced from a DOE Order. DOE Order requirements prevail. This handbook provides guidance to
implement DOE S/CI requirements and therefore uses the words “should” and “may.”
Beneficial comments (recommendations, additions, and deletions), as well as any pertinent data that may be
of use in improving this document, should be emailed to counterfeit@hq.doe.gov or addressed to:
Office of ES&H Reporting and Analysis (EHSS-23)
Office of Environment, Health, Safety and Security (EHSS)
U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585
Acknowledgments
This Handbook was developed with significant contributions of Chris Beaman (EHSS), Lisa Enstrom
(ANL), Tammie Graham (LLNL), Gabrielle Holcomb (EHSS), Kristy Kistner (ORISE), Nathan Morley
(NNSA), John Verderber (WRPS), Lucas White (HMIS), and Bill Wingfield (LANL).
mailto:counterfeit@hq.doe.gov
DOE-HDBK-1221-2024
iii
Table of Contents
1 Introduction ....................................................................................................................................... 1
2 Terminology ...................................................................................................................................... 2
3 Suspect/Counterfeit Item (S/CI) Risks ............................................................................................ 10
4 S/CI General Process ...................................................................................................................... 15
5 Indicators for S/CI Hardware Items (Fasteners) ............................................................................. 30
6 Electronics ....................................................................................................................................... 37
7 Suspect/Counterfeit Software ......................................................................................................... 52
8 Indicators of Suspect Components .................................................................................................. 59
9 Counterfeiting of NRTL Certifications and Symbols ..................................................................... 67
10 Suspect/Counterfeit & Fraudulent Documentation and Certification ............................................. 68
11 References ....................................................................................................................................... 73
Appendix A – Suspect/Counterfeit and Defective Fastener Inspection .................................................... A-1
Appendix B – Other Information Related to S/CI ...................................................................................... A-2
Appendix C – Resources ........................................................................................................................... C-1
Section 2
List of Tables
Table 1: Risk Mitigation Table ................................................................................................................... 12
Table 2: Counterfeit Risk Based Approach Example Table ....................................................................... 14
Table 3: Headmark Comparisons ................................................................................................................ 31
Table 4: Electronics Evaluation Table- Level of Rigor .............................................................................. 43
Table 5: Legacy Fastener List Codes that correspond to Figure 41 .......................................................... A-2
Table 6: High Strength Fastener Examples ............................................................................................... A-2
Table 7: Non-Compatible Standard Example ........................................................................................... A-2
DOE-HDBK-1221-2024
iv
Table of Figures
Figure 1: Model of an S/CI Program General Process Flow ..................................................................... 15
Figure 2: FAR 52.246-26 Reporting Structure at DOE ............................................................................. 20
Figure 3: Suspect/Counterfeit Item Example Reporting Chart .................................................................. 28
Figure 4: SAE Grade 5 bolts without a manufacturer mark ....................................................................... 32
Figure 5: Double-stamped Bolt .................................................................................................................. 32
Figure 6: General Fastener Quality ............................................................................................................ 33
Figure 7: 8.8 grade bolt no manufacturer marking .................................................................................... 33
Figure 8: Sample disposition process for a ratchet strap............................................................................ 34
Figure 9: “KS”-marked bolt from Legacy Headmark List ......................................................................... 35
Figure 10: Blacktopped Example ............................................................................................................... 38
Figure 11: Blacktopped Example-Indent Filled ......................................................................................... 39
Figure 12: Blacktopped Example –Side View – Overspray ...................................................................... 39
Figure 13: Sanding Example ...................................................................................................................... 40
Figure 14: Marking on Indent .................................................................................................................... 40
Figure 15: Genuine Atmel Device ............................................................................................................. 41
Figure 16: Counterfeit Atmel Device ......................................................................................................... 42
Figure 17: Example of Acceptable Indent ................................................................................................. 45
Figure 18: Example of Suspect Indent ....................................................................................................... 45
Section 3
Figure 19: Example Indications of Remarking .......................................................................................... 46
Figure 20: Example Texture Irregularity between top and bottom surface of the same device ................. 47
Figure 21: Example Dimensional Inspection ............................................................................................. 48
Figure 22: Example Resistance to Solvent Failure .................................................................................... 48
Figure 23: Example Scrape Test Failure .................................................................................................... 48
Figure 24: Example XRF Analysis ............................................................................................................ 49
Figure 25: S/CI prevention model for Software ......................................................................................... 57
Figure 26: Example Tampering ................................................................................................................. 60
Figure 29: General Appearance ................................................................................................................. 60
Figure 27: Example Low Quality Print ...................................................................................................... 61
Figure 28: Example Incorrect Manufacturer Label .................................................................................... 61
Figure 30: Configuration ............................................................................................................................ 62
Figure 34: Shackle Missing Manufacturer Marking .................................................................................. 63
Figure 35: Marking Alteration ................................................................................................................... 63
Figure 31: Example Suspect Piping ........................................................................................................... 64
Figure 32: Suspect WATTS Gas Ball Valve Label ................................................................................... 64
Figure 33: Example Used When Ordered New.......................................................................................... 65
Figure 36: Suspect/Counterfeit NRTL Sticker (TIC, 2020) ....................................................................... 67
Figure 37: Font Indication Example .......................................................................................................... 69
Figure 38: Alteration Example ................................................................................................................... 70
Figure 39: Dates and Numeration Example ............................................................................................... 71
Figure 40: Signature Example.................................................................................................................... 72
Figure 41: Legacy Fastener List............................................................................................................... A-1
Figure 42: Badge Reminder ..................................................................................................................... A-3
DOE-HDBK-1221-2024
1
1 Introduction
1.1 Purpose
Section 4
This Handbook assists the Department of Energy (DOE) in preventing suspect/counterfeit (S/CI) items
from entering the supply chain. Information and examples are provided to support preventing, detecting,
documenting, reporting, and controlling these types of items.
1.2 Applicability
This Handbook is applicable to the DOE enterprise including the NNSA, which consists of elements
within the DOE/NNSA and their contractors.
1.3 Scope
This handbook should be used in combination with current versions of DOE Order (O) 414.1 (current),
Quality Assurance, and DOE Guide (G) 414.1-2, Quality Assurance Program Guide. It is also
recommended that organizations leverage the use of current industry standards that address Counterfeit
Prevention Programs and processes.
Internationally recognized consensus standards such as those from the Society of Automotive Engineers
(SAE) and Independent Distributors of Electronics Association (IDEA) Standard 1010-B, Acceptability of
Electronic Components Distributed in the Open Market are especially useful for aiding in S/CI prevention
and detection. A comprehensive list of the SAE standards for Counterfeit prevention and detection is
provided in the Appendix C, Resources of this handbook.
The current version of DOE G 414.1-2 is a valuable reference for the principles, requirements, and
practices that establish and implement an effective quality assurance program or quality management
system in accordance with DOE O 414.1. In addition, DOE G 414.1-2 provides information on S/CI
program implementation that may be used in combination with the information in this handbook.
Although a graded approach is used throughout the handbook to manage processes such as procurements,
inspections, assessments, evaluations, etc. if an S/CI is discovered, it must be reported in accordance with
current DOE requirements such as those stated in DOE O 414.1 (current).
DOE-HDBK-1221-2024
2
2 Terminology
2.1 Acronyms
AGA American Gas Association
ANSI American National Standards Institute
ASME American Society of Mechanical Engineers
ASQC American Society for Quality Control
ASTM American Society of Testing Materials
CGA Canadian Gas Association
CGD Commercial Grade Dedication
CFR Code of Federal Regulations
CFSI Counterfeit, Fraudulent, and Suspect Items
CISA Cybersecurity & Infrastructure Security Agency
CMTR Certified Material Test Report
COA Command Option Argument
C of C Certificate of Conformance
CVSS Common Vulnerability Scoring System
DOE Department of Energy
DPA Destructive Physical Analysis
D-U-N-S Data Universal Numbering System
EFCOG Energy Facility Contractor Group
EPRI Electric Power Research Institute
ERAI Electronic Resellers Association International
FM Factory Mutual
FMEA Failure Mode and Effect Analysis
FQA Fastener Quality Act
FTIR Fourier Transform Infrared Spectroscopy
G Guide
GIDEP Government-Industry Data Exchange Program
GL Generic Letters
HTTPS Hypertext Transfer Protocol Secure
IACC International Anti-Counterfeiting Coalition
IAEA International Atomic Energy Agency
DOE-HDBK-1221-2024
3
IAQG International Aerospace Quality Group
IDEA Independent Distributors of Electronics Association
IC Integrated Circuit
IFI Industrial Fasteners Institute
IPR Intellectual Property Rights
ISO International Organization for Standardization
NCR Nonconformance Report
NIST National Institute of Standards and Technology
NNSA National Nuclear Security Administration
Section 5
NPM Node Package Manager
NQA Nuclear Quality Assurance
NRC Nuclear Regulatory Commission
NRTL Nationally Recognized Testing Laboratory
O Order
OASIS Online Aerospace Supplier Information System
OCM Original Component Manufacturer (electronic components)
OEM Original Equipment Manufacturer
OIG Office of Inspector General
OMB Office of Management and Budget
ORPS Occurrence Reporting and Processing System
OSHA Occupational Safety and Health Administration
PSI Pounds per Square Inch
QA Quality Assurance
RC Run Configuration
SAE Society of Automotive Engineers
SAM Scanning Acoustic Microscopy
SBOM Software Bill of Materials
S/CI Suspect/Counterfeit Item
SEM Scanning Electron Microscope
SME Subject Matter Expert
UL Underwriters Laboratory
XRF X-Ray Fluorescent
DOE-HDBK-1221-2024
4
2.2 Definitions
Term Definition Reference
Aftermarket
Manufacturer
(electronics)
A manufacturer that meets one or more of the
following criteria:
1. A manufacturer authorized by the original
component manufacturer (OCM) to produce
and sell replacement parts, usually due to an
OCM decision to discontinue production of
a part.
2. The manufacturer produces parts using
semiconductor dice or wafers, manufactured
by and traceable to an OCM, that have been
stored until use. They are subsequently
assembled, tested, and qualified using
processes that meet technical specifications
without violating the OCM’s intellectual
property rights (IPR), patents, or copyrights.
3. The manufacturer produces parts through
emulation, reverse-engineering, or redesign,
which match the OCM's specifications and
satisfy customer needs without violating the
OCM's IPR, patents, or copyrights.
SAE AS5553D,
Counterfeit
Electrical,
Electronic and
Electromechanical
(EEE) Parts;
Avoidance,
Detection,
Mitigation and
Disposition,
Authorized Distribution
(electronics)
Transactions conducted by an OCM-Authorized
Distributor distributing product within the terms
of an OCM contractual agreement.
SAE AS5553D,
Counterfeit
Electrical,
Electronic and
Electromechanical
(EEE) Parts;
Avoidance,
Detection,
Mitigation and
Disposition,
Blacktopping A term used to describe the intentional covering
of the original manufacturer part markings or
masking the signs of rework and removal of
original part markings.
IDEA-STD-1010-B,
Acceptability of
Electronic
Components
Distributed in the
Open Market
DOE-HDBK-1221-2024
5
Term Definition Reference
Certificate of
Conformance
(C of C)
A document signed or otherwise authenticated by
an authorized individual certifying the degree to
which items or services meet specified
requirements.
ASME NQA-1-
2008-2009, Quality
Assurance
Requirements for
Nuclear Facility
Applications
Certified Material Test
Report (CMTR)
A written and signed document approved by a
qualified party containing data and information
that attests to the actual properties of an item and
the actual results of all required tests.
DOE G 414.1-2B,
Quality Assurance
Program Guide
Checksum Used to detect errors that may have been
introduced during its transmission or storage.
Checksums are often used to verify data integrity
but are not relied upon to verify data authenticity.
COA and RC Command Option Argument (COA) which is
downloaded through a Node Package Manager
(NPM). Run Configuration (RC) is a
configuration loader that is typically downloaded
through NPM.
Sharma, A. (2021).
Consensus Standard (in
reference to the Fastener
Quality Act)
Section 6
A Consensus standard is a document that
describes fastener characteristics published by a
consensus standards organization, or a Federal
Agency, and does not include a proprietary
standard.
PL 106-34, Fastener
Quality Amendments
Act of 1999
Consensus Standard
Organization
Consensus standard organizations include: the
American Society for Testing and Materials
(ASTM), the American National Standards
Institute (ANSI), the American Society of
Mechanical Engineers (ASME), the Society of
Automotive Engineers (SAE), the International
Organization for Standardization (ISO), and any
other organization identified as a United States
consensus standards organization or a foreign and
international consensus standards organization in
the Federal Register (reference 61 Fed. Reg.
50582–83).
PL 106-34, Fastener
Quality Amendments
Act of 1999
Critical Nonconformance A nonconformance that is likely to result in
hazardous or unsafe conditions for individuals
using, maintaining, or depending upon the
supplies or services; or is likely to prevent
performance of a vital agency mission.
FAR 52.246-26,
Reporting
Nonconforming
Items
DOE-HDBK-1221-2024
6
Term Definition Reference
Data Universal
Numbering System (D-
U-N-S)
A D-U-N-S number is a unique nine-digit
identifier assigned by Dun & Bradstreet which is
used to identify and track businesses who enter in
bids for Federal Government contracting.
Although it is not required to perform work for
the U.S. Federal Government, many other Federal
Governments and companies do require it.
Dun & Bradstreet1
Decapsulation
The process of removing a cap, lid, or
encapsulating material from a packaged
integrated circuit by mechanical, thermal, or
chemical means exposing the integrated circuit
for further analysis, inspection, or electrical
examination of the die and the internal features.
SAE AS6174A –
Counterfeit Material;
Assuring Acquisition
of Authentic and
Conforming Material
Defective Any item or material that does not meet the
commercial standard or procurement
requirements as defined in such sources as
catalogues, proposals, procurement
specifications, design specifications, testing
requirements, or contracts may be considered
defective.
DOE O 232.2A,
Occurrence
Reporting and
Processing of
Operations
Information
Die A small block of semiconducting material on
which a given functional circuit is fabricated.
SAE AS6174A–
Counterfeit Material;
Assuring Acquisition
of Authentic and
Conforming Material
Electronic Packaging A major discipline within the field of electronic
engineering and includes a wide variety of
technologies. It refers to enclosures and
protective features built into the product itself and
not to shipping containers. It applies to both end
products and to components.
SAE AS6174A –
Counterfeit Material;
Assuring Acquisition
of Authentic and
Conforming Material
Engineering Evaluation A technical review conducted by qualified
engineering and other technical personnel using
accepted methods to determine the actual or
potential cause of a substantial safety hazard and
the effect of an S/CI.
DOE G 414.1-2B
Chg. 2 (Admin
Chg.), Quality
Assurance Program
Guide
1 Dun & Bradstreet: https://www.dnb.com/duns/duns-number-and-government.html
https://www.dnb.com/duns/duns-number-and-government.html
DOE-HDBK-1221-2024
7
Term Definition Reference
Failure Modes and
Effects Analysis
Failure Modes and Effects Analysis (FMEA) is a
structured risk assessment process and tool used
to improve product and process design by
assessing, quantifying, and reducing the risks
associated with failure.
Section 7
New Definition
Fastener A metallic screw, nut, bolt, or stud having
internal or external threads and load-indicating
washers or washers represented as meeting a
consensus standard.
New Definition
Head marking Markings that are physically applied onto a
fastener and may be used to provide traceability
to the manufacturer, material/grade, and heat or
lot numbers of the fastener. Markings may be
required by the referenced material specification,
standards, federal legal requirements, or
procurement and contractual requirements.
New Definition
High-Strength A fastener with a minimum tensile strength of
120,000 pounds per square inch (psi) or fasteners
considered equivalent to a SAE grade 5 would be
considered high- strength.
FQA- Report
Committee on
Commerce, Science
and Transportation
S. 795 November 19,
1999, Senate Report
106-224
Independent Distributor
(electronics)
A distributor that purchases parts with the
intention to sell and redistribute them back into
the market. Purchased parts may be obtained
from OEMs or Contract Manufacturers (typically
from excess inventories), or from other
Distributors (Franchised, Authorized, or
Independent). Resale of the purchased parts
(redistribution) may be to OEMs, Contract
Manufacturers, or other Distributors.
Independent Distributors do not normally have
contractual agreements or obligations with
OCMs. See definition of “Authorized
Distribution.”
SAE AS6174A–
Counterfeit Material;
Assuring Acquisition
of Authentic and
Conforming Material
Item(s) An all-inclusive term used in place of
appurtenance, assembly, component, equipment,
material, module, part, structure, product,
software, subassembly, sub-system, system, unit,
or support systems.
10 CFR 830,
Nuclear Safety
Management
DOE-HDBK-1221-2024
8
Term Definition Reference
Major Nonconformance A nonconformance, other than a critical
nonconformance, that is likely to result in failure
of the supplies or services, or to materially reduce
the usability of the supplies or services for their
intended purpose.
FAR 52.246-26,
Reporting
Nonconforming
Items
Manufacturer A manufacturer is the person or source which
fabricates an item for sale in commerce.
New Definition
Nonconformance A deficiency in characteristic, documentation, or
procedure that renders the quality of an item or
activity unacceptable or indeterminate.
ASME NQA-1-2008
Open Market
(electronics)
The trading market that buys or consigns OEM,
Contract Manufacturer, and Aftermarket
Manufacturer’s excess inventories of new
electronic parts and subsequently utilizes these
inventories to fulfill supply needs of other OEMs
and Contract Manufacturers, sometimes due to
urgent or obsolete part demands. Open Market
may include the purchase and sale of parts with
unknown origin or where the complete chain of
custody of such parts is unknown.
SAE AS6174 –
Counterfeit Material;
Assuring Acquisition
of Authentic and
Conforming
Material, Dated
2012-05
Risk Mitigation The process of reducing the likelihood or impact
of a potential negative event.
New Definition
DOE-HDBK-1221-2024
9
Term Definition Reference
Suspect/Counterfeit Item
(S/CI)
Counterfeit Items. Items that are intentionally
manufactured, refurbished, or altered to imitate
original products without authorization in order
to be passed off as genuine.
Section 8
Fraudulent Items. Items that are intentionally
misrepresented with intent to deceive, including
items provided with incorrect identification or
falsified and/or inaccurate certification. They
may also include items sold by entities that have
acquired the legal right to manufacture a
specified quantity of an item but produce a
larger quantity than authorized and sell the
excess as legitimate inventory.
Genuine or Authentic Item. Items that are
produced and certified without the intent to
deceive.
Suspect Items. Items where there is an
indication or suspicion that they may not be
genuine.
DOE O 414.1D,
Quality Assurance
Suspect/Counterfeit
Items Control Plan
Documents an organization’s risk-based strategy
for identification, mitigation, disposition,
detection, avoidance, reporting, and trending of
S/CIs.
New Definition
Textured
(electronics)
Plastic Electronic Components are typically made
with a mix of fine glass and plastic. The surface
of the molded package is textured when it is
removed from the mold.
SAE AS6174A –
Counterfeit Material;
Assuring Acquisition
of Authentic and
Conforming Material
DOE-HDBK-1221-2024
10
3 Suspect/Counterfeit Item (S/CI) Risks
Risk management weighs the likelihood that an event will occur against the consequence or impact of the
occurrence. Risk assessment and mitigation are often collaborative efforts among multiple organizations
and roles.
Performing an assessment for the risks of receiving S/CIs will also weigh consequence or impact against
the likelihood of occurrence. This may include how critical the item is to environment, safety, health,
security, mission success, and/or strategic value, etc. against the likelihood that the item will be received
as S/CI. Information to aid in determining the likelihood of an item being received as S/CI may be
obtained from internal DOE resources or external sources where S/CIs have been reported. Some items
are more likely to be S/CI since they have been historically and continue to be targeted by counterfeiters.
These include obsolete components, difficult to procure items, items where lead times are critical, items
where multiple versions are available, items where there is a high volume but low price or vice versa,
common commercial items, items of strategic value, etc.
After performing a risk analysis on items, risks may be identified as low, moderate, or high. “Low Risk”
(green) are items that carry a lower associated risk/hazards to the organization whereas “Moderate”
(yellow) and “High” (red) risk will carry higher associated risks to an organization. Organizations may
rate some items as higher risk than what is used in the example chart depending on how items are used.
Risk mitigations may be employed using a risk-based approach as provided in the example in Table 1,
Risk Mitigation Table. It should also be noted that the example provided in Table 2, Counterfeit Risk
Based Approach Example Table does not provide a comprehensive list of items that may be used or
procured as any item that can be made can be counterfeited.
In order to address risk, tolerance, and mitigations, an S/CI Control Plan or similar process or procedure
may be developed. The S/CI Control Plan documents the organization’s risk-based strategy for
identification, mitigation, disposition, detection, avoidance, reporting, and trending of S/CIs.
S/CI Control Plans may address the following processes:
• Roles and Responsibilities;
• Risk Assessment;
• Risk Assessment Process;
Section 9
• Graded Approach Process;
• Flow Down/Procurement Clauses;
• Personnel Training;
• Obsolescence Management;
• Nonconformance Program Coordination (include S/CI, Trend for potential issues, etc.);
• Control of External Sources/Suppliers;
• Traceability;
• Material and Parts Control;
DOE-HDBK-1221-2024
11
• Verification of Purchased/Returned Items;
• Inspections and Tests;
• Investigations;
• Handling, Segregation, and Marking;
• Reporting;
• Monitoring and Trending Activities; and/or
• Internal/External Audits and Assessments.
• Commercial Grade Dedication
Functional areas (Roles) that may be involved S/CI processes include but are not limited to:
• Quality Assurance & Control (Inspection);
• Logistics/Shipping/Receiving (Inspection);
• Assessment Personnel;
• Program/Project Management;
• Procurement/Supplier Management;
• Facilities/Stock/Assembly/Maintenance Personnel;
• Engineering;
• Materials Management & Logistics;
• Environment, Safety & Health (ES&H); and
• Security.
Table 2, Counterfeit Risk Based Approach Example Table provides an example of a graded approach and
risk assessment process. Items may be graded differently by organizations depending on how items will
be used. For instance, containers or packaging materials used in a critical application may have a higher
impact to operations which may move that item higher in the chart. Examples are variable and are highly
dependent on the organizations specific risk profile such as how vulnerable an organization may be to
certain risks (e.g., use of uncontrolled supply bases, purchase of obsolete components, purchase from
oversea suppliers, etc.) and risk tolerance such as what amount of risk is acceptable or not acceptable.
When developing a chart similar to Table 2, the plan should capture how each risk grade level will be
mitigated. Risk mitigation is the action taken to reduce threats and ensure resiliency. When mitigating
risks, steps are taken to reduce adverse effects. It is important to remember that mitigating risk is not just
about fixing vulnerabilities—it’s also about reducing the impact of any potential threats. When
developing a mitigation strategy, it is important to consider how an organization may react to an event or
occurrence as well as how you can prevent negative events or occurrences in the future.
When mitigating risk, it is crucial to develop a strategy that closely relates to and matches the
organization’s profile. A proper mitigation strategy will define how risks are managed. There are five
main risk mitigation strategies that are commonly used which include: risk acceptance, avoidance,
reduction, transference, and sharing.
DOE-HDBK-1221-2024
12
1. Risk acceptance does not reduce any of the effects of the risk. This strategy is common when the
cost of the risk itself outweighs any benefits of mitigating the risk. An organization with a low
risk profile and that typically doesn’t want to spend a lot of money on avoiding risks might use
the risk acceptance strategy. It is important to remember that having a reporting process for S/CIs
but not employing processes to prevent or detect S/CIs would be considered “accepting a risk.” It
is important to note that in many cases S/CIs are still reportable if identified, even by
happenstance.
2. Risk avoidance is the opposite of risk acceptance. It is the action that avoids any exposure to the
risk whatsoever. It’s important to note that risk avoidance is usually the most expensive of all
risk mitigation options.
Section 10
3. Risk reduction is the most common risk management strategy employed. This strategy reduces
exposure by taking actions to prevent or detect the risk.
4. Risk transference is handing over risk to a willing third party. This is often completed by means
of a contract.
5. Risk sharing occurs when responsibility for risks assumed by one organization can be shared
with another. Although this method may not eliminate the risk. It may reduce the risk to an
acceptable level. Organizations with different risk tolerance levels may be able to use risk
sharing to align responsibility for different types of risk with commensurate risk tolerance levels,
and to assign responsibility for specific types of risk to organizations with the appropriate
expertise or resources to address them.
Reference Table 1, Risk Mitigation Table for an example of when each mitigation strategy might be used:
Table 1: Risk Mitigation Table
1. Risk is identified as Low to Moderate Likelihood and Low Impact (Accept/Reduce Strategy):
a. Risk Mitigation Plan – Mitigations may be informal.
b. Procurement Contracts – Recommended use of Suspect/Counterfeit Items contracting
clause.
c. Procurement Cards (P-Cards) – These items may be procured using this method. It is
important to note that contracting clauses are not typically used.
DOE-HDBK-1221-2024
13
d. Inspection and Tests – Informal or formal processes may be used.
2. Risk is identified as High Likelihood and Low Impact (Reduce Strategy):
a. Risk Mitigation Plan – Mitigations may be informal.
b. Procurement Contracts – Recommended use of Suspect/Counterfeit Items contracting
clause.
c. P-Cards – These items may be procured on P-Cards but should be procured using
caution. For instance, organizations should use reputable and well-established suppliers
that have a history of supplying quality products and use industry-accepted consensus
standards (e.g., ISO, SAE, ASME, ASTM, etc.)
d. Inspection and Tests – Informal or formal processes may be used.
3. Risk is identified as Low to Moderate Likelihood and Moderate Impact (Accept/Reduce Strategy):
a. Risk Mitigation Plan – Recommend formalized processes and procedures that address
minimum requirements for projects that are procuring items in this risk category such as
Roles and Responsibilities, Graded Approach (Risk Categorization process),
Procurement, Reporting, handling of S/CIs if found, and evaluation/disposition process.
b. Procurement Contracts – Use of Suspect/Counterfeit Items clauses.
c. P-Cards – These items may be procured on P-Cards but should be procured using
caution. For instance, using reputable and well-established suppliers that have a history
of supplying quality products and use industry-accepted consensus standards (e.g., ISO,
SAE, ASME, ASTM, etc.) mitigates some of the risk of receiving S/CIs.
d. Inspection and Tests – more formalized processes may be used.
4. Risk is identified as Moderate to High Likelihood and High Impact (Transfer, Share, Reduce, and
Avoid Strategy):
a. Risk Mitigation Plan – Recommend formalized processes and procedures that address
minimum requirements for projects that are procuring items in this risk category such as
Roles and Responsibilities, Graded Approach (Risk Categorization process),
Procurement, Reporting, handling of S/CIs if found, and evaluation/disposition process.
b. Procurement Contracts – Use of Suspect/Counterfeit Items clauses.
c. P-Cards – These items may be procured on P-Cards but should be procured using
Section 11
caution. Again, using reputable and well-established suppliers that have a history of
supplying quality products and use industry-accepted consensus standards (e.g., ISO,
SAE, ASME, ASTM, etc.) mitigates some of the risk of receiving S/CIs.
d. Inspection and Tests – more formalized processes should be used.
NOTE: Although informal processes may be used for inspections of low to moderate risk type of items
or services, individuals should be familiar with how their local organization reports S/CIs when or if they
are identified.
DOE-HDBK-1221-2024
14
Table 2: Counterfeit Risk Based Approach Example Table
DOE-HDBK-1221-2024
15
4 S/CI General Process
Figure 1: Model of an S/CI Program General Process Flow
Above is a model of an S/CI Program General Process Flow. The following sections describe an approach
to how each process might be implemented. Note that every organization may have a different approach
or methodology for implementation. This could include additional processes or steps.
4.1 Train Personnel on S/CI
Organizations should provide general training on S/CI to personnel who may come in contact with
products, services, or software that may be S/CI. An online course is available in Learning Nucleus to all
DOE Federal, contractor, and subcontractor employees as well as suppliers that support DOE: Suspect,
Counterfeit, Defective, and Fraudulent Items Awareness (SCD-100DE) which is available at this link
https://learningnucleus.energy.gov/. Registration is required to access Learning Nucleus. Information on
registration can be obtained by emailing counterfeit@hq.doe.gov.
4.2 Planning
Up front planning can prevent S/CI, including S/CI software. Planning may include analysis of project or
program needs including an in-depth planning stage. The Planning stage will typically use a defined
graded approach and should consider the following:
1) What major procurements will be conducted during the project?
2) Will critical items be procured?
3) What steps, if any, should be included to reduce potential risks of suspect/counterfeit items?
4) Are there repeat purchases? How are these suppliers managed or given feedback if there are
issues?
A key component of planning is to understand the risks and their controls. The integrity of systems and
Train
Plan
PreventDetect
Action
Disposition
https://learningnucleus.energy.gov/
mailto:counterfeit@hq.doe.gov
DOE-HDBK-1221-2024
16
information is a critical component of managing supply chain and cybersecurity risks.
4.3 Prevention
The responsibility for preventing S/CI from entering a DOE facility starts in areas such as project
planning, design, and procurement. Actions may involve reviewing supplier quality assurance processes,
training, and using screening resources such as the Government-Industry Data Exchange Program
(GIDEP). The following sections discuss steps DOE personnel can follow to prevent S/CI. Note that
procurement refers to the procurement of items, services, and special processes, all of which may have the
potential to introduce S/CI into a system depending on the scope of work.
4.3.1 Prevention and Procurement
Prior to procurement, processes such as project planning or design processes should consider the bill of
materials, how items will be used, criticality of items and their associated risks, tests that may be needed,
and customer-defined specifications. It is vital at the procurement step that requirements are well
understood and communicated to suppliers and that contracts properly document requirements. This is
especially true when procuring items that will be used in a more critical capacity.
Section 12
The procurement process generally starts with acquisition planning, which establishes the requirements for
items including determining if any special procurement requirements exist. Many organizations will have
a formalized procurement request process to standardize acquisition planning. This could include adding
or choosing terms and conditions to be used in the contract. Individuals requesting procurements, should
be familiar with local contract clauses. The enforcement of the terms and conditions by cognizant
organization and procurement officials is necessary so that contractual requirements are not left out due to
costs, schedule, and/or production pressures.
The following practices should be used during the procurement process to prevent S/CI. Purchasers
should:
• Ensure that the suppliers have demonstrated their capability to deliver acceptable items in a
timely manner;
• Ensure controls and verification activities are commensurate with the identified risks;
• Verify individuals performing S/CI prevention processes have received S/CI training;
• Verify requirements are included in the contract documents for any necessary technical and QA
reviews of the supplier;
• Ensure quality specifications included in contracts are accurate, address the requirements, and
provide sufficient information to the supplier; and
• Verify that approved QA and S/CI clauses are included in contracts.
A key element of the procurement process is the specification requirement, including technical and quality
assurance requirements, and should be developed by the relevant Subject Matter Expert (SME). A graded
approach may be applied based on the likelihood an item will be S/CI along with other factors such as
specific application and the potential impact that failure of the item could have on the health and safety of
the public, environment, and workers. The procurement package should describe specific quality controls
DOE-HDBK-1221-2024
17
and verification methods, such as a QA audit and/or supplier source surveillance, receipt inspection, and
post-installation inspection and test.
Determine during the procurement or procurement planning process if the organization will:
1) Evaluate the supplier’s QA program using a graded approach;
2) Perform Inspection/Testing;
3) Perform Failure Modes and Effects Analysis (FMEA); or
4) Perform Commercial Grade Dedication (CGD) using in whole or in parts (depending on nuclear
facility applicability) an established process such as the process stated in American Society of
Mechanical Engineers (ASME) Nuclear Quality Assurance (NQA)-1. CGD is used for items that
are deemed safety-significant or mission critical but where supplier evaluations may not be
possible.
Unless the supplier’s quality system for generating the documentation and maintaining part number
configuration control was previously verified through performance-based evaluations, DOE and its
contractors should be cautious about accepting items based solely on supplier-generated documentation or
part-number verification.
4.3.2 Prevention and Supplier Quality Assurance
Evaluate the supplier QA program to verify the supplier or distributor has the capability to comply with
purchase order requirements. Assessments should include some of the following S/CI prevention
questions:
1) How are S/CIs prevented or detected at the supplier’s facility? Does the supplier have
documented processes or procedures?
Section 13
2) How does the supplier perform testing, inspection, or verification of items to ensure they are
genuine?
3) Is item traceability maintained (if applicable) at the facility? How is it maintained?
4) How are nonconforming items or materials and S/CIs segregated from conforming products?
5) Who is trained on S/CI prevention and detection? How are they trained?
6) How does the supplier manage customer-returned product? How do they ensure that it is not S/CI
or nonconforming? How do they ensure these types of products do not re-enter the supply chain?
7) Would the supplier report S/CIs if identified? Where would they report them?
8) Does the supplier screen inventory for the presence of S/CI?
9) Does the supplier evaluate their sub-tier suppliers and distributors for S/CI prevention and
detection controls?
To control entry of S/CIs through the procurement process, contractor QA programs should
implement procedures for:
• Controlling procurement processes;
• Developing specification/requirements and receipt inspection plans;
• Approving QA and S/CI clauses;
DOE-HDBK-1221-2024
18
• Reviewing technical and quality requirements;
• Reviewing contracts for legal interpretations of contract terms and conditions;
• Rating supplier past performance;
• Maintaining approved supplier lists;
• Performing source or receipt inspection (e.g., per pre-defined receipt inspection plan),
surveillance, and performance-based audits;
• Validating product acceptability, including performing verifying, inspecting, and testing
activities; and
• Using supplier quality information-sharing processes.
4.3.3 Prevention and Suppliers
Organizations should evaluate suppliers to prevent the introduction of S/CI. Evaluated suppliers may be
called “Approved Suppliers” or added to an “Approved Supplier List.” Organizations may use other
indicators than an Approved Supplier List to help those who are performing procurements to know which
suppliers are acceptable to use. Approved suppliers should be used when procuring items where S/CI
risks have been found to carry a high likelihood and impact to the organization.
Supplier approval may be achieved by:
• Desk Assessment – A desk assessment may be conducted through a survey, questionnaire, or
remote review of the supplier’s information. This may be performing verification on a third-party
certification that the supplier meets an internationally recognized consensus standard such as
International Organization for Standardization (ISO), American Society of Mechanical Engineers
(ASME), American Society for Testing Materials (ASTM), etc.
• On-site Assessment – An on-site assessment would typically include a performance-based audit,
surveillance, or other assessment to a specified criteria such as an internationally recognized
consensus standard. The assessment would be performed in-person at the supplier’s facility and
would review processes and procedures along with their implementation.
• Shared Assessments – Organizations may decide to use assessments performed by other
organizations internal or external to DOE, thereby reducing efforts, creating efficiencies, and
saving government funds. This also reduces efforts by suppliers and manufacturers who support
multiple assessments for similar organizational needs. Resources that may aid in gathering data
for sharing assessment information include but are not limited to the DOE Consolidated Audit
Program (DOECAP), Master Supplier List (MSL), GIDEP, Electronic Resellers Association
International (ERAI), International Aerospace Quality Group (IAQG), Online Aerospace Supplier
Information System (OASIS), ISO, and the Energy Facility Contractors Group (EFCOG).
Section 14
4.3.4 Prevention and use of Contract Clauses
All contracts should contain some type of S/CI clause prohibiting the delivery of S/CIs. Clauses should
include definitions of S/CI and any other applicable contractual requirements that may be unique or
required for the procurement (e.g., Federal Acquisition Requirements, specifications, customer
requirements, etc.). Local General Counsel or Contract Legal department should review clauses for any
organization-specific requirements or terms that may be added.
DOE-HDBK-1221-2024
19
The following example can be modified for an organization’s use:
Notwithstanding any other provisions of this agreement, the Subcontractor warrants that all items
provided to the Contractor should be genuine, new, and unused unless otherwise specified in writing
by the Contractor. Subcontractor further warrants that all items used by the Subcontractor during
the performance of work at the [name DOE location/site here], include all genuine, original, and new
components, or are otherwise suitable for the intended purpose. The Subcontractor’s warranty also
extends to labels and/or trademarks or logos affixed, or designed to be affixed, to items supplied or
delivered to the Contractor. Furthermore, the Subcontractor should indemnify the Contractor, its
agents, and third parties for any monetary loss, injury, or property damage resulting directly or
indirectly from material, components, or parts that are not genuine, original, and unused, or not
otherwise suitable for the intended purpose. This includes, but is not limited to, materials that are
defective, suspect, or counterfeit; materials that have been provided under false pretenses; and
materials or items that are materially altered, damaged, deteriorated, degraded, or result in product
failure.
In addition to the requirements above, the subcontractor must:
1) Purchase directly from product manufacturers or authorized manufacturer distributors
whenever possible.
2) Use counterfeit prevention and/or quality assurance procedures, which include an S/CI
detection program.
3) Immediately notify [name DOE location/site here] if subcontractor suspects or becomes
aware of used or counterfeit goods having been furnished during the performance of work on
this contract.
4) Report suspected fraud, waste, or abuse by a DOE employee, Subcontractor, or grant
recipient involving DOE programs to the Office of Inspector General by phone (800) 541-
1625, or by email ighotline@hq.doe.gov. Additional information is available at:
http://energy.gov/ig/office-inspector-general.
Contractors may also include a statement that notifies subcontractors of the intent to hold items identified
as S/CI and not ship them back.
Types of material, parts, and components known to have been misrepresented include (but are not limited
to): fasteners; hoisting, rigging, and lifting equipment; personal protective equipment (PPE); cranes;
hoists; valves; pipe and fittings; electrical equipment and devices; plate, bar, shapes, channel members,
and other heat-treated materials and structural items; welding rod and electrodes; electronic components;
chemicals, lubricants, and adhesives; power distribution equipment; construction equipment; bearings; fire
control equipment; calibrated instrumentation and measuring tools; telecommunications and networking
devices, and computer memory modules. In addition, because falsification of information or
documentation may constitute criminal conduct, the Contractor may reject and retain such information or
items, at no cost, and identify, segregate, and report such information or activities to cognizant
Department of Energy officials.
Section 15
Failure of a supplier to meet a quality clause like the one above should be reported by the contractor in
accordance with the contractor’s S/CI process which, at a minimum, should include notifications and
http://energy.gov/ig/office-inspector-general
DOE-HDBK-1221-2024
20
reporting as described in section 4.5, Action: Notification and Reporting of S/CI below.
Many S/CI items discovered by DOE/National Nuclear Security Administration (NNSA) were procured
with credit cards. Under many procurement systems, the use of credit cards offers the potential for
bypassing procurement controls. The use of a credit card in no way relieves the credit card holder from
prohibitions, controls, or other required authorizations for the acquisition of goods and services. Care
should be taken to assure appropriate application of procurement controls to mitigate the risk of S/CIs
including use of reputable suppliers (i.e., assessed suppliers), flow-down of specification requirements,
appropriate technical and quality requirements, and other procurement controls necessary to preclude
entry of S/CIs into the DOE supply chain.
In addition to the clause language above, many DOE contractors are now required to address the
requirements in FAR 52.246-26, Reporting Nonconforming Items. This requires that certain subcontracts
flow down requirements for reporting critical and major nonconformances and S/CIs into GIDEP.
Numerous exclusions to the insertion of this clause avoid burdening small businesses, so much of the
burden for reporting is on the DOE Prime Contractor.
Figure 2: FAR 52.246-26 Reporting Structure at DOE
DOE FEDERAL AGENCY
(Various Program Secretarial Offices)
(reference FAR 46.317, Reporting Nonconforming Items which
prescribes insertion of clause into Prime Contractor contracts)
PRIME CONTRACTOR
(Managed & Operated , Government Owned-Contractor
Operated) Labs/Sites. Report to and Screen GIDEP if FAR 52.246-
26 is inserted in contract.
reference FAR 52.246-26 para. (g) Subcontracts which prescribes
insertion of clause into subcontracts
SUBCONTRACTOR
Report items to GIDEP if FAR 52.246-26 is inserted into contract
otherwise notify Prime Contractor of S/CI issues or items that
may have been delivered to them.
DOE-HDBK-1221-2024
21
A general statement such as the following may be included in contracts to address GIDEP reporting:
Items discovered as Suspect/Counterfeit or Nonconforming may be reported to the Government-
Industry Data Exchange Program (GIDEP) by [enter DOE site/location name here] in accordance
with requirements stated in FAR 52.246-26, Reporting Nonconforming Items. It is important that
contact information is up to date for the contractor/subcontractor site so that any communications
regarding potential GIDEP submittals can be reviewed by the contractor/subcontractor company
prior to submission and any responses may be appended to the report. If, for any reason, [DOE site]
does not receive a response, we will submit the report 15 days from the original date on which we
submitted the report to the contractor/subcontractor to review.
DOE Prime Contractors should be familiar with the FAR 52.246-26 requirements and collaborate closely
with their DOE Federal Contracting Officers Representatives for questions on implementation, clause
flow-down, and reporting into GIDEP.
4.3.5 Resolution on Disputes
Section 16
Since organizations should not return items identified as S/CI or Fraudulent, contract clauses must clearly
identify to suppliers that items will not be returned, and that the supplier may be liable for costs related to
the item’s replacement. This will aid in the recovery of funds for items purchased on contracts. If items
are purchased on P-Card and cannot be returned to suppliers, an organization may be able to dispute the
charges to recover lost funds on orders:
1) Involve the local P-Card office as early in the process as possible. If all reporting processes have
been completed and there is not an open or pending investigation (i.e., the item has been released
for disposition), the organization may be able to contact the merchant directly.
2) Typically, for the merchant to be able to process a reversal of charges, no more than 60-90 days
may have passed since the item was billed to the card. However, this time period may have
passed during the inspections and investigations of the item.
3) Prior to reporting, items are typically stated as defective or nonconforming rather than S/CI. The
organization could provide proof of the defect or nonconformance such as labeling discrepancies
or other information obtained during inspections.
4) If the merchant will not return funds because too much time has passed or the merchant does not
believe there is sufficient information, work directly with the Procurement Card Office and credit
card company to dispute the charges and obtain a refund.
Note that even after following all the above processes, the organization may still be unable to recover the
funds.
4.4 Detection
After completion of the procurement process, it is likely that items will go through processes such as
receipt and inspection. During these processes, items/services may be found to be nonconforming and
may be further identified as suspect/counterfeit.
DOE-HDBK-1221-2024
22
To eliminate the risk of S/CIs being reintroduced into the supply chain, items identified as being S/CI
should not be returned to the supplier. If a suspect item is found to be acceptable (through engineering
evaluation, verification testing, or the disposition process), the item may be installed or used.
It is vital that individuals who handle products or services are familiar with, and receive training on,
potential indications of S/CI and how to report these types of items. Nonconformance reporting processes
may be used to control items identified as S/CI to prevent the inadvertent installation or use and to
complete additional requirements such as reporting into the Occurrence Reporting Processing System
(ORPS). Nonconformance Reports (NCRs) should be reviewed by an S/CI subject matter expert (SME)
or S/CI Coordinator in a timely manner to make a technical determination that the item is S/CI. At a
minimum, an S/CI Coordinator should consider:
• Does the item meet the contract criteria?
• Were S/CI requirements flowed down to the supplier in the contract?
• Were there any past performance issues with the supplier (i.e., similar suspect or nonconforming
issues)?
• Does the item have S/CI indications as noted in this handbook?
• Were costs impacted in a way that appears the supplier gained monetary funds from using
substandard or low-quality materials?
S/CI processes and programs that fail to prevent an S/CI from being delivered to a DOE facility are key
areas for focus to prevent such occurrences.
Section 17
Other processes for managing S/CIs may be used outside of the nonconformance process, but if used,
they should address the following:
• Records the critical information of the item identified (e.g., part number, description,
supplier/manufacturer, and D-U-N-S as applicable);
• Marking, tagging, and segregating;
• Actions taken and by whom (e.g., who reported the item? who is capturing the information? who
is dispositioning it?);
• Disposition and reporting conducted (e.g., was the item destroyed, used as is? where was the item
reported? objective evidence that the item was released by the Office of Inspector General (OIG);
and
• Trending and continuous improvement metrics.
4.4.1 Detection and Inspections
Acceptance is the process of ensuring that items meet requirements and specifications and that they will
be usable for their intended purpose. Acceptance may include all or some of the following steps:
• Source Inspections: Acceptance inspections may take place at the supplier’s or purchaser’s
facility. It could include dimensional inspections, surveillance of testing, and ensuring “on-site
stores and inventories” are evaluated to detect the presence of S/CIs, including electronic
components and integrated circuits.
DOE-HDBK-1221-2024
23
• Testing: Acceptance may be achieved by performing specialized testing that is conducted in-
house or by a third-party laboratory.
• Receipt Inspections: Organization may use a defined graded approach to inspect items. Low-risk
procurements (e.g., textbooks, batteries, phone chargers, etc.) may not have formal acceptance
criteria but these items may still undergo a basic or more informal inspection for S/CI
characteristics (e.g., labeling, packaging, missing or incorrect owner's manual, color variations,
etc.). Whoever is performing inspections should be familiar with how to report S/CIs, even if
identified in low-risk items.
Item/part number verification and review of certification documentation (e.g., Certified Material Test
Reports-CMTRs, Certificate of Conformance-C of C) alone are not sufficient to verify the quality of a
purchased item. Item specifications and QA criteria should be specified and verified. Consideration
should be given to the following:
• History of S/CI concerns with the item and/or supplier;
• Intended safety function of the item;
• Attributes required to perform the function;
• Processes that encompass/embrace these attributes;
• Supplier past performance information;
• Source inspection, surveillance, assessments, or QA audit results;
• Receipt inspection and acceptance testing results;
• Special test and examination methods (e.g., chemical analysis, hardness, and tensile testing); and
• Post-installation testing.
Sampling:
Large lots of received items may be sampled using criteria such as American National Standards Institute
(ANSI)/American Society for Quality Control (ASQC) Z1.4, Sampling Procedures and Tables for
Inspection by Attributes. If S/CIs are discovered during inspection or sampling, the nonconforming lot
should be controlled and dispositioned in accordance with local procedures. Note that if one component
of an item (e.g., a ratchet strap bolt) is suspect/counterfeit, the entire item (e.g., the ratchet strap in its
entirety) should be considered S/CI.
Personnel Performing Inspections:
Personnel trained to recognize S/CI should inspect items.
Documentation:
If a product is an S/CI, it should be documented in accordance with applicable procedures during the
inspection process.
Section 18
Verification testing may be conducted on a sampling basis, either at the purchaser’s facility or a qualified
independent test laboratory.
DOE-HDBK-1221-2024
24
Commercial Grade Items in Safety Systems:
When the design specifies the use of commercial-grade items in safety systems, ensure that the item will
perform the intended function and will meet design requirements applicable to the replaced item and its
application. The purchaser’s acceptance process should provide sufficient confidence that the items meet
specified requirements and should include inspections, tests, or analysis by the purchaser, or third-party
dedicating entity, supplemented after delivery as necessary by one of the following:
• Commercial grade surveys;
• Product inspections or witnesses at hold points at the manufacturer's facility;
• Analysis of historical records for acceptable performance; or
• Receipt of acceptable documentation, as applicable to the item.
Additional guidance for verifying the acceptability of commercial grade items in safety applications may
be found in ASME NQA-1 and Electric Power Research Institute (EPRI) NP-5652, Guideline for the
Acceptance of Commercial Grade Items in Nuclear Safety-Related Applications.
4.4.2 Detection and Engineering Involvement
An important objective of engineering involvement is to prevent or mitigate potential risks to the public
and worker safety attributable to S/CIs. Engineering should be involved in support of procurement,
product inspection and acceptance testing, maintenance, and the nonconformance dispositioning process.
The extent of engineering involvement should be commensurate with the risk and intended application of
the item (i.e., graded approach).
Engineering functions may include but are not limited to:
• Participating in S/CI training;
• Developing technical and procurement specifications to preclude the introduction of S/CIs;
• Determining critical characteristics of purchased items that should be specified in the purchase
order and selecting those characteristics to be verified during receipt inspection or prior to use;
• Determining verification activities such as inspections tests and methods of acceptance. The
extent of verification may be based on risk (impact/likelihood of counterfeit), supplier past
performance, sample size, dollar value, and other organizational factors.
• Evaluating acceptance test results and dispositioning S/CIs;
• Reviewing technical changes to, and deviations from, procurement documents;
• Developing methods for maintenance and inspection personnel to use;
• Participating in supplier qualification processes, audits, surveillances, and source inspections; and
• Maintaining, modifying, or justifying the replacement of equipment involving design changes.
Guidelines on engineering evaluation to justify equipment replacement are provided in EPRI NP-
6406, Guidelines for the Technical Evaluation of Replacement Items in Nuclear Power Plants.
DOE-HDBK-1221-2024
25
4.4.3 Detection and Evaluations
If S/CIs are detected prior to being installed, S/CIs should be withheld from installation or use pending
the evaluation. It is possible that during routine maintenance or during other inspection processes that an
item that is already in use or installed is identified as S/CI. The next sections discuss the evaluation
processes for items that are installed including safety and non-safety related systems.
Section 19
4.4.3.1 Evaluation: Installed Items Determined to be S/CI
Evaluations should be conducted to determine whether a system can be operated in its present
configuration without modification or replacement of the S/CI, or whether the system should be locked
out, tagged out, and/or removed from service. Typically, these evaluations are conducted by engineers or
SMEs of these systems. Evaluation results should be documented and specify any conditional use of the
system and any compensatory actions that will ensure the least possible threat to public and worker
safety. Results should be communicated to the field office in accordance with local procedures.
Contractors should ensure that S/CIs are dispositioned either to remain in place (if an engineering
evaluation justifies it) or are scheduled to be removed. If an S/CI is to be replaced at a later date, this date
should be specified in the documented engineering evaluation and added to maintenance schedules.
Installed S/CIs that can be removed from their current applications should be marked/tagged and
controlled to preclude their reuse.
If an engineering evaluation determines that an S/CI does not pose a potential safety risk and if the item
can remain in place, then it should be distinctly identified or controlled by suitable means in accordance
with:
• Local procedures;
• Affected design media updated to reflect the field condition, in order to prevent issuance of an
additional nonconformance report; and
• Performance of a duplicate engineering evaluation.
NOTE: In areas where operating temperatures are 500° F and above or are subject to cyclic loading
where fatigue failure is likely to occur, Grades 8 and 8.2 suspect/counterfeit fasteners should not be
allowed to remain in place and should be replaced prior to further use of the equipment. There may be
specific instances where engineering evaluation may determine it is necessary to leave items in-place for
a defined period of time. Additional information on fastener and other material properties and inspection
and testing criteria is provided in applicable American Society of Testing Materials (ASTM) and Society
of Automotive Engineers (SAE) standards.
4.4.3.2 Evaluation: Safety Systems
DOE O 414.1 (current) requires that contractor’s quality assurance program or quality management
system to be developed and implemented for all work commensurate with facility/activity hazards and
mission impact. Contractors should establish and maintain current lists of safety systems and those
facilities/activities affecting the DOE or DOE/NNSA mission. Such lists provide a basis for establishing
priorities, conducting inspections, and identifying and dispositioning S/CIs discovered in use. S/CIs
discovered after installation or use should be documented under local processes, appropriately
DOE-HDBK-1221-2024
26
dispositioned, and reported into ORPS. Additional reporting may also be required into GIDEP.
Reporting is discussed further in the Notification and Reporting of S/Cis section.
If S/CI are discovered in a safety system or mission-critical facility, qualified technical personnel should
immediately conduct an engineering evaluation using recognized methods and local procedures to
determine:
• Where and how the S/CI is used in a safety system or mission-critical facility, its potentially
adverse effect on safety, and its proposed disposition;
• Whether the system should be removed from service immediately, locked out, and tagged out
until the S/CI has been replaced with an acceptable item;
Section 20
• Whether the system can be used, with limitations on operation, until the item can be replaced; and
• How to mitigate potential hazards to workers during S/CI removal.
If an engineering evaluation determines that an S/CI does not pose a potential safety hazard, the item may
remain in place, provided it is properly identified or controlled by other suitable means, according to local
procedures. When it is removed, the item should be identified, marked, and controlled to prevent its reuse
in an application where it may not be suitable. Sampling inspection and special inspection techniques,
(e.g., portable testing equipment) may be used to locate and evaluate S/CIs installed in safety systems and
mission-critical facilities.
4.4.3.3 Evaluation: Non-Safety Systems
S/CI discovered in non-safety systems should prompt inspection of comparable items in safety systems,
such as an extent of condition review. S/CI discovered in non-safety system applications should be
technically evaluated to determine if it could create personnel safety hazards and be treated in accordance
with the contractors approved S/CI process. Items discovered in non-safety systems may take a less
formal approach to evaluate, but actions should still be taken to aid in recurrent issues.
4.5 Action: Notification and Reporting of S/CI
Items identified as S/CI should be documented, reported, and controlled (e.g., marked, tagged, and/or
segregated) in accordance with the requirements specified in DOE O 414.1 (current) and FAR 52.246-26.
Please refer to the requirement for the most up-to-date information on meeting established timelines that
may be stated below or other information.
The following reporting steps may be used, although some organizations may find that steps may be done
concurrently, in a different order, or may include additional steps to meet organizational level
requirements:
1) Suspect/Counterfeit Item is identified by organization.
NOTE 1: Before proceeding to the next steps, sites should use their internal procedures for
addressing S/CI. Local organizational processes typically involve a designated S/CI
coordinator who manages the process and the various reporting steps.
NOTE: 2: This step should also include any reporting between the DOE contractor and DOE
DOE-HDBK-1221-2024
27
Contracting Officer (Federal), which is required to be conducted within 60-days according to
FAR 52.246-26.
2) Report item to the Office of Inspector General (email counterfeit@hq.doe.gov for S/CI reports)
Go to the OIG Hotline form2 anonymous reporting.
NOTE 2: The OIG may not respond within the 60-day GIDEP reporting time period required
by FAR 52.246-26. Items should be considered “under investigation” per the exclusion listed
in this FAR until a release is given to the reporting organization by the OIG or cognizant
official. For questions, please contact counterfeit@hq.doe.gov prior to reporting to GIDEP in
step 3 as noted below.
3) Determine other required reporting paths as noted below. Note that Step 3 can be done
concurrently or in any order the reporting organization chooses:
3a. Does S/CI meet criteria in DOE O 232.2A, Occurrence Reporting and Processing of
Operations Information? If yes, report to ORPS and continue to next question. If no,
continue to next question.
3b. Does S/CI meet criteria in DOE O 210.2A, DOE Corporate Operating Experience
Program? If yes, report to DOE OPEXShare and continue to next question. If no,
continue to next question.
3c. Does S/CI meet the criteria in Federal Acquisition Requirement (FAR) 52.246-26,
Reporting Nonconforming Items? If yes, report to GIDEP. If no, continue to step 4.
Section 21
4) End process.
2 OIG Hotline Form is at https://www.energy.gov/ig/office-inspector-general.
mailto:counterfeit@hq.doe.gov
mailto:counterfeit@hq.doe.gov
https://www.energy.gov/ig/office-inspector-general
DOE-HDBK-1221-2024
28
Figure 3: Suspect/Counterfeit Item Example Reporting Chart
DOE-HDBK-1221-2024
29
4.6 Disposition of S/CI
Known S/CIs should be removed as soon as possible when an engineering evaluation has determined that
the S/CI could create a safety hazard. S/CIs may be destroyed, provided that the:
• Item cannot be traced to a supplier, manufacturer, or distributor;
• Item is not required as material evidence by the local OIG for litigation; and/or
• Local OIG has authorized disposition of the item by the reporting organization; or
• Item has been in the reporting organization’s possession for more than 10 years; no investigation
or litigation has been needed on the item in that time period, and the item is not needed for
training purposes (e.g., the item may be disposed of due to statute of limitations).
NOTE: Items that will be used for training purposes must clearly indicate through marking or
tagging that the item will be used “FOR TRAINING ONLY” or that it is a “TRAINING PROP.”
Smaller items may be bagged and tagged. Items should be stored in a way to preclude use.
If authorized by the OIG, destruction of the S/CI should be performed in a manner that permanently and
irrevocably alters the S/CI so that it cannot be used. Examples of alteration include melting, shredding, or
destroying the threads on fasteners; crushing circuit breaker casings; or embedding fasteners in concrete
or other media, rendering them useless. A Certificate of Destruction should be obtained from the disposal
source or used to trace destruction of items. Certificates of Destruction forms should contain the
following information:
1) Traceability to the item or documentation used for disposition (e.g., nonconformance report
number);
2) Item part number, model number, or other identification number;
3) Method of destruction;
4) Source of destruction (internal or external source being used and contract number if applicable);
and
5) Date destruction was completed.
Burying S/CIs may be acceptable if they do not contain hazardous material or material prohibited by
Federal, State, or local regulations (for example cadmium-plated fasteners; chromium, welding materials;
etc.).
Consideration should be given to surplus safety systems, components, structures, and mission-critical
facilities that have been confirmed counterfeit. All systems, structures or components with known S/CI
should have an associated NCR, which should remain open until those surplus SSCs or systems essential
to mission execution facilities are sold, returned to use, or scrapped.
For more other information related to S/CI and Resources see Appendix C.
DOE-HDBK-1221-2024
30
5 Indicators for S/CI Hardware Items (Fasteners)
There are diverse types of fasteners used throughout DOE, both in critical and non-critical applications.
Typically, critical application fasteners must be “High-Strength” or rated with a minimum tensile strength
of 120,000 pounds per square inch (psi). These are fasteners considered equivalent to a SAE grade 5 or
above. High-strength fasteners are also required to meet requirements from internationally recognized
consensus standards such as American Society for Testing Materials (ASTM), ASME, ISO, and Society
of Automotive Engineers (SAE), etc. When fasteners do not meet these standards, they may be more
likely to fail and there have been documented cases of failures which have resulted in millions of dollars
of damage and losses in life. Therefore, it is critical that DOE and its contractors have a rigorous S/CI
process for identifying sub-standard fasteners.
Section 22
It is also imperative that organizations understand U.S. laws such as the Fastener Quality Act (FQA). The
FQA, Public Law (PL) 101-592, was signed by President George H. W. Bush on November 16, 1990. The
Act protects public safety by: (1) requiring that certain fasteners, sold in commerce, conform to the
specifications to which they are represented to be manufactured; (2) providing for accreditation of
laboratories engaged in fastener testing; and (3) requiring inspection, testing, and certification in accordance
with standardized methods.
On March 7, 1996, President William J. Clinton signed the National Technology Transfer and Advancement
Act of 1995, PL 104-113, which amended the FQA to further clarify and define the requirements of the
original Act. Further amendments were announced on August 14, 1998 (reference PL 105-234), which
exempted certain fasteners approved by the Federal Aviation Administration (FAA) from FQA coverage.
Additional acts were released on June 8, 1999, which amended the FQA further (reference PL 106-34 and
FQA Amendments Act of 1999). The amendments added clarification to “consensus standards” used for
fasteners.
Fasteners should be considered suspect/counterfeit or defective when they do not conform to nationally
recognized consensus standards. This may include the failure to meet specific criteria such as marking (e.g.,
manufacturer identification), mechanical testing, or chemical composition requirements.
Fasteners that do not include a manufacturer mark but include a grade (e.g., are high strength) may be
considered “suspect” and require further evaluation to determine if the:
(1) Consensus standard requires marking such as grade marking and a manufacturer marking;
(2) Item meets the standard requirements; or
(3) Item is defective, counterfeit, or fraudulent because it does not meet the consensus standard
requirements (e.g., marking, mechanical, chemical requirements).
DOE-HDBK-1221-2024
31
Fasteners without any headmark are not
high-strength and do not fall under FQA
requirements. It is still important to verify
procurement contract requirements and
specifications to see if the bolt was
specified to be a certain grade. See
example below:
Fasteners that have a “grade” mark, are not part of
an assembly, and are considered high strength
(above 120,000 psi) fall under FQA requirements.
If missing a manufacturer marking as noted below,
the fastener is not in compliance with this
requirement and should be reported as S/CI. If part
of an assembly, additional verification should be
completed such as inspection or test to determine
authenticity.
No grade marking and no manufacturer
marking
SAE Grade 5 Marking without a manufacturer
marking
Table 3: Headmark Comparisons
5.1 FQA Clarifications
Does a manufacturer-produced fastener meet the Fastener Quality Act requirements?
1) Use resources including but not limited to the U.S. Patent and Trademark Office (USPTO)
Fastener Quality Act reference site3 and Department of Defense Specialty Metals Certification
website4 to identify the manufacturer from their insignia (if the item is marked).
2) Validate that the manufacturer is a registered fastener manufacturer by checking with the USPTO,
by verifying current fastener insignia list5. If they are not registered, then they must have a valid
and current quality management system from a consensus standard organization (e.g., ISO 9001)
– see #4 below for FQA exclusions.
Section 23
3) Validate the fastener meets the grade requirements listed on the fastener such as marking,
mechanical, and chemical (e.g., ASTM, ASME, ISO, SAE, etc.).
4) Some fasteners fall under the FQA exclusions which means they would not automatically be
considered “fraudulent” or “suspect” if found to lack registration with the USPTO or meeting
other FQA requirements. However, they may be considered suspect/counterfeit or defective if
further evaluation such as chemical or mechanical testing concludes the item is substandard, or if
the fastener is included on the “Legacy Fastener Headmark List” (see Appendix A). NOTE: the
fasteners in Appendix A should be considered suspect/counterfeit and no further testing is
required.
3Fastener Quality Act Reference Site: https://www.uspto.gov/trademarks/laws/fastener-quality-act-fqa/fastener-
quality-act-fqa.
4 DoD Specialty Metals Certification website: https://www.indfast.org/info/specialty_metal_certifications.asp.
5 USPTO FQA Registry website: https://www.uspto.gov/sites/default/files/documents/FQA_Registry.pdf.
https://www.uspto.gov/trademarks/laws/fastener-quality-act-fqa/fastener-quality-act-fqa
https://www.indfast.org/info/specialty_metal_certifications.asp
https://www.uspto.gov/trademarks/laws/fastener-quality-act-fqa/fastener-quality-act-fqa
https://www.uspto.gov/trademarks/laws/fastener-quality-act-fqa/fastener-quality-act-fqa
https://www.indfast.org/info/specialty_metal_certifications.asp
https://www.uspto.gov/sites/default/files/documents/FQA_Registry.pdf
DOE-HDBK-1221-2024
32
The NIST website6 contains additional frequently asked questions with regards to the Fastener Quality
Act.
5.2 Suspect/Counterfeit Fastener Indicators
Indication Example
Marking:
• Fastener is missing a manufacturer or grade
mark (unless certified to a specification not
requiring marking).
• Missing key information or markings on
packaging.
• Head markings are marred, missing, or appear
to have been altered.
Figure 4: SAE Grade 5 bolts without a manufacturer
mark
Marking:
• Headmarks with raised marks and depressed
marks on same fastener (not normal
manufacturing process).
• Stamping contains metric and standard
measurements or double stamping.
NOTE: Some manufacturers to identify and trace a
fastener to a specific lot, as part of their process, may use
a vibro-etch pen to note that lot number on the bolt head.
This is acceptable as part of the manufacturing process.
Figure 5: Double-stamped Bolt
Additional Description: Bolt has been double
stamped with two radial lines which indicate 18-
8 stainless steel and B-8. These fasteners should
be considered suspect/counterfeit and defective
and should not be used. Although 18-8 and B8
are chemically equivalent, they differ in tensile
strength.
6 https://www.nist.gov/standardsgov/compliance-faqs-fastener-quality-act-fqa
DOE-HDBK-1221-2024
33
Indication Example
General Fastener Quality:
• Evidence of machining marks.
• Poor thread form, evidence of wear, or threads
are not of uniform color or finish.
• Coating/plating is incorrect or inadequate
quality.
Figure 6: General Fastener Quality
(Sokoloff, 2006)
5.3 Identification Examples
5.3.1 Case Study #1
An 8.8 metric fastener without a manufacturer marking is identified on a ratchet strap. The fastener
would be considered “suspect” until further analysis or testing could be conducted to prove that the item
is defective or counterfeit. Testing on items such as bolts for ratchet straps may not be cost effective or
feasible.
Section 24
In the example for the ratchet strap, if ISO 898-1, Mechanical Properties of Fasteners Made of Carbon
Steel and Alloy Steel Part 1 was specified this would require the 8.8 fastener to have a manufacturer
marking and the fastener would be at a minimum be considered nonconforming to that marking
requirement. This can be determined visually and without testing. Further chemical and mechanical
testing may be conducted to determine if the fastener material was misrepresented did not meet the
requirements of the standard and the material was not capable of meeting its intended use. Fasteners in
assemblies (e.g., ratchet straps) are excluded under the Fastener Quality Act (FQA) from automatic
determination as counterfeit and/ or fraudulent such as in the example of the ratchet strap, but items
should still be evaluated to determine if they are adequate/safe for the intended use (i.e., using a graded
approach and as determined by local processes or procedures).
Figure 7: 8.8 grade bolt no manufacturer marking
DOE-HDBK-1221-2024
34
5.3.1.1 Case Study #1 Disposition & Reporting Example:
Figure 8: Sample disposition process for a ratchet strap
Start Reporting Process:
Fasteners that are determined to be S/CI are required to be reported. This may include local S/CI
reporting processes. The S/CI Coordinator or individual responsible for reporting external to the
organization may follow these additional reporting steps:
1) In case study #1, this item was found to be nonconforming and suspect due to the missing
manufacturer marking. However, because the item is part of an assembly, further analysis should
be conducted to confirm whether or not the item is substandard, counterfeit, or defective. Unless
further analysis is conducted (e.g., testing, documentation is obtained that indicate substandard
material), the item is not required to be reported to the DOE OIG. If the item was not part of an
assembly, then report it to the DOE Office of Inspector General (OIG) in accordance with DOE O
414.1 (current), Quality Assurance.
2) Report to the Occurrence Reporting and Processing System (ORPS) in accordance with DOE O
232.2A (current), Occurrence Reporting and Processing of Information. Suspect/Counterfeit and
Defective Items that meet the criteria of this order may be reportable to ORPS7. In the example
of case study #1, if the ratchet strap was found in use, this is reportable to the ORPS system. If
the ratchet strap was found in receipt inspection, then it would not be reportable to ORPS.
7 https://www.energy.gov/ehss/occurrence-reporting-and-processing-system to learn more about the ORPS
database.
https://www.energy.gov/ehss/occurrence-reporting-and-processing-system
DOE-HDBK-1221-2024
35
3) Report Operating Experience in accordance with DOE O 210.2 (current), DOE Corporate
Operating Experience Program. Suspect/Counterfeit and Defective Items operating experience
such as best practices, lessons learned, or other information that may be valuable to the broader
DOE enterprise may be reported using the DOE OPEXShare website8. Information regarding the
ratchet strap and processes used to identify, remove, or any lessons gained may be shared with the
broader DOE community.
Section 25
4) Report to the Government-Industry Data Exchange Program (GIDEP)9 in accordance with
Federal Acquisition Regulation (FAR) 52.246-26, Reporting Nonconforming Items. If this FAR
is included in a contract (e.g., contractor to DOE or subcontractor), it would be a requirement to
report S/Cis and certain nonconformances (major and critical). The ratchet strap may be
considered reportable depending on how the item is used (e.g., item failure could adversely affect
the environment, safety, or health of the public or workers).
5.3.2 Case Study #2
Surveillances and inspections of inventories and legacy equipment may aid in identifying
suspect/counterfeit fasteners. In one such case, a DOE site was inspecting a legacy lift when they noticed
that the lift had “KS”-marked SAE grade 5 bolts. These bolts are included on the Legacy Headmark List
(Appendix A). If these bolts were produced prior to 1999, they could be substandard and should be
removed from service. Testing may be conducted to determine safety/adequacy if items will continue to
be used. Items produced after 1999 may also be tested to verify quality. Some manufacturers have
improved the quality of their products since they were placed on the Legacy Headmark List. However,
legacy materials that may be in stock or on older assembled components may have questionable quality.
Since it may not be possible to determine when the bolts were produced, to be on the side of caution, the
organization should replace the bolts.
Figure 9: “KS”-marked bolt from Legacy Headmark List
This item is considered “suspect/counterfeit” per the Legacy Headmark List in Appendix A.
8 opexshare.doe.gov to learn more about OPEXShare.
9 https://www.gidep.org/ to learn more about GIDEP.
https://doeopexshare.doe.gov/
https://www.gidep.org/
DOE-HDBK-1221-2024
36
5.3.2.1 Case Study #2 Reporting:
Fasteners that are S/CI should be reported using the organizations S/CI reporting process. The S/CI
Coordinator or individual responsible for reporting external to the organization may follow these
additional reporting steps:
1) Report to the DOE OIG in accordance with DOE O 414.1 (current). This item was found to be
suspect/counterfeit due to the manufacturer marking being on the Legacy Headmark List
(reference Appendix A). If procurement / supplier information can be obtained or is known, this
item should be reported to the DOE OIG.
Additional Legacy Fastener Reporting Example: A legacy bolt was found in the back of
closet. No one knows when, where, or how it was procured or brought onto the DOE site, but
it is suspect/counterfeit. This would not be reportable to the OIG since there is no
information to investigate.
2) Report to ORPS in accordance with DOE O 232.2A (current). Suspect/Counterfeit and Defective
Items that meet the criteria of this order may be reportable to ORPS10. In the example of case
study #2, the bolts were found on a legacy lift in which the item was in use and performed a
function that could affect safety (i.e., lifting personnel or materials). This would be reportable to
ORPS.
3) Report Operating Experience in accordance with DOE O 210.2 (current). Information regarding
the bolts and processes used to identify, remove, or any lessons gained may be shared with the
broader DOE community.
4) The bolts should be considered for reporting to GIDEP in accordance with FAR 52.246-26 since
the item may adversely affect worker safety if it were to fail.
Section 26
5.3.3 Case Study #3
A standard stainless-steel bolt sheared during a torquing operation causing concern that the bolt may be
suspect/counterfeit. After verifying all the mechanical and chemical attributes of the bolt it was
determined that the attributes were all in the ranges specified and there were not any other indications
(other than the bolt shearing unexpectedly) that would cause suspicion that the item might be
suspect/counterfeit. After further review it was found that the torquing operation was not conducted to
manufacturers specifications which caused the bolt to shear. In this case the cause of the defect was of a
controllable nature, therefore the item is not considered suspect or counterfeit. It is still a best practice to
always review items for the potential of suspect or counterfeit when there is an unexpected failure,
especially in systems where the item may be more critical.
5.3.3.1 Case Study #3 Reporting:
Fasteners that are S/CI should be reported using the organizations S/CI reporting process. The S/CI
Coordinator or individual responsible for reporting external to the organization may follow these
additional reporting steps:
1) In case study #3, this would not be reportable to the DOE OIG.
10 https://www.energy.gov/ehss/occurrence-reporting-and-processing-system to learn more about the ORPS
database.
https://www.energy.gov/ehss/occurrence-reporting-and-processing-system
DOE-HDBK-1221-2024
37
2) Report to the Occurrence Reporting and Processing System (ORPS) in accordance with DOE O
232.2A (current). Suspect/Counterfeit and Defective Items that meet the criteria of this order
may be reportable to ORPS11. In the example of case study #3, this may be reportable to ORPS
depending on the particular details surrounding the bolt shearing (e.g., did anyone get injured,
was there a possibility of someone being injured, how was the overall end product going to be
used and if the bolts sheared in use would this have injured anyone).
3) Report Operating Experience in accordance with DOE O 210.2 (current). In this case,
information may be shared with the broader DOE community.
4) The bolts would not be reportable to GIDEP in accordance with FAR 52.246-26 since the
shearing was caused by an installation error and the manufacturer’s instructions were not
followed.
6 Electronics
Counterfeit electronics pose a serious threat to industry and government supply chains. Counterfeiters
have attacked every commodity of electronics from simple components such as capacitors, to complex
integrated circuits, such as microprocessors, and complete assembled units such as computer network
routers. Inexpensive commercial devices, as well as high-cost military components, have been
counterfeited.
Counterfeit electronic parts may be divided into five major categories, which can be broken down into 4Rs
and 1C or 4R1C as shown below:
1) Recovered;
2) Refurbished;
3) Repackaged;
4) Rejected; and
5) Cloned.
Electronics that have indications of S/CI should be reported using the organizations S/CI reporting
process.
6.1 Recovered
The first “R” is recovered electronics. In recent years, recovered electronics are the most common type
of suspect/counterfeit electronic items. The first major wave of counterfeit parts was recovered parts from
salvaged electronics waste. This type of counterfeit device has the appearance of the correct device, often
with the wrong die12 internally and a remarked package. The counterfeiter’s process includes:
Section 27
11 https://www.energy.gov/ehss/occurrence-reporting-and-processing-system to learn more about the ORPS
database.
12 A small block of semiconducting material on which a given functional circuit is fabricated.
https://www.energy.gov/ehss/occurrence-reporting-and-processing-system
DOE-HDBK-1221-2024
38
• Component removal;
• Sanding and/or blacktopping (recoating);
• Remarking;
• Detailed cleanup of solder; and
• Packaged to make it look new.
These parts can be caught early by a careful visual inspection using industry methods described in the
Independent Distributors of Electronics Association (IDEA) Standard 1010-B, Acceptability of Electronic
Components Distributed in the Open Market and SAE standard AS6171/2A, Techniques for
Suspect/Counterfeit EEE Parts Detection by External Visual Inspection, Remarking and Resurfacing, and
Surface Texture Analysis Using SEM Test Methods. On the occasions that they are not visually detected,
decapsulation or basic tests such as a curve trace will identify the counterfeit units. If these devices reach
the application board, they may fail outright and cause serious delays to manufacturing schedules. If the
device makes it to the field, it can pose a significant risk due to unreliability and premature failure.
Recovered Parts Examples (Blacktopping):
Description Figure
Indent that has been filled in with the
“blacktopping” material.
Figure 10: Blacktopped Example
DOE-HDBK-1221-2024
39
Close-up of indent that has been filled in
with the “blacktopping” material.
Figure 11: Blacktopped Example-Indent Filled
Shows blacktopping on the edge of the
parts. See how the top of the part is
shiny and the bottom has a duller finish.
These parts are made in a mold. These
molds are not designed to put a beautiful
shiny finish on the top so they can sell
their good looks. The texture should not
change halfway on a section of the part.
This picture is a notable example of an
original vs. a fake finish.
Figure 12: Blacktopped Example –Side View – Overspray
6.2 Refurbished
The second “R” is refurbished electronics. These electronic devices are often the correct item and may
even still have the original marking on the package. These refurbished units are at an elevated risk of
failure since they are often subjected to excessive heat during removal from previously used circuit or
wiring boards and may have been introduced to harsh chemicals during the refurbishment process.
Excessive heat can weaken the die. Counterfeiters have become experts in reworking a package and the
solder on the leads. They can make the device look new and unused.
Even the best visual inspection techniques can have a challenging time identifying these refurbished parts
with certainty. Typical signs that a part may be S/CI include solder that looks too new, the absence of test
contacts on leads, questionable scratches, and solder inconsistency. Decapsulation provides no assistance
in the detection of units that have the correct die internally. After careful visual inspection, an additional
test that provides value with plastic parts is Scanning Acoustic Microscopy (SAM). SAM can look inside
the package to look for severe internal package damage. Electrical testing is also effective since device
DOE-HDBK-1221-2024
40
failure rates provide an indication of handling issues. Entire lots should be rejected if the high failure
rates indicate systemic issues, which may indicate long term reliability concerns with all the units.
Refurbished parts would have similar packaging indications as recovered parts.
Section 28
6.2.1 Refurbished Electronics Examples:
Description Figure
Sanding is noticeable in the upper left-hand
corner of the item.
(reference: Counterfeit electronic
component detection – AERI)
Figure 13: Sanding Example
This part is marked on top of the indent,
which is not acceptable per manufacturing
specifications.
(reference: Counterfeit electronic
component detection – AERI)
Figure 14: Marking on Indent
6.3 Repackaged
The third “R” is repackaged, which often involves die salvaging. This is another common method
available to counterfeiters and is a process that removes a compatible die from a used package for
subsequent use in a newly manufactured package. The package was chemically decapsulated, the die
was removed, and then the die was built into new package. The result is a newly packaged device with
the correct die internally. All the packaging and marking are new, so it does not appear to be suspicious.
However, there is great danger in using the parts since the chemical decapsulation process damages the
die and diminishes its reliability. An internal visual inspection of the die will not typically identify the
recovered die. An extensive Scanning Electron Microscope (SEM) Destructive Physical Analysis could
https://www.aeri.com/counterfeit-electronic-component-detection/
https://www.aeri.com/counterfeit-electronic-component-detection/
https://www.aeri.com/counterfeit-electronic-component-detection/
https://www.aeri.com/counterfeit-electronic-component-detection/
DOE-HDBK-1221-2024
41
detect the recovered die, but SEM analysis is not typically part of counterfeit device inspection. The best
method of detection is a robust electrical test at design temperature and vibration conditions. Parts are
not normally screened under actual design conditions. Chips assembled in this way result in high failure
rates due to inferior quality and reliability of the recovered die.
Also closely related to recovered die are units that are newly manufactured from acquired dies. The new
die can be purchased from reputable sources or illegally obtained from integrated circuit (IC)
manufacturer’s rejects. A leftover failed die can be effectively used by the counterfeiters since the
finished unit will look correct in every way. Once again, the only effective method to identify these units
is a robust electrical test since visual identification techniques are ineffective on newly packaged units.
Counterfeiters are becoming experts in device substitution. In this way, they are working as component
engineers trying to determine the device that will work as the best substitute for the requested device.
Using device substitution techniques, they are able to replace one transistor with a similar function. It is
an easy task to identify a similar device and remake the component, since die markings on such
components are not common. The substitution may have significant issues since the replacement part
may have insufficient parameters for handlings (voltages, amperages, etc.) and may not be able to
withstand the designed requirements. The counterfeiter’s methods also extend to simple components such
as capacitors, resistors, and diodes. These simple device types often have minimal or no marking present
on the packages.
6.3.1 Repackaged Example
In the example, the comparison of a S/CI and genuine Atmel device on external visual inspection indicate
a variation in indent locations. This should suggest that further evaluation of the device is necessary.
Upon further evaluation of the internals of die after decapsulation, there are inconsistencies in
manufacturer markings with the genuine being marked “ATMEL” and S/CI being marked “CSI.”
Section 29
Description Figure
Genuine Atmel Device is
marked “Atmel” on interior
of die.
Figure 15: Genuine Atmel Device
DOE-HDBK-1221-2024
42
Suspect/Counterfeit is
missing pin 1 locator indent
and indents are inconsistent
to comparison genuine
example. Marked “CSI”
instead of “Atmel” on
interior of die.
Figure 16: Counterfeit Atmel Device
6.4 Rejected
The fourth “R” is rejected by manufacturers. Usually, these are tightly controlled, but rejected items
continues to be an issue. These rejected items occasionally show up in the secondary components supply
chains. Most manufacturers have tightened their procedures to ensure that rejected items are not reused;
however, it is difficult to have complete assurance that a failed device is destroyed. Some of the units can
be diverted or smuggled out and eventually sold as new. These rejected units are often nearly functional,
and with the true manufacturer marking they look like real, fully functional units. The risks are also
significant for eventual re-use of rejected wafers, or re-use of the remaining rejected die left over after
assembly. Robust electrical testing may be one of the only effective methods to identify manufacturing
rejects that could be sold as good units.
6.5 Clones
“C” stands for clones. SAE Aerospace Standard AS6171 Test Methods Standard; General Requirements,
Suspect/Counterfeit, Electrical, Electronic, and Electromechanical Parts defines a cloned part as: A
reproduction of a part produced by an unauthorized manufacturer without approval or design authority
that replicates the authorized manufacturer’s part.
Counterfeiters that use the “cloning method” are eliminating a substantial portion of the development
costs of the part, which is why this method is becoming more popular. Cloning can be done in two ways:
by reverse engineering or by obtaining design information and/or technical data inappropriately (such as
by unauthorized knowledge transfer from a person with access to the part design). An alert on cloned
parts issued by ERAI identified the following indicators:
• Inconsistent font and grammar on all labels which had appeared to be tampered with.
• Inconsistent part markings when compared to a known good device.
DOE-HDBK-1221-2024
43
• Inconsistent pin-one indicator cavities which varied in depth.
• Solvent tests did not present signs to indicate the parts were not authentic.
• A scrape test concluded no resurfacing material was present.
• Radiological inspection revealed the lead frame, die size and placement and bond wire gauge and
routing were inconsistent from the known good device.
• XRF analysis found the leads contained Sn and Cu which did not match the factory label denoting
RoHS compliancy code “e4” and varied from those found in the known good devices.
• Decapsulation revealed the die layout was consistent between the samples but differed
“significantly” from the known good devices.
• SEM did not uncover any signs to indicate the components were not authentic.
• The parts passed visual inspection.
Clones may be identified by performing destructive physical analysis. It is often during these tests that
discrepancies and differences from the original manufacturer may be identified.
6.6 General Test Methods for Electronics
Section 30
How is testing conducted for 4R1C as discussed above? Inspection methods can be based on a graded
approach or could use a multi-stage process dependent on findings from the previous stage. For example,
an organization may begin by inspecting the item’s packaging then move to visual inspection of the parts.
In addition to this, organizations may use sampling plans to accommodate large quantity purchases.
Below are some common test methods listed in order of graded approach from least to most intensive.
Table 4: Electronics Evaluation Table- Level of Rigor
Visual Inspection
Dimensional Inspection
Resistance to Solvents and Scrape Testing
X-Ray Fluorescence (XRF) Analysis
X-Ray Inspection
SAM and C-SAM Inspection
Destructive Physical Analysis (DPA)
Environmental Test Methods and Inspection
Less R
igor M
ore R
igor
DOE-HDBK-1221-2024
44
6.6.1 Visual Inspection
A visual inspection is a non-destructive test used to verify attributes of component, such as condition, part
marking, lead conditions, dimension, and surface quality. The inspection should start with the exterior
box, Electro-Static Discharge (ESD), or other manufacturer-provided packaging. Additional indications
to note during visual inspection of packaging include:
1) Part orientation in package. Are all items oriented the same direction?
2) Pin orientation. Do all parts in a reel or tape appear to have pin one oriented in the same direction
and do they all appear to be of the same design and type (e.g., consistent)?
3) Parts packaged in accordance with manufacturers specifications. Are the items packaged
correctly in accordance with manufacturer’s instructions or specifications (e.g., humidity, impact,
or other necessary controls to prevent damage during shipment or storage)?
6.6.1.1 General Packaging Indicators
All reputable electronics manufactures have quality standards that reduce the likelihood of major
imperfections. The part numbers are to be in a certain location on the part, and they are not to be crooked,
misspelled, or out of alignment. The logos are also monitored very closely and should not vary from part
to part. In addition, the markings are to withstand tough environments and still be legible. Visual
inspection of the exterior of the item (often referred to as the package) can be conducted with or without a
microscope. Typically, this type of inspection will require some sort of comparison such as the
manufacturer datasheet to provide specifications (e.g., package type, dimensions, markings, or other
relevant data).
Some indications to note when inspecting the general appearance of items include:
• Part markings;
• Color of the part marking;
• Color of the surface; and
• Scratches or chip outs on the surfaces.
6.6.1.2 Indents
Indents should be inspected to verify that they are per manufacturer specification. Indents are never
partially made during the manufacturing process and they should be consistent and uniform in depth
throughout the circle.
DOE-HDBK-1221-2024
45
Example of a uniform and
acceptable indent that is smooth in
appearance (Harold "Woody"
Hewett, Electro-Comp Services,
Inc., 2010)
Figure 17: Example of Acceptable Indent
Indent is grainy in appearance,
which indicates alteration of the
part.
(Harold "Woody" Hewett, Electro-
Comp Services, Inc., 2010)
Figure 18: Example of Suspect Indent
Section 31
6.6.1.3 Markings
Remarking is becoming increasing difficult to detect. Methods are being used by counterfeiters that will
completely remove ink markings and leave no remnant or shadow of the original marking (i.e., ghost
markings). The new markings which are applied over the top, look completely normal and may pass
visual inspections. Counterfeiters are even using surface sandblasting and laser ablation to remove laser
marking which was previously being removed by sanding. Chemically impervious blacktopping
materials that have similar material composition to the original plastic package are also in use. These
blacktop materials are not easily dissolved by military specifications marking permanency tests or even
acetone tests. Blacktop removal now requires more aggressive chemical removal methods such as
Dynasolve.
Not all blacktopping is a sign of counterfeit components. Some companies blacktop or coat their chips on
a board after fabrication. This effort precludes individual component replacement or repair. Thus, the
device should be returned to the vendor for repair services.
Additional questions on marking indications include:
• Are part markings consistent with manufacturer’s requirements and do they appear to be good
quality (e.g., verify placement, alignment, marking consistency, etc.)?
DOE-HDBK-1221-2024
46
• Are the date codes and lot codes consistent with when and where the part was originally
manufactured?
• Is the item still produced or is it obsolete? Sometimes items are produced well after the date the
manufacturer stopped production and no other manufacturers have picked up the production.
Reference Product Change Notifications (PCNs) to determine if an item has changed
manufacturing locations, when it was first starting to be produced, and when it was last produced.
PCNs may also aid in noting marking or die changes. PCNs are often available from the
manufacturer on their website or by request.
Note that the “C” in the top line is
different than the “C in the bottom
line and that the “3” is slightly
higher than the other markings in
the same line. These indications
are consistent with remarking.
Figure 19: Example Indications of Remarking
6.6.1.4 Surface and Texture Appearance
Plastic electronic components are typically made with a mix of fine glass and plastic. The surface of the
molded package is textured when it is removed from the mold. Although difficult to see in pictures, a
microscopic view shows that the differences between a typical fake and the surface of an authentic part
can best be described as having a sharper and duller look. The glass in the mixture makes for sharp peaks
and valleys, whereas, when painted with the blacktopping material the peaks and valleys are smoothed
over and filled in, as if there were a coat of paint on sandpaper. The surface should have a molded
appearance rather than a surface that has been changed by chemical or sanding to remove initial
markings. Inspect the texture (grain) of the surface of the part where applicable. Are the top and bottom
textures the same?
DOE-HDBK-1221-2024
47
This is the same device
There are inconsistencies
in general appearance
between the top surface
and bottom surface of the
item’s texture, which
make it suspect.
Figure 20: Example Texture Irregularity between top and bottom
surface of the same device
6.6.1.5 Contact Surfaces
Inspect contact surfaces such as leads, balls, and contacts for the following:
• Are the leads bent or bowed?
Section 32
• Are there any insertion marks?
• Are the leads, balls, or contacts too shiny?
• Is the plating smooth and even? Are there any voids in the plating?
• In the case of a Ball Grid Array, are the balls flattened or distorted?
• Is there any foreign substance visible on the surfaces or the leads?
• Do items have the correct number of leads, balls, pads, etc.?
6.6.2 Dimensional Inspection
Dimensional inspection may be used to compare the physical attributes and dimensions of the part to the
specifications and requirements in manufacturer datasheets. A micrometer or other instrument with the
appropriate level and accuracy should be used. When measuring a part, it is especially important to
measure part thickness as it may be a key indicator that the part has been remarked.
DOE-HDBK-1221-2024
48
Note in the image that the part thickness is
undersized which is a key indicator that the part
may have had a portion of the top layer of the
original markings removed by sanding and then
has been remarked. (Harold "Woody" Hewett,
Electro-Comp Services, Inc., 2010)
Figure 21: Example Dimensional Inspection
6.6.3 Resistance to Solvents and Scrape Testing
There are several ways to verify a device’s resistance to solvents which include the use of chemicals
(such as acetone or Dynasolve) or using a scrape test method. The purpose of these tests is to determine
if a part has been blacktopped or has a false coating material which has been used for remarking.
Acetone was used to remove blacktopping, which
after removal sanding is clearly visible. (Harold
"Woody" Hewett, Electro-Comp Services, Inc.,
2010)
Figure 22: Example Resistance to Solvent Failure
When the scrape test is performed on a part that
has been remarked, there is flaking visible on the
surface where the part was scraped. (Harold
"Woody" Hewett, Electro-Comp Services, Inc.,
2010)
Figure 23: Example Scrape Test Failure
DOE-HDBK-1221-2024
49
6.6.4 X-Ray Fluorescence Testing (XRF) Analysis
X-ray fluorescence is a non-destructive testing method used to analyze the chemical composition of an
item. XRF analyzers determine the chemistry of a sample by measuring the fluorescent (or secondary) X-
ray emitted from a sample when it is excited by a primary X-ray source. Each of the elements present in a
sample produces a set of characteristic fluorescent X-rays (“a fingerprint”) that is unique for that specific
element, which is why XRF spectroscopy is an excellent technology for qualitative and quantitative
analysis of material composition.
Example of XRF where multiple
elements are identified in the sample.
XRF Resources: AS6081, Fraudulent/Counterfeit Electronic Parts: Avoidance, Detection, Mitigation,
and Disposition – Distributors; AS6171, Test Methods Standard; General Requirements,
Suspect/Counterfeit, Electrical, Electronic, and Electromechanical Parts; and ASTM-B658-98, Standard
Test Method for Measurement of Coating Thickness by X-Ray Spectrometry.
6.6.5 X-Ray Inspection
X-Ray is a non-destructive testing method used to aid in identifying defects internal to the device. There
are various methods of X-Ray that may be employed such as computed laminography and computed
tomography. X-ray can detect voids, cracks, and differences in die construction.
X-Ray Inspection Resources: SAE AS6171/5, Techniques for Suspect/Counterfeit EEE Parts Detection
by Radiological Test Methods.
Section 33
6.6.6 SAM and C-SAM Inspection
Scanning Acoustic Microscopy (SAM) and Confocal Scanning Acoustic Microscopy (C-SAM) are non-
destructive analysis methods to detect defects inside of an electronic device. These methods use
ultrasonics to detect material changes; therefore, SAM and C-SAM may detect more finite defects (such
as cracks and delaminations), and it may be more sensitive to voids that may be present in the material.
SAM and C-SAM Resources: AS6171/6, Techniques for Suspect/Counterfeit EEE Parts Detection by
Acoustic Microscopy (AM) Test Methods. J-STD-020, Standard Moisture/Reflow Sensitivity
Classification for Non-hermetic Surface Mount Devices (SMDs); J-STD-033, Joint IPC/JEDEC Standard
for Handling, Packing, Shipping, and Use of Moisture/Reflow Sensitive Surface-Mount Devices; and J-
This Photo by Unknown Author is licensed under CC BY-SA-NC
Figure 24: Example XRF Analysis
https://chem.libretexts.org/Bookshelves/Analytical_Chemistry/Supplemental_Modules_(Analytical_Chemistry)/Analytical_Sciences_Digital_Library/Active_Learning/Contextual_Modules/Environmental_Analysis_%E2%80%93_Lake_Nakuru_Flamingos/Heavy_Metals/02_Metals_Analysis_by_X-ray_Fluorescence
https://creativecommons.org/licenses/by-nc-sa/3.0/
DOE-HDBK-1221-2024
50
STD-035, Joint IPC/JEDEC Standard for Acoustic Microscopy for Non-Hermetic Encapsulated
Electronic Devices.
6.6.7 Destructive Physical Analysis (DPA)
Destructive Physical Analysis (DPA) is the process of performing decapsulation13 disassembling, testing,
and inspecting electronic components to assess quality and reliability. Part of this testing may include
other tests such as:
• Ball Sheer Strength;
• Die Sheer Strength;
• Digital Microscopy;
• Visual Inspection;
• Glassivation Layer Inspection;
• Cross-Sectioning;
• Particle Impact Noise Detection;
• Scanning Electron Microscopy (SEM);
• SEM Metallization Inspection;
• Solder reflow/ Moisture Sensitivity Testing;
• Glassivation Thickness;
• Metallization Thickness;
• Hermeticity Testing;
• SEM, XRF, and FTIR elemental analysis;
• Scanning Acoustic Microscopy (C Mode); and
In the case of a hermetically sealed device, removal of the lid or “delidding” may be conducted using
more of a mechanical process and will not require the use of a chemical agent. These types of items
typically have a ceramic packaging that cannot be dissolved by acids or other erosive solvents; therefore,
the top must be mechanically removed to expose the internal die.
Internal inspection permits the visual inspection for foreign material, corrosion, mechanical damage, or
other workmanship and processing issues. In addition to this, items may be compared to known good
items or a “gold standard” in order to identify potential die discrepancies.
DPA Resources: SSQ-25000, Destructive Physical Analysis Testing Specification for the Space Station
Program and AS6171/4, Techniques for Suspect/Counterfeit EEE Parts Detection by
Delid/Decapsulation Physical Analysis Test Methods.
13 The process of removing a cap, lid, or encapsulating material from a packaged integrated circuit by mechanical,
thermal, or chemical means exposing the integrated circuit for further analysis, inspection, or electrical
examination of the die and the internal features.
DOE-HDBK-1221-2024
51
6.6.8 Electrical Test Methods and Inspection
Electrical testing may be conducted on individual items or Printed Circuit Boards (PCBs) to verify that
components are functional, meet electrical specifications, or will fulfill specified reliability requirements.
Section 34
Electrical Test Resource: AS6171/7, Techniques for Suspect/Counterfeit EEE Parts Detection by
Electrical Test Methods.
6.6.9 Environmental Test Methods and Inspection
Environmental testing may be used to determine if a device will perform under extreme conditions for a
defined period of time. Environmental testing can also be used to identify S/CIs and may include the
following test methods and inspections:
• Accelerated aging testing such as Burn-In, High-Temperature Operating Life and Low-
Temperature Operation.
o Used to accelerate failure mechanisms and determine reliability.
• Cyclical Moisture Resistance.
o Evaluates high-heat and humidity conditions.
• Highly Accelerated Stress Test.
o Combines high temperature, high relative humidity, and high atmospheric pressure to
evaluate accelerated resistance to humidity.
• Preconditioning Testing.
o Measures the resistance of non-hermetic surface mount devices to worst-case moisture
absorption followed by the soldering process and rework.
• Steam Aging.
o Replicates shelf life by artificially aging components and circuit boards.
• Thermal Cycling.
o Determines the ability to withstand exposure to alternating extremes of high and low
temperatures.
• Thermal Shock Testing.
o Accelerates failure modes due to rapidly changing temperatures.
DOE-HDBK-1221-2024
52
7 Suspect/Counterfeit Software
Why is software quality and the prevention of substandard and counterfeit software so important?
Electronics, electrical products, and many of the modern conveniences that we rely on each day require
software to control them. If the software does not work properly, this could result in frustration at a
minimum or a catastrophic accident. Recent events such as the case of Elaine Herzberg, a pedestrian
fatality with a self-driving Uber vehicle in Tempe Arizona in December 2018, prove that there is still a
gap in discussion of liability, vulnerability, and quality that needs to occur around software controls.
The impact of adulterated and counterfeit software was examined in 2018 by The Software Alliance
(BSA). It found that 37 percent of software installed on personal computers is unlicensed or counterfeit.
Organizations now face a one-in-three chance of encountering malware when they obtain or install an
unlicensed software package or buy a computer with unlicensed software on it. Because of the link
between counterfeit software and IT security issues from malware, this poses a danger for consumers and
businesses alike, especially when software is used in critical applications. (BSA, 2018)
Once they detect malware, consumers and enterprises may need to invest considerable time and money to
identify the corrupted software, repair their systems, recover lost data, and deal with identity theft. Each
malware attack can cost a company $2.4 million on average and can take 243 days to detect and 50 days
to resolve. To the extent that the infection leads to company downtime, or lost business data, it can also
seriously affect the company’s brand and reputation. The cost for dealing with malware that is associated
with unlicensed software is growing too. It can now cost a company more than $10,000 per infected
computer, and cost companies worldwide nearly $359 billion a year. (BSA, 2018)
Section 35
In a 2022 report from Verizon, it was found that a data breach in the supply chain can lead to wide
ranging consequences. Supply chain was responsible for 62% of System Intrusion Incidents in 2021. A
supply chain breach occurs when someone infiltrates the system through an outside partner or providers
with access to systems and data. This has dramatically changed the attack surface of the typical enterprise
in the past few years, with more suppliers and service providers touching sensitive data than ever before.
Solar Winds, which is discussed in Section 7.3 below, is an example of a supply chain breach that
impacted DOE and many other Federal agencies. (Verizon, 2022)
DOE sites may also be impacted through the purchase of commercial enterprise resource software or
products that may have been exaggerated or misrepresented as having specific features, capabilities, or
functionality that they really do not.
7.1 CASE STUDY: Lufkin VS IBM
Lufkin Industries, a publicly traded company based in Lufkin, Texas, manufactures machinery and
equipment used in various segments of the energy industry. In 2009, Lufkin decided to upgrade its
business-operations computer-software system. Over a period of several months, Lufkin engaged in
numerous meetings with International Business Machines (IBM) Corporation in which they exchanged
information about Lufkin’s needs and IBM’s capabilities. Lufkin needed an “off-the-shelf” system that
could quickly replace its old system for a price lower than the cost of upgrading that system. Based on
DOE-HDBK-1221-2024
53
Lufkin’s operational needs, IBM recommended its “Express Solution for SAP,” which uses software
developed by SAP14, a separate German corporation.
During these extended discussions, IBM made numerous representations about its Express Solution that
turned out to be false. IBM represented that the Express Solution was a preconfigured system that could
be implemented for Lufkin within 4 to 6 months and meet 80% of Lufkin’s requirements without any
enhancements. Even though IBM knew that its Express Solution would require extensive customization
before it could meet most of Lufkin’s needs, IBM continued to represent the Express Solution as a “fit”
for Lufkin. The intent was to land the sale and then figure out how to provide what Lufkin needed.
Lufkin purchased the products and found that it did not meet their needs. When Lufkin filed suit, the jury
found IBM liable on all claims. The jury awarded damages for fraudulent inducement and common law
fraud but awarded zero damages for breach of contract. (International Business Machines Corporation,
Petitioner v. Lufkin Industries, LLC, Respondent, 2018)
The Lufkin case study demonstrates the impact that a substandard software can have to a business and
costs to a project. The impact of safety or critical application software as shown in the next case study
can be much more detrimental.
7.2 CASE STUDY: Cisco Networking Devices
An IT company asked a cybersecurity firm to analyze some of its equipment only to discover that some of
its core Cisco networking devices were counterfeit. In the case of this analysis, the counterfeits were
made for profit and did not include any malware, but the items did have access to exploit backdoors into
the company to steal data and spread malware. The impact of a malicious counterfeit can be massive
because this gives the attacker full control of that system. This is just one form of a supply-chain induced
attack. (Newman, 2020)
Section 36
To avoid the procurement of counterfeit products, Cisco encourages customers to procure items directly
from them or their authorized distributors by going here15. Cisco also has an Identifying Counterfeit and
Pirated Products here16.
There have been numerous instances of the Department of Justice bringing charges against Cisco
counterfeit schemes including where items were sold to the U.S. government. Recently, a large case has
been brought forward concerning fraudulent networking products which initiated an Operating
Experience Level 3 (OE-3), Suspect/Counterfeit and Fraudulent Networking Products, to raise awareness
of this issue across the DOE Enterprise. This OE-3 can be found here:
https://stage.energy.gov/ehss/articles/operating-experience-level-3-2022-01-suspectcounterfeit-and-
fraudulent-networking.
14 Systeme, Anwendungen und Produkte in der Datenverarbeitung (SAP GmbH) is a German Software Company
15 Cisco Distributor Locator website: https://www.ciscochannelconnect.com/DistiLocator
16 Cisco Counterfeit and Brand Protection Webpage: https://www.cisco.com/c/en/us/about/legal/brand-
protection/identify-counterfeit-products.html
https://www.ciscochannelconnect.com/DistiLocator
https://www.cisco.com/c/en/us/about/legal/brand-protection/identify-counterfeit-products.html
https://stage.energy.gov/ehss/articles/operating-experience-level-3-2022-01-suspectcounterfeit-and-fraudulent-networking
https://stage.energy.gov/ehss/articles/operating-experience-level-3-2022-01-suspectcounterfeit-and-fraudulent-networking
https://www.ciscochannelconnect.com/DistiLocator
https://www.cisco.com/c/en/us/about/legal/brand-protection/identify-counterfeit-products.html
https://www.cisco.com/c/en/us/about/legal/brand-protection/identify-counterfeit-products.html
DOE-HDBK-1221-2024
54
7.3 CASE STUDY: Solar Winds
SolarWinds is a major software company based in Tulsa, OK, which provides system management tools
for network and infrastructure monitoring, as well as other technical services to hundreds of thousands of
organizations around the world. Among the company’s products is a IT performance monitoring system
called Orion.
The SolarWinds hack is the commonly used term to refer to the supply chain breach that involved the
SolarWinds Orion system starting in 2019. In this hack, suspected nation-state hackers identified as
Nobelium by Microsoft – and often simply referred to as the SolarWinds Hackers by other researchers –
gained access to the networks, systems, and data of thousands of SolarWinds customers.
The hackers used a method known as a supply chain attack to insert malicious code into the Orion system.
A supply chain attack works by targeting a third party with access to an organization’s systems rather
than trying to hack the networks directly.
More than 30,000 public and private organizations use the Orion system to manage IT resources,
including local, state, and federal agencies. As a result, the hack compromised the data, networks, and
systems of thousands when SolarWinds delivered an update to the Orion software that contained this
backdoor malware. Through this code, hackers accessed SolarWinds’s customer information technology
systems, which they could then use to install even more malware to spy on other companies and
organizations.
The purpose of this attack is still largely speculated and unknown, but this hack has been a catalyst for
rapid and broad change in the cybersecurity and software industries. (Saheed Oladimeji, 2022)
Section 37
7.4 Software Maintenance and Reuse
The unauthorized removal of systems and network maintenance tools from the supply chain may
introduce supply chain risks, such as unauthorized modification, replacement with counterfeit, or malware
insertion while the tool is outside of the enterprise’s control. (National Institute of Standards and
Technology, 2022)
Organizations should verify that code is maintainable. One way to ensure that code is maintainable is to
ensure it is compliant with the current organizational software policies. Issues may arise if the code is no
longer maintained or supported by the organization.
Software quality plays a significant role in how easily software can be reused. There are obstacles of
software quality that impact reuse such as:
• Security – Ensure code is secure. If using pre-existing code, the codebase could potentially be
vulnerable to security attacks. If the code does not have a history of being thoroughly tested, it
may contain security vulnerabilities that hackers could exploit once your product is launched.
• Reliability – Confirm reliable code by ensuring availability, fault tolerance, and recoverability.
When reusing code from a third party, some degree of control is lost since your organization did
not build the code in-house. If using a third party’s open-source code, then anyone can use and
modify the components that were reused at any time, which could change your organization’s
ability to reuse the code in the future.
• Performance Efficiencies – Ensure code efficiency by improving response times and monitoring
processor, memory, and utilization.
• Proprietary – Understand the owner of the code. If the code is proprietary and is not available to
DOE-HDBK-1221-2024
55
the public, then the owner of the code can change the terms of the license. This can affect how an
organization may be allowed to use to use code and software.
• Methodology – Understand the standards and methodology used to develop code. If the code is
undocumented or poorly written (e.g., did not follow any coding standards), then it may be more
vulnerable.
• Operating environment – Understand the operating environment. The code may be specific to a
particular platform or environment that your organization must be capable of supporting.
Special Processes Example:
The enterprise should, whenever possible and practical, use asset location technologies to track systems
and components transported between entities across the supply chain, between protected areas, or in
storage awaiting implementation, testing, maintenance, or disposal. Methods include Radio Frequency
Identification, digital signatures, or blockchains. These technologies help protect against: Diverting the
system or component for counterfeit replacement.
7.5 Avoiding Counterfeit Downloads
The following are best practices to help software engineers avoid malicious sites:
• Identify trusted software publishers. Organizations may have an approved supplier list that
includes trusted software and sites that may be used. For software downloaded directly from a
software publisher (e.g., a commercial vendor or open-source community site), limiting what sites
are allowed to only known and trusted publishers can help avoid the use of malicious software.
Establish appropriate software supply chain risk management processes to regularly evaluate
these software providers.
Section 38
• Identify trusted download sites. For software libraries, plug-ins, and components, centralized
download sites or app stores are common. Only allowing downloads from official app stores
(e.g., the Chrome web store or Apple’s App Store) or major software repositories (e.g., Microsoft
NuGet, npm, PyPi, or Maven Central) can prevent the installation of counterfeit software. These
sites have policies and procedures to prevent malware from being published and to identify and
remove malware that sneaks through. However, many tools allow for downloading software
from arbitrary sites, some of which may be malicious.
• Only download software when connected to a trusted network, either directly or via a Virtual
Private Network. A policy where software should only be downloaded when on a corporate
network is best as even home Internet connections can be subverted. DNS hijacking can be more
easily accomplished via untrusted wireless networks like those in hotels and coffee shops.
• Only visit download sites using https17 and only if their certificate is valid. Note that adversaries
can obtain their own certificates and use https on typosquatting18 sites, so this is not a defense
against this attack. However, DNS hijacking may send users to sites with invalid certificates.
• Double check that the site name is correct. Make sure to look at the entire URL19, as adversaries
can change just the domain (i.e., doe.com or doe.us instead of doe.gov).
• When searching for a download site, be careful about clicking on advertisements as they could be
“malvertisements” bought by an adversary. Using a search result that is not an ad, and verifying
the site and its URL are as expected after clicking the result, is recommended.
17 Hypertext Transfer Protocol Secure
18 Registration of a common misspelling of another organization's domain as their own
19 Uniform Resource Locator
DOE-HDBK-1221-2024
56
Even when on a legitimate site, ensuring the software being downloaded is genuine is important because
adversaries will attempt to trick users. This can affect plug-ins and extensions to browsers (Cimpanu,
2020) or integrated development environments (Krill, 2023). The following best practices are suggested:
• Double check that the software name is correct to protect against typosquatting. Where possible,
looking at the number of downloads of this software and similarly named software may help
identify counterfeit packages. The legitimate software will have more downloads.
• Where available, check out recent reviews of the software. Often, other users will warn that a
software is malicious or suspect.
• Consider a policy to require the use of software that has a substantial history and significant
usage. In other words, allow other software engineers to try out newer software and vet it before
using it in US government projects.
7.6 Avoiding Download Interception & Subversion
With the global use of https for secure browsing, the interception and modification of genuine software is
much harder. The best practices noted previously such as downloading software from trusted networks
and using https sites with valid certificates will help address potential attack vectors.
Section 39
One additional best practice is to verify software after download. Many software publishers include a
checksum of the software that can be used to verify that the software was downloaded correctly. An
attempt to alter the download would be detected – unless the adversary also updated this checksum. A
more secure verification approach is to verify a digitally signed hash of the software. That signature can
be verified, and the hash matched to one of the downloaded software. The most popular build tools (e.g.,
Gradle, Maven, and NuGet) provide mechanisms to verify signatures for open-source libraries. Some
organizations also provide an internally hosted repository (e.g., Sonatype Nexus Repository) that verifies
signatures, which means that software engineers can use this repository instead of checking signatures
themselves.
Software subversion is one of the most difficult S/CI software scenarios to avoid. In this scenario,
typified by the SolarWinds Orion attack discussed above, genuine software downloaded from a legitimate
site may be malicious because an adversary inserted malware at the source. Such an attack can occur
with software applications and with software libraries (e.g., the coa20 and rc21 JavaScript packages).
(Aguirre, 2021)
An adversary may present itself via a compromised computer being used by an employee unaware of the
infiltration. However, there are some best practices that can be employed such as:
• Identifying trusted software publishers. One useful avenue for commercial software publishers is
to request self-attestation that the publisher is following the NIST22 Secure Software
Development Framework, as required for Federal agencies by OMB Memo M-22-18, Enhancing
the Security of the Software Supply Chain through Secure Software Development Practices.
• Monitoring software products for security issues and vulnerabilities.
Once software has been downloaded, it still needs to be protected. This is particularly relevant to
software that is downloaded and made available for a broader community. Organizations may have
internal repositories for third-party libraries or directories containing commonly used software
applications. The following are best practices for protecting such repositories:
20 Command Option Argument (COA)
21 Run Configuration (RC)
22 National Institute of Standards and Technology (NIST)
DOE-HDBK-1221-2024
57
• Restrict who can upload or change software in the repository. Some organizations also require
that these privileged users use multi-factor authentication and/or a special privileged account to
modify such software or administer the repository.
• Verify software after download, as discussed previously.
In addition, steps should be taken to protect any software built by the organization to make sure that an
adversary does not subvert it. However, such guidance is outside the scope of this document. Interested
readers may wish to review the NIST Secure Software Development Framework (see tools and resources
below), which contains many references to additional information regarding software assurance.
7.7 S/CI Prevention Strategy for Software
Figure 25: S/CI prevention model for Software
S/CI prevention strategies may use a graded or risk-based approach as discussed in previous sections.
Plan:
Up front planning prevents S/CI, including S/CI software. Planning may start at the project planning
stage, uses a defined graded approach, and should consider the following:
1. What major procurements will be conducted during the project?
Section 40
2. Do any of the major or critical items include ICT/OT or software?
3. What steps, if any, should be included to reduce potential risk of suspect/counterfeit, pirated, or
other maliciously tainted ICT, OT, or software?
A key component of planning is to understand potential risks and their controls. The integrity of systems
and information is critical component of managing supply chain risks and cybersecurity risks. The
insertion of malicious code into a counterfeit product are two primary examples of risks that affect the
supply chain and cybersecurity.
Train
Plan
Design &
Develop
ProcureQuality &
Validation
Monitoring
Disposition &
Reporting
DOE-HDBK-1221-2024
58
Design and Develop:
During the design and development of software, software engineers should consider S/CI as part of the
selection and downloading of tools, plug-ins, third-party libraries and components, and any other software
used by the project. Before starting development, consider establishing processes for mitigating S/CI
risks with software. Such processes should consider defending against the following scenarios:
• Counterfeit software is provided via a site that looks like the genuine website but is not. A
common practice for adversaries is to name a site such that it could be mistaken for a legitimate
site (i.e., typosquatting). Another option is to hijack a Domain Name System (DNS) such that a
user is directed to a site controlled by the adversary rather than the genuine site.
• Counterfeit software with a name that is similar to the genuine software’s name is uploaded to an
app store, marketplace, code repository or other legitimate site. Typosquatting is common here as
well.
• Genuine software is intercepted during download and replaced with counterfeit software.
• Genuine software is subverted at the source with malicious code inserted into it.
• Genuine software may be subverted after installation with malicious code inserted into it.
Quality and Validation:
Restricting the team to only using software from trusted software publishers, identifying practices for
ensuring the software downloaded is the correct software, and establishing procedures for monitoring and
responding to published vulnerabilities in this software is recommended. Specific best practices are
provided below.
Verify the quality of software at intervals during phases such as procurement, receipt, inspection, and
installation, as appropriate. Prior to offering software, items, or service for acceptance by the purchaser,
the supplier will often verify that the item or service being furnished complies with the procurement
requirements. It is also especially important that requirements are specified correctly in procurement
documents so that during the quality and validation step at receipt, items will meet intended needs. Often,
the requirements and frequency of verification are determined by the procurement documents, applicable
specification, code and standard, uniqueness, complexity, application of the software/ item, quantity and
frequency of the procurement, and previous quality-related performance of the supplier.
It is important to carefully consider the graded approach to quality and validation of software, and to
document the process. For example, documentation might include the necessary steps to perform quality
checks and validation of critical items or software.
DOE-HDBK-1221-2024
59
Monitoring:
Section 41
Monitor software products for security issues and vulnerabilities. For software libraries23, a best practice
is to use a Software Composition Analysis tool that automatically scans for known vulnerabilities. For
other software types, monitoring for vulnerabilities may require regularly checking for new versions to
see if they are security-relevant, subscribing to appropriate mailing lists, and monitoring security websites
such as Ars Technica, BleepingComputer, and Cybersecurity & Infrastructure Security Agency (CISA)
Alerts.
Request a Software Bill of Materials (SBOM) for all software products and monitor them for known
vulnerabilities. A SBOM is a listing of all software libraries and components in a software product, so it
can be used to identify software that uses a vulnerable library. Creating a repository of SBOMs can be
particularly useful to identify software with critical vulnerabilities, such as recently occurred with the
log4shell vulnerability. (Berger, 2021)
The log4shell vulnerability, contained In the Log4j 2 library, allowed attackers to exploit a known
vulnerability using text messages which could control a computer remotely. The Apache Software
Foundation, which publishes the Log4j 2 library, gave the vulnerability a Common Vulnerability Scoring
System (CVSS) score of 10 out of 10. The highest-level severity score (i.e., 10), was assigned because of
the vulnerability’s potential for widespread exploitation, and the ease with which malicious attackers can
exploit it. While mitigation evolves and the damage unfolds, the fundamentals of the Log4j vulnerability
will not change.
In addition, steps should be taken to protect any software built by the organization to make sure that an
adversary does not subvert it. However, such guidance is outside the scope of this document. Interested
readers may wish to review the NIST Secure Software Development Framework (reference Appendix C),
which contains many references to additional information regarding software assurance.
Software identified as S/CI should be reported using the organizations S/CI reporting processes.
Additional resources and tools for S/CI prevention in software are included in Appendix C.
8 Indicators of Suspect Components
8.1 General Suspect/Counterfeit Indicators
The list includes general and prescriptive indicators of suspect/counterfeit items and components. Items
that are identified to have general indications of S/CI should be reported using the organizations S/CI
reporting process.
23 A software library is a suite of data and programming code that is used in software development. Software
libraries help developers save time by creating standardized, consistent, and quality code that can be used across
multiple projects.
DOE-HDBK-1221-2024
60
General Indications- Packaging Examples
•
•
•
•
•
•
•
•
•
Unusual or inadequate (i.e., shipped in plain
package with no manufacturer barcode).
Used or damaged parts in new packaging.
Foreign newspapers used as packaging.
Not in a manufacturers box or container.
Package lacks details or lacks critical information.
Package has evidence of tampering.
Package has evidence of being altered or replaced.
Item is packaged for sale in another country and
not for sale in the U.S.
Item is not packaged appropriately for the type of
item to prevent damage during shipping.
Figure 26: Example Tampering
Items may have been visibly tampered
with, which may be evident if tamper
seals have been broken. Always check
tamper-proof seals to verify they are
intact.
Section 42
Figure 27: General Appearance
General Indications-
General Appearance
Examples
•
•
•
•
•
•
Color is different than
usual.
Materials used are
different than usual.
Item is worn or
discolored.
Item appears
previously used when
ordered as “New.”
There are marks on the
item that appear as
though it has been
opened, tampered
with, or repaired.
Missing
manufacturer’s
standard markings and
logos.
On the Suspect/Counterfeit book pictured above, the shade of blue of
the book was different than the original and authentic version.
Numerous other indications were also noted after inspecting the book
such as blurred text and image on the front cover, misspellings, and
different print on the back cover and binding edge. Reference Data
Collection Sheet (DCS) 2446.
DOE-HDBK-1221-2024
61
General Indications- Print and
Labels Examples
• Low quality print.
• Differences in labels or
printing on similar or same lot
of items.
• Missing or incorrect
manufacturers logo.
• Inconsistency or conflicting
information on tags, labels,
docs.
• Missing stickers or
information on labels
nameplates.
• Wrong type of print (written
vs typed or vice versa).
• Labels have signs of being
altered.
• Expiration or cure dates are
missing or incorrect for item.
Figure 28: Example Low Quality Print
Counterfeit (left), Genuine (right). Notice the clarity in print
on the genuine device and the fuzzy print on the counterfeit
device.
Figure 29: Example Incorrect Manufacturer Label
The blue-and-white colored GE label is authentic. GE does
not affix black-and-white labels on boxes for this item nor
should the product number be handwritten without any proper
GE logo.
DOE-HDBK-1221-2024
62
General Indications-
Configuration
Examples
• Items do not meet
normal dimensional
requirements or are far
out of specifications.
• Items are missing
features (holes, taps,
bolts).
• Item contact surfaces
do not line up
correctly.
• Inconsistent use of
bolts, screws, rivets on
same lot of items.
• Inconsistent weight or
materials used in same
lot of items.
Figure 30: Configuration
Photograph from EPRI taken during inspection that shows “suspect
counterfeit” capacitors and “genuine” capacitors. The OEM later
confirmed that the suspected counterfeits were indeed counterfeit and
that the “not suspect” capacitors were authentic. (Electric Power
Research Institute (EPRI), 2014)
DOE-HDBK-1221-2024
63
8.2 Indications Hoist, Lifting, and Rigging Equipment
Indications Examples
• Missing manufacturer markings or
logos. Many DOE sites implement
and require a manufacturers name,
trademark, or logo to be on Hooks
and shackles (Reference DOE-STD-
1090-2020, Hoisting and Rigging).
• Worn or used appearance when
ordered as new.
• Original markings ground off and re-
stamped.
• Parts identified only as “China” only,
or “Korea,” “Mexico,” “Thailand,”
“India” (i.e., they are missing
manufacturer marking).
• Missing or incomplete
documentation.
• Trademark colored items that are
missing logos.
Figure 31: Shackle Missing Manufacturer Marking
The item shackle on the left is missing a manufacturer
marking or logo and has a red colored screw pin which
is a Crosby trademark. The item on the right is a
genuine Crosby shackle with the Crosby logo for
comparison.
Figure 32: Marking Alteration
The original markings have been ground off and re-
stamped.
DOE-HDBK-1221-2024
64
8.3 Indications specific to Suspect Piping and Piping Components including mechanical
and metal products
Section 43
Indications Examples
• Scratches on component outer surface.
• Components with no markings.
• Ground off casting marks.
• Stamped information where normally
cast.
• Irregular or Inconsistent markings.
• Pitting or corrosion.
• External weld or heat indications.
• Questionable or meaningless numbers.
• Evidence of hand-made parts.
• Painted stainless steel.
• Ferrous metals that are clean and bright.
• Excess wire brushing or painting.
Figure 33: Example Suspect Piping
This photograph is of a new flange that appears to
be previously used. There are indications of excess
grinding, scratches, and clamp marks on the flange
and bolt holes. (Picture are courtesy of Savannah
River Site.)
8.4 Indications of Suspect Valves
Indications Examples
• Incorrect data on documentation
(validate it is correct and within
specified parameters).
• Information on certificates has been
altered or corrected without permission.
• Conflicting information on
documentation or test data.
Figure 34: Suspect WATTS Gas Ball Valve Label
The WATTS Gas Ball Valve label is S/CI because
WATTS does not have a Woodbridge, Ontario,
Canada facility.
DOE-HDBK-1221-2024
65
Indications Examples
• Wrench marks on valve packing glands,
nuts, and bolts.
• Nameplates attached with screws rather
than rivets.
• Poor fit between assembled valve parts.
• Dirty internals.
• Scratched or marred fasteners or packing
glands.
• Gate valve: gate off-center when viewed
through open end.
• Fresh sand-blasted appearance of valve
bodies, eyebolts, fittings, and stems.
• Loose or missing fasteners.
• Several types of hand wheels on valves of
the same manufacturer.
• Some parts (e.g., hand wheels) look newer
than rest of the valve.
• Improper materials (e.g., bronze nut on a
stainless stem).
• Post-manufacturing alteration to
identification/rating markings.
• Indication of previous joint welding.
• Excessive standards markings (e.g.,
Underwriter’s Laboratory (UL), Factory
Mutual (FM), Canadian Gas Association
(CGA), American Gas Association (AGA).
• Valves will not open or close, even when
wrench applied.
• Substandard valves mixed in with standard
valves (substitution).
• Excess certification logos (i.e., “UL,”
“FM,” “CGA,” “AGA”) all on one valve
body – not normal, usually will have one or
two logos plus ANSI or ASME.
Suspect WATTS Gas Ball Valve Label. The
WATTS Gas Ball Valve label is S/CI because
WATTS does not have a Woodbridge, Ontario,
Canada facility.
Figure 35: Example Used When Ordered New
Indications on the valve indicate previous
use such as clamp marks, scratches, groove
in bolt hole, and lack of cleanliness. (Picture
courtesy of Savannah River Site.)
DOE-HDBK-1221-2024
66
8.5 Valve Manufacturer Information
In general, prior to installation, the valves and nameplates should be checked for proper identification to
be sure the valve is the proper type and of suitable pressure class. If it is appropriate to do so, actuate the
valve to check for damage from shipping and handling and to verify that the valve opens and closes as
intended. Do not allow the valve to actuate in a rough manner that could cause damage to seating areas of
the valve. Inspect the interior of both the valve and the adjoining pipe for cleanliness, since this a major
cause of seat leakage and seat damage if foreign material is in the line. Also, inspect the end connections
to be sure that pipe threads and flange faces are free of scratches, nicks, or dents.
Section 44
Valves produced by the following manufacturers have the following acceptable features. If these
features or information is missing, conflicting, or appears to have been altered the item should be
considered suspect and information should be verified with the manufacturer to validate if the items are
genuine.
If a valve manufacturer identifies discrepancies consistent with indications in the previous section or has
data missing or conflicting with information on their products, valves should be reported as S/CIs
following the organizations S/CI reporting process.
It is always recommended that datasheets, drawings, or other information is obtained directly from valve
manufacturers as this will provide the most comprehensive information as to what should be identified on
the valve. In general, a valve may have the following characteristics:
Valve body castings:
• Manufacturer name
• Pressure rating
• Pattern or drawing number
• Heat or melt number
• Grade of steel
• Valve size
Nameplate information:
• Valve serial number or identification number
• Valve class/ operating environment (example: water, oil, gas)
• Valve size and pressure rating
DOE-HDBK-1221-2024
67
9 Counterfeiting of NRTL Certifications and Symbols
Nationally Recognized Testing Laboratories (NRTLs) are third-party organizations recognized by the
Occupational Safety and Health Administration (OSHA) as having the capability to provide product
safety testing and certification services to the manufacturers of a wide range of products for use in the
American workplace. The testing and certifications are based on product safety standards developed by
U.S.-based standards developing organizations and often issued by ANSI.
S/CI coordinators should verify with the NRTL if the markings are correct or genuine. NRTL’'s maintain
strict traceability to their issued certifications and symbols.
For a current listing of OSHA recognized NRTLs and testing locations that operate under the program go
here24.
NRTL approved certification means that the NRTL determined that the product met the requirements of
an appropriate consensus-based product safety standard either by successfully evaluating the product itself
or by verifying that a contract laboratory has done so; and the NRTL has certified that the product met the
requirements of the product safety standard.
NRTL regulations are contained in 29 CFR 1910.7. Many products “approval” requirements are found in
OSHA’s standards (29 CFR Parts 1910, 1915, 1918, and 1926). NRTL testing and certification is
required for many types of products, including:
• Electrical equipment;
• Fire detecting and extinguishing equipment;
• Liquefied Petroleum Gas utilization equipment; and
• Equipment to be used in hazardous locations.
More products requiring NRTL approval can be located here25.
Figure 36: Suspect/Counterfeit NRTL Sticker (TIC, 2020)
24 http://www.osha.gov/dts/otpca/nrtl/
25https://www.osha.gov/nationally-recognized-testing-laboratory-program/products-requiring-approval
http://www.osha.gov/dts/otpca/nrtl/
https://www.osha.gov/nationally-recognized-testing-laboratory-program/products-requiring-approval
http://www.osha.gov/dts/otpca/nrtl/
https://www.osha.gov/nationally-recognized-testing-laboratory-program/products-requiring-approval
DOE-HDBK-1221-2024
68
10 Suspect/Counterfeit & Fraudulent Documentation and Certification
Section 45
Manufacturers and suppliers that make the intentional decision to misrepresent, alter, forge, or otherwise
create fraudulent and counterfeit documentation and/or certification marks are putting monetary gain above
the safety and welfare of people. There are various indications to determine if documentation, such as test
certificates, is genuine. Visually examining test documentation, certification papers, or labeling may
provide enough verification to determine if it is genuine. Accredited certifications typically use specific and
consistent formats for their test and certification reports. Manufacturers often will go to great lengths to
ensure that labeling, certification marks, and documentation is correct. These efforts are intended to
increase the difficulty for counterfeiters to falsify documents. Familiarity with a company’s official
documents and labels will help to identify when there is a deviation or if documents may be fraudulent.
General tips to avoid and detect S/CI and fraudulent documentation:
1) Use reputable sources for materials;
2) Verify test reports with manufacturer’s if obtaining reports through third parties;
3) Verify consistency in information and that it is correct for the manufacturer or supplier;
4) Verify certificates are signed by individuals who have the authority to sign the document (e.g., was
a test signed by the company’s janitor or their Quality Control Inspector?); and
5) Verify NRTL or other accreditations through accreditation websites. For instance, if a product is
Underwriters Laboratories listed, it will have a UL listing number, and the manufacturer and part or
model number will be listed in the database. Many NRTLs have ways to verify and lookup if a
product or listing is genuine either by number, manufacturer, product number, etc. They also
typically have departments that specialize in addressing concerns on counterfeit mark questions.
A useful acronym that helps to remember the indications of fraudulent documentation is i-FRAUDS, which
stands for:
• I. Information
• F. Font
• R. Reproduction
• A. Alteration
• U. Used
• D. Dates/Numerations
• S. Signature
See the subsections below for a further description on each of the letters in the acronym i-FRAUDS.
Discrepancies that are identified in documentation should be further inspected and reported using the
organizations S/CI Reporting Processes.
DOE-HDBK-1221-2024
69
10.1 Information
Information presented in a product’s document(s) should match the product itself and be consistent.
Inconsistencies in the information are red flags of falsified documents. Inspections may include
comparisons of products, documentation, packaging, and labels to verify that they are all consistent. This
could include verifying consistent serialization, specification numeration, or other identifying data. If
there are inconsistencies, these should be verified with the manufacturer. If items were procured directly
from the manufacturer and the manufacturers processes are in question, then the items should be reported
using the appropriate S/CI reporting processes discussed in the reporting section of this handbook.
10.2 Font
If there are non-logical changes in font size, spacing, or consistency in font type usage these are red flags
of potential fraudulent documentation. It would be logical to see some changes in fonts where it makes
sense such as in titles of documents, section headings, or signature lines. Fonts should not change in the
middle of a word, which would be considered not logical.
Section 46
CREATED FOR TRAINING PURPOSES ONLY
Figure 37: Font Indication Example
10.3 Reproduction
Documentation may be reproduced without authorization. Reproduced documentation may include the
same or original information – such as serial, batch, or item numbers. This information may be expected
to be different when purchasing multiple items but may appear to be the same. Documentation that does
not have an original signature or has duplication of the same signature, could be an indication of
unauthorized reproduction. With advances in copier technology, unauthorized reproductions are harder to
spot and documentation such as certificates of conformance or other confirmatory documents should be
examined carefully.
DOE-HDBK-1221-2024
70
10.4 Alteration
Forgery—which is when a person creates a false document or alters a genuine document, certification, or
other legal document with the intent to deceive or defraud—is a crime in most countries, including the
U.S. Figure 38 is an indication of alteration in a document. Some alterations are more obvious than
others such as the below where all or parts of the document has been removed, replaced, or copied over.
CREATED FOR TRAINING PURPOSES ONLY
Figure 38: Alteration Example
10.5 Used
Items for aging facilities may be ordered to be new. However, with the increasing age of DOE facilities
and equipment, it is becoming increasingly difficult to procure and receive new parts and equipment.
This can lead to vendors providing documentation that identifies the item as new when there is evidence
the item has been previously used. Whether or not the item was procured for an older facility, if
documentation identifies items as new when there is an indication of previous use this is an indicator of
potential fraud. This documentation should be held as “suspect” and investigated further. In addition to
this, the item should be further inspected or tested to verify if the item meets requirements for what was
specified in the contract or order documents.
DOE-HDBK-1221-2024
71
10.6 Dates & Numerations
An indication of potential fraud may be dates and numeration inconsistencies. For instance,
documentation that is intended for a specific serialized product. The product may also be marked with a
serial number. It is vital that the serial number on the product is compared against the documentation to
verify:
a. Product type;
b. Model and/or part number; and
c. Serial numbers are the same.
It is also important to verify dates on materials in which traceability was maintained and documents and
certificates were provided from the foundry or original manufacturers through distributors. Date
inconsistencies are a red flag of potential fraud.
Figure 39: Dates and Numeration Example
10.7 Signatures
Validating signatures is not always possible without complex instruments, but there are still methods that
can be employed when visually examining a document or Portable Document Format (PDF) file:
Potential red flags are:
1) Signatures are missing.
2) Digital signatures do not employ a secure signature to verify authenticity or singular use by
individuals (indicates the document may have non-secure signatures that could be used by
anyone).
3) Digital signatures were removed (indicates the document may have been edited); and
4) Document properties suggest it was edited after it was signed.
DOE-HDBK-1221-2024
72
CREATED FOR TRAINING PURPOSES ONLY
Figure 40: Signature Example
DOE-HDBK-1221-2024
Section 47
73
11 References
Current and draft directives and accompanying guidance relevant to S/CI can be found here26.
• Aguirre, J. (2021). NPM Hijackers at It Again: Popular ‘coa’ and ‘rc’ Open Source Libraries
Taken Over to Spread Malware. Retrieved from https://blog.sonatype.com/npm-hijackers-at-it-
again-popular-coa-and-rc-open-source-libraries-taken-over-to-spread-malware.
• ANSI/ASQC Z1.4-2008 (2008), Sampling Procedures and Tables for Inspection by Attributes.
• ASME NQA-1 (2022), Quality Assurance Requirements for Nuclear Facility Applications.
• American Society of Testing Materials, ASTM A193/A193M (2023), Standard Specification for
Alloy- Steel and Stainless-Steel Bolting for High Temperature or High-Pressure Service and
Other Special Purpose Applications.
• AS5553D (2022), Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts,
Avoidance, Detection, Mitigation, and Disposition.
• AS6171A (2018), Test Methods Standard; General Requirements, Suspect/Counterfeit, Electrical,
Electronic, and Electromechanical Parts.
• Berger, A. (2021, 12 17). What is Log4Shell? The Log4j vulnerability explained (and what to do
about it). DynaTrace. Retrieved from https://www.dynatrace.com/news/blog/what-is-log4shell/
• Cimpanu, C. (2020). Mozilla has banned nearly 200 malicious Firefox add-ons over the last two
weeks. ZDNet. Retrieved from https://www.zdnet.com/article/mozilla-has-banned-nearly-200-
malicious-firefox-add-ons-over-the-last-two-weeks/.
• Code of Federal Regulations, 10 CFR 830 (2020), Nuclear Safety Management, Definitions.
• Code of Federal Regulations, 29 CFR 1910.7 (1974), Occupational Safety and Health, Definition
and Requirements for a Nationally Recognized Testing Laboratory.
• DOE Acquisition Regulation Acquisition Letter 95-08 (1995).
• DOE-STD-1090-2020, Hoisting and Rigging.
• DOE Guide 414.1-2B (2013), Quality Assurance Guide.
• DOE Order 232.2A (2019), Occurrence Reporting and Processing of Operations Information.
• DOE Order 252.1A (2011), DOE Technical Standards Program.
• DOE Order 414.1D, chg. 2 (2020), Quality Assurance.
• Electric Power Research Institute (EPRI)/NP-5638 (1988) Guidelines for Preparing
Specifications for Nuclear Power Plants.
• Federal Acquisition Streamlining Act of 1994.
• EPRI NP- 5652 (2014), Guideline for the Acceptance of Commercial-Grade Items in Nuclear
Safety-Related Applications.
• EPRI NP-6406 (2006), Guidelines for the Technical Evaluation of Replacement Items in Nuclear
Power Plant.
26 DOE Directives website: http://www.directives.doe.gov
http://www.directives.doe.gov/
https://blog.sonatype.com/npm-hijackers-at-it-again-popular-coa-and-rc-open-source-libraries-taken-over-to-spread-malware
https://blog.sonatype.com/npm-hijackers-at-it-again-popular-coa-and-rc-open-source-libraries-taken-over-to-spread-malware
https://www.dynatrace.com/news/blog/what-is-log4shell/
https://www.zdnet.com/article/mozilla-has-banned-nearly-200-malicious-firefox-add-ons-over-the-last-two-weeks/
https://www.zdnet.com/article/mozilla-has-banned-nearly-200-malicious-firefox-add-ons-over-the-last-two-weeks/
http://www.directives.doe.gov/
DOE-HDBK-1221-2024
74
• Harold “Woody” Hewett, Electro-Comp Services, Inc. (2010). Methods Used in the Detection of
counterfeit Electronic Components. Clearwater, FL, USA: SMTA Int’l. Retrieved from
https://www.circuitinsight.com/pdf/methods_detection_counterfeit_components_smta.pdf.
Section 48
• Krill, P. (2023). Attackers could easily spoof popular Visual Studio Code extensions and trick
developers into downloading them, Aqua Nautilus researchers report. InfoWorld. Retrieved from
https://www.infoworld.com/article/3685542/researchers-warn-of-malicious-visual-studio-code-
extensions.html.
• International Atomic Energy Agency, IAEA-TECDOC-1169 (2000), Managing Suspect and
Counterfeit Items in the Nuclear Industry.
International Business Machines Corporation, Petitioner v. Lufkin Industries, LLC (2018),
Respondent, 17-0666 (Supreme Court of Texas). Retrieved from
https://www.txcourts.gov/media/1443741/170666.pdf.
• Independent Distributors of Electronics Association (IDEA) Standard 1010-B (2011),
Acceptability of Electronic Components Distributed in the Open Market.
• International Data Corporation (IDC). (2013). The Dangerous World of Counterfeit and Pirated
Software. Framingham: Microsoft Corporation. Retrieved from
https://news.microsoft.com/download/presskits/antipiracy/docs/IDC030513.pdf.
Newman, L. H. (2020). The Anatomy of a Cisco Counterfeit Shows Its Dangerous Potential. Wired,
1-2. Retrieved from https://www.wired.com/story/counterfeit-cisco-switch-teardown/.
• https://www.nist.gov/standardsgov/compliance-faqs-fastener-quality-act-fqa
• OECD and European Union Intellectual Property Office. (2022). Dangerous Fakes: Trade in
Counterfeit Goods that Pose Health, Safety and Environmental Risks. Illicit Trade. Paris,
France. Doi: HTTPs://doi.org/10.1787/117e352b-en.
• Office of Management and Budget (OMB) Policy Letter 91-3 (1991), Reporting Nonconforming
Products.
• OMB Memo M-22-18 (2022), Enhancing the Security of the Software Supply Chain through
Secure Software Development Practices.
• Saheed Oladimeji, S. M. (2022). SolarWinds hack explained: Everything you need to know.
Retrieved from WhatIs.com TechTarget: https://www.techtarget.com/whatis/feature/SolarWinds-
hack-explained-Everything-you-need-to-know.
• Sharma, A. (2021). Popular 'coa' NPM library hijacked to steal user passwords. Retrieved from
https://www.bleepingcomputer.com/news/security/popular-coa-npm-library-hijacked-to-steal-
user-passwords/.
• Society of Automotive Engineers, SAE AS9120B (2016), Quality Management Systems-
Requirements for Aviation, Space, and Defense Distributors.
• The Software Alliance (BSA). (2018). Software Management: Security Imperative, Business
Opportunity. DC: The Software Alliance/ BSA. Retrieved from https://gss.bsa.org/wp-
content/uploads/2018/05/2018_BSA_GSS_Report_en.pdf#page=4.
• Sokoloff, L (2006). Thread Repair in the Aluminum Head of Mercedes-Benz Ponton Engines.
Retrieved from http://www.mbzponton.org/valueadded/maintenance/thread/repair.htm.
• TIC Council Anti-Counterfeiting Committee (2020) Falsified: Test Reports & Certificates:
Identification and Impact of Counterfeit Test Reports and Certificates in the Global Marketplace.
Section 49
https://www.circuitinsight.com/pdf/methods_detection_counterfeit_components_smta.pdf
https://www.infoworld.com/article/3685542/researchers-warn-of-malicious-visual-studio-code-extensions.html
https://www.infoworld.com/article/3685542/researchers-warn-of-malicious-visual-studio-code-extensions.html
https://www.txcourts.gov/media/1443741/170666.pdf
https://news.microsoft.com/download/presskits/antipiracy/docs/IDC030513.pdf
https://www.wired.com/story/counterfeit-cisco-switch-teardown/h
https://www.nist.gov/standardsgov/compliance-faqs-fastener-quality-act-fq
https://www.nist.gov/standardsgov/compliance-faqs-fastener-quality-act-fq
https://doi.org/10.1787/117e352b-en
https://www.techtarget.com/whatis/feature/SolarWinds-hack-explained-Everything-you-need-to-know
https://www.techtarget.com/whatis/feature/SolarWinds-hack-explained-Everything-you-need-to-know
https://www.bleepingcomputer.com/news/security/popular-coa-npm-library-hijacked-to-steal-user-passwords/
https://www.bleepingcomputer.com/news/security/popular-coa-npm-library-hijacked-to-steal-user-passwords/
https://gss.bsa.org/wp-content/uploads/2018/05/2018_BSA_GSS_Report_en.pdf#page=4
https://gss.bsa.org/wp-content/uploads/2018/05/2018_BSA_GSS_Report_en.pdf#page=4
http://www.mbzponton.org/valueadded/maintenance/thread/repair.htm
DOE-HDBK-1221-2024
A-1
Appendix A – Suspect/Counterfeit and Defective Fastener Inspection
The DOE Suspect/Counterfeit and Defective Fastener Inspection document is available here27.
Legacy Fastener Headmark List: Manufactured Prior to 1999
All fasteners listed below that are identified as having been manufactured prior to 1999 and as a best
practice should be considered suspect/counterfeit or defective and replaced without any further testing.
Additional verification may be needed or conducted on fasteners prior to use. This may be especially true
if a site is unsure if a fastener is considered a “legacy fastener” produced prior to 1999. Some of these
listed fasteners may still be found in distributors’ stock, inventories, or other points of sale and therefore
may be provided in more recent procurements. It may be necessary to determine the date of manufacture,
obtain CMTRs, C of Cs, or other documentation of some of these fasteners to confirm they are not
defective, suspect, counterfeit, or fraudulent. Additionally, if the fastener is determined to be one of these
legacy fasteners and will be used, all of the following should be completed:
1) Validation or testing to ensure the fasteners meet requirements.
2) Marking or tagging of the fasteners.
3) Documentation to demonstrate that testing/validation has occurred; and
4) Documentation maintained until the fasteners are removed from service.
Figure 41: Legacy Fastener List
27 https://www.energy.gov/ehss/articles/suspect-counterfeit-defective-fastener-inspection
Grade A 325 Grade 5 Grade 8.2
Grade 8
https://www.energy.gov/ehss/articles/suspect-counterfeit-defective-fastener-inspection
https://www.energy.gov/ehss/articles/suspect-counterfeit-defective-fastener-inspection
DOE-HDBK-1221-2024
A-2
Marking Manufacturer Country
A Asahi Mfg. Japan
E Daiei Japan
FM Fastener Co Japan
H Hinomoto Metal Japan
J Jinn Her Taiwan
KS Kosaka Kogyo Japan
KY Kyoei Mfg Japan
M Minamida Sieybo Japan
MS Minato Kogyo Japan
NF Nippon Fasteners Japan
RT Takai Ltd. Japan
UNY Unytite Japan
Hollow Triangle Infasco Canada, Taiwan, Japan
Table 5: Legacy Fastener List Codes that correspond to Figure 41
Section 50
Appendix A-1 Current Suspect Fastener Headmark List: All Fasteners 1999 to Current
High strength fasteners (e.g., tensile strength of SAE grade 5 or around 120,000 psi or greater) that are
missing manufacturer markings, such as the examples shown below, should be considered “suspect.”
Further evaluation should be conducted to conclude if they are substandard, defective, or counterfeit.
NOTE: this is not a comprehensive list of “suspect” high-strength fasteners.
Grade 5 Grade 8
Metric 8.8 Metric 10.9
Table 6: High Strength Fastener Examples
Fasteners that are marked with dual non-compatible standards or conflicting information should be treated
as defective. Note there may be instances where dual markings are acceptable and are a part of normal
manufacturer processes. See below for dual non-compatible marking examples.
18-8 Stainless steel dual marked as “B8” F593 marked as “B8”- there is no “B8”
material type in this standard
Table 7: Non-Compatible Standard Example
DOE-HDBK-1221-2024
A-3
Appendix A-2 Badge Reminders: Suspect/Counterfeit and Defective Item Fastener
Inspection
C
ut
C
ut
Fold in Middle
Figure 42: Badge Reminder
DOE-HDBK-1221-2024
B-1
Appendix B – Other Information Related to S/CI
Resource information on NRC’s initiative to prevent the intrusion of counterfeit, fraudulent, and suspect
items (CFSI) into NRC regulated facilities can be found at the following websites:
• Actions to Improve the Detection of Counterfeit and Fraudulently Marked Products (Generic
Letter 89-02) GL89002, https://www.nrc.gov/reading-rm/doc-collections/gen-comm/gen-
letters/1989/gl89002.html.
• Counterfeit, Fraudulent, Suspect Items (CFSI) Project Update,
https://www.nrc.gov/docs/ML1222/ML12227A917.pdf
• 2012 Vendor Oversight Workshop, https://www.nrc.gov/reactors/new-reactors/how-we-
regulate/oversight/quality-assurance/vendor-oversight/past/2012/index.html
• Counterfeit Parts Supplied to Nuclear Power Plants (Information Notice 2008-04) IN2008-04,
https://www.nrc.gov/docs/ML0807/ML080790266.pdf
• Licensee Commercial-Grade Procurement and Dedication Programs (Generic Letter 91-05),
GL91005g, https://www.nrc.gov/docs/ML0311/ML031140508.pdf
• SECY-11-0154, An Agency wide Approach to Counterfeit, Fraudulent, and Suspect Items,
https://www.nrc.gov/docs/ML0311/ML031140508.pdf
• Staff Review of Counterfeit, Fraudulent, and Suspect Items (CFSI), ML112130293,
https://www.nrc.gov/docs/ML1204/ML120440268.pdf
• U.S. Patent and Trademark Office Fastener Insignia Register Active Insignias,
https://www.uspto.gov/trademarks/laws/fastener-quality-act-fqa/fastener-quality-act-fqa
http://www.nrc.gov/reading-rm/doc-collections/gen-comm/gen-letters/1989/gl89002.html
https://www.nrc.gov/reactors/new-reactors/how-we-regulate/oversight/quality-assurance/vendor-oversight/past/2012/index.html
https://www.nrc.gov/reactors/new-reactors/how-we-regulate/oversight/quality-assurance/vendor-oversight/past/2012/index.html
https://www.nrc.gov/docs/ML0807/ML080790266.pdf
https://www.nrc.gov/docs/ML0311/ML031140508.pdf
https://www.nrc.gov/docs/ML0311/ML031140508.pdf
https://www.nrc.gov/docs/ML1204/ML120440268.pdf
https://www.uspto.gov/trademarks/laws/fastener-quality-act-fqa/fastener-quality-act-fqa
DOE-HDBK-1221-2024
C-1
Appendix C – Resources
C-1 Internal DOE Resources
Below is a list of internal to DOE resources for S/CI:
• Department of Energy
Office of Environment, Health, Safety and Security Office of Corporate Safety Analysis, EHSS-
23, Email: counterfeit@hq.doe.gov. DOE Germantown 19901 Germantown Road Germantown,
Maryland 20874.
Section 51
• DOE OPEXShare
DOE builds a resilient safety and quality program through the use and sharing of operating
experience in accordance with DOE O 210.2A, DOE Corporate Operating Experience Program.
Sites should participate and add information as much as reasonably possible to share lessons
learned, best practices, and other valuable operating experience information that may relate to
suspect/counterfeit items prevention, detection, program practices into DOE OPEXShare at
https://doeopexshare.doe.gov/. Online registration is required.
• DOE Organizational Excellence (OrgEx)
The DOE OrgEx website is a collaborative platform used for transferring relevant knowledge
throughout the DOE. OrgEx enables DOE to become agile and effective in order to advance the
national, economic, and energy security of the United States and to promote scientific and
technological innovation in support of our mission. https://orgex.energy.gov/.
• DOE Occurrence Reporting and Processing System (ORPS)
The Department of Energy’s Occurrence Reporting Program provides timely notification to the
DOE complex of events that could adversely affect public or DOE worker health and safety, the
environment, national security, DOE’s safeguards, and security interests, functioning of DOE
facilities, or the Department’s reputation. This includes certain suspect/counterfeit items that
meet the criteria stated in DOE O 232.2A, Occurrence Reporting and Processing of Operations
Information. https://www.energy.gov/ehss/occurrence-reporting-and-processing-system.
• Suspect/Counterfeit and Defective Items (S/CI-DI) websites:
o S/CI-DI Webpage (S/CI Coordinator Access Only): To request access, go to
https://reportspw1.doe.gov/sci/register.
o The DOE Office of ES&H Reporting and Analysis (EHSS-23) maintains a website for
relevant S/CI information and related reference documents at:
https://energy.gov/ehss/policy-guidance-reports/databases/suspectcounterfeit-and-
defective-items.
o S/CI Webpage on Powerpedia (available to DOE Federal and Contractors) to access go to
https://powerpedia.energy.gov/wiki/Suspect_or_Counterfeit_Items_and_Defective_Items.
mailto:counterfeit@hq.doe.gov
https://doeopexshare.doe.gov/
https://orgex.energy.gov/
https://www.energy.gov/ehss/occurrence-reporting-and-processing-system
https://reportspw1.doe.gov/sci/register
https://energy.gov/ehss/policy-guidance-reports/databases/suspectcounterfeit-and-defective-items
https://energy.gov/ehss/policy-guidance-reports/databases/suspectcounterfeit-and-defective-items
https://powerpedia.energy.gov/wiki/Suspect_or_Counterfeit_Items_and_Defective_Items
DOE-HDBK-1221-2024
C-2
C-2 External to DOE Resources
Below is a list of some key industry resources for S/CI information or to aid in prevention:
• Automotive Electronics Council (AEC) (http://www.aecouncil.com)
AEC-Q101, Failure Mechanism Based Stress Test Qualification For Discrete Semiconductors.
• American National Standards Institute (ANSI) reference https://ansi.org/
ANSI works in close collaboration with stakeholders from industry and government to identify
and develop standards- and conformance-based solutions to national and global priorities.
• American Society for Testing and Materials (ASTM) reference https://www.astm.org/
ASTM is committed to serving global societal needs, by positively impacting public health and
safety, consumer confidence and overall quality of life.
Section 52
• American Society of Mechanical Engineers (ASME) reference https://www.asme.org/
ASME is a not-for-profit professional organization that enables collaboration, knowledge sharing
and skill development across all engineering disciplines, while promoting the vital role of the
engineer in society.
• Department of Commerce National Institute of Standards and Technology reference
https://www.commerce.gov/bureaus-and-offices/nist
The National Institute of Standards and Technology (NIST) was founded in 1901 and is part of
the U.S. Department of Commerce. NIST is one of the nation's oldest physical science
laboratories. NIST measurements support the smallest of technologies to the largest and most
complex of human-made creations—from nanoscale devices so tiny that tens of thousands can fit
on the end of a single human hair up to earthquake-resistant skyscrapers and global
communication networks.
• Destructive Physical Analysis Resource
o SSQ-25000, Destructive Physical Analysis Testing Specification for the Space
Station Program
• Government-Industry Data Exchange Program (GIDEP) reference https://www.gidep.org/
GIDEP is a cooperative activity between government and industry participants seeking to reduce
or eliminate expenditures of resources by sharing technical information essential during research,
design, development, production, and operational phases of the life cycle of systems, facilities,
and equipment.
• Industrial Fasteners Institute (IFI) reference https://www.indfast.org/
IFI is committed to being the leader in providing fastener technology leadership. IFI members
receive technical support in product design, manufacturing practices, quality assurance, and
standards development and interpretation.
• Joint Electron Device Engineering Council (JEDEC) reference https://www.jedec.org/
JEDEC is the global leader in developing open standards for the microelectronics industry, with
more than 3,000 volunteers representing over 350 member companies.
o JESD22-B101, External Visual
http://www.aecouncil.com/
https://ansi.org/
https://www.astm.org/
https://www.asme.org/
https://www.commerce.gov/bureaus-and-offices/nist
https://www.gidep.org/
https://www.indfast.org/
https://www.jedec.org/
DOE-HDBK-1221-2024
C-3
o JESD22-B107, Marking Permanency
o JESD22-A104, Temperature Cycling
o JESD22-A113, Preconditioning of Non-hermetic Surface Mount Devices Prior to
Reliability Testing
o J-STD-020, Joint IPC/JEDEC Standard Moisture/Reflow Sensitivity Classification for
Non-hermetic Surface Mount Devices (SMDs)
o J-STD-035, Joint IPC/JEDEC Standard for Acoustic Microscopy for Non-Hermetic
Encapsulated Electronic Devices
• The Electronic Resellers Association International (www.erai.com)
The ERAI provides its global members with supply chain risk mitigation solutions, including the
world's largest searchable database of counterfeit components and high-risk suppliers.
• The Independent Distributors of Electronics Association (IDEA) reference
https://idofea.org/
IDEA employs a comprehensive approach that focuses on programs and best practices that
establish and increase quality standards, provide industry with a conduit to improve the access to
and sharing of relevant knowledge, and advance industry ethics and integrity.
• The International Anti-Counterfeiting Coalition (IACC) (www.iacc.org.)
The IACC brings together thousands of people from various industries, educational institutions,
and government at all levels to share with and learn from each other on key strategies and
practical solutions to addressing counterfeiting and piracy. IACC members benefit from a global
community.
Section 53
• The U.S. Patent and Trademark Office (USPTO) reference https://www.uspto.gov/
The USTPO provides numerous resources that may aid those performing inspections on products
including resources on the Fastener Quality Act and current insignia registry and a Trademark
Electronic Search System (TESS) which can be used to validate registered manufacturer
markings, location of manufacturers, manufacturer contacts, and other vital information that may
not be easily discoverable. https://tmsearch.uspto.gov/.
• TrustedParts.com (https://www.trustedparts.com)
TrustedParts.com was created by the Electronic Components Industry Association (ECIA) in
collaboration with participating distributors as a free service to support the authorized electronic
components industry by giving users access to aggregated price and availability data for genuine
parts from only authorized sources. It is still recommended that DOE sites review, assess, and
determine if sources meet their specific project needs and criteria using a graded approach.
• IDEA-STD-1010, Acceptability of Electronic Components Distributed in the Open Market
• Society Automotive Engineers (SAE) reference https://www.sae.org/
SAE International is a global association of more than 128,000 engineers and related technical
experts in the aerospace, automotive and commercial-vehicle industries. Our core competencies
are life-long learning and voluntary consensus standards development. SAE has numerous
counterfeit prevention and detection standards which include:
http://www.erai.com/
https://idofea.org/
https://www.uspto.gov/
https://tmsearch.uspto.gov/
https://www.trustedparts.com/
https://www.sae.org/
DOE-HDBK-1221-2024
C-4
o AIR6273, Terms, Definitions, and Acronyms Counterfeit Materiel or Electrical,
Electronic, and Electromechanical Parts.
o ARP6178, Fraudulent/Counterfeit Electronic Parts, Toll for Risk Assessment of
Distributors.
o ARP6328, Guideline for Development of Counterfeit Electronic Parts; Avoidance,
Detection, Mitigation, and Disposition Systems.
o AS5553D, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts,
Avoidance, Detection, Mitigation, and Disposition.
o AS6081A, Fraudulent/Counterfeit Electronic Parts: Avoidance, Detection, Mitigation,
and Disposition-Independent Distribution.
o AS6171A, Test Methods Standard; General Requirements, Suspect/Counterfeit,
Electrical, Electronic, and Electromechanical Parts which can also be broken down into
the following test method processes and procedures:
AS6171/1, Suspect/Counterfeit Test Evaluation Method.
AS6171/2A Techniques for Suspect/Counterfeit EEE Parts Detection by External
Visual Inspection, Remarking and Resurfacing, and Surface Texture Analysis
Using SEM Test Methods.
AS6171/3, Techniques for Suspect/Counterfeit EEE Parts Detection by X-Ray
Fluorescence Test Methods.
AS6171/4, Techniques for Suspect/Counterfeit EEE Parts Detection by
Delid/Decapsulation Physical Analysis Test Methods.
AS6171/5, Techniques for Suspect/Counterfeit EEE Parts Detection by
Radiological Test Methods.
AS6171/6, Techniques for Suspect/Counterfeit EEE Parts Detection by Acoustic
Microscopy (AM) Test Methods.
AS6171/7, Techniques for Suspect/Counterfeit EEE Parts Detection by Electrical
Test Methods.
AS6171/8, Techniques for Suspect/Counterfeit EEE Parts Detection by Raman
Spectroscopy Test Methods.
AS6171/9, Techniques for Suspect/Counterfeit EEE Parts Detection by Fourier
Transform Infrared Spectroscopy (FTIR) Test Methods.
Section 54
AS6171/10, Techniques for Suspect/Counterfeit EEE Parts Detection by
Thermogravimetric Analysis (TGA) Test Methods.
AS6171/11, Techniques for Suspect/Counterfeit EEE Parts Detection by Design
Recovery Test Methods.
o AS6174A, Counterfeit Materiel; Assuring Acquisition of Authentic and Conforming
Materiel.
o AS6462C, AS5553C, Counterfeit Electrical, Electronic, and Electromechanical (EEE)
Parts, Avoidance, Detection, Mitigation, and Disposition Verification Criteria.
DOE-HDBK-1221-2024
C-5
o AS6810 Requirements for Accreditation Bodies when Accrediting Test Laboratories
Performing Detection of Suspect/Counterfeit in Accordance with AS6171 General
Requirements and the Associated Test Methods.
o AS6832, Counterfeit Materiel; Assuring Acquisition of Authentic and Conforming
Fasteners.
o AS6886, Counterfeit Materiel; Assuring Acquisition of Authentic and Conforming
Refrigerant.
o AS6496, Fraudulent/Counterfeit Electronic Parts: Avoidance, Detection, Mitigation, and
Disposition- Authorized/Franchised Distribution.
• Software Resources:
o NIST Secure Software Development Framework: https://csrc.nist.gov/Projects/ssdf.
o OMB Memo M-22-18, Enhancing the Security of the Software Supply Chain through
Secure Software Development Practices: https://www.whitehouse.gov/wp-
content/uploads/2022/09/M-22-18.pdf.
o Software Composition Analysis: https://owasp.org/www-
community/Component_Analysis.
o Sonatype Nexus Repository: https://www.sonatype.com/products/nexus-repository.
• Underwriters Laboratory reference https://www.ul.com/
UL Solutions helps companies to demonstrate safety, enhance sustainability, strengthen security,
deliver quality, manage risk, and achieve regulatory compliance.
• United States Nuclear Regulatory Commission reference https://www.nrc.gov/
The U.S. Nuclear Regulatory Commission (NRC) was created as an independent agency by
Congress in 1974 to ensure the safe use of radioactive materials for beneficial civilian purposes
while protecting people and the environment. The NRC regulates commercial nuclear power
plants and other uses of nuclear materials, such as in nuclear medicine, through licensing,
inspection, and enforcement of its requirements.
https://csrc.nist.gov/Projects/ssdf
https://www.whitehouse.gov/wp-content/uploads/2022/09/M-22-18.pdf
https://www.whitehouse.gov/wp-content/uploads/2022/09/M-22-18.pdf
https://owasp.org/www-community/Component_Analysis
https://owasp.org/www-community/Component_Analysis
https://www.sonatype.com/products/nexus-repository
https://www.ul.com/
https://www.nrc.gov/
1 Introduction
1.1 Purpose
1.2 Applicability
1.3 Scope
2 Terminology
2.1 Acronyms
2.2 Definitions
3 Suspect/Counterfeit Item (S/CI) Risks
4 S/CI General Process
4.1 Train Personnel on S/CI
4.2 Planning
4.3 Prevention
4.3.1 Prevention and Procurement
4.3.2 Prevention and Supplier Quality Assurance
4.3.3 Prevention and Suppliers
4.3.4 Prevention and use of Contract Clauses
4.3.5 Resolution on Disputes
4.4 Detection
4.4.1 Detection and Inspections
4.4.2 Detection and Engineering Involvement
4.4.3 Detection and Evaluations
4.4.3.1 Evaluation: Installed Items Determined to be S/CI
4.4.3.2 Evaluation: Safety Systems
4.4.3.3 Evaluation: Non-Safety Systems
4.5 Action: Notification and Reporting of S/CI
4.6 Disposition of S/CI
5 Indicators for S/CI Hardware Items (Fasteners)
5.1 FQA Clarifications
5.2 Suspect/Counterfeit Fastener Indicators
5.3 Identification Examples
5.3.1 Case Study #1
5.3.1.1 Case Study #1 Disposition & Reporting Example:
Section 55
5.3.2 Case Study #2
5.3.2.1 Case Study #2 Reporting:
5.3.3 Case Study #3
5.3.3.1 Case Study #3 Reporting:
6 Electronics
6.1 Recovered
6.2 Refurbished
6.2.1 Refurbished Electronics Examples:
6.3 Repackaged
6.3.1 Repackaged Example
6.4 Rejected
6.5 Clones
6.6 General Test Methods for Electronics
6.6.1 Visual Inspection
6.6.1.1 General Packaging Indicators
6.6.1.2 Indents
6.6.1.3 Markings
6.6.1.4 Surface and Texture Appearance
6.6.1.5 Contact Surfaces
6.6.2 Dimensional Inspection
6.6.3 Resistance to Solvents and Scrape Testing
6.6.4 X-Ray Fluorescence Testing (XRF) Analysis
6.6.5 X-Ray Inspection
6.6.6 SAM and C-SAM Inspection
6.6.7 Destructive Physical Analysis (DPA)
6.6.8 Electrical Test Methods and Inspection
6.6.9 Environmental Test Methods and Inspection
7 Suspect/Counterfeit Software
7.1 CASE STUDY: Lufkin VS IBM
7.2 CASE STUDY: Cisco Networking Devices
7.3 CASE STUDY: Solar Winds
7.4 Software Maintenance and Reuse
7.5 Avoiding Counterfeit Downloads
7.6 Avoiding Download Interception & Subversion
7.7 S/CI Prevention Strategy for Software
8 Indicators of Suspect Components
8.1 General Suspect/Counterfeit Indicators
8.2 Indications Hoist, Lifting, and Rigging Equipment
8.3 Indications specific to Suspect Piping and Piping Components including mechanical and metal products
8.4 Indications of Suspect Valves
8.5 Valve Manufacturer Information
9 Counterfeiting of NRTL Certifications and Symbols
10 Suspect/Counterfeit & Fraudulent Documentation and Certification
10.1 Information
10.2 Font
10.3 Reproduction
10.4 Alteration
10.5 Used
10.6 Dates & Numerations
10.7 Signatures
11 References
Appendix A – Suspect/Counterfeit and Defective Fastener Inspection
Appendix B – Other Information Related to S/CI
Appendix C – Resources
C-1 Internal DOE Resources
C-2 External to DOE Resources
Accessibility Report
Filename:
DOE-HDBK-1221-2024-CLEAN.pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found no problems in this document.
Needs manual check: 0
Passed manually: 2
Failed manually: 0
Skipped: 0
Passed: 30
Failed: 0
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Passed manually Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Passed Bookmarks are present in large documents
Color contrast Passed manually Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Passed All page content is tagged
Tagged annotations Passed All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Section 56
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Passed Tables must contain the same number of columns in each row and rows in each column
Summary Passed Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Passed Appropriate nesting
Back to Top